Concrete crews are hard at work pouring pads and pathways for
the Senior Park. A majority of work for Phase 1
will be completed this month.
CHESTERFIELD TOWNSHIP
PROGRESS AT A GLANCE
PROGRESS AT A GLANCE PROVIDES A SNAPSHOT LOOK INTO THE ACTIVITIES OF YOUR
MUNICIPAL GOVERNMENT, TOWNSHIP PROJECTS, AND SPECIAL SERVICES.
AUGUST 2021AUGUST 2021
Upcoming Meeting Schedule
Planning Commission August 3 & August 17 7:00 PM
Township Board August 10 & August 24 7:00 PM
Zoning Board August 11 & August 25 7:00 PM
Beautification Committee August 5 7:00 PM
Historical Society August 2 6:30 PM
Parks & Recreation Commission August 25 6:30 PM
Public Engagement: Looking Ahead
Township Offices closed September 6, 2021 for Labor Day.
Board and Commission Vacancies
Are you looking for a way to serve your community? Chesterfield Township is accepting applications and
letters of interest for each of our boards and commissions; Assessing Board of Review, Beautification
Committee, Parks and Recreation Commission, Planning Commission, and Zoning Board of Appeals.
www.chesterfieldtwp.org > Government > Boards and Commissions
Township Office Construction Updates:
Senior Park: Construction is well underway and is expected to last throughout August and into September, with a
majority of the work to be completed in July/August.
Front Entrance Drive & Parking Lot: During early September, the Front Entranceway Drive will begin to see
construction. A majority of the drive and parking lot work will not begin until the Senior Park project is nearing
completion.
Bridge Replacement: Bridge reconstruction has a preliminary start date of Columbus Day Weekend (October 9-
11). During this weekend, contractors will put a temporary bridge in place to access the Township Offices. Throughout
this weekend, there will be no vehicular access to Township Offices or grounds.Historical Society Events: Firebase Chesterfield: August 14 (10 AM - 4 PM) & August 15 (10 AM - 3 PM) We will host the Michigan Military Technical & Historical Society in a Vietnam living history experience. The event will feature a public demonstration of authentic Cold War era combat, encampment life, and vehicle displays. Two battle reenactments will take place daily at 11:00 AM and 2:00 PM. Food and drinks will be available for purchase. Entrance fee is a donation of $1 per person or $2 for a family. Leisure Services Events: Summer Concerts: August 6 (Jukebox Junkies) August 13 (Family Tradition) Friday nights at 6:30 PM join us at the Municipal Offices. Park your vehicles, grab your chairs, blanket, and snacks, and walk over the footbridge to have a family night full of fun. Food Trucks @ the Township: Friday, August 13 (12 PM - 3 PM) Foodies unite for food trucks! Currently on the schedule we have Teener’s Wieners, Whoa! Tacos, Nom Nom Ninja, and Sugar Rush. Follow the Chesterfield Township Leisure Services Facebook page for more details and the most up-to-date listing of available menus/food servicers. Detroit Institute of Arts: Inside|Out Inside|Out brings reproductions of great treasures from the Detroit Institute of Arts into your community. Discover them all around town. See a map of the works of art in our community on the following page and visit dia.org/insideout for maps of other communities and information on upcoming programs.
Township Business
Sidewalk Replacement Program is Underway
More details regarding the Sidewalk Replacement Program can also be found on our website by following the
following prompts, or viewing the report attached:
www.chesterfieldtwp.org > Services > Roads and Sidewalks > Sidewalk Replacement Program
Summer Tax Information
Summer and/or School Taxes are due July 1, and payable July 1 - September 14 without interest. These tax bills include
50% of the Anchor Bay and New Haven school taxes, 100% of the L’Anse Creuse school taxes, County Operating taxes,
Macomb Intermediate school taxes, and Macomb Community College taxes. Check out this infographic showing exactly
where your total tax dollars go, based on the Anchor Bay School Tax Rate. More charts are available on our website.TABLE OF CONTENTS
Project Management Reports
1012-2019 23 Mile Rd. Water Main - Phase 1 Design
1017-2019 Brandenburg Shoreline - Construction
1023-2020 Senior Park
1024-2020 Jefferson Avenue Pathway
1026-2020 2020 Sanitary Sewer CCTV & Cleaning Program
1027-2020 Civic Center Bridge Construction
1028-2020 Civic Center Pavement Rehabilitation
1029-2020 Brandenburg Tennis Courts HMA Rehab & Parking Lot
1030-2021 Maurice DeMuynck Bay Harbor Pump Station Study
1031-2021 2021 New Haven Water Main Project
1032-2021 Peggy Lane Water Main Project
1033-2021 Jefferson Avenue Water Main Project - Phase 1
Special Assessment Districts (SAD) Reports
Building ReportsBrandenburg Shoreline (1017-2019)
July 31, 2021 Project Manager: Josh Sonnenberg
Funding Source: NOAA & Chesterfield Twp Phase: Construction
Estimated Project Budget: $1,348,305.00 Project Cost to Date: $1,031,629.46
Estimated Completion Date: Spring 2021
Change Orders: $11,213.22
Project Details
The shoreline restoration is slated to include 740 linear feet of shoreline softening as well as 1.5 acres of near
shore habitat creation and is primarily funded by a grant from the National Oceanic and Atmospheric
Administration (NOAA). The project will include sections of rocky breakwater intended to promote an increase in
juvenile fish and healthy assemblages of game fish while providing forage for waterfowl, along with shoreline
bioengineering which adds habitat complexity and will provide improved habitat for herpetofauna and
macroinvertebrates. Ongoing communication and collaborative work will be between OHM Advisors, Chesterfield
Township, Great Lakes Commission, NOAA, and other regulatory agencies will be essential for a successful project.
Due to the spawning timeline for the fish habitat, in water work cannot be done between April 1 st and Sept 30th.
Goal is to have additional funding secured and project awarded in August 2020. Winning contractor, Anglin, will
have project prepped and ready to start the site work by November 1, 2020.
Project Status
• Project work will be paused for the summer while the park is being used by the residents. We will take
this time to study the project and plan for additional work will be done in the fall.
• Planting complete in the cove area. Temporary fence installed to protect the new plants fence will remain
in place until spring• Township has repeated the need to keep
the cove area maintained. One notice of
noncompliance was already sent to the
planting contractor. They responded and bed
maintenance work is underway.
• The grading along the shoreline will
continue to settle in the areas were the work
was done. This was expected and the areas will
be filled and repaired during the work in the
fall.
• Where the new shoreline rocks meet the
lawn has also showed signs of settling
additional rocks will be added in the fall.
• Team is developing a punch list work on
these items are ongoing
• Our State and Federal Partners have been
wonderful to work with and have provided us
with additional grant information for future site improvements
• SEMCOG meeting conducted on site and provided a shoreline tour
• For the first time since COVID restrictions started the entire project team and partners met onsite. We
discussed the project thus far and additional improvements moving forward.Senior Park (1023-2020) July 31, 2021 Project Manager: Josh Sonnenberg Funding Source: CBDG $149,734.75 & Township $63,272.50 Phase: Construction Estimated Project Budget: $213,007.25 Project Cost to Date: n/a Estimated Completion Date: August 2021 Change Orders: n/a Project Details Our Seniors have a beautiful indoor space for all-season recreational programming, but their outdoor space is limited. The addition of a Senior Park will permit individuals, who are 55 and older to experience the outdoors in an area they can call their “own.” This park will provide outdoor activities for both the active and passive populations of aging adults. It will include an equipment-based exercise area, raised garden bed, open green space, ADA accessible concrete pathways, a patio pavilion, and shaded areas for programming; all of which will be contained within a fenced perimeter, complete with a locked gate, lush landscape, and park sign with designated use. This project will be finished in two phases. Phase One 2020: • Phase one will include site survey, fence, cement and flat work, patio pavilion foundation, garden bed foundation, courts/programming area foundation, entrance sign, turf, green space and exercise equipment. Upon completion of this phase, senior citizens will have an outdoor recreation area immediately available for use. Phase Two 2021: • Phase two includes a covered patio/pavilion for permanent shade to the patio, a doorway leading into the Senior Center, and the raised garden/flower bed * Engineering for both phases will occur during phase one. Total Project Funding is $213,007.25 with $149,734.75 from CBDG Bricks & Mortar Grant and $63,272.50 Township General Fund Timeline for Phase 1 Concept Idea (Ways and Means) January 15, 2020 Grant Applications Due to Macomb County: February 21, 2020 Grants Awarded: April/May 2020 Grant Agreement Executed: October/November 2020
Engineering Design & Bid Package: December 2020 Bid (MTTN): Posted by: April 30,2021 Bid Opening: May 13, 2021 Board Approval - Bid Award: June 2021 Construction Start: July 2021 Construction End: August 2021 Project Status Formal Grant Agreement has been executed. Project was awarded to WCI Contractors, preliminary site work has begun, footings are in place.
Jefferson Avenue Pathway (1024-2020) August 2, 2021 Project Manager: Mitch O’Connor Funding Source: GL# 101-446-970.000. Phase: Construction Estimated Project Budget: $281,914.35 Project Cost to Date: $252,872.69 Estimated Completion Date: Fall 2021 Project Details This project is a pathway which will connect Sutton Drive to the existing path along the north side of the newly constructed Salt River bridge. The recently restored right-of-way in this area does not provide a safe route for non-motorized travelers and necessitates the construction of a pathway. This pathway includes a modular block retaining wall with guardrails. This retaining wall component is necessary due to the grade changes immediately adjacent to the bridge. Project Status This project is substantially complete. Contractor is completing final restoration. Change Orders Change Order No. 1: Increase permit allowance, removal of utility pole (DTE), realignment of pathway (DTE conflict at Sutton), extension of new wall. Change Order No 2: Additional aggregate base, addition of 2 feet of wood rail fence, and replacing asphalt with concrete on pathway.
2020 Sanitary Sewer CCTV & Cleaning Program (1026-2020) August 1, 2020 Project Manager: Donald Coddington Funding Source: 591-541-801.000 Phase: Construction Estimated Project Budget: $297,681.77 Project Cost to Date: $195,686.86 Estimated Completion Date: July 9, 2021 Project Details Public Works maintains the sanitary sewer infrastructure by implementing a closed caption television (CCTV) and cleaning project for a section of the sanitary sewer. The general focus is to televise the entire sanitary sewer infrastructure over a 10-year period to ensure that we can maintain and repair all potential major defects that are found and to reduce or eliminate inflow and infiltration into our system. Ensuring that our sanitary sewer system is secure and devoid of infiltration helps prevent the unnecessary treatment of clean water by GLWA. Project Status The project went out to bid, with the bid opening taking place on September 29, 2020. Public Works went to the board on October 13 and had the construction portion of the project awarded to DVM Utilities, Inc., at a total cost of $231,505.00, and an updated total project cost of $297.681.77. Project started on April 12. The CCTV and Cleaning portion of the project is complete. AEW is now compiling all potential repairs that need to be made. That list will be given to the DPW shortly. DVM Utilities has been notifying residents 24-48 hours prior to work being done on their street. Change Orders None.
Civic Center Bridge Construction (1027-2020)& Civic Center Pavement Rehabilitation (1028-2020) August 2, 2021 Project Manager: Mitch O’Connor Funding Source: GL# 101-265-975.000 Phase: Bid & Award Estimated Project Budget: $1,024,893.40 Project Cost to Date: $81,814.04 Estimated Completion Date: Fall 2021 Project Details The paving project is for the existing surfaces be milled 2” with isolated full depth repairs where the pavement is showing signs of base failure as well as a crush and shape for the main driveway with 4” HMA cap from Sugarbush to the parking area. Using this approach and with proper maintenance the pavement should last another 10 years. The bridge project will replace the existing timber superstructure with a comparable but thicker timber structure Project Status The bid opening was scheduled for May 18, 2021. The low bidder at the May 18, 2021 bid opening was Blaze Contracting, Inc. The Project was awarded at the June 8, 2021 Board Meeting. A Pre-Construction Meeting was held on June 22, 2021. Construction is scheduled to begin September 7, 2021 and be completed this fall. Change Orders None.
Brandenburg Sport Court Rehabilitation (1029-2020) August 2, 2021 Project Manager: Mitch O’Connor Funding Source: GL: 101-265-975-000 Phase: Construction Estimated Project Budget: $250,000.00 Project Cost to Date: $176,129.46 Completion Date: June 2021 Project Details This project will resurface the existing basketball and tennis court and replace the auxiliary court with three pickleball courts. Project Status Asphalt Specialist Inc. have completed construction and courts are striped and open for use. The Contractor is currently working on completing the Township punch list items Change Orders Change Order No. 1: Change from replacement of existing fence to new black vinyl chain link fence. Change Order No. 2: Additional surfacing material & addition of 1 fence post.
Maurice DeMuynck Anchor Bay Pump Station Study (1030-2021) August 1, 2021 Project Manager: Donald Coddington Funding Source: General Fund Phase: Construction Estimated Project Budget: $162,097.00 Project Cost to Date: $48,742.50 Estimated Substantial Completion Date: September 30, 2021 Project Details The Maurice DeMuynck Anchor Bay Pump Station is in need of some overdue repairs and maintenance. While Public Works has been maintaining the station to the best of its ability, there are some major maintenance and repairs that need to be done that are beyond the scope of the department. We partnered with OHM Advisors to create a package to bring to the board that can begin the overall assessment and recommendation of what needs to be completed, and to create a capital improvement plan (CIP) that will help improve the station's functionality. As of right now the station has four pumps on site, of which three are known to need a fair amount of maintenance or replacement. The study will take roughly four months to complete. Project Status OHM Advisors, Public Works, and Engineering had a workshop on February 8 to discuss the project, as well as have an on-site visit to the pump station to gather more information. A 360-degree walkthrough was created for the building, giving a great depiction of the station and its operation. Additional meetings were held to determine the potential configuration options of the four pumps currently in the station. The meetings gathered information on the potential use of electric, diesel, or natural gas pumps in the station.
A meeting was held with Detroit Pump on July 21 and it was determined that the entirety of the pump shaft and column is beyond repair and will need to be fully replaced. The inspection of this shaft and column is the basis for the condition of all four pumps. The Water and Sewer, Engineering, and Facilities & Operations Departments are working together to determine the course of action to take on this station, as a replacement shaft and column has a 30-week lead time for replacement. Emergency backup plans are also being established in preparation for large rain events. Change Orders None
2021 New Haven Road Water Main Project (1031-2021)
August 1, 2021 Project Manager: Donald Coddington
Funding Source: Enterprise Fund Phase: Design
Estimated Project Budget: $278,700.00 Project Cost to Date: $16,373.10
Estimated Completion Date: October 5, 2021
Project Details
Monicatti Auto Sales is expanding their business by adding a second building onto their property. Per Fire
Department regulations, the new building must have a fire hydrant within 300 feet of the new building, which
requires water main to be built along New Haven Rd. Water main will be installed across Pollard Park, a small DTE
Energy parcel, and Monicatti Auto Sales, which totals approximately 1,200 feet. The debt service for water main
has been paid for the parcels affected by this project.
Project Status
Project started on February 10, 2021, with AEW proceeding with design of the water main. The expectation is to
bid out the project in March or April, with the construction award to be announced at the board meeting that
follows the bid opening.
FDM Contracting, Inc. was awarded the construction portion of the project at the May 25, 2021 board meeting.
FDM Contracting began construction on the water main the week of June 8. Water main has been installed and
water services connected. Project is substantially complete.
Change Orders
• NonePeggy Lane Water Main Project (1032-2021)
August 1, 2021 Project Manager: Donald Coddington
Funding Source: Enterprise Fund Phase: Design
Estimated Project Budget: $2,179,500.00 Project Cost to Date: $9,900.00
Estimated Completion Date: December 31, 2022
Project Details
The Peggy Lane Water Main Replacement Project includes replacing roughly 5,000 feet of water main
along the following roads:
• Peggy Lane (Seaden to Sugarbush)
• Short Court (off of Peggy Lane)
• Seaden Drive (23 Mile to Bower Rd)
Project Status
A project kickoff meeting was held on April 23. OHM Advisors is currently beginning the design phase of
the project.
Design is currently 60% complete.
Change Orders
None.Jefferson Avenue Water Main Project – Phase 1 (1033-2021)
August 1, 2021 Project Manager: Donald Coddington
Funding Source: Enterprise Fund Phase: Design
Estimated Project Budget: $2,380,900.00 Project Cost to Date: $10,800.00
Estimated Completion Date: December 31, 2022
Project Details
The Jefferson Avenue Water Main Replacement Project - Phase 1 includes the following water main
replacement:
• Jefferson Avenue from William P Rosso Highway to 21 Mile Rd - Approximately 4,500 feet
• Rosso Highway east of Jefferson Avenue - Approximately 1,000 feet
Project Status
A project kickoff meeting was held on April 23. OHM Advisors is currently beginning the design phase of
the project.
Design is currently 50% complete.
Change Orders
None.2021 Sidewalk Replacement Program August 2, 2021 Project Manager: Mitch O’Connor Funding Source: GL# 101-446-928.000. Phase: Construction Estimated Project Budget: $439,348.35 Project Cost to Date: $108,304.35 Estimated Completion Date: Fall 2021 Project Details Area of work Zone 1 (see map) This project is to remove and replace the current sidewalk that is rated a #5, or #4 by homeowner request. Rating criteria is: 1. Lip Between Slabs #4 - 3/4 Inch - 1/4 IN length = 2FT #5 - 2+ Cracks > 1/4 IN Wide length > 2FT 3. Cross Slope #4 - Slope > 4% #5 - Slope > 6%
4. Longitudinal Slope #4 - Noticeable Tilt 1IN per FT (>8.33%) 5. Surface of Slab Scaled #4 - 1/4IN Deep #5 - >25% Scaling > 1/4IN Deep 6. Water Ponding #4 - Ponding 1/2IN Deep #5 - Ponding ≥ 3/4IN Deep Project Status This project is currently under construction. Change Orders None.
SPECIAL ASSESSMENT DISTRICT
(SAD) REPORTS
Progress Status Update as of 7.31.2021BBUILDING
UILDINGRREPORTS
EPORTS
ProgressStatus
Progress StatusUpdate
Updateasasofof7.31.2021
8.31.202090 Single Family Residential Permits Processed this fiscal year. 8/3/2021
41 Multi-Family Residential Permits Processed this fiscal year
20 Minor Commercial/Industrial Projects (Interior Buildouts, Remodel, Miscellaneous Improvements ect…)
3111 Miscellaneous Permits Processed this fiscial yeat (Fence, Windows, Roofs, Sheds, Plumbing, Mechanical, Etc…)
- Jan. Feb Mar. Apr. May Jun.
Single Family 13 8 39 6 13 10
Multi Family 0 0 2 0 29 0
Commercial/Industrial 1 2 3 4 3 2
Total Permit: 268 298 359 584 600 571
- Jul. Aug. Sept. Oct. Nov. Dec.
Single Family 5
Multi Family 10
Commercial/Industrial 4
Miscellaneous 433
Plan Review Stage Milestone Dates
Project Name Address Project Type Applied Permit Issued Final C/O Status
Home 2 Suites 29328 23 Mile Rd New Building(Bldg) 9/19/2018 Review in Process
New Building(Eng) 3/2/2019 11/15/2017 Approved
4/11/2019 *Plan revision Submitted
Cabela's 45959 Towne Center Addition/Remodel(Bldg) 6/2/2020 Review in Process
Addition/Remodel(Eng) N/A N/A
*Re-submitting new Design
23 Mile Senior 31150, 31244, 31260 New Building(Bldg) 9/23/2020 Review in Process
Apartments 23 Mile Rd New Building(Eng) 9/23/2020 Review in Process
Gordon Foods 51630 Gratiot Remodel (BLDG) 3/30/2021 Review Complete, Permit Ready
Remodel (ENG) N/A N/A
Maxi Mini Storage 47555 Gratiot New Building(Bldg) 6/19/2021 Ready to issue 7/16/21
New Building(Eng) 6/19/2021 Approved
Construction Stage Milestone Dates
Project Name Address Project Type Applied Permit Issued Final C/O Status
Grace Assisted Living 29891 23 Mile Rd New Building(Bldg) 8/28/2017 10/30/2017 12/21/2018 Temp C/O
New Building(Eng) 9/7/2017 1/2/2018 Under Construction
5/23/2019 Operating under a Temporary Certificate of Occupancy *Site work under Construction
Serenity Village 47640 Gratiot New Building(Bldg) 7/14/2016 9/12/2016 7/6/2018 Temp C/O
New Building(Eng) 6/6/2016 7/27/2016 Under Construction
Tru Hotel 45301 Market Place New Building(Bldg) 2/20/2019 6/10/2019 Under Construction
New Building(Eng) 1/16/2019 3/29/2019 Approved
Town Place Suites 45255 Market Place New Building(Bldg) 2/11/2018 6/10/2019 Under Construction
New Building(Eng) 7/24/2019 3/29/2019 Approved
Great Lake Foot & Ankle 32743 23 Mile Rd Interior Remodel(Bldg) 12/11/2019 6/30/2020 Under Construction
Interior Remodel(Eng) N/A N/A
Leo's Coney Island 51800 Gratiot New Building(Bldg) 4/15/2020 6/4/2020 Under Construction
51848 Gratiot New Building(Eng) 4/15/2020 Under Construction
Leo's Coney Island 51848 Gratiot Interior Remodel(Bldg) 8/17/2020 10/5/2020 Under Construction
Interior Remodel(Eng) N/A N/A
Dental Office 52840 Gratiot New Building(Bldg) 5/29/2020 10/7/2020 Under Construction
Sadikoff Dentistry 09-17-227-017 New Building(Eng) 5/29/2020 10/7/2020 Under Construction
Attendant Care Services 32525 23 Mile Rd Major Office Reno.(Bldg) 8/18/2020 10/6/2020 Under Construction
Major Office Reno.(Eng) N/A N/A
Chesterfield Twp. PRV 31000 Concordia New Construction(Bldg) 9/11/2020 9/25/2020 Under Construction
Station 55800 Gratiot New Construction(Eng) In-House Review In House Review
Gallo Companies 45313 Market Place New Building(Bldg) 6/4/2020 10/8/2020 Under Construction
Chesterfield Corner, LLC New Building(Eng) 1/31/2020 9/28/2020 Under Construction
Macomb Power Sports 46301 Gratiot New Sales Facility(Bldg) 8/30/2020 10/9/2020 Under Construction
New Sales Facility(Eng) 8/30/2020 9/25/2020 Under Construction
Villiage of East Harbor Kiely New Building(Bldg) 11/22/2019 11/24/2020 Under Construction
*Multi. Cottage Unit within PUD New Building(Eng) 10/1/2019 2/18/2020 Review Completed 2/18/20
Villiage of East Harbor 50900 Gerring Dr New Building(Bldg) 11/15/2019 11/24/2020 Under Construction
Independent Living Building New Building(Eng) 10/1/2019 2/18/2020 Review Completed 2/18/20
Villiage of East Harbor 33875 Kiely Addition(Bldg) 11/15/2019 11/24/2020 Under Construction
(Additon to Existing
Heathcare/Wellness) Addition(Eng) 10/1/2019 2/18/2020 Review Completed 2/18/20
Monicatti Auto Sales 55800 New Haven New Building(Bldg) 11/9/2020 11/25/2020 Under Construction
New Building(Eng) 11/9/2020 11/18/2020 Review Completed 11/18/2020
*In house Review
GT Auto 54191 Gratiot New Building(Bldg) 10/21/2020 12/9/2020 Under Construction
*Multi-Unit Industrial Building New Building(Eng) N/A
Fitbody Boot Camp 52396 Gratiot Interior Remodel(BLDG) 1/8/2021 2/10/2021 Under Construction
Interior Remodel(ENG) N/A N/A
Clear Water Fresh Farm 50750 E. Russell Schmidt Interior Remodel(BLDG) 1/8/2021 3/11/2021 Under Construction
Interior Remodel(ENG) N/A N/A
Kohl's 50500 Gratiot Interior Remodel(BLDG) 2/17/2021 3/24/2021 Under Construction
Interior Remodel(ENG) N/A N/A
Bayview Medical 32743 23 Mile Rd Ste. 150 Remodel & Tank Install(BLDG) 2/8/2021 2/25/2021 Under Construction
2/2/21 Admin
Remodel & Tank Install (ENG) 2/2/2021 Approval Under Construction
Evident Church 52101 Gratiot Addition (BLDG) 3/15/2021 5/18/2021 Under Construction
Addition (ENG) 3/15/2021 5/18/2021 Under Construction
Viscount Pools 27659 23 Mile Rd New - Interior Build out (BLDG) 3/25/2021 5/19/2021 Under Construction
New - Interior Build out (ENG) N/A N/A
Prestige Commons 33503 23 Mile Rd Addition (BLDG) 3/4/2021 8/3/2021 Under Construction
Addition (ENG) 3/4/20201 Under ConstructionUS Mattress 51405 Gratiot Build-Out(BLDG) 5/12/2021 7/28/2021 Under Construction
Build-out(ENG) N/A N/a
Motor City Stamping 47783 Gratiot New Building(Bldg) 7/1/2021 7/13/2021 Under Construction
New Building(Eng) 7/1/2021 Under Construction
Chesterfield Laundromat 45429 Market Place Interior Build-Out(Bldg) 6/25/2021 7/29/2021 Under Construction
Interior Build-Out(Eng) N/a N/A
SE Michigan Vets Facility Sugarbush New Building(Bldg) 3/18/2019 State Agency
New Building(Eng) 1/29/2019 State Agency
5/23/2019 *State of Michigan Performing Insecptions and Approvals
Completion / Certificate of Occupancy Stage Milestone Dates
Project Name Address Project Type Applied Permit Issued Final C/O Status
Storypoint 51760 Gratiot New Building(Bldg) 5/8/2017 8/30/2017 7/15/2019 C of O Issued
New Building(Eng) 4/20/2017 8/28/2017 7/15/2019 Site Work Finaled
MSGCU 45120 Market Place Major Renovations(Bldg) 7/2/2019 7/26/2019 1/3/2020 C of O Issued
Major Renovations(Eng) N/A N/A N/A N/A
Hand & Stone 50932 Gratiot Interior Buildout(Bldg) 11/8/2019 12/18/2019 2/27/2020 C of O Issued
Interior Buildout(Eng) N/A N/A N/A N/A
Dunkin/Baskin 46895 Gratiot Interior Buildout(Bldg) 8/19/2019 8/20/2019 4/14/2020 C of O Issued
Interior Buildout(Eng) N/A N/A N/A N/A
Dunkin Dounts 46895 Gratiot New Building(Bldg) 5/20/2019 8/19/2019 5/27/2020 C of O Issued
New Building(Eng) 8/19/2019 5/27/2020 Site Work Finaled
Remax 45437 Market Place Buildout of New Office(Bldg) 12/27/2019 1/17/2020 5/29/2020 C of O Issued
Buildout of New Office(Eng) N/A N/A N/A N/A
New Baltimore Family Dentist30260 23 Mile Rd New Building(Bldg) 5/7/2019 6/11/2019 6/25/2020 C of O Issued
New Building(Eng) 4/7/2019 5/21/2019 6/25/2020 Site Work Finaled
Motor City Stamping 47825 Gratiot Addition(Bldg) 9/24/2018 11/9/2018 7/10/2020 C of O Issued
Addition(Eng) 11/1/2018 11/9/2018 Site Work Finaled
Bj's Gas Station 45115 Towne Center New Building(Bldg) 3/14/2019 5/31/2019 7/14/2020 C of O Issued
New Building(Eng) 3/27/2019 Site Work Finaled
Super Cuts 50944 Gratiot Interior Buildout(Bldg) 3/20/2020 5/27/2020 7/27/2020 C of O Issued
Interior Buildout(Eng) N/A N/A N/A N/A
Zuccaro's Chapel Addition 46601 Gratiot New Building(Bldg) 5/25/2018 6/5/2018 8/4/2020 C of O Issued
New Building(Eng) N/A N/A N/A N/A
AIT 29700 Commerce Addition(Bldg) 8/9/2018 12/14/2018 9/29/2020 C of O Issued
Addition(Eng) 10/1/2018 11/4/2018 Site Work Finaled
Comerica Bank 32777 23 Mile Rd Interior Reno(Bldg) 5/8/2020 7/2/2020 9/15/2020 C of O Issued
Interior Reno(Eng) N/A N/A N/A N/A
Presbyterian Village 33875 Kiely Remodel(Bldg) 11/16/2016 2/16/2017 10/7/2020 C of O Issued
Remodel(Eng) N/A N/A N/A N/A
Presbyterian Village 33875 Kiely Additon(Bldg) 11/16/2016 5/18/2017 10/7/2020 C of O Issued
Addition(Eng) 10/4/206 3/6/2017 Site Work Finaled
Olive Garden 27169 23 Mile Rd New Building(Bldg) 10/18/2018 5/17/2019 9/1/2020 C of O Issued
New Building(Eng) 11/15/2019 4/5/2019 Site Work Finaled
Schaller 29933 Commerce Addition(Bldg) 12/5/2018 6/19/2019 10/7/2020 C of O Issued
Addition(Eng) 9/21/2018 6/19/2019 10/7/2020 Site Work Finaled
Bj's Construction 46385 Contintental New Building(Bldg) 3/12/2019 6/25/2019 10/7/2020 C of O Issued
New Building(Eng) 3/12/2019 6/25/2019 10/7/2020 Site Work Finaled
Best Buy 50400 Waterside Interior Remodel(Bldg) 1/8/2020 1/24/2020 10/8/2020 C of O Issued
Interior Remodel(Eng) N/A N/A N/A N/A
Interior Reno/Expansion Of
Turbo/Industrial 46460 Continental Office(Bldg) 12/3/2019 1/27/2020 11/11/2020 C of O Issued
Interior Reno/Expansion Of
(Reno & Mezzanine Build out) Office(Eng) N/A N/A N/A N/A
Aldi 50700 Waterside New Building(Bldg) 8/20/2019 4/22/2020 11/12/2020 C of O Issued
New Building(Eng) 8/20/2019 3/2/2020 11/12/2020 Site Work Finaled
Bj's Warehouse 45101 Towne Center New Building(Bldg) 3/14/2019 5/31/2019 12/2/2020 C of O Issued
New Building(Eng) 3/27/2019 5/31/2019 12/2/2020 Site Work Finaled
Value City Furniture 50400 Gratiot Interior Buildout(Bldg) 9/11/2020 10/8/2020 11/11/2020 C of O Issued
Interior Buildout(Eng) N/A N/A N/A N/A
Center For TLC 30330 Hickory Addition(Bldg) 5/19/2020 7/29/2020 1/12/2021
Addition(Eng) N/A N/A
Burlington Coat Factory 50355 Waterside New Building(Bldg) 12/4/2019 2/12/2020 2/19/2021 C of O Issued
New Building(Eng) 11/26/2019 2/12/2020 2/19/2021 Site Work Finaled
Beaumont Hospital 50630 Chestefield Rd Interior Buildout(Bldg) 8/17/2020 10/5/2020 3/2/2021 C of O Issued
Suite Building Out Interior Buildout(Eng) N/A N/A 3/2/2021 N/ABeaumont - Ugrent Care 50964 Gratiot Interior Buildout(Bldg) 9/3/2020 11/24/2020 3/2/2021 C of O Issued
Interior Buildout(Eng) N/A N/A
Green Car Wash 45115 Market Place New Building(Bldg) 6/2/2020 7/15/2020 5/10/2021 CofO issued
New Building(Eng) 5/12/2020 5/10/2021 Site Work Finaled
Savvy Sliders 27830 23 Mile Rd. New - Interior Build out (BLDG) 3/24/2021 4/13/2021 5/25/2021 C of O issued
New - Interior Build out (ENG) N/A N/A
Fire Station 1 26001 22 Mile Rd Addition(Bldg) 8/13/2019 9/10/2019 6/18/2021 CofO issued
Addition(Eng) 8/13/2019 N/a
Arctic Circle Brewery 27663 23 Mile Rd Interior Remodel(Bldg) 3/23/2020 9/18/2020 6/4/2021 CofO issued
Interior Remodel(Eng) N/A N/A
Home Goods 26303 Bay Vista Drive New Building(Bldg) 2/3/2020 9/26/2020 6/28/2021 CofO issued
New Building(Eng) 2/3/2020 9/29/2020 6/28/2021 Site Work FinaledYou can also read