CONTENTS

1   COMPANY BACKGROUND

2   ORGANISATION CHART AND CVS

    PHARMACEUTICAL FIT OUT &
3   CONSTRUCTION EXPERIENCE

4   CASE STUDIES

5   HSEQ

6   FINANCIALS

7   REFERENCES

    Understanding Construc�on
Pharmaceu cal Fit Out & Construc on Experience - ADCO ...
1   COMPANY
    BACKGROUND

    Understanding Construc�on
Pharmaceu cal Fit Out & Construc on Experience - ADCO ...
Company Background
The success of ADCO is built on relationships with clients and professionals that span years.

ADCO is a business that grows with challenges. Since its inception in the economic recession of 2009 it has built
success by delivering what it promises. The strength of the ADCO teams comprise a proven track record in clean
room installation, fit out works and general contracting, with specialisation in the pharmaceutical sector.

Understanding Construc�on

   Mission Statement
   ADCO was founded in 2009 to deliver construction management services with transparency,
   consistency and respect for the professional teams and clients with whom we collaborate.

                                                                                                         ADCO Contracting | Pharmaceu�cal Capability Document   1
Pharmaceu cal Fit Out & Construc on Experience - ADCO ...
Team ADCO                                                        Mick Foran
                                                                             CEO

       When we look after our people,
       our people look after our clients.
                                                                       Gisela Ba�sta
                                                                      PMO Project Manager

  Accounts              Es�ma�ng                                         Opera�on                                  Commercial                                       Environment,
 Department             Department                                      Department                                 Department                                      Health & Safety

Rita Jasai�ene          Brian Nolan            Mairead Lu�rell          Joe Doorley           Sean Quinn          Michael Pender               Keith Kavanagh                   Stephen Baxter
   Accounts         Estimating & Procurement   PM Pharma Division      Contracts Manager     Contract Manager      Quantity Surveyor          Health & Safety Manager                 EHS Advisor

                       Brian Gubbins           Francis Kavanagh       Anthony Donnelly        Pat Gorman            Sergio Faria                 Peter Sharpe                        Cliff Dillon
                           Estimating             Site Manager          Project Manager       Project Manager      Quantity Surveyor           Environmental Manager                 EHS Advisor

                      Steven Howard              Pat Browne           Ronan Geoghan          Nicanor Sula         Itallo Nebenzahl            Temitope Malaolu
                       Quantity Surveyor       Construction Manager     Project Engineer       Site Manager        Quantity Surveyor           Health & Safety Officer

                         Anita Joyce            Ken O’ Keefe             Bill Marks         Diarmaid Long                                          Nivi Raani
                           Purchasing             Site Engineer          Site Manager          Site Manager                                         EHS Advisor

                                                Mar�n Molloy          Mick Kennedy            Ciara Nolan                                       Mayela Rivero
                                                   Site Manager         Project Manager     Document Controller                                    EHS Assistant

Understanding Construc�on
                                                                                                                                  ADCO Contracting | Pharmaceu�cal Capability Document              2
Pharmaceu cal Fit Out & Construc on Experience - ADCO ...
2   ORGANISATION
    CHART AND CVS

    Understanding Construc�on
Pharmaceu cal Fit Out & Construc on Experience - ADCO ...
Relevant Experience
                             Mairead leads the Pharmaceutical Division at ADCO Contracting. With
                             over 10 years experience in Ireland and internationally in pharmaceutical
                             environments, Mairead has managed projects for clients such as MSD,
                             Alexion, Pfizer, Allergan and Amgen. Mairead’s project work has included
                             new builds, design & build, fit-out, refurbishment, cleanrooms and
                             shutdowns. Mairead is responsible for the full remit of ADCO’s pharma
                             division including contract negotiation, cost & waste minimisation, client
Mairead Lu�rell              management, stakeholder engagement and resource management.
Pharma Division Manager

Qualifica�ons                Key Skills
                             • Overall management of the day-to-day operations on site.
• MEngSc Civil Engineering
  with Business              • Manage morning staff meetings – delegating responsibilities through
• IOSH Managing Safely in      the General Foreman & team Leaders within the crews.
  Construction - CIF 2016    • Micro-Management of ongoing projects particularly with all works received
• Project Management           from Merck Scharp and Dohme from receipt of works to completion.
  Strategies - CIF 2018      • On-site inspections completed with the General Foreman.
                             • Overall responsibility to ensure quality of product, health
                               & safety requirements & efficiency in work.
                             • Review scheduling & status of all works being completed.

 MSD
 Swords, Co. Dublin
 €14m

 MSD
 Clonmel, Co. Dublin
 €6m

 BMS
 Cruiserath, Co. Dublin
 2019 - Current
Pharmaceu cal Fit Out & Construc on Experience - ADCO ...
Relevant Experience
                               Keith has worked in the Construction Industry for more than 20 years, moving into
                               Health & Safety 3 years ago in Biomass, PetroChem and Pharmaceutical Projects.
                               As EHS Advisor on projects Keith has worked on large complex projects, giving
                               him the extensive knowledge and skills to deal with a range of building aspects.

Keith Kavanagh
Site EHS Advisor

Qualifica�ons                  Key Skills
                               • Project Supervisor Construction Stage
• NEBOSH International
  Certificate in Health &      • Overall management of the day-to-day site safety.
  Safety and Site Management   • Managing site safety documentation.
• CIF/IOSH Managing            • Managing ADCO staff safety documentation.
  Safety in Construction
                               • On-site inspections completed with the General Foreman.
• Project Supervisor
  Construction Stage (PSCS)    • Overall responsibility to ensure quality of product, health & safety
                                 requirements & efficiency in work practices are maintained & enhanced.
                               • Reviewing site safety daily.

 MSD
 Swords, Co. Dublin
 €14m

 MSD
 Clonmel, Co. Dublin
 €6m

ADCO’s Experience

 €22m Projected                 207 Projects                             194 Years Combined
 2020 Turnover                  Delivered on Time                        Experience
Pharmaceu cal Fit Out & Construc on Experience - ADCO ...
Relevant Experience
                           Joe has more than 20 years under his belt nationally and internationally, having
                           taken his trade to the US, Canada and the Middle East. Acquiring a wealth of
                           knowledge very rapidly, Joe began his career as an Engineer and swiftly moved
                           from Project Manager to Contracts Manager. Joe has been responsible for the
                           safe and successful execution of a wide variety of construction projects including
                           industrial, commercial, pharmaceutical and fit out facilities.

Joe Doorley
Contracts Manager

Qualifica�ons              Key Skills
                           • Ensuring Project Delivery
• BSc Production and
  Design Management        • Quality of project, Health & Safety requirements &
• Dip. Civil Engineering     efficiency in all projects are maintained & enhanced.
• Incorporate Member       • Establish and maintain working relationships.
  of the Chartered
                           • Effective communication throughout all parties.
  Institute of Building
• Certificate in Project
  Management, DIT.

 MSD
 Swords, Co. Dublin
 €14m

 Staycity Aparthotel
 Co. Dublin
 €7m

 Glanbia Plc,
 Kilkenny
 €1m
Pharmaceu cal Fit Out & Construc on Experience - ADCO ...
Relevant Experience
                               An experienced Project Manager and Chartered Engineer with an
                               Honours Degree in Civil, Structural and Environmental Engineering
                               from Trinity College and a Diploma of Project Management from
                               The Australian Institute of Management, Sean has recently joined
                               ADCO to oversee newbuild, pharmaceutical and fitout projects.

Sean Quinn
Contract Manager

Qualifica�ons                  Key Skills
                               • Project Supervisor Construction Stage
• BEng Civil, Structural and
  Environmental Engineering    • Overall management of the day-to-day site safety.
• HDIP Project Management      • Managing site safety documentation.
• IOSH Managing Safely in      • Managing ADCO staff safety documentation.
  Construction, CIF 2016
                               • On-site inspections completed with the General Foreman.
                               • Overall responsibility to ensure quality of product, health & safety
                                 requirements & efficiency in work practices are maintained & enhanced.
                               • Reviewing site safety daily.

 MSD
 Clonmel, Co. Dublin
 €6m

 BMS
 Cruiserath, Co. Dublin
 2019 - Current

ADCO’s Experience

 €22m Projected                 207 Projects                             194 Years Combined
 2020 Turnover                  Delivered on Time                        Experience
Relevant Experience
                                Anthony has worked in the Construction Industry for more than 8 years
                                from Project Designer Client Side to Project Manager on the Contractor side.
                                As Project Manager Anthony has worked on large complex developments,
                                multi-storey financial and commercial projects, giving him the extensive
                                knowledge and skills to deal with a range of building aspects associated
                                with cost analysis & final accounts. Anthony has an excellent track record in
                                the delivery of quality projects in accordance with BCAR and Specifications.
                                He has very strong communication skills and is very experienced in the
Anthony Donnelly                design & build model of construction from some key projects he managed
Project Manager/QS              giving him great knowledge of specification document’s & pricing.

Qualifica�ons                   Key Skills
                                • Overall management of the day-to-day operations on site.
• BSc. Building Surveying DIT
                                • Manage morning staff meetings – delegating responsibilities
• IOSH Managing Safely in
  Construction - CIF 2017         through the General Foreman & team Leaders within the crews.
• Safe Pass                     • Assist in specifying the pricing document &
• First Aid                       cost control frame work document.
                                • Budget control & manage all commercial & purchasing elements for
                                  all jobs being undertaken on-site & tracking RFI’s & Variations.
                                • Overall responsibility to ensure quality of product, health & safety
                                  requirements & efficiency in work practices are maintained & enhanced.

 MSD
 Swords, Dublin
 €14m

 Biotek
 Swords, Dublin

 Permanent TSB
 Grafton Street, Dublin
 €1m
Relevant Experience
                             Pat is a professional, highly qualified Construction Manager with
                             over 25 years experience of working within the civil engineering
                             and building sectors, across International markets including Ireland,
                             Australia and the United Kingdom. Excellent organisational and team
                             working skills. Proven track record of safe delivery of projects.

Pat Browne
Construction Manager

Qualifica�ons                Key Skills
                             • Overall management of the day-to-day operations on site
• BSc Construction
  Management                 • Manage morning staff meetings – delegating responsibilities
• Sustainable Construction     through the General Foreman & team Leaders within the crews.
  and Development - CIOB     • Micro-Management of ongoing projects
• Managing Safely
                             • Assist the JV Team in specifying the pricing document
  for Construction
                               & cost control frame work document
  Managers - IOSH
                             • Budget control & manage all commercial & purchasing elements for
• Post Graduate Diploma
  Environmental Management     all jobs being undertaken on-site & tracking RFI’s & Variations

 MSD
 Clonmel, Co. Dublin
 €6m

 Eli Lilly Pharma IE2B
 Kinsale, Cork
 2020

 Brexit Customs Facility
 Rosslare, Wexford
 Nov. 2017 - Feb.2019
Relevant Experience
                             Professional, highly qualified Civil engineer with over
                             10 years’ experience of working within main and sub-
                             contractors leading and implementing self-perform
                             infrastructure projects in Ireland, UK and Middle East.

Diarmuid Long
Site Manager

Qualifica�ons                Key Skills
                             • Managing multiple sites, while providing oversight and
• BEng Civil Engineering
                               guidance throughout to sections and site engineers.
• CSCS Card
• Site Supervisor Course     • Producing programmes, method statements, risk
• First Aid at Work Course     assessments, ITPs and toolbox talks.
• Agricultural Green Cert    • Procurement of materials, machinery and formwork.
                             • Liaising with clients and stakeholders
                             • Managing a self-perform workforce, machinery, logistics etc.

 MSD
 Clonmel, Co. Dublin
 €6m

 Bank Sta�on
 Capacity Upgrade
 London, UK
 2018-2020

 Riyadh Metro
 Egress Shaffs and Adits
 Riyadh, Saudi Arabia
 2015-2018
Relevant Experience
                                Francis has worked in the Construction Industry for more than 8 years from Site
                                Engineer to Site Manager. As Site Manager on projects Francis has worked on
                                large complex developments, multi-storey pharmaceutical, food and commercial
                                projects, giving him the extensive knowledge and skills to deal with a range of
                                building aspects. Francis has worked with Merck Sharp and Dhome since 2014.

Francis Kavanagh
Site Supervisor

Qualifica�ons                   Key Skills
                                • Comply with company management, quality, and environmental systems.
• Master Carpenter
                                • Create and monitor work schedules for subcontractors
• Manual Handling
                                  and directly employed labour.
• Scaffolding CSCS Supervisor
• CIF First Aid                 • Manage short term programs and monitor progress on
• Safepass                        site to ensure delivery of completed project.
                                • Ensure that all machinery and tools are available to the crew
                                  and everything is in proper order and state of repair.
                                • Ensure that all materials, supplies, tools and equipment
                                  are procured in a time efficient manner.

 MSD
 Swords, Co. Dublin
 €14m

 Helsinn Birex
 Co. Dublin
 €700k

 Allergan
 Co. Dublin
 €500k
Relevant Experience
                                Ronan has mastered quality control through his experience as a cabinet maker and
                                is now successfully bringing his expertise to large scale construction projects such
                                as Staycity Aparthotel, Allure and Oasis of the Seas and 190 Strand apartments
                                London. As the quality control lead on-site Ronan will be involved in every aspect
                                of the job, ensuring the only the highest quality delivery of every milestone.

Ronan Geoghegan
Quality Control

Qualifica�ons                   Key Skills
                                • Attending site meetings with the design team, discussing design issues,
• BSc Furniture Design
                                  problems on site, progress on the job, BCAR material submission.
  and Manufacture
• CIF Project Management        • Managing all the sub-contractors.
  Strategies                    • Keeping track of day worksheets of sub-contractors and the variations onsite.
• National Skills All-Ireland
                                • Organising labour for the site when needed.
  Cabinet Making Winner
                                • Overall responsibility to ensure quality of product, health & safety
                                  requirements & efficiency in work practices are maintained & enhanced.

 MSD
 Clonmel, Co. Dublin
 €6m

 BMS
 Cruiserath, Co. Dublin
 2019 - Current

 Staycity Aparthotel
 Dublin
 €7m
3   PHARMACEUTICAL FIT
    OUT AND CONSTRUCTION
    EXPERIENCE

    Understanding Construc�on
PHARMACEUTICAL FIT OUT AND CONSTRUCTION EXPERIENCE MATRIX
                                                                                                                                                              Epoxy/
                                                                                 Scheduled                 Modular                                                        Full CSA Scope
                                                                                             Pressurised                 Stainless   HH-P        Specialist   Resin/                        External   Internal/
                                        Clean Build                              Shutdown/                 Stainless                                                      - substructure,
                                                      Secondary       Live                   Temporary                   Steel       Twin Wall   Vendor       Vinyl/CRC                     Civils -   External Civils
                 Biotech   API   ATEX   & Gowning
                                                      Manufacturing   Facility
                                                                                 Out of
                                                                                             Protection
                                                                                                           Steel &
                                                                                                                         Process     Process     Equipment    Flooring/
                                                                                                                                                                          superstructure,
                                                                                                                                                                                            Roads/     - RC Concrete
                                        Protocols                                Hours                     Mild Steel                                                     internal
                                                                                             Bubbles                     Pipework    Pipework    Install      Coating                       Carparks   Bunds/Tanks
                                                                                 Works                     Fabrication                                                    finishes
                                                                                                                                                              Systems

MSD Ballydine,
Clonmel                     •     •         •                            •           •           •                                       •                        •             •               •            •
2020-2021
MSD Swords
                            •     •         •              •             •           •           •             •                                     •            •             •               •            •
2010-2017
MSD Biotech
Project             •                       •                            •           •           •             •                                                  •             •               •
2018 – 2021
Takeda
                    •       •               •                            •           •                                       •                                    •
Grangecastle
Allergan                                                   •             •           •           •             •                                     •            •             •               •            •
Helsinn Birex                                              •             •           •           •             •                                                  •             •               •            •

IPSEN                       •                                            •                                                                                                                      •            •

Alexion 2020        •                                                    •           •           •                                                                              •               •            •

Amgen               •                       •                            •           •           •             •                                                  •             •                            •
Astellas 2020                     •                                      •           •                         •             •           •                        •                                          •

BMS 2021            •                       •                            •           •           •             •                                     •            •                             •            •

SK Biotek 2021      •             •                                      •           •                                                                                          •

Clearstream                                                •             •           •           •             •             •                                    •             •

Leo Labs                          •         •                            •           •           •                                                   •            •             •               •            •

Covidien                                                                 •           •                                                                            •             •               •            •

MSD Carlow          •                                                    •                                                                                                                      •            •

                                                                                                                                                     ADCO Contracting | Pharmaceu�cal Capability Document                14
NEW BUILD EXPERIENCE MATRIX

                              ADCO Contracting | Pharmaceu�cal Capability Document   15
4   CASE
    STUDIES

    Understanding Construc�on
Our History with MSD
          ADCO has been delivering successful projects
          in partnership with MSD since 1996.

Phase 1: Ballydine, Clonmel, 1996–2000
Our knowledge and experience of MSD and the Ballydine site started
in 1996 when our CEO, Michael Foran, worked directly on the BCEP
expansion project alongside MSD staff including Charlie Carleton, Tom
Leacy, Michael Leonard of Prochem and Ger Bythell of ARUP. ADCO
Contracting also completed a civil work project onsite at MSD Ballydine
for Con Sheehan and Donal Murphy of Jacobs back in 2014.

Phase 2: Swords, Co. Dublin, 2014-2017
Working in partnership with PM Group, ADCO Contracting provided framework
agreement construction and contracting services based out of the Swords facility
in Co. Dublin. The majority of our team have been based out of Swords at one
time or another. Over the years our work has included both external and internal
works. Internal works including cleanroom upgrade with extensive and meticulous
planning, shutdown and upgrade works without minimising production. ADCO
Contracting also completed external works including car parks, drainage works,
maintenance to water mains and the installation of petrol interceptors.

                                                                                   ADCO Contracting | Pharmaceu�cal Capability Document   17
Decontamina�on Works, 2016                                         Value: €1m

 The MSD Swords plant ceased production of API product in 2016
 and the plant needed to be decontaminated and made safe as MSD
 intended to sell the site. PM Group appointed ADCO to assist with full
 decontamination scope of HVAC system and cleanroom suites. Much
 of this work was completed by our teams while wearing versa flow suits
 to protect them from risk of exposure to residual API product.

 Project: Clean to Shell Project, 2017                               Value: €2m

 MSD decided to opt out of selling the facility and instead repurpose
 and expand it into a new production facility to produce a new
 immunotherapy cancer drug Keytruda. ADCO completed the full clean
 to shell scope including all asset identification & destruction. ADCO
 managed all waste management for this project: removal of over 126k
 Tons of demolition and construction waste, 184 Tons of Hazardous
 material & achieved rebates on 1,873 Tons of recyclable metals.

Phase 3: Swords, Co. Dublin, 2018–2020                              Value: €12m

MSD expands with the development of a multi-billion euro facility at Swords.
In partnership with PM Group & Jacobs Joint Venture, ADCO Contracting
completed the internal finishes scope for the Central Utilities Building, MS&T
Labs & Bulk Drug Substance Building. The project reached over 4,000,000
million man-hours onsite with zero LTIs. This is the largest facility of it’s
constructed in such a short time frame with an exemplary safety record.

                                                                                  ADCO Contracting | Pharmaceu�cal Capability Document   18
MSD, Ballydine
B-Con/POD building CSA
and Contractors’ Compound
(currently on-site)
Project Value          €6m
Project Manager        PM Group
Designer               PM Group

Scope                                    Challenges
ADCO was contracted to manage            1. Working within the constraints of a live pharmaceutical facility. Access is very
the civil and structural elements of a      tightly controlled and is more rigourous in the context of COVID 19 SOP.
new build extension to the existing      2. Exisiting live services - underground cabling, power, data, chemical process
facility in Ballydine and to construct      drainage management. Preplanned methodologies and strict coordination with
a contractors’ compound to facilitate       other contractors onsite and compliance with strict permiting regime.
expansion of the plant in the coming     3. Sensitive tributary of River Suir - sedimentation plans to mitigate runoff from earthworks.
years. The project comprises 2           4. PIMS infomation sharing platform - Common Data Environment
separate scopes of work in parallel.        - design approvals, technical submittals.
                                         5. Very tight programme in the context of harsh weather conditions and high water table.
                                                                                                 ADCO Contracting | Pharmaceu�cal Capability Document   19
MSD, Ballydine
B-Con/POD building CSA
and Contractors’ Compound
(currently on-site)
 Main Contract
 • Pile Caps
 • Precast Ground Beams
 • Hardcore, Insulation
   and Radon Barrier
 • Process Drainage - Pressurised
   Double Contained HDPE System
 • Storm Drainage including
   Attenuation Tank
 • Foul Drainage
 • Fire Drain
 • Ducting
 • Concrete Floor Pours -
   ‘Superflat’ Finish
 • Footpaths, Roads and Landscaping

 Contractors’ Compound
 • Tree & Vegetation Removal
 • Topsoil Strip
 • Cut and Fill
 • Hardcore and Road Build Up
 • Road Surfacing
 • Line Marking
 • Fencing
 • Building Foundations
 • Drainage and Services
 • Traffic Management and
   Live Road tie-in
                                      ADCO Contracting | Pharmaceu�cal Capability Document   20
MSD, Swords,
Co. Dublin
Project Value     €14m
Project Dura�on   104 weeks
Architect         Jacobs & PM Group
QS Consultant     Jacobs & PM Group
                  external - Linesight
Eng. Consultant   Jacobs & PM Group
M&E Consultant    Jacobs & PM Group

                                         Scope
                                         MSD expands with the development of a multi-billion euro facility at Swords. In partnership
                                         with PM Group & Jacobs Joint Venture, ADCO Contracting completed the internal finishes
                                         scope for the Central Utilities Building, MS&T Labs & Bulk Drug Substance Building. The
                                         project reached over 4,000,000 million man-hours onsite with zero LTIs. This is the largest
                                         facility of it’s constructed in such a short time frame with an exemplary safety record.

                                                                                                ADCO Contracting | Pharmaceu�cal Capability Document   21
BMS, Co. Dublin
Project Value      €600k
Project Dura�on    16 weeks
Designers          DPS & Jacobs

Innova�ons                          Scope
ADCO re-sequenced the civil works   ADCO were awarded 2 recent contracts at BMS. One of the significant plant upgrades
to accommodate CRC coating of       involves the implementation of a new Captured Process Waste System consisting of:
the structures and to avoid works   CRC Coated Concrete Bund to house the Installation of a 128,000 Litre GRP External Waste
in the UG Process chamber being     Collection Tank including stair access to top of tank and associated instrumentation and
executed as a Confined Space.       controls, Installation of new piperack & connection to existing piperack, RC Loading Bay
                                    including kerbing, traffic island and road markings, RC Underground Tank & Valve Chamber,
                                    Stainless Steel Process Drainage, Stormwater Drainage, Ducting, Footpaths and Landscaping.

                                                                                            ADCO Contracting | Pharmaceu�cal Capability Document   22
SK Biotek
Swords, Dublin
Architect             RKD Architects
Eng. Consultant       Garland
                      Designer Group

Scope                                     Challenges
The ADCO specialist pharmaceutical        Working within the constraints of a live pharmaceutical plant (ERT rated), materials in/
team is currently onsite delivering the   waste out, safety, continuity of services, large external excavation on the campus of
builder’s works package to construct an   the main thoroughfare of an existing pharma plant, unidentified services discovered. To
ESB substation and client switchroom.     mitigate these challenges the onsite team carried out detailed risk assessments, works are
                                          planned in compliance with best practice and management ensures that these plans are
                                          adhered to by workcrews. Communication is fundamental to the success of the project -
                                          RAMS are communicated via ADCO site foreman, the detailed SPA is filled out in the daily
                                          Morning Huddle, regular toolbox talks reinforce the importance of planning for safety.

                                                                                                   ADCO Contracting | Pharmaceu�cal Capability Document   23
Astellas

Project Dura�on   12 weeks
Architect         McElroy &
                  Associates

                               Scope
                               Civil Construction within a Live Production Atex Area of a New Solvent Recovery
                               Bunded Tank with Underground Stainless Process lines and CRC Wall Lining.

                               Type
                               Complex install, working around existing live areas.

                               Result
                               Completed in 10 weeks.

                                                                                      ADCO Contracting | Pharmaceu�cal Capability Document   24
Our Clients

              ADCO Contracting | Pharmaceu�cal Capability Document   25
5   HEALTH & SAFETY,
    ENVIRONMENTAL
    AND QUALITY

    Understanding Construc�on
Health and Safety

 Safeguard                        Strive                           Establish
 The Safety, Health and Welfare   To eliminate any foreseeable     Document and maintain
 of employees (full and part      hazards which may result in      EHS procedures to assist in
 time), contractors, visitors     personal injuries, ill health,   compliance with the policy,
 and anyone that may be           fires, security losses and/      relevant statutory legislation.
 affected by our operations.      or damage to property.

603,381                                           0                                             0
Man Hours                              Accidents                                  Lost Time

                                                                                ADCO Contracting | Pharmaceu�cal Capability Document   27
Environmental

Implement                            Communicate                           Maintain
an environmental management          this policy to all employees and      a policy for continuous
planning procedure for site          sub-contractors and control           improvement of the
base activities to ensure            where within our control              environmental management
management and control                                                     system and performance
where within our control

ADCO’s Waste Management Plan
Due to the nature of ADCO related works a small amount of hazardous and non-hazardous
waste will be generated. ADCO will implement a waste management system to ensure all
waste is handled, packaged, labelled, stored, transported and delivered to the appropriate
treatment location in accordance with all legislative and policy procedures.

                                                                                        ADCO Contracting | Pharmaceu�cal Capability Document   28
Quality

Comply                            Promote                            Maintain
with relevant legislation,        a culture of quality awareness     an externally accredited
regulations and in accordance     and responsibility through         management system that meets the
with relevant specifications      leadership, communication          requirements of ISO 9001:2000
and requirements                  and training for our employees,
                                  suppliers and sub-contractors

Tech
Procore project management software is used to collaborate with our site teams &
design teams – RFI’s, Tech Submittals, Quality. Procore enables our on site teams to
view BIM models and plans via a tablet. An in-house Revit Technician, interrogates 3D
BIM models to assist with work planning and design solutions for out site teams.

                                                                                 ADCO Contracting | Pharmaceu�cal Capability Document   29
Social Responsibility

“   Thank you so much to all at ADCO for suppor�ng our 2019 Tiny Hearts Christmas
    Appeal. Your dona�on empowers CMRF Crumlin to con�nue the fight against childhood
    illness. With your help we are improving facili�es for children in hospital this Christmas
    and inves�ng in research to give them hope for be�er Christmases to come.

    - Gráinne Kennedy, Head of Corporate Partnerships CMRF Crumlin

“   Dear friends at ADCO, during the winter months, families struggling to make
    ends meet face their toughest �me of year. Because of your kind dona�on to
    the Society of St. Vincent de Paul, you will be there to lighten their load.

    - Kieran Stafford, National President The Society of St. Vincent de Paul

“   Thank you to all at ADCO for your part in raising funds towards our vital work, in collabora�on
    with your colleagues at MSD, PM Group, Kirby and P&S Machinery. I know a lot of work
    was put in to this ini�a�ve and we really appreciate you going the extra mile to get this
    off the ground. It is certainly the most innova�ve fundraiser we have ever come across!

    - Síofra Kelly, Corporate Partnerships Officer Focus Ireland

                                                                                           ADCO Contracting | Pharmaceu�cal Capability Document   30
6   FINANCIALS

    Understanding Construc�on
Steady Growth

                       Deliverability
                       70% of our business is for repeat customers, with projects
             70%       increasing in scale each time. Our customers come back to
                       us because they know we will deliver what we promise.

Turnover                                                               €30m
Actual and Projected                            €24m

                         €19m

         €12m

          2017           2019                    2021                   2023
                                                                           ADCO Contracting | Pharmaceu�cal Capability Document   32
Insurances

        €13m        €6.5m       €5m
        Employers   Public      Contractor
        Liability   Liability   All Risk

Bonds

                                       ADCO Contracting | Pharmaceu�cal Capability Document   33
7   REFERENCES

    Understanding Construc�on
MSD Global Engineering Solutions
Dublin Biotech
Drynam Road
Swords, Co. Dublin

19-November-2019

To whom it may concern:

I am writing in reference to ADCO Contracting scope of works at the new Merck Biotech, Dublin project.

ADCO were appointed as the CSA contractor responsible for the Internal architectural finishes scope within the
main production facility. I found ADCO to be very professional, organized and efficient in their planning and
execution of their works.

Their approach to procurement of subcontracts was particularly useful and it was clear that they worked diligently
to represent MSD’s best interests when it came time to negotiate and award subcontract.

They have fully embraced our safety and quality initiatives and have delivered their scope to the challenging
schedule the project demanded.

I would have no hesitation in recommending ADCO Contracting for any future works.

Sincerely,

Christopher Riley
Facility Delivery Lead
Christopher.riley1@merck.com
Mobile: 083-066-7797
Glanbia Estates Limited               Telephone +353 56 7772200
                                                           Glanbia House                Facsimile +353 56 7772222
                                                                 Kilkenny                         www.glanbia.com
                                                                   Ireland

To whom it concerns,

ADCO Contrac�ng & Civil Engineering were appointed as the main contractor for the
Glanbia headquarters fit out on Ring Road, Kilkenny. The Project value was approx. €1M
including mechanical, electrical and data works.

The design was modern and contemporary, high end with a�en�on to detail especially on
internal finishes. We found ADCO to be an extremely competent contrac�ng firm from
Senior Management down to site based management.

On appointment we were very impressed in the way they set about the task. We found the
entire team very pro-active, they always demonstrated a can do approach. From start to
finish the ADCO project team were in constant consulta�on with our design team and as a
result the project was carried out in a smooth, efficient and professional manner.

We were very pleased with the end result and with the performance and professionalism
carried out throughout the program of the project.The appointed team worked with
flexibility and efficiency leading to a comple�on within budget.

We would have no hesita�on to highly recommend ADCO to any construc�on en�ty, due to
quality of craftsmanship, a�en�on to detail, and professional staff and I have already
expressed my desire to have ADCO tender future projects with Glanbia.

Paddy O’Keeffe
Property Opera�ons Manager

Directors: M Garvey, M Horan,   Glanbia Estates Limited                 Registered Office:
S Talbot and P Walsh            A subsidiary of Glanbia plc             Glanbia House, Kilkenny, Ireland.
                                                                        Registered in Ireland as a
                                                                        Private Limited Company
                                                                        Number 292947
PM Group
                                                                                    Killakee House
                                                                                    Belgard Square
                                                                                    Dublin 24
                                                                                    Ireland

                                                                                    T +353 1 404 0700
                                                                                    E dublin@pmgroup-global.com
                                                                                    W www.pmgroup-global.com

Our Reference: IE0312288-01
                                                                                    International Office Network
22/11/2019
                                                                                    Belgium                   Saudi Arabia
Ms Mairead Luttrell,                                                                China                     Singapore
                                                                                    Czech Republic            Slovakia
Project Manager,                                                                    India                     Turkey
ADCO Contracting & Civil Engineering                                                Ireland                   UK
Unit 2A, Nangor Road Business Park,                                                 Poland                    USA
                                                                                    Russia
Nangor Road,
Dublin 12,
D12 Y771

                                                                                    The project delivery specialists

Re: MSD Biotech Project

Dear Mairead,

I would just like to thank you and all your ADCO colleagues on the MSD Biotech
Project for the co-operation and assistance you so willingly gave during the
construction of this very important Bio-tech Manufacturing Plant.

We all had to go beyond our norms in terms of performance to deliver what was
required to meet the aggressive safety and schedule challenges this project meted
out but ADCO met those challenges head on and delivered on both fronts.

Personally and professionally I look forward to working with ADCO and your good
self again.

Yours Sincerely,

Michael Davern
Project Health and Safety Manager

                                                                                    Project Management Limited
                                                                                    t/a PM Group, is a private company limited
                                                                                    by shares, registered in Ireland.
                                                                                    Company Registration No. 043789.
                                                                                    Registered Office: Killakee House,
                                                                                    Belgard Square, Dublin 24, Ireland.

                                                                                    Directors D Flinter (Chairman), D Murphy (CEO),
                                                                                    F Barry, L Foley, B Gallagher, H Keelan, S Kelly,
                                                                                    M Lynam, JC O’Connell, L O’Mahony,
                                                                                    A Schouten (British), M Shelly, L Westman

                                                                                    Secretary J Sheehan
                                                                                    Template Ref: 162.TP.15
ADCO LETTER 221129

                                                                                      162.TP.15, Issue 8, 19/01/2016
You can also read