Joint European Stakeholder Group - Tuesday 14 September 2021 Meeting 60 - National Grid ESO

 
CONTINUE READING
Joint European Stakeholder Group - Tuesday 14 September 2021 Meeting 60 - National Grid ESO
Joint European
                     Stakeholder Group

Tuesday 14 September 2021
Meeting 60
Joint European Stakeholder Group - Tuesday 14 September 2021 Meeting 60 - National Grid ESO
1. Welcome & Introductions

Garth Graham
Independent Chair
Joint European Stakeholder Group - Tuesday 14 September 2021 Meeting 60 - National Grid ESO
Agenda

     Title                                                Lead                    Time

1.   Welcome & Introductions                              Chair                   10:00 - 10:05

2.   TCA Update                            Camille Gilesnan & Osaaf Syed, NGESO   10:05 - 10:15

3.   TCA Progress                              Catherine Contiguglia, Ofgem       10:15 - 10:25

4.   CEP 6(4) update                              Joseph Henry, NGESO             10:25 - 10:35

5.   Upcoming PX consultation                     Anato Chowdhury, BEIS           10:35 - 10:45

6.   Review of Actions log                     Andrew Hemus, Tech Secretary

7.   Future Meeting Dates & Agenda Items       Andrew Hemus, Tech Secretary       10:45 - 10:50

8.   Stakeholder Representation                           Chair

9.   Any Other Business                                    All                    10:50 - 11:00
Joint European Stakeholder Group - Tuesday 14 September 2021 Meeting 60 - National Grid ESO
2. TCA Update

Camille Gilesnan & Osaaf Syed, NGESO
TCA Update – 14/09/2021

Osaaf Syed & Camille Gilsenan
Technical Procedures Required for Electricity Trading Arrangements
Priority Areas (Reminder)
Procedure              Lead                Support                           What does it look like? What does it Timeframe for entry into
                                                                             cover?                               operation
Capacity Calculation   • UK (NGESO to      •   NGESO will need support       • Current assumption is that it could look a bit like   • The day ahead technical procedure
                         lead for UK)          from interconnectors,           the CACM framework, but not necessarily.                should run in parallel with the day
                         and EU TSOs           connecting TSO, ENTSOE        • Needs to hit all the areas mentioned in the TCA         ahead LVC procedure, and enter into
                                               etc                           • Scope of this work is outlined in the TCA and TSO       operation by April 2022
                                                                               letters (Annex 2)                                     • Plan Required for other timeframes by
                                                                             • BEIS (and EC) letter requests plan for other            Nov 2021
                                                                               timeframes (i.e. Intraday and Long-Term)
Capacity Allocation    • UK (ICs to lead   •   NGESO to support              • Allocation of capacity across all timeframes          •   April 2022 for day ahead technical
and Day Ahead target     for UK) and EU                                      • The Day Ahead arrangements are the priority               procedure
                         TSOs                                                • Scope set out in TCA Annex ENER-4 and TSO             •   Other timeframes TBC
model
                                                                               letters
                                                                             • For other timescales UK/EU TSOs have been
                                                                               requested to propose timescales for the
                                                                               development of the technical procedures for the
                                                                               remaining timeframes
Cross Border           • UK (NGESO to      •   NGESO will                  • Current assumption is that this technical               •   Timeframe/high level plan to be
Balancing                lead for UK)          need support from             procedure could bridge the gap between EBGL                 developed and proposed by EU and
                         and EU TSOs           the interconnectors, connec   and the TCA – an EBGL like framework                        UK TSOs by November 2021
                                               ting TSOs, ENTSOE, wider    • The high-level principles for efficient cross border
                                               industry                      balancing products/markets
Other Procedures       • Specialised   •       NGESO, Interconnectors,  • Other aspects of the TCA                                   •   TBC
Required                 Committee to          connecting TSOs, ENTSOE,
                         provide               BM and Non BM parties
                         recommendatio         and other industry
                         ns                    participants etc
High level plan for Day Ahead Capacity Calculation Technical
Procedure
Timeframe   Day Ahead Capacity Calculation – What has been done so far            Timeframe     Day Ahead Capacity Calculation – Next Steps
July 2021   EU TSOs requested time to develop a position.                         September     Next meeting with EU TSOs will take place on Friday 17th
            UK TSO workgroup continued with weekly workgroup to                   2021          September 2021.
            progress UK position and capacity calculation optioneering.                         Bi-weekly meetings with EU TSOs on the Day Ahead Capacity
August      NGESO shared optioneering with UK and EU TSOs for                                   Calculation Technical Procedure.
2021        review.                                                               October       Industry consultation on the Day Ahead Capacity Calculation
            EU TSOs came back to the table on 27th August with a high             2021          Technical Procedure followed by submission to the Regulatory
            level update.                                                                       Authorities as per the TCA*
            UK TSOs continue to progress UK position and capacity
            calculation optioneering.                                             November      Technical Procedure, plan for other timescales and RA opinion
                                                                                  2021​         submitted to Specialised Committee for opinion*​
Early     Discussed the link between MLRVC and Capacity
September Calculation.
2021      Discussion on the approach to November 2021 deadline.                   April 2022​   Entry into operation of technical procedure*
          Raised the risk to timeline with BEIS, further work required
          to share with BEIS & Ofgem.

*These timelines have been shared with the UK TSO SteerCo on the Technical Procedures. Further work is being done in the UK to ensure all parties agree. EU
TSOs also will need to come to table and agree these timelines.
3. TCA Progress

Catherine Contiguglia, Ofgem
4. CEP 6(4) update

Joseph Henry, NGESO
Pricing Proposal under Article 6(4) for Pay as Clear
Workstream – Creating a GB Pricing Proposal which currently existing in ERL Article
30(1) and Article 30(3) of the Regulation (EC) 2017/2195
Update since last JESG:

- Webinar held to gauge industry feedback
- Bilateral being held with vocal stakeholders – looking to hold document walk through
  webinar
- Feedback being taken into consideration before final redrafting
- Aim to open consultation in October, final submission in November

Next Steps

- ESO to complete final drafting
- Consultation to open in October
- Submission to Ofgem in November
Pricing Proposal under Article 6(4) for Pay as Clear
Upcoming Milestone and timelines
Milestone                                 Provisional Date
Further development based on feedback     September 2021
Bilateral Conversations with Stakeholders w/c 13/09/2021
Second Webinar – Document                 w/c 27/09/2021
Walkthrough
EBR Article 10 Process and Consultation   Early October
Final submission to Authority             November 2021
Decision                                  2 months after submission
5. Upcoming PX consultation

Anato Chowdhury, BEIS
6. Review of Actions log

Andrew Hemus
JESG Technical Secretary
JESG Standing items
ID   Topic                                                                        Lead Party
S1   Continue to review the membership of the JESG and engage additional          JESG Chair
     industry parties where appropriate.
S2   Prepare a commentary / comparison document between the Network Code and      NGET / Ofgem /
     the existing GB arrangements at appropriate stages in the Code development   BEIS
     for each Network Code.
S3   Share any intelligence about how other member states are approaching         BEIS / Ofgem / Industry parties with European parent companies
     demonstrating compliance through information gained from other government
     departments, regulators or parent companies.
JESG Open Actions

ID     Topic                                      Lead Party Status Update

131.   GB Interconnectors Capacity Calculation    Claire    Open    The methodology is currently being finalised following the consultation.
       Methodology (NTC) Wider Policy Queries –   Huxley
       4) Better understanding on the potential   (NGESO)
       impact on BSUoS and wider impacts on the
       wholesale market.
7. Future Meeting Dates & Agenda
Items

Andrew Hemus
JESG Technical Secretary
Future JESG Meetings
     •   As always registration is required and will be opened through the JESG Weekly
         updates.
     •   Stakeholders are invited to put forward agenda items for the forthcoming JESG
         meetings:

     Date                      Proposed Agenda Items
     Tuesday 12 October
     Tuesday 9 November
8. Stakeholder Representation

All
9. AOB