AUGUST 2021
MORDIALLOC
FREEWAY
We’re building the Mordialloc Freeway to connect the
Mornington Peninsula Freeway to the Dingley Bypass.
In July, we hit another massive • installed drainage under Lower
milestone, installing the last of Dandenong Road at Howard Road We’ll carry out most of these
the 252 beams that make up the • laid asphalt and completed works during the day, Monday
Freeway's six bridges. With the linemarking at the Dingley Bypass. to Friday between 7am and
bridge over Springvale Road now 7pm and on Saturdays between
built, we’re turning our focus 7am and 3.30pm. Some works
to the finishing touches for the What we’re doing may need to happen at night
to minimise impacts on traffic
Freeway and local roads over the Over the coming month, we’ll:
and utility services, but we’ll let
coming months. • start laying the final layer of you know in advance of works
asphalt on local roads outside our normal hours.
Recently, we also:
• continue installing the world’s first
• built the new lanes and traffic islands
75% recycled plastic noise walls
at the Centre Dandenong Road and
along the Freeway
Boundary Road intersection
• completed asphalting works on • finish installing barriers and
Centre Dandenong Road drainage on the Lower Dandenong
Road and Governor Road bridges
• finished pouring the concrete decks
before starting to paint them
and started installing barriers for the
bridges over Governor and Lower • continue planting a million trees Image above: Beam lift on the
Dandenong roads and plants along the Freeway. bridge over Springvale Road
SIGN UP FOR PROJECT UPDATES
roadprojects.vic.gov.au
Authorised by the Victorian Government, 1 Treasury Place, MelbourneHeather
ton Roa
d
Old D
Upcoming disruptions Dingley
Bypass
nd 1
a
e
no
ng
R
ad
o
Centre D
andenon
g Road
2
We
Ce
nt
sta
MOORABBIN re
ll
oad
Da
Roa
nd
Boundary R
en
d
on
g
Ro
ad
Construction Planning DINGLEY
VILLAGE
A bird’s eye view
impacts your journey Check out our latest video
flying over the Freeway to
We’ll use trucks, cranes, excavators,
piling rigs and other machinery to
As we turn our focus to the finishing
see what’s happening from 3 Lower D
andenon
g Road
touches for the Freeway and local
complete these works. You may a unique perspective.
roads, there may be minor traffic
experience some noise and vibration delays or detours in place while we
and be able to see machinery from SCAN BELOW TO
complete the work. This includes
time to time. We may also need to VIEW THE VIDEO
overnight road closures while we
M or
remove trees and vegetation where complete asphalting works.
it’s unavoidable. BRAESIDE
diall
Take a look at the upcoming
d
We’ll sometimes need to temporarily
ale Roa
disruptions map to see what we'll be
oc Fre
close lanes on local roads, reduce speed White S
doing between now and October. We'll treet
limits, move safety barriers and detour
be in touch with more details closer
pedestrian paths affected by our works.
Springv
eway
to the works. Please allow extra time
for your journey.
We’ll do our best to minimise our If our works are affected by weather,
construction impacts and will we'll reschedule them to take place at
Governo 4
continue to monitor noise and similar times to minimise disruption Image above: Installing the r Road
vibration levels during the works. to the community. 75% recycled plastic noise walls
Well ay
Parkwen
MAP LEGEND UPCOMING DISRUPTIONS s Roa
Bow
d WATERWAYS
New freeway Dingley Bypass closed Centre Dandenong Road
1 overnight for up to 2 nights 2 closed overnight for up to
New freeway ramp in early October. 2 nights in early October.
ASPENDALE
Lower Dandenong Road Governor Road closed GARDENS
New walking and cycling path
3 closed overnight for 4 overnight for up to 10 nights ASPENDALE 5
Existing walking and cycling path up to 12 nights in late in early September and
September. Detours via 2 nights in early October.
Mo
New traffic light Centre Dandenong Road Detours via Springvale Road
rni
d
and Governor Road, and Lower Dandenong Road. oa
ngt
leR
New bridge va
on P
Springvale Road closed Mornington Peninsula Freeway
5 overnight between 8pm and 6 closed overnight for up to
Sp
rin
g
We
6
enin
Pedestrian underpass 6am Friday 3 September 4 nights in early October.
lls
EDITHVALE
sula
and Saturday 4 September.
Roa
The road will also be closed
Fwy
d
overnight for up to 12 nights in
late September/early October. Not to scale
Promenad e
ha mes
TSafety is our
key priority Keeping you informed
The Mordialloc Freeway project To help keep you up to date on our SMS service
has been designated a critical state works, we’ve developed an online
infrastructure project under the latest interactive map to provide timely You can now receive text messages
restrictions. Work is continuing safety information about our current and about changes to traffic, access to
with strict COVIDSafe plans in place planned works and disruptions. homes and businesses and other
and we’ll continue to comply with all vital project information.
directions from the Chief Health Officer. With works continuing, we encourage
you to view the interactive map at To sign up, text Mordi to
We are managing the number of staff roadprojects.vic.gov.au/mordi-works 0499 073 073, or visit our website.
attending our worksites, as well as
implementing preventative measures You can also subscribe to receive
to ensure community safety. email updates at roadprojects.vic.
gov.au/contact/email-sms-updates
Safety measures across the site
include temperature screening, Thank you for your understanding while
additional protective equipment we complete these important works.
including masks, daily health
screening of workers, enhanced
cleaning, staggered shifts and break
times, and physical distancing. Image above: Beam lifts in
progress over Springvale Road
For more information about
coronavirus (COVID-19) visit Image right: View of the beams from
coronavirus.vic.gov.au. the top of the bridge
Contact us
contact@roadprojects.vic.gov.au Follow us on social media Please contact us if you would like this
1800 105 105 @roadprojectsvic information in an accessible format
ajor Road Projects Victoria
M For languages other than English, If you need assistance because of a hearing or
2923
1060
GPO Box 4509, Melbourne VIC 3001 please call 9209 0147 speech impairment, please visit relayservice.gov.auYou can also read