"New Nets Project : What is the situation and what are we looking towards in terms of issues for deployment" - Dr Yacouba Savadogo - Vector ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
“New Nets Project : What is the situation
and what are we looking towards in terms
of issues for deployment”
Dr Yacouba Savadogo
1Malaria situation in Burkina Faso
Trend of malaria incidence from 2012 to 2017 ( per
1000)
700
607
Cumulative Incidence (0/00)
600
514
500 463 451
415 413
400
300
200
100
-
An 2012 An 2013 An 2014 An 2015 An 2016 An 2017
YearsINSECTICIDES RESISTANCE IN BURKINA FASO
Résistance aux pyréthrinoïdes (perméthrine et deltaméthrine ) au Burkina Faso (Dabiré et al,
2012)RESISTANCE AUX INSECTICIDES AU BURKINA FASO
Résistance aux carbamates (bendiocarb, carbosulfan) et aux organophosphorés (Fenithrotion et
Chlorpyriphos-methyl) au Burkina Faso (Dabiré et al, 2012)Spatial distribution of insecticide
resistance (PY)
• Irmapper 21/01/2019Unitaid New Net Project
(2018-2022)Problem Statement Decreasing efficacy of pyrethroid insecticides threatens global gains in malaria control Project Goal Establishment of a sustainable market for a broader set of LLIN tools, which perform in areas of pyrethroid resistance
Project Outputs # Output Partner 1 RCTs to generate evidence to support VCAG LSTMH review. 2 Technical Assistance to ensure effective AMP/PSI implementation of pilots and learning on operational aspects. 3 Evidence of effectiveness and cost-effectiveness PATH generated during pilots. 4 Co-payment and other levers to enable pilots, IVCC stimulate market and reduce price. (Project Lead)
2019 LLIN CAMPAIGN ❑LLIN Campaign in 2019 with support of GF & PMI; ❑ Multiproducts Campaign : Standards Net (mono treated net), PBO Net & Interceptor G2 Net
TYPES OF LLINs IN 2019 CAMPAIGN
TYPES OF LLIN QUANTITY
STANDARDS Nets 9 341 339
1 299 245
PBO Nets
1 533 618
INTERCEPTOR G2
TOTAL 12 174 202
10PROCHAINES
REPARTITION OF TYPES ETAPES
OF MILD IN 2019
ACTIVITES DATES LIEUX
Relecture des documents de macroplanification Déc 2018 et janv PNLP
de la campagne avec l’ assistance technique de 2019
l’AMP)
Atelier de formation d’un pool de facilitateurs Ouagadougou
sur la micro planification
Tenue de la 1ère réunion du CMO 03 décembre PNLP
Appui aux DS pour l’élaboration des microplans Janvier 209
Suivi de la livraison des MILDA dans les DS À partir de janv
2019
4CHALLENGES
• Reprogramming of the campaign ( distribution in two
time) : Ordinaire & PBO in MAY AND IG2 in August
• Review and update of macroplanification documents;
• Additional ressource requirements for
microplanification, logistic, communication, and
monitoring;
• Technical Assistance (AMP, PMI)
12CHALLENGES
• Respect of the chronogramme;
• Quality of household census;
• Development of communication plan taking account
the repartition of type of LLIN
• Managing rumors at all level
• Storage areas for New Generation LLIN
• Transportation and distribution of LLIN in insecure
areas
13Impact evaluation: IG2 vs STANDARD
❖ Epidemiology
❖Entomology
• compare trends in
• Longitunal study – malaria incidence
– Vector density rates passively
reported CASE
– EIR – malaria
– Resistance level prevalence in
– Vector behaviour children under five
years of.
❖ Anthropology
– Gathering evidence on LLIN uptake and
usage
– time at risk of mosquito blood feeding
and human activities not taking place
under protection of an LLINOUTLOOK
• Micro-planning workshop
• Technical assistance (BCC & Logistic);
• Committee meeting;
• Household census in one time;
• Distribution in two times
• Evaluation is only done in IG2 zone no PBO net
1546
You can also read