MAJOR PROJECTS 2017-2021 - MINISTRY OF PUBLIC WORKS MAY 2017 - Flanders Investment & Trade
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
DIRECT PUBLIC
INVESTMENT
- Upgrade and Rehabilitation of Route 11 CH
- Optimization of Route 41 CH
- Improvement of Route E-30-F
- Upgrade of Route 7 by sections
- Canelillo Reservoir
- Pocuro Reservoir
- Cautín Reservoir
- New Hospital of Puente AltoPROJECT DATA SHEET NATIONAL ROAD DEPARTMENT
UPGRADE AND REHABILITATION ROUTE 11 CH Updated: MAY 2017
Project Information
Location Arica & Parinacota Region
Improvement of the international highway Arica Location Map
Objective to Tambo Quemado (border with Bolivia), 192
km.
Maintenance and upgrade of Route 11 CH. 127
1
Main works 2016-2019: Asphalt repair,
construction of auxiliary tracks, road safety
measures, path rectification, bridge construction
and environmental measures. 100
36
Description of 18
76
Works
2016-2019: US$ 130 million
Estimated
Investment
2020-2023:US$ 150 million
Type of
Public
Investment
Improvement of connectivity between Chile and
Bolivia and the Port of Arica.
Benefits
Reduction of risk of accidents and travel times
and improving road safety.
Current Situation Timetable
Activity Date
Section km.
Working section km. 36-60, asphalt repair, path rectification, st
36-60 and 137- End of works 1 Semester 2017
construction of auxiliary tracks, road safety measures
147
From first term 2016, works on km. 170-192, asphalt replacement, road
Section km. th
safety measures, path rectification, and environmental measures in End of works 4 Quarter 2018
170-192
Lauca National Park
In process design studies sections km 18-36; 76-100 and 100-
nd
127. Construction begins at the end of 2018. All projects consider End of works 2 Semester 2023
citizen consulting process
Source: Sub-Department of Development, Sub-Department of WorksPROJECT DATA SHEET NATIONAL ROAD DEPARTMENT
- OPTIMIZATION OF ROUTE 41 CH Updated: MAY 2017
Project Information
Location Coquimbo Region
Improvement of the international connection from Location Map
Objective Coquimbo - La Serena to Argentina (San Juan) and
the Mercosur.
Improvement works and expansion in some sections.
Description
Construction of bridges and protection structures in
of Works
an international route of 233 km in the Chilean side.
Estimated 2016-2019: US$ 34 million
Investment 2019-2024: US$ 81 million
Type of
Public
Investment
To improve connection between Chile, Argentina and
the Mercosur, and the access to the Port of
Benefits Coquimbo as well the touristic areas in La Serena
and Vicuña. Reduce the risk of accidents, reduce
travel times and improve safety on the route.
Current Situation Timetable
Activity Date
Call for tender:
Design of expansion Las Rojas- 2017
Marqueza
Design Project of section La Serena-Las Rojas ready
Design of expansion Marqueza- 2018
Puclaro bridge
New call for tender to finish section Juntas del Toro y Puente El
Camarón (km 147-162) during first term 2017
Design of expansion Works 2018
Puclaro Tunnel - Vicuña
Plans for Citizen Participation during the whole Project.
Improvement Works: La 2020
Environmental management measures should be taken even if the
Laguna- Llano Las Liebres
Project is not located in a National Park
Enlargement La Serena-Las 2019
Rojas (exprop)
Source: Sub-Department of Development, Sub-Department of WorksPROJECT DATA SHEET NATIONAL ROAD DEPARTMENT
- IMPROVEMENT OF ROUTE E-30-F Updated: MAY 2017
Project Information
Valparaíso Region, from the crossing of
Location National Highway 5 to Zapallar - Puchuncaví -
Concón.
Location Map
Improve the standard of urban and interurban
Objective
roads between Zapallar and Concón.
Route of 83 km.
The first section will have 7 m. wide and an outer
Description of berm of 2 m.
Works
In the urban section (2 km.) a roundabout is
considered together with a new bridge over the
Aconcagua river
Estimated 2016-2019: US$ 44 million
Investment 2020-2024: US$ 108 million
Type of
Public
Investment
Improvement of coastal connectivity in Northern
Valparaiso Region with a reduction of travel
Benefits
times, reduction of the risks of accidents and
improvement in safety of the route.
Current Situation Timetable
Activity Date
Call for tender:
Expropiation process and Interurban section works in progress
- Improvement of section 2017
Engineering studies for section Concón - Quintero (17 km) ready at the Concón-Cantonera Norte
end of 2017 Concón Bridge
Improvement of Route F30-E sector Cementerio Concón-Límite urbano - Upgrading works of section 2018
under progress ending july 2017 Concón-Cantonera Norte II
phase
Citizen Participation during the whole process -Expansion Cantonera Norte- 2021
Road Junction F-240
Source: Sub-Department of Development, Sub-Department of WorksPROJECT DATA SHEET NATIONAL ROAD DEPARTMENT
Updated: MAY 2017
- UPGRADE OF ROUTE 7 BY SECTIONS
Project Information Location Map
Location Los Lagos and Aysén Regions
- Improvement of connectivity in Route 7
between Coyhaique and Puerto Montt with
only 3 seatransfers
- Studies for road construction of section
Pichanco - Caleta Gonzalo and beginning of
expropiation process.
Objective
- Paving of central section in Villa Ortega
- Paving from Cerro Castillo to South Access
of Cochrane (250 km)
- Design studies road Cochrane-Puerto
Yungay (120 km)
- Length of the road: 1,075 km (Pto. Montt –
Coyhaique – Cochrane – Pto. Yungay), 475
km paved in asphalt or concrete.
Description - Construction of a paved road for average
of Works speed of 50-70km/hr.
- Sections of mountain road will be 4-6 mt.wide
to allow average speed of 40 km/hr.
Estimated US$ 1,200 million for improvement of remaining 600
Investment kms
Type of
Public
Investment
Improve connectivity of the Region, with the
reduction of travel times, risk of accidents and the
Benefits improving of road safety.
Benefits for the population, tourism and economic
activities of 16 % of the national territory.Current Situation Timetable 2016 – 2018
Activity Date
This initiative is part of the portfolio of projects of the Special Plan for
the Development of Extreme Areas (PEDZE) of the Region of Aysén.
Citizen participation plans are considered.
Northern Section, Call
for bids nd
2 sem 2016
Section Puñon – Ex
Pte. Parafina, 8 km nd
2 sem 2016
Section Pte. Cisnes –
Pichicolo, 11 km
2018 - 2019
Section Pte. El Blanco
– Pichanco, 25 km
The Project has been divided in 3 sections: Section Leptepú –
2018 - 2019
- Northern Section: Pto. Montt – Coyhaique Fiordo Largo, 11 km
- Central: Intersection R 240 CH – Intersection Route X-50, Section C. Gonzalo –
2017 - 2018
- Southern: Villa Cerro Castillo – Cochrane – Pto. Yungay. Pte. Bonito, 35 km
Section Lím. Reg – La st
1 sem 2017
Tolva, 22 km
Section Lago nd
2 sem 2017
Risopatrón, 14 km
Section Las Pulgas – nd
2 sem 2016
F. Queulat, 12 km
Sector F. Queulat – Bif.
2018 - 2019
Cisnes, 27 km
Central Section, Call
Northern Section: Puerto Montt – Coyhaique:
for bids
Not paved section: 230 km nd
2 sem 2016
Section 1 Intersection
Studies under progress: 96 km – 2018
R 240 CH – V. Ortega
Paving under progress: 65 km
Southern Section, Call
for bids:
Section V. Cerro 2017-18
Castillo – Laguna
Central Section: Intersection R 240 CH and Route X-50: Verde
Not paved section: 52 km
Studies under progress: 28 km Section 1 Acc. Murta 2017-18
– Pto. Tranquilo
Section 1 Confluence 2017-18
River Baker/Nef –
Cochrane
Southern Section: Villa Cerro Castillo – Cochrane:
Not paved section: 245 km
Studies under progress: 65 km
Basic Works under progress: 30 km
Source: Sub-Department of Development, Sub-Department of WorksNATIONAL DEPARTMENT FOR
PROJECT DATA SHEET HYDRAULIC WORKS
- CANELILLO RESERVOIR Updated: MAY 2017
Project Information Location Map
Location Province of Choapa in Coquimbo Region,
Capacity: 200 Hm3
Description Flood area 800 ha
of Works Wall height: 84 m.
Netwrk of new irrigation channels: 300 kms.
Irrigation
15.000 ha.
Area
Communes Illapel, Canela, Los Vilos
Estimated Wall of the dam
US$ 169 million
Investment
Hydroelectric
Under analysis
generation
The National Department for Hydraulic Works has
Water Rights 3
rights for 150 Hm /year. Possibilities to capture the
water near the reservoir under study
Current Situation Timetable
Activity Date
Feasibility studies Ready
Study of environmental
2017 – 2018
Feasibility studies are been executed by Empresa SMI. assessment
Design of Project and environmental studies 2017-2018 Design studies 2018 – 2019
Construction 2020 – 2024
Source: Department of Irrigation ProjectsNATIONAL DEPARTMENT FOR
PROJECT DATA SHEET HYDRAULIC WORKS
- POCURO RESERVOIR Updated: MAY 2017
Project Information Location Map
Province of los Andes, Commune of Calle Larga,
Location
Valparaíso Region
Volume of the reservoir: 100 Hm3
Dam wall height: 100 m
Description
Feeder Channel: 17 km (from Aconcagua River) and a
of Works
capacity of 20 m3/s
Main channel: 10 km
Irrigation
30.000 Has
Area
River st nd
1 and 2 sections of Aconcagua river
sections
Area of the Wall
Dam
Estimated
US$ 290 million
Investment
Hydroelectri 5 to 10 MW installed capacity
c generation
The National Department has permanent water rights
3
Water Rights for 400 Hm /year in the first section of Aconcagua river.
Current Situation Timetable
Activity Date
st
1 sem. 2017
Social and economic
1. Feasibility studies and environment assessment under progress,
State Evaluation System
ending first semester 2017
st
1 sem 2017
Council of Ministers
2. Working on a model to run in a single contract both design and
construction
Allocation of budgetary st
1 sem. 2017
resources
Expropiaton nd
2 sem. 2017
Call for bids nd
2 sem. 2017
Source: Department of Irrigation ProjectsNATIONAL DEPARTMENT FOR
PROJECT DATA SHEET HYDRAULIC WORKS
- CAUTIN RESERVOIR Updated: MAY 2017
Project Information Location Map
Location Province of Cautín, Araucanía Region
3
Capacity: 142 Hm CAUTÍN
Description of
Dam wall height: 62 m
Works
Irrigation Area 32.274 Has
Communes Victoria, Perquenco and Lautaro
Estimated
US$ 427 million
Investment
Hydroelectric
Under evaluation
generation
The National Department has permanent water
Water Rights rights for 670 Hm3/year and temporal water
3
rights for 534 Hm /year.
Current Situation Timetable
Activity Date
Feasibility studies 2017- 2018
Environmental 2019 – 2020
Prefeasibility studies ready since 2013 Assessment
Feasibility studies from 2017 2020 - 2021
Design
Construction 2022 - 2024
Source : Department of Irrigation ProjectsNATIONAL DEPARTMENT OF
PROJECT DATA SHEET ARCHITECTURE
- NEW HOSPITAL OF PUENTE ALTO Updated: MAY 2017
Project Information
Location Commune of Puente Alto, Santiago
Metropolitan Region
Set up a health infrastructure to give high
complexity coverage to 1.5 millon
Objective
inhabitants in the south of Santiago city
Description of It will have 400 beds (48 for critical
Works patients), 10 surgical pavilions
Estimated
US$ 243 million (including equipment)
Investment
Public. Ministry of Health
Type of Investment
Other Priorities It should cover: open care,
hospitalization, therapeutic procedures,
emergency telemedicine and a nursery.
Current Situation Timetable
Activity Date
Proyecto delayed nd
CCall for bids 2 semester 2017
Design studies by the Ministry of Health in progress
Source: Planning and Coordination Division
Término de obrasCONCESSIONS
- The Loa Route
- Route 5, Section Antofagasta – Iquique
- Route 5: Section Caldera - Antofagasta
- Re-tender of Route N° 5 Los Vilos – La Serena and
Conurbation
- Route 5, Section Santiago - Los Vilos
- Interconnection Santiago-Valparaíso-Viña del Mar
(Route 68) + Alternatives
- Costanera Central Highway - Section Av. La Florida –
Camilo Henríquez
- Eastern Américo Vespucio Urban Highway - Príncipe
de Gales – Grecia
- Interconnection Highway 68 with Highway 78
- Highway Santiago – San Antonio (Route 78)
- Transversal Route of O’higgins Region
- Fruit Highway, G-66
- Re-tender Route 5 - Talca – Chillán
- Re-tender Route 5 - Chillán – Collipulli
- Nahuelbuta Route
- Route Freire – Villarrica – Pucón
- Re-tender Route 5: Temuco – Rio Bueno + Access to
Valdivia
- Metropolitan Highway of Puerto Montt
- North-South Route of Chiloé
- Las Palmas Reservoir
- Los Angeles Reservoir
- Catemu Reservoir
- La Jaula Reservoir
- La Tranca and Murallas Viejas ReservoirsPROJECT DATA SHEET PUBLIC WORKS PPP
- THE LOA ROUTE Updated: MAY 2017
Project Information Location Map
Communes of Sierra Gorda and Calama in Antofagasta
Location
Region
Increase service levels and improving connectivity and
Objective
territorial integration of the Region Rutas del Loa
Revamping and expansion up to 2 lanes each side
Description
of the Route 25
of Works
Construction of the Eastern bypass to Calama
connecting Routes 21, 23, 24 and 25
Economic It considers MGI and ITC
Conditions
R
Estimated ut
US$ 293 million
Investment
as
Type of
PPP – BOT de
Investment
l
Improvement of service and standard levels of Lo
Route 25.
Benefits a
Improvement of safety conditions and shorter travel
times (1
36
K
Current Situation m. Timetable
Call for Bids ) nd
2 Quarter 2017
h
• Bidding conditions ready Receipt of Tenders 4t Quarter 2017
Contract award 1st Semester 2018
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- ROUTE 5, SECTION ANTOFAGASTA –
Updated: MAY 2017
IQUIQUE
Project Information: Location Map
Route 5 between the cities of Antofagasta and
Location
Iquique
Improvement of the standard in Route 5, Carmen
Objective
Alto and Humberstone in the junction with Route 16.
Description of Two lanes in each side.
Works Max speed 120km/h
Economic Road tolls
Conditions State subsidy 30% aprox.
Estimated
US$ 458 million
Investment
Type of
PPP - BOT
Investment
Rehabilitation and improvement of a section of
the Route 5.
Benefits Improvement of safety conditions and shorter
travel times
More secondary access roads
Current Situation Timetable
st
Call for Bids 1 Semester 2020
Private initiative nd
Receipt of Tenders 2 Semester 2020
Studies under progress
nd
Contract award 2 Semester 2021
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- ROUTE 5: SECTION CALDERA -
Updated: MAY 2017
ANTOFAGASTA
Project Information: Location Map
Route 5 between the cities of Caldera and
Location
Antofagasta
Improvement of the standard in this section of the
Objective Route 5
Description of Two lanes in each side.
Works Max speed 120km/h
Road tolls
Economic
Conditions State subsidy 30 %
Estimated
US$ 640 million
Investment
Type of
PPP – BOT -
Investment
Expansion of the 4 lanes highway from
Antofagasta to the south
Benefits Improvement of safety conditions and shorter
travel times
More secondary access roads
Current Situation Timetable
rd
Call for Bids 3 Quarter 2018
st
Studies of this private proposal under progress Receipt of Tenders 1 Quarter 2019
nd
Contract award 2 Semester 2019
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- RE-TENDER OF ROUTE N° 5 LOS VILOS – LA Updated: MAY 2017
SERENA AND CONURBATION
Project Information Location Map
Location North of Santiago from km 229 to km 474
Re- tender of the contract for Route N° 5 from Los
Objective Vilos to Coquimbo, including urban sector between
Coquimbo and La Serena
Description of 229 km 4-lanes intercity road
Works 17 km of urban highway with three lanes in
each direction
Economic
Road tolls
Conditions
Estimated
US$ 328 million
Investment
Type of
PPP – BOT
Investment
Improve urban connectivity
Increase transport capacity on the urban sector
Benefits Reduce accidents
With this section the concessioned highway
from Caldera to Pargua goes up to 1.955 km
Current Situation Timetable
Private Initiative Call for bids rd
3 Quarter 2017
Developing studies for: design, expropriations, environmental
assessment Reception of bids End of 2017
Finishing project proposal st
Preparation of bidding conditions Contract award 1 Semester 2018
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- ROUTE 5, SECTION SANTIAGO - LOS
Updated: MAY 2017
VILOS
Project Information: Location Map
Communes of Quilicura, Colina, Lampa, Til Til,
Location Llay Llay, Hijuelas, La Calera, Nogales, Zapallar,
La Ligua, Papudo and Los Vilos in Central Chile
Increase service levels and improving connectivity
Objective and territorial integration of this part of the national
territory
Improvement of the standard of the Route 5
Description of
between Santiago and Los Vilos.
Works
Economic
Road tolls - Not subsidies
Conditions
Estimated
US$ 225 million
Investment
Type of
PPP – BOT
Investment
• Standard improvement of a section of the
Route 5.
Benefits • Improvement of safety conditions and shorter
travel times
• More secondary access roads
Current Situation Timetable
Call for Bids End of 2019
rd
Evaluating necessary studies to develop this re-tender project Receipt of Tenders 3 Quarter 2020
st
Contract award 1 Quarter 2021
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- INTERCONNECTION SANTIAGO-VALPARAÍSO-
Updated: MAY 2017
VIÑA DEL MAR (ROUTE 68) + ALTERNATIVES
Project Information: Location Map
Location Provinces of Valparaíso and Santiago
Increase service levels and improving the standard
Objective
of the highway
Route 68, has 110 km. It needs a better standard
Description of
with different secondary roads, junctions and
Works
additional lanes.
Economic
Road tolls
Conditions
Estimated
US$ 600 million
Investment
Type of
PPP – BOT
Investment
Promotes regional economic growth and
Benefits territorial integration of 2 of the most important
metropolitan areas of the country and
Valparaíso seaport
Current Situation Timetable
st
Call for Bids 1 Semester 2019
Studies of demand and Social Evaluation under progress
Receipt of Tenders End of 2019
Re-tender Route 68 Santiago – Valparaíso – Viña del Mar.
nd
Contract award 2 Quarter 2020
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- COSTANERA CENTRAL HIGHWAY - SECTION
AV. LA FLORIDA – CAMILO HENRÍQUEZ Updated: MAY 2017
Project Information: Location Map
South-east side of Santiago
Location Metropolitan Area. Communes of La Florida and
Puente Alto.
Improvement of transport system, connectivity and
Objective
infrastructure standard of the city
Building a high standard underground
highway of 12 km.. 9 km is an underground
route with 3 lanes in each side and the
Description of other 3 km will have 2 lanes in each side.
Works
The project includes connections to local
roads and Américo Vespucio Sur Highway.
Road tolls
Economic
State subsidies 36 %
Conditions
Free flow tolls
Estimated
US$ 1.1 Billion
Investment
Type of
Private Initiative - PPP – BOT
Investment
Improvement of connectivity between
south-east districts and downtown
Reduction of traffic congestion
Benefits New public transport corridor
Reduction of operational costs.
Improvement of safety conditions and
shorter travel times.
Current Situation Timetable
nd
Call for bids 2 Quarter 2018
Developing of technical studies and bidding conditions
st
Citizen participation in local communities Receipt of tenders 1 Quarter 2019
th
Contract award 4 Quarter 2019
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- Eastern Américo Vespucio Urban
Updated: MAY 2017
Highway - Príncipe de Gales – Grecia
Project Information Location Map
Location Eastern side of Santiago
Complete the Americo Vespucio ring road with high
Objective
quality and service standard
Construction of two underground double tracks
with 3 lanes each side
Description of
Works Urban redeveloping in surface considering
larger green areas and more facilities for public
urban transportation.
Road tolls
Economic
Estimated 15% of state subsidy
Conditions
Free flow tolls
Estimated
US$ 786 million
Investment
Type of
PPP – BOT
Investment
Complete the Américo Vespucio ring road in
Santiago with a high service standard
Reduce accidents and traffic jams, mainly
during rush hours.
Benefits
Reduce commuting time and pollution
emissions.
Improve public transportation and connectivity
in the city.
Current Situation Timetable
Call for Bids August 2016
Finishing technical studies and bidding bases
nd
Prequalification process re-open Receipt of Tenders 2 Quarter 2017
Closing agreements and approval with authorities h
Contract award 4t Quarter 2017
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
INTERCONNECTION HIGHWAY 68 WITH HIGHWAY 78
Updated: MAY 2017
Project Information: Location Map
Western side of Santiago
Location Metropolitan Area. Communes of
Pudahuel and Maipú.
Improvement of transport system,
Objective connectivity and infrastructure standard
of Western Santiago
Construction of a 9.4 km 4-
lanes road, to reduce traffic
impact in urban zones
Internal roads, lighting and
drainage
Description of Works
Construction of different flyovers
and structures in the junctions
with Route 68 and Route 78
Internal roads and road safety
measures
Road tolls
Economic Conditions Free flow tolls
Not subsidies
Estimated Investment US$ 250 million
Type of Investment Private Initiative - PPP – BOT
Improve connectivity between
central and western areas of
Santiago
Improve connection to the main
Benefits national seaports avoiding to
cross through Santiago.
Better local urban development
Reduction of accidents, travel
times and pollution emissions
Current Situation Timetable
rd
Call for bids 3 Quarter 2017
Finishing technical studies and developing of bidding contracts Reception of bids End of 2017
st
Contract award 1 Semester 2018
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- HIGHWAY SANTIAGO – SAN ANTONIO
Updated: MAY 2017
(ROUTE 78)
Project Information: Location Map
Provinces of Santiago, Talagante, Melipilla and
Location
San Antonio.
Upgrade the standard of the route
Objective
Better service levels
Route 78 highway has 4 lanes and an extension
of 105 kms
Description of It needs a better standard with different
Works secondary roads, junctions and local roads.
Replacement of old bridges and construction of
a few new ones.
Road tolls
Economic Not subsidies
Conditions One trunk toll area in Melipilla and in some
junction roads.
Estimated
US$ 300 million
Investment
Type of
PPP – BOT
Investment
Benefits
Promotes regional economic growth and
territorial integration in medium size localities
and between Santiago and the main national
port: San Antonio
Current Situation Timetable
st
Call for Bids 1 Quarter 2020
Re-tender of Route 78 Santiago-San Antonio rd
Studies of demand and social evaluation under progress Receipt of Tenders 3 Quarter 2020
st
Contract award 1 Quarter 2021
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
TRANSVERSAL ROUTE OF O’HIGGINS REGION Updated: MAY 2017
Project Information: Location Map
Location From south-west Rancagua to the village of Alhué
Create a new connection to the port of San Antonio
Objective
from Rancagua and the commune of Alhué
Building of a new road (68 km.) including
Description of
auxiliary tracks and road safety measures.
Works
Tunnel of 6 km.
Economic Road tolls
Conditions State subsidy almost 30%
Estimated
US$ 306 million
Investment
Type of
PPP – BOT
Investment
Improve travel time between Rancagua and
San Antonio
Create a better connection to the Fruit Highway
Benefits
G-66
Complementary to the future binational tunnel
Las Leñas between Chile and Argentina
Current Situation Timetable
st
Call for Bids 1 Semester 2020
nd
First stages of a private initiative. Studies under progress Receipt of Tenders 2 Semester 2020
st
Contract award 1 Semester 2021
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- FRUIT HIGHWAY, G-66 Updated: MAY 2017
Project Information Location Map
120 km south from Santiago to the port of San
Location
Antonio
Improve connectivity for small and medium scale
producers (fruits, vegetables and wine) from
Objective
O’Higgins and Maule Regions to the port of San
Antonio
Restore and improve 138 km of the existing
road and construction of a bidirectional road to
reduce traffic impact in urban zones
Description of
Construction of a 21 km 4-lanes road
Works
Construction of different flyovers and
structures to reduce negative impact on
population
Road tolls
Economic
State subsidies 50-60 %
Conditions
Free flow tolls
Estimated
US$ 600 million
Investment
Type of
PPP – BOT
Investment
Improvement of connectivity
Reduction of transport costs for local
Benefits
producers
Reduction of accidents
Current Situation Timetable
rd
Call for Bids 3 Quarter 2017
Technical studies ready
Agreements with local authorities and citizen participation Receipt of Tenders st
1 Quarter 2018
Preparation of bidding contracts
st
Contract award 1 semester 2018
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
RE-TENDER ROUTE 5 - TALCA – CHILLÁN Updated: MAY 2017
Project Information: Location Map
Communes of Río Claro, San Rafael, Talca,
Maule, San Javier, Villa Alegre, Linares, Longaví,
Location
Retiro, Parral y Ñiquén, San Carlos, San Nicolás,
Chillán and Chillán Viejo.
Increase service levels and improving the standard
Objective
of the highway with additional works
4-lanes road and 193.3 km, It will have:
Description of New local roads
Works Junctions – bridges
Bypass sectors
Free flow toll system
Economic Road tolls
Conditions Not subsidies
Estimated
US$ 225 million
Investment
Type of
PPP – BOT
Investment
Improve connectivity between central and
southern Chile
Better local and regional economic
Benefits
development and integration
Reduction of accidents, travel times and
pollution emissions
Current Situation Timetable
st
Call for Bids 1 Quarter 2019
Studies of demand and social evaluation under progress rd
Receipt of Tenders 3 Quarter 2019
TOR of basic engineering studies in preparation.
st
Contract award 1 Quarter 2020
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- RE-TENDER ROUTE 5 - CHILLÁN –
Updated: MAY 2017
COLLIPULLI
Project Information: Location Map
Communes of Chillán, Bulnes, Cabrero, Los
Location
Ángeles, Mulchén and Collipulli in Biobío Region
Improvement of actual highway standard, including
Objective additional works and the increase of service levels
while improving user safety
Section of 160 km. in Route 5 with 2-lanes in each
side.
To include:
Description of
Works
New local roads
Junctions – bridges
Bypass sectors
Free flow toll system
Economic Road tolls
Conditions Not subsidies
Estimated
US$ 225 million
Investment
Type of
PPP – BOT
Investment
Improvement of connectivity
Reduction of transport costs for local producers
Reduction of accidents
Improve connectivity between central and
Benefits
southern Chile
Better local and regional economic
development and integration
Current Situation Timetable
st
Call for Bids 1 Semester 2019
Studies under progress Receipt of Tenders rd
3 Quarter 2019
nd
Contract award 2 Quarter 2020
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- NAHUELBUTA ROUTE Updated: MAY 2017
Project Information Location Map
Location Km 520 south of Santiago
Improve connectivity and maximize economic and
Objective social benefits in an area mainly focused on forests
and forestry
55 km road
Description of
4-lanes highway
Works
Uneven junctions
Road tolls
Economic
Estimated 41% of state subsidy
Conditions
Manual tolls
Estimated
US$ 245 million
Investment
Type of
PPP – B5OT
Investment
Connectivity improvement
Benefits Reduction of transport costs for local producers
Reduction of accidents
Current Situation Timetable
Call for Bids November 2016
nd
Bidding bases and procedures in progress Receipt of Tenders 2 Quarter 2017
Agreements with local authorities and indigenous communities
th
Contract award 4 Quarter 2017
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- ROUTE FREIRE – VILLARRICA – PUCÓN Updated: MAY 2017
Project Information: Location Map
Location Freire, Villarrica and Pucón
Improvement of Route 199 CH between Freire and
Objective
Villarrica and additional works
Construction of a road with 2-lanes in each side
Description of
High safety standard
Works
40.8 km. of auxiliary roads
Economic Road tolls
Conditions
Estimated
US$ 330 million
Investment
Type of
PPP – BOT
Investment
Connectivity improvement
Benefits Reduction of transport costs for local producers
Reduction of accidents and congestion
Current Situation Timetable
Call for Bids End of 2019
st
Private initiative under study Receipt of Tenders 1 Quarter 2020
rd
Contract award 3 Quarter 2020
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- RE-TENDER ROUTE 5: TEMUCO – RIO BUENO +
Updated: MAY 2017
ACCESS TO VALDIVIA
Location Map
Project Information:
Communes of Gorbea, Loncoche, Lanco, San José
Location de la Mariquina, Máfil, Los Lagos, Paillaco, La
Unión, Río Bueno and Valdivia
Improvement of actual highway standard, including
Objective additional works and the increase of service levels
while improving user safety and better access to
Valdivia city
Improvement of 172 km. of the 4 - lanes road
Upgrade to 2-lanes in each side to Valdivia (88
Description of km.)
Works New local roads
Junctions – bridges
Bypass sectors.
Economic - Road tolls
Conditions - Not subsidies
Estimated
US$ 250 million.
Investment
Type of
PPP – BOT
Investment
Increase of safety standard to decrease
accident rate in acess to Valdivia
Connectivity improvement
Reduction of transport costs for local producers
Benefits
Reduction of accidents and congestion
Better local and regional economic
development
Current Situation Timetable
Call for Bids End of 2017
Private initiative. Proponent R y Q Ingeniería. Time limit for th
Receipt of Tenders 4 Quarter 2018
presentation of first studies: April 2017
nd
Contract award 2 Quarter 2019
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- METROPOLITAN HIGHWAY OF PUERTO
Updated: MAY 2017
MONTT
Project Information Location Map
Location Puerto Montt - 1.000 km. south of Santiago
• Improvement of transport system, connectivity
Objective and infrastructure standard of Puerto Montt
• Improvement of connection between Puerto Varas
and El Tepual Airport
Description of 4-lanes highway in 32 km.
Works Urban highway standard
Road tolls
Economic
Estimated State subsidy; 30 %
Conditions
Free flow tolls
Estimated
US$ 321 million
Investment
Type of
Investment PPP – BOT
Improvement of connectivity between Puerto
Montt and Puerto Varas
Benefits Reduction of traffic congestion.
Reduction of operational costs.
Improvement of safety conditions.
Current Situation Timetable
Private initiative Call for Bids End of 2017
Developing of technical studies (demand, environmental
nd
assessement, business model, etc..) Receipt of Tenders 2 Quarter 2018
Defining economic conditions
nd Contract award End of 2018
Citizen participation from 2 Semester 2016
Source: CCOPPROJECT DATA SHEET PUBLIC WORKS PPP
- NORTH-SOUTH ROUTE OF CHILOÉ Updated: MAY 2017
Project Information Location Map
Location 1,100 km south of Santiago
Improve and extend the transportation system in the
Objective
island of Chiloé
Improvement of 101 km road with 2-lanes each
side
Description of Construction of auxiliary tracks, road safety
Works measures, path rectification, construction of
new bridges and maintenance of existing ones
and environmental measures.
Economic Road tolls
Conditions Not subsidies
Estimated
US$ 250 million
Investment
Type of
Private initiative – PPP BOT
Investment
Improve connectivity
Increase transport capacity on the trunk road of
the island
Benefits
Reduce accidents
Contribute to the economic development of the
island
Current Situation Timetable
rd
Call for Bids 3 Quarter 2017
Private initiative (Constructora Internacional). Developing of
nd
studies until MAY 2017 Receipt of Tenders 2 Quarter 2018
Preparation of bidding conditions st
Contract award 1 Quarter 2019
Source: CCOPNATIONAL DEP. FOR HYDRAULIC
PROJECT DATA SHEET WORKS - PUBLIC WORKS PPP
- LAS PALMAS RESERVOIR Updated: MAY 2017
Project Information: Location Map
Petorca Province, Petorca Commune
Location
3
Volume of the reservoir: 55 Hm .
Description of
Feeder channel: 58 km
Works
.
Irrigation área 2.932 Ha and 1,285 rural properties
River sections In communes of Petorca and Cabildo
Estimated VAN MM$ 35,000.
investment and TIR = 8,9 %
economic
conditions US$ 161 million – State subsidy near 100 %
Hydroelectric Not
generation
The National Department has water rights for 10
Water rights
Hm3/year, in rivulet Las Palmas.
Current Situation Timetable
Activity Date
End of design December 2016
Environment
December 2016
1. Design studies under process Assessment
rd
Call for bids 3 Quarter 2017
2. Project in the National System for Environment Assessment
Receipt of Tenders End of 2017
End of construction 2022
Source: Department of Irrigation ProjectsNATIONAL DEP. FOR HYDRAULIC
PROJECT DATA SHEET WORKS - PUBLIC WORKS PPP
- LOS ÁNGELES RESERVOIR Updated: MAY 2017
Project Information Location Map
Location Petorca Province, Commune of La Ligua.
Multipurpose reservoir with capacity of 30
Description of 3
Hm and a feeder channel of 24 km (from
Works
Alicahue River).
Irrigation Area 2,160 Ha. and 676 rural properties
Socio-economic
indicators VAN: MM$ 280
Estimated
US$ 161 million – State subsidy near 100 %
Investment
Hydroelectric
No
Generation
Water rights under study. The reservoir has
Water rights
water rights from users.
Current Situation Timetable
Activity Date
st
Design Studies 1 Semester 2017
1. Environment assessment studies under progress.
nd
Environment Assessment 2 Semester 2017
2. Complementary design studies are developing th
Call for bidding 4 Quarter 2017
3. The MOPW is analyzing PPP conditions st
Receipt of Tenders 1 Quarter 2018
Source: Department of Irrigation ProjectsNATIONAL DEP. FOR HYDRAULIC
PROJECT DATA SHEET WORKS - PUBLIC WORKS PPP
- CATEMU RESERVOIR Updated: MAY 2017
Project Information Location Map
San Felipe Province, Commune of Catemu in
Location
Valparaiso Region
3
Volume of the reservoir: 180 Hm
Description Dam wall height: 65 m
of Works Feeder Channel: 25 km (from Aconcagua River) and
3
a capacity of 20 m /s
Irrigation
33,100 Ha and 4,160 rural properties
área
nd rd th
River Lower areas of 2 , 3 and 4 sections of Aconcagua
sections River
Estimated
US$ 423 million – State subsidy near 100 %
investment
Hydroelectric 5 to 10 MW
generation
The National Department has water rights for 630
Water rights nd
Hm3/year in the 2 section of Aconcagua River. Water
rights of users equivalent to 70 % during winter.
Current Situation Timetable
Activity Date
Environment
nd
Assessment 2 Sem. 2017
Technical studies to review and complement the feasibility of the dam
are performed nd
Expropiation 2 Sem. 2017
Study of environmental assessment under progress. nd
Bidding process 2 Sem. 2017
Tender conditions in elaboration st
Receipt of Tenders 1 Sem. 2018
Source: Department of Irrigation ProjectsNATIONAL DEP. FOR HYDRAULIC
PROJECT DATA SHEET WORKS - PUBLIC WORKS PPP
Updated: MAY 2017
- LA JAULA RESERVOIR
Project Information Location Map
Location Commune El Romeral (Teno river), Maule Region SECTOR LA
JAULA
3
Description of Capacity: 160 Hm
Works Dam Wall height: 115 m
Irrigated área 53,045 Has.- Commune of Teno
CURICÓ
Estimated
US$ 384 million
Investment
Hydroelectric
20 MW (estimated)
Generation
The National Department has water rights for 320
Water rights 3
Hm in the Teno River from October to January
Current Situation Timetable
Activity Date
Feasibility Studies 2017 - 2019
Prefeasibility studies developed during 2014.
Environment
Feasibility studies to be developed by the National Department for 2019 – 2020
Assessment
Hydraulic Works 2017-2019
Design 2020 – 2021
2017 Evaluation as a potential PPP project
Construction 2022 - 2024
Source: Department of Irrigation ProjectsNATIONAL DEP FPR HYDAULIC WORKS –
PROJECT DATA SHEET PUBLIC WORKS PPP
LA TRANCA RESERVOIR Updated: MAY 2017
Project Information
Location
Limari Province, commune of Combarbalá,
Cogotí River
Multipurpose reservoir type CFRD
3
Description of Capacity: 50 Hm .
Works Dam wall height: 120 m
It includes some complementary works.
Benefits Commune of Combarbalá inhabitants
4,940 Ha of irrigation area and 432 rural
properties.
Estimated
Investment US$ 177 million and 100 % subsidy
Hydroelectric
Generation 2.4 MW
Water rights Mainly from rural users
Current situation Timetable
End of basic design nd
2 Semester 2017
Complementary design studies under progress studies
nd
Environment assessment studies developing End of EAS 2 Semester 2017
Call for bidding End of 2017
rd
Receipt of Tenders 3 Quarter 2018
Source: Department of Irrigation ProjectsNATIONAL DEP. FOR HYDRAULIC
PROJECT DATA SHEET WORKS – PUBLIC WORKS PPP
MURALLAS VIEJAS RESERVOIR Updated: MAY 2017
Project Information
Location Limarí Province, commune of
Combarbalá, Combarbalá River
Description of
Works Multipurpose reservoir type CFRD
3
Capacity: 50 Hm
Dam wall height: 107 m
It includes some complementary
works
Inhabitants and agriculture producers
of Combarbalá commune
Benefits
2,370 Ha irrigation area and 500 rural
properties
Rural drinking water programme
Estimated
US$ 118 million with 100 % subsidies
Investment
Hydroelectric
1 MW
Generation
.
Water rights Mainly from rural users
Current Situation Timetable
End of basic design nd
2 Semester 2017
Complementary design studies under progress studies
Environment assessment studies developing
nd
End of EAS 2 Semester 2017
Call for bidding nd
2 Semester 2017
st
1 Semester 2018
Receipt of Tenders
Source: Department of Irrigation Projects
La Tranca and Murallas Viejas reservoirs will be jointly tenderedBINATIONAL PROJECTS - Agua Negra Binational Tunnel
PROJECT DATA SHEET CHILE-ARGENTINA
- AGUA NEGRA BINATIONAL TUNNEL Updated: MAY 2017
Project Information Location Map
Coquimbo region in Chile and San Juan Province
Location
in Argentina
Improve integration between Chile and Argentina
Objective and extend the transportation system with Mercosur
countries
Description of Construction of a tunnel of 13.9 km in the
Works Andes Mountains at 3,600 mt of altitude
Economic Total costs according to the territorial part: 72 %
Conditions Argentina and 28 % Chile
Estimated
US$ 1.4 billion
Investment
Type of
Direct public investment financed by IABD
Investment
Improve connectivity of Chile and Mercosur
countries
Benefits
Contribute to the economic development mainly
of Coquimbo region and San Juan Province
Current Situation Timetable
Call for
October 19th, 2016
prequalification
Institutional organization of a binational entity: EBITAN nd
Call for Bids 2 Semester 2017
Prequalification in progress
st
Contract award 1 Quarter 2018
Source: MOPCONTACTS
PUBLIC DIRECT INVESTMENTS
Road Projects: Walter Bruning, Director of the National Road
Department, Morandé 59, 2º piso, Santiago, Chile, email:
walter.bruning@mop.gov.cl
Public Building Projects: Claudia Silva, Director of the National
Department of Architecture, Morandé 59, 10º piso, Santiago, Chile,
email: claudia.silva.p@mop.gov.cl
Reservoir Projects: Reinaldo Fuentealba, Director of the National
Department for Hydraulic Works, Morandé 59, 5º piso, Santiago, Chile,
email: reinaldo.fuentealba@mop.gov.cl
CONCESSIONS
Concessions Coordinator: Eduardo Abedrapo, Merced 753, Santiago,
Chile, email: eduardo.abedrapo@mop.gov.cl
INTERNATIONAL COORDINATION
International Coordinator MOP: Rigoberto García G., Morandé 59, 6º
piso, Santiago, Chile, email: rigoberto.garcia@mop.gov.clYou can also read