2022 Proposed Budget - November 8, 2021 Workshop

Page created by Salvador Lang
 
CONTINUE READING
2022 Proposed Budget - November 8, 2021 Workshop
2022
  Proposed
  Budget

November 8, 2021 Workshop
2022 Proposed Budget - November 8, 2021 Workshop
Budget Program Review
           General Fund
• 426 Recycling
• 430 Public Works Administration
• 432 Snow & Ice Control
• 433 Traffic Control Devices
• 436 Storm Sewers & Drains
• 437 Repairs of Vehicles & Machinery
• 438 Maintenance & Repair of Roads &
  Bridges
• 446 Stormwater Management & Flood
  Control
2022 Proposed Budget - November 8, 2021 Workshop
Budget Program Review
             continued
• 490s Refunds and Transfers
• Capital Budget
   • Capital Improvements Program Fund (CIP)
   • 5 Year Capital Equipment Plan (GF and CIP)
• Other Remaining Funds
   •   American Rescue Plan Fund
   •   Transportation District Fund
   •   Assessment Fund
   •   State Highway Aid Fund
2022 Proposed Budget - November 8, 2021 Workshop
2022 Proposed Consolidated Budget
                        Transportation District   Assessment Fund
                                                        0%             State Aid Fund
                                Fund                                         4%
                                 1%

            Capital Projects and
            Improvements Fund
                    18%

       American Rescue Plan
              Fund
               6%
                                                                         General Fund
                                                                             71%

                                         Amended          Adopted        Proposed
                                          Budget           Budget         Budget               % of
                                           2020             2021           2022     % Change   Total
General Fund                           $ 16,418,250     $ 16,270,000   $ 16,685,655       3%      71%
American Rescue Plan Fund                       -                -        1,478,530     100%       6%
Capital Projects and Improvements Fund    4,319,300        3,915,500      4,258,760       9%      18%
Transportation District Fund                132,700          127,150        127,150       0%       1%
Assessment Fund                             391,000          391,000          4,100     -99%       0%
State Aid Fund                              904,500          826,715        837,400       1%       4%
                                       $ 22,165,750     $ 21,530,365   $ 23,391,595       9%     100%
2022 Proposed Budget - November 8, 2021 Workshop
2022 Proposed Consolidated Budget
                                                                                                            Capital
                                                             American Rescue       Transportation       Improvements                      State Highway Aid
                                              General Fund     Plan Fund            District Fund        Project Fund   Assessment Fund          Fund         TOTAL ALL FUNDS

REVENUE

Tax Revenue                                    12,832,000              -                    -                    -                -                  -            12,832,000

Non-Tax Revenue                                 1,884,945           3,060                 2,500              15,000            4,100              1,000            1,910,605

Inter-Fund Transfers In                           345,000              -                    -              2,722,100              -                  -             3,067,100

Assessments                                         7,900              -               124,650                   -                -                  -              132,550

Federal Revenue                                       -          1,475,470                  -                    -                -                  -             1,475,470

State Revenue                                     754,500              -                    -               989,660               -             836,400            2,580,560
Contributions from Prior Year Fund
Balance                                           861,310              -                    -               532,000               -                  -             1,393,310

                          TOTAL REVENUE   $    16,685,655    $   1,478,530     $        127,150     $      4,258,760    $      4,100      $     837,400       $   23,391,595

EXPENDITURES

General Government                        $     2,270,655    $         -       $            -       $       914,660     $         -       $          -        $    3,185,315

Public Safety                                   8,104,815              -                    -                    -                -                  -             8,104,815

Public Works                                    3,989,055              -                    -              2,859,100              -                  -             6,848,155

Culture and Recreation                            839,130              -                    -               485,000               -                  -             1,324,130

Refunds                                           107,000              -                    -                    -                -                  -              107,000

Inter-Fund Transfers Out                        1,375,000         730,000              124,700                   -                -             837,400            3,067,100

Contributions to Fund Balance                         -           748,530                 2,450                  -             4,100                 -              755,080

                  TOTAL EXPENDITURES      $    16,685,655    $   1,478,530     $        127,150     $      4,258,760    $      4,100      $     837,400       $   23,391,595

Projected Fund Balance 12/31/21           $     9,986,871    $     747,000     $        579,132     $      3,041,187    $     828,900     $          -        $   15,183,090
Projected Fund Balance 12/31/22           $     9,125,561    $   1,495,530     $        581,582     $      2,509,187    $     833,000     $          -        $   14,544,860
2022 Proposed Budget - November 8, 2021 Workshop
2022 Department of Public Works Budget
      General Fund Expenditures

                                                     Maintenance and Repairs   Storm Water Management and Flood
Repair of Vehicles and Machinery
                                                      of Roads and Bridges                  Control
               14%
                                                               1%                             2%
                                                                                                                  Recycling
                                                                                                                     1%

       Storm Sewers and Drains
                2%

                          Traffic Control Devices
                                    10%
                                                                                                     Public Works Administration
                                                                                                                54%

                              Snow and Ice Control
                                     16%

              Public Works by Department $3,989,055
2022 Proposed Budget - November 8, 2021 Workshop
Department of Public Works
                 Proposed Reorganization

                                   Director of Public Works
                                       (Superintendent)

                               Assistant Director of Public Works

 Stormwater      Buildings &
  and Flood                               Construction
                   Grounds                                          Fleet   Administration
   Control -                             (432, 433, 436
                 (409 & 454)                                        (437)      (430)
Environmental                               & 438)
   Services
 (426 & 446)
426 Recycling
The 2022 budget reflects the continuation of the fully automated
contracted trash, recycling & yard waste curbside collection for residential                                     Recycling
housing units and “pay as you use” bulk collection waste. This is the first                                      $46,850
year of a new contract with Waste Management to provide the curbside                                                                  Supplies (200)
                                                                                                                                         11,050
collection for trash, recycling and yard waste. The new contract calls for                                                                24%
Waste Management to manage the replacement of trash, recycling and
yard cart, so that expense is no longer in the budget. However, we have
                                                                                                         Other Services
included expense for a glass drop off program once the new contract                                       and Charges
begins. A curbside leaf collection program operated by the Public Works                                    (300-400)
Department continues using specific equipment and procedures so that                                         35,800
the Town remains a partner in a leaf pickup and composting operation                                          76%
undertaken jointly by the Town, Allegheny County, and other North Hills
communities since the fall of 1991.

Salaries for the public works crew who perform this work can be found in       Personal Services (100)      Supplies (200)   Other Services and Charges (300-400)
program 430 (Public Works Administration.) Costs associated with the
communication of information on trash, recycling and yard waste
operations to the residents is included in program 406 (Citizen
Information) as well as an annual submission the DEP recycling
performance grant.
426 Recycling
430 Public Works Administration
The Public Works Budget is divided into various
                                                                         Public Works Administra�on
divisions such as snow control, traffic, vehicle
                                                                                 $2,161,085
maintenance, road maintenance, storm water and          Supplies (200)                                             Other Services and
                                                             2%                                                    Charges (300-400)
parks that will note expenses related to those                                                                            2%
functions. Staffing costs for some of the more
specialized work such as vehicle maintenance and
traffic control remain with those programs, otherwise
                                                                                          Personal Services
all payroll and benefit costs are included in this                                             (100)
division of Public Works.                                                                       96%

New facility construction and reconstruction of old
facilities is presented in the Capital Improvements
Fund (Fund 18). Large equipment purchases and           Personal Services (100)   Supplies (200)   Other Services and Charges (300-400)
replacements are also noted in the Capital
Improvement budget.
430 Public Works Administration

                                                                           Adopted      Projected     Proposed      Budget $        Budget %
Public Works                           Actual      Actual      Actual      Budget        Actual        Budget       Increase/       Increase/
430     Public Works Administration     2018        2019        2020        2021          2021          2022       (Decrease)      (Decrease)

Personal Services (100)                1,062,691   1,294,945   1,276,635    1,936,540     1,870,741    2,077,715       141,175            7%

Supplies (200)                            33,962      17,834      36,216       37,650       27,100        33,400         (4,250)         -11%

Other Services and Charges (300-400)      56,027      35,702      32,512       50,385       29,576        49,970          (415)           -1%

Capital Purchases (700)                  216,982     110,826     127,652        8,000       61,000           -           (8,000)        -100%

Total Public Works Administration      1,369,662   1,459,307   1,473,015    2,032,575     1,988,417    2,161,085       128,510            6%
432 Snow and Ice Control
The snow and ice control program/division within Public
Works provides for the winter maintenance (salting and
plowing of snow) on the 110.1 miles of Town roads and
20.12 miles of state-owned roads. This State road mileage
encompasses all State roads in the Town with the exception
of Route 19 and McKnight Road but does includes their
ramps. The Public Works Department also offers plowing to
approximately 18 miles of private roads in times of heavy
snowfall (6”+ accumulation) upon request of all adjacent
property owners.
The budget is based on the average number of snowfalls
during a winter season. The Town obtains is annual
allocations of road salt for our snow and ice control from
two different sources, the North Hills COG joint Salt Bids and
the Pennsylvania COSTARS program budgets are based on
the per ton cost of salt in each contract.
432 Snow and Ice Control

                                                                                 Adopted     Projected    Proposed      Budget $        Budget %
   Public Works                         Actual         Actual       Actual       Budget       Actual       Budget       Increase/       Increase/
   432     Snow and Ice Control          2018           2019         2020         2021         2021         2022       (Decrease)      (Decrease)

   Personal Services (100)                172,442        190,855      127,399       59,850       66,500       75,415        15,565           26%

   Supplies (200)                         408,670        425,812      476,751      522,000      469,000      544,200        22,200            4%

   Other Services & Charges (300-400)            444            -            -         500          -          3,200         2,700          540%

   Capital Purchases (700)                       -              -            -       5,000          -            -           (5,000)        -100%

   Total Snow and Ice Control             581,556        616,667      604,150      587,350      535,500      622,815        35,465            6%

Personal Service and Supplies Costs for Public Works are supported by the following revenues estimated:
• State Funding - Winter and Severe Winter Maintenance of $73,000 and $4,500 respectively.
433 Traffic Control Devices
The Traffic Control Division provides for the continued in-house
installation and maintenance of traffic control signage and devices                                Traffic Control Devices
throughout the Town. Currently Town forces maintain over 4,000
advisory, regulatory, and street name signs and twenty-nine (29)                                         $387,540
signalized intersections in the Town. Moderate troubleshooting and            Other Services
repair of traffic signal controllers and over 250 signal heads is also         and Charges
handled in-house. Private contractors are currently used to perform             (300-400)
more advanced repairs.                                                             29%

This program uses in-house sign making equipment to respond rapidly                                                     Personal Services
                                                                                               Supplies (200)                (100)
and efficiently to complaints of damaged, outdated, missing or vandalized                          14%                        57%
signs. The Town continues a system of sign replacement based on its
road program schedule and when needed as a result of damage or
vandalism.
The Town will continue to out-source line striping of roads, crosswalks,
parking lots, and VASCAR lines in 2022. Engineering contains costs with     Personal Services (100)    Supplies (200)   Other Services and Charges (300-400)
the upgrade work on any traffic signals that are not capital in nature.
The Town contracts for streetlight service at the intersection of
Thompson Run Road, Red Coach Road and Hazlett Road from Duquesne
Light Company. The Greybrooke Civic Association reimburses the Town
for the cost of this streetlight.
433 Traffic Control Devices

                                                                           Adopted     Projected    Proposed      Budget $        Budget %
Public Works                           Actual      Actual      Actual      Budget       Actual       Budget       Increase/       Increase/
433     Traffic Control Devices         2018        2019        2020        2021         2021         2022       (Decrease)      (Decrease)

Personal Services (100)                  146,166     214,188     183,597     209,530      187,730      219,040         9,510            5%

Supplies (200)                            19,374      19,903      17,558      30,600       30,120       54,350        23,750           78%

Other Services and Charges (300-400)     125,100      56,911      52,137     127,600       76,500      114,150        (13,450)         -11%

Total Traffic Control Devices            290,640     291,002     253,292     367,730      294,350      387,540        19,810            5%
436 Storm Sewers and Drains
Throughout the year the Town performs maintenance
                                                          Other Services              Storm Sewers and Drains
on storm water and drainage facilities that are part of    and Charges
                                                                                              $71,110
the streets based on regular inspection of the              (300-400)
                                                               8%
facilities. The public works staff also makes                        Supplies (200)
adjustments to catch basins and short stretches of                        8%
pipe repair often associated with our road paving
program. Substantial lengths of storm pipe and inlets,                                                    Personal Services
outlet structures, energy dissipation and other                                                                (100)
                                                                                                                84%
stormwater or management techniques are replaced,
lined by contractor or repaired under the Fund 18
Capital Budget.

                                                               Personal Services (100)   Supplies (200)     Other Services and Charges (300-400)
436 Storm Sewers and Drains

                                                                             Adopted     Projected    Proposed      Budget $      Budget %
Public Works                           Actual      Actual       Actual       Budget       Actual       Budget       Increase/     Increase/
436     Storm Sewers and Drains         2018        2019         2020         2021         2021         2022       (Decrease)    (Decrease)

Personal Services (100)                  137,841      39,724       78,375       59,500       59,850       59,610           110          0%

Supplies (200)                             1,991            3            -       5,700        5,200        6,000           300          5%

Other Services and Charges (300-400)       3,624       3,395        5,928        3,100        7,500        5,500         2,400         77%

Total Storm Sewers and Drains            143,456      43,122       84,303       68,300       72,550       71,110         2,810          4%
437 Repairs of Vehicles and Machines
The Town’s maintenance garage is staffed by 3 mechanics.
The responsibilities of these personnel include maintenance                 Repairs of Vehicles and Machines
and inspection of approx. 59 pieces of major equipment
(police vehicles, public works trucks, excavating and other                                    $543,555                 Other Services
equipment, leaf vacuum trucks, street sweeper and                                                                        and Charges
administrative vehicles) and numerous minor pieces of                                                                     (300-400)
equipment. Continuance of in-house maintenance provides                                                                      4%
an immediate internal response to vehicle and equipment
problems and failures as well as routine, scheduled                             Supplies (200)
maintenance capability which extends the life of the                                  38%               Personal Services
equipment. Emergency repairs undertaken during snow and                                                       (100)
ice control efforts maintain the continuity of that service.                                                   58%
Major repairs, such as chassis or frame straightening and
work requiring equipment not available in the Town garage
are accomplished by an outside service provider. The Town
also performs routine maintenance on McCandless Franklin
Park Ambulance Authority equipment subject to
reimbursement.
                                                              Personal Services (100)    Supplies (200) Other Services and Charges (300-400)
Except for fuel consumption all Town related vehicle activity
is charged here. Vehicle Fuel assumes that fuel prices remain
steady in 2022.
437 Repairs of Vehicles and Machines

                                                                                  Adopted     Projected    Proposed      Budget $        Budget %
Public Works                                Actual       Actual       Actual      Budget       Actual       Budget       Increase/       Increase/
437     Repairs of Vehicles and Machinery    2018         2019         2020        2021         2021         2022       (Decrease)      (Decrease)

Personal Services (100)                       272,050      291,858      303,760     318,355      291,890      314,605         (3,750)          -1%

Supplies (200)                                293,166      167,466      151,354     191,000      181,750      206,350        15,350            8%

Other Services and Charges (300-400)           14,090        5,370       39,120      26,600       16,200       22,600         (4,000)         -15%

Capital Purchases (700)                              -            -      84,280         -         17,000          -              -             0%

Total Repairs of Vehicles and Machinery       579,306      464,694      578,514     535,955      506,840      543,555         7,600            1%
438 Maintenance & Repair of Roads &
                             Bridges
All maintenance and improvements on Town roads and
bridges not related to specific Capital Improvement      Maintenance & Repair of Roads & Bridges
Projects is performed under this Public Works program.                  $59,200
Maintenance includes pothole patching, minor
incidental repaving and milling along with roadside
trimming. Capital construction projects such as the
Town’s road paving and drainage improvement                             Other
programs are presented in Fund 18, the Capital                       Services and
Improvement Projects Fund.                                           Charges (300 -          Supplies (200)
                                                                         400)                    55%
There are currently ten lane miles of trimming being                     45%
addressed as well as ongoing response to new areas of
overgrowth. Guiderail is replaced yearly under
contract. Any shoulder repair is accomplished on an as
needed basis using stockpiled milled asphalt. The
current policy of curbing streets in the Town reduces
shoulder repair to a nominal level. In-house labor,        Supplies (200)     Other Services and Charges (300-400)
equipment rental and small contract assistance
supports the program.
438 Maintenance & Repair of Roads &
                                        Bridges

                                                                                 Adopted     Projected    Proposed      Budget $      Budget %
Public Works                                 Actual      Actual      Actual      Budget       Actual       Budget       Increase/     Increase/
438     Maint and Repairs of Roads/Bridges    2018        2019        2020        2021         2021         2022       (Decrease)    (Decrease)

Personal Services (100)                        194,499     303,421     163,796         -            -            -             -            0%

Supplies (200)                                   7,214       8,535       6,521      27,500       26,920       32,700         5,200         19%

Other Services and Charges (300-400)             5,432      16,815      20,430      24,750       15,600       26,500         1,750          7%

Total Maint and Repairs of Roads/Bridges       207,145     328,771     190,747      52,250       42,520       59,200         6,950         13%
446 Stormwater Management & Flood
                                       Control
The Town owns over 60 public stormwater management facilities. They vary in
age and size, but each plays a critical role in stormwater control in the Town. Each    Stormwater Management and Flood Control
facility requires regular inspection and maintenance which is performed by Town
staff. We continue to actively participate in stormwater management on a                               $96,900
regional basis through the North Hills Council of Governments (NHCOG). NHCOG
has recently completed the update of the Pine Creek Watershed Implementation                                                           Supplies (200)
Plan and is working on coordinating release rates for ponds and a COG-Wide                                                                 11%
stormwater study for the Pine Creek Watershed. This work is expected to
continue into 2022.
                                                                                                     Other Services
The Town will continue in its efforts to inspect, maintain and update facilities with
                                                                                                      and Charges
the help of Gateway Engineering. Contracted services contains the costs
                                                                                                       (300-400)
associated with primarily MS-4 inventory work, mapping and monitoring to meet
more stringent MS-4 permitting guidelines, preparation specifications for the                             89%
update of facilities, and troubleshooting that are not considered capital in nature.
Street Sweeping costs have been moved to this program as it is directly related to
our compliance with the MS4 permit. Spring sweeping occurs at strategic times
during year. Sweeping will begin at winter's end, (approximately April 1),again in
late summer to contribute toward water quality in streams, and finally in late fall        Supplies (200)     Other Services and Charges (300-400)
to clean off catch basins of leaves and debris. Street sweeping will also occur
following significant storm events. Also included here is a volunteer
stream/roadside cleanup in the spring and fall.
In addition, there are funds budgeted in the Capital Improvement Plan to expand
our efforts in flood control and for MS4 compliance.
446 Stormwater Management & Flood
                                       Control

                                                                                   Adopted     Projected    Proposed      Budget $      Budget %
Public Works                                 Actual       Actual       Actual      Budget       Actual       Budget       Increase/     Increase/
446     Storm Water Mgmt and Flood Control    2018         2019         2020        2021         2021         2022       (Decrease)    (Decrease)

Personal Services (100)                          1,957        6,426       31,800         -            -            -             -            0%

Supplies (200)                                        -            -       1,560       4,500        4,300       10,200         5,700        127%

Other Services and Charges (300-400)            29,020       79,746       85,605      84,000       72,300       86,700         2,700          3%

Total Storm Water Mgmt and Flood Control        30,977       86,172      118,965      88,500       76,600       96,900         8,400          9%
491 Refunds

                                                                                   Adopted     Projected    Proposed
                                               Actual      Actual      Actual      Budget       Actual       Budget
     491     Refunds of Prior Year Revenues     2018        2019        2020        2021         2021         2022

Refunds of Prior Year Revenues(491)
             Property Tax Refunds                    118         -         1,747       3,600        1,500        1,500
             Earned Income Tax Refunds            99,206     105,522     104,170     100,000       90,000      100,000
             Business Privilege Tax Refunds          449       4,566      12,778       5,000        1,750        4,000
             Local Services Tax Refunds            1,355       1,545       1,366       2,000        1,200        1,500
TOTAL REFUNDS OF PRIOR YEAR REVENUES             101,128     111,633     120,061     110,600       94,450      107,000
492 General Fund Interfund Transfers

                                                                                        Adopted      Projected     Proposed
                                                    Actual      Actual      Actual      Budget        Actual        Budget
     492     Transfers to Other Funds                2018        2019        2020        2021          2021          2022

Transfers to Other Funds
             Transfer to Capital Improvement Fund     262,235   1,423,400   1,519,700    1,200,000     1,200,000    1,375,000
Total Transfers to Other Funds                        262,235   1,423,400   1,519,700    1,200,000     1,200,000    1,375,000
Capital Improvements Program Fund (CIP)
Capital Improvements Program Fund (CIP)
     5- Year Forecast by Classification
Capital Improvements Program Fund (CIP)
  General Government Programs in 2022
• Other Administrative Projects - Sidewalks
   The Town has received Multimodal Transportation Fund grants to improve pedestrian
   accommodations in the amount of $684,800. The Town’s goal is to provide safe routes for
   pedestrians to promote multimodal transportation options and efficiencies throughout the
   Town. The project will include design, bidding, and construction services to complete the
   project in accordance with the grant funding requirements. The project began in 2020 and
   can extend through June of 2023.

• Building and Plant – Town Hall Improvements
   Ongoing building improvements to Town Hall with a focus on improving energy efficiency
   and safety. Work slated for 2022 includes window replacements ($225K) and Boiler
   improvements ($50K)
Capital Improvements Program Fund (CIP)
     5- Year Forecast by Classification
Capital Improvements Program Fund (CIP)
                  Public Works Programs in 2022
• General Government – Large Equipment                     • Traffic Control Devices – Traffic Cameras
   We have included the purchase of 1 10-ton dump
                                                               We are proposing the installation of a traffic camera at
   truck and the associated equipment (i.e. plows) for
                                                               the intersection of McKnight Road and Duncan Ave at
   public works to replace aging equipment within the
                                                               McCandless Crossing for public safety assistance.
   department in the work they perform year-round. In
   addition to the dump trucks this budget includes road
   pre-treaters, stormwater mowers and the Boom
   Mower replacement based on the needs of the
   department over the next year and beyond.
Capital Improvements Program Fund (CIP)
                     Public Works Programs in 2022 continued
• Storm Sewers and Drains –                                                 • Storm Sewers and Drains – Blazier and
  Stormwater Drainage Improvements                                            Ingomar Culvert replacement
This is likely the most labor-intensive area for Public Works crews. Even   This culvert is considered by PennDOT to be a bridge. As such it is required that an
through the winter, as weather permits, crews work on the repair and        inspection be performed, by PennDOT. During these inspections it has been noted
replacement of storm sewer facilities. This work consists of replacing      that the culvert is a metal arch construction. It was installed when Blazier Drive was
storm sewer pipe. Repair or replacement of storm inlets, manholes,          extended from the Showcase Cinema property to Ingomar Road. Believed to be the
headwalls and endwalls. This work concentrates on streets that have         1970s or early 1980s. That makes this culvert at least 40 years of age.
been chosen for the paving program each year. For the 2022 Paving           Recent inspections have identified areas of rusting and deterioration of metal fabric of
Program, crews will be inspecting and repairing at least 126 storm sewer    the arch. The inspection report indicates that work should be performed on this
inlets, 35 manholes, and 21 headwall/endwalls. There are also               culvert.
approximately 1,450 linear feet (lf) of pipe recommended for replacement
and 1,680 lf of pipe being considered for Cured In Place Polyethylene       The current plan requires design to be completed in 2022. The new structure will be
lining. If the lining method is not used these pipe sections will be        a precast concrete box culvert similar to structure at the McKnight Road end of Blazier
replaced using traditional excavation and replacement.                      Drive. The project would then be bid for completion in 2023. Gateway Engineers has
                                                                            provided a remaining design estimate of $85,000. plus permits. This would include
Public Works Crews also inspect and repair other inlets and manholes        design of the culvert, test boring to determine what may be needed to support the
routinely throughout the year. Often residents will call to report a        structure along with any other engineering issues that might develop during design
problem that they have observed.                                            and construction. A cost estimate will be development based upon the engineers’
                                                                            design and requirements and is currently estimated at $1.5 million.
Capital Improvements Program Fund (CIP)
            Public Works Programs in 2022 continued
• Maintenance and Repair of Town Roads – Resurfacing and
  Reconstruction
  This project includes all costs associated with resurfacing and rebuilding Town roads proposed in 2022. The Public
  Works crew follow the paving contractor and completes property restoration and hydroseeding as part of the re-
  landscaping process. This project is budgeted significantly lower this year in order to fund other projects as well as
  reduced available state funding.
  Currently the program is set to repave every Town road in an 18 - 20 year time span. Some roads remain in good shape
  longer and some roads deteriorate more quickly. Based on this time span each year’s program seeks to renew
  approximately 6 miles of two-lane roads. Depending on the length of individual roads there are anywhere from 18 to
  30 roads involved with each year’s program. Based on age a group of roads are selected for the program each fall. A
  review of all roads is completed in the spring. Road conditions have been known to change through the winter. When
  needed some roads are removed while others are added.
Capital Improvements Program Fund (CIP)
                 Public Works Programs in 2022 continued
• Stormwater Detention Facilities                                       • PRP Best BMP: Stream Bank Restoration
     These items are integral to the continuing effort associated            North Meadows
     with the Town’s MS4 Permit and our Pollution Reduction Plan.
     In 2020 Public Works crews began work to clear and mow
     detention facilities in the Upper Pine Creek area. Once cleared
     and mowed the facilities were inspected for other needed           • PRP Best BMP: Stream Bank Restoration
     repairs. To date all repairs have been minor and performed by           Lowries Run (Wall Park)
     Public Works personnel.
     Looking forward, maintenance activities will continue. Crews
     will move into the Lowries Run basin and begin clearing and
     mowing. If major work is identified in any area, bids will be      • Rain Garden – David Councill Park
     taken to have that work completed by an outside contractor.
• Inlet Filter Inserts
     Inlet Filters have also been deployed to assist with the
     Pollution Reduction Plan. At an approximate cost of $
     1,000.00 each these filters offer simple remedies to reduce silt
     and sediment from entering stream. For 2022 15 such filters
     are set to be deployed along Meinert Road, Reichold Road and
     Sloop Road.
Capital Improvements Program Fund (CIP)
     5- Year Forecast by Classification
Capital Improvements Program Fund (CIP)
                          Parks Programs in 2022
• Tennis Courts – Devlin Park                                        • Cameras for Parks -
    The Tennis Courts were last repaved in 2007. The project
    included removal of all existing fencing and the replacing of        We are proposing the installation of security cameras within
    the fencing with green vinyl coated fabric, removal and              select Town Parks for public safety assistance and asset
    replacement of all asphalt material with repair of the base as       security.
    needed, color coating and lining the tennis courts.
                                                                     • Wall Park – GEDTF Grant Funded
    Over the following 12 years the courts developed “stress”
                                                                         The recreational fields at Wall Park will be updated with a
    cracks throughout. Several contractors inspected the issue.          $250,000 GEDTF grant.
    The only suggestion offered was to repave the courts. Bids
    were taken in 2019 to rehab the tennis courts once again. The
    low bid received for the paving work exceeded the budgeted
    amount and was rejected.
    With the onset of COVID 19 in 2020 no bidding was done to
    complete this work.
    The cracks have grown in length and width.
    The Town received a CITF grant in the amount of $100,000 to
    offset the costs of this project.
5 Year Vehicle, Equipment and Software Purchases
American Rescue Plan Fund
                                              Amended                     Proposed
                                               Budget        Projected     Budget       Projected     Projected     Projected
                                                2021        Actual 2021     2022          2023          2024          2025
REVENUES
Non-Tax Revenue
         Interest Earnings                    $     1,530   $     1,530   $     3,060   $     3,000   $     1,500   $       -
Federal Grants and Entitlements
         American Rescue Plan                 1,475,470      1,475,470    1,475,470             -             -             -
             Total Grants and Entitlements    1,475,470      1,475,470    1,475,470             -             -             -

TOTAL REVENUES                                1,477,000      1,477,000    1,478,530           3,000         1,500           -

EXPENDITURES
Interfund Transfers Out
         General Fund                             730,000       730,000       345,000       385,000           -             -
         Capital Improvements Projects Fund           -             -         385,000       350,000       385,000       380,030
TOTAL EXPENDITURES                                730,000       730,000       730,000       735,000       385,000       380,030

FUND BALANCE, JANUARY 1                               -             -       747,000     1,495,530         763,530       380,030
FUND BALANCE, DECEMBER 31                         747,000       747,000   1,495,530       763,530         380,030           -
American Rescue Plan Fund
                                           2021      2022      2023      Totals
General Fund
         Transfer from ARP Fund            730,000   345,000   385,000   1,460,000
         Town-Wide
 Multi      Software                                 107,500    97,500    205,000
         Public Safety Equip
  410       License Plate Reader            15,000                         15,000
  410       Traffic Signs                    3,700                          3,700
  410       Taser replacements              15,000                         15,000
  410       Lexipol                         31,200                         31,200
  410       Patrol Vehicles (2/year)                  89,050    96,000    185,050
  410       Body-Worn Cameras                         72,000               72,000
         Building and Zoning
  413       Replacement Vehicle                       38,000               38,000
  414       Zoning Ordinance                          65,000               65,000
         Public Works Equipment
  430       Zero Turn                       13,500                         13,500
  430       Pressure Washer                  5,000                          5,000
  430       Hammer                           7,500                          7,500
  430       Fork Lift                       15,000                         15,000
  430       Milling Attachment              20,000                         20,000
  430       Truck Radios                                        45,000     45,000
         Transfer to CIP
  409       Windows                                  275,000               275,000
  409       HVAC                                               449,050     449,050
                                   Total   125,900   646,550   687,550   1,460,000
American Rescue Plan Fund
Transportation District Fund
Assessment Fund
State Highway Aid Fund
2022 Proposed Consolidated Budget                                                           Capital
                                                             American Rescue       Transportation       Improvements                      State Highway Aid
                                              General Fund     Plan Fund            District Fund        Project Fund   Assessment Fund          Fund         TOTAL ALL FUNDS

REVENUE

Tax Revenue                                    12,832,000              -                    -                    -                -                  -            12,832,000

Non-Tax Revenue                                 1,884,945           3,060                 2,500              15,000            4,100              1,000            1,910,605

Inter-Fund Transfers In                          345,000               -                    -              2,722,100              -                  -             3,067,100

Assessments                                         7,900              -               124,650                   -                -                  -              132,550

Federal Revenue                                       -          1,475,470                  -                    -                -                  -             1,475,470

State Revenue                                    754,500               -                    -               989,660               -             836,400            2,580,560
Contributions from Prior Year Fund
Balance                                          861,310               -                    -               532,000               -                  -             1,393,310

                          TOTAL REVENUE   $    16,685,655    $   1,478,530     $        127,150     $      4,258,760    $      4,100      $     837,400       $   23,391,595

EXPENDITURES

General Government                        $     2,270,655    $         -       $            -       $       914,660     $         -       $          -        $    3,185,315

Public Safety                                   8,104,815              -                    -                    -                -                  -             8,104,815

Public Works                                    3,989,055              -                    -              2,859,100              -                  -             6,848,155

Culture and Recreation                           839,130               -                    -               485,000               -                  -             1,324,130

Refunds                                          107,000               -                    -                    -                -                  -              107,000

Inter-Fund Transfers Out                        1,375,000         730,000              124,700                   -                -             837,400            3,067,100

Contributions to Fund Balance                         -           748,530                 2,450                  -             4,100                 -              755,080

                  TOTAL EXPENDITURES      $    16,685,655    $   1,478,530     $        127,150     $      4,258,760    $      4,100      $     837,400       $   23,391,595

Projected Fund Balance 12/31/21           $     9,986,871    $     747,000     $        579,132     $      3,041,187    $     828,900     $          -        $   15,183,090
Projected Fund Balance 12/31/22           $     9,125,561    $   1,495,530     $        581,582     $      2,509,187    $     833,000     $          -        $   14,544,860
2022 Budget Review
    & Approval Process
 October 25, 2021 Town Council Meeting @ 7:30pm
     Programs 400-409; 410-414; 419; 451; 454; 457

 November 8, 2021 Town Council Meeting @ 7:30pm
    Programs 426-446; 454; 491 - 494;
    Capital Improvements Program Budget, and
    Other Remaining Special Revenue Funds.

• November 22, 2021 Town Council Meeting @ 7:30pm
   • Public Hearing on 2022 Budget

• December 13, 2021 Town Council Meeting @ 7:30pm
    • Review Public Hearing on Budget
    • Salary Reviews (Executive session)
    • Approval of 2022 Budget