VRIC Cambridge House Presentation - January 2019 - coromining.com
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Disclaimer
This presentation includes certain forward-looking statements securities of Coro
about future events and/or financial results which are forward- Mining Corp. The potential target tonnage and grade noted for the
looking in nature and subject to risks and uncertainties. Such Marimaca project are conceptual in nature as there has been
forward-looking statements or information, including but not insufficient exploration to define mineral resources, and it is
limited to those with respect to the development of the Marimaca uncertain if further exploration will result in these targets being
project, metal prices, metallurgical results and resource estimates, delineated as mineral resources.
involve known and unknown risks, uncertainties, and other factors
which may cause the actual results, performance or achievements Unless otherwise indicated, Coro has prepared the technical
of the Company to be materially different from any future results, information in this presentation (“Technical Information”) based on
performance or achievements expressed or implied by such information contained in the technical reports and news releases
forward-looking statements or information. Forward-looking (collectively the “Disclosure Documents”) available under Coro
statements include without limitation, statements regarding the Mining Corp.’s company profile on SEDAR at www.sedar.com. Each
company’s plans, goal or objectives and future completion of mine Disclosure Document was prepared by or under the supervision of a
feasibility studies, mine development programs, capital and qualified person (a “Qualified Person”) as defined in National
operating costs, production, potential mineralization, resources and Instrument 43-101 – Standards of Disclosure for Mineral Projects of
reserves, exploration results and future plans and objectives of Coro the Canadian Securities Administrators (“NI 43-101”). For readers to
Mining Corp. Forward-looking statements can generally be fully understand the information in this presentation, they should
identified by the use of forward-looking terminology such as “may”, read the Technical Reports (available on www.sedar.com) in their
“will”, “expect”, “intend”, “estimate”, “anticipate”, “believe”, or “ entirety, including all qualifications, assumptions and exclusions that
continue” or the negative thereof or variations thereon or similar relate to the information set out in this presentation which qualifies
terminology. There can be no assurance that such statements will the Technical Information. Readers are advised that mineral
prove to be accurate and actual results and future events could resources that are not mineral reserves do not have demonstrated
differ materially from those anticipated in such statements. economic viability. The Disclosure Documents are each intended to
Important factors that could cause results to differ materially from be read as a whole, and sections should not be read or relied upon
expectations include risks associated with mining generally and pre- out of context. The Technical Information is subject to the
development stage projects in particular. The company is an assumptions and qualifications contained in the Disclosure
exploration, development & mining company. Many references to Documents. All Dollar amounts in this presentations are US Dollars
resources and other geological and technical information contained unless otherwise stated.
herein have not been verified by an independent expert and are
either not in accordance with the requirements under National Sergio Rivera, Vice President Exploration CEO of Coro Mining Corp, a
Instrument 43-101 or have not been prepared in accordance with a geologist with more than 35 years of experience is the Qualified
preliminary or final feasibility study. Potential investors should Person for the purposes of NI 43-101 and has approved this written
conduct their own investigations as to the suitability of investing in disclosure.
2Why Copper?
1. Population growth
GROWING
2. Urbanization
DEMAND
3. Electrification
1. Increasing risk
FALLING
2. Declining project quality
SUPPLY
3. Financing challenges
4Chile: First For Copper
#1 Copper resources
#1 Copper mines
#1 Industrial and commercial infrastructure
5Mining Lifecyle S-Curve
Relative Share Price
DEPLETION
DEPOSIT DEFINITION
DEPOSIT DRILLING
INITIAL DRILLING
DISCOVERY ORPHAN PERIOD
EARLY EXLPORATION ADVANCED EXLPORATION CONSTRUCTION PRODUCTION
6Geological Setting: Copper Manto Deposits
Mantos de la Luna
Michilla
MEJILLONES
MARIMACA
Mantos Blancos
ANTOFAGASTA
1011
Defining the Scale of Marimaca
12WHY INVEST? Unique Project Strong Team Time is Now
You can also read