2020 PORTFOLIO - Ardent Architects
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Ardent Architects HI. WELCOME TO OUR PORTFOLIO Below is a sample of our projects that we are working on and are proud to show you. If you are interested in seeing more examples of our documentation, please contact us and we can provide you with relevant examples to your project. WE DESIGN A BETTER FUTURE Ardent Architects are a firm based on Commitment, Passion and Integrity. We define our company as a firm that puts our client’s ambitions and requirements first. CONTACT US Ground floor, 21 Shierlaw Ave Canterbury VIC 3126 Australia Phone: +61 3 9889 3317 E-mail: enquire@ardentarchitects.com www.ardentarchitects.com ABOUT US Architecture that surpasses expectations 2
Ardent Architects Project: APA Head Office Location: Southbank Budget: $3M Services: Design and project management Current Status: Completed Ardent Architects were engaged to design and deliver the move of APA Gasnet from Dandenong to a new head office fitout in Southbank. The fitout was over 2000m² over the 13th and 14th floors of the IBM building. The project was delivered in a very tight time frame with over a dozen departments of stakeholders. APA GROUP - LVL 13 & 14, 60 CITY RD SOUTHBANK COMMERCIAL FIT-OUT Architecture that surpasses expectations 3
Ardent Architects Project: MedCentral Knox Medical Centre Location: Knoxfield Budget: Services: Design and Documentation Current Status: Completed MEDCENTRAL KNOX MEDICAL CENTRE COMMERCIAL FIT-OUT Architecture that surpasses expectations 4
Ardent Architects Project: South Morang Mazda Location: South Morang Budget: $8M Services: Full Architectural services Ardent Architects are currently delivering the South Morang Mazda facility in South Morang. The facility is a full line dealership incorporating a full basement new car hand over area. The facility includes a 40 bay workshop. The facility was completed in May 2017 SOUTH MORANG MAZDA AUTOMOTIVE COMMERCIAL BUILD Architecture that surpasses expectations 5
Ardent Architects Project: Bruce Clough Mazda Location: Pakenham Budget: $5M Services: Full Architectural services Ardent Architects delivered the Pakenham Mazda facility. The facility is a full line dealership that addresses the M1 freeway in Pakenham. The dealership was delivered in December 2016. PAKENHAM MAZDA AUTOMOTIVE COMMERCIAL BUILD Architecture that surpasses expectations 6
Ardent Project: Nissan NREDI and RVI Program Architects Location: Australia wide Services: Design, Implementation, Costing Current Status: In progress Ardent Architects have been delivering Nissan’s national RVI program since 2013 and continue to work with Nissan on upgrading their dealerships through the new NREDI program. Ardent worked with Nissan Australia to develop a localised Corporate Identify program for Australia for their new program roll-out in 2017. Since then, Ardent have assisted Nissan in designing dealerships to recieve the new scheme across the nation. Ardent provide detailed concept design services to assist Nissan Head Office, often working woth other Architects to ensure that the Nissan brand comes first and foremost. NISSAN AUSTRALIA FRANCHISE PROJECTS Architecture that surpasses expectations 7
Ardent Architects Project: City Nissan & Hyundai Location: Collingwood Budget: $10M Services: Full Architectural services Ardent Architects delivered the City Nissan and Hyundai facility. The design is a high density modern approach to automotive retailing in a CBD location. The scarcity of land and cost of the CBD location required utilising the site well above traditional automotive models. The facility features two levels to incorporate new and used vehicle sales as well as a full service department with 20 workshop bays and parking for over 50 vehicles on site. The facility has been designed to incorporate the existing adjoining Yarra Honda showroom. This enables the new facility to share functional resources and provide more options for vehicle movement. The facility was completed February 2016 CITY NISSAN & HYUNDAI AUTOMOTIVE COMMERCIAL BUILD Architecture that surpasses expectations 8
Ardent Architects Project: Burwood Nissan Location: Burwood Victoria Budget: $1.5M (conversion from warehouse) Services: Full architectural services Ardent Architects were engaged by Camberwell Nissan to deliver their new facility in Burwood. The building was an existing industrial building that had been used for garment manufacture, display and offices. Ardent worked closely with the client and the franchise to deliver a modern facility on a minor budget. We worked with the dual level nature of the building to provide a first floor workshop and ground floor showroom. BURWOOD NISSAN AUTOMOTIVE COMMERCIAL RENOVATION Architecture that surpasses expectations 9
Ardent Project: Priceline franchise projects Architects Location: Australia Services: Architectural and Interior Design Current Status: In progress Ardent work with Priceline Head Office to design develop and produce construction documentation for Priceline and Priceline Pharmacy stores nation- wide. Ardent have been working on these projects since 2014 and continue the strong relationship with Priceline working on 20 projects throughout 2019 and continuing into 2020. The Priceline projects require detailed knowledge of the company standards and design criteria while ensuring standardized documentation. Each site provides problems and challenges which test our staffs skill in ensuring the Priceline design intent and corporate identity is maintained when being applied to some of the most complex sites we have worked on. Several of our staff have been working on the Priceline program since 2008 and continue to excel at delivering exceptional documentation to the client. PRICELINE PHARMACY FRANCHISE PROJECTS Architecture that surpasses expectations 10
Ardent Project: Top End Medical Centre Architects Location: Darwin Budget: $1.2m Services: Design and Documentation Current Status: Completed Ardent Architects were engaged to design and deliver a medical centre at the new Gateway Shopping centre in Darwin. We worked remotely with the client via online meetings to go through the design process and finalise the scope of the project. Ardent tendered the project for the client and performed the contract administration during the construction phase. Ardent Architects designed and detailed the interior design and fit-out. We also sourced and selected all the furniture and joinery. The project was designed to have a hard wearing interior fitout with colour and vibrancy. The client wanted to create an environment that avoided being drab or clinical. TOP END MEDICAL CENTRE COMMERCIAL FIT-OUT Architecture that surpasses expectations 11
Ardent Architects Project: VICSES Facility program Location: Victoria Budget: ~$30m Services: Architectural Current Status: In progress Ardent are pleased to announce our partnership with ESIA (Emergency Services Infrastructure Authority) to design the new standard for all future VICSES Unit facilities. In conjunction with this, Ardent will be providing our services to assist the VICSES in bringing these new facilities to units over the next 2 years. These projects include Wangaratta, Emerald, Northcote and Broadmeadows. Wangaratta will be constructed in 2020 with many others following suit. VICSES - NEW FACILITY PROGRAM GOVERNMENT / PUBLIC WORKS Architecture that surpasses expectations 12
Ardent Architects Project: Mitchell St. Renovation Location: Northcote Budget: $800K Services: Design and Documentation Current Status: Completed Ardent were commissioned to design a modern extension to an early 1900’s house in Northcote. The result was a two storey sleek modern living space. The design preserved the original heritage house at the front including it’s internal detailing and then transitions into the modern living area. The house provides for separation of living areas and sleeping areas between parents and teenage children. The living area features a polished concrete slab with yellow glass as part of the aggregate for a subtle but iridescent fleck to the concrete. Westgarth Builders did an amazing job on the project with amazing attention to detail and quality work which resulted in an amazing finished product. The house sold in July 2015 for a record $2.82M which was the highest amount ever paid per m² for a house in Northcote. This achievement was a testament to the clients commitment to the vision and the builders attention to detail MITCHELL ST, NORTHCOTE RESIDENTIAL RENOVATION Architecture that surpasses expectations 13
Ardent Project: Bastings St. Renovation Architects Location: Northcote Budget: $600K Services: Design and Documentation Current Status: Completed This is the second completed project for owner / builders Westgarth Homes. It is great to have clients to want to push the boundaries of what is possible in home renovation and aren’t scared of employing commercial grade structure to open up amazing spaces. The existing house was a small, quaint weather board house typical to Northcote. The brief was to take the existing the existing house and while keeping the facade re-imagine the rest of the house to create a spacious contemporary house on a modest sized block. The rear living area opens up to an amazing two storey void with eye catching suspended fireplace. BASTINGS ST, NORTHCOTE RESIDENTIAL RENOVATION Architecture that surpasses expectations 14
Ardent Architects Project: Alexandra Residence Location: Thornbury Budget: $750K Services: Design and Documentation Current Status: Completed Our clients came to us with a brief to renovate their existing house to enhance the current living space while providing access to previous underutilized aspects. Specifically these included light, diversity, space efficiency and storage. The original building was built in 1928 for two spinster sisters, as a classic weatherboard Californian bungalow with the 4 original rooms divided by a central corridor. Their decision to renovate was influenced by a love for the area and what it represents. The client provided a stylistic aim with key words such as urban, ethnic, industrial, technical, warm, diversity in materials (steel, reclaimed/reused, wood, concrete, iron). They also expressed a desire that the final build must reflect the local history of the house and the area they belong to ALEXANDRA RESIDENCE RESIDENTIAL EXTENSION Architecture that surpasses expectations 15
Ardent Architects Project: Magic Hand Carwash program Location: Australia wide Services: Design, Development and Construction Current Status: In progress Ardent are working with the team at Magic Hand Carwwash to provide design and documentation services for their franchise roll-out program. Using Ardent’s skills in automotive architectural design, we have applied those learning into the carwash facility design to achieve great results for the client. 27 projects have been commenced over the past 4 years with Magic Hand and continue to grow the relationship through a successful partnership. MAGIC HAND CARWASH FRANCHISE PROJECTS Architecture that surpasses expectations 16
Ardent Architects GREENS ROAD EXISTING SITE ENTRANCE EXISTING SITE ENTRANCE future additional parking on EXISTING INTERNAL ROAD resurfacing adjoining dirt carpark EXISTING BUILDING OUTLINE EXISTING BUILDING OUTLINE EXISTING BUILDING OUTLINE VISITOR CARPARK EXISTING BUILDING OUTLINE STAFF CARPARK EXISTING BUILDING OUTLINE main entrance EXISTING BUILDING OUTLINE EXISTING INTERNAL ROAD EXISTING BUILDING OUTLINE RECEPTION 45 m² MEETING ROOM CONTROL ROOM 81 m² BBQ area STAFF CARPARK 9 m² OFFICE OFFICE OFFICE 90 m² 123 m² 123 m² MEETING ROOM BREAKOUT 9 m² 115 m² UNDERCOVER OFFICE DWG STORE DWG STORE WALKWAY MEETING ROOM 42 m² 17 m² 16 m² 60 m² 9 m² shelving LIFT STORE STAIRS STAIRS staff 5 m² MEETING ROOM 13 m² PRINTING 6 m² 13 m² 9 m² BOARDROOM AMENITIES EXISTING BUILDING OUTLINE 6 m² 35 m² 38 m² plan draws QUIET ROOM 6 m² PLANT with bench top QUIET ROOM entrance 19 m² 6 m² QUIET ROOM 6 m² EXISTING SITE ENTRANCE EXISTING INTERNAL ROAD 1 NEW BUILD GROUND FLOOR PLAN Room Schedule New Room Schedule New Furniture Schedule Option 1 Build Build 108 1 : 250 Project: APA Group Project: Department Sustainability and Family Count Name Area Name Area AMENITIES 38 m² OFFICE 122 m² Location: Dandenong Environment AMENITIES 38 m² OFFICE 96 m² Furn_Allsteel_Acuity_Office_Chair 209 BOARDROOM 35 m² PAYROLL 121 m² Furn_recep_Reception desk modern 1 BREAKOUT CONTROL ROOM 115 m² 81 m² PLANT PLANT 19 m² 19 m² Budget: $10M Location: Regional Victoria Furniture_Chair_Customer 93 CORRIDOR 122 m² PRINTING 6 m² IT CORRIDOR 88 m² PRINTING 6 m² 40 m² Furniture_Table_Picnic 17 DWG STORE 17 m² PRINTING 3 m² Services: Feasibility & Master Planning Budget: TBA DWG STORE 16 m² QUIET ROOM 6 m² Furniture_Table_Showroom Sales_1200 diam 31 IT 40 m² QUIET ROOM 6 m² Furniture_Table_with_chairs 5 KITCHENETTE 3 m² QUIET ROOM 6 m² Services: Feasibility Master Planning, OFFICE PAYROLL LIFT 5 m² QUIET ROOM 6 m² OFFICE OFFICE OFFICE OFFICE 96 m² 122 m² 122 m² 122 m² 122 m² Lapalma_Bar_Stool_2931 121 m² 4 LIFT 5 m² QUIET ROOM 6 m² MEETING ROOM 9 m² QUIET ROOM 6 m² Nissan_Furniture_Club chair_1 Seater 4 MEETING ROOM 9 m² QUIET ROOM 6 m² Wodonga, Wangaratta, Bright, Rushworth, Epsom,Nissan_Furniture_Table_Customer MEETING ROOM 9 m² RECEPTION 45 m² Lounge_Coffee_1200 x 600 1 MEETING ROOM 9 m² SERVER ROOM 38 m² Workstation 1800 x 1800 angled 208 OFFICE 42 m² STAIRS 18 m² Ardent Architects are currently engaged by APA to Maryborough OFFICE 90 m² STAIRS 13 m² OFFICE 123 m² STAIRS 13 m² OFFICE 123 m² STAIRS 14 m² CORRIDOR OFFICE 122 m² STORE 6 m² provide master planning and feasibility services on 88 m² LIFT OFFICE 122 m² STORE 13 m² STORE STAIRS 5 m² OFFICE 122 m² STORE 6 m² 6 m² PRINTING 14 m² SERVER ROOM AMENITIES 6 m² UNDERCOVER 60 m² the long term redevelopment and accommodation 38 m² PRINTING 38 m² WALKWAY 3 m² WC 6 m² QUIET ROOM 6 m² PLANT QUIET ROOM 2051 m² of their engineering and property departments. Ardent was engaged by DSE to create master 19 m² 6 m² QUIET ROOM 6 m² QUIET ROOM 6 m² Parking Schedule 6 Car Type Count The project brief was to master plan the staged plan reports for major regional facilities for Staff Car 192 2 NEW construction of additional BUILD FIRST FLOOR PLAN office accommodation redevelopment or substantial upgrade. We Visitor Car 20 212 108 1 : 250and renovate the existing office space. The delivered master-planning for 7 regional sites existing office space is to be distilled into the new concurrently, working closely with the client and development with no disruption to the day to day project groups to capture and review their future Revisions Rev Date Description Project no. address sheet No. Scale TITLE 11256 180 GREENS ROAD SOUTH DANDENONG 1 : 250@A1 Drawings are not be measured or 105 running of the facility. requirements. scaled off. All areas, quantities 15/03/2012 12:21:53 PM VIC and prices are estimates only and do not take the place of a quantity PROJECT NEW BUILDING MASTER CONCEPT DESIGN client Suite 3, 191 Riversdale Rd. Hawthorn 3205 surveyor. These drawings are to be read in conjunction with DANDENONG MASTER PLANNING APA GROUP Date checked by PLAN Rev. no. Ph: 03 9889 3317 Fax: 03 9882 7633 associated consultant drawings. 15/03/2012 JM 01 ©Copyright 2011 MASTER PLANNING FINAL CONSTRUCTION PHOTOS Architecture that surpasses expectations 17
Ardent Project: Corporate Identity Development Architects Our staff have been involved in the development of Our staff were involved in the development of Corporate Identity Development for: Corporate Identity and Signage Manuals for: • Subaru Australia, Developed the CI3 • Nissan Australia’s corporate identity manual for Corporate Identity program 220 site implementation • Honda MPE, Australian corporate identity • Nissan New Zealand’s Corporate Identity • Total Metrics, logo, corporate branding, Manual website and print media • Renault Australia’s corporate identity manual • Outline software, logo and corporate branding • Honda MPE corporate identity manual • Scope software, logo and corporate branding • Coles National Standards Manual • Spectral Modes, logo and corporate branding • Venturi software, logo and corporate identity • ASMA group, corporate print media • Oben Australia, corporate branding • Silvia Motor Sports, corporate identity and branding • FP Decision Maker software, development of logo ENTRY ELEMENT ENTRY ELEMENT ENTRY ELEMENT ENTRY ELEMENT LOUVRES GLAZING RATIOS CONSTRUCTION IMAGES DOORS NUMBER OF LOUVRES AND SPACING EXTERNAL GLAZING The entry element is designed to be used in a ratio of MANDATORY A minimum of five (5) and a maximum of seven (7) VARIABLE LIGHT TRANSMISSION (VLT) VISIBILITY STRIPS ENTRY ELEMENT 1:1 and is flexible within margins to accommodate most 3267 3267 louvres are required. The louvres will be equally ENTRY ELEMENT WITH 800MM BRAND SYMBOL spaced on the overall fascia height as per site All external glazing is to have a minimum Variable Where required seek Nissan’s guidance for specification. existing buildings. Light Transmission (VLT) index of 70%. The bottom edge of the visibility strips are to be located EQ EQ EQ EQ CAULKING DOOR requirements. Bare minimum option for small rural showroom where between 900mm and 1000mm above finished floor level The entry element should: Main Brand Pylon sign is located on highway road side. FRAMELESS GLAZING and are to 50mm in height. Refer to AS 1428.1-2009 for LINEAR THRESHOLD For further information refer to Section 6 - Glazing for DRAINAGE SYSTEM requirements in regards to louvre to glazing height ratios. further information. - Be placed in a prominent position Note: This element can be mirrored as shown. Metro Dealerships to have external frameless glazing for 3050 OR MORE 3050 OR MORE - Sit under the fascia where possible showroom Areas. SELECT TILES - Be the main entry point for customers SELECT TILES. FALL - Incorporate a single auto sliding door where 1530 1530 AS REQUIRED Where this is not possible, a flushline glazed framing possible system is preferred. 2100 2100 - In cases where swing doors are used utilise FINISHED FLOOR LEVEL frameless glazing EXTERNAL SUN CONTROL In order to meet the requirement of Part J (refer Section 6 - Part J) external sun control in the form of operable louvres or an extended eave may be required. WATERPROOF WATERPROOF Retail Visual Identity (RVI) Program MEMBRANE TO FLANGE MEMBRANE TO FLANGE Nissan’s louvres can be supplied in an operable MANDATORY configuration to allow for automatic shading. If automatic PREFERRED (WITHOUT LOUVRES) THRESHOLD DETAIL louvres are to be used they must be automated so as to ENTRY ELEMENT WITH 1050MM BRAND SYMBOL only angle when required under Part J. The automation DOOR system is to have a seasonable capability so as not to ACM panel sizes are kept around Nissan Brand Symbol VLT 50% VLT 70% to stay as tall and vertical as an iconic symbol rather than angle when not needed during cooler months. (NOT ACCEPTABLE) looking stubby. ENTRY ELEMENT RECESSED ENTRY MAT Note: This element can be mirrored as shown. 5 BLADES (MIN. 1000MM HIGH) 6 BLADES 7 BLADES (MAX. 2000MM HIGH) 3668 3668 SELECT TILES PARTIALLY CLAD ENTRY ELEMENT EQ EQ EQ EQ 2450 LAST BAY VARIES N 6N NISSAN MOTOR CO. (AUSTRALIA) PTY LTD. 1200 20 FINISHED FLOOR LEVEL 50 2400 50 50 100 DEALER SUPPLIED STRUCTURE 75 50 3658 OR MORE 3658 OR MORE The entry element requires two VARIES (1200) EQ EQ EQ EQ 1000 - 2000 vertical and one horizontal support. 1931 Dealer’s architect to liaise with 1931 WATERPROOF signage company on requirements VISIBILITY STRIP PATTERN MEMBRANE ALLOW FOR SCREED 2413 prior to construction documentation. 2413 UNDERNEATH ENTRY MAT ALLOW FOR DRAINAGE TO MAT WELL ENTRY MAT DETAIL OPTIONAL GAP AT TOP - FINISH WITH SPACE OR BLADE AT TOP 229 EQ EQ EQ EQ VARIES (1200) 1000 - 2000 PREFERRED (WITH LOUVRES) RECOMMENDED ENTRY ELEMENT WITH 1050MM BRAND SYMBOL Standard size entry element with 1050mm Brand Symbol. MINIMUM 5 BLADES / MAXIMUM 7 BLADES Note: This element can be mirrored as shown. 4270 4270 EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ VARIES (2000) 1000-2000 4166 OR MORE 4166 OR MORE 1931 1931 2642 2642 2450 LAST BAY VARIES VISIBILITY STRIPS ENTRY ELEMENT FRAMING 3-03 3-05 3-07 3-16 4-04 5-02 Facility Guidelines GLAZING FACILITY DESIGN - GENERAL FACILITY DESIGN - SERVICE FINISHES FACILITY DESIGN - GENERAL FACILITY DESIGN - GENERAL GLAZING ALIGNMENT POWER SUPPLY TO SHOWROOM NEW VEHICLE DELIVERY BAY SHOWROOM DISPLAY SPACING WORKSHOP HOIST LAYOUT CEILINGS Glazing that is within one metre behind the ACM cladding It is recommended for new showrooms or major New cars should be delivered from delivery bays off the 4 POST SHOWROOM, LOUNGES & SERVICE RECEPTION Adequate spacing needs to be given between new vehicles is to have its mullions aligned to the ACM cladding grid. renovations that mains power be supplied to car display showroom floor. and showroom walls to give customers the space required It is recommended to leave at least 1m 1000 Panels that are 2450mm or 1225mm wide can be used. - White suspended solid plasterboard ceiling areas to allow for continual trickle charging of batteries and to move around a vehicle and open all doors while being between the last bay and the end wall to - 13mm thick plasterboard power to interactive displays. The delivery zone should be dedicated space in the Framed glazing to be used only with NMA approval. able to walk past them while open. facilitate reversing space and equipment - Rondo Key-Lock Concealed Ceiling System showroom. storage It is also recommended that provision be made in the OFFICES lounge area of the showroom for items such as a fridge, Delivery bays should be located on the side of the Work benches to be PMS 200 red - White suspended acoustic ceiling tile coffee machine and water dispenser. showroom so as not to interrupt the main showroom - Armstrong “Dune” Tegular Edge Profile with Superfine facade glazing. It is mandatory to have a hoist suitable for 15mm Exposed Tee Grid suspended ceiling system; wheel alignment with a hoist rated to 6 Deliverybays should have full time and easy egress to a or tonne and a bay size of 7m x 5m. driveway so as customers can easily drive their car out of - CSR Gyprock Supatone on exposed suspended the dealership. ceiling system It is mandatory for each site to have a 4 post hoist rated to 6 tonne for non- conventional vehicle servicing with a bay size of 7m x 5m. It is preferred that bulkheads are used to provide air conditioning and heating Hose reels for oil, air water are typically to showroom IN-FLOOR DUCT shared between two bays. Space needs to be allowed for the reels as well as the supply pipework 2 POST Hoists are to are to be ordered in PMS 200 red. Where they cannot be supplied in that color they are to be painted. Tool boxes where supplied are to be PMS 200 red. SCISSOR Tool boxes where supplied are to be PMS Frameless glass 200 red. Shows alignment between cladding and framing CLOSED OFFICES Hoists are to are to be ordered in PMS HORIZONTAL MULLION 200 red. Where they cannot be supplied When a horizontal mullion is required in the glazing it is in that color they are to be painted. recommended that it aligns with bottom louvre, as shown It is preferred that bulkheads are used below, in order reduce its impact on the overall facade. to provide air conditioning and heating to showroom Bay line marking in white. IN FLOOR DUCT TO HOUSE POWER TO EXTENTS OF SHOWROOM OPTION ONE - IN-FLOOR DUCT TO SHOWROOM FLOOR GLAZING SHOWROOM FLOOR TILE IN-FLOOR DUCT BORDER TILE Orange dashed lines denote OHS safe WHEN A HORIZONTAL area required around moving parts of CONCRETE FLOOR MULLION IS REQUIRED the hoist including the car. While most IT IS TO ALIGN WITH Two-thirds high partitions between technicians prefer two post hoists in BOTTOM OF LOUVRES offices to be half solid, half glazed. some existing workshops the spacing will not accommodate all two post hoists and meet OHS & Worksafe requirements. OPTION ONE - IN-FLOOR DUCT TO SHOWROOM FLOOR DETAIL 7000 ELEVATION SECTION OPEN OFFICES 7-09 9-07 9-09 10-05 5-06 9-12 NOVEMBER 2015 CORPORATE IDENTITY FINAL CONSTRUCTION PHOTOS Architecture that surpasses expectations 18
Ardent Project: Olympic Avenue Kindergarten Architects Location: Cheltenham Budget: $300k Services: Architectural and Interior Design Current Status: Completed Bayside Council engaged Ardent Architects to deliver a major extension to Olympic Avenue kindergarten. The project had a very tight budget for the amount of space required. Ardent approached the design from a commercial store angle to reduce the materials, structure and trades on site so as to create a cost effective shell with a majority of the budget then being able to be spent on quality fitout. The new room has been fondly be nicknamed “The Rainbow Room” because of its colourful windows. There has been a very positive response from the kindergarten teachers about the room’s colours, flexibility and thermal comfort. The metal cladding material used on the internal walls enable staff to use magnets to place the children’s drawings on the walls, reducing their need for pins. The project was completed by February 2013. OLYMPIC AVENUE KINDERGARTEN SCHOOL PROJECT Architecture that surpasses expectations 19
Ardent Architects Project: Shipston Sporting Pavilion Location: Cheltenham Budget: $900k Services: Architectural and Interior Design Current Status: Completed Bayside Council engaged Ardent Architects to deliver a major new sporting facility for the soccer and cricket teams in the area. The brief called for a hard wearing facility that required minimal maintenance. Ardent utilised an insulated panel system for the roof which both minimised structure and removed the need for a ceiling in the building. This provided an economical construction method that delivered high bright ceilings with excellent insulation. The feature cranked roof was achieved with a 3D steel design and the insulated panels raked in two directions to create an exciting floating roof. The use of the long span insulated roof panels also created clean lines and reduced opportunities for birds nesting and other maintenance issues. The project was completed by June 2013. SHIPSTON SPORTING PAVILLION COMMERCIAL PUBLIC BUILD Architecture that surpasses expectations 20
Ardent Architects Project: Victoria University Building M Location: Footscray Budget: $1.5M Services: Master planning & Design Current Status: Completed Ardent Architects were engaged to master plan the internal layout configuration of building M for the facilities department of Victoria University and complete a new interior fitout of the student union lounge and offices. The design was to fit in seamlessly with the existing colour scheme, but be a bright, functional and modern design. Using Building Information Modelling (BIM) we are able to report on efficiencies from different re-configurations to evaluate them via a measurable criteria. This data driven approach takes the guess work out of the planning and provides design scenarios that can be reviewed by ranked requirements. This approach gives the client the ability to review a costing of each option against a criteria e.g. number of staff accommodated, area per staff member, % of usable space. Ardent Architects will include all spatial data in the 3D model, as well as staff information, so that their location and proximity to their department and team can be reported on. This method is very efficient at the works stage, as plans can be issued to staff and movers to assist in the relocation of departments over a number of floors. VICTORIA UNIVERSITY BUILDING M MASTER PLANNING AND INTERIOR DESIGN Architecture that surpasses expectations 21
Ardent Project: Bayside Council: Brighton Toilets Architects Location: Brighton Budget: $70k Services: Architectural Current Status: Completed Bayside Council engaged Ardent Architects to deliver a signature amenities project for the Brighton area. The brief called for an amenities block that incorporated high quality design so as not to look like a traditional utilitarian facility. The finished facility was to also be low maintenance and long lasting. Ardent utilised recycled timber and PET bottles combined to create the timber like planks that clad the building. This material will not fade and incorporates an anti-graffiti polymer to reduce the risk of vandalism. The high floating roof was designed to provide natural ventilation as well as discouraging climbing. T he roof has no guttering as it drains to a crushed rock pit to the rear. The roof design reduced the need for on going maintenance because there is no guttering to be regularly cleaned. The project was completed by August 2013. BAYSIDE COUNCIL - BRIGHTON TOILETS PUBLIC WORKS Architecture that surpasses expectations 22
Ardent Architects Project: Apartment concepts Services: Design and Town Planning Ardent have worked on several apartment projects through concept and into planning phase. These projects have been vital in allowing the client to understand the available space and achieve planning approval at and ‘on-boarding’ at an early phase to ensure that all parties are comfortable with the design. APARTMENT DESIGN MULTI-RES DEVELOPMENT Architecture that surpasses expectations 23
Ardent Architects Project: Newstead Dual-Occupancy Location: Caulfield Budget: $2m Services: Design development and Documentation Current Status: Completed Working with Build Star Build, we designed and documented 2 of these developments within the same street. One of these was for the director of Blue Star to move in to. The apartments each have a shared basement with turn-tables and a gymnasium, along with 2 storeys each designed for the best outcome for spacial requirements and council regulations. NEWSTEAD ST, CAULFIELD MULTI-RES DEVELOPMENT Architecture that surpasses expectations 24
Ardent Architects Project: Broughton Rd Apartments Location: Surrey Hills Budget: $1.7m Services: Design, Development and Documentation Current Status: Completed Ardent Architects were engaged by the client to deliver a town house development on a site constrained by two easements, one of which was 3m wide at 45° through the site. A typical side by side town house arrangement couldn’t work. We developed a maisonette style of dual occupancy styled to be sympathetic the primarily 1920’s style of the area. The two bedroom, two bathroom townhouses offer generous living areas and outdoor private spaces. By stacking the residences it meant that all floor areas could have generous amounts of windows providing very light, bright accommodations. BROUGHTON RD APARTMENTS MULTI-RES DEVELOPMENT Architecture that surpasses expectations 25
Ardent Architects Project: Blackburn Apartments Location: Blackburn Budget: $6m Services: Design development and Documentation Current Status: Completed BLACKBURN APARTMENTS MULTI-RES DEVELOPMENT Architecture that surpasses expectations 26
services. Mechanical work to be confirmed with Priceline Below is a sample of our documentation Project Manager at tender. Ardent Proposed gondola fittings to be MOP (mother of If you are interested in seeing more examples pearl) to of our match existing documentation, (eg. SEB’s, boxes/drawers). please Architects contact us and we can provide you with relevant examples to your project. Confirm material Dispensary finish with bulkhead @ Priceline PM. No. Description Date 2500mm AFFL with Dulux 'Leadman' paint. 1 PRELIMINARY 2019.06.12 A CONSTRUCTION ISSUE Shop fitter to alllow to paint all 2019.06.21 2100 400 No. Descri OUTLET LEGEND ELEVATION walls of Prep Area in P1 DULUX 6 EQ. DIV. COSMETICS COSMETICS COSMETICS COSMETICS COSMETICS COSMETICS COSMETICS COSMETICS COSMETICS CL B CONSTRUCTION ISSUE - Retaining "Vivid White" SW1G1 acrylic 2 2019.07.01 1 PRELIMINARY wash and wear A CONSTRUCTION ISS 900 (1) SINGLE - GENERAL POWER OUTLET. CU runs of 2100H aisle Cosmetics & P1 (HEIGHT) All overhead cupboards B CONSTRUCTION ISS P1 P1 Skincare gondola doors) to and tall SEBs All overhead cupboards (with runs of 2100H aisle C Ex. 2300mm H Cosmetic Wall Bays with Pelmets (with or without or without doors) to have COSMETICS have 16mm backing and 16mm backing and be Skincare gondola an SINGLE - GENERAL POWER OUTLET. ew vinyl graphic on the wall 900 (1) (HEIGHT) be minimum 400mm minimum 400mm deep Vertical deep internally. Total internally. Total overall width Shopfitter to allow to paint all walls to P1 Dulux overall width with door - 'Vivid White' SW1G1 low sheen acrylic washand with door - 432mm 432mm 900 (2) DOUBLE - GENERAL POWER OUTLET. wear paint. Total overall with without (HEIGHT) Total overall with without door - 416mm Ex. Ex. Vertical Ex. Ex. 250 Ex. 3000 Ex. Ex. door - 416mm 3200 16mm carcass panels with 4 EQ. DIV. New vinyl graphic white melamine finish to P4 900 (1) (HEIGHT) SINGLE - DATA OUTLET. 2450 on the wall overhead cupboards 3045 Provide adjustable 16mm MDF 1415 shelving x2 to cupboards as indicated. White melamine finish. adjustable shelf Ex. 1420mm H General 900 (2) (HEIGHT) DOUBLE Floor - DATA OUTLET. Bays with All edges to have white new metal boxes New full height security D02 melamine edging or be finished 800 16mm carcass panels with Ex. Ex. Ex. glazing fin. Ex. Ex. 920 Ex. white melamine finish to in white ABS edging (By LAMINEX) 900 (3) (HEIGHT) TRIPLE - DATA OUTLET. Ex. overhead cupboards adjustable shelf GENERAL NOTES: Rel. SEP Provide D pull handles to all Generic drawer for Ex. SEB Ex. SEB 1. Architect to ensure all d OP cupdoards script on file P12 N.C.C. and all relevant ENIN PROFESSIONAL PROFESSIONAL 900 (4) PROFESSIONAL QUADRUPLE - DATA OUTLET. SERVICES (HEIGHT) SERVICES SERVICES "Johnson" 150 x 150mm white tile 2. All dimensions in millime GENERAL ProvideNOTES: G Dispensary bulkhead adjustable 16mm splashback to bench 3. Do not scale these draw above MDF shelving x2 to 32mm thick benchtop. take precedence. Ex. 1420mm H Prof. service Floor Bays cupboards as indicated. Lmainate finish to benchtop 4. This drawing and its con 600 OUTLET with new metal boxes LEGEND PLAN 1. Architect to ensure White melamine all drawings finish. All and leading edgescomply with B.C.A, laws and protection. 1000 edges to have white N.C.C. andedging all relevant building codes and statutory (1100) 2100 5. Do not reproduce in full POWERWALL melamine or be Script In (1100) ©Copyright code Relocated ceiling light 2. All dimensions in millimetres unless noted otherwise. PW4 900 (1) SINGLE -GENERAL POWER OUTLET. Ethical shelving for drug storage finished in white ABS RD (HEIGHT) edging (By LAMINEX) Relocated 1 x 1600 3. Do not scale these drawings - Figured dimensions Ex. Ex. Ex.OUTLET. Ex. 00 Ex. Ex. CL DOUBLE -GENERAL POWER script in counter 20 P12 take precedence. Provide 80mm dia (height Ex. 1420mm H Prof. serviceDouble general power outlet Floor Bays R 1325 adjustable) chrome support legs @ (1) 1x Double GPO 4. This drawing and its contents are subject 1500mm centres. Alternate to to copyright (700) POWERWALL with new(HEIGHT) metal boxes RACK 1800 900 (1) (2) 2x Double GPO’s laws and protection. chrome legs -Provide 18mm support code 900 blades under bench at 1500mm crs. PW4 RD (3) 3x Double GPO’s. 5. Do not reproduce in fulltoorprovide in part without supportapproval. 1500 PROFESSIONAL PROFESSIONAL PROFESSIONAL adequate GPO with 20mm grey conduit, fixed Rel. SEP Rel SEB SERVICES SERVICES SERVICES ©Copyright Ex. SEB to wall. Shop fitter's flooring contracter to DashedShop linefitter's denotes flooring contractor to supply and install 100mm high L PROFESSIONAL PROFESSIONAL PROFESSIONAL Signagesupply above on 100mm high and install 1000 "Armstrong" black feather edge vinyl SERVICES SERVICES SERVICES DATA POINTS "Armstrong" black feather edge vinyl skirting POWERWALL 900 (1) Refer to specifications for colour bulkhead. Refer skirting to P11 code (HEIGHT) Relocated ceiling light PREP AREA ELEV. PREP AREA ELEV. Signage plan. PW3 Ex. 1420mm H Prof. servicecoded Floor Bays cabling connectors. CL RD with new metal boxes 2 3 Ex. Ex. DB Ex. to DURESS BUTTON to be installed 116 Ex. 1 : 20 Ex. Ex. 1 : 20 6380 nominated counter. 2 Shop fitter to alllow to paint all 400 3285 EX. SAT 2450 3 WILLACH WILLACH WILLACH WILLACH walls of Prep Area in P1 DULUX 8 EQ. DIV. "Vivid White" SW1G1 acrylic 500 FM 1785 Line denotes proposed 25 x 25mm 3180 saw cut chases for conduit cabling Relocated 1 x 1800 DISPENSARY wash and wear DISPENSARY New SEP Shopfitter to allow to paint all walls to P1 Dulux to counter units. to be installed bydispensary counter 'Vivid White' SW1G1 low sheen acrylic washand P1 All overhead cupboards (with Ex. 1420mm H Prof. servicenominated Floor Bayscontractor. All chasing is P12 17 m² 17 m² wear paint. or without doors) to have with new metal boxes 16mm backing and be P1 Forward subject to a structural engineer's approval and the slab will require relocated 4 x Willach fastmover minimum 400mm deep 500 FM STORE DEVELOPMENT internally. Total overall width PROFESSIONAL PROFESSIONAL PROFESSIONAL scanning. Confirm with Dispensary with door - 432mm Relocated ceiling light CL SERVICES SERVICES SERVICES management prior to cutting slab. Total overall with without Ex. SEB Ex. SEB door - 416mm L PROFESSIONAL PROFESSIONAL PROFESSIONAL Ex. SERVICES Ex.SERVICES Ex. aisle SERVICES (12v) illuminated Low-voltage All overhead cupboards (with or Ex. Ex. 730 Ex.250 Australian 16mm carcass panels with Pharmaceutical Industries Limited. white melamine finish to dispensary counter without doors) to have 16mm R 250 Camberwell Road, overhead cupboards 1820 Relocated Drug safe 1 x 1500 forward gondolas. Allow for 6mm wide x 20 500 FM relocated backing and be minimum 400mm 1500 Ex. 1420mm H Prof. service10mm Floor deep Bays saw cut in floor to run Camberwell VICTORIA 3124. 00 deep internally. Provide adjustable 16mm MDF with new metal boxes health 12v cable to floor gondolas. Total overall width with door - 432mm adjustable Locked bag 3002 Hawthorn BC VICTORIA 3122. shelving x2 to cupboards as shelf www.api.net.au station into 890 Total overall with without door - indicated. White melamine finish. adjustable shelf adjustable shelf Transformers to be plugged GPO's behind wall bays 416mm 1250 All edges to have white Relocated Drug fridge This document and its contents may not be reproduced, melamine edgingdistributed, modified or or be finished 800 800 adjustable shelf adapted without the consent of Priceline Pty Ltd. ABS in white Theedging Priceline trademarks and (By LAMINEX) 500 FM 1070 2025 16mm carcass panels with white adjustable shelf adjustable shelf . associated devices shown in this document are trademarks of Priceline Pty CL . NOTE relocated ol 1850h xmelamine finish to overhead ol Provide D pull handles to all .C .C cupboards customer 595w x cupdoards Relocated ceiling light Ex Numbers indicated beside generalwaiting chairs power outlets, refer 1000 Ex 595d to height above floor level to centre of plate and (no. 1200 FRANCHISE -Ex. "Johnson" 150 x 150mm white tile Ex. Ex. Ex. x2 to cupboards as indicated. Ex. Inner Provide adjustable 16mm MDF shelving Ex. 750 splashback to bench of wall plates) White health melamine finish. All edges to have PARTNER: Shop fitter to supply and install Shop fitter to supply and "Clark" or similar benchmark 16715 Numbers indicated beside data points refer to height fridge white melamine edging or be finished install stainless steel slim 600 600 CL D08 in white ABS edging (By LAMINEX) 930mm single end bowel with paper towel dispenser Ex. SEB 2225 above floor 920 level and (no. of points) CONSULTANT: single tap hole to prep area 2100 750 750 750 750 bench. Relocated. 2300mm H Custom made (1100) (1100) VITAMINS 32mm thick benchtop. Lmainate shelf for script EX. SAT EX. SAT All dimensions to centre of GPO Vitamins Wall Bays Factory Ethical shelving for drug storage finish to benchtop and leading Relocated / Existing Ethical bays and add edges new where required. ready 750 3180 3180 P4 CONSULT Notice board CONSULT Shop fitter electrical contractor to supply and install "Stiebel Eltron" ROOM ROOM instant hot water unit. SNU5/MES to 900 900 VITAMINS (500) basins and SNU10/MES to sink areas Ex. Ex. Ex. PREP AREA Ex. Shop fitter's flooring contractor to 5 m² Ardent Architects Pty Ltd www.ardentarchitects.com CONTACT US 5 m² info@ardentarchitects.com STORE DE supply and install 100mm high Ground Floor, 21 Shierlaw Ave Shop fitter's flooring contracter to (300) 13 m² "Armstrong" black feather edge vinyl Relocated ceiling light Relocated Canterbury VIC 3126ceiling light supply Ph: and Relocated100mm high ceiling install 3317 03 9889 light skirting "Armstrong" black feather edge vinyl FOR CONSTRUCTION ew metal boxes skirting Australian Pharma 3910 250 Camberwell R Ground floor, 21 Shierlaw Ave ROLLEX LEC PGR 353 Camberwell VICT New overhead PREP FRIDGE DRUG New overhead 16mm base panels with white 8 EQ. DIV. Locked bag 3002 melamine finish VITAMINS VITAMINS VITAMINS cupboard cupboard www.api.net.au SAFE 5 PREP AREA ELEV. 600 SUBJECT TO BUILDING SURVEYOR APPROVAL 4 PREP AREA ELEV. Canterbury VIC 3126 This document and its contents ma adapted without the consent of Pric 1 : 20 PROJECT: 1 : 20 associated devices shown in this Ex. grid ceiling in ceiling moulding 1 Architectural moulding profile with Relocated 340mm PROPOSED H400'Prescriptions PRICELINE PHARMACY Allow to provide 3 nom. rear Australia FRANCHISE - area to be painted matt black. PWB 085C to be painted matt and Advice' sign toWerribee front surface bulkhead Plaza shopping centre. Tenancy T102 access 250 hatches to PARTNER: Relocated Drug Relocated Drug black. of dispensary bulkhead Heathas Rd. Hoppers Crossing Victoriadispensary signage 250 3029 Phone: +61 3 9889 3317 (1100) fridge safe 2 CONSULTANT: standard. TITLE: (700) PROPOSED GROUND E-mail: enquire@ardentarchitects.com 1 www.ardentarchitects.com FLOOR PLAN Ardent Architects Pty Ltd (1100) Ground Floor, 21 Shierlaw Ave EXAMPLE DOCUMENTATION NOTE: 2020 Canterbury VIC 3126 1 250 2 Retain existing STORE GRADE: STORE ceiling No: and replace DRAWING water No: damaged tiles. EQUIPMENT LEGEND FOR CON 5 119 3 MED (168-215) 0 106 SUBJECT TO BUILDIN Retain existing ceiling light and replace faulty lights. 2/2020 12:07:25 PM 4 PROJECT: PROPOSED PRICELINE DESIGNED BY: CHECKED BY: APPROVED DATE: EXISTING Werribee Plaza shopping Clean Ex. Air conditioning vents and registers. C.W - - Heath Rd. Hoppers Cross PROJECT NUMBER: PROJECT DATE: SCALE @ A1: Architecture that surpasses expectations 27TITLE: PREP AREA - PAINT 17.05.2019 1 : 50 STORE DEVELOPMENT EXISTING RELOCATED ROLLEX LEC PGR 353 IMAGE CODE LOCATION DESCRIPTION Australian Pharmaceutical Industries Limited. STORE GRADE: STOR REVISED BY: REVISED DATE: REVISION No: 600 600 PREP FRIDGE 0 .5 1 1.5 2 2.5 3m 250 Camberwell Road, MED (168-215) 0 00 DRUG 1:50 Camberwell VICTORIA 3124.
You can also read