PIONEER 10,000 Celebrating LNG cargoes - Qatargas

Page created by Alberto Christensen
 
CONTINUE READING
PIONEER 10,000 Celebrating LNG cargoes - Qatargas
PIONEER
                    THE MAGAZINE OF QATARGAS OPERATING COMPANY LIMITED
     THE

                                              ISSUE 152 – Quarter Two 2016

Celebrating

10,000
LNG cargoes
                                           QATARGAS
                                          CEO FORUM
                                      NURTURING QATARI
A major milestone                              TALENT
for Qatar energy
PIONEER 10,000 Celebrating LNG cargoes - Qatargas
SUPPORTING
                                        NEW DISCOVERIES
                                           IN RESEARCH

IT’S WHAT MAKES
A WORLD LEADER
We have a long history of supporting
the research initiatives of local
universities and institutes. It’s just one        The World’s Premier
of the things that make us the World’s            LNG Company
Premier LNG Company.                              www.qatargas.com.qa
PIONEER 10,000 Celebrating LNG cargoes - Qatargas
qatargas CORPORATE scoreCARD
                                            year to date june 2016

                                  SAFETY, HEALTH AND ENVIRONMENTAL Performance

                                                  Qatargas outperforming industry

             TRIF                                      Flaring                                                Greenhouse Gas
             {Total Recordable                         {% of Sweet Gas}                                       Emissions Intensity
             Injury Frequency}              1.0                                                               {Tonne GHG/Tonne LNG}
  1.0                                                                                        0.450
             0.98                                          0.91

                                                                                             0.445

                        0.68                                                                 0.440
                                                                                                              0.441
 0.5                                        0.5
                                                                                             0.435
                                                                  0.52

                                                                                  0.41
                                                                                             0.430

                                     0                                                                                 0.433       0.433
   0                                         0                                                  0

   Industry Average                                                                                                    Qatarization
   Actual                                                                                            A High Calibre and Diverse Workforce
                                                                                                                        {Total Headcount}
   Target

                    Efficient and Reliable Operations
                         Industry Average         Actual                   Target

LNG Reliability                  96.5%            96.6%                   97.5%                Target                  Actual
                                                                                               22.9%                   21.5%
LR Reliability                   95%              98.6%                   98.5%

Expenditure vs Target             n/a              86%                      n/a

                  Customer satisfaction
                                 Actual           Target                                 finaNcial performance
 Reliable Deliveries             100%              100%                                               Actual                   Target

 Positive Responses                                                        Sales Volume
to Customer Change               96%               85%                    (Million Tonnes)             29.2                    29.2
      Requests
PIONEER 10,000 Celebrating LNG cargoes - Qatargas
Flawless
03 Flawless
implementation
A message from the CEO.
                                                                                                       The Magazine Of QatarGas

                                                                                                                                                    implementation
04 10,000 LNG Cargo
              th
                                                                                                       Operating Company Limited
Celebrating a successful key
milestone for Qatargas and
the State of Qatar.
                                                                                                              Editorial Team
                                                                                                                 Editor in Chief:
                                                                                                                  Daniel Yates
                                                                                                                Editorial Director:
                                                                                                               Thajudeen V. Aliar
                                                                                                                  Arabic Editor:
                                                                                                                 Eiman Fakhroo

                                                                                                                 Published by
06 CEO Awards FOR                    12 LNG 18 Perth                                                    The Public Relations Department
PREMIER LEADERS                      Company presents papers                                             Qatargas Operating Company
Discussing key Company               highlighting focus on                                                          Limited
topics and rewarding
exemplary leadership.
                                     customer service and its flare
                                     reduction programme.             20 Hayyakum
                                                                                                         Qatargas Operating Company
                                                                                                                 P.O. Box 22666
                                                                                                                                                    Absolute dedication to
                                                                                                                                                    excellence creates desired results
                                                                      PROGRAMME                                    Doha, Qatar
08 Qatargas signs SPA                14 Safety remains A              Highlighting Qatargas’                  Tel: +974 4452 3224
with JERA                            key focus                        social media social media              Fax: +974 4473 6628
Reaffirming longstanding                                              campaign to recruit Qatari
mutual commitment from a                                              nationals.                            Firefly Communications
trusted commercial partner.                                                                                       P.O. Box 11596
                                                                      21 Long Service and                          Doha, Qatar
09 Agreement with                                                     Shukran Awards                          Tel: +974 4434 0360                                             At Qatargas, our    by the recent inaugural delivery of a       Direction Statement. For example, we
                                                                                                              Fax: +974 4434 0359                                             commitment          spot LNG cargo to JERA in Japan. This       recently completed the region’s first
Kuwait                                                                Qatargas acknowledges staff
Expanding Qatargas’ client                                            loyalty, performance and                                                                                to operational      agreement extends more than two             Waste Water Treatment plant that uses
base in the Middle East.                                              excellence.                         All Rights Reserved. No part of this                                excellence          decades of relations between Qatargas       Membrane Bio-Reactor technology,
                                                                                                      publication may be reproduced, stored in a                              underpins           and Japanese customers.                     manifesting Qatargas’ commitment to
                                                                                                      retrieval system or transmitted in any form
10 Waste Water                                                        21 Sports Highlights             or by any means, electronic, mechanical,                               everything that         In fact, it was in 1992 that the        environmental conservation.
Treatment                                                             Muaither crowned as               photocopying or otherwise without the                                 we do. Whether      first Sale and Purchase Agreement              Ultimately, our recent achievements
                                                                                                        prior permission of the Public Relations
The region’s first Waste             19 CEO Forum                     Qatargas League champion.       Department, Qatargas Operating Company.
                                                                                                                                                                              that be our focus   was signed by Qatargas and Japan,           are testament to the hard work
Water Treatment Plant using          Promoting Qatarization and                                                                                                               on safety, our      an agreement which enabled the              and dedication of Qatargas’ staff,
Membrane Bio-Reactor                 nurturing National talent.       22 Being socially                                                                                       dedication to       development of Qatargas 1. Only four        contractors and partners. Together,
technology.                                                           responsible                                Printed on recycled paper          serving customers with consummate             years later, the first LNG shipment was     we are responsible for the Company’s
                                                                      Preserving Qatar’s natural                                                    professionalism, or developing our            sent to Japan, marking the start of a       ongoing success. And I am convinced
11 SLUDGE MANAGEMENT                                                  landscape and promoting                                                       people and fostering a culture of             relationship that has remained firm         that our commitment to operational
Qatargas has successfully                                             fitness, wellbeing and dental                                                 learning, Qatargas relentlessly strives       ever since. This deal gave momentum         excellence will maintain our status as
implemented its Sludge                                                health.                                                                       for flawless execution.                       to the State of Qatar’s ambition to         the World’s Premier LNG Company.
Management Project.                                                                                                                                     Indeed, this is the ‘Qatargas way’.       become the number one LNG exporting            I would therefore like to take this
                                                                                                                                                    Our dedication to excellence has led          nation in the world.                        opportunity to offer my deepest
                                                                                                                                                    to many noteworthy accomplishments,               On another front, our recent            gratitude to all of you who have worked
                                                                                                                 Scan QR CODE                       exemplified by the recent safe                agreement with Kuwait Petroleum             so tirelessly to reach the important
                                                                                                             TO VISIT OUR WEBSITE
                                                                                                                                                    transportation of the 10,000th cargo of       Corporation (KPC) reiterates our intent     milestone of 10,000 cargoes. And thank
                                                                                                       Qatargas is now present on social            Qatari LNG loaded from Ras Laffan Port        to not only service existing clients, but   you for your ongoing contribution to
                                                                                                      media via Facebook, Youtube, Twitter          in May.                                       to gain new customers. I truly believe      Qatargas, and the State of Qatar’s
                                                                                                                 and Instagram.                         The 10,000th cargo is a shining           that this agreement signifies a positive    energy sector as a whole.
                                                                                                                                                    example of how Qatargas works in unity        future for similar trade relationships
                                                                      24 Go Green                        We look forward to seeing your
                                                                                                       involvement and support on social            with our domestic partners – Qatar            between Qatar and the Gulf region,
                                                                      Refreshing your commitment                     media:                         Petroleum, RasGas and Nakilat – toward        and indeed within the greater Middle
                                                                      to the environment.                      Facebook: Qatargas                   achieving the goals of the State of           East. Qatargas has clearly developed a
                                                                                                               YouTube: Qatargas                    Qatar, under the wise leadership of His       strong reputation for being a reliable
                                                                                                               Twitter: @Qatargas
                                                                                                                                                    Highness the Emir Sheikh Tamim bin            provider of clean energy, and the deal

             contents
                                                                                                              Instagram: Qatargas
                                                                                                               LinkedIn : Qatargas                  Hamad Al-Thani. This milestone also           with Kuwait consolidates the Company’s
                                                                                                                                                    illustrates the phenomenal growth of          position as the LNG partner of choice.
                                                                                                                                                    the State of Qatar’s LNG industry.                Of course, our focus on operational     Khalid Bin
                                                                                                                                                        Furthermore, Qatargas’ commitment         excellence extends to every part of our     Khalifa Al-Thani
                                                                                                                                                    to serving our customers is evidenced         business, as outlined in the Qatargas       CEO, Qatargas

2   |   the pioneer   |   quarter two 2016                                                                                                                                                                                                     quarter two 2016   |   the pioneer   |   3
PIONEER 10,000 Celebrating LNG cargoes - Qatargas
KEY milestone
                                                                                                                                                                                                                    Qatar Petroleum, Qatargas, RasGas and Nakilat
                                                                                                                                                                                                                   officials join the Captain of the vessel, ‘Mozah’ to
                                                                                                                                                                                                                  commemorate the historic 10,000th cargo loading.

for qatar’s
lng sector

Celebrating the 10,000th vessel loading                                                                                                  RLIC in numbers:                                                      A history of
                                                                                                                                                                                                               Ras Laffan
                                                                                                                                         295 km2 – total area of RLIC                                          Industrial City
Marking a significant landmark for Qatar’s liquefied natural gas (LNG)                                                                   3.9 km2 – area that houses Qatargas’ Trains 1 to 7
sector, Qatar Petroleum, Qatargas and RasGas successfully loaded the                                                                     80 kms north-east of Doha
                                                                                                                                                                                                               Mid-1990s
10,000th cargo from Ras Laffan Port in May.                                                                                                                                                                    Qatar makes a multi-million dollar
                                                                                                                                                                                                               investment to develop port facilities
                                                                                                                                         Operating companies: Qatargas, RasGas,                                and infrastructure at RLIC.
                                                                                                                                         ExxonMobil, Shell, Total, Dolphin Energy, Oryx GTL, Al
The 10,000th cargo was               work and dedication by           contribution to delivering        largest hydrocarbon export       Khaleej Gas, RLOC, Ras Laffan Helium, Qatar Helium
loaded on board the                  Qatar Petroleum, Qatargas        safe and reliable LNG to our      ports in the world, with six                                                                           1996 December
Qatargas-chartered Q-Max             and RasGas, under the wise       customers.”                       operational LNG berths acting
vessel ‘Mozah’, bound for            leadership of His Highness           Covering an area of more      as the gateway for Qatar’s                                                                             The first LNG cargo loaded.
South Hook LNG Terminal              Sheikh Tamim bin Hamad Al        than 295 square kilometers        LNG to the rest of the world.
in the UK. Chartered by              Thani, the Emir of the State     (km2), RLIC provides the              Its geographical advantage                                                                         2003 April
Qatargas from Nakilat,               of Qatar.”                       common facilities of land,        between Asia and Europe on                                                                             500th LNG cargo loaded.
(Qatar’s shipping company                “Qatargas is the World’s     infrastructure, port and          the international maritime
with the largest fleet of LNG        Premier LNG Company,             cooling water to Qatar’s          shipping route has enabled
carriers in the world), the          and we are proud to work         LNG companies. It also            Qatar to stay ahead of other                                                                           2008 January
‘Mozah’ is one of 13 Q-Max           alongside world-class            offers utilities, desalinated     LNG suppliers around the                                                                               1,000th LNG cargo loaded.
vessels with a capacity of           companies at Ras Laffan          water, waste management,          world.
260,000 cubic metres of LNG
- the largest in the world.
                                     Industrial City (RLIC),” said
                                     Khalid Bin Khalifa Al-Thani,
                                                                      environment management,
                                                                      fire fighting and emergency
                                                                                                            Ras Laffan Port provides
                                                                                                        an essential strategic link
                                                                                                                                                                                                               2010 December
‘Mozah’ was named by HH              CEO, Qatargas. “This historic    response as well as support       in the chain connecting gas                                                                            Qatar reaches its goal of total LNG
Sheikha Moza Bint Nasser             event – the safe and reliable    services such as healthcare,      production derived from                                                                                production capacity of 77 mtpa
Al Misned in July 2008 and           transportation of the 10,000th   accommodation and                 the North Field with the                                                                               with Qatargas simultaneously
the vessel was delivered to          LNG cargo from Qatar – is        telecommunications.               end users of gas, liquid and                                                                           reaching 42 mtpa.
Qatargas that September.             a tribute to the combined            Known as one of the           associated products across
    Commenting on the                expertise of our partners,       largest exporting ports in the    the world. It has been an                                                                              2011 June
occasion, Saad Sherida               staff and contractors. This      Middle East and Asia, since its   integral component to Qatar
Al-Kaabi, QP President and           remarkable feat underscores      inception in 1996, its port and   successfully achieving its
                                                                                                                                                                     Workplace to: 115,000 people              5,000th LNG cargo loaded.
CEO, said, “The achievement          our commitment to                berth facilities have expanded    target in December 2010 of a
of 10,000 LNG cargoes                operational excellence, and      significantly. The port,          total LNG production capacity                                 The Port: 56 km2 – one of the largest    2016 May
from Ras Laffan Port is a            I congratulate everyone          covering an area of 56 square     of 77 million tonnes per                                      hydrocarbon export ports in the world    10,000th LNG cargo loaded.
testament to all the hard            who has made a valued            kilometres, is one of the         annum (mtpa).

4   |   the pioneer   |   quarter two 2016                                                                                                                                                                    quarter two 2016          |   the pioneer          |   5
PIONEER 10,000 Celebrating LNG cargoes - Qatargas
Leadership rewarded                                         conducted in the fields of welding,
                                                                                                                                                                              The three Qatargas leaders recognized                       NDT and lifting equipment were also
                                                                                                                                                                              by the CEO for their outstanding                            key factors in successfully achieving
                                                                                                                                                                              performance were Abdurrahman                                Qatargas’ goals. “Doing the work
                                                                                                                                                                              Mohamed Al-Mulla, Shipping Manager                          right the first time, and every time
                                                                                                                                                                              (C&S Group); Kulasekaran Venkatapathy,                      without any rework/rejection is a
                                                                                                                                                                              Senior Quality Assurance/Quality Control                    key contributing factor in terms of
                                                                                                                                                                              (QA/QC) Engineer in the Integrity                           financial performance which we practice
                                                                                                                                                                              Division (E&V Group); and Eric Guillotin,                   professionally throughout our activities,”
                                                                                                                                                                              Laffan Refinery 2 Project Manager                           he said. “We have always extended our
                                                                                                                                                                              (Refinery Ventures Group).                                  support to operational requirements
                                                                                                                                                                                 The respective Chief Operating                           during turn around shutdowns, as well as
                                                                                                                                                                              Officers highlighted the outstanding                        emergency repair works, with our team
                                                                                                                                                                              performance of the three award winners.                     in full support.”
                                                                                                                                                                              Alaa Abujbara (COO-Commercial and                               Of the next award recipient - Eric
                                                                                                                                                                              Shipping) outlined how the performance                      Guillotin, LR2 Project Manager - Salman
                                                                                                                                                                              of Al-Mulla exemplified the emphasis on                     Ashkanani (COO-Refinery Ventures) said:
                                                                                                                                                                              strong functionality in every department                    “Eric plays a significant role for safety
                                                                                                                                                                              and resourcefulness required from                           performance improvement with QG
                                                                                                                                                                              leaders at Qatargas. “Abdurrahman has                       SHE and OTS support. LR2 project Total
                                                                                                                                                                              created a culture of uncompromising                         Recordable Injury Rate (TRIR) was 0.64
                                                                                                                                                                              standards on safety ethics and                              in 2015, and the 2016 year-to-date TRIR
                                                                                                                                                                              compliance,” said Abujbara, “and                            is 0.38. LR2 overall progress has been
                                                                                                                                                                              repeatedly reinforces these values with                     improved in order to meet the planned
                                                                                                                                                                              his team; and the British Safety Council                    start-up date for LR2, engineering and
                                                                                                                                                                              Sword and Globe of Honour awards are a                      procurement are almost complete, all
                                                                                                                                                                              perfect example of this.”                                   equipment is installed and the budget is
                                                                                                                                                                                 Venkatapathy was rewarded for                            well under control.”
                                                                                                                                                                              his initiative and attention to detail,                         Eric, a secondee from Total,
                                                                                                                                                                              which has had a tangible effect on the                      emphasised how safety always comes
                                                                                                                                                                              bottom line. Sheikh Khalid Bin Abdulla                      first. “Nothing is more important. We
                                                                                                                The PLE discussions covered the headline topics of            Al-Thani, COO-Engineering and Ventures,                     always try to do our best. It is the first

Premier Leader Event
                                                                                                                quarterly performance, progress on 2016 Corporate
                                                                                                                Initiatives and retention of talent. There was also a focus
                                                                                                                                                                              said: “Venkatapathy, a member of the                        goal for the project team and is the
                                                                                                                on maintaining performance and preventing production          experienced and professional QA/                            activity I dedicate the largest part of
                                                                                                                disrupting events.
                                                                                                                                                                              QC team, has been instrumental in                           my time to. Schedule is the second
                                                                                                                                                                              detecting several violations from                           challenge of any project. Quality control,

rewards leadership
                                                                                                                                                                              suppliers/vendors that have tried to                        cost control and strict management of
                                                                                                                                                                              supply and install off-spec material and                    contract are key activities for success of
                                                                                                                                                                              equipment on Qatargas facilities. The                       such a project.”
                                                                                                                                                                              use of such spurious material/equipment                         The support he receives from
                                                                                                                                                                              could result in catastrophic failures                       Qatargas management enables Eric to
                                                                                                                                                                              and compromise the plant safety and                         perform at the level required. “I work
Qatargas’ Corporate Planning                 The event, held in April at Al
                                             Khor Community, was attended
                                                                                Cost and production
                                                                                The finance presentation
                                                                                                                                                                              integrity.”                                                 with a great team and benefit from full
                                                                                                                                                                                 In addition to his focus on safety,                      support from my hierarchy. Above all,
Department recently conducted                by nearly 60 Qatargas leaders,     covered the Q1 2016                                                                           Venkatapathy explained that external                        the Qatargas organisation, its clear goals
                                             who discussed headline tracks      prices (and the trend for                                                                     audits on contractors/vendors and                           and its company culture are a strong
the Quarter 1 Premier Leader Event           such as quarterly performance,     the year) for condensate                                                                      specific awareness programmes                               foundation for success.”
                                             progress on 2016 Corporate         and liquefied natural gas
(PLE). The event was attended by             Initiatives and retention of       (LNG) and their impact on
high-level Qatargas leaders and              talent, within the framework of
                                             the Company’s ongoing focus
                                                                                revenue, reiterating focus
                                                                                throughout Qatargas on
included discussions around related          on safety.
                                                 During the discussions,
                                                                                cost optimisation. The
                                                                                outstanding performance
key topics. Three of the Company’s           safety as the Company’s            of LR1 and the unplanned
                                             number one priority was            shutdowns of Train 1 and
best leaders were rewarded for               reinforced by Khalid Bin           Train 4, with no delays in
                                             Khalifa Al-Thani, Qatargas         deliveries for customers,
their outstanding performance at a           CEO. He re-emphasised the          were also mentioned.
special awards ceremony.                     importance of safety and
                                             highlighted vehicle accidents,
                                                                                Operations updated on
                                                                                production status for all
                                             a major issue in Qatar. There      the LNG trains, causes and
                                             was also a focus on reducing       impact of reliability losses.
                                             injuries during the summer         Strong focus was placed on
                                             – as historically it is the high   maintaining performance and
                                             injury season – with emphasis      on preventing production
                                             on the ongoing heat stress         disrupting events from
                                             management programme, as           reoccurring, with reliability
                                             well as the ‘Right tool for the    being the key to customer
                                             job’ campaign.                     satisfaction.                   Abdurrahman Mohamed Al-Mulla (1st from Left), Eric Guillotin (3rd from Left) and Kulasekaran Venkatapathy (6th from Left) join Qatargas’ CEO and senior management at the PLE.

6   |   the pioneer   |   quarter two 2016                                                                                                                                                                                                   quarter two 2016           |   the pioneer          |   7
PIONEER 10,000 Celebrating LNG cargoes - Qatargas
Japan’s trusted and                                                                                                                                        4-year deal with
reliable LNG supplier                                                                                                                                      Kuwait Petroleum
Building on our strong commitment to Japanese partners, Qatargas                                                                                           Qatargas has recently signed a four-year agreement with Kuwait Petroleum
has successfully delivered its first spot cargo to JERA, reinforcing our                                                                                   Corporation (KPC) to supply half a million tonnes of LNG per year to Kuwait
position as the World’s Premier LNG Company.                                                                                                               over the next four years. This further enhances Qatar’s reach in the Gulf
                                                                                                                                                           Cooperation Council (GCC) and the Middle East markets.
The signing of the first Sale                    cargo to Japan’s newly                           to Japan and to date has
and Purchase Agreement                           established JERA Co. Inc.                        delivered more than 2300                                                                                                                                       “The signing of this
(SPA) with Japan in 1992
was Qatargas’ first major
                                                 under the newly executed
                                                 Master SPA between the two
                                                                                                  cargoes of Qatari LNG to
                                                                                                  Japan.
                                                                                                                                                                                                                                                                 agreement with KWC is
milestone, leading to the                        companies.                                          The new agreement                                                                                                                                           another significant step in
                                                                                                                                        14.6
development of Qatargas 1,                          JERA is a recently formed                     reinforces the highest
with three liquefied natural                     joint venture between two                        levels of commitment                                                                                                                                           demonstrating Qatargas’
gas (LNG) trains, each
with an initial production
                                                 of Japan’s largest power
                                                 utilities – Qatargas’ first ever
                                                                                                  Qatargas has
                                                                                                  towards providing a
                                                                                                                                                                                                                                                                 capability to reliably and
capacity of two million
tonnes per annum (mtpa).
                                                 customer, Chubu Electric
                                                 Power Company Inc. and
                                                                                                  trusted and reliable
                                                                                                  energy supply to
                                                                                                                                       million tonnes                                                                                                            efficiently lead the supply of
The first shipment under this                    TEPCO Fuel & Power Inc.                          Japan. The deal also
                                                                                                                                Qatargas delivered 14.6
                                                                                                                                                                                                                                                                 LNG to the Middle Eastern
                                                                                                  reinforces Qatargas
agreement was delivered in
1997 marking one of the early
                                                    The spot cargo was
                                                 delivered onboard the Q-Flex                     as Japan’s LNG                million tonnes of LNG to                                                                                                         emerging energy markets.”
steps in building the robust
partnership between Qatar
                                                 LNG vessel ‘Al Ruwais’ to the
                                                 Futtsu LNG Terminal in Tokyo
                                                                                                  supplier of choice.
                                                                                                  Significantly, this deal
                                                                                                                                  Japan during 2015.                                                                                                             – Khalid Bin Khalifa Al-Thani,
and Japan.                                       Bay in May of this year.                         highlights Qatargas’                                                                                                                                           Chief Executive Officer,
   Nearly two decades                               Japan continues to be                         unrelenting dedication to
later, Qatargas continues                        the world’s largest importer                     being the World’s Premier                                                                                                                                      Qatargas.
                                                                                                                                                           The Floating Storage & Regasification Unit (FSRU), ‘Golar Igloo’, chartered by Kuwait Petroleum
to strengthen relationships                      of LNG. In 2015 alone,                           LNG Company, reliably and                                Corporation and moored in Mina Al-Ahmadi port, Kuwait. The first cargo as part of the new agreement
with Japan, having recently                      Qatargas delivered a total of                    safely delivering LNG to                                 was delivered by Qatargas onboard Q-Flex vessel, ‘Al Gharrafa’, in March 2016.
delivered its first spot LNG                     14.6 million tonnes of LNG                       customers all over the world.
                                                                                                                                                           Qatargas 2, the world’s first                  region and the Middle East,                    efficiently lead the supply of   the majority of Kuwait’s
                                                                                                                                                           fully integrated value chain                   and enhances its established                   LNG to the Middle Eastern        energy requirements since
                                                                                                                                                           LNG venture, will supply                       global position.                               emerging energy markets,”        2011 through both direct
                                                                                                                                                           the LNG to KPC. Qatargas 2                         The conclusion of this                     said Khalid Bin Khalifa          sales with KPC and through
                                                                                                                                                           is a joint venture between                     agreement cements the                          Al-Thani, Chief Executive        third parties who have
                                                                                                                                                           Qatar Petroleum, ExxonMobil                    positive and mutually                          Officer, Qatargas. “This deal    collaborated with both
                                                                                                                                                           and Total which started                        beneficial trade relations                     demonstrates the eagerness       Qatargas and KPC.
                                                                                                                                                           production in 2009. The                        between the Qatari Kuwaiti                     to stengthen and expand our         Qatargas has already
                                                                                                                                                           LNG will be delivered to                       energy sectors, and enhances                   relationship, and Qatargas’      supplied LNG to Dubai,
                                                                                                                                                           KPC’s Mina Al-Ahmadi LNG                       the position of the State of                   readiness to meet KPC’s          United Arab Emirates, since
                                                                                                                                                           reveiving terminal in Kuwait,                  Qatar as a safe and reliable                   future demand for LNG.”          2008, and successfully
                                                                                                                                                           on board Q-Flex vessels                        supplier of clean energy to                       To respond to Kuwait’s        delivered a commissioning
                                                                                                                                                           chartered by Qatargas.                         all corners of the world,” Al-                 increased energy needs           cargo to Jordan in May
                                                                                                                                                               According to Saad                          Kaabi added.                                   during the summer months,        2015. The new deal with
                                                                                                                                                           Sherida Al-Kaabi, Qatargas                         “The signing of this                       the majority of the volume       KPC further reinforces the
                                                                                                                                                           Chairman of the Board, “The                    agreement with KWC is                          over the four years will be      Company’s commitment to
                                                                                                                                                           agreement consolidates                         another significant step in                    delivered between March          safely and reliably supply
                                                                                                                                                           the position of Qatargas as                    demonstrating Qatargas’                        and November each year.          clean energy around the
                                                                                                                                                           the LNG partner in the GCC                     capability to reliably and                     Qatargas has been providing      world.

                                                                                                                                                           “The conclusion of this agreement cements the positive and mutually
                                                                                                                                                           beneficial trade relations between the Qatari and Kuwaiti energy
                                                                                                                                                           sectors, and enhances the position of the State of Qatar as a safe
                                                                                                                                                           and reliable supplier of clean energy to all corners of the world.” –
The spot cargo was delivered on board the Q-Flex LNG vessel ‘Al Ruwais’ to the Futtsu LNG Terminal in Tokyo Bay in May of this year.                       Saad Sherida Al-Kaabi, Qatargas Chairman of the Board.
8   |   the pioneer         |   quarter two 2016                                                                                                                                                                                                                                  quarter two 2016   |   the pioneer   |   9
PIONEER 10,000 Celebrating LNG cargoes - Qatargas
MBR TECHNOLOGY ENHANCES
                                                                                                                                                                       Commenting on this region-first
                                                                                                                                                                   development, Sheikh Khalid Bin Abdullah
                                                                                                                                                                   Al-Thani, Qatargas Chief Operating Officer               WWT PLANT – Block diagram
                                                                                                                                                                   – Engineering and Ventures, said, “This

WASTE WATER TREATMENT
                                                                                                                                                                                                                                                     Intel wastewater
                                                                                                                                                                   is a very important accomplishment for
                                                                                                                                                                   Qatargas as we have set a precedent in
                                                                                                                                                                   the LNG industry in the region to reuse
                                                                                                                                                                   waste water at the Qatargas 1 plant.                  Calamity                                       Calamity basin Vol. 900m3
                                                                                                                                                                                                                                                       Equalization
                                                                                                                                                                   This project is a clear manifestation                   tank                                         Equalization basin Vol. 1300m3
Qatargas continually strives to adopt best industry practices and to lead the                                                                                      of our commitment to environmental
                                                                                                                                                                   conservation and is part of the huge
way in the use of innovative technologies in the liquefied natural gas (LNG)                                                                                       investments we have made in the recent
                                                                                                                                                                   past to minimise our environmental                                                                       Pre-
sector. In line with the Qatar National Vision 2030 (QNV 2030) objective of                                                                                        footprint, in line with the values spelled                                                            Screening
                                                                                                                                                                                                                                                                                      Screen Size: 1mm

sustainable water use, and as part of the Company’s ongoing Waste Water                                                                                            out in the Qatargas Direction Statement. I
                                                                                                                                                                   congratulate all those who worked on the                              Cooling
Management Strategy, Qatargas 1 has recently completed the region’s first                                                                                          planning, design and construction phases
                                                                                                                                                                   of this project and those who contributed
                                                                                                                                                                                                                                         (Chiller)
                                                                                                                                                                                                                                                                                Pre-DN /N Pre-DN Vol. 2 x 250m3
Waste Water Treatment plant, incorporating Membrane Bio-Reactor                                                                                                    to its successful operation.”                                                                                Biological Nitrification
                                                                                                                                                                                                                                                                                Treatment Vol. 2 x 600m3
                                                                                                                                                                       Led by Ventures Department with
(MBR) technology.                                                                                                                                                  the support of the Environment Affairs,
                                                                                                                                                                   Engineering, Operations and several                                Sludge
                                                                                                                                                                                                                                                                          ZeeWeed 3 lines x 2 cassettes x 36
“This project is a                                                                                                                                                 other stakeholders, outstanding work has
                                                                                                                                                                   been undertaken in developing a strong
                                                                                                                                                                                                                                    dewatering                            500D UF modules installed each
                                                                                                                                                                                                                                                                         Membranes
clear manifestation                                                                                                                                                design, procuring high quality equipment                                                                        Maximum netflux: 12 lmh
                                                                                                                                                                   and executing the construction works of
of our commitment                                                                                                                                                  the project safely without any lost time
to environmental                                                                                                                                                   incident (LTI). The pilot MBR plant was first
                                                                                                                                                                   tested for six months in 2008 following
                                                                                                                                                                                                                                                            GAC
                                                                                                                                                                                                                                                         Filtration     N. 2 FV2B filters Diam. 3000 mm
conservation and                                                                                                                                                   which the Qatargas team embarked on the                   Sludge to disposal
                                                                                                                                                                                                                             520 kg/day @ 14%
                                                                                                                                                                   Front End Engineering Design (FEED) and
is part of the huge                                                                                                                                                the Execution Phase Contracts (EPC) and
                                                                                                                                                                                                                                                  Treated water to irrigation
                                                                                                                                                                   the start-up between 2011 and 2015.
investments we have
made in the recent
past to minimise
our environmental
footprint in line
                                                                                                                                                                   The Qatargas Sludge
with the values
spelled out in the                                                                                                                                                 Management Journey
Qatargas Direction
                                                                                                                                                                   Minimising our environmental footprint is a key requirement of the Qatargas
Statement.” – Sheikh                                        The completed Waste Water Treatment plant at Qatargas 1.

                                                                                                                                                                   Direction Statement. With the successful implementation of our Sludge
Khalid Bin Abdullah                                         Qatargas successfully completed the                        regulations and also helps meet the
Al-Thani, Qatargas                                          region’s first Waste Water Treatment                       sustainable water use objective of the      Management Project, Qatargas has significantly reduced its overall waste
                                                            plant in April, which uses state-of-the-                   QNV 2030.
Chief Operating Officer                                     art MBR technology. The plant has the                         The Waste Water Plant treats the         inventory onsite while minimising associated waste storage, transportation and
– Engineering and
                                                            capacity to treat nearly 1300 cubic
                                                            meters of waste water per day.
                                                                                                                       used water until it reaches irrigation
                                                                                                                       grade water and can be re-used. The
                                                                                                                                                                   disposal risks. This noteworthy achievement is testament to Qatargas’ ongoing
Ventures.                                                       The new facility forms part of the
                                                            Company’s Waste Water Management
                                                                                                                       MBR uses a combination of bacterial
                                                                                                                       bio-reactor to consume and breakdown
                                                                                                                                                                   commitment to improving our environmental performance.
                                                            Strategy, which is centred on three                        the pollutants. The downstream of this
                                                            pillars:                                                   bio-reactor’s man-made membranes is         Due to a lack of established, in-country        disciplinary project to implement a                   Recognising the extensive safety,
                                                            • Re-use suitable streams for irrigation;                  then used to screen out larger particles,   disposal pathways, hydrocarbon                  sustainable disposal process for these             permitting and operational requirements
                                                            • Recycle suitable streams to produce                      bacterial biomass and other compounds.      sludge and slurry waste streams have            waste streams in 2015. Starting with the           for commissioning such a project onsite,
                                                                desalinated water with advanced                           The MBR now obtains removal              accumulated steadily in recent years            development of a technically challenging           the WMT established an effective
                                                                waste water treatment technologies                     rates of more than 95 percent for           reaching more than 3500 cubic metres            scope of work and followed by a                    partnership with the contractor to
                                                                planned for future; and                                key parameters such as Chemical             (m3) in 2015. Future predictions (2016-         comprehensive technical evaluation and             facilitate the mobilisation process, while
                                                            • Reduce disposal of waste water to                        Oxygen Demand (COD) and Nitrogen            2018) indicate an additional 4000 m3 of         tendering process, Ecolog International            reaching out for support from other
                                                                deep well injection through increased                  compounds. This means that the treated      sludge will be produced from upcoming           was awarded a long term contract to                Qatargas teams. An Engineering Review
                                                                water recycling and reuse.                             water is significantly better than that     facility shutdowns and tank cleaning            mobilise and commission a state-of-the-            of the centrifuge process was conducted
                                                            The new Waste Water Treatment plant is                     processed via other conventional            activities. A joint Waste Management            art centrifuge system at the Qatargas              by Surveillance Engineering, followed by
                                                            in line with the State of Qatar’s Ministry                 treating methods, an indication of the      Team (WMT) from Maintenance Services            facilities in Ras Laffan Industrial City           third-party certification of the separation
The new plant uses Membrane Bio-Reactor (MBR) technology.   of Municipality and Environment (MoME)                     project’s success.                          and Environmental Affairs led a multi-          (RLIC).                                            system and safety-critical equipment by

10   |   the pioneer      |   quarter two 2016                                                                                                                                                                                                                          quarter two 2016     |   the pioneer   |   11
PIONEER 10,000 Celebrating LNG cargoes - Qatargas
Qatargas Quality Control.             The process                         • Stage 2: Sludge is                            streams are managed
An occupational exposure              The sludge separation process         separated by centrifuge                       and disposed of via                                                                                 Qatargas participated in the recent LNG 18
monitoring program was also
implemented by the Qatargas
Medical Team which helped
identify potential occupational
                                      comprises the following key
                                      stages:
                                      • Stage 1: Sludge is mixed
                                         and pre-heated;
                                                                            breaking it down into three
                                                                            main components: waste
                                                                            oil, water and solid sand;
                                                                          • Stage 3: Separated waste
                                                                                                                          established in-country
                                                                                                                          disposal pathways in line
                                                                                                                          with the Qatargas Waste
                                                                                                                          Management Procedure.
                                                                                                                                                                        70%                                                   Conference and Exhibition in Perth, Australia. During
                                                                                                                                                                                                                              the conference, senior executives presented papers
                                                                                                                                                                    Qatargas has successfully
hazards as well as appropriate
design controls and personnel                                                                                                                                         reduced flaring at its                                  highlighting the Company’s focus on customer
protection measures. This                                  Sludge and Slurry Separation Process                                                                       LNG facilities by 70%                                   service as key to responding to evolving customer
inter-disciplinary teamwork                                                                                                                                                since 2011.
allowed for safe, yet rapid
                                        Water
                                                                                                                                                                                                                              needs and its flare reduction programme.
mobilisation of the centrifuge
system to site and is another                     Condensate Tank
example of successful
                                                                                                                                                                  LNG 18 in Perth is part of the LNG X                          experienced an unexpected national
collaboration within Qatargas.
                                                                                                                                                                  series, which has been running every                          natural gas pipeline outage.”
    The centrifuge system has
                                                                                                                                                                  three years since 1968. It is a significant                   Al-Hussaini’s paper focused on:
processed over 90% of the              Water
                                                                                                                                                                  global LNG industry event which aims                          • The latest developments and trends
2015 sludge inventory existing         Softener
                                                                                                                                                                  to provide a technical and commercial                            affecting the global gas demand and
onsite as of the end of July                                 Steam                                                                                                platform for the LNG industry.                                   supply in the mid-term and long-
2016, while maintaining an
                                                                                                                                          Stage 3                     Qatargas Marketing Director Abdulla                          term;
outstanding safety record. To

                                                                          Condensate
                                                                                                                                                                  Ahmad Al-Hussaini, presented a paper                          • Incentives for new supply;
date, only 3% of the residual                           Boiler
                                                                                                                                                                  at the conference entitled, ‘What is                          • Development challenges; and
waste generated from sludge
                                                                                                                                                                  the right mix of incentives to meet                           • The anticipated decline in costs of
separation is solid residue that                                                                                                          Water                   future LNG demand’. Through his                                  new LNG projects.
requires final disposal at the                                                                      Stage 2                               Recovery                presentation, he highlighted Qatargas’                        Also during the conference, Khalifa
Mesaieed Industrial City (MIC)          Stage 1                                                                                           Tank                    focus on customer service as key to                           Ahmed Al-Sulaiti, Qatargas Safety and
Hazardous Waste Treatment
                                                                                                                                                                  the Company’s response to evolving                            Risk Manager, presented a paper on the
Center. This allows for                 Sludge
                                                                                                                                                                  customers’ needs.                                             Company’s flare reduction programme.
considerable savings in waste                           Mixing
                                                         Tank                                                                                    Oil                  Commenting on the recent shifts in                        His paper focused on:
transportation and disposal                                                                                             Water Out
                                                                                                                                                 Recovery         supply and demand trends, Al-Hussaini                         • Qatargas’ flare management
costs along with minimisation
                                                                                                              Oil Out                            Tank             described some of Qatargas’ activities                           approach;
of associated environmental                                      Sludge                Solids Out
                                                                                                                                                                  in response to the evolving landscape,                        • Main drivers and challenges for flare
and health and safety risks.
                                                                                                                                                                  stating, “Qatargas has responded to this                         reduction;
                                                                                                                                                                  evolution of buyers’ needs with an even                       • The various initiatives currently
                                                                                                                                                                  greater focus on ‘customer service’. In                          underway to manage and minimise

LNG 18 Conference
                                                                                                                                                                  2015, at the request of our buyers, we                           flaring;
                                                                                                                                                                  delivered part cargoes into multiple                          • The major capital projects
                                                                                                                                                                  locations on five separate occasions. We                         undertaken by Qatargas; and

and Exhibition
                                                                                                                                                                  also made supplemental spot cargoes                           • Enhanced awareness, monitoring and                         Khalifa Al-Sulaiti, Qatargas Safety and Risk Manager
                                                                                                                                                                                                                                                                                             addresses delegates at LNG 18 on Qatargas’ flare
                                                                                                                                                                  available to a long-term customer who                            reporting successes.                                      reduction programme.

                                                                                                                         Abdulla Ahmad Al-Hussaini, Qatargas
                                                                                                                         Marketing Director, delivering a paper
                                                                                                                                                     at LNG 18.

                                                                                                                                                                                                                                Nabil Madani, Lead Rotating Equipment Engineer, (right) presents ‘A Robust Refrigeration Compressor Simulation Model’.

                                                                                                                                                                                                                                       Nabil Madani, Lead Rotating Equipment Engineer, (right) presents ‘A Robust Refrigeration Compressor Simulation

                                                                                                                                                                                                                                    What a journey!
                                                                                                                                                                                                                                       Model’.

                                                                                                                                                                                                                                    The Qatargas stand at the exhibition showcased the Company’s incredible
                                                                                                                                                                                                                                    development in two short decades from when it was a start-up in the 1990s
                                                                                                                                                                                                                                    to its current position  asAl-Sulaiti,
                                                                                                                                                                                                                                                         Khalifa the World’s
                                                                                                                                                                                                                                                                           QatargasPremier      LNG
                                                                                                                                                                                                                                                                                     Safety and Risk   Company.
                                                                                                                                                                                                                                                                                                     Manager        The
                                                                                                                                                                                                                                                                                                             addresses     exhibition
                                                                                                                                                                                                                                                                                                                       delegates at the LNG 18 in
                                                                                                                                                                  Rishi Maharaj, Senior Commercial Analyst, (left)                  highlighted some ofPerth
                                                                                                                                                                                                                                                          theonkey   milestones
                                                                                                                                                                                                                                                                 Qatargas’             accomplished
                                                                                                                                                                                                                                                                            flare reduction programme.     along the journey.
                                                                                                                                                                  presenting a poster on ‘Mitigating the challenges towards
                                                                                                                                                                  being an effective LNG importer’.

12   |   the pioneer   |   quarter two 2016                                                                                                                                                                                                                                                     quarter two 2016          |   the pioneer           |   13
PIONEER 10,000 Celebrating LNG cargoes - Qatargas
Process Safety Symposium
                                                                               The Qatar Process Safety
                                                                               Symposium is an annual
                                                                                                                  Maintenance Project)
                                                                                                                  shutdown was completed
                                                                                                                                                “Safety in Qatargas is not just
                                                                               knowledge-sharing platform         in May.                       a word or a commitment; it is
                                                                               for industry representatives    Delivering the plenary
                                                                               to stay abreast of successful   keynote address, Ahmed           translated into every action and
                                                                               safety stories, incident case
                                                                               studies, best practices, new
                                                                                                               Helal Al-Mohannadi,
                                                                                                               Qatargas Chief Operating         appears in every task.” – Khalifa
                                                                               legislative regimes and
                                                                               recent advances in research
                                                                                                               Officer – Operations, outlined
                                                                                                               Qatargas’ strategy for
                                                                                                                                                Al-Sulaiti, Safety and Risk Manager,
                                                                               on process safety.              managing and monitoring          Qatargas.
                                                                                  During the event,            safety performance,
                                                                               Qatargas representatives        noting the various safety
                                                                               emphasised the Company’s        programmes and initiatives
                                                                               remarkable safety record        in place, with an emphasis
                                                                               highlighting key milestones     on the Qatargas Incident and
                                                                               including:                      Injury Free (IIF) culture.
                                                                               • Qatargas 2 completed an          Khalifa Al-Sulaiti,
                                                                                  entire year of operation     Safety and Risk Manager
                                                                                  without any recordable       at Qatargas, opened his
                                                                                  injuries;                    presentation by showcasing
                                                                               • Laffan Refinery completed     the Safe Start 2016 video,
                                                                                  two years of operation       and shared insights into
                                                                                  without recordable           Qatargas’ on-going safety
                                                                                  injuries;                    journey. He said, “We have
                                                                               • Two major shutdowns           developed a dedicated task
                                                                                  were completed in 2015       force to identify root causes
                                                                                  without recordable           behind Loss of Primary
                                                                                  injuries;                    Containment (LOPC’s) and
                                                                               • Train 6 shutdown was          recommend enhancements
                                                                                  completed safely and         to minimise all process safety
                                                                                  successfully in April; and   events. We also continue to
                                                                               • Train 3 and Sulfur            roll out campaigns that focus
                                                                                                                                                Ahmed Helal Al-Mohannadi, Qatargas Chief Operating Officer – Operations, delivered the
                                                                                  Recovery Unit 4 (Plateau     on safety themes.”               plenary keynote address during the Process Safety Symposium.

                                                                                                               Stellar safety
                                                                                                               performance for
                                                                                                               Ventures Department
Safety remains
                                                                                                                              12
                                                                                                               Leading by example,              one which we are very

A key focus
                                                                                                               the Qatargas Ventures            proud of. This important
                                                                                                               Department successfully          milestone showcases
                                                                                                               surpassed the 12 million         the commitment of
                                                                                                               man-hours worked without a       the entire team to the                           million
                                                                                                               lost time incident (LTI) since   Qatargas Incident
                                                                                                                                                                                                man-hours
In meeting the objectives of the Qatargas Direction Statement to ‘sustain an                                   2013.
                                                                                                                  Commending the
                                                                                                                                                and Injury Free (IIF)
                                                                                                                                                culture.”
Incident and Injury Free (IIF) workplace, eliminate hydrocarbon releases and                                   department, Sheikh                  Sheikh Khalid                       The number of man-hours
                                                                                                               Khalid Bin Abdulla Al-           Abdulla Al-Thani                         without LTI achieved
minimise our environmental footprint’, the Company continually undertakes                                      Thani, Chief Operating           believes that the 100
                                                                                                                                                                                            by the Ventures
                                                                                                               Officer – Engineering and        percent commitment
significant activities toward achieving key milestones.                                                        Ventures, noted, “This is an     from management to                           Department.
                                                                                                               outstanding achievement and      the safety ethos has

14   |   the pioneer   |   quarter two 2016                                                                                                                                      quarter two 2016           |   the pioneer        |     15
“This important milestone showcases the commitment of the
entire team to the Qatargas Incident and Injury Free (IIF)                                                                                                          Incident
                                                                                                                                                                    Management Training
culture.” – Sheikh Khalid Bin Abdulla Al-Thani, Chief Operating
Officer – Engineering and Ventures.
helped in reaching this accomplishment. “This
is a collective achievement and remarkable
demonstration of teamwork by Qatargas
Project Management Team, Qatargas
Operations, contractors and sub-contractors.
At Qatargas, safety is a core value shared by
employees and contractors alike,” he added.
    This achievement once again proves that
an IIF workplace is possible. Technology,
engineering and maintaining high quality
standards ensures safe LNG production and
operational excellence.
                                                              The Ventures team celebrate their safety achievement.

                                                                                                                                                                    The Qatargas Emergency Management                        Action Planning cycles. Representatives from

Train-3 and SRU-4 (PMP)                                                                                                                                             Services Department held an Incident
                                                                                                                                                                    Management Team (IMT) training for
                                                                                                                                                                    managers and team members from various
                                                                                                                                                                                                                             major Qatargas shareholders also joined the
                                                                                                                                                                                                                             training.
                                                                                                                                                                                                                                The workshop included case studies, which

shutdowns completed
                                                                                                                                                                    assets and functions across the Company.                 required the use of incident management
                                                                                                                                                                       Eighty-two managers and heads of                      tools such as:
                                                                                                                                                                    sections attended the training, which                    • Event logging;
                                                                                                                                                                    covered the Qatargas Response Management                 • PEAR (people, environment, assets,

successfully
                                                                                                                                                                    Process, with the objective of developing                   reputation) situation boards; and                                     EMS Department’s incident management
                                                                                                                                                                    competencies and strengthening the                       • Stakeholder engagement.                                                    training strengthened the response
                                                                                                                                                                                                                                                                                                           readiness of Asset Leadership and
                                                                                                                                                                    response readiness of Asset Leadership and               The training provided a practical roadmap as                                             Support Team functions.
                                                                                                                                                                    Support Team functions. Attendees tested                 part of the Company’s ongoing readiness in
                                                                                                                                                                    their ability to identify, mitigate and respond          and continuous improvement of its response
                                                                                                                                                                    to any situations and exercised Incident                 capacity building.
Qatargas 1’s LNG Train-3              production resumed safely                       shutdown project, the team                    budget and on schedule,
2016 shutdown was recently            and on schedule. This was                       achieved all of its objectives                without any recordable
completed successfully,               followed by SRU-4, marking                      and leading Indicator KPIs,                   wastage of time or resources.

                                                                                                                                                                    Process Safety Barriers
safely and within the scope           the overall end of Qatargas                     with zero leaks or rework                     Among the lagging indicators,
and quality of all Qatargas           1 planned shutdown safely                       during or after the shutdown.                 a minor recordable injury
requirements. The shutdown            after a total of 35 days.                       Furthermore, the entire                       (medical treatment case), was

                                                                                                                                                                    Management – A proactive
covered all the facilities of         Despite the complexity of the                   project was completed within                  reported.
Train-3, Sulfur Recovery Unit
(SRU)-4, Acid Gas Removal
Unit (AGR)-4, Inlet Receiving
                                                                                                                                    Despite the
                                                                                                                                    complexity of
                                                                                                                                                                    approach to prevent incidents
unit (IR) and part of the
Utilities Sea Water system.
   During the shutdown                                                                                                              the shutdown
execution, internal inspection
of selected pressure vessels
                                                                                                                                    project,
was carried out along with                                                                                                          the team
key replacements, justified                                                                                                                                         In the LNG industry, process
corrective and preventive                                                                                                           achieved all                    safety barriers are control
maintenance jobs and
a significant number of
                                                                                                                                    its objectives                  measures used to help prevent
                                                                                                                                                                    or mitigate a major accident.
venture projects. During this
period, the LNG Train-1 and
                                                                                                                                    and shutdown                    In the past, inadequate barrier
                                                                                                                                                                    management has led to many
Train-2 shutdowns provided                                                                                                          leading                         major incidents in the oil and
an opportunity for various                                                                                                                                          gas industry and therefore, at
replacements and repairs.                                                                                                           indicator KPIs                  Qatargas, Barrier Management
And during the Plateau
Maintenance Project (PMP)
                                                                                                                                    with zero leaks                 is key in operating company
                                                                                                                                                                    facilities.
SRU-4/AGR-4 Shutdown,                                                                                                               or rework                           There are different types
major refractory repair work                                                                                                                                        of process barriers such as
was also carried out.                                                                                                               during or after                 People Barriers, Physical/
   Following almost 20
days of continuous work,
                                      The recent shutdowns covered all the facilities of Qatargas 1 LNG Train-3, SRU-4, AGR-4, IR
                                      and part of Utilities Sea Water system.
                                                                                                                                    the shutdown.                   Equipment Barriers and
                                                                                                                                                                    Procedures Barriers.
                                                                                                                                                                                                      A multidisciplinary team made up of Alvin Alfiyansyah (SEQ), Vincent Hoe (OTS), Yasser Bassiony (OTS), Wahyu Hidayat (SEQ), Santhosh
                                                                                                                                                                                                      Nagappan (OTS), and Bensadek Belkacem (ENG) lead the Barrier Management Process.

16   |   the pioneer   |   quarter two 2016                                                                                                                                                                                                                                            quarter two 2016           |   the pioneer        |   17
Qatargas Barrier
           Management process
                                                                        Physical/Equipment
                                                                        Barriers
                                                                        Also known as a Safety
                                                                                                           to lead the initiative. The team
                                                                                                           is mandated with ensuring that
                                                                                                           major incident hazards and               NURTURING
                                                                                                                                                    NATIONAL TALENT
                                                                        Critical Element (SCE), these      related barriers are identified.
                                                                        types of barriers must be          For each SCE, a Technical
         “We know our barriers are in place &                           regularly inspected, tested and    Authority (TA) is appointed,
                                                                        maintained, to ensure:             Performance Standards (PS)
               effective all the time”                                  • Structural integrity;            are defined and assurance
                                                                        • Process Containment;             tasks are executed.
                                                                        • Ignition Control;                    There are five key stages            The annual CEO Forum for National Graduates and Trainees, Hayyakkum
                  Analyse,                                              • Detection Systems;
                                                                        • Protection Systems;
                                                                                                           to the Barrier Management
                                                                                                           Process (see inset):
                                                                                                                                                    campaign, scholarships, recognition awards and in house training courses are
                  Report &                Define &
                  Improve                 Validate                      • Shutdown Systems;                1. Define and identify Safety            some of the initiatives that nurture Qatari national talent within Qatargas.
                                        Performance                     • Emergency Response; and              Critical Elements;
                                         Standard                       • Safety.                          2. Align with the assurance
                                                                        Operations and Maintenance             validation plan;                                                                                                                                 Participants at the 15th Annual
                                                                                                                                                                                                                                                                CEO Forum held in May.
                         Barrier                                        activities on SCEs demand          3. Identify and execute
           Manage      Management                                       high performance standards             assurance activities;
          Changes &                                                     in order to reduce the risk of a   4. Manage changes and
          Deviations     process           Align with                   major incident.                        deviations; and
                                           assurance                                                       5. Analyse, report and
                                           activities                   A new Barrier                          improve.
                            Execute                                     Management Process                 As part of the process, any
                           Assurance                                    A multidisciplinary team led       change, deferment, non-
                           Activities                                   by OTS/Operations Excellence       conformance and deviation
                                                                        and comprised of Operations        to each SCE is risk-assessed,
                                                                        Excellence, Loss Prevention        reviewed by the appropriate
                                                                        Engineering, Engineering and       TA and approved at the
                                                                        Maintenance has been formed        appropriate level.

Heat Stress:                                                                                                                                        Running for 15 consecutive years, the
                                                                                                                                                    CEO Forum for National Graduates
                                                                                                                                                    and National Trainees forms an
                                                                                                                                                                                                our national workforce and provide you
                                                                                                                                                                                                with guidance as well as the necessary
                                                                                                                                                                                                tools to grow in your professional life.”
                                                                                                                                                                                                                                            Development Programme (IDP)
                                                                                                                                                                                                                                            workflow.
                                                                                                                                                                                                                                               Other significant launches by the

an action plan                                                                           89
                                                                                                                                                    integral component of the Company’s            Also addressing the forums, Ali          Learning and Development Department
                                                                                                                                                    Qatarization strategy.                      Mohammed Al-Emadi, LNG Marketing            this year include:
                                                                                                                                                        This year’s forum, with the theme,      Division Manager shared his success         • National Graduate Development
                                                                                                                                                    ‘My Career, My Responsibility’              story with the National Graduates              Programme e-learning;
                                                                                                                                                    encouraged Nationals to take ownership      and Mones Khider Al-Rwaili, Head of         • Coaching Community; and
                                                                                        The number of                                               of their own career development by          Shutdown Operations, Onshore Support        • New Technical Preparation
The Workers’ Welfare and Occupational Health            Management – the                                               For the past two             embracing any one of a number of            Operation shared his success with              Programme (TPP).
Forum is a Qatar Petroleum initiative organised         Qatargas Way’.                  days in 2015 that              years, Qatargas              initiatives the Company has in place for    National Trainees.
annually as part of the industry’s commitment              With summer                   the heat index               has maintained a              developing national talent.                                                             Awards
to meet the objectives of the Human                     fast approaching,
                                                                                          exceeded 54.               strong performance                 Addressing the Qatari Nationals,        New Individual Development                  During the forum the CEO presented
Development pillar of the Qatar National Vision         Kien highlighted:                                          record with regard to            the CEO Khalid Bin Khalifa Al-Thani,        Programme platform                          awards to the best national graduates
2030 (QNV 2030). The objective of the forum             • The Company’s heat                                      heat-related incidents            was full of encouragement, explaining,      The forum also provided an opportunity      on scholarship and development.
is to make institutional arrangements for                  stress management                                   with zero reported                   “As National Graduates, you are the         for the Qatargas Learning and               Furthermore, trainees and coaches
ensuring the health, safety and welfare of its             strategy;                                       incidents across all assets.             cornerstone of this incredible journey we   Development Department to announce          were awarded for their outstanding
expatriate labour.                                      • The measures adopted by                         Regrettably, there were                   are undertaking. At Qatargas we value       the enhancement of Individual               performance in 2016.
    Representing Qatargas at the event was                 the Industrial Hygiene Division to protect     two contractor incidents. In
the Medical Department’s Senior Industrial                 employees from heat exhaustion; and            2015, Qatargas recorded 89
Hygienist, Liew Saik Kien, who presented
a paper entitled, ‘Resilient Heat Stress
                                                        • Key points from its 2016 Heat Stress
                                                           Management Action Plan.
                                                                                                          days when the heat index
                                                                                                          exceeded 54. With even hotter
                                                                                                                                                                                                                                              Focus Group
                                                                                                          temperatures expected in                                                                                                            The Focus Group is instrumental
                                                                                                          2016, the Heat Stress Action                                                                                                        in organising the CEO forum in
                                                                                                          Plan has been developed to                                                                                                          association with the Learning and
                                                                                                          maintain resilience on climate                                                                                                      Development (L&D) Department.
                                                                                                          change, with an on-going                                                                                                            Each year the L&D Department
                                                                                                          target of zero heat related                                                                                                         invites National Graduates to
                                                                                                          incidents.                                                                                                                          form this group which comprises
                                                                                                                                                                                                                                              a number of National Graduates
                                                                                                                                                                                                                                              representing each group
                                                                                                                                                                                                                                              across Qatargas functions with
                                                                                                                                                                                                                                              the objective of enhancing
                                                                                                                                                                                                                                              communication between L&D
                                                                                                           Medical Department’s Senior Industrial
                                                                                                           Hygienist, Liew Saik Kien addresses                                                                                                Department and the graduate
                                                                                                           delegates at the Workers’ Welfare
                                                                                                           and Occupational Health Forum held                                                                                                 community.
                                                                                                           recently in Qatar.                       The award winners at the CEO Forum 2016.

18   |   the pioneer   |    quarter two 2016                                                                                                                                                                                                 quarter two 2016    |   the pioneer          |   19
Award recipients and their feedback
                                                                                                                                             Long Service and                                                                                                                     Outstanding
                                                                                                                                                                                                                                                                                 achievements

                                                                                                                                             Shukran awards
           Best Coaches                         Best National Graduates                              Hard work and determination are
                                                                                                  key factors in a successful career.
           of National Graduates
                                          Alanood Al-Malki – Administration - HR                  The theme of the CEO Forum was ‘My                                                                                                                                                         185
     Shihaam Bawa –                       Aljohara Abdulmohsen Al-Manaa – C & S - Sales Admin     Career My Responsibility’, and I am
     Administration - HR                  Eman Raji Elhmoud - E & V - Engineering                 determined to work hard to ensure                                                                                                                                              Employees received
     Shane Palmer – C & S - Sales         Fahad Moh’d Al-Hajri – Operations Maintenance           that Qatargas maintains its position as                                                                                                                                        the Shukran award.
     Admin                                Ghada Abdulla Al-Abdulla – Administration - L & D       the World’s Premier LNG Company.”
     Bouchebri El-Hadi - E & V -          Sara Mohammed Al-Hail - Finance                         -Mohammed Nasser Al-Saadi - Finance        An award ceremony was held       towards achieving the                       congratulations to those of
     Engineering                                                                                                                             to recognise employees for
                                                                                                                                             their dedicated long service
                                                                                                                                                                              Company’s business goals. I
                                                                                                                                                                              would therefore like to say my
                                                                                                                                                                                                                          you who have received a Long
                                                                                                                                                                                                                          Service Award. This award
                                                                                                                                                                                                                                                                                             362
         Setting the right goals               Best Coaches of Trainees                      Scholarship - Academic Excellence
                                                                                                                                             to the Company, and for          personal ‘shukran’ to all of you,           is a reflection of your hard
     is the first step in climbing
                                                                                                                                             outstanding achievements.        and encourage you to keep up                work, professionalism and                           Employees received the
     the ladder of success in any         Riad Boudjadja – Operation Maintenance         Nayef Ali Al-Briki - RLTO
                                                                                                                                             A total of 185 Qatargas          this high level of performance.             contribution to the success of                       Long Service award.
     career. At Qatargas, the                I am profoundly honored to                  AbdulRahman Metair Al-Enazi - RLTO
     learning and development                                                            Mohammed Ali R A Al-Sulaiti - RLTO                  employees received the           I would also like to extend my              Qatargas over many years.”
                                          be selected as one of the best
     process helps everyone do                                                                                                               Shukran award and 362
                                          coaches. This recognition is                      The award gave me the motivation to
     this in the best possible            a great motivation for me to                                                                       employees received the Long
     manner.” -Fahad Thani                                                               develop myself and to continually take              Service award.
                                          continue to contribute to the                  ownership of my own development and
     Al-Mesaifri - Finance                development of young Qataris.”                                                                         Addressing the awardees,
                                                                                         career path.” -Abdulla Ali Al-Kubaisi - RLTO
                                          -Sofiane Khiari – Operation                                                                        Khalid Bin Khalifa Al-Thani,
        Obtaining this award has
     motivated me to work even            Process                                                                                            CEO, said, “Let me start by
     harder, and to continue to              It’s very heartening to know that                                                               congratulating all of you
     support the Qatarization             my engagement as a coach has                           Best National Trainees                      who are here to receive the
     programme. This award                helped trainees acquire professional           Eisa Rashid Almudahka – Engineering - Integrity     Shukran award. This award
     holds a very special place           skills, whilst simultaneously                  Abdulla Menassar Mousa – Operation Process          is in recognition of your
     in my heart.” -Muhammad              sharpening my own knowledge.”                  Naif Salah Sayyar – Operation Maintenance           outstanding performance
     Ramzan Babar – Operation             -Babu Raj Dharmarajan -                                                                            and valuable contribution        Award winners pose with the CEO and senior management.
     Maintenance                          Engineering - Integrity

Reaching out                                                                                                                                 Muaither shines in
to future                                                                                                                                    Qatargas League
talent                                                                                                                                       Qatargas’ robust corporate social responsibility programme includes its

through
                                                                                                                                             support for various sports. For the past three years, the Company has been
                                                                                                                                             the title sponsor of the country’s reserve and second division football league,
                                                                                                                                             which is now known as Qatargas League.
social media                                                                                                                                 Qatar Football Association
                                                                                                                                             (QFA), in partnership with
                                                                                                                                                                              positive evolution, which has
                                                                                                                                                                              contributed to the promotion
The most recent development           campaign builds on Qatargas’                                                                           Qatargas, recently crowned       of the game during the past
of the ongoing Hayyakum               reputation as the World’s                                                                              Muaither Sports Club as          two seasons,” said Sheikh
programme has been an                 Premier LNG Company to                                                                                 champions of the Qatargas        Khalid Bin Abdullah Al-
outreach recruitment                  capture the students’ attention,                                                                       League. In winning the league,   Thani, adding: “It has also
campaign delivered across             and particularly focuses on two                                                                        Muaither gained promotion to     contributed to achieving our
social media. The Qatargas            of the Company’s Qatarization                                                                          the Qatar Stars League.          goals of elevating football
campaign aims to recruit              initiaitives.                                                                                             Sheikh Khalid Bin Abdullah    in light of the country’s
Qatari High School and                1. Technical Preparation              Qatari Nationals for key         2. Individual Development       Al-Thani, Chief Operating        preparations to host the FIFA
University graduates by                   Programme                         technical positions across          Programme                    Officer - Engineering and        World Cup 2022.”
highlighting the different                The Technical Preparation         Qatargas’ Operations and            The Individual Development   Ventures at Qatargas and             In total, 18 clubs from
career opportunities the                  Programme (TPP) offers            Maintenance departments.            Programme (IDP) offer        Ahmad Abdul Aziz Al-             reserve and second division
Company can offer.                        Qatari Nationals with             It provides a combination of        exciting career prospects    Buainain, a member of the        league took part in the
    Projecting an exciting                high school diplomas              theoretical offsite training,       to Nationals that hold       QFA Executive Committee,         Qatargas League’s 2015
culture of learning, innovation,          rewarding roles in Process,       delivered at the College of         a Bachelor’s Degree          were among the dignitaries       to 2016 season, the third
diversity and excellence, the             Electrical, Mechanical            the North Atlantic (CNA-Q)          in disciplines such as       present at the award             year the league has been
campaign mirrors some of the              and Instrumentation               and workplace learning,             Engineering, Information     ceremony.                        held in its current form
objectives of the Company’s               disciplines. The three-year       completed at Qatargas               Technology, and Business        “We are very pleased          in partnership with the                     Qatargas and QFA officials join the players and officials of Muaither, Champions of the
Direction Statement. The                  programme prepares young          facilities.                         Administration.              with the Qatargas League’s       Company.                                    Qatargas League for the 2015-16 season.

20    |   the pioneer   |   quarter two 2016                                                                                                                                                                                                                 quarter two 2016            |   the pioneer            |   21
Being socially                                                                                                                                                          Healthy
                                                                                                                                                                        living

responsible                                                                                                                                                             At the Healthy Diet event,
                                                                                                                                                                        participants were provided
                                                                                                                                                                        with a free medical
                                                                                                                                                                        assessment including
                                                                                                                                                                        weight, height, blood sugar
Qatargas employees and their families have been participating in a host                                                                                                 and blood pressure checks,
                                                                                                                                                                        in addition to counselling
of events organised in line with the Company’s mission to be socially                                                                                                   sessions on healthy diet and
                                                                                                                                                                        growth monitoring in infants
responsible by actively contributing to social, community and local                                                                                                     and children.
                                                                                                                                                                           The event was part of a
business. As well as spreading many positive environmental and medical                                                                                                  series of activities organised

                                                                                                                                                                                                                        150+
messages, the participants had a lot of fun in the process.                                                                                                             by the Qatargas Medical
                                                                                                                                                                        Department in 2016 in an
                                                                                                                                                                        effort to raise awareness on
                                                                                                                                                                        the importance of having a
Preserving Qatar’s beaches                                                 Azzam AbdulAziz Al-
                                                                        Mannai, Qatargas Public
                                                                                                                         “Initiatives aimed at
                                                                                                                         promoting environmental
                                                                                                                                                                        balanced lifestyle.                                   The number of
                                                                                                                                                                                                                           employees and their
The third annual Qatargas            the clean-up forms part of         Relations Manager, thanked                       protection form an integral                                                                      families who attended
beach clean-up took place at         the Company’s activities in        the Qatargas volunteers                          part of Qatargas’ Corporate                                                                      the Healthy Diet event                                                       Mickey Mouse and Elmo attended the event to keep children
Al Ghariya beach, some 100           its commitment to promoting        who participated in the                          Social Responsibility                                                                              at Qatargas Doha                                                            entertained and encourage them to live a healthy lifestyle.

kilometres North of Doha.            environmental protection and       beach clean-up for setting                       programme. Our efforts in                                                                           Medical Centre.
Organised in collaboration           preserving the natural beauty      aside their personal time to                     this area are fully aligned with
with the Ministry of                 of the State of Qatar for          work towards environmental                       the objectives of the Qatar
Municipality and Environment,        generations to come.               protection. He added,                            National Vision 2030.”                                                                                                                                                                            Meanwhile, Al Khor
                                                                                                                                                                                                                                                                                                                       Community concluded its 12-
                                                                                                                                                                                                                                                                                                                       week SAHA healthy lifestyle
                                                                                                                                                                                                                                                                                                                       campaign, in which 230
                                                                                                                                                                                                                                                                                                                       participants committed to
                                                                                                                                                                                                                                                                                                                       adopting a healthier lifestyle,
                                                                                                                                                                                                                                                                                                                       improving their nutrition and
                                                                                                                                                                                                                                                                                                                       becoming more active.
                                                                                                                                                                                                                                                                                                                           Keeping with the healthy
                                                                                                                                                                                                                                                                                                                       living theme, the Medical
                                                                                                                                                                                                                                                                                                                       Department also hosted an
                                                                                                                                                                                                                                                                                                                       educational event on oral
                                                                                                                                                                                                                                                                                                                       hygiene at the Qatargas
                                                                                                                                                                                                                                                                                                                       Doha Head Office. The ‘Ask
                                                                                                                                                                                                                                                                                                                       the Dentist’ event aimed
                                                                                                                                                                                                                                                                                                                       to help people understand
                                                               Qatargas employees are pictured after participating in the Company’s third annual beach clean up.                                                                                                                                                       proper oral hygiene
                                                                                                                                                                                                                                        Participants in the SAHA healthy lifestyle campaign were given medals          measures.
                                                                                                                                                                                                                                               and other prizes for losing weight in their respective categories.
                                                                                                                                                                                                                                                                                                                           For many, a visit to the
                                                                                                                                                                                                                                                                                                                       dentist can be a daunting
Donating valuable                                                                                                                                                                                                                                                                                                      prospect, and so the friendly
                                                                                                                                                                                                                                                                                                                       dentists were on hand to
‘drops of life’                                                                                                                                                                                                                                                                                                        discuss important dental
                                                                                                                                                                                                                                                                                                                       health issues in a more
Due to the constant demand for healthy and reliable blood to
                                                                                                                                                                                                                                                                                                                       relaxed environment than
help people in need, there is a constant requirement for blood
                                                                                                                                                                                                                                                                                                                       the dentist’s chair.
donations. That is why, for the past 15 years, Qatargas has
organised regular blood donation campaigns at its premises in
coordination with Hamad Medical Corporation (HMC).
    For people who need transfusions, donated blood could
save their life. Qatargas was recognised by HMC for its on-

                                                                                                                                                                                                                                                                                                                              230
going support in raising awareness for HMC’s blood donation
drive at the ‘World Blood Donor Day’ celebration.
    The ceremony was organised by HMC in recognition of
individuals and organisations who supported HMC in its bid to
                                                                                                                                                                                                                                                                                                                            The number of residents
promote voluntary blood donation amongst the community                                                                                                                                                                                                                                                                      from Al Khor Community
and helping the blood bank increase its supply of life saving                                                                                                                                                                                                                                                                who participated in the
blood.                                                                                                                                                                                                                                                                                                                        12-week SAHA healthy
    World Blood Donor Day is celebrated worldwide annually on                                                                                                                                                                                                                                                                   lifestyle campaign.
                                                                        Azzam AbdulAziz Al-Mannai, Public Relations Manager, Qatargas, received a
June 14 in order to raise awareness of the need for safe and            commemorative plaque and certificate of appreciation from Dr. Saleh Ali Al-Marri, Assistant
adequate blood, and to thank voluntary blood donors for their           Secretary General for Medical Affairs at the Ministry of Public Health, in recognition of the
                                                                        Company’s support as ‘Gold Sponsor’ of the World Blood Donor Day event, and its efforts in
life saving gifts of blood.                                             supporting HMC’s blood donation campaigns.                                                      Dentists and dental hygienists from the Qatargas Medical Department met with employees in a more relaxed environment.

22   |   the pioneer   |   quarter two 2016                                                                                                                                                                                                                                                               quarter two 2016           |   the pioneer        |   23
You can also read