Community Information Booklet
www.westerndownsgreenpowerhub.com.au
contact@westerndownsgreenpowerhub.com.auFinland
GLOBALLY Ireland
The company is headquartered
in Paris, France, and has two France
Australian offices – in Sydney and
United States Jamaica
Canberra.
Portugal
We operate across renewable Mexico
energy technologies including
El Salvador
solar, wind and storage in Europe,
Central America, Africa, the Mozambique
Middle East and Australia. Zambia
Argentina Australia
LOCALLY
Neoen Australia began operations
in 2012. Over the last seven years
DeGrussa Solar and Storage Project
the company has initiated the
Dubbo Solar Hub
development of more than 1GW
Hornsdale Wind Farms 1, 2, 3
Hornsdale Power Reserve
Parkes Solar Farm
Griffith Solar Farm
of solar and wind projects through
Coleambally Solar Farm organic growth, local partnerships
Bulgana Green Power Hub Numurkah Solar Farm and strategic acquisitions.
Neoen produce green electricity from renewable sources such as sunlight and wind
using mature, tried and tested technologies. We are also leaders in energy storage.
Page 2WORLD’S
L A R G E S T B AT T E R Y
HORNSDALE
POWER RESERVE
LESS THAN SIX
MONTHS
FROM PROJECT
INCEPTION TO
COMPLETION
• 100MW Lithium-ion battery located
next to Hornsdale Wind Farm
• Owned and operated by Neoen
• Installed and maintained by Tesla
• Provides grid stability services
• Saved SA energy consumers
$50 million in 2018
• 50MW Stage 2 now under construction
REDUCES RISK
OF BLACKOUT
IN SOUTH
AUSTRALIA
Page 3DELIVERING CHEAPER ENERGY
FOR INDUSTRY
LAVERTON STEELWORKS
VICTORIA
Laverton Steelworks have agreed to take power from
Neoen's 128 MW Numurkah Solar Farm under a 15-year
deal. GFG Alliance’s Executive Chairman Sanjeev Gupta said
the deal would help lower energy costs at Laverton.
DEGRUSSA MINING
WESTERN AUSTRALIA
DeGrussa is the largest off-grid solar battery storage
project in Australia. It powers a gold and copper mine in
remote WA. Commissioned in June 2016, it provides a
solar and storage solution to the majority of the mine’s
daytime electricity requirements, offsetting up to 20% of
total diesel consumption annually.
NECTAR FARMS
VICTORIA
Bulgana Green Power Hub, consisting of 196 MW of wind
backed by a 20MW battery, is co-located with agri-business
Nectar Farms to provide secure and affordable energy.
Nectar Farms is using the latest in hydroponic glasshouse
and plant technology to create a 10 hectare state of the art
facility and over 130 local jobs.
Page 4WESTERN DOWNS GREEN POWER HUB
OVERVIEW
Will span across 150MW 400MW Will be located High solar
1,545 hectares battery storage solar farm near the irradiance of
of land Kogan Creek 1,968 W/m2
Power Station
Page 5PHASE 1:
PROJECT LIFE CYCLE
DE VEL OPM ENT
Choose site Meet local Meet Environmental
land owners traditional surveys,
owners local input,
design Community
Info Day
We are
here
CONTRACT
Appoint Grid connection Government Public Government
contractors agreement approval exhibition submission
Local jobs
session PHASE 2:
CONST RUCT ION
Regular
community
Arrange finance Prepare for Hire workers Build updates
construction
PHASE 3: Testing &
OPERATION accreditation
Operations
& maintenance
Launch Community Plant trees Generate Grid
benefit sharing celebration electricity connection
program
Site visits
& open days Back to phase 1
Plant operates
for 25+ years
Environmental Land management Annual benefits Renewal or
monitoring & farming continues sharing program decommission?
Decommission
Page 6W H AT H A P P E N S
DURING CONSTRUCTION
300-400 people
during peak construction
7-10
permanent
staff
EARLY WORKS CONSTRUCTION STAGES
MAY/JUNE 2020 JULY 2020 TO FEBRUARY 2022
IN THE TOWN ON THE ROADS AT THE SITE
Increased numbers Road upgrades Surveys being conducted
As early construction works The project will b e accessed via Currently undergoing extensive
commence, you will start to see Sixteen Mile Hall Road, which in consultation with the Barrangum
more project and construction staff turn will be accessed via Kogan Native Title Group – Aboriginal
around town. Condamine Road. cultural heritage survey, while a
Cultural Heritage Agreement has
The local service economy will see Prior to construction, extensive road
been agreed and signed.
an increase in their business. upgrades will be made to Sixteen
Mile Hall Road to ensure that it is a Construction hours will be Monday to
At peak, the numbers of construction graveled pavement road. Upgrades Saturday from 6am to 6pm.
staff will be up to 300 to 400 people. to the road will be in-line with
We expect construction staff to Western Downs Regional Council
come from surrounding towns standards.
Chinchilla, Dalby and Tara, as well as
the wider Toowoomba and Brisbane
areas.
Page 7OUR TEAM
DEVELOPERS, OWNERS & OPERATORS
Development Manager: Anne Frederic
Construction Manager: Laszlo Csanyi
Community Relations Manager: Lisa Stiebel
EPC contract
will be awarded
in April 2020
ENGINEERING, PROCUREMENT & CONSTRUCTION
CONTRACTOR
Overall control of the site, managing deliveries of equipment and design of the solar farm.
ELECTRICAL CIVIL & MECHANICAL SUBSTATION
INSTALLATION SUBCONTRACTOR SUBCONTRACTOR
SUBCONTRACTOR Site establishment, road and drainage Design and construction of the solar
Electrical installation of AC and DC works. Mechanical installation of the farm’s substation including high
cable systems and PV module cables. PV panels and tracking system. voltage (HV) equipment.
Page 8EMPLOYMENT OPPORTUNITIES
Engineering, Procurement & Construction Contractor
General roles available
Administration
Security
Waste Recycling
Electrical Installation Civil & Mechanical Substation Subcontractor
Subcontractor Subcontractor Roles available
Plant Operators Labour roles Administration
Roles available Civil
roles available available
Electricians General Labour
Loader Concreters
Electricity installation Electricity installation
Excavator Pipelayers
Electrical Trade Assistants
Grader General Labour Electrical Trade Assistants
Roller
Dump Truck
Watercarts
Forklift and/or
Telehandler
Trucks
Pile Driver
SUPPLIER OPPORTUNITIES
Goods and services we expect to be procured with a planned start date of June/July 2020:
Accommodation Safety Products (Local)
Cleaners Septic Pump Out Services
Computer Small Equipment Hire
Network Support Transport (Minor)
Crane (Minor Lifts) Waste Management (Liquid)
Earthworks Plant (Wet and Dry Hire) Waste Management (Solid)
Fencing and Gates Water (Construction)
Food and Catering Service Water (Potable)
Freight Concreters
Fuel Concrete Supply
Material Testing Welding & Engineering Fabrication (Site Services)
Mechanical Fitter/Maintenance Operation & Maintenance Facility Construction
Quarry Products
Anyone interested in working on the project, can email
contact@westerndownsgreenpowerhub.com.au with the following information:
Name and Contact Details
Service Area – Electrical/Mechanical/Civil
Brief Summary of skills and experience
Details will then be sent on to the appropriate person within one of our contractors.
Page 9P R O J E C T L AY O U T & L O C AT I O N
General Information
N PV-Module Rating (Wp) 340
Inverter Rating at 35°C (MVA) 2.2
W E
Nb of MVPS type 1: 4.4 MVA 101
S Nb of MVPS type 2: 2.2 MVA 8
Nb of Panels/Strings 29
Nb of Strings/Tracker 3
Nb of Trackers/Inverter 80
Nb of Trackers 16,800
Nb of Strings 50,400
Nb of Panels 1,461,600
DC Power of PV plant (Wp) 496,944,000
AC Power of PV plant at 35°C (MVA) 462
Area of PV plant (Ha) 1,400
Distance between two tracker rows - "Pitch" (m) 7
LEGEND :
MVPS BLOCK BOUNDARIES
5.5 MVA MVPS
2.75 MVA MVPS
A0 Preliminary design
N° Modifications Made by Date Check by Date
Customer :
N° of Project :
NEOEN WESTERN DOWNS SOLAR FARM
EPC Contractor :
Title document :
GENERAL LAYOUT
PRELIMINARY DESIGN
Drawn By : Checked By : Approved By : Date Scale Format Sheet
27/03/2018 1:20,000 A3 1/1
Project Title Area Code Issuer Doc type Pack code Seq N° Rev
A0
Chinchilla
W
ar
reg
o
Hw
r Rd
y
a
ooy
ey C
Western Downs Koga
n Con
Green Power Hub damin
e Rd
Oak
Dalby
Leich
hard
t Hw
Toowoomba
y
20km
Page 10LOCAL COMMUNITY ECONOMIC BENEFITS
BENEFITS
$100,000 PER YEAR
FOR LOCAL PROJECTS AND
INITIATIVES THROUGHOUT
THE PROJECT LIFESPAN
(APPROXIMATELY 30 YEARS)
$540 MILLION 300-400 JOBS 7-10 JOBS
INFRASTRUCTURE CREATED DURING CREATED DURING
INVESTMENT CONSTRUCTION OPERATIONS
E N V I R O N M E N TA L B E N E F I T S
ABILITY TO PRODUCE APPROXIMATELY
1,031,400 MWh
PER YEAR WHICH IS EQUIVALENT TO:
DISPLACING POWERING REMOVING PLANTING
825,120 TONNES 224,364 HOMES 23,092 CARS 8,457,480 TREES
OF CO 2 EMISSIONS FROM THE ROAD
Page 11www.neoen.com/en Natasha Lawrence, Project Manager 0499 490 330 natasha.lawrence@neoen.com