2018/19 Annual Performance Plan - Cradle of Humankind World Heritage Site and Dinokeng Projects
2018/19 Annual Performance Plan

Cradle of Humankind World Heritage Site and Dinokeng
                     Projects

                    2018/2019
2018/19 Annual Performance Plan - Cradle of Humankind World Heritage Site and Dinokeng Projects
Table of Contents

FOREWORD .............................................................................................................................................................. ii
OFFICIAL SIGN-OFF ................................................................................................................................................. iii
PART A: STRATEGIC OVERVIEW ..............................................................................................................................6
1. UPDATED SITUATIONAL ANALYSIS ............................................................................................................. ………6
1.1 Performance Delivery Environment……………………………………………………………………………………………9
1.2 Organisational Environment……………….……………………………………………………………………………….…..11
2. REVISIONS TO LEGISLATIVE AND OTHER MANDATES………………………………………………………………….12
3. OVIERVIEW OF 2015/16 BUDGET AND MTEF ESTIMATE……………………………………………………………..12
3.1 Expenditure Estimates…………………………………………………………………………………………………………….12
3.2 Economic Classification…………………………………………………………………………………………………………..12
3.2 Relating Expenditure Trends to Strategic Outcome Oriented……………………………………………………..12
PART B: PROGRAMMES AND SUB-PROGRAMMES.………………………………………………………….…………13
4. PROGRAMME 1: ADMINISTRATION……………………..……………………………………………………………..…15
4.1. Strategic Objectives Annual Targets for 2018/19…………………………..……………………………………17
4.2. Performance Indicators and Annual Targets for 2018/19…………………………………………….…….17
4.3. Quarterly Targets for 2018/19…………………………………………………………………………………………….17
4.4. Reconciling performance targets with the budget and MTEF………………………………………………17
4.5. Performance and expenditure Trends………………………………………………………………………………….18
5. PROGRAMME 2: CRADLE OF HUMANKIND……............................................................................19
5.1. Strategic Objectives Annual Targets for 2018/19…………………………..…………………………………..20
5.2. Performance Indicators and Annual Targets for 2018/19…………………………………………….…….20
5.3. Quarterly Targets for 2018/19…………………………………………………………………………………………….21
5.4. Reconciling performance targets with the budget and MTEF……………………………………………….22
5.5. Performance and expenditure Trends………………………………………………………………………………….23
6. PROGRAMME 3: DINOKENG……….…………………………………..……………………………….….……………….24
6.1. Strategic Objectives Annual Targets for 2018/19…………………………..……………………………………25
6.2. Performance Indicators and Annual Targets for 2018/19…………………………………………….……..25
6.3. Quarterly Targets for 2018/19……………………………………………………………………………………………..25
6.4. Reconciling performance targets with the budget and MTEF………………………………………………..26
6.5. Performance and expenditure Trends……………………………………………………………………………………26
7. PROGRAMME 4: TOURISM………...………….………………………………………………………….…………………..28
7.1. Strategic Objectives Annual Targets for 2018/19…………………………..…………………………………….29
7.2. Performance Indicators and Annual Targets for 2018/19…………………………………………….………29
7.3. Quarterly Targets for 2018/19………………………………………………………………………………………………29
7.4. Reconciling performance targets with the budget and MTEF…………………………………………………29
7.5. Performance and expenditure Trends……………………………………………………………………………………30

PART C………….………………………………………………………………………………………………………………………………31
9. LINKS TO THE LONG TERM INFRASTRUCTURE AND OTHER CAPITAL PLANS…………………………….31
10. CONDITIONAL GRANTS………………………………………………………………………………………………….………31
11. PUBLIC ENTITIES…………………………………………………………………………………………………………………….31
12. PUBLIC PRIVATE PARTNERSHIPS………………………………………….……………………………………………….31
ANNEXURE D CHANGES TO THE STRATEGIC PLAN…….………………………………………………………….…….32
ANNEXURE E TECHNICAL INDICATOR DESCRIPTION……………………………………………………………………….33
ANNEXURE F STRATEGIC OBJECTIVE TECHNICAL INDICATOR…………………………………………………………37
ANNEXURE G STRATEGIC RISKS…………………………………………………………………………………………………….41

                                                                                                                                                                      iv
ABBREVIATIONS
APP         Annual Performance Plan
AFS         Annual Financial Statements
BAS         Basic Accounting System
BBBEE       Broad-Based Black Economic Empowerment
BRICS       Brazil, Russia, India, China and South Africa
CEO         Chief Executive Officer
COHWHS      Cradle of Humankind World Heritage Site
COHWHS MA   Cradle of Humankind World Heritage Site Management Authority
CFO         Chief Financial Officer
CoE         Compensation of Employees
CoJ         City of Johannesburg
DGR         Dinokeng Game Reserve
DGR MA      Dinokeng Game Reserve Management Authority
GHS         Garankuwa Hotel School
GCR         Gauteng City Region
GCR EDC     Gauteng City Region Economic Development Plan
GDED        Gauteng Department of Economic Development
GTA         Gauteng Tourism Authority
GTSS        Gauteng Tourism Sector Strategy
GPG         Gauteng Provincial Government
HOD         Head of Department
ICT         Information Communication Technology
ICC         Intepretation Centre Complex
IDP         Integrated Development Plan
IECM        Intergrated Environment and Conservation and Management
IFMS        Integrated Financial Management System
MEC         Member of the Executive Council
MTEF        Medium Term Expenditure Framework
MTEC        Medium Term Expenditure Committee
MTSF        Medium Term Strategic Framework
NDEA        National Department of Environmental Affairs
NTSS        National Tourism Sector Strategy
Paes        Protected Areas Strategy
PFMA        Public Finance Management Act (Act 1 of 1999)
SAT         South African Tourism
SCM         Supply Chain Management
SMME        Small Medium Micro Enterprises
TER         Township Economic Revitilisation
TMR         Transformation Modernization and Reindustrialization
UK          United Kingdom
USA         United States of America
WHC         World Heritage Convention

                                                                           v
PART A: STRATEGIC OVERVIEW

      1.     UPDATED SITUATIONAL ANALYSIS

      Gauteng is a driving force in the tourism sector as illustrated by the demand scope conducted, compared
      to other provinces as per Tables 1 and 2. Moreover, Gauteng is a crucial hub that establishes economic
      linkages for other tourism destinations in South Africa. Gauteng’s tourism performance is represented
      below:

      Table 1: Provincial Share of International Arrivals
                                                                                    YEAR

                                Year 2013                   Year 2014               Year 2015                Year 2016

                                Column %      Count         Column %    Count       Column %    Count        Column %    Count

Provincial    Gauteng           41.4%         3 712 144     39.8%       3 804 125   41.4%       3 682 510    42.9%       4 305 634
Share of
 Arrivals     Western           14.8%         1 330 520     14.5%       1 386 100   14.9%       1 323 283    15.6%       1 568 357
              Cape

              Eastern Cape      3.1%          276 611       3.2%        304 888     3.0%        270 986      3.2%        324 560

              Northern          1.7%          156 588       1.7%        166 657     1.2%        108 699      1.0%        98 214%
              Cape

              KwaZulu           8.6%          772 372       8.0%        768 228     8.4%        743 615      7.5%        753 617
              Natal

              Mpumalanga        12.6%         1 132 444     12.0%       1 144 021   14.6%       1 300 271    14.2%       1 427 795

              Limpopo           15.9%         1 422 556     17.2%       1 639 766   15.1%       1 344 830    15.3%       1 541 120

              North West        5.5%          493 197       5.3%        508 537     8.7%        773 464      8.9%        893 318

              Free State        8.9%          796 706       10.1%       960 147     10.6%       947 861      12.2%       1 223 631

              TOTAL             100%          8 961 665     100%        9 549 236   100%        8 903 773    100%        10 044 163

      Source: Annual Tourism Report: 2016, South African Tourism, June 2017

                           Annual Performance Plan Template 2018/19                                       Page 6
Table 2: Domestic Trips Taken to Provinces
Trips – Domestic Destination by Province

Province                       2009           2010         2011         2012         2013         2014         2015           2016

Gauteng                       5 044 000       6 388 000    5 100 000    4 199 000    4 456 000    4 293 000    3 828 000      4 447 000

Eastern Cape                  5 884 000       3 977 000    2 861 000    2 314 000    2 050 000    3 224 000    3 370 000      2 900 000

Northern Cape                   574 000        219 000      381 000      386 000      480 000      557 000         275 000     521 000

Western Cape                  3 498 000       2 698 000    2 403 000    1 960 000    2 406 000    1 606 000    1 829 000      2 139 000

Limpopo                       1 942 000       2 939 000    3 500 000    5 109 000    5 583 000    7 367 000    5 666 000      8 343 000

Mpumalanga                    1 685 000       1 743 000    2 188 000    2 917 000    3 153 000    3 330 000    2 156 000      1 658 000

Kwa-Zulu Natal                9 073 000       8 348 000    7 224 000    6 215 000    7 307 000    5 280 000    4 980 000      4 193 000

Free State                    1 673 000       1 061 000    1 166 000    1 137 000     878 000     1 043 000    1 200 000      1 140 000

North West                    1 358 000       2 498 000    1 914 000    1 914 000     994 000     2 298 000    1 751 000      1 296 000

Total                        30 731 000      29 871 000   26 737 000   25 413 000   27 307 000   28 998 000   25 055 000     26 637 000

Source: Annual Tourism Report: 2016, South African Tourism, June 2017

In 2016, Gauteng City Region received 4.3 million foreign tourists (42.9%), surpassing other provinces in
South Africa. South African Tourism (SAT) statistics show that the majority of these were African land-based
visitors. The Province is the second largest long-haul tourist hub in South Africa, attracting large markets
from Europe (France, Germany), UK and the USA and also strong pull within the emerging markets, namely
China and India. The foreign markets primarily visit South Africa for holiday purposes, followed by business
travel purposes, and visiting friends and family. The statistics demonstrate that the Gauteng City Region
has a strong footing within the long-haul international markets, with the potential to grow in the African
tourist markets even more into a lucrative and unique tourist demand market.

In terms of domestic tourism, Gauteng captured 4.4 million domestic trips, taking the second spot from the
8.3 million trips undertaken to Limpopo Province. With the domestic tourist market, it is important to
recognize that the market more frequently takes day trips than overnight trips. Gauteng receives a much
higher number of day trips compared to other provinces, more so with domestic bed nights. The domestic
tourist demographics of Gauteng suggests that the Province is attracting three main domestic market
segments, namely the High-Life Enthusiasts, Business Travellers and Well-to-Do Mzansi Families. However,
statistics show that the Gauteng domestic tourist market generates less revenue compared to other
competing provinces, emphasising the potential to motivate more spending and tourist-like activities under
its domestic tourist markets and residents.

The distribution of international and domestic tourism is as follows;

        •    City of Johannesburg captured 77% of international visitors and 37% of domestic trips.

        •    City of Tshwane captured 18% of international visitors and 21% of domestic trips.

        •    City of Ekurhuleni captured 4% of international visitors and 25% of domestic trips.

        •    West Rand District Municipality captured 1% of international visitors and 21% of domestic trips.

        •    Sedibeng District Municipality captured 1% of international visitors and 1% of domestic trips.

                    Annual Performance Plan Template 2018/19                                              Page 7
The Gauteng City Region is relatively attractive within the foreign markets, especially the African Regional
markets and has great appeal to the domestic market. The sub-regional statistics show a high-level of
interest in the City of Johannesburg, with the distribution of tourists trickling down to the other regions. The
main geographical pull factor for Gauteng is the City of Johannesburg, with the City of Ekurhuleni and the
City of Tshwane competing with each other on a horizontal level and vertical level with the City of
Johannesburg (COJ), as the CoJ region is the core for tourist and economic activities in Gauteng and South
Africa, while the West Rand and Sedibeng are on competitive terms within the market size they need to
capture.

The strongest competitor to Gauteng on provincial level is the Western Cape, followed by KwaZulu-Natal.
Gauteng is strong within the tour operating and conferencing component, emphasising that Gauteng is
primarily focusing on building its business tourism niche offering. Breaking down to region-level in the
Gauteng Province, it is evident that the tourism sector is very strong in the City of Johannesburg, followed
by City of Tshwane and City of Ekurhuleni, with the West Rand and Sedibeng District Municipalities unable
to show the volumes in tourism supply and demand. However, from an economic development point of
view, West Rand and Sedibeng are profiled as having the ability to use tourism as a primary economic
driver. This does not mean that the other development corridors’ economic sectors should not consider
tourism as a key economic driver, but that the uniquely available resources and limited economic activity in
the West Rand and Sedibeng areas provides an ideal platform for tourism development in these areas to
cap unemployment and rural degradation.

Tourism receives priority from a provincial and inter-regional perspective. However, the coordination and
collaboration between local, regional and provincial role-players (public and private sector) remain a key
issue hampering full realization of tourism potential. The 1996 White Paper on Development and
Promotion of Tourism provides that tourism is government led, private sector driven and community based
and thus emphasising the importance of collaboration between public and private sector in order to
catalyse tourism growth and facilitae its leverage for socio-econocic development.

Tourism has the ability to achieve radical transformation objectives, alongside enhancing investor
confidence, increases national pride, and serves as an engine of growth, while generating income for
biodiversity conservation and cultural heritage protection, and thus further motivates the importance of
government to prioritise tourism as a key economic driver for social development.

To improve the competitiveness of all the regions while not deteriorating the current strong players, it is
important that market share is motivated, increased demand and development of key tourism nodes in all
regions that has the ability to attract long-stay and day visitors to the regions, moreover motivating tourism
linkages and an economic rippling effect throughout the Gauteng City Region. The Gauteng City Region has
a unique market trend and attraction compared to other provinces in South Africa. The long-term success
of Gauteng as an international and domestic tourist destination will rely on the strengthening of the market
segment’s needs and potential interest, alongside the increase and spread of destination management,
marketing and development on a spatial-level.

Gauteng’s strength is on cultural and natural heritage, ranging from international importance to local
relevancy. Amongst this list of most visited attractions in Gauteng is the City of Johannesburg, Maropeng
and Sterkfontein Caves (the official visitor centres in the Cradle of Humankind World Heritage Site),
Apartheid Museum, Voortrekker Monument, Soweto Township tours, Constitution Hill, Cullinan Diamond
Mine (Dinokeng) and the Nelson Mandela Museum.

Table 3 captures and presents a summary of key internal and external environmental factors that have a
direct impact on the performance of the tourism sector:

                Annual Performance Plan Template 2018/19                                 Page 8
Table 3: SWOT Analysis
 STRENGTHS                                                                   WEAKNESS

      •  Gauteng's growing middle-class population increases the                 •     Challenges specific skills shortages in tourism and
         potential for significant household spending                                  hospitality
     •   Gauteng       possesses      relatively   much     developed            •     Tourism yield has be impacted recent introduction of direct
         infrastructure (bulk/tourism) which makes the province                        flights from various international source markets
         attractive to investors and visitors                                    •     High unemployment rate in the country, wage rates remain
     •   The province is a financial hub for the rest of the sub-                      comparatively low by international standards.
         Saharan African region.                                                 •     Lack of public passenger transportation to Maropeng and
     •   The Province has six universities and a number of other                       Sterkfontein Caves
         institutions of higher learning                                         •     Perception that industry employs illegal foreigners at an
     •   Policies and strategies that unlock and support the                           expense of trained locals – contributing to unemployment for
         inclusive development and growth of tourism, and ensure                       graduates in the country
         thriving entrepreneurship                                               •     Lack of industry’s desire to transform
     •   Proactive skills development approaches that tackle
         unemployment though skills development aimed at making
         the labour force relevant to the labour market
         requirements.
     •   Vibrant investment promotion programme in the province
         aimed at promoting the Province as an investment
         destination for tourism
     •   A clearly defined sector intervention strategy to propel
         growth as well as promote labour absorption. (GTSS)
     •   A focus on developing and expanding catalytic
         infrastructure (viz. broadband, etc.) to propel sector growth
         and create employment opportunities
 OPPORTUNITIES                                                               THREATS

      •      Strong growth in Africa presents an opportunity for tourism         •     Global and national threats on the SA/province’s open
             to promote export to these markets.                                       economy.
      •      The currency depreciation offers an opportunity for the             •     The risk of a further possible credit rating downgrade will
             sector to promote tourism through price competitiveness –                 impact plans for major infrastructure expansion including
             locate specific sectors/ subsectors with 'low hanging fruit’.             tourism investment
      •      Unique and exciting tourism offerings versus the competing          •     The impact of Brexit on investment and tourism – the
             destinations in Gauteng – i.e Human Origin History,                       expected contraction (and possible recession in the UK) may
             Shopping, Health Tourism ect.                                             impact on Gauteng given that the UK is a significant source
      •      Strategic location - we remain a Gateway to Africa                        market for both FDI and Tourism.
             irrespective of the threats posed by introduction of                •     South Africa will experience slow economic growth over the
             domestic flights to KZN and Western Cape                                  coming years due to weak consumer demand, lacklustre
                                                                                       investment, relatively subdued commodity prices and
                                                                                       sporadic strikes and power cuts.
                                                                                 •     South Africans possess high household debt, meaning that
                                                                                       the majority of the consumers finance many of their
                                                                                       purchases through credit, making them largely exposed to
                                                                                       interest rate fluctuations.
                                                                                 •     The potential entry of global foreign retailers may out-
                                                                                       compete local retailers who are not as modernised or
                                                                                       sophisticated by international standards.

This APP for 2018/19 financial year is structured such that it addresses challenges and maximises
opportunities raised in this situational analysis.

     1.1 Performance delivery environment

The Programmes’ priorities and projects featured in this Annual Performance Plan (APP) 2018/19 directly
respond to the following frameworks;

     1.1.1      Gauteng City Region Economic Development Plan (GCR EDP) (Implementation Plan)

The GCR EDP Implementation Plan’s goal is to save and create decent jobs through focus on sector
transformation, industrialization, skills development, leveraging on public procurement and the township
economy to build an inclusive and sustainable economy. All Programmes contribute to the below (8) pillars;

                     Annual Performance Plan Template 2018/19                                              Page 9
a)    African integration
            b)    Skills development
            c)    Local production/industrialisation
            d)    Public-private procurement
            e)    Township economy
            f)    Black ownership and control
            g)    Green economy/climate change
            h)    Research and innovation

    1.1.2        Transformation Modernisation and Re-Industrialisation (TMR) Approach and its Pillars

The TMR Approach of the Gauteng Provincial Government (GPG) sets a framework for radical economic
transformation in Gauteng. All Programmes contribute to the below seven (7) pillars;

            a)    Radical economic transformation
            b)    Decisive spatial transformation
            c)    Accelerated social transformation
            d)    Transformation of state and governance
            e)    Modernisation of the public service
            f)    Taking the lead in Africa’s new industrial revolution

    1.1.3 The Gauteng Tourism Sector Strategy (GTSS)

The GTSS which was revised by the Province in 2017 to align to the National Tourism Sector Strategy
(NTSS), sets a vision for tourism in Gauteng, which is to become “Africa's Must-See, Vibrant, Big City
Experience”. This vision will be achieved through 5 strategic interventions, being implemented by all
Programmes, namely;

            a)    Destination management prioritisation
            b)    Enhance the experience and the visitor economy
            c)    Market competitiveness and diversification
            d)    Tourism accessibility and smart city concepts, and
            e)    Tourism sector transformation

In the current financial year (2017/18) the Programmes are implementing the following projects as part of
the Annual Performance Plans:

Programme 1: Cradle of Humankind World Heritage Site (COHWHS)

    •   Fossil sites inspections - number of fossil sites inspected (annual planned target is 13 registered
        fossil sites): The first set of fossil site inspections for the 2017/2018 year were completed in June
        2017. The reports that are generated from these inspections have been finalised and
        correspondence drafted to landowners as well as the South African Resources Agency (SAHRA).
        The second set of inspections of the sites took place late November/early December 2017 as is
        common practice in terms of the inspection of the sites. The second and final report of the 13
        registered fossil sites in the COHWHS as well as the Malapa fossil site will be delivered and
        reported on in Q4.
    •   Water monitoring programme - CSIR was appointed for the water monitoring programme at the
        COHWHS for the three year period ending in year 2021, and to date 17 water boreholes in the
        COHWHS are being monitored.
    •   School visits - the sponsored school visits to Sterkfontein and Maropeng was undertaken in the
        third quarter and 2000 learners participated.
    •   Jobs sustained at Maropeng - 110 number of jobs sustained at Maropeng and 13 addition jobs
        were created.
    •   Visitors to Maropeng and Sterkfontein Caves - 305 000 people visited the visitor centres in the
        COHWHS.

                   Annual Performance Plan Template 2018/19                            Page 10
Programme 2: Dinokeng

    •   4 124 hectares of vegetation managed in DGR – The total number of hectares of vegetation
        managed to date is 1 325. The variance of 2 799 is as a result that no suitable service provider
        was found to implement the project despite having advertised the tender several times. The
        reported limited hectares of vegetation managed were through a partnership arrangement
        between the Dinokeng Entity and Dinokeng Game Reserve Management Agency (DGRMA).
    •   SMMEs and Cooperatives support - a target of 20 SMMEs and 9 cooperatives supported in
        Dinokeng has been achieved to date.
    •   Job creation - There are currently no jobs that have been created through Working on Fire (WoF) as
        a result that no suitable service provider was found to implement the despite having advertised
        the tender several times. 54 jobs were derived through the operations of the DGRMA and 544 job
        opportunities derived from the operational funding expenditure of the DGR.
    •   The training of leaners on tourism and hospitality skills programmes at Dinokeng is going to be
        implemented in Q4.
    •   Community Trust - Community Trust at DGR was launched in 6 July 2017, trustees have been
        vetted and registration documentation was prepared and forwarded to the Office of the State
        Attorney. The Office of the State Attorney has lodged the registration documentation with the
        Master of High Court, and the Trust will be registered in March 2018.

Programme 3: Tourism

    •   The following projects (Number of township tourism products showcased to markets; Number of
        community based tourism projects supported; and Number of people enrolled in tourism and
        hospitality skills development initiatives) in quarter 1 of the 2017/18 financial year featured on
        the GDED APP 2017/18. During the budget adjustment of September 2017, the GDED APP was
        revised to exclude all indicators for GDED agencies and entities. Therefore these projects were
        removed from GDED APP 2017/18 and are now contained in the Integrated Operational Plans for
        the COHWHS and Dinokeng Projects School for 2017/18. These projects are continously
        reported and monitored alongside all projects featured in the Integrated Operational Plans for
        COHWHS and Dinokeng Projects l for 2017/18 on a monthly and quarterly. To date 93 tourism
        products have been showcased to markets and 117 products are still to be showcased at
        Meetings Africa, Vakansie and Soweto Camp Festival Shows which are due to be held in Q4 of the
        financial year. 6 community based tourism initiatives have been supported and 14 768 people
        have been enrolled in skills development initiatives and capacity building workshops.

All these projects will be delivered at the end of the financial year 2017/18, with the exception of hectares
of vegetation managed in DGR and jobs leveraged from this project. This is because there was no suitable
service provider found to implement the project despite having advertised the tender several times.

1.2 Organisational Environment

The COHWHS and Dinokeng Projects remain trading entities of the GDED currently reporting to the
Accounting Officer (Chief Executive Officer). The Tourism Supply function that has been transferred from
the Gauteng Tourism Authority, and the Garankuwa Hotel School are also currently reporting to the
COHWHS and Dinokeng Accounting Officer (CEO) as part of implementing the Gauteng Executive
Authority’s decision to integrate these functions towards establishing the Gauteng Conservation and
Heritage Agency. Discussions are currently taking place to relocate the Ga-Rankuwa Hotel School to an
appropriate department in the Gauteng Province where its mandate can be fully utilised.

 The COHWHS and Dinokeng Projects are now stand-alone entities from 1 October 2017. However, the
entities are not capacitated to perform support functions that have previously been provided by GDED. A
transitional organisational structure has been developed to make provision for the tourism and support
functions. The structure is still awaiting approval.

               Annual Performance Plan Template 2018/19                               Page 11
2. REVISIONS TO LEGISLATIVE AND OTHER MANDATES

There have been no significant changes to the legislative and other mandates governing the tourism
sector, the COHWHS and Dinokeng Projects, and the Garankuwa Hotel School.

3. OVERVIEW OF 2018/19 BUDGET AND MTEF ESTIMATES

3.1 CRADLE OF HUMANKIND WORLD HERITAGE SITE

     3.1.1       Expenditure Estimates

                                                                               Adju
                                                                               sted
                                                                    Main
                                                                                          Revised
                                              Outcome              appropri                              Medium-term estimates
                                                                               appr
                                                                    ation
                                                                               opri       estimate
                                                                               atio
                                                                                n
                                           2015/
                                 2014/15                                       2017/18                2018/     2019/
                                            16        2016/17                                                               2020/21
R thousand                                                                                             19        20

                                 72 628    71 643        63 599    70 706                 64 522      75 254    79 468       83 839

      Total payments and
  estimates                      72 628    71643         63 599    70 706                 64 522      75 254    79 468       83 839

     3.1.2 Economic Classification

                                                                                Adjust
                                                                                          Revise
                                                                     Main        ed
                                                                                          d
                                              Outcome               appropri                             Medium-term estimates
                                                                     ation      appro
                                                                                          estimat
                                                                                priatio
                                                                                          e
                                                                                   n
                                           2015/
                                 2014/15                                       2017/18               2018/1                  2020/2
                                            16          2016/17                                                 2019/20
R thousand                                                                                             9                       1

 Current payments

 Compensation of employees        15 780    13 787        14 773     19 401               19 401       20 701      22 067      23 523
 Goods and services               20 654    18 731        25 460     44 305               38 121       46 553      48 701      51 203
 Interest and rent on land
 Transfers and subsidies to:      21 731     6 451        14 066      6 500                6 500        7 500       7 500        7 913
 Provinces and municipalities
 Departmental agencies and
 accounts
 Non-profit institutions
 Households
 Payments for capital assets
 Buildings and other fixed
 structures
 Machinery and equipment                                                                     500          500       1200      1200
 Software and other intangible
 assets
 Payments for financial assets
 Total economic classification    58 165     38 969       54 299     70 706               64 522     75 254      79 468      83 839

                    Annual Performance Plan Template 2018/19                                             Page 12
3.2 DINOKENG

      3.2.1       Expenditure Estimates

                                                                              Adjus
                                                                    Main                     Revis
                                                                               ted
                                                                   appro                     ed
                                                Outcome                                                  Medium-term estimates
                                                                   priatio
                                                                              appro
                                                                      n                      estim
                                                                              priati
                                                                                             ate
                                                                               on
                                            2015/1
                                  2014/15                                     2017/18                  2018/1                 2020/2
                                              6         2016/17                                                   2019/20
 R thousand                                                                                              9                      1

                                  39 145     55 219       45 665   43 202                 36 498       43 950      50 935     53 953

      Total payments and
  estimates                       39 145     55 219       45 665   43 202                 36 498       43 950      50 935     53 953

      3.2.2       Economic Classification

                                                                                             Revise
                                                                    Main      Adjusted
                                                                                             d
                                              Outcome              appropri                                 Medium-term estimates
                                                                    ation     appropria
                                                                                             estimat
                                                                                tion
                                                                                             e
                                            2015/1                                                       2018/                  2020
                                  2014/15               2016/17               2017/18                              2019/20
 R thousand                                   6                                                           19                     /21

  Current payments                 33 612   38 593      37 441     43 202                  36 498        43 950    50 935     53 953

  Compensation of employees       12 543     11 102       12 611    17 991                   17 991      18 991      19 547    20 620
  Goods and services              17 133      23891       19 880    21 111                   14 407      20 859      27 260    29 043
  Interest and rent on land
  Transfers and subsidies to:       3 936     3 600        4 950     3 600                    3 600       3 600       3 600     3 600
  Provinces and municipalities
  Departmental agencies and
  accounts
  Non-profit institutions
  Households
  Payments for capital assets                                          500                      500         500        528          690
  Buildings and other fixed
  structures
  Machinery and equipment                                              500                      500         500        528          690
  Software and other intangible
  assets
  Payments for financial assets
  Total economic classification    33 612    38 593       37 441    43 202                   36 498      43 950      50 935    53 953

3.4 Performance and Expenditure Trends
The COHWHS is a trading entity of the Gauteng Department of Economic Development. Total
expenditure amounts to R 58.1 million in 2014/15 decreasing to R 38.9 million in 2015/16 and
increased to R 54.2 million in 2016/17. The expenditure is anticipated to increase over the MTEF period
for project implementation. The entity supports the development and management of the Cradle of
Humankind World Heritage Site as a UNESCO-inscribed World Heritage Site which is in the North Western
Region of the province as a tourism destination which focuses on the palaeontological sciences,
sustainable natural resource conservation and utilisation, culture and history. Tourism is one of the key
drivers for the creation of an inclusive economy in this geo-spatial tourism project that includes the
following areas of management: implementation of the Operational Guidelines for the Implementation of
the World Heritage Convention; fossil site management; ground water monitoring; Working on Fire
programme; land use management; cycling and mountain bike development and maintenance thereof;
management of the maintenance of the road network and signage in the COHWHS; cooperatives

                     Annual Performance Plan Template 2018/19                                              Page 13
establishment, support; training and mentoring; sponsored schools visits project to the visitor centres in
the COHWHS; community projects; implementation of an inclusive economy strategy; Cradle Trust
management; stakeholder management and public meetings.

For Dinokeng, a total expenditure increased from R33,6 million in 2014/15 to R38,5 million in
2015/16.The project budget will increase as the result of more project implementation. These increases
are as a result of the intensive drive on investment on tourism infrastructure development programmes
and empowerment of SMMEs and cooperatives that the Dinokeng Project has embarked on over a period
of time.. The first phase of the self-drive route project was completed during 2014/15. An immediate
positive impact on visitor numbers to the Dinokeng Game Reserve was reported. The Dinokeng Project
implemented the second phase of the self- drive route in 2015/16. A picnic site and a game viewing deck
in the DGR are also planned to be completed in 2017/18. On completion, these tourism assets will be
managed and operated by SMMEs.

               Annual Performance Plan Template 2018/19                            Page 14
4. PROGRAMME 1: ADMINISTRATION

BUDGET                 PURPOSE                   SUB-PROGRAMMES                                           FUNCTIONS
PROGRAMME

Administration    Effective Resource     Office of the Chief Executive Officer   •   Provides leadership, decision-making, strategic direction,
                  Utilisation and Good   and Chief Operations Officer                policy development, decision-making support and financial
                  Governance                                                         oversight for the Entities.
                                                                                 •   To translate policies and priorities into strategies for
                                                                                     effective service delivery and planning, to manage, monitor
                                                                                     and control performance.
                                                                                 •   To manage and direct the entities transversal administrative
                                                                                     programmes that give leadership to the Entities.
                                                                                 •   To effectively maintain an oversight function of the whole
                                                                                     Programmes mandate and function.
                                                                                 •   Ensure compliance with statutory and good governance
                                                                                     practices.
                                                                                 •   Strengthen the support, guidance and interaction with
                                                                                     stakeholders.
                                                                                 •   Strengthen institutional mechanisms for integrated planning,
                                                                                     monitoring and evaluation.
                                         Human Capital Management                •   To provide support services to the other programmes with
                                                                                     regard to human resources management and development,
                                                                                     information technology, facility support maintenance, legal
                                                                                     services and communication service.
                                                                                 •   To provide a strategic support function to the entities.
                                                                                 •   To ensure the rendering of ICT, human capital, corporate
                                                                                     assurance, legal and communication support services to the
                                                                                     entities.
                                                                                 •   To monitor and evaluate Departmental performance.
                                                                                 •   To develop and manage knowledge and information
                                                                                     systems, records and co-ordinate ICT.
                                         Financial Management                    •   To provide effective support service (including monitoring
                                                                                     and control) with regard to Budgeting, Financial and
                                                                                     Management Accounting, Supply Chain Management, and
                                                                                     Asset Management..
                                                                                 •   To provide an effective financial management function.
                                                                                 •   To provide an effective and efficient Supply Chain
                                                                                     Management function
                                                                                 •   To ensure implementation of the PFMA and other related
                                                                                     Financial Regulations and Policies.
                                                                                 •   To provide planning and budgeting support to the entities.
                                         Communication Services                  •   To focus on internal and external communications of the
                                                                                     department through written, verbal, visual and electronic
                                                                                     media as well as marketing and advertising of the
                                                                                     departmental services.
                                                                                 •   To render communication services to the Entities.
                                         Planning, Monitoring and                •   Maintain a framework for Monitoring and Evaluation aligned
                                         Evaluations                                 to provincial and national M&E prescripts.
                                                                                 •   Advise on generating and developing performance and
                                                                                     output indicators.
                                                                                 •   Ensure efficiency and effectiveness in organizational
                                                                                     performance system and reporting
                                                                                 •   Provide baseline or benchmarking information to measure
                                                                                     results of programme in relation to the Ten Pillars of
                                                                                     Transformation, Modernisation and Re-industralisation.
                                                                                 •   Evaluate relevance, effectiveness and impact of Entities
                                                                                     policies and intervention.

                                         Administration and Knowledge            •   The purpose is to strengthen the institutional governance
                                         Management                                  and knowledge management for improved service delivery
                                                                                     through the development and maintenance of a knowledge
                                                                                     management repository to capture, store and disseminate
                                                                                     institutional knowledge.

                 Annual Performance Plan Template 2018/19                                             Page 15
The Programme will work towards the following strategic objective:
a.   To achieve and maintain the highest level of financial governance.

                 Annual Performance Plan Template 2018/19                 Page 16
4.1 Strategic Objectives Annual Targets for 2018/19
  Strategic Objective      Strategic        Audited/Actual Performance                  Estimated                    Medium-Term Targets
                           Objective                                                   Performance
                           Indicator                                                                     2018/19         2019/20           2020/21
                                        2014/15        2015/16          2016/17         2017/18

 1.     To achieve        Financial         -            -                -                -                12              12               12
        and maintain      Performance
        the highest       Management
        level of          Reports
        financial         produced
        governance                          -            -                -                -                4                4               4

4.2 Performance Indicators and Annual Targets for 2018/19
        Performance Indicators              Audited/Actual Performance                   Estimated                   Medium-Term Targets
                                                                                        Performanc
                                                                                             e
                                         2014/15        2015/16          2016/17         2017/18           2018/19         2019/20          2020/2
                                                                                                                                              1
 1.     TO ACHIEVE AND MAINTAIN THE HIGHEST LEVEL OF FINANCIAL GOVERNANCE

 1.1 Financial performance                      -            -                -                -                12           12               12
     management reports prduced

 1.2 Number of Interim Annual                   -            -                -                -                 4               4            4
     Financial Statement reports
     compiled

4.3 Quarterly Targets for 2018/19
         Performance Indicators          Reporting      Reporting         Annual                           Quarterly Targets
                                        Responsibili     Period           Targets
                                                                                               1   st            2nd                 3rd         4th
                                            ty
 1.     TO ACHIEVE AND MAINTAIN THE HIGHEST LEVEL OF FINANCIAL GOVERNANCE

 1.1 Financial Performance               Financial       Quartely             12               3                     3               3            3
     Management Reports                 Management
     produced

 1.2 Number of Interim Annual            Financial       Quartely             4                1                     1               1            1
     Financial Statement reports        Management
     compiled

4.4 Reconciling performance targets with the Budget and MTEF

Sub-programme                                                    Expenditure outcome                      Adjusted      Medium-term expenditure
                                                                                                        appropriation         estimate
R thousand                                              2014/15 2015/16 2016/17                           2017/18     2018/19 2019/20 2020/21
 Administration                                                0       0       0                               37 773 41 947 43 939 46 487
Total                                                                                                          37 773 41 947 43 939 46 487

Economic classification
 Current payments                                                   0              0                0            37 773      41 947         43 939     46 487
      Compensation of employees                                     0              0                0            13 108      30 553         32 619     34 511
      Goods and services                                            0              0                0            27 489
      of which:                                                                                                     500              550      605        666

               1st Draft Annual Performance Plan Template 2018/19                                                         Page 17
Annual report                                          0       0    0         1 401      1 512    1 629    1 756
   Audit Fees                                             0       0    0         1 000
   Computer Equipment                                     0       0    0           500        710      816      930
   Stationery                                             0       0    0            35         40       50      600
   Bank Charges                                           0       0    0            50         70       90      110
   Courier and Postage                                    0       0    0           396        512      559      612
   Cell phones and Data cards                             0       0    0           213        233      251      269
   Licencing                                              0       0    0           130         33       36       39
   Data lines                                             0       0    0           385        424      466      513
   Equipment lease IT                                     0       0    0         9 104      9 899   10 665   11 507
   Operating Lease Expense(Rental)                        0       0    0           650        594      630      656
   Bursary                                                0       0    0           650        594      630      353
   Training and Organizational Development                0       0    0           191        550      605      969
   Conference and Workshops                               0       0    0           500        550      605      666
   Venues and facilities                                  0       0    0           350        400      422      445
   Travelling and Subsistence                             0       0    0         1 000      1 250    1 368      210
   Consultation fees                                      0       0    0                    1 000    1 500    3 000
   Advertising                                            0       0    0                        5        5        6
   Administrative fees                                    0       0    0           500        550      605      666

 Transfers and subsidies to:
   Provinces and municipalities                           0       0    0             0         0         0        0
   Departmental agencies and accounts                     0       0    0             0         0         0        0
   Public corporations and private enterprises            0       0    0             0         0         0        0
   Households                                             0       0    0             0         0         0        0
 Payments for capital assets                              0       0    0           500         0         0        0
   Buildings and fixed structures                         0       0    0             0         0         0        0
   Machinery and equipment                                0       0    0           500         0         0        0
   Software and other intangible assets                   0       0    0             0         0         0        0
   Payments for financial assets                          0       0    0             0         0         0        0
Total                                                     0       0    0        37 773    41 947    43 939   46 487

4.5 Performance and Expenditure Trends

The expenditure for Programme 1 is expected to increase in the MTEF period to respond to the
organisational changes as a result of reverse migration of the trading entities from Department of
Economic Development. The trading entities have received full delegation and became stand-alone
entitites from 1 October 2017. The budget will have to be increased to increase resources as the Entities
are expected to establish the following functions which were previously provided by GDED:

    1. Financial Management
    2. Human Resources Management
    3. Communication
    4. Corporate Services

             1st Draft Annual Performance Plan Template 2018/19                          Page 18
5. PROGRAMME 2: CRADLE OF HUMANKIND WORLD HERITAGE SITE

 BUDGET               PURPOSE                SUB-PROGRAMMES                                           FUNCTIONS
 PROGRAMME

 COHWHS          Sustainable          Integrated Environment and           •   To manage and profile the Cradle of Humankind World
                 Conservation and     Conservation and Management of            Heritage Site as one of the world’s iconic tourism and
                 Heritage Assets      Land Use                                  heritage destinations.
                                      Interpretation Centre Complex        •    To manage and profile the Cradle of Humankind World
                                                                                Heritage Site as one of the world’s iconic tourism and
                                                                                heritage destinations.
                                      Public Participation and Community   •    Provide public participation platforms for the communities to
                                      Benefits                                  have a say in the management of the COHWHS and provide
                                                                                community beneficiation projects.

The Programme will work towards the following strategic objective:
 a) To ensure that the Cradle of Humankind World Heritage Site is a well-managed and maintained World
    Heritage Site that contributes to scientific research, community beneficiation and the tourism visitor
    economy.
 b) Ensure tangible community beneficiation and growth in the visitor economy.

           1st Draft Annual Performance Plan Template 2018/19                                         Page 19
5.1 Strategic Objectives Annual Targets for 2018/19
     Strategic Objective      Strategic             Audited/Actual Performance     Estimated             Medium-Term Targets
                              Objective                                            Performance
                              Indicator                                                          2018/19       2019/2       2020/21
                                              2014/15       2015/16      2016/17 2017/18
                                                                                                                   0
 1.       To ensure         Collaborate         -              -           -           -          Collabora     Collabo         -
          that the          with similar                                                             tion        ration
          Cradle of         African World                                                        agreement       agree
          Humankind         Heritage                                                               signed        ment
          World             Sites on                                                              between       signed
          Heritage Site     scientific                                                            COHWHS       between
          is a well-        research,                                                                and       COHWHS
          managed           community                                                              Nairobi        and
          and               beneficiation                                                         National     Ethopian
          maintained        and the                                                              Museum/       Paleonto
          World             tourism                                                                Kenya       logy Site
          Heritage Site     visitor
          that              economy
          contributes
          to scientific     Implement           -              -           -           -         Implemen       Imple         Imple
          research,         the                                                                    tation       menta        menta
          community         Integrated                                                             report        tion          tion
          beneficiation     Management                                                           produced       report        report
          and the           Plan (IMP) for                                                                     produced     produced
          tourism           COHWHS
          visitor
                            Develop             -              -           -           -          COHWHS            -           -
          economy.                                                                                 specific
                            COHWHS
                            specific land                                                         land use
                            use                                                                  regulation
                            regulation                                                           approved

 2      To ensure           Facilitate          -              -           -           -          2 interven       3            3
        tangible            public                                                                   tions     interven     interven
        community           accessibility                                                        introduced      tions        tions
        beneficiation       to Maropeng                                                                        introduced   introduced
                            as the official
                            visitor centre
                            in the
                            COHWHS
                            Implementio         -              -           -           -         Implemen       Imple         Imple
                            n of the                                                               tation       menta        menta
                            findings of                                                            report        tion          tion
                            the inclusive                                                        produced       report        report
                            economy                                                                            produced     produced
                            socio-
                            economic
                            impact
                            assessment
                            study for the
                            COHWHS

5.2 Performance Indicators and Annual Targets for 2018/19

         Performance Indicators                 Audited/Actual Performance           Estimated           Medium-Term Targets
                                                                                    Performanc
                                                                                         e
                                              2014/15       2015/16      2016/17     2017/18       2018/19     2019/20
                                                                                                           2020/2
                                                                                                               1
 1   TO ENSURE THAT CRADLE OF HUMANKIND IS A WELL-MANAGED AND MAINTAINED WORLD HERITAGE SITE THAT CONTRIBUTES TO
     SCIENTIFIC RESEARCH, COMMUNITY BENEFICIATION AND THE TOURISM VISITOR ECONOMY.
 1.1 Cooperation agreements            -            -            -            -      Collabo    Collabora      -
 .   signed with East Africa                                                          ration        tion
     (Kenya) on scientific                                                            agree       agree
     research, community                                                               ment        ment
     beneficiation and the tourism                                                    signed      signed
     visitor economy with regard                                                     between     between
     to palaeoanthropological                                                       COHWHS      COHWHS

                        Annual Performance Plan Template 2018/19                                          Page 20
Performance Indicators           Audited/Actual Performance           Estimated          Medium-Term Targets
                                                                           Performanc
                                                                                e
                                   2014/15        2015/16     2016/17       2017/18     2018/19        2019/20         2020/2
                                                                                                                         1
     sites                                                                                and             and
                                                                                        Nairobi         Ethopian
                                                                                        National        Paleonto
                                                                                        Museum          logy Site
                                                                                        / Kenya
1.2 COHWHS Integrated                  -            -            -             -          Imple        Implemen        Imple
    Management Plan (IMP)                                                                menta            tation       menta
    implementation report                                                                  tion           report        tion
    produced                                                                              report        produced       report
                                                                                        produced                       produc
                                                                                                                         ed
1.3 COHWHS specific land use           -            -            -             -        COHWHS               -           -
    regulation approved                                                                  specific
                                                                                        land use
                                                                                          regula
                                                                                           tion
                                                                                        approved
2    TO ENSURE TANGIBLE COMMUNITY BENEFICIATION
2.1 Number of public                   -                -            -         -           2                 3           3
    transportation interventions
    to Maropeng facilitated
2.2 Implementation report of           -                -            -         -          Imple        Implemen        Imple
    Socio-economic impact                                                                menta            tation       menta
    assessment study in the                                                                tion           report        tion
    COHWHS produced                                                                       report        produced       report
                                                                                        produced                       produc
                                                                                                                         ed

     5.3 Quarterly Targets for 2018/19

      Performance Indicators        Reporting     Reporting    Annual                   Quarterly Targets
                                   Responsibili    Period      Targets
                                                                               1st          2nd                  3rd         4th
                                       ty

1.  TO ENSURE THAT CRADLE OF HUMANKIND IS A WELL-MANAGED AND MAINTAINED WORLD HERITAGE SITE THAT
    CONTRIBUTES TO SCIENTIFIC RESEARCH, COMMUNITY BENEFICIATION AND THE TOURISM VISITOR ECONOMY.
1.1 Collaboration agreement         COHWHS    Annually     Agree         -            -        Agree                          -
    signed with East Africa                                ment                                 ment
    (Kenya) on scientific research,                       signed                               signed
    community beneficiation and                          between                              between
    the tourism visitor economy                          COHWHS                              COHWHS
    with regard to                                          and                                  and
    palaeoanthropological sites                           Nairobi                              Nairobi
                                                         National                             National
                                                         Museum/                             Museum/
                                                          Kenya                                Kenya

1.2 COHWHS Integrated               COHWHS         Annually   Implemen             -           -          Implemen            -
    Management Plan (IMP)                                       tation                                      tation
    implementation report                                       report                                      report
    produced                                                  produced                                    produced

1.3 COHWHS specific land use        COHWHS         Annually    COHWHS              -           -          COHWHS              -
    regulation approved                                         specific                                   specific
                                                               land use                                   land use
                                                              regulation                                    regula
                                                              approved                                       tion
                                                                                                          approved

                 Annual Performance Plan Template 2018/19                                          Page 21
Performance Indicators           Reporting       Reporting      Annual                            Quarterly Targets
                                                 Responsibili      Period        Targets
                                                                                                    1   st                 2nd             3rd            4th
                                                     ty
         2.      TO ENSURE TANGIBLE COMMUNITY BENEFICIATION

         2.1 Number of public                         COHWHS       Annually           2             -                       -              2               -
             transportation interventions to
             Maropeng facilitated
         2.2 Implementation report of                 COHWHS       Annually     Implemen            -                       -         Implemen             -
             Socio-economic impact                                                tation                                                tation
             assessment study in the                                              report                                                report
             COHWHS produced                                                    produced                                              produced

        5.4 Reconciling performance targets with the Budget and MTEF

                                                                                                      Adjusted                      Medium-term expenditure
Sub-programme                                                     Expenditure outcome
                                                                                                    appropriation                         estimate

                                                                                                                                 2018/1     2019/2              2020/2
R thousand                                                2014/15       2015/16           2016/17            2017/18
                                                                                                                                   9          0                   1

  Cradle of Humankind World Heritage Site                   15 780        13 787           14 773               20 995           24 453          24 451          25 856

Total                                                      15 780        13 787            14 773               20 995           24 453        24 451           25 856

Economic classification

  Current payments                                          47 600        33 357           34 652               20 995           24 453          24 451          25 856

        Compensation of employees                           15 780        13 787           14 773                5 935             6 333          6 751           7 197

        Goods and services                                  42 248        25 045           37 925                8 560             8 363         10 201          11 159
        of which:
        Communication                                           1 796         2 485         2932                  200                  0             0               0
        Computer services                                        496             0             88                      0               0             0               0

        Consultants, contractors and special services       32 168        16 781           28 841                7 700             7 655          9 445          10 400

        Audits                                                   578           619            789                      0               0             0               0
        Training and development                                  70           181             43                      0               0             0               0
        Operating leases                                           0             0            146                      0               0             0               0
        Operating payments                                      4 104         4 131         3 990                      0               0             0               0
        Travel and subsistence                                   817           614            763                  30                33             36              39
        Venues and facilities                                   2113            17             22                 630               675            720             720
        Other                                                     98           191            311                      0               0             0               0
        Administrative fess                                        8            26              0                      0               0             0               0

  Transfers and subsidies to:                                      0             0              0                6 500             7 500          7 500           7 500

        Public corporations and private enterprises                0             0              0                6 500             7 500          7 500           7 500

  Payments for capital assets                                    137           137            942                      0               0             0               0

        Machinery and equipment                                  137           137            942                      0               0             0               0

        Software and other intangible assets                       0             0              0                      0               0             0               0

        Payments for financial assets                              0             0              0                      0               0             0               0

Total                                                      58 165        38 969            53 640               20 995           24 453        24 451           25 856

                              Annual Performance Plan Template 2018/19                                                          Page 22
5.5 Performance and Expenditure Trends
The COHWHS is a trading entity of the Gauteng Department of Economic Development. Total
expenditure amounts to R 58.1 million in 2014/15 decreasing to R 38.9 million in 2015/16 and
increased to R 54.2 million in 2016/17. The expenditure is anticipated to increase over the MTEF period
for project implementation. The entity supports the development and management of the Cradle of
Humankind World Heritage Site as a UNESCO-inscribed World Heritage Site which is in the North Western
Region of the province as a tourism destination which focuses on the palaeontological sciences,
sustainable natural resource conservation and utilisation, culture and history. Tourism is one of the key
drivers for the creation of an inclusive economy in this geo-spatial tourism project that includes the
following areas of management: implementation of the Operational Guidelines for the Implementation of
the World Heritage Convention; fossil site management; ground water monitoring; Working on Fire
programme; land use management; cycling and mountain bike development and maintenance thereof;
management of the maintenance of the road network and signage in the COHWHS; cooperatives
establishment, support; training and mentoring; sponsored schools visits project to the visitor centres in
the COHWHS; community projects; implementation of an inclusive economy strategy; Cradle Trust
management; stakeholder management and public meetings.

               Annual Performance Plan Template 2018/19                            Page 23
6. PROGRAMME 3: DINOKENG

    BUDGET              PURPOSE               SUB-PROGRAMMES                                           FUNCTIONS
    PROGRAMME

    Dinokeng       Sustainable         Dinokeng Game Reserve (DGR)          •   The purpose of the Dinokeng Game Reserve sub- programme
                   Conservation and                                             is to develop and manage the Dinokeng Game Reserve to
                   Heritage Assets                                              serve as a catalyst for socio economic upliftment to an
                                                                                impoverished part of the province and to add to the
                                                                                protected areas strategy (PAES) of Gauteng province to
                                                                                conserve biodiversity. This initiative was fully researched and
                                                                                described in the Master Plan that was completed in
                                                                                December 2001 and approved by cabinet.
                                       Tourism Hubs                         •   The purpose of the Tourism Hubs sub-programme is to invest
                                                                                in strategic tourism infrastructure to create tourism
                                                                                attractions in both Cullinan and Roodeplaat to increase
                                                                                tourist numbers to contribute to the growth of the local
                                                                                economies, promote participation of previously marginalised
                                                                                into the mainstream economies of these areas. In Cullinan,
                                                                                the sub-programme aims to develop the area as a Window
                                                                                into a Jewellery Precinct. In the Roodeplaat, the sub-
                                                                                programme aims to develop the area as a Window into
                                                                                African Waterways offering mass recreation and
                                                                                environmental education facilities for the domestic emerging
                                                                                market and large school groups.
                                       Public Participation and Community   •   The purpose of the Public Participation and Community
                                       Benefits                                 Benefits sub-programme is to implement the principles of
                                                                                the Transformation, Modernisation and Re-industrialisation
                                                                                objective by advancing the goals of the Township Economic
                                                                                Revitalisation Strategy using tourism as a basis for
                                                                                intervention. The delivery model is tourism development and
                                                                                enterprise support and development of cooperatives and
                                                                                small-medium and micro size township businesses as well
                                                                                as ensuring an inclusive tourism economy through
                                                                                communities. To ensure sustainability and inclusiveness,
                                                                                communities are provided with requisite skills through
                                                                                training programmes.

The Programme will work towards the following strategic objective:
•      SMMEs and cooperatives participating in the tourism economic activities in the Dinokeng project area
       as part of a radically transformed tourism economy.

                  Annual Performance Plan Template 2018/19                                        Page 24