                          Verallia Brazil has relocated its glassworks from the Água Branca
                          district of downtown São Paulo to the outskirts of Jacutinga –
                          a small town in a landscape marked by mountains. The new
                          plant’s three production lines currently manufacture around
                          one million bottles a day for the domestic beverage industry.
                          futronic supplied the controls and drives and was involved from
                          the outset. Even for a glass giant like Verallia, this was an unusually
                          large and complex project.

                      What is probably Brazil’s most modern
                    glassworks now stands where a mountain
                      crest once proudly dominated the hilly
                         landscape surrounding Jacutinga

                    64    glass machinery plants & accessories 2/2021
FUTRONIC Glass giant at the summit in Brazil
V
      erallia is one of the biggest
      container glass manufac-
      turers in the world – a
global player by any definition.
The company employs around
10,000 people and is made up of
32 glass production facilities in
11 countries throughout Europe
and Latin America. In 2019,
the Group reportedly achieved
turnover of EUR 2.6 billion. In
short, it’s a mammoth organisa-
tion, where things are constantly
on the move. There’s always
something being extended, con-
verted, replaced or modernised
somewhere at one of the numer-
ous manufacturing facilities.                                                almost five kilometres of pipe-
Verallia has specialists for this     THE REGION’S PRIDE                     lines were laid. The new Verallia
purpose – indeed whole depart-           This construction project of        works, which was inaugurated in
ments with experienced project        almost biblical proportions is doc-    July 2019, provides around 270
managers who accomplish even          umented in a video. The scenes         direct and 90 indirect jobs for
the most complex missions ably.       it depicts are more than a little      the local population.
Nevertheless, the Jacutinga pro-      reminiscent of ‘Fitzcarraldo’, the
ject turned out to be a monu-         Werner Herzog epic film from           ADVANCED TECHNOLOGY
mental task, even for Verallia.       1982, in which the protagonist         MADE IN GERMANY
                                      of the same name – played by              Verallia invested something like
MOUNTAIN MAKES WAY FOR                Klaus Kinski – dreams of build-        EUR 77 million in the new plant –
A NEW GLASS PLANT                     ing a lavish opera house in the        and in state-of-the-art technology
   Verallia Brazil has its head-      middle of the virgin Amazon rain       to match. “Our new factory com-
quarters in the São Paulo met-        forest. Fitzcarraldo, obsessed         plies with even the strictest safety
ropolitan area. For many years,       by his grand vision, forces his        and environmental regulations,”
one of this huge country’s three      indigenous crew to haul an old         Messina emphasises. Verallia sets
Verallia glassworks was locat-        steamship over a mountain.             itself high standards and the pro-
ed just a stone’s throw away in       Fortunately, there was none of         duction shop is no exception. Two
an industrial park in the city’s      this madness to be witnessed at        complete lines were transported
Água Branca district. During          the construction site in Jacutinga.    from Água Branca to Jacutinga in
the early tens of this century, it    On the contrary: Brazil’s – if         connection with the move. A new,
became clear that capacity for        not the entire South American          German-built IS machine from
production and growth would           continent’s – most modern glass-       Heye International is also installed
soon be exhausted, with no more       works was systematically charted       there. The two existing systems
local reserves available. There       out and completed in a mere            were modernised by futronic as
appeared to be no other option        26 months and Carlos Messina,          part of an extensive retrofit.
but to build a new plant. The         Verallia Jacutinga’s Project              The retrofit project was pre-
question was, where? It didn’t        Director, admits that: “we at          pared by experts at Verallia
take long to find the ideal spot      Verallia – and literally the whole     and futronic well in advance.
– on the outskirts of the small       region – are very proud of it.”        “I was invited to the first meet-
town of Jacutinga in the state of        In May 2017, an army of exca-       ing with Verallia representatives
Minas Gerais, some 200 kilo-          vators, bulldozers and trucks          in São Paulo in spring 2017,”
metres north of São Paulo. The        moved in to remove about 630           recalls sales engineer Marc
area surrounding Jacutinga is         tons of earth and create a gigan-      Meersschaut, who is responsi-
quite hilly, though, and graded       tic graded area for the new plant      ble at futronic for business with
land is a rarity. The management      to stand on. All in all, around        South America. Eduardo José
therefore decided to move half a      30,000 tons of concrete and            M. da Fonseca, the project man-
mountain in order to make space       1200 tons of steel were used.          ager at Verallia who also over-
for the new plant.                    164 kilometres of cables and           sees technologies and processes

                                                                      glass machinery plants & accessories 2/2021   65
FUTRONIC Glass giant at the summit in Brazil
RETROFIT PROJECTS
Retrofit projects

                     at all Verallia Vidros plants, was           years now. In spite of that, “The
                     similarly in on the negotiations             new plant in Jacutinga was an
                     from the start. The two of them              unusually large and complex
                     spoke to each other regularly on             project even by our standards,”
                     the phone during the months                  Meersschaut adds. “That’s the
                     that followed, discussing various            reason we’re particularly proud
                     details as well as specific safety           of the contribution we had the
                     features. Meersschaut eventually             privilege of making.”
                     took a second trip to São Paulo                 Of course, he’s also hoping to
                     to wrap up the contract. The                 get a chunk of the pie whenever
                     controls and drives for the three            more refurbishments or expan-
                     production lines were shipped                sions are planned in the future.
                     and put into operation at the                The three production lines cur-        Marc Meersschaut,
                     end of June 2019. Only days                  rently manufacture around one        futronic Sales Manager
                     later, the complete plant went               million bottles a day for beer,
                     productive.                                  wine and spirits. Yet the market
                                                                  is growing – and in Brazil, too,
                     BUILT FOR THE FUTURE                         there is a noticeable trend away
                        “A project on that kind of                from plastic packaging in favour
                     scale can only succeed if you                of glass. It goes without say-
                     bring in the best of the best to             ing that the new plant is geared
                     help you – competent partners                to this growth potential. The        FUTRONIC GMBH
                     who you can rely on absolute-                present factory buildings have
                     ly from day one,” da Fonseca                 enough space for three more lines           Tolnauer Strasse 3-4 y
                     stresses. “That’s why we went                and preliminary talks are already       D-88069 Tettnang
                                                                                                                             - German
                                                                                                                               3070
                     straight to futronic, to get the             under way with futronic, amongst           Tel.: +49-7542-5
                                                                                                                               30770
                     specialists from Lake Constance              others. Additional capacity exists        Fax: +49-7542-5
                                                                                                                                 ic.de
                                                                                                             E-mail: info@futron
                     on board.” The two partners                  as well in the outdoor areas.
                     know each other and they hold                “The Verallia plant in Jacutinga”,          www.futronic.de
                     one another in high regard – in              Meersschaut concludes, “is built
                     fact, they have done for many                for the future.”