DUBLIN PROGRESS REPORT #5
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Vote for DC in 2021! Gearing up for a
The site of the 2021 World Monumental
Science Fiction Convention Worldcon
(Worldcon) will be chosen
at Dublin 2019 – An Irish
Worldcon (dublin2019.com).
To cast a ballot for the 2021
Worldcon site, you must
meet two requirements:
1. Be at least a supporting
member of Dublin 2019.
2. Pay a Advance Supporting
Membership (ASM) fee for
the 2021 Worldcon.
The 2021 Site Selection bal-
lot will be posted in April on
the Dublin 2019 website to
download and fill out. Votes
may also be cast on-site at
Dublin 2019. The winning
2021 Worldcon bid will be
announced on Sunday, 18
August 2019, at Dublin 2019.
The deadline for being on the
ballot for the 2021 Worldcon
has passed — DC in 2021
submitted the only bid.
What is the DC in 2021 Worldcon Bid?
Washington, D.C. has played host to many science fiction and fantasy conventions, includ-
ing Disclave, Capclave, and two Worldcons — Discon I (1963) and Discon II (1974). A
new generation of area fans and friends are bidding to bring the 79th World Science Fiction
Convention to DC for a third time on Wednesday through Sunday, 25 – 29 August 2021, at
the Marriott Wardman Park hotel in the Woodley Park neighborhood of Northwest Wash-
ington, D.C.
DC in 2021 is a committee of the Baltimore-Washington Area Worldcon Association, Inc.
(BWAWA); a 501(c)(3) tax-exempt organization devoted to the promotion of the science
fiction and fantasy genre in all its forms. To learn more about BWAWA and our Code of
Conduct, please visit bwawa.org.
DCin2021.org • info@DCin2021.org • Facebook/Twitter: DCin2021
Times Three cover illustration for Times Three by Robert Silverberg,
Subterranean Press, April 2011 © John Picacio. All rights reserved.Dublin 2019: An Irish Worldcon
Progress Report #5
Guests of Honour August 15 - 19, 2019
Ginjer Buchanan Convention Centre Dublin
Jocelyn Bell Burnell www.dublin2019.com
Mary & Bill Burns facebook: dublin2019
Diane Duane twitter: dublin2019
Steve Jackson instagram:
Ian McDonald dublin2019worldcon
info@dublin2019.com
“Worldcon”, “Hugo Award”, and the Hugo Award Logo are registered service marks of Worldcon Intellectual Property,
a California non-profit public benefit corporation. “World Science Fiction Society”, “WSFS”, “World Science Fiction
Convention”, “NASFiC”, “Lodestar Award”, and the distinctive design of the Hugo Award Trophy Rocket are service
marks of the World Science Fiction Society, an unincorporated literary society.
1Table of Contents
Articles Pages
A Message from the Chair 3
Programme Link 4
Logistics Jobs & Volunteers 5
Site Selection 6
Map of Venues 6
Accesibility Services 7
Warhoon 28 8
Box Office 9
Registration 10
About the Surrounding Area... 11
Membership List 13
Membership Breakdown 17
Maps: CCD 23
Point Square 30
Cover art by Sara Felix, Page 4 art by Iain Clark, Page 8 art by Iain Clark, Page 10 Sara Felix,
Page 22 art by Teddy Harvia
Contact Us
The Access policy is online at:
https://dublin2019.com/about/accessibility-services/
For information about the programme, please see:
https://dublin2019.com/things-to-do/programming/
Interested in our policies?
https://dublin2019.com/about/policies/
Want to volunteer?
For general inquiries
https://dublin2019.com/get-involved/volunteer/ please email
info@dublin2019.com
Want to know more about the exhibit hall?
https://dublin2019.com/whats-on/exhibits/
Post
Need Childcare? Dublin 2019
https://dublin2019.com/about/childcare/
211 Black Horse Ave
Dublin 7, D07 DFT0
Ireland
2A Message from the Chair
Right then, here we are now. I am not sure I to get a wristband, and to use it. Please check
would start from here, but you’ve got to start out the article about it. This may be NEW to
somewhere! you.
Are you ready? I am very sorry that we have let some of you
down. We’ve sent out news to parents and
It is now a matter of weeks and days until the young adult members about the venue and I’m
convention and the work is tremendous. I’ve sorry we’ve communicated this later than we
been in the privileged position of watching should but hope the direct emails have helped
on, keenly as so many ideas and notions are clarify. Do email mss@dublin2019.com if you
brought to fruition, and now, we hope this need any information or clarification.
Progress report will be where you start to focus
on your plans over the time of Dublin 2019, An I am excited by many elements that we are
Irish Worldcon. bringing you, some incredible events, and
programme, some wonderful exhibits, and I
Whats Up? hope you enjoy planning your five days, or as
many days as you can. Do look at our Plays,
We are cognisant that we all have varying Concerts, musicals and performances.
needs and desires, and hopes, and fears and
you know, stuff, so, if a query or question We are utilising many venues. The Point Square
or issue is not addressed here, or you do and The Convention Centre Dublin and our
have something that is giving you agitation, Fringe Events, are across the city. Please do
excitement or a wrinkled nose, just drop info@ have a close look, at locations and all that
dublin2019.com or access@dubin2019.com Dublin has to offer, it is a beautiful city, and
an email, they are happy to help. We are all Ireland is incredible, so do plan.
volunteers but likewise we all want you to have
a good experience. Programme will be available in the next few
days and from then, you can get more detailed
WE NEED VOLUNTEERS!! plans in place, pack books to be signed, bring
costumes, and feel free to cosplay when you
Would you be happy to help the team. like, but especially Saturday.
Hundreds of people are already working on this
all volunteer event, but we need many more, We have Scientists and Astronauts, and Artists
especially in the run up and at con. Please and Authors and its astoundingly amazing,
do let volunteer@dublin2019.com know if you and thanks to you all, who’ve helped in all
would like to help, We have a google form, a capacities, we are so lucky to have so many
job listing and just really need to hear from you who are happy to help us make Dublin 2019 a
- because it really does help, and it is fun to be reality.
involved. https://dublin2019.com/get-involved/
volunteer/ Thanks a million - looking forward to seeing
you.
A New Thing
very best,
We need to have a ticketed system for
the evening Auditorium events: Opening James
Ceremonies and Retro Hugo Awards, Orchestra
concert, Masquerade, and 2019 Hugo Awards.
This will be in the form of a wristband, and is
about managing queues. There is a time frame
3Logistics Jobs & Volunteers!
The Logistics Division is responsible for Volunteers for this team are needed during the
supporting every other division at con and we main days of the convention.
need lots of people to help us do just that!
We’re very happy to have you come along for Con Office: Worldcon needs an awful lot of
even just an hour or two over the course of the pens, paper, magic whiteboards, and lots of
weekend. other things in order to run efficiently. Con
Office takes the orders, obtains the supplies,
Move-In/Move-Out (MIMO): On Tuesday and passes everything out to the other
and Wednesday, August 13 and 14, we’ll be divisions. Help is especially needed on Tuesday
moving everything into our venues so if you and Wednesday, August 13 and 14 for this
live in Dublin or you’re arriving at the con effort, but also throughout the convention as it
early, please think about coming down to the seems one pen is never enough!
convention centre and volunteering. The ability
to lift and carry is definitely an advantage but Shipping & Storage: This team is responsible
is not required. We’ll also need a lot of help for delivering things to the Dublin 2019 venues
on the evening of Monday, August 19, and the and then moving things between the venues
morning/afternoon of Tuesday, August 20, so over the course of the con. We are especially
please consider sticking around and lending a looking for an appropriately licensed driver to
hand! be part of the van driving team. The bulk of this
work will be during move-in and move-out, but
Ops: With several venues and multiple floors in there will also be activity during the core days
the convention centre, we will need quite a few of the convention.
people in our Convention Operations team. If
you want to help make life easier for your fellow Furniture: Every Worldcon needs more
members, working closely with the venue staff, furniture than the venue can provide! This team
please consider donating an hour or two of will be working very closely with MIMO and
your time per day to Ops! Ops volunteers are Shipping & Storage to deliver that furniture to
needed throughout the duration of the con. the right place at the right time. This work will
primarily take place during the move-in and
At-Con IT Support Staff: The Dublin Worldcon move-out periods.
At-Con IT Support Team is responsible for on-
site setup and support of computers (Windows
and Mac), printers, copiers, and networking
(wireless and wired) for the entire convention
in both the convention centre, Warehouse/
Odeon, and possibly hotel spaces. This
includes installing software on site as well as
Childcare
helping users set up their personal computers Do you need childcare while attending
to interface with the rest of our infrastructure. Dublin 2019? We will have a childcare
Help is especially needed on the August 13 and provider available in the Spencer Hotel.
14. The deadline for sign-up is AUGUST 5,
2019.
Listeners: The Listeners team is responsible
for helping to enforce our Code of Conduct. Please sign up here:
The team takes reports and listens to people’s https://forms.gle/y9bDiejrLQdEsXEo7
concerns, and then acts as necessary to keep
our members safe and ensure that Dublin
2019 is an open and welcoming Worldcon.
5Site Selection
Where will Worldcon take place in 2021? Supporting Membership fee of €40, which
goes to the winning bid. This process
The site of the World Science Fiction automatically makes you a Supporting
Convention (“Worldcon”) in 2021 is Member of the winning bid’s convention.
determined by you all, the members of this Links to downloading the ballot are here:
year’s Worldcon. To vote in Site Selection https://dublin2019.com/hugo-awards-wsfs/
you must be a Full Attending, Young Adult, site-selection/, as well as a link to a page
First Worldcon, or Supporting Member of where you can pay the Advance Supporting
Dublin 2019. You must also pay an Advance Membership fee online. However, all printed
and (surface) mailed ballots must reach us
no later than on Saturday, August 3, 2019, so
if you are attending Dublin 2019, the safest
Getting here and simplest way to vote in site selection is to
do it at the convention.
Need information on getting to the Voting in Dublin will be open these hours:
convention? The website has you
covered! Thursday: 12:00 to 18:00
Friday: 10:00 to 18:00
https://dublin2019.com/location/ Saturday: 10:00 to 16:00
traveling-to-dublin/
Map of Venues
For more maps check out the website. There are CCD and warehouse maps
at the back of the Progress Report.
6Accessibility Services
Mobility Devices with hearing devices. Please come to the
It appears that we might have a very small Access desk to borrow a device.
number of spare mobility devices due to
cancellations. If you wish to book a scooter, For more information about accessibility at the
please email access@dublin2019.com. Mobility convention, visit https://dublin2019.com/about/
scooter rental is €20 per day. Scooters may accessibility-services/
also be available on a first-come, first-served
basis at the convention. Accessing Access Services
Anyone with accessibility needs should register
If you’ve already booked a mobility scooter, with Access. Whether your needs are simple or
power wheelchair, or other mobility device complex, we want to do everything we can to
with us, you’ll be able to collect it upon arrival help you enjoy yourself. Accessibility doesn’t
at the CCD. Just go to the Access Desk for just mean physical, and there is no such thing
assistance, unless you’ve received different as “not needing help badly enough.” When
information from us in email. you arrive at the convention, check in at the
Access Desk to receive a badge sticker that will
Hugo Awards mark you as registered with Access in order to
Tickets for accessible seating at the Hugo help our team spot members with accessibility
Awards and Retro Hugos will be available at needs. You’ll also be able to learn about other
the Access Desk. Seating will be reserved for services and opportunities that are available.
those who have visual impairments, mobility
difficulties, or need wheelchair-accessible
seating or to be close to an exit.
Access Service Highlights
Registration – If registration lines are long or
you need assistance with picking up your
Volunteers
badge or registering on-site, come to the
Access Desk first. Volunteers will be available Want to help make this Worldcon
to assist you. fantastic by lending a hand? We are
always in need of volunteers to help
Access Seating - All programme rooms will out, and there are some fun perks for
have designated wheelchair/mobility scooter volunteers including t-shirts, raffle prizes,
spaces as well as seats reserved up front for and GROATs.
those with visual or auditory disabilities. Priority
seating or line passes will be available for large If this sounds like fun, please fill out the
events for those who are not able to stand in a following form or come find us in person
queue. at the convention!
Quiet Room – If you need to get away from the https://docs.google.com/forms/d/
noise and crowds, Board Room 3 on Level 1 e/1FAIpQLScTurBePkRKP29Z5KSi
is the designated Quiet Room in the CCD, and BB2GDvMuq1vGT4vDvChzL3MMF
will be available for the duration of the con.
4L-3A/viewform
Hearing Assistance - All meeting rooms and
halls have an induction hearing loop. All halls
and the auditorium have an infrared hearing
system with loaner devices that can connect
7Warhoon 28
TAKE HOME A PIECE OF FAN HISTORY THE WRITER, THE WIT, THE WARHOON
LIMITED STOCK AVAILABLE
His work was celebrated by his peers and
Northern Irish fan Walt Willis was a great other fans, from special editions of fanzines
influence on fandom, particularly from the 1950s and collections of his writings through being
onward, bringing his own brand of humorous a Worldcon honoree in 1992 as MagiCon’s
writing to Ireland, the UK, and the US. His Fan Guest of Honour. However, Richard
influence went beyond writing, though: it is Bergeron pulled out all the stops in 1978. The
because of efforts to bring him to the 1952 Willis-dedicated issue of his fanzine Warhoon
Worldcon in Chicago that we have traditions like (Warhoon 28) is a work of art in its own right.
the Trans-Atlantic Fan Fund, Going Up and Over Hardbound and gold-embossed, it’s a massive
Fan Fund, and Down Under Fan Fund (and other anthology of Willis’s writings and art, reflecting
fan funds). He even co-wrote the basis of one of the history of the man and his fan writing.
our theatrical performances alongside Bob Shaw,
A Pilgrim’s Progress The Enchanted Duplicator! This is your chance to take home a real piece
of fan memorabilia. We have the remaining
Of course, he was best known for his fan writing. stock of Warhoon 28 available here at Dublin,
He won a Hugo for it in 1958 (as Best Actifan), and are delighted that we can share our joy at
and was nominated several more times. He was what an influence a Northern Irish writer had on
responsible for the fanzines Slant (with James the science fiction world. Come buy your copy
White) and Hyphen (with Chuck Harris), and today!
contributed to many more, including his series
“The Harp that Once or Twice” for Quandry.
Keep in touch!
Hello all! We wanted to remind you
that Dublin 2019’s website has lots
of amazing information about the
convention that is getting updated
consistently as we get closer to August.
Some of the highlights include:
• Travel information for to and around
Dublin
• Information on the various activities
that you can expect
• Our blog has lovely details on Irish
fiction, our Touring Tuesday feature
that will help you plan your travel, and
special announcements and news
Bookmark us and have the latest
information available!
https://www.dublin2019.com
8Box Office
Box Office for Auditorium Events wrist bands, the auditorium is considered
full and we cannot let people in without
The CCD want to ensure queueing can take place wristbands. It would be a great pity to
safely before busy major events so they have turn people away if there were still seats
asked that we implement a system to deal with it. available.
As a result, Dublin2019 will have a Box Office for • If you find that members of your party
some events. cannot attend, we will have one of the
Box Office desks open from 6:30pm as a
The Box Office only applies to a few Returns Desk (or you can bring the surplus
performances taking place in the Main wristbands back to the Box Office whilst
Auditorium: we are still open). If we have run out of
• The Opening / Retro Hugo Ceremony wristbands earlier in the day, it will always
(Thursday) be worth checking the Returns desk to
• The Orchestral Evening (Friday) see if any have become available (Return
• Masquerade (Saturday) Wristbands will be dealt with on a first-
• The Hugo Award Ceremony (Sunday). come-first-served basis and there will not
be a Reserve List).
You will not need to go to the Box Office for • People with Accessibility issues can
anything on Second Stage, on Programme, at approach Access who will have an
The Point or in any other performance space. allocated number of wristbands available.
• If you do not have a wristband, you will
We will not be giving out tickets from the Box not be able to enter the auditorium, so
Office – instead, you will be given a wrist band. please don’t lose yours!
Wrist bands are free and will denote which • If you arrive late with a wristband,
entrance you can use to enter the Auditorium you will still be allowed to go in but may
and at what time (please do not turn up earlier have to wait for a suitable break in the
than the time allocated as you will only be turned performance.
away).
We realise that this is not the usual way of
The wrist bands will allow access from the Third doing things at a WorldCon and we apologise
Floor (Auditorium Stalls) at 7pm or 7.30pm or for any inconvenience caused, but as long
the Fourth Floor (Auditorium Circle) at 7pm or as everyone is aware of how the new system
7.30pm. Performances start at 8pm, so there is operates it should still lead to a great evening of
plenty of time to get everyone into the venue. entertainment.
Once inside, seating is unallocated so you can
choose where you want to sit (some areas will be
reserved for Award Nominees or Presenters, but
staff inside the Auditorium will help you find a free
seat). We do of course ask that you don’t leave
seats open, as we are expecting to have a full
Free Locus Magazine
house for all these events. Limited-time exclusive for Members of
Dublin 2019: An Irish Worldcon - Free
A few more points: digital download of Locus #693, August
• The Box Office will be open from 1pm – 2018, with the 2018 Worldcon San Jose
4pm on the days of Performance. It will be convention report!
in the downstairs foyer, next to Registration.
• We will only be allocating wristbands
for that day’s event. There will be different
https://subscribers.locusmag.com/
coloured wristbands depending on the day. worldcon-issue
• You may collect up to 6 wristbands at a
time for friends and family, but please do
not over-collect – Once we have run out of
9Registration
All membership and day pass sales will end at If you arrive after Registration is closed for
2 August 2019 at 00:01 Irish Time. (Note that the evening and want to go to night events
in-person sales will be available at Dublin Comic requiring a convention badge, go to Convention
Con, if there are any memberships or day passes Operations office in Liffey 5 for a temporary night
remaining.) There will be NO sales on the door. badge.
Membership Transfers Badge Name Changes
After the close of online sales, you might be able After 00:01 Irish Time 2 August 2019, please do
to find a membership for sale by private parties not change your name or badge name online as
on the Dublin 2019 Facebook page or Twitter those changes will not be reflected in the at-con
feed. You must qualify for the membership membership database. All changes need to be
level you are buying or pay to upgrade it to the made when you pick up your badge.
membership level you qualify for. (Visit https://
dublin2019.com/memberships/ for an explanation Lost Badges
of membership levels and eligibility requirements.)
If you lose your badge at the convention, go to
For membership transfers before 00:01 Irish the Registration Solutions desk. Note that we
Time 2 August 2019, please contact registrar@ charge a fee to replace lost badges.
dublin2019.com.
For membership transfers after than that time,,
you MUST bring an email from the membership
owner’s email address asking registration to
transfer the membership to you.
At-Con Registration
Please bring something with your name on it to
at-con Registration - if possible - it makes picking
up your badge faster.
After 00:01 Irish Time 2 August 2019, please do
not change your name or Badge Name online,
these changes will not be in the at-con database.
All changes will need to be done when you pick
up your badge.
Registration hours will be:
Tuesday: 16:00 - 19:00
Wednesday: 9:00 - 19:00
Thursday: 9:00 - 19:00
Friday: 9:00 - 19:00
Saturday: 9:00 - 19:00
Sunday: 9:00 - 19:00
Monday: 10:00 - 12:00
10About the surrounding area...
An excerpt from our FAQ online here: https:// • Closest pub – The Ferryman is just across
dublin2019.com/about/faq/ the Samuel Beckett Bridge (about a 4 minute
walk from the CCD), opens at noon (12:30
Convention Centre Dublin (CCD) and Sun) & has a carvery for lunch!
Immediate Surroundings • Closest collection of restaurants – CHQ
(adjacent to the Emmigration Museum), 8
• If you have an emergency in the CCD, call minute walk west of the CCD.
+353-18184999, the CCD security number. • Closest grocery (if you’re staying south
• Closest full-service emergency room, of the Liffey) – Eurospar, Hanover Quay, is
open 24 hours a day – Mater Miserecordiea a 10 minute walk from the CCD, groceries,
University Hospital, Eccles St, Dublin 7 +353 takeaway & liquor available.
(01) 803 2488. 2.6 km northwest of the CCD. • Other nearby grocery/pharmacies
• Closest walk-in center (for minor injuries/ • SuperValu Talbot St/Kane/
illnesses) – Mater Smithfield Rapid Injury McCartney’s, 27-32 Talbot St, 1.2 km
Clinic, Smithfield, Dublin +353 (01) 657 9000, NW of the CCD, or take the Luas Red
353 (01) 854-5247, 3.1 km west of CCD, open Line west one stop to the Busáras stop,
8:00-18:00 M-F, 10:00-18:00 S-S groceries and carryout.
• Closest garda (police) station – Store • Jervis Shopping Centre, 125 Abbey
St., about 1 km west of the CCD, near the Street Upper, North City. Luas Red
Busaras Luas stop and south of the Connolly Line west to the Jervis stop (about a
Train station. 10 minutes tram ride from the Spencer
• The CCD will have food and alcohol for sale Dock stop). Many stores including
during Worldcon, and Point Square has several groceries (Tesco, Marks & Spencer),
restaurants and a coffee bar. drug store (Boots – this appears to
• Closest grocery/convenience store – be the closest Boots to the CCD) and
Fresh Market IFSC, 1 Mayor St Lower, 5 several takeaways.
minute walk northwest of the CCD, a block • There’s also a Lidl market north of the
north of the Spencer Hotel, groceries, Jervis Centre at 1 Moore st.
takeaway & liquor available. • Locations of Fresh markets in Dublin.
• Closest drugstore – Remedi, northwest of • How can I get distilled water for my
the CCD (Unit 8 Custom House Square, IFSC), CPAP?
is a 5 minute walk away & across from the Distilled water is extremely expensive and
Fresh Market. hard-to-get in Dublin. You have a few options.
• Closest ATM – AIB ATM North Wall, across Some say that using Dublin tap water will
from the Spencer Hotel, a 4 minute walk west not harm your CPAP. Most hotel rooms have
of the CCD. Use the ATM locator to find more a kettle so you can boil water to clean your
ATMs in Ireland. machine. Another possible option is to get
• Closest copy shop/shipping service – de-ionised water at Tesco – it’s only €1.5 for
BizPost Etc, North Dock, about an 8 minute 2.5 liters. The closest Tesco to the CCD is at
walk west of the CCD. the Jervis Centre which is about a 10 minute
• Closest Irish Post Office – Upper Erne tram ride on the Luas Red Line west to the
Street Post Office. 24 Erne Street Upper, Jervis stop. Note that some people advise
Dublin 2. It’s about a 10 minute walk away — against this option.
take the Samuel Beckett Bridge south over the
Liffey, take a right, walk about a block, take
your first left, walk about 4 blocks, turn left on
Upper Erme St
• Closest coffee – Several coffee bars within
blocks.
1111
Membership List
This is NOT a complete list of members. This is the list of Public members who joined or upgraded between 19
March 2019 and 29 July 2019. An (S) after a name indicates a supporting membership, or someone on Instalment
Plan where payment is incomplete.
Note: Members are only listed if they opted into the directory when registering.
Some members have opted to be listed under a “Fan Name”. Children and Infants are not listed.
If you are a member and do not see your name listed here (or if you would like to update how you are listed on
the website and in the Dublin 2019 Souvenir Book), please visit https://api.dublin2019.com to request a login link
and update your member record Public First Name and Public Last Name Fields. If you have questions about your
membership or other Registrations questions or concerns, please contact registrar@dublin2019.com.
AmyCat @BookUniverse Lisa Bah (S) Evelyn Bond (S) Jane Charlesworth
(S) Yasser Bahjatt Gustavo Bondoni Mia Chen
Yacio 7ri Alex Bailey Chris Borst (S) Sara Chen
Ben Aaronovitch Tracy Bailey-Mathews Alexandra Bourget (S) Zichen Chen (S)
Miriam Abuin Cherie Baker Owain Boyd Sara Chicazul
Archil Abunia Christine Baker Randal Bradakis (S) Greg Chivers
Angeline Adams Gavia Baker-Whitelaw Chris Brant (S) Catherine Cho
Jonathan Adams (S) Keith Ballinger Christopher Brathwaite Chris (S)
Sarah Adamson Daniel Balparda Darin Brees Sigurd Christensen
Christina Addy (S) Michele Bannister Susannah Brewer (S) John Christmas
Shweta Adhyam Emma Bardon (S) Brianna (S) Thomas Christmas
George Akin (S) Don Barkauskas (S) Simone Brick (S) Sam Christopher (S)
Levan Alania Baron (S) James Bridgeman (S) Maeve Clancy
Joseph Alecozay (S) Brick Barrientos (S) Christian Brock (S) C S Clarebourne
William Alexander Andrew Barton G. Brown (S) Fiona Clark
Alexander Dione Basseri (S) Rob Brown Graham Clark
BE Allatt Chris Battey (S) Walter Bryan (S) Lorain Clark
Alyssia Allcock (S) Peter S. Beagle Kelly Buchanan (S) Alison Clarke
Sarah Altmann (S) Steven Beard Courtni Burleson Anne Clarke
Mike Amari (S) Eskild Beck Stephen Burridge Fleur Clarke
Cylia Amendolara (S) Ren Bedasbad (S) Kayti Burt Frankie Clarke
Charlie Jane Anders Peter Adrian Behravesh James Butt (S) David Cleary
Constance Anderson (S) Santiago Belluco Neil Butt (S) Heather Cleary (S)
Justin Lee Anderson Eliza Bentley C A (S) Caitrin Clewell (S)
Magnus Anderson TJ Berg Rosier Cade (S) Paul Coad (S)
Andreas Andersson Jennifer Berger Rogers Cadenhead (S) Susan Cofield
Maria Andersson Kristina Bergkvist Caitlin (S) Charles Cogar (S)
Per Andersson Stephanie Bergman Matthew Caldwell (S) João Pedro Isidoro Colaço
Erin Andrews Dirk Bergstrom (S) Valerie Callender (S)
Linnéa Anglemark Orazio Bernardi Suzanne Callison (S) G Mark Cole (S)
Jeff Antram (S) Cindy Bethard Matt Calvert Orlagh Collison
David Ap`Gnarl Laura Bethard Marcus Campbell Russ Colson
Nick Arber (S) Lee Bethel Merrilyn Campbell Erin Congdon (S)
Eric Armstrong Shanthanu Bhardwaj (S) Dan Canaan John Connolly
Nadine Armstrong (S) Brandon Biagioli Isabel Cañas Tina Connolly
Vanessa Armstrong Oli Bird Susan Cane Lily Connors (S)
Charlotte Ashbrooke (S) Brandi Blackburn (S) Zachariah Carlson (S) Amanda Cook (S)
Madeline Ashby Elaine Blank (S) Stephen Cass James Coombes (S)
John Paul Ashenfelter (S) Anna Blumstein (S) Alex Cassutt Kevin Cooney
Ashley (S) A.J. Bobo (S) Cynthia Cassutt Lee Cope
Sabesh Asokan Eric Bodary (S) Michael Cassutt Tony Coppola (S)
Jason Aukerman Eric Bodlund Todd Castillo Christopher Corbitt
Aulne Paweł Bokszczanin Becky Chambers Ian Cordingley (S)
Margaret Austin David Bolger Paul Chambers Mike Cosgrave (S)
Stathis Avramis Cameron Bolinger Charles Chandler (S) Deborah Costello
Thanasis Avramis Saga Bolund M Chapin (S) Richard Counsell
Paolo Bacigalupi Amy Bond Michael Chapman Caroline Couture (S)
13Paul Cray Katherine Duckworth Elena Gaillard Joanne Harris
Oisin Creaner Andy Dudak Norma Gallagher John Harris
Melissa Crew (S) David Duffy (S) Ben Galley K. Harris (S)
S. R. Cronin Albert Dunberg (S) Irene Gallo Rachel Hartman
Matthew Cropley Margaret Dunlap (S) Fred Gambino Paul Hattori
Stéphane Crouzy Aaron Dunne Liang Gao (S) Matthew Hawn
Julie Crowley Michał Duszak Qipeng Gao (S) Tajinder Singh Hayer
Colm Cullen Chris Dwan M. E. Garber Hazel
Jim Cushing Tea Dzneladze James Geluso (S) Sean Patrick Hazlett
Karen Cushing Malcolm Eckel (S) Geoffray Penny Heal
Chris Dalby Frossie Economou (S) Nicolas George Kevin Heard (S)
Dan 2 (S) Leanne Edwards Amanda Gicharu Fearghus Heatley
Kelly Danforth Bennett Ellis (S) Brendan Gillen Ciara Heavin
Bensen Daniel Sara Kate Ellis Kieron Gillen Johanna Hedberg
Tesni Davies Seth Ellis (S) Grainne Gillespie Chris Heilman (S)
Bruce Davis Alex Emm Gillespie (S) Joe Heiman
Clifton Davis (S) Peter Enyeart (S) Greer Gilman Petra Helenius
Margaret Davis (S) Rayn Epremian Cara Glover Thera Heller
Jim Day Rachel Epstein (S) Kerry Glover Jacqueline Hencsie (S)
Ingrid De Beus Adrienne Ertman (S) Vladimer Gogosashvili Elizabeth Henderson
Gabrielle de Cuir Oliver Esmonde David Golden (S) Howard V. Hendrix
Gabrielle de Cuir Kat Ettridge Jeanne Goldfein (S) Daniel Henriksson
Giovanni De Feo Lyle Evans Elizabeth Goldgar (S) Jim Henry (S)
Marc De Vos (S) Laure Eve Alyssa Goldman Mark Henwick
Erik DeBill Emily Everhart (S) Jennie Goloboy Anna Hepworth
Valerie DeBill Mary Faherty Jonathan Goodman Michelle Herder (S)
Mary B Deevy Alicia Faires Nigel Goodwin John Hergenroeder (S)
Pablo Defendini Jay Faulkner Mark Goody (S) Stephan Herman
Degenhardt (S) Constance Fay Marius Gordan Hilary Hertzoff (S)
Tamara L. DeGray (S) Christina Fayz (S) Reesa Graham (S) Heather Hesse (S)
Andrew Delaney (S) Arlen Feldman William Gray Sebastian Hetman
Siobhan Dempsey (S) Yuan Feng Llew Green (S) Michael Heumann (S)
Li Deng Stuart Ferguson (S) Gregory (S) Andrew Hickey (S)
Christopher Denney Juan Fernández Martín Keith D. Gremban Doug Highsmith
Tanya DePass Ananda Ferrari Ossanai Katja Gressenbuch Reiko Hikawa
Ellen Derosa Tom Feulner Anna Grochowska Kristina Hildebrand
Denis Detraz David Fiander (S) Pat Grogan Joe Hill
Bob Devney (S) Paddy Finn Phil Gross (S) Lauren Hinkle (S)
dgold Thomas Fischer (S) Sonya Gross (S) David Hipple
Deepa Dhimar (S) Hesky Fisher (S) Congyun “Mu-Ming” Gu Alan Hoare (S)
Joe Dicker (S) Elizabeth Fitzgerald (S) Yuan Gu Andrew Hoddinott (S)
Elizabeth DiGangi Jim Fitzpatrick Stephanie Gunn (S) Rusty Hodge
Paul Dion Lorie Fleming Peter Gwynne Kathryn Hodghead (S)
Jonathan Disher (S) Claudia Fontana Santoyo Miki Habryn (S) David Hoff (S)
Woody Dismukes (S) Leora Hadas Palle Hoffstein
John Dodd Tavares Ford (S) Sarah Haddock Matthias Hofmann
Tom Dodds Maurice Forrester (S) Sammi Hadert Larisa Hohenboken (S)
Seamus Doherty Matthew Forslund (S) Linda Hafemeister (S) Erica Holcomb
Seumas Dòmhnallach Titus Fortner Mitchell Hahn-Branson Julie Holderman
Donaithnen (S) Emily Fowl (S) (S) Ashley Holmes (S)
Caitlin Donegan-Tartell Adrienne Fox Betsy Haibel (S) Bob Holt (S)
(S) Melissa Frain Anne Häkkinen Heather Holt (S)
Donna Frames Maike Hallmann Jane Holzman
Eoin Dornan Stephanie Franklin (S) Aaron Hamer Henning Hönicke (S)
Liz Dornan Claire Fraser (S) Alwyn Hamilton Rich Horton (S)
Kludge Dorsey Meredith Frazier (S) Hamlin (S) Ron Hosler (S)
Bridget Downey Alex Frederiksen Jeanne Hand-Boniakows- K Howie
Starla Doyal (S) Florrie L. Frederiksen ki (S) Anne Hueser (S)
Darragh Doyle David Freund (S) F. Harder Joseph Huey (S)
Dr X Eric Frey (S) Tav Hare Matthew Hughes
Alex Draven (S) Aaron Gable (S) Delia Harrington Jacek Hummel (S)
Houlei Duan Avani Gadani (S) Bevin Harris (S) Kathleen Hunt
Christopher Duckworth Edward Gaillard Brandon Harris (S) Kevin Hunt
14WORDS OF POWER
Ritchie Valentine Smith
In a world very different to ours is a huge and cosmopolitan
city, which trade and mutual tolerance has made rich. This city
has mortal enemies, but on its side is a young man from the
steam-powered Empire of Albion. He carries an ancient sword
engraved with two true words of power: freedom and
change. His enemy is entropy, and death itself. If his battle is
lost, the universe is lost…
A brilliant debut, set in a version of the samurai Orient as new
world powers arrive.
www.ritchievalentinesmith.com
‘Imagine a parallel world where ancient
magic and what is described as the magic of
mechanics collide… First-rate fantasy!’
British Fantasy Society
‘A wonderful story, in the spirit of Robert
Jordan’
David Wingrove, ‘Chung Kuo’
‘…dripping with fantasy-satisfying magic
(and with) a thundering good denouement’
thebookbag.co.uk
Available through Amazon as
a paperback and with Kindle
as an ebook.
Buy from
amazon.co.uk amazon.comMembership List
Nick Hutchinson (S) Quinn Kepner Robert Lee (S) Christina Manoli
Seo-hyun Hutchinson Terry Kepner Victoria Lee Jonathan Marcus (S)
MC Huybrechts Elizabeth Kerner Yeonggyeong Lee Mark
Brit Hvide Khalfan Roderick Leeuwenhart Sergey Markov
Carl Hylin Stephen Kilbride Terra LeMay J. Scott Marlatt
Saul Hymes (S) Gerald M. Kilby Paddy Lennon Aubrey Marshall
Ingmar Albizu (S) Joe Kilian Martin Lessem Maddy Marshall
Ville Inkiläinen Peter Kilkelly (S) SaraKate Lessem Philip Marshall
Fadi Ismail Liam Killings-Murphy Breandán Lesueur Allie Martinez (S)
J. A. W. Martin Killings-Murphy Eric Lesueur Beth Martyn
Becca Jackson Megan Killings-Murphy Anastasia Lewis (S) Andrew Mason (S)
Robert Jackson Jaime Kimbrel (S) Anna Lewis Paul Mason
Rhys Jacobson (S) Aubri Kinahan (S) Dave Lewis Claudia Mastroianni (S)
Adiba Jaigirdar Hayley King (S) Kari Lewis Christine Materi (S)
Linda K James Jaime King (S) Alex Li (S) Elanor Matton-Johnson
Jane (S) Robin Kirk (S) Yinghui Li (S)
Kristin Janz (S) Jasmin Kirkbride Zhan Li Brett Matzke (S)
Michael JasonSmith Keith Kissel (S) Jennifer Liang (S) D Mayo-Wells (S)
Marykate Jasper Michele Kitay Ashaya Lilien-Bailey David Mc Andrew (S)
Vatroslav Jelovica Niall Kitson Aziz Lilien-Bailey Gerry Mc Evoy
Bill Jennings (S) Alexander Kjäll Hans Lindqwist Maire McCarthy
Jesper Rugård Jensen Robert Kleiman Julie Lindsey (S) Andrew McClean
Hong Sik Jeon Mark Klein (S) Laura Lindzey (S) Daniel McColl (S)
Irina Jevlakova Jeff Klenzing Julia Linthicum (S) Patrick McCormack (S)
Ge Jing Daniel Koechlin Paul Lister Jeanette McCracken (S)
John Michael Kohne (S) Chengshu Liu Clare McDonald
Johnman Kevin Koidl Em Liu M. Luke McDonell
Michael Johns (S) Minja Kolu Hancheng Liu Suzanne McEndoo
Rose Johnston Pertti Kontio Xingjun Liu Julie McGalliard
Maria Jokela Kristen Koopman (S) Liz (S) Laura McGill (S)
Bee Jones (S) Agnes Kormendi Lottie Llewelyn-Wells Marion McGowan
Royden Jones (S) Erle Melvin Korshak Errol Lobo (S) Seanan McGuire
Sarah Jones (S) Jenny Kotora-Lynch Andrew Logan Eloise McInerney
Johan Jonsson Ivan Kranjcevic Ted Logan Jennifer McKenzie
Betsy Jorgensen (S) Naomi Kritzer Marianne Lombard (S) Stef McLaughlin (S)
Brad Justus Andrew Kuchling (S) Kin-Ming Looi Suzanne McLeod
Lawrence K U. Kuehn Marina Lostetter Dominique McMahon (S)
Manna K Brook Kuhn Christopher Lotts Robert McVay
Diane Kaczor Volkmar Kuhnle Kirsten Love (S) Lisa Meece (S)
Michael Kahn Katerina Kuneva Chard Lowden (S) Angelina Meehan
Alex Kamachi (S) Milena Kuneva Adi Loya Caroline Meeks
Samuel Karlin Nicole Kurtz Stephanie Lucas (S) Cat Meier (S)
Kasia (S) Yanni Kuznia Colm Lundberg Joris Meijer
Ilya Katsev Øyvind Kvernvold Myhre Fabrizio Luzzatti (S) Melissa (S)
Stephanie Katz Marika L (S) Michael Lyons Andrew Meneely
David Katzman (S) Lace (S) Guangzhao Lyu Daniel Meneely
Suvi Kauppila Claude Lalumière Donald Maass Katrina Mergen (S)
Ellen Kaye-Cheveldayoff N.A.S. Lamerichs Bruce MacDermott Atlin Merrick
(S) Geralyn Lance (S) Dana MacDermott Douglas Merrill (S)
Caroline Keating Jer Lance (S) Angus Macdonald (S) Sara Messenger
Kate Keehan Linda Landberg Jason Macdonald Willa Michaelsen (S)
David Keener Danielle Lane (S) Sandra Maclean Mikayla Micomonaco (S)
Jerry Kelleher Jennifer Lane (S) Derek MacLeod Amy Miller (S)
Fiona Kelly Jerry Lane Richard Magahiz (S) Eric Miller (S)
George Kelly Betsy Langmuir (S) Carolanne Mahony Heath Miller (S)
Lorelei Kelly (S) Hamish Laws (S) Tamara Malaney Justin P. Miller (S)
Michael Kemp (S) Iain Lawson Joseph Malik Laura Miller (S)
Lynda Kennard (S) David Lee (S) Greg Manchess Lydia Miller (S)
Linda Kepner Helen Lee Christopher Mangum (S) Carl Millitello
16Membership Breakdown
Country Adult Child First Infant Staff Supporter Young Grand
WorldCon Adult Total
Argentina 1 1 2
Australia 85 6 50 1 142
Austria 5 2 3 10
Belgium 20 7 5 32
Brazil 4 2 1 7
Bulgaria 2 1 1 4
Canada 152 1 18 1 68 5 245
China 26 1 4 1 32
Costa Rica 1 1
Croatia 10 1 1 1 2 15
Cyprus 1 1
Czech Republic 4 1 5
Denmark 27 4 3 34
Did Not State 159 26 27 2 80 35 329
Estonia 9 1 10
Finland 231 6 30 5 65 24 361
France 61 11 7 4 83
Georgia 3 2 5
Germany 153 1 23 22 9 208
Greece 1 1
Guernsey 2 2
17Hong Kong 1 1
Hungary 2 2
Iceland 2 2 4
Indonesia 1 1
Ireland 170 9 279 11 3 9 20 501
Israel 43 4 11 2 6 66
Italy 20 6 5 2 33
Japan 33 1 2 7 1 44
Jersey 2 2
Korea, Republic of 4 4
Latvia 1 1
Luxembourg 9 1 2 1 13
Malaysia 2 1 1 4
Malta 1 1 2 4
New Zealand 19 2 9 1 31
Nigeria 1 1
Norway 55 1 2 3 1 62
Paraguay 1 1
Poland 43 3 6 3 1 7 63
Portugal 3 4 1 8
Romania 4 3 2 9
Russia 24 24
Saudi Arabia 1 1
Senegal 1 1
Singapore 6 1 1 8
Slovenia 1 1 2
South Africa 2 2
Spain 20 11 3 3 37
Sweden 104 15 4 18 9 150
Switzerland 23 7 5 1 36
Taiwan 3 1 4
Thailand 1 1
The Netherlands 70 1 13 1 3 4 92
Trinidad & Tobago 1 1
Turkey 1 1 2
UK 1058 27 236 11 1 88 94 1515
Ukraine 6 2 8
United Arab Emirates 1 1
USA 1618 19 128 4 2 987 53 2811
Vatican City 1 1
Grand Total 4308 101 867 45 7 1460 293 7081
18Membership List
Deborah Millitello Matthias Neeracher (S) Lucy Parker Fox A. Purtill
Caroline Mills Celia Neri Eric Parmer (S) Patricia M. Purtill
Ethan Mills (S) Kyle Newman (S) Sandy Parsons Erik Quackenbush
Cole Mirza Dave Newton (S) PaulV (S) Matthew Quirk (S)
Cole Mirza Léan Ní Chuilleanáin Amanda Pavani Fernandes Colleen R (S)
Drake Misfeldt (S) Kayleigh NicGearailt Mike Paxton (S) Jay R
Curtis Mitchell (S) Lydy Nickerson (S) S Pearson (S) Marianne R. A. (S)
Tanja Mitchell Anna Nicodemus Brooks Peck Rachael (S)
Becky Moczulski Quinn Nicodemus Ellen Miriam Pedersen Coart Ramey (S)
Steven Mollmann (S) Linda Nicoll Nicoll Acacia Pepler (S) Lori Ramey (S)
Rachel Moloney Eeva Nikunen Kristina Pérez Blandine Raynaud (S)
David Monaghan Emilie Nogaro Carolyn Petersen (S) Dawna Read
Kathleen Monin (S) Ryan Noonan (S) Emil Hjörvar Petersen Kristin Rebik
Elneclare Montgomery Sandra Norman Jon Peterson April Reeve (S)
(S) David J Normoyle Alina Petrican CD Rehbinder
Marc Moorcroft Ali Nouraei Katrina Pfeifer (S) Conor Reid
Chris Moore Elizabeth Novaski (S) Matt Phelps (S) James Reid (S)
Gareth Morgan (S) Naomi Novik Diana Pho Sarah Reidy
Glyn Morgan Nuts Pooch Picucci (S) Anna Remennik (S)
Stephanie Malia Morris Chris O Hara (S) Star Picucci (S) Zandra Renwick
Oliver Morton Linda O’Brien (S) Tamora Pierce Lucille Rettino
Beth Moscato-Goodpas- Seamus O’Carey Timo Pietilä (S) Robert Reynolds (S)
ter (S) Denise O’Connell Kristin Pilotte (S) Benjamin Ricciardi
Jennifer Moser Jurling (S) Zoe O’Connell (S) Birdie Pingleton Brandon Rice
Jon Moss (S) Hugh O’Donnell Ricardo Pinto Dominic Riemenschneider
Jack Mozley Andreas Öggesjö Frank Piper (S) Alex Riina (S)
Kate Mulholland Tapio Ojala Evan Pipho (S) Julia Rios
Gugii Munh-Orgil Jonathan Olsson Bob Pisani (S) Tim Roberge (S)
Jacq Murphy K O’Mahony B. Pladek Kristen E. Hope Robilliard
Janice Murphy (S) O’Malley (S) Patti Poblete (S) Sean Robinson
Jennifer Murphy (S) David O’Neill Derek Poindexter Spider Robinson
Robin Murphy June Ong David Pomerico Merlin Roche
Siobhan Murphy Min Onouchi Alexea Portner (S) Jackie Rogoff (S)
Richard Murray Israel Oppenheimer Eric Portner (S) Eleanor Rosenthal (S)
Ethan Murtagh Sylvan Oppenheimer Aaron Pound S. Ross (S)
Ross Murtagh Hirotaka Osawa Angela Pound Mark, the Silverdragon
Lorcan Nagle Michael O’Shea David Powers Roth (S)
Michał Nagrodzki Yisroel Oshinsky (S) Rory Priest Patrick Rothfuss
Richard Nair Dana Ostrowski (S) Heather Prince (S) Julien Rousseau (S)
Ariuna Namsrai Chelsea Outlaw (S) Ceri Pritchard Hope Rudolph (S)
Jamie-Lee Nardone Fred Paffhausen (S) Frank Probst (S) Bill Ruhsam (S)
Ben Nash (S) Tasia Papadatos Sabine Puetz J. Rushing
Cynthia Naval (S) Pilar Paradelo (S) Stefanie “Banshee” Pulla Edwin Rydberg
Laura Neale Sangjoon Park Karen Purcell (S) Helen Ryder
Join US on Social Media
WWW.DUBLIN2019.COM
dublin2019 dublin2019 dublin2019worldcon
#AnIrishWorldcon
19Membership List Philippa Ryder Kate Secor Ross Smith (S) Anne Stewart (S) Karen Rylander Laura Secor (S) Suncerae Smith (S) Bill Stewart (S) Melissa Sá Arthur Seleznov Smitty J.G. Stewart Elina Saario H Severino (S) Dag-Erling Smørgrav (S) Jill Stewart (S) Richard Sacks-Wilner Margarita Sevier (S) Alicia Smyth David Stockman Vaibhav Sagar (S) Miriam Sexton (S) Jason Snell (S) Cathal Stockmann Magne Sagvolden Wendy Shaffer Anna Södling Ynte Stockmann Jatinder Sahota Anya Shanahan Jeff Soesbe (S) Theresa Storey (S) Miwa Sakuraki Adam R. Shannon Kevin Sonney Athene Storey Cosgrave Kier Salmon Shasta (S) Marie Sotiriou (S) (S) Sam John Shaw (S) Daniel Southwick (S) Luke Stras (S) Jason Sanford (S) Liz Shayne (S) Benjamin Sparrow James Stratton (S) Kevin Saunders (S) Virginia Shea (S) Sandi Spires (S) Jeremiah Stratton (S) Randy Saunders (S) Shmulik Shelach Anne Springsteen (S) Marcus Streets John Scalzi Coral Sheldon-Hess (S) Chris Stabback Mat Streets Kristine Scalzi Mike Shema (S) Jean Standard (S) Rae Streets Lawrence Schick Melissa Shumake (S) Barry Stanford (S) Alan Stuart Nora Schinnerl Danny Sichel (S) Elise Stangle (S) Katie Styrt (S) Greg Schmidt (S) Sameem Siddiqui Piotr Staniewski Vera Sun Carsten Schmitt Sigurd David Steffen (S) Sami Sundell (S) Arek Schneyer Noora Sinbel Ragen Steffen-Jennings Katie Sundsted Hans-Peter Schoeni Greg Skodacek (S) (S) Todd Sundsted Michael Scholl (S) Erik Skorpen (S) Tom Steiman-Cameron Tracy Sundsted Mick Schubert Allegra Sloman (S) Andrew Stern (S) Keith Sutton (S) Harrison Schweiloch (S) Amy Smift (S) Eleanor Stevens Marcin Świeczkowski Douglas Scothorn (S) Joseph Smith Geoff Stevens Louis Sylvester (S) Jenna Scott (S) Karen Ann Smith (S) Jason Stevens Tablesaw Tablesawsen Jill S Seal (S) Peter Smith (S) Thomas Stevens (S)
Membership List
Chuck Taggart (S) Andrew Ward Mika Yrjölä Gabriel Stenholm
Declan Taggart Katie Warren (S) E. Lily YU Lars-Erik Stenholm
Heikki Tähtinen Shirley Watkinson Matthew Yunge (S) Ruta Steponaviciute
Denis Taillandier Christopher Watson Ellen Zemlin (S) Robert Sternberg
Tímea Takács Mary Watson Marco Zennaro (S) Linnea Sternefält
Fumiki Takahashi Sam Watts Quan Zhou Nicolette Stewart
Shweta Taneja Gabrielle Wei Xian Zhou Tom Stidman (S)
Fei Tang Kathleen Weiler (S) Jen Zink Marc Stiegler
J Tang Jacob Weisman Beth Zipser (S) Chris Stimson (S)
Andrea Tatjana (S) Rina Weisman Zak Zyz Streeter (S)
Matt Taylor (S) Joseph Weiss (S) James Joseph Styles
Timothy Taylor (S) Joseph Weiss (S) Sean Shapira (S) Justus Sundqvist
Eleanor Teasdale Noam Weiss Judith Shardo Eero Suoranta
Shay Telfer Melanie Wendelin Judith Shardo Robert Surgey
Joe Thomas Penny Wenger Jeremy Sharp (S) Christopher Swenson (S)
Martyn Thomas (S) William Wentworth-Sheilds Heather Shaw Maria Szabo Gilson (S)
Thomas (S) Tim O. Weßling Joel Shepherd Catherine Taaffe
Charles Thompson (S) Wayne West (S) Peng Shepherd Steven Tagawa
Zoe Thompson Sarah R. Westvik Michiko Short Nahomi Tago
Amanda Thorn Terry Weyna (S) Craig Simms Bogi Takács (S)
Megan Thorn Peter Wheeler Lavinia Simson Matthew Takeda (S)
Adam Thorp Pram Wheels Mark Sinclair Kearstyn Takemoto (S)
Fredric Tillenius Edward Whiteside (S) Sally Sinclair Assaf Tal
E. Catherine Tobler (S) Nathaniel Whitestone (S) Suzanne Skelly Tamar
Gary Tognetti (S) Lena Wiberg Cory Skerry (S) Aurelian Tarlescu
Nino Tordia Ysabeau Wilce Rebecca Slitt Eli Tärnholm
Marita Touru Erin Wilcox Alan Smale Scott Tat (S)
Philipp Tovar Darren Wilkin (S) Karen Smale Mari Tatsumi
Lindsay Townes (S) Brian Williams (S) Brent Smart (S) Takayuki Tatsumi
Carol Townsend (S) Nick Williams Alex Smith (S) Andy Taylor (S)
Kelly Trop Sarah Williams (S) Angela Smith Michael Taylor (S)
Brian Truitt (S) Bethany Willick (S) Brooke Smith Ashley Taylor Anderson
Tamsin Try Kristyn Willson (S) Martin Smith Christine Taylor-Butler
William Tsikerdanos BD Wilson (S) Maz Smith Heidi Tebbe (S)
Anne-Marie Tuikka David Wilson (S) Michael Smith Lucas Teixeira
Sian Tukiainen Joshua Winfield Arlen Snyder (S) Yevgeny Teron
Cadwell Turnbull Maja Winnicka Robert Snyder (S) Susan Thau
Thane Tuttle (S) Cliff Winnig (S) Femi Sobowale (S) Pascal J. Thomas
Jenny Underwood (S) Chinami Wirth (S) Anne Solley Michael Thome (S)
Ville Uusivuori (S) Sam Witwer (S) Rivers Solomon Erika Thomenius (S)
Kerttu Vähänen Beth Wodzinski (S) Jaan Eerik Sõmermaa David Thurston (S)
Andy Vaipan Nasa Wofford Silvio Sosio Sarah Tolmie
Catherynne Valente Sienna Wofford Tanya Spackman (S) Franz Tomasek (S)
Douglas A. Van Belle Tammy Wofford Thomas Speck (S) John Toon (S)
Wendy Van Belle Anna Wood Glen Spratt (S) William Torkington
Remco van Straten Simon Woodworth Tia Sprengel (S) Scott Trent (S)
James Van Zandt (S) Michael Worrall (S) Michael Squires (S) Rebecca Try
Leo Vanmolkot Jan Woźnica Manoj Srivastava Robyn Try
Pablo Vazquez Helen Wright (S) Carlie St. George (S) Emery Tse (S)
Philip Venton Jeff Xilon (S) Tim Stampton (S) Chizuko Tsukamoto
Charles Vess Latssep Yang Lindsey Stanford Miles Tugman
Karen von Haam (S) Yan Yang Anna Štefánková Ilse Tuohimaa
Phoebe Wagner Jane Yannetti Cameron Steiman Sean Turner
Wendell Wagner Haijun Yao N. Aladdin Steiman-Cam- Simon Tye (S)
Olivia Waite (S) YK Yoon eron Timothy Underwood
Christopher Walker (S) Annie Yotova Annina Steinbach Evertjan van de Kaa
Annie Wallace Jeni Young Adam Steiner Anton van Esch
Pierre-Emmanuel Wang Crispin Young Wilson (S) Martin Stellinga Cobi van Hemmen
21Membership List
Jeroen van Unen Henry Wessells (S) Richard Wright
Fiona Van Verth Stu West (S) Keely Wrolstad (S)
Hélène Vannucci Tom West Michael Wysocki
Vaso (S) Aisling White C.A. Yates
Miguel Vidigal Mairi White (S) Caroline M. Yoachim (S)
Emil Volcheck (S) Marie Willaing Clarence Young (S)
Annalies Vuong (S) Jenna Willey June Young
Wren Wallis (S) Mark Willey Ross Younger
Pauline Walsh Rhett Willey Susan Yule
Sarah Walsh (S) Graeme Williams (S) Zara Zara (S)
Nikki Walters Kenesha Williams Feng Zhang
Weijian WANG Phil Williams Margaret Zimmerman
Bonnie Warford (S) Tyler Williams Terry Zimmerman
Kelly Wasson (S) Anne Wilson Michael Zipser (S)
Mike Wasson (S) Scott Wilson Jennifer Zwahr-Castro
Laura Watkins (S) E.L. Winberry
Simon Watkins Adam Wing
Andrew Watson Jeffrey Woidke (S)
Sarah Watson Susan Wolcott (S)
Ulrich Weigand Jay Wolf
Adam Weller Navah Wolfe (S)
M. Welsh Andrew Woode
2278TH WORLD SCIENCE FICTION CONVENTION
29TH JULY - 2ND AUGUST, 2020
WELLINGTON, NEW ZEALAND
M ERCEDES L ACKEY
& L ARRY D IXON
Author GOHs
G REG B ROADMORE
NZ Artist GOH
R OSE M ITCHELL
Fan GOH
G EORGE R. R. M ARTIN
ToastmasterMaps: CCD Ground Floor
Maps: CCD First Floor
Maps: CCD Second Floor
Maps: CCD Third Floor
Maps: CCD Fourth Floor
Maps: CCD Fifth Floor
Maps: Point Square
You can also read