Country Report (Draft) - UNCRD
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Seventh Regional EST Forum in Asia
“Next Generation Transport Systems We Want for 21st Century ~ Looking Beyond Rio+20”
Bali, Indonesia, 23-25 April, 2013
Country Report
(Draft)
-------------------------------------
This country report was prepared by Brunei Darussalam as an input for the Seventh Regional EST Forum
in Asia. The views expressed herein do not necessarily reflect the views of the United Nations.Country Report/Brunei Darussalam
Name of the Country:
Country Report BRUNEI DARUSSALAM
Name, Designation and Organization Respondent:
Public Work Department, Ministry of Development, &
Land Transport Department, Ministry of Communications
Other Organizations contributing to Country Report:
Voluntary Progress/Achievements/Initiatives towards Goals of the Bangkok 2020 Declaration
With the objective of demonstrating the renewed interest and commitment of Asian countries towards realizing
a promising decade (2010-2020) of sustainable actions and measures for achieving safe, secure, affordable,
efficient, and people and environmentally friendly transport in rapidly urbanizing Asia, the participating
countries of the Forum discussed and agreed on a goodwill and voluntary declaration - “Bangkok Declaration
for 2020 – Sustainable Transport Goals for 2010-2020”. The objective of the Country Reporting is to share
among international community the progress and achievements made, including various challenges faced, by
countries in implementing each of the underlined goals. This would also help development agencies, donors,
and MDBs in assessing the sustainable transport needs and challenges to better devise their existing as well as
future capacity building programs and operations in sustainable transport.
1/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
I. Strategies to Avoid unnecessary travel and reduce trip distances
1 Formally integrate land-use and Any action had been taken so far? Challenges faced in implementation:
transport planning processes and ☐ Not yet Finance
related institutional arrangements at ☐ Some (design – piloting) Transport Survey
the local, regional, and national levels ☐ Largely in Place Roadside interview
☐ Fully Completed
“Avoid” Strategy
(Please Check the box)
Examples of pilot projects and/or policies developed or under development – include URLs
where relevant
Centre For Strategy and Policy Studies (CSPS) preparing a Land Transport Master Plan (LTMP)
which will shape the country's land transport policy up to and beyond 2035
Important Actions you will take in 2013
2/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
2 Achieve mixed-use development Any action had been taken so far? Challenges faced in implementation:
and medium-to-high densities along ☐ Not yet Data Gathering
key corridors within cities through ☐ Some (design – piloting)
appropriate land ‐ use policies and ☐ Largely in Place
provide people ‐ oriented local ☐ Fully Completed
access, (Please Check the box)
“Avoid” Strategy
and actively promote transit-oriented Examples of pilot projects and/or policies developed or under development – include URLs
development (TOD) when where relevant
introducing new public Brunei/Muara Master Plan
transport infrastructure Bandar Seri Begawan Development Master Plan
Important Actions you will take in 2013
Improve public transportation and facilities
Implementation of projects in accordance to the master plan
3/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
3 Institute policies, programmes, and Any action had been taken so far? Challenges faced in implementation:
projects supporting Information and ☐ Not yet
Communications Technologies ☐ Some (design – piloting)
(ICT), such as internet access, ☐ Largely in Place
teleconferencing, and telecommuting, ☐ Fully Completed
“Avoid” Strategy
as a means to reduce unneeded travel (Please Check the box)
Examples of pilot projects and/or policies developed or under development – include URLs
where relevant
Important Actions you will take in 2013
II. Strategies to Shift towards more sustainable modes
4 Require Non-Motorized Transport Any action had been taken so far? Challenges faced in implementation:
“Shift” Strategy
(NMT) components in transport ☐ Not yet Finance
master plans in all major cities and ☐ Some (design – piloting) Space to built facilities
prioritize transport infrastructure ☐ Largely in Place
investments to NMT, including ☐ Fully Completed
wide-scale improvements to (Please Check the box)
4/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
pedestrian and bicycle facilities, Examples of pilot projects and/or policies developed or under development – include URLs
development of facilities for where relevant
intermodal connectivity, and adoption Providing bicycle lane in national housing area and parks
of complete street design standards, Providing footpath at commercial and housing area
wherever feasible
Important Actions you will take in 2013
Implementation projects providing the pedestrian and bicycle lane
5 Improve public transport services Any action had been taken so far? Challenges faced in implementation:
including high quality and affordable ☐ Not yet Public to use public transportation
“Shift” Strategy
services on dedicated infrastructure ☐ Some (design – piloting) Infrastructure and facilities
along major arterial corridors in the ☐ Largely in Place Attract public to utilize public buses due to cheaper
city and connect with feeder services ☐ Fully Completed to own a private vehicle.
into residential communities (Please Check the box)
5/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
Examples of pilot projects and/or policies developed or under development – include URLs
where relevant
Introduction of Brunei 1st park and rides facilities - Reducing Traffic Congestion in
Brunei National Hospital
Upgrade the bus stop facilities/increase the number of Bus shelter /bus stop
Develop new central Bus station and terminals
Improve connectivity of Public Bus routes
New type of bus, more feeder services
Important Actions you will take in 2013
Extending the Services to other area - commercial area
New Bus route introduce
Built new central bus station and terminals
Improve connectivity of Public Bus routes
End of 2013 – tender foe new Bus franchise
6/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
6 Reduce the urban transport mode Any action had been taken so far? Challenges faced in implementation:
share of private motorized vehicles √ Not yet Finance
through Transportation Demand ☐ Some (design – piloting) Increasing number of Vehicles
Management (TDM) measures, ☐ Largely in Place
including pricing measures that ☐ Fully Completed
integrate congestion, safety, and (Please Check the box)
pollution costs, aimed at gradually
reducing price distortions that directly
“Shift” Strategy
or indirectly encourage driving, Examples of pilot projects and/or policies developed or under development – include URLs
motorization, and sprawl where relevant
Traffic Congestion Programme - identifying road congestion area
Road Safety programme - identifying black spot area in Brunei
Introducing new bus route for Main District, Brunei Muara.
Important Actions you will take in 2013
Implementation of projects under the Traffic congestion programme
Implementation of projects improving all the Black Spot in Brunei
.
7/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
7 Achieve significant shifts to more Any action had been taken so far? Challenges faced in implementation:
sustainable modes of inter-city ☐ Not yet Corridor
passenger and goods transport, ☐ Some (design – piloting) Finance
including priority for high-quality ☐ Largely in Place
long distance bus, inland water ☐ Fully Completed
transport, high-speed rail over car and (Please Check the box)
air passenger travel, and priority for
“Shift” Strategy
train and barge freight over truck and
air freight by building supporting Examples of pilot projects and/or policies developed or under development – include URLs
infrastructure such as dry inland ports where relevant
A Study on Brunei’s Land Transport system to formulate road map and national Land Transport
master plan will be completed by July 2013.
Important Actions you will take in 2013
III. Strategies to Improve transport practices and technologies
8/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
8 Diversify towards more sustainable Any action had been taken so far? Challenges faced in implementation:
transport fuels and technologies, ☐ Not yet Education
including greater market penetration ☐ Some (design – piloting) Finance
of options such as vehicles operating ☐ Largely in Place Cheap Fuel Price
Expensive than ordinary vehicle
on electricity generated from ☐ Fully Completed
renewable sources, hybrid (Please Check the box)
technology, and natural gas
“Improve” Strategy
Examples of pilot projects and/or policies developed or under development – include URLs
where relevant
Encourage of the purchase of Hybrid Vehicle through lower import tax.
Important Actions you will take in 2013
More publicity to shift people to use hybrid Vehicle
9/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
9 Set progressive, appropriate, and Any action had been taken so far? Challenges faced in implementation:
affordable standards for fuel quality, ☐ Not yet
fuel efficiency, and tailpipe emissions ☐ Some (design – piloting)
for all vehicle types, including new ☐ Largely in Place
and in-use vehicles ☐ Fully Completed
(Please Check the box)
“Improve” Strategy
Examples of pilot projects and/or policies developed or under development – include URLs
where relevant
Plan to introduce the vehicle rating standard toward safer vehicle on road.
Plan to upgrade fuel quality to Euro 4 standard
Important Actions you will take in 2013
10/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
10 Establish effective vehicle testing and Any action had been taken so far? Challenges faced in implementation:
compliance regimes, including formal ☐ Not yet
vehicle registration systems and ☐ Some (design – piloting)
appropriate periodic vehicle ☐ Largely in Place
inspection and maintenance (I/M) ☐ Fully Completed
requirements, with particular (Please Check the box)
emphasis on commercial vehicles, to
enforce progressive emission and
“Improve” Strategy
safety standards, resulting in older
polluting commercial vehicles being
gradually phased-out from the vehicle Examples of pilot projects and/or policies developed or under development – include URLs
fleet, as well as testing and where relevant
compliance regimes for vessels
Periodic Vehicle Inspection (Private Vehicle above 7 years & above annually, Commercial twice
a year.
Computerized Vehicle Inspection Center (VIC).
Important Actions you will take in 2013
Commercialization of Vehicle Inspection Centre (PPP model)
11/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
11 Adopt Intelligent Transportation Any action had been taken so far? Challenges faced in implementation:
Systems (ITS), such as electronic fare ☐ Not yet Financial
and road user charging systems, ☐ Some (design – piloting) Identifying the routes
transport control centres, and ☐ Largely in Place
real-time user information, when ☐ Fully Completed
applicable (Please Check the box)
“Improve” Strategy
Examples of pilot projects and/or policies developed or under development – include URLs
where relevant
Implementation of ITS into the Brunei Road network especially the major roads - concentrating
congestion area.
Important Actions you will take in 2013
Application of budget for the next national Development Programmed
12/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
12 Achieve improved freight transport Any action had been taken so far? Challenges faced in implementation:
efficiency, including road, rail, air, ☐ Not yet Finance
and water, through policies, ☐ Some (design – piloting) Identification of roads to be use as freight transport
programmes, and projects that ☐ Largely in Place
modernize the freight vehicle ☐ Fully Completed
technology, implement fleet control (Please Check the box)
“Improve” Strategy
and management systems, and
support better logistics and supply
chain management Examples of pilot projects and/or policies developed or under development – include URLs
where relevant
Improvement of existing road for more efficient freight transport within the Brunei
Important Actions you will take in 2013
IV. Cross-cutting strategies
13/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
13 Adopt a zero-fatality policy with Any action had been taken so far? Challenges faced in implementation:
respect to road, rail, and waterway ☐ Not yet Financial
safety and implement appropriate ☐ Some (design – piloting) To set up infrastructure and facilities.
speed control, traffic calming ☐ Largely in Place
strategies, strict driver licensing, ☐ Fully Completed
motor vehicle registration, insurance (Please Check the box)
“Cross-Cutting” StrategyStrategy
requirements, and better post-accident
care oriented to significant reductions
in accidents and injuries Examples of pilot projects and/or policies developed or under development – include URLs
where relevant
Transformation Major Junctions into Interchanges along the National Highways
Improve Black Sport Area
Introducing Guidelines traffic calming into the Brunei Road system
Full Implementation of Demerit Points Systems in Mei/Jun 2013
Revision of Driving School Curriculum.
Mandatory to attended Defensive Driving for bus driver
Road Traffic Act/Regulations amendment 2013.
Amendment of Road Trafic (Driving LicenseI Regulations
Upgrade/New device for Speed Warning Device (SWD) to be install mandatory to commercial
vehicle.
14/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
Important Actions you will take in 2013
Implementation of interchanges projects
Implementation of traffic calming measures
Full implementation of Road Traffic (Driving Licenses) Regulations 2013
Full implementation on Demerit Points System Phase III.
14 Promote monitoring of the health Any action had been taken so far? Challenges faced in implementation:
impacts from transport emissions and ☐ Not yet
noise, especially with regard to ☐ Some (design – piloting)
incidences of asthma, other ☐ Largely in Place
pulmonary diseases, and heart disease ☐ Fully Completed
“Cross-Cutting” Strategy
in major cities, assess the economic (Please Check the box)
impacts of air pollution and noise,
and devise mitigation strategies,
especially aiding sensitive Examples of pilot projects and/or policies developed or under development – include URLs
populations near high traffic where relevant
concentrations
Monitoring device to measure CO2 emission install at Major road.
15/22Country Report/Brunei Darussalam
Goal Goal Description Voluntary Progress/Achievements/Initiatives in Implementing Bangkok 2020
No. Declaration
Important Actions you will take in 2013
16/22Country Report/Brunei Darussalam
15 Establish country-specific, Any action had been taken so far? Challenges faced in implementation:
progressive, health-based, ☐ Not yet
cost-effective, and enforceable air ☐ Some (design – piloting) Expertise
quality and noise standards, also ☐ Largely in Place
taking into account the WHO ☐ Fully Completed
guidelines, and mandate monitoring (Please Check the box)
and reporting in order to reduce the
“Cross-Cutting”
occurrence of days in which pollutant
levels of particulate matter, nitrogen Examples of pilot projects and/or policies developed or under development – include URLs
oxides, sulphur oxides, carbon where relevant
monoxide, and ground-level ozone
exceed the national standards or Regulate emission and noise test through computerized vehicle inspection center (Periodic
zones where noise levels exceed the mandatory inspection).
national standards, especially with
regard to environments near high Important Actions you will take in 2013
traffic concentrations
17/22Country Report/Brunei Darussalam
16 Implement sustainable low-carbon Any action had been taken so far? Challenges faced in implementation:
transport initiatives to mitigate the ☐ Not yet
causes of global climate change and ☐ Some (design – piloting)
to fortify national energy security, ☐ Largely in Place
and to report the inventory of all ☐ Fully Completed
greenhouse gases emitted from the (Please Check the box)
transport sector in the National
“Cross-Cutting” Strategy
Communication to the UNFCCC
Examples of pilot projects and/or policies developed or under development – include URLs
where relevant
Important Actions you will take in 2013
18/22Country Report/Brunei Darussalam
17 Adopt social equity as a planning and Any action had been taken so far? Challenges faced in implementation:
design criteria in the development ☐ Not yet Financial
and implementation of transport ☐ Some (design – piloting)
initiatives, leading to improved ☐ Largely in Place
quality, safety and security for all and ☐ Fully Completed
especially for women, universal (Please Check the box)
accessibility of streets and public
“Cross-Cutting” Strategy
transport systems for persons with
disabilities and elderly, affordability Examples of pilot projects and/or policies developed or under development – include URLs
of transport systems for low-income where relevant
groups, and up-gradation, Implementation of minimal fee for using public transportation
modernization and integration of Provide disabilities facilities for the public at the commercial area
intermediate public transport
Important Actions you will take in 2013
19/22Country Report/Brunei Darussalam
18 Encourage innovative financing Any action had been taken so far? Challenges faced in implementation:
mechanisms for sustainable transport ☐ Not yet Promoting Public Transportation
infrastructure and operations through ☐ Some (design – piloting) Improving public transportation
measures, such as parking levies, fuel ☐ Largely in Place
pricing, time-of-day automated road ☐ Fully Completed
“Cross-Cutting” Strategy
user charging, and public-private (Please Check the box)
partnerships such as land value
capture, including consideration of
carbon markets, wherever feasible Examples of pilot projects and/or policies developed or under development – include URLs
where relevant
Park and rides project is the first step to promote public transportation
Important Actions you will take in 2013
Improve service of the public transportation
Promote public transportation
20/22Country Report/Brunei Darussalam
19 Encourage widespread distribution of Any action had been taken so far? Challenges faced in implementation:
information and awareness on ☐ Not yet Public support
sustainable transport to all levels of ☐ Some (design – piloting) Finance
government and to the public through ☐ Largely in Place Improvement of existing infrastructure
outreach, promotional campaigns, ☐ Fully Completed
“Cross-Cutting” Strategy
timely reporting of monitored (Please Check the box)
indicators, and participatory
processes
Examples of pilot projects and/or policies developed or under development – include URLs
where relevant
Important Actions you will take in 2013
Improvement of the public transport services incrementally, such as connectivity & route,
operating hours, Frequency waiting time and publicity.
21/22Country Report/Brunei Darussalam
20 Develop dedicated and funded Any action had been taken so far? Challenges faced in implementation:
institutions that address sustainable ☐ Not yet Finance
transport-land use policies and ☐ Some (design – piloting)
implementation, including research ☐ Largely in Place
and development on ☐ Fully Completed
“Cross-Cutting” Strategy
environmentally-sustainable (Please Check the box)
transport, and promote good
governance through implementation
of environmental impact assessments Examples of pilot projects and/or policies developed or under development – include URLs
for major transport projects where relevant
EIA will be included in all new Road projects
Important Actions you will take in 2013
Undertake Feasibility Studies on EIA for new road to be constructed.
22/22You can also read