     (MINING OF COLOUR GRANITE)
   SMT P. JAYA LALITHA
 MINING OF COLOR GRANITE
  OVER AN EXTENT: 2.83 HA
      Mine Address: Sy. No.10 (P)
    Raikurudu (V), Seethampeta (M)
   Srikakulam (Dt.), Andhra Pradesh

            Prepared By
     P.V. SATYANARAYANA
      RQP/DMG/AP/34/2017
   Bommasani Sadhan, 2nd Floor,
          Near One Centre,
             Gollapudi,
        Vijayawada-521225
       Mobile No.8940343373
   Email Id:latticeit.in@gmail.com
PROJECT: Smt P. Jayalalitha                                        Pre-Feasibility Report

                                   EXECUTIVE SUMMARY
1.0     INTRODUCTION
        The Mining Lease was granted in favor of Smt P. Jayalalitha, over an extent of 2.83 Ha,
        Sy.No.10 (P) of Raikurudu (V), Seethampeta (M), Srikakulam District, and Andhra
        Pradesh.

1.2     SALIENT FEATURES OF THE PROJECT
        The mine lease area falls under the Toposheet No. 65 N/10 bearing following Toposheet
        details:
        Toposheet No.         : 65 N/10

DETAILS OF BOUNDARY GPS VALUES

                   BP           North Latitude                East Longitude
                      1.         18°43'49.6"N                  83°44'13.9"E
                      2.        18°43'53.11"N                  83°44'08.15"E
                      3.        18°43'56.91"N                  83°44'10.76"E
                      4.        18°43'53.42"N                  83°44'16.52"E

The nearest railway station is Amudalavalasa which is at 56.0 kms from the mine lease area. The
nearest airport is Visakhapatnam Airport at 156 kms from the mining site.

SAILENT FEATURES OF THE PROJECT
Nature of the project                         Smt P. Jayalalitha
                                              Mining of Colour Granite
Size of the Project                           Maximum Production – 8,300 Cum/Annum
LOCATION OF PROJECT
District & State                              Srikakulam District, Andhra Pradesh
Village & Mandal                              Raikurudu Village & Seethampeta Mandal
PROJECT: Smt P. Jayalalitha                                             Pre-Feasibility Report
Land Availability                                 2.83 Ha.,
Nearest Village                                   Raikurudu Village at 1.2 kms
Toposheet No.                                     65 N/10
GENERAL CLIMATIC CONDITIONS
Annual rainfall                                   1000 mm
Min and max temp.                                 250C and 480 C
Predominant wind direction                        SW to NE & SE to NW
HISTORICAL / IMPORTANT PLACES
Nearest highway                                   National Highway-NH-16 at a distance of 63.4 kms
Nearest town                                      Seethampeta at a distance of 12.0 kms
Nearest Railway Station                           Amudalavalasa Railway Station at 56.0 kms
Nearest seaport                                   Visakhapatnam Port at a distance of 156 kms
Nearest Airport                                   Visakhapatnam Airport at a distance 174 kms
Archaeological /Historically Important Site       None within 10 km radius of the site
Sensitive Places                                  None within 10 km radius of the site
Sanctuaries / National parks                      None within 10 km radius of the site

 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
 Identification of project and project proponent. In case of mining project, a copy of mining
        lease/letter of intent should be given.
        Details of Project Proponent:
        Name of Mine             :       Smt P. Jayalalitha

                    ADDRESS OF THE MINE                            ADDRESS OF THE LESSEE

         Smt P. Jayalalitha                                    Smt P. Jayalalitha
         Sy.No.10 (P)                                          W/o Krishna Rao
         Raikurudu (V),                                        Vallagadda Village,
         Seethampeta (M)                                       Seethampeta Mandal,
         Srikakulam District,                                  Srikakulam District,
         Andhra Pradesh                                        Andhra Pradesh State.
PROJECT: Smt P. Jayalalitha                                      Pre-Feasibility Report

 Brief Description of nature of the project
      Smt P.Jayalalitha has grant of Q.L for Colour granite over an extent of 2.83 hectares
      occurring at Sy.No.10 (P) of Raikurudu Village, Seethampeta Mandal, Srikakulam District
      for a period of 20 years.

      The Assistant Director of Mines and Geology, Srikakulam, vide File No.4217/Q/02 dated:
      23.08.2003 submitted the proposals recommending for grant of quarry lease for Colour
      granite over an extent of 2.83 hectares occurring at Sy No.10(P) of Raikurudu Village &
      Seethampeta Mandal, Srikakulam District, A.P, in favour of Smt P. Jayalalitha.

      After, careful Examination of the proposals of the Assistant Director of Mines and
      Geology, Srikakulam, it is decided in principle to grant of quarry lease for Colour Granite
      over a precise extent of 2.83 Ha., in Sy.No.10 (P), of Raikurudu Village, Seethampeta
      Mandal, Srikakulam District A.P, in favour of Smt P. Jayalalitha, for a period of 20 years
      subject submission of Approved Mining Plan issued by the Director of Mines & Geology,
      Ibrahimpatnam vide Notice No.32908/R1-3/2002, dated.14.03.2018.

      The Mining Plan Approved Vide Letter No.768/MP-SKM/2018, dated: 21.07.2003.

 Need for the project and its importance to the country and or region.
      In the present scenario, the Colour granite has good market in the country apart for export
      purpose. The available granite is made of rough blocks, slabs, panel and tiles, monuments
      and other fancy and decorative items like pen stand, flower vases, table tops-tea troy &
      others. High precision products like surface plates may also be made for engineering
      application.

 Demand-supply Gap.
      There is a demand of Color Granite and is ever growing with the growth of industrial
      sector in the country. The requirement of the mineral is always found high in adjoining
      areas.
PROJECT: Smt P. Jayalalitha                                       Pre-Feasibility Report

 Imports V/s Indigenous production
      Colour Granite mined from the proposed project will neither be exported nor imported. It
      is an indigenous production and will be supplied within the country.

 Export Possibility
      No export.

 Domestic/ Export Markets
      Color granite is having good demand in export and domestic market. The applicant has
      contacted the buyers at Chennai and other important trade centers to export the rough
      blocks of color granite from this area. All efforts will be made to improve the market
      trend and demand to ensure that the venture is a profitable one.

 Employment generation (Direct and Indirect due to the project)
      The proposed project will generate direct employment to 42 people and indirectly in
      transportation etc.

 PROJECT DESCRIPTION
 Type of project including interlinked and interdependent projects, if any
      The proposed mining project is mining of Color Granite in semi-mechanized open cast
      method by using hydraulic excavators, tippers, jackhammer drills.

 Location:
      The above said quarry lease falls in Topo sheet No. 64 N/10. The Quarry lease area is
      located at a distance of about 1.2 kms from Raikurudu village. The Mandal Head Quarters
      Seethampeta is located at the distance of 12.0 kms. The quarry lease area can be
      approached from Palakonda-Kothuru Road.
PROJECT: Smt P. Jayalalitha                    Pre-Feasibility Report

                     GOOGLE MAP AROUND 10 KM RADIUS
PROJECT: Smt P. Jayalalitha                    Pre-Feasibility Report

                      TOPO MAP AROUND 10 KM RADIUS
PROJECT: Smt P. Jayalalitha                                                             Pre-Feasibility Report

   Details of alternate sites considered
          The mineral is site specific, hence there are no alternative sites considered. Mining activities
          are carried out based on local geology and availability of the mineral.

               Total Geological Reserves
      A        Geological Reserves                                             5,97,779 M3
      B        Reserves Blocked under 7.5 M Buffer Zone                         73,618 M3
      C        Reserves Blocked under Safety Slopes                            2,17,003 M3
      D        Total Reserves Blocked(B+C)                                     2,90,621 M3
      E        Reserves available for quarry (A-(B+C)                          3,07,157 M3
      F        Extraction of Market Grade Reserves @ 25%                        76,790 M3
               Recovery

Life of Mine = Marketable Proved Reserves + Already recovered
                       An Average Production per year

              = 76,790 Cu.m -16,339 Cu.m

              = 60,451 /8,300

               = 7.3 or say 7.0 Years

   Size or magnitude of operation
          The proposed mine has lease over an area of 2.83 Ha.,
                                      Year                 Production @
                                                             25%(Cbm)

                                    2018-19                     7,500
                                    2019-20                     7,750
                                    2020-21                     8,000
                                    2021-22                     8,250
                                    2022-23                    10,000
                                     Total                     41,500
                                    Average                      8,300
PROJECT: Smt P. Jayalalitha                                       Pre-Feasibility Report

 Project description with process details
      The method of quarrying is in semi-mechanized open cast method by using hydraulic
      excavators, tippers, jack hammer drills. The blocks will be cut in conventional Wire Saw
      cutter and will be split. The larger blocks will further be reduced to smaller handable
      sizes.

 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of
      Final Products, Mode of Transport of Raw Material and Finished Product No raw
      material will be required in the proposed project. The available granite is made of rough
      blocks, slabs, panel and tiles, monuments and other fancy and decorative items like pen
      stand, flower vases, table tops-tea troy & others. Except removal of overburden in the
      upper layer, no mineral processing will be carried out in the mine lease area.

 Resource optimization/ recycling and reuse.
      Minerals are depleting assets once mined; they cannot be replenished like agriculture,
      vegetation thus a scientific approach will be taken up in exploitation of mineral with
      systematic method. Mining work will be carried out by semi-mechanized open cast
      method. 75% of the solid waste will be disposed for roads developments and building
      material.

 Availability of water its source, energy/ power requirement and source
      Water Requirement
      Around 11.5 KLD of water will be required for the project activity. Water requirement
      will be met through water tankers. Water is required in the mine for spraying on the roads
      and working faces to suppress the dust. Also a small quantity of drinking water is
      required.
     S. No     Description     Fresh water        Waste water               Disposal
      1.       Domestic          2.0 KLD             1.6 KLD        Septic tank followed by
                                                                    soak pit
      2.       Green belt        3.0 KLD                --                      --
      3.       Dust              4.0 KLD                                        --
               suppression                              --
PROJECT: Smt P. Jayalalitha                                       Pre-Feasibility Report
       4.    Wire    Saw          2.5 KLD
             Cutting
            TOTAL                 11.5 KLD           1.6 KLD

 Quantity of wastes to be generated (liquid and solid) and scheme for their management/
     disposal.
 Solid Waste Generation & its Disposal
      The solid waste generated will be disposed to the proposed dump yard i.e. existing within
      the lease area.

                           Year                Waste @ 75% (M3)

                          2018-19                     22,500
                          2019-20                     23,250
                          2020-21                     24,000
                          2021-22                     24,750
                          2022-23                     30,000
                           Total                     1,24,500
                         Average                      24,900

 Liquid Effluent
      1.6 KLD of domestic effluent will be generated at the mine site. It will be send to send to
      septic tank followed by soak pit.

4.    SITE ANALYSIS
 Connectivity
      The quarry lease area is connected by Palakonda - Kothuru Road which is 4.7 kms away
      from the site.

 Nearest Railway Station
      The nearest rail head is Amudalavalasa Railway station at a distance of 56.0 kms from the mine
      location.
PROJECT: Smt P. Jayalalitha                                       Pre-Feasibility Report

 Nearest Airport
       The nearest airport facility is available at Visakhapatnam Airport which is about 174 kms
       away from mine.

 Nearest Highway
       National highway-NH-16 at a distance of 66 kms

 Land form, land use and land ownership
       During the ensuing scheme period an area of 2.83 Ha., of land mining will be done as per
       approved mine plan. Measures will be taken for the reclamation only after the end of
       mining scheme period.

 Existing land use pattern
       The quarry lease applied area is surrounded by hillocks comprising export quality granite,
       Excavation of the precious granite from the village is bringing in additional income to the
       gram panchayath, besides agricultural practices are very good.

 Existing infrastructure
       There are no major constructions seen near to the mining lease area. Temporary Office,
       Rest Shelter, Drinking Water Facilities, First aid facilities will be provided by the
       applicant of the mining lease area.

 Soil classification
       The generated top soil will be preserved as a separate stock for future. The over burden/
       generated waste will be stocked in earmarked area for waste dumping.

 Climatic data from secondary sources
       CLIMATE & RAINFALL
       The quarry lease applied area is falling under semi-arid tropical zone. The area is having
       dry climate. The temperature recorded in this area is 250C in winter and about 480C in
PROJECT: Smt P. Jayalalitha                                            Pre-Feasibility Report
       summer seasons. The wind direction is in SW- NE. The average annual rainfall of the
       area is 1000 mm.

4.9    Social infrastructure available
       All the social infrastructure facilities like hospitals, schools, colleges etc are available
       nearby villages, Mandal headquarters.

5 .0   PLANNING BRIEF
 Planning concept (Type of industries, facilities, transportation etc) Town and Country
       Planning/Development authority Classification.
       It is proposed to produce 41,500 M3 of market grade rough blocks during the plan period
       with an average annual production of 8,300 M3. Benches of 6M height and 6M width will
       be developed during plan period.

 Population projection
       The project will employ nearly 42 workers from nearby villages. Thus, there will not be
       any increase in population due to the project.

 Land use planning
       Land use planning explained under Existing Land Use Pattern.

 Assessment of Infrastructure Demand (Physical and Social)
       Safety equipments, small rest shelter and first aid facilities will be made available for the
       workers in the mine lease area.

 Amenities/facilities
       The following facilities will be extended by the mine management:
          i.   Direct and indirect Employment.
         ii.   Arrangement for safe and healthy working conditions.
        iii.   Provision of drinking water.
        iv.    Conducting medical camps for workers and nearby villagers at regular intervals.
PROJECT: Smt P. Jayalalitha                                       Pre-Feasibility Report

6.   PROPOSED INFRASTRUCTURE
 Industrial area (Processing Area)
      No mineral processing will be carried out in the mine lease area. After excavation, the
      color granite will be dispatched as per orders.

 Residential area (Non Processing Area)
      The mine workers will be hired from nearby villages, so residential areas will not be
      made.

 Green belt
      Plantation will be made at open places and along the approach road.

 Drinking Water Management
      Water Requirement for drinking purpose is 2.0 KLD which will be supplied by water
      tankers.

 Sewerage System
      Domestic wastewater generated will be send to septic tank followed by soak pit.

 Industrial Waste Management
      Not Applicable

 Solid Waste Management
      The waste generated during the mining will be dumped in the SW of the quarry lease area

 Power Requirement & Supply/ Source
      Not Applicable.
PROJECT: Smt P. Jayalalitha                                        Pre-Feasibility Report

 REHABILITATION AND RESETTLEMENT (R & R) PLAN
 Policy to be adopted (Central/State) in respect of the project affected persons including
      home oustees, land oustees and landless laborers (a brief outline to be given)
      No human settlements exist in the M.L. area and no humans will be displaced from the
      area so the proposed project does not involve any rehabilitation and resettlement.

 PROJECT SCHEDULE & COST ESTIMATES
 Likely date of start of construction and likely date of completion (Time schedule for the
      project to be given)
      The project will commence once Environmental Clearance and other necessary
      certificates are obtained from the respective departments.

 Estimated project cost along with analysis in terms of economic viability of the project.
      The envisaged maximum annual production of Color Granite in a year is estimated to be 8,300
      Cum/Annum.
      The cost of the project              :   23.00 Lakhs
      EMP Cost                             :   8.0 Lakhs

 ANALYSIS OF PROPOSAL (Final recommendations):
 The main occupation of villagers is agriculture and sheep raring. The commencement of mining
      activity in this area improved the socio-economic status of the local people by creation of
      employment and paying taxes to gram Panchayath.
      The mining in this area does not involve any hazardous methods. The lessee is providing
      first aid facilities at mine site.