MARIE ‐ ELIH MED ‐ PROFORBIOMED CAPITALIZATION PROCESS
(GREECE)
inputs for the Policy Paper 2nd version
19th September, Ljubljana
Organised by Region of East Macedonia and Thrace
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
1. Working group meeting in Greece
2. Greek pilot actions
3. Reflections on Policy paper/ Strategic lines
A Territorial and Financial Governance
B Competitiveness, economic activities and
employment
C Market activation
D Smart energy management systems and services
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
1. Working group meeting in Greece
Date: 3rd of September 2013
Place: Komotini
Hosted by: Region of East Macedonia and Thrace
Attended by: the Greek partners of the projects “ELIH‐Med”,
“PROFORBIOMED” and “MARIE” and Mr Jean‐Claude Tourret, General
Director from AVITEM
ELIHMed PROFORBIOMED MARIE
ANKO SA ‐ West
Region of East Macedonia Region of Western
Macedonia Development
and Thrace Macedonia
Company
Democritus University of University of Western Institute of Accelerating
Thrace Macedonia Systems and Applications
Agency for planning and
Centre for Renewable
development of Patras ‐
Energy Sources and Saving
ADEP
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
1. Working group meeting in Greece
Sessions of the meeting:
Press Conference
Presentation of the Policy Paper
Presentation of ELIH‐Med, MARIE and
PROFORBIOMED pilot actions in Greece
Visit of pilot project site – Students Residence,
University Campus of Democritus University, Komotini
Discussion on strategies to use pilot actions to
improve the Policy Paper
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
2. Greek pilot actions
5 Students’ residences buildings containing in total 630 flats,
accommodating 700 students, within the Democritus
University of Thrace campus of Komotini
ELIH MED
Public Buildings owned and managed by DUTH
Peri‐urban area (on the edge of the city of Komotini)
Social Dwellings Æ selection of Students with social‐financial
criteria
Range in a size between: ~1400m2 up to ~3600m2
Date of construction : 1985‐1988
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
2. Greek pilot actions
Planned Energy‐saving measures / metering actions:
‐ External walls insulation,
‐ External insulation to floors above pilotis
‐ Roof‐mounted Solar hot water collectors
‐ Replacement of student rooms’ lighting
‐ Space heating controls
ELIH MED
‐ Replacement of (limited) broken window glazing
‐ Heat and electricity metering, temperature data loggers
‐ Replacement of boilers Expected results of energy retrofitting
experimentation:
‐ Energy Class rise by up to 2 categories or
‐ Energy consumption decrease ~ 35‐40%
Voluntary Agreements (2 so far)
Social Approach
‐ Motivation of Students
‐ TMG and PPCG meetings
‐ Questionnaire
Communication activities
Evaluation Period
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
2. Greek pilot actions
The goal of the project’s pilot activities is to indentify and
select appropriate buildings of the Mediterranean territory
in order to increase the energy efficiency and create
sustainable and long‐term financing mechanisms for
MARIE
energy conservation investments in buildings.
The Greek partners selected the following public buildings:
‐ The Hospital of Ptolemaida “Bodosakio”
‐ The Administrative Building of Region of Western
Macedonia in Kozani
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
2. Greek pilot actions
State of art:
The priliminary energy audits to the 2 selected buildings
and the cost/benefit analysis of possible investment
solutions have been concluded
At the current phase, the partners are at the process of
MARIE
setting up the specifications of the Call for the selection of
an ESCO company.
Next steps:
‐ Energy Auditing‐ Technical Report for the final selection of
EEM‐ Financial Scheme
‐ Supply & Installation of equipment
‐ Evaluation of the results of the pilot actions
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
2. Greek pilot actions
Indicative actions already taking place in Greece:
PROFORBIOMED
‐ development of feasibility studies for specific bioenergy projects
‐ development of a system for more efficient management of forest
residues through mapping with a GIS system all management studies in
selected forests
Selected bioenergy projects:
‐ Co‐firing in Kardia Power Plant located in Kozani, Region of West
Macedonia
‐ Pellet factory combined with biogas plant in Servia‐Kozani, Region of
West Macedonia
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
2. Greek pilot actions
AXIS I – Network building Up:
The pilot action is focused on the organizational aspects of the forestry biomass production
PROFORBIOMED
chains, developing tools to improve the non‐technical issues of the project.
AXIS II – a. Biomass office
will develop links with experts in Wood Biomass sectors and establish a comprehensive
information service dedicated to biomass derived heat and energy technologies and supply chains.
AXIS II – b. Web site‐ Tool for biomass use information in local level
AXIS II – c. Best Practices
The Region of West Macedonia will improve the Logistics in co‐firing or pellet factory Cost
relation maps based on GIS
The results of the exchange will be used for drawing the Guidelines for a more efficient Biomass
Supply Chain.
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
3. Reflections on Policy paper/ Strategic lines
Sets of
Strategic lines Comments
Strategic Lines
1.1. Articulation of EEB policies giving to
ELIH‐MED: REMTH has undertaken all the communication and
regional authorities a central role in
coordination at territorial level capitalisation activities and plays a key role at regional level
1.2. Elaboration, coordination and
implementation of differentiated policies
and plans targeting the various typologies of ‐
existing buildings and the different types of
owners
1.3. Development of financial engineering
1. Territorial capabilities to leverage the European ELIH‐MED: Additional funding through innovative financing which
and financial Regional Development Fund (ERDF) and could lead to leverage of ERDF fund ‐ Promotion of Voluntary
governance other public funds on private financial Agreements (2 so far)
resources
ELIH‐MED: Two groups, TMG and PPCG, have been formulated,
with the active involvement of final users (students) – A social
approach is developed by CRES
1.4. Development of inclusive policies
involving final users PROFORBIOMED: try to implement project that are closer to the
citizens. e.g. the replacement of oil boiler in a hospital or the
biomass solution for heating purposes in a swimming pool of a
public athlete center.
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
3. Reflections on Policy paper/ Strategic lines
Sets of Strategic Lines Strategic lines Comments
2.1. Creation of dynamic energy efficiency PROFORBIOMED: promotes the investments in Green energy (biomass)
economic ecosystems ‐ solutions towards employability.
2.2. Promotion of training for existing and
‐
new professional profiles
2. Competitiveness, 2.3. Use of public procurement as an
‐
economic activities energy–efficiency oriented investment tool
and employment
2.4. To encourage innovative initiatives in
‐
the social economy sector
2.5. To encourage and finance the research
‐
on integrated energy construction.
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
3. Reflections on Policy paper/ Strategic lines
Sets of
Strategic lines Comments
Strategic Lines
ELIH‐MED: The TMG group is towards this direction. The ELIH‐MED Greek partners along with the
TMG group organised a workshop for stakeholders.
3.1. To raise awareness of the Communication activities implemented by REMTH focus on raising awareness of stakeholders,
opportunities on energy among several groups in regional level.
efficiency among the major
stakeholders MARIE: Through the RIG (Regional Interest Group) meetings that take place every year in the
Region of Western Macedonia in the framework of MARIE project.
3. Market
PROFORBIOMED: Web portal to connect customers (individuals and small and medium‐sized power
activation
plants) and suppliers of biomass.
3.2. Creation and
development of incentives to
overcome the main market
barriers
3.3. Lower the financial risk
MARIE: This S.L. is linked with the Pilot Action (PA 2.1) focused on ESCOs and TPF (Third Party
through guarantee system
and financial facilities Financing).
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
3. Reflections on Policy paper/ Strategic lines
Sets of Strategic Lines Strategic lines Comments
ELIH‐MED: Meters (heat and electricity) and temperature data loggers have
4.1. Improvement of
been installed in the pilot buildings and the results with be linked with user
the available
information on energy behaviour and awareness
consumption for users
PROFORBIOMED: use of smart meters for measuring the CO2 footprint that
4. Smart energy and providers
their system has and the saving in CO2 achieved in a yearly basis.
management systems
and services
4.2. Developement of PROFORBIOMED: WP 4 partners will select local communities with already
interconnected
developed supply side and prepare a pre‐feasibility study for a small or
intelligent energy
management systems medium size biomass plant or district heating/cooling system with emphasis
at urban scale on ESCOs
ELIH-MED: 1.1, 1.3, 1.4, 3.1, 4.1
MARIE: 3.1, 3.3
Proforbiomed: 1.4, 2.1, 3.1, 4.1, 4.2
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
3. Reflections on Policy paper/ Strategic lines
Lack of coordination between EU funds and bureaucracy is the most
significant identified barrier that lead to time consuming processes.
The policy paper should take into consideration the Nearly Zero Energy
Buildings and Sustainable building (energy and resources saving) adapted to
the Mediterranean context.
Biomass solutions, addressed by Proforbiomed could be included in the
concept of Nearly Zero Buildings, since Renewable Energies are necessary to
achieve zero energy balance.
Local Authorities do not have the competence to deal with banks, ESCOs
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
3. Reflections on Policy paper/ Strategic lines
The training of the beneficiaries is rather crucial in order to reduce the risk of
the Regions when dealing with private funds.
Local Authorities could play a key role in energy efficiency and could
coordinate the different actors in the region (stakeholders, users, banks,
engineers etc..)
A secure legal and financial environment is necessary, at least for ESCO’s and
for the first stages of development in a new market.
AXIS 2 “Competitiveness, economic activities and employment” was
characterized as the most challenging, since the renewable energy resources
and energy efficiency could lead to new jobs and “green” entrepreneurship
opportunities.
The strategic lines of AXIS 2 is the most difficult to reach through the pilot activities
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
3. Reflections on Policy paper/ Strategic lines
In order to succeed in the set goals the partners should:
– Be consistent in long term
– Train in order to create employment (MARIE project intention, self‐construction is
a concept studied in ELIH‐MED)
– Raise awareness regarding the issues that constitute the objectives of the 3
projects
– Increase the use of biomass in buildings for energy and heating purposes. This is a
big challenge that could have a significant affection to the employment in long
term.
Local government does not have enough power and a strategy should be developed
in order to involve them at a larger extent.
We ask the amount of ERDF fund for Energy efficiency (4% today) to be raised, while
we cannot absorb the existing fund in most cases – need for efficient policies and
programmes
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
3. Reflections on Policy paper/ Strategic lines
The issue of renewable energy should be introduced in the Policy Paper while the
weak point is Capitalization and Dissemination.
It was stressed out that if the projects do not develop tools, and don’t proceed in
construction works, with deliverables that are limited to studies and reports, then
the outputs remain unexploited.
The real construction work undertaken in pilot projects in ELIH‐MED could lead to
significant experience for MED programme, helping to the improvement of next
programming calls.
The projects should considered what actions/ results have added value after the
closure of the projects – more focus on strategic projects and real construction
pilots
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER
Project co‐financed by European Regional Development Fund ‐ ERDFPOLICY
PAPER
3. Reflections on Policy paper/ Strategic lines
It was proposed to include a 5th pillar to the 4 existing ones that could be “New
knowledge‐ training ‐ dissemination” since the sharing of knowledge is rather
important and could improve user behaviour. Capitalization plays a significant
role in European projects.
It was suggested that the national partners sign a formal agreement regarding
the recommendations of the Policy Paper in order to validate it and diffuse them
at regional and national level. This issue will be discussed further by the partners.
Projet cofinancé par le Fonds Européen de Développement Régional ‐ FEDER