INTRODUCTION.
The annual Workplace Safety and Health (WSH) Awards
recognise companies and individuals for achieving excellence
in workplace safety and health.

It starts from the mindset that all injuries are preventable
and everyone can go home safe and healthy. This requires
the commitment of all employees; from top management
to the last worker.

The WSH Awards Commemorative Book features some of
the best WSH practices and innovations by the WSH Awards
recipients. The WSH Council hopes that, through their efforts,
companies and individuals will pick up useful tips to prevent
accidents at work.

This year, 158 award recipients will be recognised for their
WSH efforts in 2017. The WSH Council congratulates all award
recipients for their achievements and commitment to WSH!
AWARDS 2018 Recipients of Workplace Safety and Health Awards - Workplace Safety and Health Council
WSH
PERFORMANCE
awards 2018
Recognising companies for exceptional
safety and health standards, and systems.
AWARDS 2018 Recipients of Workplace Safety and Health Awards - Workplace Safety and Health Council
WSH Performance (EXCELLENCE) AWARDS

                                                             Infineum Singapore Pte Ltd

                                                             To Infineum Singapore Pte Ltd, winning the
                                                             WSH Performance (Excellence) Award is
                                                             a testament to the excellent work and
                                                             commitment of the company to continuously
                                                             improve its safety performance and standards.

                                                             Infineum consistently keeps abreast with
                                                             technological advancements. Over the
                                                             years, Infineum has been implementing
                                                             automation in its plant operations. By
                                                             incorporating technology in its work
                      “We are proud of the Infineum          processes, it allows the company to conduct
                      Singapore plant in receiving the       early identification of hazards and mitigate
                                                             any risks to prevent accidents at the
                      WSH Performance (Excellence)
                                                             workplace. This also minimises human
                      Award for the 11th consecutive         intervention in work processes and
                      year. It is a great encouragement to   simultaneously upgrades its workforce
                      continue on our Nobody Gets Hurt       with new skills.
                      safety journey, here in Singapore
                      and elsewhere in the world.”           Infineum is also proud of its Behaviour
                                                             Based Safety Observation (BBSO)                 observations of other colleagues, and stop
                      Mr Frank Horneck                       programme, which has been contributing          any unsafe acts at work. Through the
                      Global Manufacturing Manager           to its outstanding safety performance.          programme, BBSO promotes a positive
                      Infineum Singapore Pte Ltd             The programme encourages all employees          behaviour towards WSH and reinforces its
                                                             to look out for, and document, safety           WSH goal of “Nobody Gets Hurt.”

      Represented by:
      Mdm Yap Seok Chen
      Plant Manager
AWARDS 2018 Recipients of Workplace Safety and Health Awards - Workplace Safety and Health Council
WSH Performance (EXCELLENCE) AWARDS

                            “We are honoured to be
                            recognised for our health
                            and safety performance,
                            but we did not do it for the
                            award. We did it because
                            our employees are our
                            most precious asset.
                            Workplace health and
                            safety is what they are
                            entitled to.”

                            Mr Co Gia Nguyen
                            Vice President
                            and General Manager            Rockwell Automation Asia Pacific
                            Rockwell Automation Asia       Business Center
                            Pacific Business Center

                                                           Rockwell Automation’s management takes          Rockwell Automation has also implemented
                                                           a strong lead in keeping its employees safe     the concept of “The Connected Safety”
                                                           and healthy. The management conducts            to align with the vision of Smart Manufacturing.
                                                           monthly Safety Observation Tours (SOT)          Traditionally, safety is a reactive process.
                                                           in all manufacturing areas, laboratories        When an accident or a near miss incident
                                                           and offices.                                    happens, companies will implement
                                                                                                           procedures and processes to prevent similar
       Represented by:                                     During the tours, the management focuses        incidents from happening again.
       Mr Wee Yee                                          on establishing communication and
       Production Manager                                  engagement with its employees by                However, with the implementation of
                                                           observing work behaviours and getting           “The Connected Safety”, smart sensors
                                                           feedback on areas that need improvement.        are installed in the company to monitor
                                                           SOT is a critical component in maintaining      end-user behaviour of employees operating
                                                           high WSH standards with zero loss time          the equipment. Through this, the company
                                                           injury for the last 11 years since it started   is able to intervene and rectify the wrong
                                                           operations in Singapore.                        behaviour before any incident or near miss
                                                                                                           can happen.
AWARDS 2018 Recipients of Workplace Safety and Health Awards - Workplace Safety and Health Council
WSH Performance (GOLD) AWARDS

                                                  Bintai Kindenko Pte Ltd

                                                  As a first-time WSH Performance (Gold)
                                                  Award recipient, Bintai Kindenko Pte Ltd
                                                  is proud to receive the award and gain
                                                  recognition for its WSH efforts and
                                                  commitment. With more than 40 years in
                     “Workplace safety and        the Mechanical and Electrical Engineering
                     health is important to us    industry, Bintai Kindenko is known for its
                     because everyone matters.    reliability and delivery of top-of-the-line
                     Our employees and            services to its clients.
                     subcontractors’ workers
                                                  At Bintai Kindenko, the management
                     are our greatest asset.
                                                  encourages open communication about
                     Only through them we can     WSH across all levels of employees and
                     achieve success with our     subcontractors. The company actively
                     customers. Therefore,        engages everyone through safety dialogue
                     we will do all that we can   sessions, project coordination meetings,
                     to protect them from         safety trainings, refresher courses and site
                                                  inspections. WSH information is also
                     injuries and illnesses.”
                                                  shared through print and digital platforms     In addition, supervisors will lead the workers
                                                  in the workplace.                              in doing morning exercises every day to
                      Mr Chua Swee Ann                                                           relieve fatigue.
                      Managing Director and       Workers are trained regularly on worksite
                      Chief Executive Officer     safety and emergency preparation; perform      Through its efforts, Bintai Kindenko
                      Bintai Kindenko Pte Ltd     periodic risk assessments, safety briefings    has achieved 25 million accident-free man
                                                  and mass tool box meetings every day;          hours since 2014, resulting in greater
                                                  and supervisors conduct regular safety         productivity and fewer man-hour loss due
                                                  checks before commencement of work.            to work accidents.

  Represented by:
  Mr Mohamed Barak
  Head of WSH Department
AWARDS 2018 Recipients of Workplace Safety and Health Awards - Workplace Safety and Health Council
WSH Performance (GOLD) AWARDS

                                            Keppel Singmarine Pte Ltd

                                            Keppel Singmarine Pte Ltd, the specialised          Keppel Singmarine ensures all employees
                                            shipbuilding arm of Keppel Offshore &               are trained and updated on safety measures
                                            Marine, is dedicated to keeping its employees       and best practices, so that employees are
                                            safe and healthy by shaping the right work          empowered to stop any unsafe work.
                                            behaviour and instilling a strong safety culture.   This, in turn, builds a stronger safety culture
                                                                                                as workers are able to adopt a more proactive
                                            Part of the Keppel Group, Keppel Singmarine         role in preventing incidents. Keppel Singmarine
                                            is guided by Keppel’s five Key Safety Principles.   achieved over 2.5 million man-hours worked
                                            One of the safety principles is that ‘Everyone      without any accidents in 2017.
              “Safety is a core value at    is empowered to stop any unsafe work’.
              Keppel and an integral part
              of our business. We are
              committed to provide a safe
              and healthy workplace for
              all our stakeholders.”

              Mr Abu Bakar Bin Mohd Nor
              Managing Director
              Keppel Singmarine Pte Ltd
AWARDS 2018 Recipients of Workplace Safety and Health Awards - Workplace Safety and Health Council
WSH Performance (GOLD) AWARDS

                     “Senior management should
                     take ownership of workplace
                     safety and health, and provide
                     a two-way communication in
                     facilitating feedback from the
                     workforce. Through this
                     approach, it will lead to
                     transformation of strategy in
                     mitigating vulnerable situations
                     for Total WSH excellence.”

                     Er. Lucas NG Hong Kiang
                     General Manager of Plant
                     Petrochemical Corporation of       Petrochemical Corporation of
                     Singapore (Private) Limited        Singapore (Private) Limited

                                                        For Petrochemical Corporation of Singapore       Various representatives from the
                                                        (PCS), winning the WSH Award means more          association are also assigned to sit in the
                                                        than just recognition for the company. It is a   Responsible Care Committee alongside its
                                                        testament to its high standards of WSH           CEO/Managing Director.
                                                        programmes and strong workplace culture,
 Represented by:
                                                        which is ingrained in its workforce.             Through the committee, the contractors will
 Mr Akira Yonemura
 Managing Director                                                                                       aid in setting the WSH direction and policy
                                                        PCS believes that it is important to treat its   of the company, and align its objectives and
                                                        employees and contractors with the same          goals with PCS. With close partnership
                                                        level of health and safety. Respecting the       and good camaraderie, important WSH
                                                        contractors as equal – “One PCS, One             information is disseminated more
                                                        Team”, PCS partnered with its contractors to     effectively and cooperatively to its
                                                        form a trade association.                        contractors and employees.
AWARDS 2018 Recipients of Workplace Safety and Health Awards - Workplace Safety and Health Council
WSH Performance (GOLD) AWARDS

                                           UG M&E Pte Ltd

                                           WSH is a top priority for UG M&E Pte Ltd.
                                           It believes that WSH has to be driven
                                           by the top management to the employees
                                           in order to achieve WSH excellence.

                                           Before the start of any work, the top
                                           management will conduct dialogue
                                           sessions with all stakeholders and get
                                           the stakeholders on board to pledge
                                           commitment to WSH. This strengthens the
                                           level of WSH commitment throughout the
                                           company and it is cascaded down to every
                                           individual with the top management taking
                                           the lead in safety and health at work.
         “We are honoured to be
         awarded the WSH Performance       UG M&E also makes sure all employees
         (Gold) Award. Our greatest        attend regular WSH training and courses
         asset is our staff, who has       to upgrade skills, especially when new
                                           technology and innovation are introduced
         made this prestigious
                                           in its work processes.
         recognition possible through
         their firm and steadfast belief
         – safety is our way of life.”

         Mr Tai Chee Yick,
         Executive Vice President
         UG M&E Pte Ltd
AWARDS 2018 Recipients of Workplace Safety and Health Awards - Workplace Safety and Health Council
WSH Performance (EXCELLENCE) AWARDS                             WSH Performance (SILVER) AWARDS

Infineum Singapore Pte Ltd       Rockwell Automation            Amec Foster Wheeler Asia Pacific Pte Ltd   Moderna Homes Pte Ltd
                                 Asia Pacific Business Center
                                                                Asiabuild Construction Pte Ltd             Mun Siong Engineering Limited

                                                                BBR GREENTECH PTE LTD                      Nishimatsu Construction Co., Ltd.

                                                                BOUSTEAD PROJECTS E&C PTE LTD              PEC LTD.

                                                                CARRIER TRANSICOLD PTE LTD                 Plant General Services Pte Ltd
WSH Performance (GOLD) AWARDS
                                                                GlaxoSmithKline (1 Pioneer Sector 1)       Raffles Quay Asset Management Pte Ltd

                                                                GlaxoSmithKline (38 Quality Road)          Rotary Electrical & Instrumentation Pte Ltd
Bintai Kindenko Pte Ltd          Keppel Singmarine Pte Ltd
                                                                Greatearth Corporation Pte Ltd             Rotary Engineering Pte. Ltd.
Petrochemical Corporation        UG M&E Pte Ltd
of Singapore (Private) Limited                                  Hai Leck Engineering Pte. Ltd.             ROTARY IMC PTE LTD

                                                                Keppel DHCS Pte Ltd                        ROTARY MECHANICAL AND CONSTRUCTION
                                                                                                           COMPANY (PRIVATE) LIMITED
                                                                Keppel FELS Limited
                                                                                                           Rotary-Thai Construction Pte Ltd
                                                                Kok Tong Construction Pte Ltd
                                                                                                           Sembcorp Marine Integrated Yard Pte. Ltd.
                                                                KTC Civil Engineering & Construction       (Pandan Yard)
                                                                Pte Ltd
                                                                                                           Sembcorp Marine Integrated Yard Pte. Ltd.
                                                                Kuan Aik Hong Construction Pte Ltd         (Tuas Boulevard Yard & Tanjong Kling Yard)

                                                                Kurihara Kogyo Co., Ltd                    Singapore Engineering & Construction Pte Ltd

                                                                Lendlease Retail Pte Ltd                   Teambuild Engineering & Construction Pte Ltd

                                                                Lucite International Singapore Pte Ltd     Testing Inspection & Solution Pte Ltd

                                                                Lum Chang Building Contractors Pte Ltd     Unison Construction Pte Ltd
WSH Performance AWARDS                                                                                               SAFETY AND HEALTH AWARD RECOGNITION FOR PROJECTS

Amec Foster Wheeler Asia Pacific Pte Ltd         Ed. Zublin AG Singapore Branch                       Keppel FELS Limited                           Keppel FELS Limited
Evonik Me6 Project                               Design and Construction of Underpass for             BORR SKALD Self-Elevating Drilling Unit       ENSCO DPS-1 Dynamic Positioning
                                                 Bukit Panjang Station - C9057 (LTA)                  (KFELS SUPER B Class)                         Semi-Submersible Drilling Unit
Asiabuild Construction Pte Ltd
Design & Build of Upgrading Projects for G20E    Ed. Zublin AG Singapore Branch                       Keppel FELS Limited                           Keppel Shipyard Limited
                                                 T3005 - Advance Sewer Diversion - NEWater Pipe       BORR TIVAR Self-Elevating Drilling Unit       BW Adolo
Asiabuild Construction Pte Ltd                   and Effluent Outfall pipe (Package 2 - LTA)          (KFELS SUPER B Class)
Integrated Construction and Prefabrication Hub                                                                                                      Keppel Shipyard Limited
(ICPH) 4                                         Greatearth Corporation Pte Ltd                       Keppel FELS Limited                           BW Catcher
                                                 GEM Residences                                       ENSCO 123 Self-Elevating Drilling Unit
BHCC Construction Pte. Ltd.                                                                           (KFELS SUPER A Class)                         Keppel Shipyard Limited
HDB Dawson Vista C6                              Greatearth Corporation Pte Ltd                                                                     Culzean FSO Turret
                                                 SENJA HEIGHTS (HDB BPN6C12)                          Keppel FELS Limited
BOUSTEAD PROJECTS E&C PTE LTD                                                                         TS JASPER Self-Elevating Drilling Unit        Keppel Shipyard Limited
ALICE @ MEDIAPOLIS                               Greatearth Corporation Pte Ltd                       (KFELS N Plus)                                Bokalift 1
                                                 Senja Ridges (HDB BPN6C15)
CES Engineering & Construction Pte Ltd                                                                Keppel FELS Limited                           Keppel Shipyard Limited
Alkaff Oasis at Bidadari C6                      Hai Leck Engineering Pte. Ltd.                       FECON 1 Self-Elevating Drilling Unit          FPSO MTC Ledang
                                                 Shell Bukom Maintenance Project                      (KFELS B Class)
CES Engineering & Construction Pte Ltd                                                                                                              Keppel Shipyard Limited
Alkaff Oasis at Bidadari C7                      Hock Lian Seng Infrastructure Pte Ltd -              Keppel FELS Limited                           Hilli Episeyo
                                                 Sembcorp Design & Construction Pte Ltd JV            FECON 2 Self-Elevating Drilling Unit
Chip Eng Seng Contractors (1988) Pte Ltd         Development of Changi East to Effect 3 Runway        (KFELS B Class)                               Keppel Shipyard Limited
Green Ridges at Tampines N6C1A&C1B               Operations at Singapore Changi Airport (Package 2)                                                 LNG Lerici
                                                                                                      Keppel FELS Limited
Chip Eng Seng Contractors (1988) Pte Ltd         Hwa Seng Builder Pte Ltd                             FECON 3 Self-Elevating Drilling Unit          Keppel Singmarine Pte Ltd
Marsiling Greenview at Woodlands                 Contract ER397A - Expansion of KPE/TPE               (KFELS B Class)                               H389 (MPV EVEREST)
N1C26&C27                                        Interchange Including Link Road to Punggol Central
                                                                                                      Keppel FELS Limited                           Keppel Singmarine Pte Ltd
DIAP-SHAP JOINT VENTURE PTE LTD                  Hwa Seng Builder Pte Ltd                             JDC HAKURYU-15 Self-Elevating Drilling Unit   H395 (KST LIBERTY)
Proposed Reclamation at Jurong Island            Contract ER478 - Widening of Woodlands Road,         (KFELS SUPER B Class)
Westward Extension                               Choa Chu Kang Link and Stagmont Ring                                                               Kim Seng Heng Engineering Construction
                                                                                                      Keppel FELS Limited                           (Pte) Ltd
Dragages Singapore Pte Ltd                       Kajima Overseas Asia (Singapore) Pte. Ltd.           FELS CAN-DO Ultra Deepwater Drillship         Paya Lebar Quarter - Plot C
Woodlands Care Home                              A & A works to OUE Downtown at 6 Shenton Way
                                                                                                      Keppel FELS Limited                           KTC Civil Engineering & Construction Pte Ltd
Dyna-Mac Engineering Services Pte Ltd            Kajima Overseas Asia (Singapore) Pte. Ltd.           BORR Self-Elevating Drilling Unit             Contract 9068 - Construction of Linkways to
Culzean Development FSO Topside Modules          Centre for Healthcare Innovation and National        (KFELS B Class)                               DTL2 Stations
Fabrication                                      Centre for Infectious Diseases Project
                                                                                                      Keppel FELS Limited                           KTC Civil Engineering & Construction Pte Ltd
Dyna-Mac Engineering Services Pte Ltd            Keppel FELS Limited                                  KFELS CAN-DO II Semi-Submersible              Contract T218 - Construction of Orchard
Upper Zakum, UZ750 Islands Surface Facilities    BORR SAGA Self-Elevating Drilling Unit               Cargo Barge                                   Boulevard Station for Thomson Line
                                                 (KFELS SUPER B Class)
WSH Performance AWARDS                                                                            SAFETY AND HEALTH AWARD RECOGNITION FOR PROJECTS

KTC Civil Engineering & Construction    Sembcorp Marine Integrated Yard Pte. Ltd.   Shanghai Tunnel Engineering Co. (S)         ST Engineering Electronics Ltd
Pte Ltd                                 (Admiralty Yard)                            Pte Ltd                                     Contract T260 - Thomson-East Coast Line
Contract T312 - Construction of         Gina Krog FSO Conversion                    LTA Contract T206 - Construction of         Communications System
Sungei Bedok Station and Tunnels for                                                Woodlands Bored Tunnels and CCT
Thomson East-Coast Line                 Sembcorp Marine Integrated Yard Pte. Ltd.                                               Sunhuan Construction Pte Ltd
                                        (Admiralty Yard)                            Shanghai Tunnel Engineering Co. (S)         West Jurong Island 400kV Substation
Lendlease Singapore Pte. Ltd            Kaombo (Block 32) Development Project -     Pte Ltd
Amgen HWFI Project                      Kaombo Norte FPSO Conversion                LTA Contract T225 - Construction of         Teambuild Engineering & Construction
                                                                                    Shenton Way Station and Tunnels for         Pte Ltd
Lendlease Singapore Pte. Ltd            Sembcorp Marine Integrated Yard Pte. Ltd.   Thomson-East Coast Line                     Building Works at Dawson Contract 3
Amgen MSB Project                       (Tuas Boulevard Yard)
                                        Floating Dry Dock                           Sim Lian Construction Co (Pte) Ltd          Teambuild Engineering & Construction
PEC LTD.                                                                            Bukit Panjang N6C13 & C14                   Pte Ltd
FAB Division - 19 Shipyard Rd           Sembcorp Marine Integrated Yard Pte. Ltd.                                               Design & Build of Upgrading Projects for G18D
                                        (Tuas Boulevard Yard)                       SINGAPORE ENGINEERING &
PEC LTD.                                FPSO EWT Libra                              CONSTRUCTION PTE LTD                        Teambuild Engineering & Construction
GSK Projects and Maintenance                                                        The Wisteria & Wisteria Mall                Pte Ltd
                                        Sembcorp Marine Integrated Yard Pte. Ltd.                                               Design & Build of Upgrading Projects for G22E
PEC LTD.                                (Tuas Boulevard Yard)                       SSANGYONG ENGINEERING &
MBM site                                FSO Ailsa                                   CONSTRUCTION CO LTD                         Teambuild Engineering & Construction
                                                                                    Forest Woods                                Pte Ltd
PEC LTD.                                Sembcorp Marine Integrated Yard Pte. Ltd.                                               Building Works at Bukit Batok Neighbourhood 4
MOGAS COGEN PROJECT (MCP)               (Tuas Boulevard Yard)                       ST Engineering Electronics Ltd              Contract 16
                                        JE3T                                        Contract 955 - Downtown Line Integrated
PEC LTD.                                                                            Supervisory Control System                  Teambuild Engineering & Construction
SCP site                                Sembcorp Marine Integrated Yard Pte. Ltd.                                               Pte Ltd
                                        (Tuas Boulevard Yard)                       ST Engineering Electronics Ltd              Building Works at Yishun Neighbourhood 4
PEC LTD.                                P-68                                        Contract 956 - Downtown Line Maintenance    Contract 22
SRC Maintenance Projects                                                            Management System
                                        Sembcorp Marine Integrated Yard Pte. Ltd.                                               Teambuild Engineering & Construction
PEC LTD.                                (Tuas Boulevard Yard)                       ST Engineering Electronics Ltd              Pte Ltd
SYM Site                                Q7000                                       Contract 960 - Downtown Line                The Brownstone
                                                                                    Communications System
Raffles Quay Asset Management Pte Ltd   Sembcorp Marine Integrated Yard Pte. Ltd.                                               Tiong Aik Construction Pte Ltd
Marina Bay Financial Centre Tower 3     (Tuas Boulevard Yard)                       ST Engineering Electronics Ltd              Highline Residences
                                        Sevilla Knutsen                             Contract 961 - Downtown Line Mobile Phone
Raffles Quay Asset Management Pte Ltd                                               Network Coverage                            Unison Construction Pte Ltd
One Raffles Quay                        Sembcorp Marine Integrated Yard Pte. Ltd.                                               2 Draycott Park
                                        (Tuas Boulevard Yard)                       ST Engineering Electronics Ltd
SCB Building Construction Pte. Ltd.     Sleipnir                                    Contract 972B - Downtown Line AFC           Unison Construction Pte Ltd
LTA C1685A - TWE Tuas Depot                                                         Network Infrastructure                      Principal Garden
                                        Sembcorp Marine Integrated Yard Pte. Ltd.
                                        (Tuas Boulevard Yard)
                                        Sleipnir Land Fabrication
WSH
DEVELOPER
awards 2018
Profiling leading developers dedicated
to safety and health excellence.
WSH Developer AWARDS

                                           City Developments Limited

                                           For over two decades, City Developments
                                           Limited (CDL) has engaged stakeholders to
                                           collectively build a strong Environmental,
    “Building a strong EHS culture is      Health and Safety (EHS) culture. CDL’s
    an ongoing journey. Over the           procurement process requires all builders
    years, through risk reviews and the    to have an accredited safety and health
    monitoring of EHS performances,        management system.
    CDL has proactively encouraged
                                           Since 2001, in addition to regulatory-mandated
    our stakeholders to always adopt
                                           audits, CDL monitors builders’ EHS
    an EHS-conscious mindset.              performances through its 5-Star EHS
    With their firm support, we have       Assessment System. CDL has also                   one of the first developers in Asia to apply
    collectively maintained a high level   voluntarily committed itself as a founding        the advanced Prefabricated Prefinished
    of EHS performance. CDL will           signatory to the WSH Council’s ‘Pledge for        Volumetric Construction (PPVC) method for
    continue to engage our                 Zero – A CEO Commitment Charter’.                 a residential development.
    stakeholders to ensure that
                                           To support the Construction Industry WSH          To enhance workers’ well-being holistically,
    good systems and practices are         Action Plans, CDL galvanised 24 of its key        CDL also introduced initiatives like distributing
    in place to create a safer and         builders and consultants to join the ‘Pledge      fortified rice to construction workers at its
    healthier workplace.”                  Towards Zero Vision through Safe Design –         2017 annual 5-Star EHS Awards. Established
                                           Safe Practices – Safe Culture’ in 2016, a first   in 2005, the Awards recognise exemplary
    Mr Chia Ngiang Hong                    for a developer. This followed two similar        builders and workers for EHS excellence at
    Group General Manager                  rounds of a CDL-initiated pledge signing in       CDL’s construction sites.
    City Developments Limited              2010 and 2014.
                                                                                             Through its various EHS efforts, CDL
                                           Further enhancing safety and productivity         maintained zero fatalities and occupational
                                           through technological innovations, CDL is         diseases at its construction sites in 2017.
WSH Developer AWARDS

City Developments Limited
WSH
Innovation
awards 2018
Showcasing the best of WSH
innovations across various industries.
WSH Innovation AWARDS

  “Safety is an enabler for
  productivity. There is
  absolutely no need to       CYC International Pte Ltd
  compromise one for the      Olivia Underwater Cleaning System
  other. The use of modern
  technology is one bridge
  that enables safety and     CYC International Pte Ltd conducts             remove waste sludge while the production
                              maintenance work on cooling tower basins       plants are still in operation. The robot is
  productivity.”
                              and other waste water containments for         compact and can manoeuvre easily in
                              petrochemical refineries and semi-conductor    confined spaces such as sump pits,
  Mr Danny Chua               plants. The basins and containments have to    interceptor pits and cooling tower basins.
  Managing Director           be cleaned and the waste sludge at the         The robot’s rotating brush will sweep
  CYC International Pte Ltd   bottom of the basin or containment has to      the sludge and a suction inlet will suction
                              be removed before any maintenance work.        the waste from the water. There is a
                                                                             360-degree waterproof camera that will
                              Cleaning the basins and containments           allow the robot to operate in the water with
                              requires a large amount of time and            low visibility.
                              manpower within a limited time period to
                              complete. The process also involves workers    With “Olivia”, workers do not have to work
                              working in confined spaces, which has a high   in confined spaces anymore and the number
                              risk of injuries and accidents.                of workers has been reduced from 20 to
                                                                             six workers. The time needed to complete
                              To eliminate the risks and improve its         the job has also been shortened from 168
                              productivity, CYC International created        hours to 112 hours. There is minimal water
                              “Olivia”. “Olivia” is a hydraulic-operated     wastage as water is being recycled for
                              robot that can submerge underwater and         discharging and refilling the containments.
WSH Innovation AWARDS

                                              GE Aviation Engine Services
                                              Singapore Pte Ltd
                                              Semi-auto Crimper Machine

                                              Operators at GE Aviation Engine Services       The team from GE Aviation Engine Services
                                              Singapore Pte Ltd are required to manually     analysed the manual process and created the
           “EHS Excellence is a part of       knock on metal strips using a manual           semi-auto crimper machine to eliminate the
           our DNA. It’s what we do           aluminium block and hammer to crimp the        risk factors. The machine uses pneumatic
           every day and it relates to        strips in order to assemble the strips on an   force to apply impact force on a metal strip.
                                              aircraft engine component.                     The metal strip is placed on a metal fixture
           everything we do. From
                                                                                             to hold it in place. The machine is equipped
           manufacturing and selling          The action of “crimping” is tedious and        with a two-hand operation for both hands
           products, selecting suppliers,     can pose significant ergonomic risks such      and a door interlock system to ensure the
           and servicing equipment at         as chronic strain injury due to the repeated   safety of the operators.
           our customer sites, to driving a   knocking motion of hammering. The
           car on company business.           operators are also prone to occupational       In addition to reducing risks, the machine
                                              injuries such as noise induced deafness from   reduces the processing time from 90 to 30
           EHS is all of our responsibility
                                              high-decibel excessive knocking and hands      minutes, and saves $48,000 of production
           and is embedding in our            and fingers getting struck by the hammer.      cost per year.
           culture. Your role is critical.”

           Ms Ann Klee
           EHS Vice President
           GE Aviation Engine Services
           Singapore Pte Ltd

Represented by:
Mr Thines Kumar
Manufacturing Engineer
WSH Innovation AWARDS

                                                Hai Leck Engineering Pte. Ltd.
                                                Safe Rolling Platform

                                                Storage tank construction, steel structure
                                                installation and plant maintenance work
                                                are carried out in Hai Leck Engineering
                                                Pte Ltd every day. To perform the work,
                                                tank bottom steel plates need to be placed
                                                inside the tank to be rehabilitated.

                                                Traditionally, the steel plates have to be
                                                lifted and placed down through the roof
                                                opening of the tank using a crane. Once the
           “Hai Leck nurtures people            plates are in the tank, the plates are moved
           with embedded safe attitudes,        manually using a trolley. The workers will
           competent for the job and admire     then arrange the bottom and annular plates
           the organisational values in their   according to the layout into the tank shell
                                                location, and weld the bottom plates and
           daily works which become part
                                                the annular plates together.
           of their lives.”

           Mr Cheng Yao Tong
                                                                                               The whole process is labour intensive and
           Chief Executive Officer
                                                                                               involves many high risks. The risks from
           Hai Leck Engineering Pte. Ltd.
                                                                                               crane lifting operations and manually pulling
                                                                                               of the steel plates can cause injuries and
                                                                                               fatigue. As such, immediate measures were
                                                                                               taken by Hai Leck Engineering to eliminate
                                                                                               these hazards.

                                                                                               Hai Leck Engineering created a safe rolling
                                                                                               platform method to transport the steel
                                                                                               plates into the storage tank safely. Using a
Represented by:                                                                                mechanical device, the workers place the
Mr Kothandan Rajasekar                                                                         steel plates on a moveable frame with
Construction Manager                                                                           rollers and push the plates into the storage
                                                                                               tank through a door opening at the tank
                                                                                               shell. The steel plates are then pulled and
                                                                                               aligned using the air winch.

                                                                                               This method not only eliminates crane
                                                                                               operations and work at height activities,
                                                                                               it also improves productivity. Manpower
                                                                                               required to shift the steel plates is reduced
                                                                                               significantly from 16 to three workers and
                                                                                               time taken to perform the task is also halved
                                                                                               from 20 to 10 minutes.
WSH Innovation AWARDS

                   “Innovation is an integral and
                   critical component in building
                   a safe environment. At Keppel
                   FELS, we constantly innovate
                   to build better tools, develop
                   more efficient work processes
                   and expand communication
                   channels with our employees
                   so that we can improve their
                   overall well-being.”

                   Mr Tan Leong Peng
                   Executive Director (Offshore)
                   Keppel Offshore & Marine         Keppel FELS Limited
                                                    Shackle Jig

                                                    In Keppel FELS Limited, heavy blocks are        To improve the work process, Keppel FELS
                                                    moved from one place to another by              designed a new shackle jig that can hold up
                                                    attaching shackles which are lifted together    to eight shackles compared to the old
                                                    with the heavy blocks by a crane. This          design which can only hold four shackles.
                                                    process requires workers to use a forklift to   The shackles can be placed in the upright
                                                    pick up shackles from the rack and transfer     position, thus eliminating the need to use
                                                    them to an open space. Workers will then        a forklift.
Represented by:                                     manually remove the shackle’s pin and nut
Mr Yan Yew Seng                                     to insert the crane lifting sling.              Requiring only two workers to execute the
Hull Manager                                                                                        job, the new system eliminates pinch points
                                                    After securing the shackle, the crane will      and reduces the number of man-hours
                                                    move the block to the designated location       required to complete the job from 146 to 29
                                                    after which workers will remove the             hours, achieving 80% cost savings for one
                                                    shackle’s pin and nut to detach the crane       rigging or de-rigging job.
                                                    lifting sling. The process of rigging and
                                                    de-rigging pose risks such as pinch points,
                                                    heavy lifting work, and it requires five
                                                    workers and a forklift.
WSH Innovation AWARDS

“No safety, no business!”

Mr Paul Shin
Chief Executive Officer
Koh Brothers Building & Civil
Engineering Contractor (Pte.) Ltd.   Koh Brothers Building & Civil
                                     Engineering Contractor (Pte.) Ltd.
                                     Moveable Lifting Frame Wall
                                     Formwork System

                                     It is common to see cranes lifting               frame is constructed using steel materials
                                     formworks at construction sites. A worker        and support beams to provide backing for
                                     will climb up a ladder to rig the formwork and   the wall formwork. The lifting frame system
                                     the crane will hoist the formwork from one       can move from left to right with the aid of
                                     location to another. In addition, the crane      an electrical winch or be manually pushed.
                                     must be set up on a firm ground with steel       Using the system, the workers anchor the
                                     plates as a base. Soft or uneven grounds,        framework onto chain hooks, raise the wall
                                     especially after a rain, are unstable and can    formwork slightly above the ground and
                                     cause the crane to topple. The process           push the lifting frame to the desired location
                                     poses a lot of risks such as crane toppling,     with the electrical winch by manullay pushing.
       Represented by:               worker falling from heights while climbing
       Mr Sean Low Shuey Ming        the ladder or being struck by falling objects    With the new system, cranes are no longer
       Senior Project Manager        such the formwork. Productivity is also a        required to lift and move the formwork.
                                     concern because more manpower and time           Thus, eliminating the risks of falling from
                                     are needed to set up the crane and perform       heights and being struck by objects.
                                     the task.                                        The innovation also reduces the number
                                                                                      of man-hours to complete the work process
                                     To overcome the hazards and improve              from 60 to 14 days. Productivity has
                                     productivity, Koh Brothers Building & Civil      significantly improved by 329%, and the
                                     Engineering invented the moveable lifting        lifting frames are cost-saving as it can be
                                     frame wall formwork system. The lifting          reconstructed using recycled steel materials.
WSH Innovation AWARDS

                                             Poh Tiong Choon Logistics Limited
                                             Spring Brake System for Trailers

                                             Poh Tiong Choon Logistics Ltd is a
                                             third-party logistics service provider for
                                             land transportation, warehousing, bulk cargo
                                             handling, container services, etc. Most of
              “Establish work practices,     its customers are from the oil and gas
              provide training, conduct      industry, and require transportation of
              operations in a manner         containers and ISO tanks using trailers.
              that safeguard property,
              employees and the              During the process of coupling between
                                             the prime mover and trailer, the trailer
              communities that it operates
                                             may move backwards or forward if its
              in, and develop continuous     service brakes are not working properly.
              improvements HSEQ plans.”      This happens when there is a loss of
                                             compressed air pressure in the service
              Mr Poh Choon Ann               brake which causes the brake to be
              Chairman                       disengaged. A sudden movement by the
              Poh Tiong Choon                trailer, also known as a “runaway” trailer,
              Logistics Limited              can be hazardous as it can cause damage
                                             to the vehicle, surrounding properties or
                                             even injure a worker.

                                             To prevent a “runaway” trailer, Poh Tiong
                                             Choon install spring brake in addition to the
                                             service brake on the trailers. The spring       the brake is less susceptible to failure or
                                             brake consists of two chambers – the main       being disengaged inadvertently.
                                             spring chamber and the service brake
                                             chamber. Using the mechanical force of the      After installing the spring brake system,
                                             main spring chamber, it will engage the         injury loss time due to a "runaway" trailer
                                             brakes when the trailers are being parked.      and damages to any properties or vehicles
                                             Without the use of compressed air,              have been mitigated.

Represented by:
Mr Loh Chia Wee
Senior HSE Manager
WSH Innovation AWARDS

                                         Resorts World at Sentosa Pte Ltd
                                         Sesame Street Ride Vehicle Brake
                                         Release Mechanism

                                         The Ride Vehicle (RV) in the Sesame Street
                                         Spaghetti Space Chase is an immersive
                                         indoor ride in Universal Studios Singapore.
                                         To maintain the RV, it has to be transported
“The safety and well-being of all team   to the workshop. However, if the RV’s
members at Resorts World Sentosa         electric current collector is unable to receive
is of paramount importance. We are       power from the overhead electrical rails due
committed to providing a safe and        to a fault, the RV cannot be transported to
                                         the workshop.
healthy workplace for everyone as we
deliver outstanding guest experiences    To recover the RV, two maintenance team
at this lifestyle destination resort.”   members from Resorts World Sentosa
                                         (RWS) will have to climb up and stand on
Mr Lee On Nam                            the RV to release the motor brakes manually.
Executive Vice President,                While the two team members on the RV are
Human Resources and                      holding on to the brakes, another two will
Technical Services                       slowly push the RV to the maintenance bay
Chairman, RWS Safety                     and a supervisor will oversee the task.
Steering Committee                       This process exposes the workers to the           recovery device that will allow the team
Resorts World Sentosa                    risk of falling from heights and fatigue from     members to work safely. The recovery
                                         standing for long hours as the process            device uses a rechargeable DC battery
                                         takes 90 minutes to complete.                     power supply that connects to the RV’s
                                                                                           control relays to activate the motor brakes.
                                         With a strong WSH culture instilled in the        It is a hand-held device with emergency
                                         company, RWS developed a portable                 stop and mode selections.

                                                                                           The recovery device is connected to the
                                                                                           control relay without having anyone to
                                                                                           mount. Thus, it eliminates the risk of falling
                                                                                           from height and reduces the amount of
                                                                                           manpower from five to three workers to
                                                                                           carry out the task. The time needed to
                                                                                           recover the ride has also been reduced to
                                                                                           30 minutes, contributing to greater work
                                                                                           efficiency and enhanced guest experiences
Represented by:                                                                            with shorter downtime.
Mr Ferseval Dematera
Manager
WSH Innovation AWARDS

                                                    SATS LTD.
                                                    Forklift Improvement Programme

                                                    Forklift incidents were on the rise in SATS        Some of the key features of the upgraded
                 “At SATS, we are committed         Ltd. After further investigation, it was           forklifts include speed limit device which
                 to providing a safe, secure and    observed that forklift incidents occurred          cannot be tampered with, smart card
                 healthy work environment for our   when operators were reversing. Employees           access system which prevents unauthorised
                                                    working within the forklift operation areas        use of the forklifts, seatbelt lighting to
                 people. Our Technology-driven,
                                                    were also at risk of coming into contact with      indicate failure to fasten seatbelt, and a blue
                 People-led approach to             reversing forklifts. Pre-existing infrastructure   reverse light system to warn employees of
                 automation encourages our          and communication lapses were some                 approaching forklifts.
                 people to develop new skills       reasons that resulted in these incidents.
                 and lead innovation, which                                                            With the implementation of the new safety
                 ensures sustainability is          A team from SATS was formed to review              features, SATS has seen a significant
                                                    the issue and came up with solutions               reduction in the number of potential
                 integral to our business
                                                    that would eliminate the risks. The team           incidents and near-misses involving forklifts
                 strategy and operations.”          implemented several features on its current        in the warehouse. This has also improved
                                                    fleet of forklifts that would improve the          forklift operators’ responsibilities and
                 Mr Eugene Cheng                    safety of its forklift operators and ground        heightened safety awareness levels among
                 Executive Vice President,          staff working in the warehouse.                    ground staff working in the warehouse.
                 Group Services
                 SATS LTD.

Represented by:
Mr Wong Chee Meng
Senior Vice President
WSH Innovation AWARDS

             “As Sembcorp Marine
             develops new innovations
             that keep us relevant and
             effective in the ever-changing
             operating environment,
             we strive to maintain safety
             as our foremost priority
             at all times.”

             Mr Wong Weng Sun
             President & Chief Executive
             Officer (CEO)
             Sembcorp Marine Ltd              Sembcorp Marine Integrated Yard
                                              Pte. Ltd. - Tuas Boulevard Yard
                                              SAT Workstation

                                              At Sembcorp Marine yards, workers carry         workstation to conduct pipe fitting
                                              out pipe fitting operations with two workers    operations safely and efficiently. Using this
                                              holding the pipes on a clamp standee while      workstation, the pipes can be secured safely
                                              another fits the additional section on to the   and aligned properly with a pipe vice. This
                                              pipes. The clamp standee used to hold the       eliminates the risk of falling pipes and tools
                                              pipes is unstable and cannot secure the         as well as pinch points resulting from having
                                              pipes safely. This can cause the pipes to       to hold two pipes together manually.
                                              fall off and injure the workers.
                                                                                              Workers can also adjust the workstation to
Represented by:                               The workers are further exposed to pinch        the desired height so that work can be
Ms Siti Musyarrafah                           points between two pipes while holding          carried out in a more comfortable position.
bte Mohd Raihan                               them together. They are susceptible to poor     The workstation is easy to use and only one
Officer                                       working postures from standing awkwardly        worker is needed to perform the welding
                                              when holding the pipes, and may get skin        process.
                                              burns or irritation from coming into contact
                                              with welding sparks during the welding          With the SAT workstation, fatigue and
                                              process.                                        manpower have been reduced, leading to
                                                                                              lower risk probability. Overall, Sembcorp
                                              To eliminate these risks, Sembcorp Marine       Marine achieved a 50% cut in man-hours
                                              developed the Sat Align Tack (SAT)              for pipe fitting operations.
WSH Innovation AWARDS

                                                ST Engineering Marine Ltd.
                                                Removal and Installation of Shaft Lines

                                                Removal and installation of the tail shaft in a
                                                vessel is complex, time-consuming and
                                                laborious. It requires a lot of coordination of
                                                various components such as erecting a
                “We believe that “Safety        scaffold platform around the shafting area,
                                                installing eye bolts and chain blocks using a
                Starts with Me” and hence,
                                                multi-elevated working platform, securing
                we pledge to abide by all       the propeller with a lifting gear, and requiring
                safety rules, stop all unsafe   10 workers to extract the tail shaft by pulling
                practices and watch for our     the chain blocks.
                co-workers’ safety. We shall
                through our diligence and       This process poses many hazards – falling
                                                from heights, falling objects, heavy lifting,
                continuous improvement
                                                fatigue and pinch points. To minimise the
                efforts achieve our goal        risk of accidents, ST Engineering Marine
                of zero accident.”              Limited designed a shaft jig that comprises
                                                of hydraulic power packs and u-clamps,             The shaft is supported by the u-clamps
                Mr Mohamad Zahid                and built at the same angle of inclination         which have rubber paddings to increase
                Bin Wagiman                     as the stern tube in the vessel.                   traction between the shaft and the u-clamp
                Vice President (EHS)
                                                                                                   and minimise any damage to the shaft.
                ST Engineering
                                                                                                   The u-clamps are attached to a hydraulic
                Marine Ltd.
                                                                                                   system that exerts a force to move the shaft
                                                                                                   along the jig in order to withdraw it from
                                                                                                   the vessel.

                                                                                                   The new shaft jig reduces work at height
                                                                                                   activities and use of lifting equipment such
                                                                                                   as the crane by 80%. It also requires fewer
                                                                                                   man hours and workers to complete the
                                                                                                   task, thus reducing the the man hour cost
                                                                                                   per vessel from $20,000 to $4,000.
Represented by:
Mr Kejenthran Jayakrishnan
Engineer
WSH Innovation AWARDS

                                                    TechnipFMC
                                                    Remotely Controlled Automated
                                                    Pressure Testing System

                                                    Pressure testing of production parts is a       With the new automated pressure testing
                                                    crucial stage in the factory acceptance test.   system, a comprehensive safety interlocks
                                                    Technicians performing the pressure tests       are installed on the test cell to prevent test
                                                    are exposed to high pressure which can          cell doors from opening if pressure is
                                                    cause severe physical injury to the workers.    detected by the system through its real
                                                                                                    time pressure sensors. The implementation
                                                    The technicians need to operate pressure        of these sensors and pressure testing
                  “TechnipFMC is committed          pumps and needle valves manually during         recipe improve pressure testing control
                                                    the pressure testing process. As it is a        and progress monitoring. The system
                  to fostering an incident-free
                                                    manual process, it is prone to human errors     will generate report automatically
                  environment worldwide.            and can cause over-pressurisation or
                  We will not compromise                                                            whereas previously all reports had to be
                                                    uncontrolled pressure release. Technicians
                                                                                                    documented manually.
                  safety, health, security,         are isolated from pressure exposure through
                  environmental or sustainability   the manual door lock mechanism and
                                                                                                    With better engineering controls, there is
                  to achieve our financial,         administrative pressure testing warning sign.
                                                                                                    lower probability of over pressuring caused
                  project, service and                                                              by human error and isolation of technicians
                                                    TechnipFMC found a solution to reduce or
                  manufacturing objectives.”        even eliminate the risks due to manual          from high pressure which can serious
                                                    pressure testing. A team of subject matter      injury or death. The new system improves
                  Mr Doug Pferdehirt                experts, manufacturing engineers and            efficiency by allowing technicians to
                  CEO                               programmers developed a centralised             perform multiple testing simultaneously
                  TechnipFMC                        automated pressure testing software that        with all decision-making processed by
                                                    can be programmed for various pressure          the software.
                                                    testing patterns remotely and automatically.

Represented by:
Mr Edwin Lee
Deputy Senior Manager,
Manufacturing Operations
WSH Innovation AWARDS                                                                                    WSH SUPERVISOR AWARDS

CYC International Pte Ltd                     Resorts World at Sentosa Pte Ltd                 Mr Tan Eng Khoon
Olivia Underwater Cleaning System             Sesame Street Ride Vehicle Brake Release         Galmon (S) Pte Ltd
                                              Mechanism
GE Aviation, Engine Services                                                                   Mr Balasubramaniyan Appathurai
- Singapore Pte Ltd                           SATS LTD.                                        Keppel DHCS O&M Pte Ltd
Semi-auto Crimper Machine                     Forklift Improvement Programme
                                                                                               Mr Thanarajan Verasalam
Hai Leck Engineering Pte. Ltd.                Sembcorp Marine Integrated Yard Pte. Ltd.        Keppel FELS Limited
Safe Rolling Platform                         - Tuas Boulevard Yard
                                              SAT Workstation                                  Mr Karri Kasiviswanadha Reddy
Keppel FELS Limited                                                                            NatSteel Holdings Pte Ltd
Shackle Jig                                   ST Engineering Marine Ltd.
                                              Removal and Installation of Shaft Lines          Mr Mohammad Norrahman'Izhammuddin
Koh Brothers Building & Civil Engineering                                                      Bin Sonny
Contractor (Pte.) Ltd.                        TechnipFMC                                       Nishimatsu Construction Co., Ltd
Moveable Lifting Frame Wall Formwork System   Remotely Controlled Automated Pressure Testing
                                              System                                           Mr Dela Cruz Joseph Tenioso
Poh Tiong Choon Logistics Limited                                                              PEC LTD.
Spring Brake System for Trailers
                                                                                               Mr Selvaraj Karthikeyan
                                                                                               Sembcorp Marine Integrated Yard Pte. Ltd.
                                                                                               - Tuas Boulevard Yard

                                                                                               Mr Samikannu Santhanaraj
                                                                                               ST Engineering Marine Ltd.

                                                                                               Mr Mohamed Rafi Bin Syed Masood
                                                                                               SMRT Automotive Service Pte Ltd

                                                                                               Mr Hannan Abdul Khaleque Khan
                                                                                               Teambuild Engineering & Construction Pte Ltd
WSH OFFICER AWARDS

Mr Marcus Ho Yeow Chong
ORGANISED BY