z Background
information
z Remediation Standard
Development
z Example Sites
z Technical and
Logistical Challenges
z Landfill Assessment
and Remediation
z Landfill Monitoring
z AcknowledgementsBackground Information
z The DEW Line was built
during the height of the
Cold War.
z Radar sites:
– 42 sites in Canada were
operated between 1955 and
1985 by USAF & Canada
– Replaced by the North
Warning System.
– 21 INAC sites, some
abandoned since 1963.
– INAC has responsibility for
numerous similar sitesDEW Line Cleanup Protocol
1989-93:
z Assessments took place at the DEW Line.
z Scientific investigations led to the development of a
cleanup protocol for the DEW Line (including concept
cleanup plans for contaminated soil and landfills).
z Cleanup criteria for contaminants were developed
specifically for the Arctic - the DEW Line Cleanup Criteria
(DCC).ISACHSEN, NT
ISACHSEN, NT
Investigation Phase
Challenging Factors
z Construction Season
– Limited to summer usually 3 –4 months
z Remote and isolated locations
– Logistics, on-site analysis, supplies
z Resources
– On-site resources: gravel, shale, bedrock, permafrost
– Contractors and equipment
z Ecosystem
– Linear foodchain
z Global Warming
– Permafrost degradationPermafrost degradation above equipment burial area.
Landfill Concept z Remediation/Closure of Existing Landfills – Risk Evaluation – Excavate/Remediate z Development of New Landfills – Non-hazardous – Contaminated Soil
Engineering Design
z The designs require;
z demolition of facilities,
z On-site disposal of site debris,
z Off-site disposal of hazardous materials and
contaminated soils,
z development and closure of landfills,
z use of permafrost,
z use of existing granular material sources,
z site grading.Landfill Risk Evaluation
z Background information
– Based on National Classification System
z Matrix factors
– Contaminant source
– Pathways
– Receptors
– Special considerations
– Traditional knowledge
z Interpreting the scoreContaminant Source z LandfillExtent z Estimated Depth of Landfill z Presence of Leachate z Presence of Surface Contaminated Soil z Presence of Surface Debris
Pathways z AerialTransport z Water Transport – Topography – Cover material (type and depth) – Runoff potential – Precipitation – Distance to downgradient drainage channels
Receptors
z Downgradient Freshwater/marine habitat
– Proximity, usage
z Terrestrial habitat
– Extent, usage
z Landuse
– Occupation, use of drinking water and food
resourcesUnique factors z Special Considerations – Non-generic, site specific factors – Potentially worth 10% of each category z Traditional knowledge – Site workers – Local community
Landfill Evaluation Score Landfill Evaluation Score – Maximum = 150 Potential Environmental Risk Classification >100 High >75,
Landfill Remediation
z High Risk Landfills
– Excavate
– Waste separated and classified
z Moderate Risk Landfills
– Leachate contain or excavate component
– More detailed assessment – eg. visual and thermal
monitoring; and groundwater and soil sampling
z Low Risk Landfills
– Regrade against erosion if necessary
– visual monitoring and soil samplingDemolition of Facilities
Removal of Site Debris
Landfill Excavation
Landfill Excavation
Verification
Sampling
Waste
ClassificationNon-Hazardous Waste Landfill
GRANULAR FILL COVER
(TYP.)
0.3m
WASTE INTERMEDIATE GRANULAR
FILL COVER
(MAX)
1m
WASTE
GRANULAR FILL COVER
GRANULAR FILL BERM
NON-HAZARDOUS WASTE
GRANULAR FILL BERM
EXISTING GROUND
NON-HAZARDOUS WASTE LANDFILLLeachate Containment
Modification
GRANULARFILL(THICKNESS
BASEDONDESIGNACTIVELAYER)
RIPRAP
SAND NON-WOVENGEOTEXTILE
ABOVEANDBELOW
GEOMEMBRANE
0.15mMIN. SAND
0.3mMIN. SAND
GEOMEMBRANE 0.7mMIN. SATURATED
GRANULARFILL
0.15mMIN. SAND
LANDFILL WITH LEACHATE CONTAINMENTContaminated Soil Landfill
0.3m DCC TIER CONTAMINATED SOIL
0.15m MIN. INTERMEDIATE GRANULAR FILL COVER
(REQUIRED ONLY FOR LANDFILLING OF SOFT SOILS)
GRANULAR FILL COVER 0.3m DCC TIER CONTAMINATED SOIL
EXISTING GROUND
EXCAVATE TO SATURATED
PERMAFROST
COMPACTED TIER
CONTAMINATED SOIL
SATURATED FROZEN BERM
0.3m MIN. SAND
GEOMEMBRANE
0.15m MIN. SAND
0.3m MIN. GRANULAR FILL NON-WOVEN GEOTEXTILE
ABOVE AND BELOW
GEOMEMBRANE
TIER DISPOSAL FACILITYLandfill
Monitoring
- visual
- soil/groudwater
- thermalAcknowledgments
z Indian and Northern Affairs Canada
– Ms Joanna Ankersmit (Contaminants Sites Program)
– Dr Wayne Ingham (Water and Earth Science
Associates)
z Department of National Defence
– Dew Line Cleanup Team
z Environment Canada
– Lisa Keller, Country RepresentativeContact Information Indian and Northern Affairs Canada Water and Earth Science Associates Les Terrasses de la Chaudiere The Woolen Mill, 4 Cataraqui St. Room 616 Kingston, ON, Canada 10 Wellington St. Gatineau, K7K 1Z7 Quebec, Canada ph: (613) 531 2725 K1A 0H4 Fx: (613) 531 1852 ph: (819) 997-8413 wingham@wesa.ca fx: (819) 953-2590 nahirm@inac.gc.ca
You can also read