Builder Information Pack - MAY 2020 - Core Projects
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
O R A N A
•
B U I L D E R
I N F O R M AT I O N
PA C K
O V E RV I E W Located along 375 Pattersons Road, The project will offer 42 hectares of open
Clyde North, it’s 55km South East from spaces; comprising of 6 local parks,
Melbourne CBD. Set across 274 hectares, 2 recreational reserves and 3 wetlands.
Core Projects and Balcon Group are providing approximately over 4,000 Orana will also include its own town centre,
residential allotments. Orana will be a primary school and a community hub.
proud to introduce you to, Orana. the largest masterplanned community
The community will feature 10 kilometres
coming to the South East.
The name Orana is inspired by an of dedicated off road cycle paths that
connect the town centre, schools, shared
Indigenous word meaning ‘Welcome’. facilities and parks, providing simple and
sustainable commuting options.O R A N A
Berwick
20min Drive
•
B U I L D E R
Melbourne
CBD
I N F O R M AT I O N
50min Drive
Fountain Gate
Shopping Centre
THE FACTS
PA C K
20min Drive
Address: 375 Pattersons Road,
Bunjil Place
Clyde North 20min Drive
Estate Size: 274 Hectares
(Size of Fitzroy & Collingwood combined)
Cranbourne
Station
Allotments: Over 4,000 homes 15min Drive
Product Mix: Land & Medium Density
Cranbourne
10min Drive
Public Retail Launch: July 2020
Civil Construction: Underway – Beginning
November 2019
Council: City of Casey
DV Grand Opening: Spring 2021
Allotment Delivery: 200-250 lots per year
Open Space: 42 Hectares
(More green space than
Melbourne’s Royal Botanic Gardens)
Phillip Island
1hr Drive
LEGEND
N
Parkland Wetlands Active Shared
Mornington
Recreation Footpath Peninsula
30min DriveO R A N A
BUYER PROFILE TIMEFRAMES
•
B U I L D E R
• First Home Buyers
• Young to midlife couples and families Title Timeframe: 10 months per stage, construction programme
I N F O R M AT I O N
First titles expected November/December 2020 (Stages 1 & 2)
• Aged between 28-40 years old
Land Settlement: 14 days
• Value for money and affordability is important to
them, however they will spend more on items they Home Build Timeframe: 12 months from settlement to begin construction
PA C K
consider increasing their perceived status 12 months of commencement to complete the build
• Culturally diverse, Indian, Sri Lankan, New Zealand,
UK and Australian
BY THE END OF 2021:
• 200+ Residential lots
PRODUCT MIX • A 35 lot Display Village – Grand Opening in Spring 2021
• Stage 1 Park (Over 7,500m2)
• Diverse lot mix catering to all Orana buyer types
Servicing all of precinct 1 and will include:
• Multiple precincts will create further diversity of • Playground
product throughout the estate • Outdoor fitness equipment
• Public art
Frontage Depth % of Lot Type • Running track
• BBQs
16 16 0.6% 0.6%
• Orana Community Place – interim Council operated
10.5 21 1.5% community facility within Display Village.
12.5 21 11.0% 16.2%
14 21 3.8%
12.5 25 7.6% WITHIN 5 YEARS:
15.4%
14 25 7.7%
• 850+ over 15 Stages
8.5 28 4.2%
• Orana Town Centre
12.5 28 19.7%
53.2% • Supermarket and specialty stores (Stage 1)
14 28 21.6%
16 28 7.6% • 11 hectares of Wetlands Reserve
12.5 32 2.5% • Pattersons Road extension
14 32 6.4% 14.6% • 2 intersections
16 32 5.7% • 2.2km of arterial road
Expected lot mix within first precinctO R A N A
AMENITIES AND FEATURE ESTATE REQUIREMENTS:
•
B U I L D E R
Amenities within: Town Centre
NBN: NBN Co
Community Hub
Recycled Water: Yes
I N F O R M AT I O N
Primary School
Proposed Preschool Rainwater Tank: No
Front Landscaping Promotion*: Installed by LD Total upon house completion
Featuring: 6 local parks *While the promotion is running, all allotments are eligible
PA C K
2 recreational reserves for a front landscaping package.
3 wetlands
Engineering: Where filling is required Level 1 Compaction
report including lot specific certificates
Bike Tracks: 10km dedicated off road cycle paths will be provided
The full design guidelines can be accessed here
Distances To: Melbourne CBD – 55km (50mins drive)
Cranbourne – 9km (10mins drive)
Westfield Fountain Gate – 16km (20mins drive)
INITIATIVES
Cranbourne Park Shopping Centre – 8.6km (13mins drive)
Train Stations: Cranbourne Station – 9km (15mins drive) Partnership with Bunjil Place Arts Trust
Committed to funding artwork from local artists throughout the estate.
Future Clyde Station – 3km (5mins drive)
Homes for Homes | homesforhomes.org.au
Schools: Clyde Grammar – 9.4km Balcon is donating 0.1% of each lot sold, for social and affordable housing to
Haileybury Collage (Berwick) – 14.9km those in need. Each purchaser will be given the opportunity to participate to the
One Early Education Group – 6km donation when they sell their home.
Headstart Early Education Clyde North – 6km
Wilandra Rise Primary School – 6km Urban Forest Project
Berwick Primary School – 14.8km Achieving up to 30% canopy coverage in Orana.
Berwick Grammar School – 17km
Cranbourne Secondary School – 8.2km UDIA EnviroDevelopment | envirodevelopment.com.au
Casey Grammar School – 7.1km
Orana has been awarded with a 6-leaf accreditation.
Cranbourne Carlisle Primary School – 10.6km
Community Kids Hampton Park Early Education Centre – 17.3km
Lyndhurst Secondary College – 12.6km
Lyndhurst Primary School – 13.8km
DEVELOPER
Clyde Primary School – 5.6km
Balcon Group | balcongroup.com.auCORE PROJECTS TEAM
Nigel Jacotine Adele Katelanis
Senior Estate Manager Builder Partner Specialist
njacotine@coreprojects.com.au akatelanis@coreprojects.com.au
0409 535 740 0447 267 087
Grant Neilson Alyssa Taing
Project Manager Assistant Project Manager
gneilson@coreprojects.com.au ataing@coreprojects.com.au
C R E AT E YO U R B E ST L I F E
O R A N AC LY D E N O RT H .C O M . AU
1800 M Y O R A N A
1800 696 726
Visual, verbal or written plans, illustrations, images and information are impressions of Orana Clyde North.
These plans, illustrations, images and information (including but not limited to price, availability, dates, plans,
specifications and construction of proposed facilities and infrastructure) are indicative depictions for presentation
purposes only and are believed to be correct at the time of publishing but are subject to change without notice.
Areas, locations and dimensions are approximates only and are subject to survey. Future transport and other
infrastructure and facilities and features are provided for in the precinct structure plan but the size and location is
subject to delivery by third parties, site and market conditions, regulatory approvals, final plans and other factors
and are not to be relied upon as no warranty or representation is given or to be construed. Purchasers should make
their own enquiries, review contracts carefully and obtain independent advice before purchasing.You can also read