Procurement Strategy for Transport - A strategy to outline the procurement by Porirua City Council for Roading and Transport activities

Page created by Peter Christensen
 
CONTINUE READING
Procurement Strategy for Transport - A strategy to outline the procurement by Porirua City Council for Roading and Transport activities
Procurement Strategy
for Transport
A strategy to outline the procurement by
Porirua City Council for Roading and
Transport activities

Final
October 2019
Procurement Strategy for Transport - A strategy to outline the procurement by Porirua City Council for Roading and Transport activities
VERSION HISTORY
   Version              Date                   Description            Owner         Revision Due

      1              12/9/2014                                  Manager Roading      2016/17
      2             01/09/2018                                  Transport Manager    2021/22
      3         2 September 2019             Major rewrite in   Transport Manager    2022/23
                                            advance of tender
                                            round for Network
                                              Maintenance
     3.1           16 Sept 2019                   Edits         Transport Manager    2022/23
     3.2           16 Oct 2019               Edit post NZTA     Transport Manager    2022/23
                                              feedback PS
    Final          18 Oct 2019                 Finalisation     Transport Manager    2022/23

Roading Procurement Strategy October 2019                                                  2
Procurement Strategy for Transport - A strategy to outline the procurement by Porirua City Council for Roading and Transport activities
;
CONTENTS PAGE

1.     Executive Summary ........................................................................................... 4
     1.1     Overview ..................................................................................................... 4
     1.2     Recommendations ...................................................................................... 5
     1.3     Council Endorsement .................................................................................. 5
2.     Context .............................................................................................................. 6
     2.1     Strategic Objectives .................................................................................... 6
       2.1.1        Council’s Overall Strategic Objectives .................................................. 6
       2.1.2        Growth in Porirua ................................................................................. 6
       2.1.3        Specific Transport Enhancements ........................................................ 8
       2.1.4        Asset Valuation and Condition ............................................................. 8
       2.1.5        Overall Financial Strategy .................................................................... 9
     2.2     Outcomes and objectives for the Transport Procurement Strategy ............ 10
     2.3     NZTA’s Procurement Requirements .......................................................... 11
     2.4     Other Factors affecting Procurement......................................................... 11
       2.4.1   Organisation-wide Procurement Policy............................................... 11
       2.4.2   Regional Procurement ....................................................................... 12
       2.4.3   Public Private Partnership model in Porirua City ................................ 12
       2.4.4   Other Strategic Documents ................................................................ 12
3.     Procurement environment ................................................................................ 13
     3.1     Analysis of Supplier Market ....................................................................... 13
       3.1.1        s17A and Delivery Strategy. ............................................................... 13
       3.1.2        Professional Services Providers ......................................................... 13
       3.1.3        Physical Works Contractor Market ..................................................... 14
     3.2     What do we need to buy? - Analysis of planned spend ............................. 15
     3.3     Impact of Council Procurement on others.................................................. 17
4.     Procurement Programme ................................................................................. 18
     4.1     Procurement Programme .......................................................................... 18
       4.1.1        Contracting Strategy .......................................................................... 18
       4.1.2        Detailed programme and procurement approach ............................... 19
       4.1.3        Simplified Programme timeline ........................................................... 23
     4.2     Unusual/Advanced procurement ............................................................... 23
5.     Implementation................................................................................................. 24
     5.1     Capability and Capacity - general.............................................................. 24
     5.2     Internal Procurement Processes ............................................................... 24
     5.3     Performance Measurement and Monitoring............................................... 25
     5.4     Communication Plan ................................................................................. 25
Appendix 1 – Council Transport Structure ............................................................... 26

Roading Procurement Strategy October 2019                                                                                    3
Procurement Strategy for Transport - A strategy to outline the procurement by Porirua City Council for Roading and Transport activities
1. EXECUTIVE SUMMARY
1.1 Overview
Porirua is experiencing and planning for additional considerable growth. Annual
residential growth is over twice the historical average, and there are major
investments in the region such as the Eastern Porirua Regeneration Project, Porirua
Adventure Park, Kenepuru Landing, Plimmerton Farms etc. This growth, and the
completion of major projects such as Transmission Gully will increase the pressure
on our roading and transport network.

Porirua City Council (Council) has undertaken significant long-term planning with a
Growth Strategy 2018 to 2048 and a Long-Term Infrastructure Strategy 2018 to
2038. To accompany these and Council’s other planning initiatives, this procurement
strategy outlines how Council will plan and procure the delivery of projects and
services to support the transport network.

Historically, the investment in the transport network has been less than ideal. Council
had other infrastructure and funding priorities so adopted a ‘high risk’ investment
profile and capped funding in transport for a period; but is now moving to a medium-
risk profile. In addition, our contracting strategies and internal management
processes to monitor these have not always resulted in the desired levels of service
and/or outputs.

The following diagram summarises the issues/challenges and how these are
addressed in this procurement strategy.

            Issues/Challenges                                Addressed in this Procurement
       Increasing Growth in Porirua                                    strategy

     Specific transport initiatives (TG                    Increased investment – from high risk
                 impacts)                                 strategy to medium risk strategy for LTP
                                                                          funding
    Prior under-investment in roading
              infrastructure                              Specific projects to address TG linkages
                                                                        and impacts
          Backlog of maintenance
                                                         Unbundling contracts to get greater focus
           Asset condition deficits                       on maintenance activity and good value
                                                                       for money
              Market conditions
                                                         Increased focus on RAMM data quality in
     Under capability/capacity within                                 new contracts
               Council
                                                          Council change in structure to ensure it
                                                                  has capability/capacity

Roading Procurement Strategy October 2019                                             4
1.2 Recommendations
Council recommends:

    a) the New Zealand Transport Agency (NZTA) endorse this strategy and the
       programme described within it; and

    b) continued approval by NZTA under s26 of the Land Transport Management
       Act for the use of in-house professional services.

Council also notes that three are no advanced components or variations to the NZTA
Procurement Manual.

If approval of the full Procurement Strategy is delayed then approval of the Roading
Maintenance Contract procurement component is sought ASAP to allow this to go to
the market in Q4 2019.

1.3 Council Endorsement
Procurement Strategy Owner:                 Transport Manager

Once endorsed this strategy will apply to all procurement involving NZTA funding and
will be owned by Council’s Executive Leadership Team, specifically managed by the
Transport Team, and overseen by the Procurement Committee.

This is not a standard alone document but is to be read in conjunction with the
Transport Activity Management Plan 2018-21.

The Procurement Strategy will be reviewed on an on-going basis as part of the
Management Plan Review. A full review will occur at least every three years or when
a major change in funding policy or process occurs. Next review date is 2022/23.

Roading Procurement Strategy October 2019                                              5
2. CONTEXT
2.1 Strategic Objectives
             Council’s Overall Strategic Objectives

The transportation activity fits within Council’s strategic priorities as set out in the
Long Term Plan 2018 to 2038 of;
• a growing prosperous and regionally connected city
• a great village and city experience –ensuring that our city’s infrastructure is
   resilient and fit-for-purpose, connecting our city through walking, cycling and road
   networks.

Our transport network plays a big part in this as it helps us connect safely and
efficiently. We want an integrated network to ensure that our drivers, pedestrians,
cyclists and public transport users can travel safely and conveniently around and
through our city.

             Growth in Porirua
Council has developed a Growth Strategy 2018 to 2048. The Growth Strategy is in
response to, and to influence future growth pressures in Porirua. These include:
• Residential growth is currently running at 2.2% per annum – a significant increase
   on the historical 1% per annum
• Porirua may get as many as 29,000 extra people by 2048
• There is significant urban development planned and underway. There is $1.5
   billion of investment in Eastern Porirua through the regeneration strategy. There
   are a number of other urban developments – both greenfield and increasing
   intensification of residential areas.

The growth principles included are (highlight added):
• A diverse and inclusive city
• A harbour-centred city
• A compact and liveable city
• A connected and active city
• A city of opportunities and prosperity
• A resilient city

The principles of “Compact and liveable”, “connected and active” and “a resilient city”
have clear implications for transport networks. The effect of growth will be an
increased pressure on the roading network. In Porirua, 57% of residents use a car to
get to work with 12% using public transport (2013 census). In addition, in the
Wellington region, cars represent 68% of all trips and 81% of distance covered
(Ministry of Transport, Household Travel Survey 2015-18).

The following spatial layout from the Growth Strategy indicates the 30 Year Growth
Horizon and expected intensification of development, including some major transport
routes:

Roading Procurement Strategy October 2019                                              6
Spatial Layout from Council’s 2018-2048 Growth Strategy:

Roading Procurement Strategy October 2019                  7
Specific Transport Enhancements

Transmission Gully (TG) is a
significant investment in the
region and should improve
overall resilience. Council is
contributing around $40m for its
Link Roads due for completion
by July 2020. These changes will
have a significant effect on the
way traffic flows through, and
within, the Porirua City region.

In addition, due to the direct
linkage with TG, the Kenepuru
Corridor is expected to see
significant changes of use. For
example, the southern section is expected to incur increased vehicle usage by about
4,000 plus vehicles per day (a 20+% increase).

             Asset Valuation and Condition
The transport assets in Porirua have a total replacement cost of $332 million (as at
December 2018 as follows:

                                                         Depreciated
                                     Replacement        Replacement         Annual      Cumulative
 Asset Group                                Cost                Cost   Depreciation    Depreciation
 Formation                           $ 69,273,453       $ 69,273,453            $-               $-
 Subbase                             $ 31,897,872       $ 29,993,867       $39,681      $ 1,904,005
 Basecourse                          $ 39,407,108       $ 18,327,236      $440,001     $ 21,079,872
 First Coat Seals                    $ 12,458,627        $ 5,052,709      $154,700      $ 7,405,918
 Surface                             $ 17,116,771        $ 5,856,046      $969,319     $ 11,260,725
 Carparks                                   $960,001       $472,239        $23,231        $487,762
 Bridges & Large Culverts            $ 27,199,009       $ 17,251,378      $291,978      $ 9,947,631
 Drainage                            $ 16,769,503        $ 6,096,291      $277,671     $ 10,673,212
 Footpath                            $ 46,902,766       $ 21,562,427      $613,692     $ 25,340,338
 Islands                                    $928,967       $429,121        $13,991        $499,846
 Minor Structures                              $890            $415            $59            $474
 Railings Railings                    $ 1,406,331          $519,075        $65,269        $887,257
 Retaining Walls                     $ 13,892,447        $ 6,493,471      $232,114      $ 7,398,976
 Signs                                $ 1,777,541          $613,366       $118,503      $ 1,164,174
 Street Lights                       $ 16,985,410        $ 9,976,734      $566,181      $ 7,008,676
 Surface Water Channel               $ 35,379,932       $ 17,618,349      $472,522     $ 17,761,582
 Traffic Signals                            $127,636        $ 25,527       $ 8,509        $102,109
 Total                              $ 332,484,263      $ 209,561,704   $ 4,287,422    $ 122,922,560

Roading Procurement Strategy October 2019                                                 8
The following are the performance measures reported through our LTP/Annual
Report processes:

  Measure                                   Result 2018/19       Target 2018/19
  Response to service requests:
  Percentage of customer service
  requests relating to roads and
  footpaths responded to within the                             More than 85% within
  agreed timeframes                              64%             agreed timeframes

  Road safety: Number of fatalities
  and serious injury crashes on the
  local road network (expressed as a                           Contribute to a reducing
  number)                                         17             trend over 5 years

  Road condition: The average
  quality of ride on sealed local roads                       More than 75% quality of
  (smooth travel exposure by NZTA)               79%                    ride

  Road maintenance: Percentage of
  sealed local road network that is                            9% resurfaced (external
  resurfaced                                     3.7%                contractor)

  Footpaths: Percentage of footpaths
  that are in average or better                                More than 97% in better
  condition                                     97.4%           or average condition

  Resident satisfaction with the                                   More than 70%
  condition of:                                                     satisfaction
                                                 47%
       (a) local roads                                             More than 70%
       (b) local footpaths                       51%                satisfaction

In addition, some of our Road Assessment and Maintenance Management (RAMM)
database data is not as reliable as we desire and we are investing to insure we
continually improve the quality of our RAMM information.

             Overall Financial Strategy

In addition to the Growth Strategy, Council has developed its Long Term Plan 2018 –
2038. Rather than a 10 year view we are now taking a 20 year view of financing and
funding. Included in this is a specific Infrastructure Strategy, linked to the LTP and
the Asset Management Plans:

Roading Procurement Strategy October 2019                                                 9
The financial strategy indicates forecast 4.98% rates increases for the next two years
of the Long Term plan. A significant amount of this increase is just to address the
historical underfunding of depreciation across Council and is not for additional
service levels.

The funding in the Infrastructure Strategy aims to address the following:

•   The backlog of maintenance to be addressed in the next 2-3 years (however
    funding is constrained on 2019/20).
•   Large capital to address capacity issues and alleviate congestion points. The
    Long Term Plan is moving to a more targeted funding of transport projects over
    the next ten years. This will include capital projects, improvement and
    maintenance that have longer term impacts on the City’s networks, both for
    vehicle movements and the movement of the people around the City by cycle or
    foot
•   In the last few years the Council has moved from a high risk strategy to a medium
    risk strategy, with the objective of bringing much of the network up to a fit for
    purpose condition and providing a network that delivers value for Council and all
    the users of the Transport system.

2.2 Outcomes and objectives for the Transport
    Procurement Strategy
A key outcome is to deliver value for money and a coherent response to the
challenges and opportunities that present themselves to Council in the next three
years (and beyond). Investing in the transport network is part of the critical
infrastructure to promote and support economic growth.

Council is a significant user of public money, and that the expenditure of this money
has a significant impact on the local and domestic economy and the overall
performance of the Council. Every action undertaken to spend these funds is publicly
discoverable and the use should reflect the practice of good governance and
financial management. To this end the Transport team uses the Council and NZTA
procurement processes and frame works to deliver value for money on the transport
programme and for the wider council. This strategy aims to be consistent with the
Porirua City Council Procurement Policy (#969114), the One Network Roading
Classification (ONRC) requirements and the NZTA Procurement Manual.

NZTA are a significant funder and partner of Council transport infrastructure. This
procurement strategy is to align with NZTA requirements.

Roading Procurement Strategy October 2019                                             10
2.3 NZTA’s Procurement Requirements
The NZTA’s procurement requirements are:
   • Value for money
   • Competitive and efficient markets
   • Fair competition among suppliers

The proposed contracting strategy in the following sections has taking that into account
with the contracting strategy and programme. Council has based its procurement
policy on the Government Procurement Rules. The NZTA Procurement Manual is used
to drive the transport programme and its related programmes. Council is driving
improved procurement practices across the Transport Team and the entire
organisation including ensuring:

•   Each procurement decision is driven by the principles of ‘best value over whole of
    life’, having due regard to propriety
•   Using the Government Procurement Rules and guidance to inform and direct
    Council’s procurement policy
•   Promote open and effective competition including full and fair opportunity for all
    suppliers
•   Promote awareness of its Sustainable Procurement Policy among Transport staff
    involved in the procurement of infrastructure and services
•   Establish organisational targets and measure associated progress to support
    continued improvement in procurement practices.

Council also aligns its procurement activity with NZTA requirements. Council’s
Procurement Policy states that ”any officer engaged in any NZTA subsidised work
should have a clear understanding of the NZTA procurement manual, its requirements
and principles”. It also states that ”All procurement projects for NZTA subsidised work
shall follow the procedures set out in the NZTA Procurement manual. The tender
evaluation procedure must be specified in the Conditions to tendering and the method
specified must be adhered to”.

2.4 Other Factors affecting Procurement

             Organisation-wide Procurement Policy

This Transport Procurement Strategy fits within Council’s Procurement Policy of July
2018. The purpose of the Procurement Policy is to provide guidance to staff and
suppliers to achieve our Long-Term Plan objectives. It defines how Council will
undertake procurement decisions, the processes involved and provides clarity to
suppliers and the community on what Council will consider in procurement and the
guiding procurement principles.

The Scope of Council’s Procurement Policy applies as follows:
•   All Council staff with responsibility for procuring goods and services do so in
    accordance with the Financial Delegations Policy
•   Consultants or contractors used to advise on, arrange or manage a procurement
    process for Council

Roading Procurement Strategy October 2019                                             11
•   Any Officer engaged in any NZTA subsidised work should have a clear
    understanding of the NZTA procurement manual and its requirements as well as
    the principals in this policy.

             Regional Procurement
There are no immediate plans to secure wholesale regional procurement of
Transport services at the current time. Currently Council does secure traffic signal
maintenance and operation via a regional procurement process. However, the
Transport team is aware of the procurement strategies, contracts and contractors
working on road assets in adjacent authority areas. For example, the One Network
Road Classification (ONRC) involves categorising roads based on the functions they
perform as part of a national network. These classifications will assist local
government and NZTA to plan, invest in, and maintain and operate a transport
network in a more strategic, consistent and affordable way throughout the country.

Council may investigate the potential of joint procurement of some further transport
asset services at a future date, if it is deemed to deliver value for money and is not
inconsistent with the procurement strategy or procedures in operation at that time.

At this stage, regional procurement is not expected to realise tangible value as there
is no one contractor who could service more than one council in any real and efficient
fashion.

             Public Private Partnership model in Porirua City
The TG programme involves Council in the construction of the two Link Roads
(connecting to/from Waitangirua and Whitby) associated with the development.
Construction of TG began in 2015/2016. The Council Link Roads are being procured
using a separate, standard, Design and Construct contract procured via the TG
Public Private Partnership (PPP). Under this procurement process, Council has
contracted directly with the principal construction subcontractor as part of the PPP
Consortium. This work is now current and ongoing with practical completion
programmed to occur prior to July 2020.

             Other Strategic Documents
Key planning documents that inform the transport programme and the development
of this procurement strategy include:
• Land Transport Management Act 2003
• Local Government Act 2002
• Porirua City Council District Plan
• Porirua City Council Long Term Plan
• Porirua City Council Growth Strategy 2018 to 2048
• Porirua Long-Term Infrastructure Strategy 2018 to 2038
• Porirua City Council Transport Asset Management Plan 2018
• Government Procurement Rules
• NZTA Procurement Manual
• Wellington Regional Land Transport Plan 2015
• Wellington Regional Land Transport Strategy: 2010-2040
• Making Cycling Safer and More Attractive The NZ Transport Agency’s cycling
    safety action plan 2015
• Safer Journeys - NZ’s Road Safety Strategy 2010-2020
These documents are available on request from the relevant authority.

Roading Procurement Strategy October 2019                                                12
3. PROCUREMENT ENVIRONMENT
3.1 Analysis of Supplier Market
             s17A and Delivery Strategy.
Councils are required to determine the cost-effectiveness of different funding,
governance and service delivery options under s17A of the Local Government Act
2002. A review of roading and transport activities under s17a confirms the overall
contracting out of the physical works and retention of in-house of governance and
management capability.

Council retains an in-house team to plan and manage the delivery of the transport
projects with its major purchases being professional services and physical works.
Council continues to provide some professional services in-house to improve the
effectiveness of strategic alignment and delivery e.g. the preparation of funding
applications and the design of small / low risk transportation and safety improvement
projects, while outsourcing specialised professional services and when additional
capacity is required.

The following table summarises the delivery mechanisms:

                               Activity                    Delivery mechanism

      Asset Management                                     In House / Contracted
      Specialist technical and asset management advice     In House / Contracted
      Community safety                                           In House
      Structures inspections and management                In House / Contracted
      Associated road strategy and maintenance issues      In House / Contracted
      Physical works contract management                   In House / Contracted
      Operational aspects of managing Porirua roads              In House
      (overweight permits, corridor access requests CARS
      temporary traffic management plans etc.)
      Maintenance physical works                                Contracted
      Physical renewals and improvements                        Contracted

             Professional Services Providers
Council currently uses a professional service provider to deliver Roading Asset
Management Professional Services. The scope of the work includes but is not limited
to:
    • Pavement Testing and Analysis
    • Condition Rating
    • Development of Maintenance Strategy
    • Pavement Performance Modelling (dTIMS)
    • Road Asset Valuation.

Specialised professional services will continue to be sourced from external providers
where no internal expertise and/or capacity exists.

Roading Procurement Strategy October 2019                                            13
Physical Works Contractor Market

There are ongoing macro-economic considerations for the physical works market:

•   Cost of capital is generally low, with historically low interest rates, but there are
    uncertainties about future global economic demand, the effects of climate change
    and climate change policies on roading/transport projects etc.
•   Cost of labour is increasing with a generally low unemployment rate and forecast
    rises to the minimum wage having a knock-on effect to the next tier of workers
•   Cost of inputs increasing and variable, with oil prices and exchange rates
    increasing, and supply of materials such as aggregates sometimes uncertain
•   The impact of increased focus on Health & Safety and traffic management plan
    requirements which are necessary and appropriate but do sometimes constrain
    capacity, flexibility, and increase costs.

The contracting market in the region is notable for:

•   Three (3) major contractors dominating the major capital and long term
    transportation maintenance contracts, being Fulton Hogan, Higgins, and Downer
    with all being major national providers
•   Minor contractors available for small works, often subcontracting to one or more
    of the aforementioned major contractors.

The contracting market is in a period of heightened uncertainty as:

•   TG as a major project which is tying up considerable resources of equipment and
    labour with a revised, stated, completion date of ‘sometime’ in 2020 although
    there is the potential for this to be delayed.
•   The Otaki Expressway is also a significant project which is programmed to
    continue through to 2021
•   Challenges for local councils to deliver on their chip resealing and renewal
    activities
•   Uncertain commitment to the next tranche of major physical transportation
    projects. Many Roads of National Significance (RONS) projects are on hold or
    postponed.

The above factors transpire into an observed increase in civil construction costs with
indications that roading unit rates have increased significantly in the lower North
Island. Contractors appear to be ensuring that all tenders are appropriately
profitable, and in some cases are not tendering if they do not immediately have
sufficient resource and/or certainty of making a minimum financial return. There is no
indication that contractors are securing long term work for certainty at reduced
profitability.

This uncertainty in the contractor market is expected to last through the next 2-5
years (which is also the timeframe when the major regional projects such as TG and
the Otaki Expressway are completed) and this needs to be taken into consideration
in procurement planning.

To ensure reliability of supply of emergency works, the primary response is included
in the Roading Maintenance Contract.

Roading Procurement Strategy October 2019                                              14
3.2 What do we need to buy? - Analysis of planned
    spend
Council has allocated additional subsidies from NZTA (being the increased Funding
Assistance Rate (FAR) to 56% and new subsidies on footpath work) particularly to
areas that have fallen behind, such as sealed pavement maintenance, sealed road
resurfacing, sealed pavement rehabilitation and footpath renewals. Where possible
drainage renewals and structures maintenance have also received additional budget
allocations compared to historical spend, to start catching up on previous
underspend and to finance particular projects.

Intersection upgrade projects are programmed for areas of growth and change due to
TG. There is a significant expenditure envisaged for revocation and/or TG
Integration planning work, the cost of which is estimated by Council but not yet
approved by NZTA due to NZTA not progressing their Revocation business case.
Walking and cycling projects are the other major capital expenditure projects. There
is also known slip, seawall and erosion work to be managed.
These projects have been submitted via Transport Investment Online (TIO) and into
the Regional Land Transport Programme (RLTP).

The budget below sets out the annual profile of spend on physical assets for
Transport. The programme includes physical works for all Transport activities
(subsidised and un-subsidised).

                                                                                     2019-22
                                            2018/19   2019/20   2020/21   2021/22   (3 years)
                                             $000      $000      $000      $000       $000
                                                        LTP       LTP
 Project Description                        Budget      Yr2       Yr3     LTP Yr4    Total
 Roading & Safety Maintenance

 111 - Sealed Pavement Maintenance             408       421       450        464         1,335
 113 - Routine Drainage Maintenance            359       370       390        402         1,162
 114 - Structures Maintenance                  326       334       355        366         1,056
 121 - Environmental Maintenance               454       468       493        508         1,469
 122 - Traffic Service Maintenance             211       219       240        248           706
 123 - Operational Traffic Maintenance           5         5         5          5            16
 124 - Cycle Path Maintenance                   51        53        55         57           165
 131 - Level Crossing Warning Device             5         5         5          5            15
 151 - Network & Asset Management              431       440       459        468         1,367
 Minor Events Emergency works                  107       110       114        117           341
 NZTA 003 - Activity Management Plans           51        52        53         54           159
 Traffic Services Maintenance -
 Streetlighting Power                          519       530       541        553      1,624
                                                                                           -
 Accessways                                      61        63        64        65        192
 Asset Management                                20        21        22        22         65
 CAR Management                                 247       250       253       256        759
 CBD Canopies & Walkways                        219       223        68        70        361
 Footpath Maintenance                            68        71        73        75        219
 Footpath RAMM                                   15        16        16        17         49
 Footpath Vegetation                             77        79        82        84        245
 432 - Road Safety Promotion                    183       189       194       200        583
 Maintenance subtotal                         3,817     3,920     3,932     4,037     11,889

Roading Procurement Strategy October 2019                                            15
2019-22
                                            2018/19   2019/20   2020/21   2021/22   (3 years)
                                             $000      $000      $000      $000       $000
                                                        LTP       LTP
 Project Description                        Budget      Yr2       Yr3     LTP Yr4     Total
 212 - Sealed Road Resurfacing                1,248     1,288     1,329       871      3,488
 213 - Drainage Renewals                        511       159        80        83        322
 214 - Sealed Road Pavement
 Rehabilitation                                408       421       435        449          1,305
 215 - Structures Component
 Replacements                                   61        63        65         67            195
 222 - Traffic Services Renewals               382       395       408        421          1,224
 321 - New Traffic Management Facilities        20         5         5          5             15
 Sealed Pavement Mtce - Reseal
 Preparation Work                               331       342       353       365          1,060
 Footpath Renewals                              537       211       217       127            555
 Capital subtotal                             3,499     2,884     2,892     2,388          8,163

 Offstreet Parking                              68        71        73         75           219
 Street Furniture                               56        57        59         60           176
 Transport (non-subsidised) Assert
 Management                                    133       137       141        146           424
 Unsubsidised subtotal                         257       265       273        281           819

 Roading & Safety Maintenance
 subtotal                                     7,573     7,068     7,097     6,706     20,871

 Capital Projects
 141 - Emergency Works                          765       365       373       381          1,119
 323 - Transmission Gully                    12,787     6,014         -         -          6,014
 341 - Minor Improvements                       245       250       266       272            788
 Albatross Close slip repair work             1,500         -         -         -              -
 Conversion of all Streetlights to LED          606         -         -         -              -
 Intersection Upgrades                          746     2,304     1,182     1,291          4,777
 LTP - New Road Connections, Eskdale             25       730         -       218            948
 LTP - Roading Bridge Upgrade, Kenepuru
 Culvert                                          -         -       501         -        501
 Walking and Cycling Pathway Priorities         306       297       517         -        814
 Seawalls                                         -       146       490       354        990
 SH1 & SH58 Revocation Project                  180       210       102       275        587
 Wineera to CBD Pathway                         918         -         -         -          -
 Wineera to Onepoto Walkway & Cycleway          408     2,710         -         -      2,710
                                             18,486    13,026     3,431     2,791     19,248

 Total                                       26,059    20,094    10,528     9,497     40,119

Excluding Council’s TG Link Roads, it plans to spend $40m on its transport network
in the three year funding period 2019/20 to 2021/22. The Long Term Plan (LTP)
reports Council’s aim to restrict rates increases to 5% for the 2018/19 year and
beyond. This restriction of rates increases requires an overall budget reduction in
conjunction with improved reprioritisation of funding allocation.

Roading Procurement Strategy October 2019                                             16
The 2015/25 LTP determined to move from the high-risk scenario to a planned
medium-risk scenario. This means that an additional $12.8m is expected to be
required over the next ten years. This investment would take the transport network to
a 30% likelihood of significant failure of an asset resulting in a loss of service. At this
stage, we are two (2) years into a six (6) year progression to achieve 30% likelihood
of loss of service. A purposeful progression towards reduced threat of failure and
sustained prioritised investment is considered appropriate for Council, given the
competing financial demands on the city’s infrastructure.

3.3 Impact of Council Procurement on others
The Council considers the impact of its procurement on other approved
organisations. Currently, with the contracting strategy outlined in section 4.1.1 we are
focusing on our own organisation’s procurement activities and foresee limited impact
on other approved organisations, or opportunities for collaboration (beyond ongoing
collegial/professional dialogue).

This procurement strategy will be published on Council’s website and communicated
directly to regional stakeholders.

Roading Procurement Strategy October 2019                                                17
4. PROCUREMENT PROGRAMME
4.1 Procurement Programme
             Contracting Strategy

Historically our contracting approach for transport contracts has been:
• Tendering for major capital projects
• A major Network Maintenance Contract (NMC) bundling roading maintenance,
    renewals/reseals, vegetation control, lighting maintenance and ancillary services.
    Contract. Council’s latest iteration of the NMC, AM000046, started in May 2015
    and has been contracted to Downers.

The current NMC has been challenging and has not met its expectations. This is
related to:
• Ongoing under-investment in asset renewals leading to lower than desirable
    asset condition
• RAMM data quality not increasing appreciatively
• Insufficient contract monitoring by Client to ensure service levels are being met.

Our contracting strategy for the medium term aims to address this by significantly
changing our contract philosophy. We will carry out the following:
• Unbundling contracts. We will unbundle AM00046 services including:
   o Split ‘core’ maintenance activities from renewals/rehabilitations/reseals.
       Maintenance activity will be let on a medium term contract (3+1+1) to lock in a
       maintenance provider (see table below).
   o Renewals and reseals will be let by annual programme to give Council
       flexibility, and also enable competitive bidding as major projects such TG are
       completed in the region.
   o Split out street lighting as this is generally a subcontracted service or a
       discrete business unit within some roading companies. With the change to
       LED’s there is also a changing work profile to this activity.
   o Vegetation Control will be let as a standalone contract.
   o Remove other minor ancillary services that are often subcontracted (e.g.
       traffic counting).
• Greater financial control within contracts. We will increase use of ‘unit rates’
   within contracts and reduce ‘lump sums’ so that there is greater transparency in
   the delivery of services enabling payments to be more closely linked to delivery of
   quality outcomes.
• Increasing Contract Management. We have increased resources and capability
   within the Transport team to match both the increased internal management
   required for unbundled contracts and to improve monitoring to ensure the service
   output levels are being achieved.
• Ensuring our procurement processes adequately account for non-price attributes.

The overall unbundling should also support competitive markets – different
contractors may pick up portions of the work – rather than having one Contractor
dominate. This unbundling and greater financial control de-risks the contract pricing
for both the Council and Contractors and should provide greater transparency.

Our approach also has been to take into account NZTA’s objectives of obtaining best
value for money, obtained by fair competition and encouraging competitive and
efficient markets.

Roading Procurement Strategy October 2019                                               18
Detailed programme and procurement approach

Based on the contracting strategy above, the following table summarises the
procurement project by segment, the nature of the activities, bundling of contracts,
delivery models and selection methods, and the impact on NZTA objectives.

Roading Procurement Strategy October 2019                                              19
Contracted Works
    Segments             Inclusions                    Existing                  Procurement basis    Selection & Contracting                  Meeting NZTA Procurement
    and value1                                         Contracts                                      Approach                                 Objectives
    Major capital        Link roads, traffic           Let by Project            Delivery model –                 Generally NZTA Price         Open tendering achieving good value
    (circa $6m in        safety                                                  mostly staged2. Some             Quality Method.              and fair competition.
    the next 2           enhancements etc.             Contract value            generally smaller
    years following                                    varies from year          projects let as design           Small (
Contracted Works
 Segments    Inclusions                     Existing            Procurement basis    Selection & Contracting                Meeting NZTA Procurement
 and value1                                 Contracts                                Approach                               Objectives
 Road        Footpath and                   Current Contract    Delivery model staged.     NZTA Price Quality Method        Achieving good value by providing
 maintenance pavement repairs,              expires June                                   (PQM), incorporating an          certainty for a contractor and working
 (circa $2m         Drainage                2020                By Medium term             Engineers Estimate, and a        through integration with Council
 annually)          maintenance                                 Contract (3+1+1)           Schedule of Prices (SoP) for     processes/asset information and a
                                                                                           transparency.                    focus on maintenance outcomes.

                                                                                           NZS3917: 2013 as a base
                                                                                           document. Reference to all
                                                                                           appropriate NZTA technical
                                                                                           standards with a technical
                                                                                           and performance
                                                                                           specification developed from
                                                                                           good practice.

 Professional       A Professional          Professional        Delivery model mostly      Will retender with a             Achieving good value by reducing
 services           Services Contract       Services Contract   staged for technical       weighted attribute model.        transaction cost of each service
 (circa $0.6m       provides the basis      for three years     support. In-house                                           appointment being tendered.
 annually but       for the majority of     runs through to     expertise maintained       Ongoing direct appointment       Transparency through the
 higher with        this professional       30 September        for planning and           for specific technical advice.   Professional Services Contract.
 design works)      support.                2020 with a         decision-making,
                                            possible            contract management        ACENZ contract form will         For small works avoid cost of
                    Additional low value    extension of 2      etc. as per current.       generally be used.               tendering through direct appointment.
                    specific works (e.g.    further years.
                    design works) may                           Will retender the
                    be procured directly                        Professional Services
                    from the                                    Contract either at the
                    Professional                                end of the term of the
                    Services Contract or                        extension period.
                    from providers
                    directly.                                   May also appoint
                                                                technical professional
                                                                services directly as per
                                                                the NZTA procurement
                                                                manual and in

Roading Procurement Strategy October 2019                                                      21
Contracted Works
 Segments           Inclusions              Existing             Procurement basis    Selection & Contracting        Meeting NZTA Procurement
 and value1                                 Contracts                                 Approach                       Objectives
                                                                 accordance with
                                                                 Council’s procurement
                                                                 policies.

 Ancillary          Vegetation Control,     Most expire June     Delivery model staged.   Generally weighted         Transparency as these are usually
 services           Street light            2020                                          attributes                 delivered by specialist
 (Circa $0.5m       maintenance, traffic                         Each service by                                     subcontractors.
 annually)          counting etc.           Vegetation           medium term contract     NZS3917: 2013 or bespoke
                                            control              – generally open         service-based contracts.
                                            value less than      market (smaller
                                            $200k                contracts less than
                                                                 $200k may be through
                                                                 closed contest)
                    Traffic signals         Porirua is a party   Tendered regionally as   NZTA methodologies         Competitive markets by retaining two
                    operations &            to a Wellington      a staged delivery                                   different contractors in the market.
                    maintenance             Regional             model at the same                                   Transparency through a regional
                                            Services Contract    time as WCC – with                                  agreement.
                                            with NZTA and        different contractors
                                            other regional       for each portfolio.
                                            TA’s bar WCC.
                                            Minor value

Roading Procurement Strategy October 2019                                                    22
Simplified Programme timeline

The following shows the simplified timeline for procurement, with considerable activity in Q4 of 2019 and early in 2020 to implement new
contracts.

                                                 2019                      2020                                       2021                                  2022
Simplified Programme                        Q3          Q4     Q1     Q2          Q3        Q4         Q1        Q2          Q3   Q4      Q1           Q2      Q3          Q4
Current Maintenance and Reseals
Contract
Roading Maintenance Contract
  Tender period and award                          Tender
  Contract                                                                   New Contract                                                                   Ongoing -> 2023 + 1 +1
Renewals & reseals Programme
  Tender                                                     Tender                              Tender Y2                             Tender Y3
  Programme of works                                                         Year 1                                     Year 2
Annual Capital
  Tender period and award
  Contract                                                                             Various dates                                   Various dates
Vegetation Control
  Tender
  Contract                                                                                                                                                  Ongoing -> 2023 + 1 +1
Streetlight maintenance
  Tender
  Contract                                                                                                                                                  Ongoing -> 2023 + 1 +1
Professional Services
  Current Contract                   Current Contract                                  Extension period                                                               New Contract
  Tender

4.2 Unusual/Advanced procurement
No unusual procurement or advanced procurement activity is planned at this stage.

Roading Procurement Strategy October 2019                                                                   23
5. IMPLEMENTATION

5.1       Capability and Capacity - general
Council has recently reviewed and refreshed its staffing structure. There have been
improvements in the oversight and staffing of the transport group to give better focus
and continuity to the overall transport program. Appendix 1 outlines the new
structure.

This structure should provide sufficient capability and capacity to ensure Council can
implement the procurement programme in conformance with NZTA requirements.
5.2 Internal Procurement Processes
Council has a comprehensive procurement policy aligned with the Government
Procurement Rules and uses GETS extensively. The Procurement Committee is the
internal governance group accountable for the procurement policies and processes.
It oversees all procurement plans and all procurement over the value of $100,000 as
high risk procurement. All of these must go to the Procurement committee to be
vetted and signed off for publishing and then for the contract to be signed. This is to
mitigate any unforeseen risks in these larger, and/or higher risk, contracts and
projects.

Council’s procurement team provide the overall framework for procurement with the
Transport Team providing the specific transport technical knowledge and evaluative
expertise. Each teams’ accountabilities and responsibilities are summarised below:

                   Procurement Team                       Transport Team
  Accountabilities • Procurement                      •   Overall Transport
                      Framework                           Procurement activity
                   • Ensure Procurement               •   Funding arrangements with
                      Committee oversight.                NZTA
                                                      •   Procurement in accordance
                                                          with NZTA.
  Responsibilities       •   Project management       •   Specific technical expertise
                             support where required       for projects
                         •   GETS coordination        •   NZTA approved procurement
                         •   Monitoring and               plans
                             Reporting procurement    •   NZTA approved evaluator/s.
                             activities
                         •   Contract Register.

Following from the NZTA audit in late 2019, Council ensures that it has NZTA
approved evaluators on all evaluation panels and is using current versions of all
NZTA documents for evaluation purposes.

Roading Procurement Strategy October 2019                                                24
5.3 Performance Measurement and Monitoring
The following will be undertaken to measure and monitor this procurement strategy:

    •    Performance measures as listed in section 2.1.4 will be annually reviewed
         and reported.
    •    Each major procurement exercise is monitored by the Procurement
         Committee through its procurement plan through to reported results to ensure
         fair competition, and value for money and competitive markets.
    •    This Procurement Strategy is reviewed every three years.

5.4 Communication Plan
The procurement strategy will be communicated through the following media:
• On the intranet for internal stakeholders
• On the internet for external stakeholders
• GETS
• Direct email to neighbouring territorial Local Authorities and NZTA
• As part of the Activity Management Plan process.

Roading Procurement Strategy October 2019                                            25
APPENDIX 1 – COUNCIL TRANSPORT STRUCTURE

Roading Procurement Strategy October 2019   26