Crystal Apartments Ltd - Rental Housing - 124 W 20th Street, North Vancouver, BC
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Revisions
Issued For Rezoning, Development Permit
January 28, 2021
Project
Crystal
Apartments Ltd.
124 W 20th Street
North Vancouver
Scale: NTS
Crystal Apartments Ltd. - Rental Housing
January 28, 2021
124 W 20th Street, North Vancouver, BC
A-0.00Copyright. All rights reserved. Reproduction in whole or in part is prohibited. This drawing as an instrument of service is the property of the architect and may not be used in any way without the written permission of this office.Written dimensions shall have precedence over scaled dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job. Architect shall be informed of any discrepancie or variations from the dimensions and conditions on the drawing. Revisions Issued For Rezoning, Development Permit January 28, 2021 Project Crystal Apartments Ltd. 124 W 20th Street North Vancouver Index Scale: NTS January 28, 2021 A-0.01
Copyright. All rights reserved. Reproduction in whole or in part is prohibited. This drawing as an instrument of service is the property of the architect and may not be used in any way without the written permission of this office.Written dimensions shall have precedence over scaled dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job. Architect shall be informed of any discrepancie or variations from the dimensions and conditions on the drawing. Revisions Issued For Rezoning, Development Permit January 28, 2021 Project Crystal Apartments Ltd. 124 W 20th Street North Vancouver Zoning Map Plan Scale: NTS January 28, 2021 A-0.41
6
2 4 3
5 Copyright. All rights reserved. Reproduction in
whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
1
SITE Revisions
Issued For Rezoning, Development Permit
January 28, 2021
1 9 8
7
10
2
Project
Crystal
3 5 7 9 Apartments Ltd.
124 W 20th Street
North Vancouver
Context Plan
Scale: NTS
January 28, 2021
4 6 8 10
A-0.42Legend
Transit Corridor
1 Lonsdale Avenue
Parks and Amenities
2 Wagg Creek Park
3 Rey Sargent Park
4 Harry Jerome Community Centre
5 Centennial Theatre Copyright. All rights reserved. Reproduction in
whole or in part is prohibited. This drawing as an
6 Norseman Park instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
7 Memorial Community Recreation Centre have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
Businesses
8 Lonsdale Veterinary Hospital Revisions
Issued For Rezoning, Development Permit
9 Health & Beauty and Restaurants January 28, 2021
10 LifeLabs Medical Laboratory Services
11 London Drugs
12 Grocery Markets / Restaurants / Sports Stores
Residential
13 121 21st Street West (3 Storeys)
14 135 21st Street West (3 Storeys)
15 134 20th Street West (4 Storeys)
16 144 20th Street West (3 Storeys)
17 121 20th Street West (3 Storeys)
18 131 20th Street West (3 Storeys)
19 137 20th Street West (3 Storeys)
20 149 20th Street West (3 Storeys)
21 Townhome Complex
22 2006 Chesterfield Avenue (2 Storeys)
23 1940 Chesterfield Avenue (Townhome Complex)
24 1953 Chesterfield Avenue (Single Family Homes)
Project
Crystal
Apartments Ltd.
124 W 20th Street
North Vancouver
Context Plan
Scale: NTS
January 28, 2021
A-0.43Copyright. All rights reserved. Reproduction in whole or in part is prohibited. This drawing as an instrument of service is the property of the architect and may not be used in any way without the written permission of this office.Written dimensions shall have precedence over scaled dimensions. Contractors shall verify and be responsible for all dimensions and conditions on the job. Architect shall be informed of any discrepancie or variations from the dimensions and conditions on the drawing. Revisions Issued For Rezoning, Development Permit January 28, 2021 Project Crystal Apartments Ltd. 124 W 20th Street North Vancouver Design Rationale Scale: NTS January 28, 2021 A-0.44
Copyright. All rights reserved. Reproduction in
whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
Revisions
Issued For Rezoning, Development Permit
January 28, 2021
View from South East View from South West
Project
Crystal
Apartments Ltd.
124 W 20th Street
North Vancouver
Renderings
Scale: NTS
South West - Bird's eye View of Residential Entrance January 28, 2021
A-0.45A
A-1.03 Lane B
A-1.04
Ramp Dn 10%
6
.28
.12
.45
.9
02
03
03
03
+1
+1
+1
+1
1 2 3 4 5 6 tw
+103.80
VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR
T
Garbage
Staging
Copyright. All rights reserved. Reproduction in
whole or in part is prohibited. This drawing as an
+102.88 instrument of service is the property of the architect
+103.75 and may not be used in any way without the written
permission of this office.Written dimensions shall
tw
+102.70 +103.80 have precedence over scaled dimensions.
+102.70 3r Contractors shall verify and be responsible for all
+102.70
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
+103.30
from the dimensions and conditions on the drawing.
tw
+103.40 Revisions
Ramp Dn 12.5%
Issued For Rezoning, Development Permit
D January 28, 2021
(AH)
+102.70
tw
+103.40
D1 +102.70
+103.15
3r
(AH) tw
+103.20
C1
(Adpt
Amenity
(579sf)
+102.70
AH)
Stair 1 Stair 2
+102.70
it
tw
Wash levators +103.20
it +102.70
Office 102.70m
Elec.
ail
tw
+102.87
Lobby
(243sf) Amenity Project
(336sf)
C C Crystal
A-1.05
Vest. A-1.05
Apartments Ltd.
1 2 C 124 W 20th Street
(AH) +102.70 (AH) +102.70 (Adpt) +102.70
(AH) North Vancouver
tw
+102.70 +102.70 +102.87
85.38m to Hydrant
102.61+ 4.3% +102.35
+102.60 +102.62 +102.62
+102.62
+102.57
6r
5r 5r 4r 5%
3r 3r
1.
70+
1.7
4+
1.8
5+
1.
97+
+102.11 +1
02.2
Site Plan
10 10 10 10 4
Scale: 1/8"=1'-0"
2%
A 2% 2% B 2% January 28, 2021
A-1.03 A-1.04
+ + + 6+ 1+ + + +
5+ 8 +
79 91 . 05 .1 27 36 40
1.
5 1.6 1. 1. 02 10
2 2.2 2. 02
.
02
.
10 10 10 10 1 10 10 1 1
20th Street W
A-1.011
1 0 2.7
2.4 .5 .10
3
.10 .1 02 EL CUT CROSS ON SOUTH RIM OF SANITARY MANHOLE
10
EL EL
102.5
ELEVATION 102.921 METRES .57 6 6
6.096
2 SANITARY 1 .32 1 03 0 3.7 0 3.8
2.7 3.0 03 .
L.1
1
5
4 L .
2.4 .10 MANHOLE 0 1 E EL
3.
1 . 1 L . E
0 .5 EL EL E
L.1 02
LANE
10
SOUTH RIM EL.102.92
E
E L.1 NORTH INVERT EL.100.24
SS ND
. 6 5
I T NE POST WEST INVERT EL.100.19 R
G .10
OU 3.79
2 W ON
.10 EL
0.914
EL IR .67
02 2.69 3.7
9 T
.1
EL L.10 2.8
0 2 .37 .64 OS .86
3.1 03 03 . 1 0 P 03
E
EL
.10 EDGE OF TRAVELLED LANE EL
.10 90° 59' 49" E L . 1
EL .1 EL
IR ON E L . 1
0.25 DIA
39.000
PROPERTY LINE PROPERTY LINE
DECIDUOUS
X
3
.39 .33 2.6
.1 02 .102 .10 HEDGE
EL
WOOD FENCE
EL EL
P .6
TOL.102
3
.91 'H'
PROPERTY LINE
01 71 .95
X
E
PROPERTY LINE
.1
EL TOP102. .101 103 8
. 3.7
EL EL .5 L. 10
.60
EDGE OF BLACKTOP
E
. 1 03
.94 .97
E L
VR 138 01
X
.1 1 01 Copyright. All rights reserved. Reproduction in
EL 6 L . 2
2.2 E 02.3 0 .62
PROPERTY LINE
whole or in part is prohibited. This drawing as an
.10 P .7 03 3
E L EL
. 1 TOL.102 . 1 3.6 instrument of service is the property of the architect
E 103 E L
EL.1
0 and may not be used in any way without the written
permission of this office.Written dimensions shall
X
5
5 2.6 have precedence over scaled dimensions.
2.4 .48 .10 .53 4
.70 3.1
Contractors shall verify and be responsible for all
L.1
0 2 EL 02
E .10 L.1 1 02 BLACKTOP . 10 .3 1 dimensions and conditions on the job. Architect
EL E . EL 03
14.72
14.70
L
E PARKING AREA .94 E L.1 shall be informed of any discrepancie or variations
02 from the dimensions and conditions on the drawing.
X
. 1
E L P .47
TO .103
BALCONY
EL
EDGE OF BLACKTOP
Revisions
X
CATCH
21 BASIN 102.4
L.
2
10
22 23 24 10
3
25 Issued For Rezoning, Development Permit
January 28, 2021
E
2. TOP OF FLASHING
5
.90 EL.106.70
X
02
3 TOTAL SITE AREA = 1686.6 m ² .71 EL. 1
2.5 .64 02
L.1
0 (18154 sq.ft.) L.1
02
E L . 1
P .3
2
3.4
0 1
3.5.46 .48
0
E E TO .103 . 10 1 0
. 3 3
2.5 EL EL EL L.10L.10
X
.1 0 E E
EL X
6 .86 .35
.65 02.7 . 1 02 03
6 02 OP EL 76 1
2.6 . 1 . 1 4 KT .74 EL
.
0 EL EL .70 2.7 .68 2.
X
.1 02 BALCONY C
EL
.10
2 .1 0
. 1 P BALCONY
A 2
BLL.10 .10
EL 1.58 EL EL TO E EL 2.57
.69 A CK 2.74
02
0.76
6.29 6.32
0.76
3 . 1 BL .10 1.55
2.7 EL EL
WALL
2.56
BALCONY0.18
.10
OVERHANG
BRICK WALL
EL 2.43 8.89 3.54 2.41
X
1.10
1.10
BALCONY
1.23
1.23
ROOF PEAK
3.98
2.51
2.51
EL.112.84
4.00
1.19 1.65
(TOP OF FLASHING)
BRICK
MAIN FLOOR OVERHANG OVERHANG
X
MAIN FLOOR
.61 EL.103.14 EL.102.80 TOP OF FLASHING
43.226
2 1.19
43.216
.10 EL.111.50
EL
4 9 1.57 1.55 6 .86
P 3.1
X
TOL.10 0 2.461 2.6 102 4
E .1 .
EL .102 .10 EL. 3.0
EL . 1 0 3
X X X
EL EL 03.1
0
LANE
8 P .1 0 1
01.5 TO .103 4 0 2.6 EL
.
1
X
EL
.1 EL 01.7 EL
.
41"
L .1 9
P 3.0
00"
E
TOL.10
E
X
02'
.75
59'
FOUR STOREY THREE STOREY .102
6 E L
APARTMENT BUILDING P .6
TO .102 APARTMENT BUILDING
ROCK WALL
L
X
E
1°
0°
No.124
.04
X
.103
E L
103 BUILDING
.68
.102
E L
X
.94
. 102 'F'
16.84
2 EL
2.7
P .66 .1 0
TO .102 EL
L
.96
X
E 6
P .9 02
TO .102 . 1
3 EL EL
ROOF PEAK 1.9
EL.111.45 .10
EL
(TOP OF FLASHING) 0
1.7
X
FENCE
.10
ROCK WALL
EL
X
7
WOOD
P 2.8
TOL.10
E
.78
Project
. 102 81
EL 102.
BALCONY
X
MAIN FLOOR .10
2 .77
EL
.
EL
. 10 2.8
1
Crystal
EL
Apartments Ltd.
X X
EL.102.70 WOOD FENCE
.57
X
58 02 .77 .90
P . .1 2 .71 GAS 2 102
TO .102 EL 2.7 FIRST FLOOR 02 10 L . 6.096
EL .10 E L. 1 METEREL. E
2.58 02 .56 GROUND FLOOR EL BALCONY GROUND FLOOR 6 2.57 124 W 20th Street
BALCONY 02.7
MAIN FLOOR .1 8 BALCONY . 1 North Vancouver
EL 2.6 EL
X
EL.100.32 .10 MAIN FLOOR
9 EL EL.103.45
0 1.6 5 .69
.1 2.6 02
EL .10 CONCRETE L.1 .74 .94
EL E 1 02 . 1 02
L . E L
E
X
.62 1 .66 6
02 2.6 1 5 02 2.6
.1 . 10 02.6 02.6 E L. 1
. 10
.49 EL EL . 1 L. 1 EL
2 EL E
7.61
.10
EL
7.61
HEDGE
3
2.6 .63
X
10
.1 0 2
EL L.10
2.
HEDGE
E
HEDGE
5
5
2.4
9
61 2.8
0 . 5 1
1 0 5 5 2.55 61 TOP102. 2.6
6
L. 10
2.6 2 9 . . . SIGN .63
X
1 L 4 0 2 E
2.5 .10 .10 2.4 E 02 46 2.5 L.
1
.10
.
EL 5 . 1 0
ND 0 .1 0
EL EL .102.49 L.1 102. 10 E EL .5 EL POST.102 0
1.6
1
OU01.7 EL L
E .10 E
L . E L .
O .102 2.56
P 5 EL P 2.7
0 R 5 4 L E T 0 PROPERTY LINE P 2.6 TOL.10
.1 G L.1 HEDGE P .
TO .102
E EL L.1 HEDGE TOL.10 E
EL E STEPS 39.046 STEPS E ROCK WALL E
EL
O ST
P 2.4
1 .74 P 2.5
1 ROCK WALL 8 WATER 91° 2.0
2
00' .53 6
02 02.0 48"02.5402.07 .22 2.3
6
OS
T 7 .47
Survey Plan
NP 1 1.8 2 0 2.3
TOL.10 .10 TOL.10 VALVE 02.03 0 2 1 0 4 9 . 1 7SIGN 102 P .6 L.1 NP 1 02
IRO EL E .1 0
.1 2. EL. . L
02 E EL.
1 .1 .1
EL EL 2.0 POST EL . TO .102 E
IRO .1 0
EL
.
E EL EL L .10 .1 1 0 EL EL Scale: 1/8"=1'-0"
E EL EL
.
LAWN CONCRETE LAWN January 28, 2021
.04
.51 .91 02
01 . 1 01 E L . 1
. 1 EL 6
EL .47 1.9 5 6 7 6 0
1 01 .55 .68 .80 .93 .10 2.0 2.1 2.2 2.3 2.4 1
EL
. 01 .10
1
.10
1
101 EL 1 0 10 1 0 .10 10 2.6
.1
EL EL EL
. L. CONCRETE SIDEWALK L. L. EL L. L.1
0
EL E E E E E
2 LAMP LAMP
1.5 1 .96 .45
9.40
.10 STANDARD P .9 01 02 STANDARD
EL TO .101 1
9.44
LAWN . 1 LAWN .
8 3 8 EL PARKING EL 7 0 1 6 EL
.30 P 3 4 P .4 P .6 P .7 P .0 P .2 P .3 P .3
P
TO .101 TO101. TO .101 TO .101 TO .101 SIGN TO .102 TO .102 TOL.102 TOL.102
. EL EL EL 0.15 HIGH CONCRETE CURB EL EL
EL EL E E
A-1.02
CONCRETE APRON
ER 5 ER 9 ER 3 ER 8 ER 3 ER 6 ER 2 ER 5 ER 6 ER 1
TT .1 TT 1.1 TT 1.3 TT 1.4 TT 1.6 TT 1.7 TT 1.9 TT 02.0 TT02.1 TT02.2
GUL.101 GUL.10 GUL.10 GUL.10 GUL.10 GUL.10 GUL.10 U
G .1 U
G L.1 U
G L.1
E E E E E E E EL E E6.10M SETBACK LINE
5.94M SETBACK LINE
PROPERTY LINE
PROPERTY LINE
Copyright. All rights reserved. Reproduction in
whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
C
A-1.05 Revisions
Issued For Rezoning, Development Permit
January 28, 2021
Elevator El. 124.45m
Roof El. 121.53m
Top Plate El. 120.77m
Unit A Unit B1
6th El. 118.00m
Unit A Unit B1
5th El. 114.94m
Unit A Unit B1
4th El. 111.88m
Unit A Unit B1
3rd El. 108.82m
Unit A Unit B1
Lane West 20th 2nd El. 105.76m
Street
Corr Wash Office Unit B1
Main El. 102.70m
Project
Crystal
Drive Asile
Apartments Ltd.
P1 El. 99.35m 124 W 20th Street
North Vancouver
Drive Asile
P2 El. 96.30m
Site Section A
Scale: 1/8"=1'-0"
SECTION A
January 28, 2021
A-1.036.10M SETBACK LINE
5.94M SETBACK LINE
PROPERTY LINE
PROPERTY LINE
Copyright. All rights reserved. Reproduction in
whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
C
A-1.05 Revisions
Issued For Rezoning, Development Permit
January 28, 2021
Elevator El. 124.45m
Roof Deck
Roof El. 121.53m
Top Plate El. 120.77m
Unit D Unit C3 Unit C Unit B
6th El. 118.00m
Unit D Unit C3 Unit C Unit B
5th El. 114.94m
Unit D Unit C3 Unit C Unit B
4th El. 111.88m
Unit D Unit C3 Unit C Unit B
3rd El. 108.82m
Unit D Unit C3 Unit C Unit B
Lane West 20th 2nd El. 105.76m
Visitor Parking Street
Unit D Amenity Unit C Amenity
Main El. 102.70m
Project
Crystal
Bike Lockers Drive Asile Drive Asile
Apartments Ltd.
P1 El. 99.35m 124 W 20th Street
North Vancouver
Storage Lockers Drive Asile
P2 El. 96.30m
Site Section B
Scale: 1/8"=1'-0"
SECTION B
January 28, 2021
A-1.043.51M SETBACK LINE
3.51M SETBACK LINE
PROPERTY LINE
PROPERTY LINE
Copyright. All rights reserved. Reproduction in
whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
A B
A-1.03 A-1.04 Revisions
Issued For Rezoning, Development Permit
January 28, 2021
Elevator El. 124.45m
Roof Deck
Roof El. 121.53m
Top Plate El. 120.77m
Unit B1 Unit B2 Unit B Unit B Unit C
6th El. 118.00m
Unit B1 Unit B2 Unit B Unit B Unit C
5th El. 114.94m
Adjacent
Property Unit B1 Unit B2 Unit B Unit B Unit C
4th El. 111.88m
Unit B1 Unit B2 Unit B Unit B Unit C Lonsdale
Pet 3rd El. 108.82m
Hospital
Unit B1 Unit B2 Unit B Unit B Unit C
2nd El. 105.76m
Unit B1 Unit B2 Unit B Vest. Amenity Unit C
Main El. 102.70m
Project
Crystal
Drive Asile
Apartments Ltd.
P1 El. 99.35m 124 W 20th Street
North Vancouver
Drive Asile
P2 El. 96.30m
Site Section C
Scale: 1/8"=1'-0"
SECTION C
January 28, 2021
A-1.05A B
A-1.03 A-1.04
Copyright. All rights reserved. Reproduction in
whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
Revisions
Issued For Rezoning, Development Permit
January 28, 2021
34 Storage Lockers
Mech LEC Lobby
Ramp Up 12.5%
Elec
EMR
4 Storage
Lockers SM
52
SM
51
SM
50
SM
49
SM
48
SM
47
SM
46
SM
45
Project
C
22 Residential Two Way C Crystal
Drive Aisle
A-1.05
Stalls A-1.05
Apartments Ltd.
124 W 20th Street
North Vancouver
31 32 33 34 35 36 37 38 39 40 41 42 43 44
SM
Parking
Level 2
Scale: 1/8"=1'-0"
A B January 28, 2021
A-1.03 A-1.04
A-2.01A B
A-1.03 A-1.04
MT
Ramp Dn 10%
32 Bike Lockers
Copyright. All rights reserved. Reproduction in
24 Bike whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
Lockers permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
Ramp Dn 10%
Revisions
Issued For Rezoning, Development Permit
January 28, 2021
Drive Aisle
Two Way
SM
30 29 28 27 26 25
Ramp Dn 12.5%
Two Way
28 Residential Stalls Drive Aisle
38 Bike
Lockers
22 23 24
SM
Lobby
Janitor
Ramp Up 12.5%
Garbage/
Recycling
(345sf) SM SM SM SM SM
21 20 19 18 17 16 15
Project
C
A-1.05
Two Way
Drive Aisle
C
A-1.05
Crystal
Apartments Ltd.
124 W 20th Street
North Vancouver
1 2 3 4 5 6 7 8 9 10 11 12 13 14
SM SM
Parking
Level 1
Scale: 1/8"=1'-0"
A B January 28, 2021
A-1.03 A-1.04
A-2.02A
A-1.03 Lane B
A-1.04
Ramp Dn 10%
6
.28
.12
.45
.9
02
03
03
03
+1
+1
+1
+1
1 2 3 4 5 6 tw
+103.80
VISITOR VISITOR VISITOR VISITOR VISITOR VISITOR
T
Garbage
Staging
Copyright. All rights reserved. Reproduction in
whole or in part is prohibited. This drawing as an
+102.88 instrument of service is the property of the architect
+103.75 and may not be used in any way without the written
permission of this office.Written dimensions shall
tw
+102.70 +103.80 have precedence over scaled dimensions.
+102.70 3r Contractors shall verify and be responsible for all
+102.70
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
+103.30
from the dimensions and conditions on the drawing.
tw
+103.40 Revisions
Ramp Dn 12.5%
Issued For Rezoning, Development Permit
D January 28, 2021
(AH)
+102.70
tw
+103.40
D1 +102.70
+103.15
3r
(AH) tw
+103.20
C1
(Adpt
Amenity
(579sf)
+102.70
AH)
Stair 1 Stair 2
+102.70
it
tw
Wash levators +103.20
it +102.70
Office 102.70m
Elec.
ail
tw
+102.87
Lobby
(243sf) Amenity Project
(336sf)
C C Crystal
A-1.05
Vest. A-1.05
Apartments Ltd.
1 2 C 124 W 20th Street
(AH) +102.70 (AH) +102.70 (Adpt) +102.70
(AH) North Vancouver
tw
+102.70 +102.70 +102.87
85.38m to Hydrant
102.61+ 4.3% +102.35
+102.60 +102.62 +102.62
+102.62
+102.57
6r
5r 5r 4r 5%
3r 3r
1.
70+
1.7
4+
1.8
5+
1.
97+
+102.11 +1
02.2
Main Floor
10 10 10 10 4
Scale: 1/8"=1'-0"
2%
A 2% 2% B 2% January 28, 2021
A-1.03 A-1.04
+ + + 6+ 1+ + + +
5+ 8 +
79 91 . 05 .1 27 36 40
1.
5 1.6 1. 1. 02 10
2 2.2 2. 02
.
02
.
10 10 10 10 1 10 10 1 1
20th Street W
A-2.03A B
A-1.03 A-1.04
Cop r t. All r ts reserved. eprod t o
ole or part s pro ted. s dra as a
str me t o serv e s t e propert o t e ar te t
a d ma ot e sed a a t o t t e r tte
perm ss o o t s o e. r tte d me s o s s all
ave pre ede e over s aled d me s o s.
Co tra tors s all ver a d e respo s le or all
d me s o s a d o d t o s o t e o . Ar te t
s all e ormed o a d s repa e or var at o s
rom t e d me s o s a d o d t o s o t e dra .
Revisions
Issued For Rezoning, Development Permit
D January 28, 2021
C2
C3
C1
(Adpt)
A
Elevators
FFE: 105.76m
Elec.
Project
C
A-1.05
C
A-1.05
Crystal
B1 B2 B B C Apartments Ltd.
124 W 20th Street
(Adpt) (Adpt) North Vancouver
Level 2 Plan
Scale: 1/8"=1'-0"
A B January 28, 2021
A-1.03 A-1.04
A-2.04A B
A-1.03 A-1.04
Cop r t. All r ts reserved. eprod t o
ole or part s pro ted. s dra as a
str me t o serv e s t e propert o t e ar te t
a d ma ot e sed a a t o t t e r tte
perm ss o o t s o e. r tte d me s o s s all
ave pre ede e over s aled d me s o s.
Co tra tors s all ver a d e respo s le or all
d me s o s a d o d t o s o t e o . Ar te t
s all e ormed o a d s repa e or var at o s
rom t e d me s o s a d o d t o s o t e dra .
Revisions
Issued For Rezoning, Development Permit
D January 28, 2021
C2
C3
C1
(Adpt)
A
Elevators
FFE: 108.82m
Elec.
Project
C
A-1.05
C
A-1.05
Crystal
B1 B2 B B C Apartments Ltd.
124 W 20th Street
(Adpt) (Adpt) North Vancouver
Level 3 Plan
Scale: 1/8"=1'-0"
A B January 28, 2021
A-1.03 A-1.04
A-2.05A B
A-1.03 A-1.04
Cop r t. All r ts reserved. eprod t o
ole or part s pro ted. s dra as a
str me t o serv e s t e propert o t e ar te t
a d ma ot e sed a a t o t t e r tte
perm ss o o t s o e. r tte d me s o s s all
ave pre ede e over s aled d me s o s.
Co tra tors s all ver a d e respo s le or all
d me s o s a d o d t o s o t e o . Ar te t
s all e ormed o a d s repa e or var at o s
rom t e d me s o s a d o d t o s o t e dra .
Revisions
Issued For Rezoning, Development Permit
D January 28, 2021
C2
C3
C1
(Adpt)
A
Elevators
FFE: 111.88m
Elec.
Project
C
A-1.05
C
A-1.05
Crystal
B1 B2 B B C Apartments Ltd.
124 W 20th Street
(Adpt) (Adpt) North Vancouver
Level 4 Plans
Scale: 1/8"=1'-0"
A B January 28, 2021
A-1.03 A-1.04
A-2.06A B
A-1.03 A-1.04
Cop r t. All r ts reserved. eprod t o
ole or part s pro ted. s dra as a
str me t o serv e s t e propert o t e ar te t
a d ma ot e sed a a t o t t e r tte
perm ss o o t s o e. r tte d me s o s s all
ave pre ede e over s aled d me s o s.
Co tra tors s all ver a d e respo s le or all
d me s o s a d o d t o s o t e o . Ar te t
s all e ormed o a d s repa e or var at o s
rom t e d me s o s a d o d t o s o t e dra .
Revisions
Issued For Rezoning, Development Permit
D January 28, 2021
C2
C3
C1
(Adpt)
A
Elevators
FFE: 114.94m
Elec.
Project
C
A-1.05
C
A-1.05
Crystal
B1 B2 B B C Apartments Ltd.
124 W 20th Street
(Adpt) (Adpt) North Vancouver
Level 5 Plans
Scale: 1/8"=1'-0"
A B January 28, 2021
A-1.03 A-1.04
A-2.07A B
A-1.03 A-1.04
Cop r t. All r ts reserved. eprod t o
ole or part s pro ted. s dra as a
str me t o serv e s t e propert o t e ar te t
a d ma ot e sed a a t o t t e r tte
perm ss o o t s o e. r tte d me s o s s all
ave pre ede e over s aled d me s o s.
Co tra tors s all ver a d e respo s le or all
d me s o s a d o d t o s o t e o . Ar te t
s all e ormed o a d s repa e or var at o s
rom t e d me s o s a d o d t o s o t e dra .
Revisions
Issued For Rezoning, Development Permit
D January 28, 2021
C2
C3
C1
(Adpt)
A
Elevators
FFE: 118.00m
Elec.
Project
C
A-1.05
C
A-1.05
Crystal
B1 B2 B B C Apartments Ltd.
124 W 20th Street
(Adpt) (Adpt) North Vancouver
Level 6 Plan
Scale: 1/8"=1'-0"
A B January 28, 2021
A-1.03 A-1.04
A-2.08A B
A-1.03 A-1.04
Copyright. All rights reserved. Reproduction in
whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
Revisions
Issued For Rezoning, Development Permit
January 28, 2021
R 1 1. m
lev. obby
Roof ec
Amenity
(1,115sf) Project
C C Crystal
A-1.05
1 1.5 m A-1.05
Apartments Ltd.
124 W 20th Street
North Vancouver
Roof Plan
Scale: 1/8"=1'-0"
A B January 28, 2021
A-1.03 A-1.04
A-2.09A B
A-1.03 A-1.04
o y i t. All i t e e e . Re o ction in
w ole o in t i o i ite . i win n
in t ment of e ice i t e o e ty of t e c itect
n m y not e e in ny w y wit o t t e w itten
e mi ion of t i office. itten imen ion ll
e ece ence o e c le imen ion .
ont cto ll e ify n e e on i le fo ll
imen ion n con ition on t e o . A c itect
ll e info me of ny i c e ncie o i tion
f om t e imen ion n con ition on t e win .
Revisions
Issued For Rezoning, Development Permit
January 28, 2021
ROOF: 121.38m
ROOF: 124.45m
Roof Deck
Amenity
Below
Project
C
A-1.05
C
A-1.05
Crystal
Apartments Ltd.
124 W 20th Street
North Vancouver
Elevator and Stair
Roof Plan
Scale: 1/8"=1'-0"
A B January 28, 2021
A-1.03 A-1.04
A-2.10Proposed Development
3.51M SETBACK LINE
3.51M SETBACK LINE
PROPERTY LINE
PROPERTY LINE
A B
A-1.03 A-1.04
1 2 3 4a 6 7 8b 9 10 1 21 19 17 4b 8a 5 18 13 16 15
Copyright. All rights reserved. Reproduction in
Elevator El. 124.45m whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
Roof El. 121.53m
Top Plate El. 120.77m Revisions
Issued For Rezoning, Development Permit
January 28, 2021
6th El. 118.00m
5th El. 114.94m
Building Height
Existing 4 Storey apartment
4th El. 111.88m
3rd El. 108.82m
Existing
1 Storey Animal Hospital
2nd El. 105.76m Lane
Main El. 102.70m 124 West 20th
El. 100.32m Main Floor
P1 El. 99.35m
13 18 11 12
Project
P2 El. 96.30m
Crystal
Apartments Ltd.
SOUTH ELEVATION (W 20TH STREET) 124 W 20th Street
North Vancouver
Exterior Finish Legend Spatial Calculations
1 Roof 2-ply SBS Membrane, 7 Concrete Copings Caps, Headers, Lintels and Sills 14 Balcony Fascia Fibre Cement Trim Board,
Light Grey Colour to match brick Benjamin Moore 2132-10 Black
2 Soffit Hardie Panel 8a Vinyl Window Vinyl Frame 15 Columns Wood,
Benjamin Moore AF-680 Wish Black Colour: Broda Stain, Natural 111
3 Roof Fascia Fiber Cement Trim Board 8b Vinyl Window Vinyl Frame 16 Beams Fibre Cement Trim Board, South Elevation
Benjamin Moore 2132-10 Black White Benjamin Moore 2132-10 Black
(W 20th Street)
4a Wall Panel Hardie Reveal Panel System, Smooth 9 Guardrails Aluminum Frames, Powder Coated, 17 Trellis Wood,
Benjamin Moore OC-57 White Heron Makin Metals, Iron Ore Colour: Broda Stain, Natural 111 Scale: 1/8"=1'-0"
January 28, 2021
4b Wall Panel Hardie Reveal Panel System, Smooth 10 Guardrail Glazing Tempered Glass Panels, Vitruim Glass, 18 Feature Soffit Longboard Soffit, V-groove, 6" Exposure,
Benjamin Moore HC-104 Copley Gray Colour: Pewter Colour: Light Cherry
4c Wall Panel Hardie Reveal Panel System, Smooth 11 Curtain Wall Smooth, Matt Finish, 19 Window Flashing Prefinished Aluminum
Benjamin Moore HC-87 Ashley Gray Black Colour: See Supplementary Colour Board
5 Wood Cladding HardiePlank Lap Siding, 6" Exposure, 12 Curtain Wall Spandrel Vitrum Glass, 20 Fascia Flashing Prefinished Aluminum
Colour: Opaci-coat #3-0586 Medium Gray Colour: See Supplementary Colour Board
6 Brick Venner Yankee Hill Brick, Smooth 13 Metal Canopy Powder Coated Steel, 21 Gutter & RWL Prefinished Aluminum,
A-3.00
Standard Running Bond, Dark Iron Spot Benjamin Moore 2132-10 Black Colour: See Supplementary Colour Board3.51M SETBACK LINE
3.51M SETBACK LINE
PROPERTY LINE
PROPERTY LINE
C
A-1.05
15 16 13 8a 18 4b 5 17 19 4a 8b 9 10 21 4c 3 2 1
Copyright. All rights reserved. Reproduction in
Elevator El. 124.45m whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
Roof El. 121.53m
Top Plate El. 120.77m Revisions
Issued For Rezoning, Development Permit
January 28, 2021
OBS OBS
6th El. 118.00m
OBS OBS
5th El. 114.94m
Building Height
OBS OBS
4th El. 111.88m
OBS OBS
3rd El. 108.82m
OBS OBS
W20th Street 2nd El. 105.76m
Vistors' Parking
(Beyond)
Lane
PMT
OBS OBS
Main El. 102.70m
P1 El. 99.35m
6 7 13 11
Project
P2 El. 96.30m
Crystal
Apartments Ltd.
EAST ELEVATION 124 W 20th Street
North Vancouver
Exterior Finish Legend Spatial Calculations
1 Roof 2-ply SBS Membrane, 7 Concrete Copings Caps, Headers, Lintels and Sills 14 Balcony Fascia Fibre Cement Trim Board,
Light Grey Colour to match brick Benjamin Moore 2132-10 Black
2 Soffit Hardie Panel 8a Vinyl Window Vinyl Frame 15 Columns Wood,
Benjamin Moore AF-680 Wish Black Colour: Broda Stain, Natural 111
3 Roof Fascia Fiber Cement Trim Board 8b Vinyl Window Vinyl Frame 16 Beams Fibre Cement Trim Board,
Benjamin Moore 2132-10 Black White Benjamin Moore 2132-10 Black
East Elevation
4a Wall Panel Hardie Reveal Panel System, Smooth 9 Guardrails Aluminum Frames, Powder Coated, 17 Trellis Wood,
Benjamin Moore OC-57 White Heron Makin Metals, Iron Ore Colour: Broda Stain, Natural 111 Scale: 1/8"=1'-0"
January 28, 2021
4b Wall Panel Hardie Reveal Panel System, Smooth 10 Guardrail Glazing Tempered Glass Panels, Vitruim Glass, 18 Feature Soffit Longboard Soffit, V-groove, 6" Exposure,
Benjamin Moore HC-104 Copley Gray Colour: Pewter Colour: Light Cherry
4c Wall Panel Hardie Reveal Panel System, Smooth 11 Curtain Wall Smooth, Matt Finish, 19 Window Flashing Prefinished Aluminum
Benjamin Moore HC-87 Ashley Gray Black Colour: See Supplementary Colour Board
5 Wood Cladding HardiePlank Lap Siding, 6" Exposure, 12 Curtain Wall Spandrel Vitrum Glass, 20 Fascia Flashing Prefinished Aluminum
Colour: Opaci-coat #3-0586 Medium Gray Colour: See Supplementary Colour Board
6 Brick Venner Yankee Hill Brick, Smooth 13 Metal Canopy Powder Coated Steel, 21 Gutter & RWL Prefinished Aluminum,
A-3.01
Standard Running Bond, Dark Iron Spot Benjamin Moore 2132-10 Black Colour: See Supplementary Colour Board3.51M SETBACK LINE
3.51M SETBACK LINE
PROPERTY LINE
PROPERTY LINE
B A
A-1.04 A-1.03
8a 4c 9 10 17 8b 1 4a 21 19 8a 4b 3 2 1
Copyright. All rights reserved. Reproduction in
whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
Top Plate El. 120.77m Revisions
Issued For Rezoning, Development Permit
January 28, 2021
6th El. 118.00m
5th El. 114.94m
Building Height
Existing 4 Storey apartment
4th El. 111.88m
3rd El. 108.82m
Existing
1 Storey Animal Hospital
Lane 2nd El. 105.76m
PMT
Main El. 102.70m
Parkade Ramp
El. 100.32m Main Floor
P1 El. 99.35m
Project
P2 El. 96.30m
Crystal
Apartments Ltd.
NORTH ELEVATION (LANE) 124 W 20th Street
North Vancouver
Exterior Finish Legend Spatial Calculations
1 Roof 2-ply SBS Membrane, 7 Concrete Copings Caps, Headers, Lintels and Sills 14 Balcony Fascia Fibre Cement Trim Board,
Light Grey Colour to match brick Benjamin Moore 2132-10 Black
2 Soffit Hardie Panel 8a Vinyl Window Vinyl Frame 15 Columns Wood,
Benjamin Moore AF-680 Wish Black Colour: Broda Stain, Natural 111
3 Roof Fascia Fiber Cement Trim Board 8b Vinyl Window Vinyl Frame 16 Beams Fibre Cement Trim Board, North Elevation
Benjamin Moore 2132-10 Black White Benjamin Moore 2132-10 Black
(Lane)
4a Wall Panel Hardie Reveal Panel System, Smooth 9 Guardrails Aluminum Frames, Powder Coated, 17 Trellis Wood,
Benjamin Moore OC-57 White Heron Makin Metals, Iron Ore Colour: Broda Stain, Natural 111 Scale: 1/8"=1'-0"
January 28, 2021
4b Wall Panel Hardie Reveal Panel System, Smooth 10 Guardrail Glazing Tempered Glass Panels, Vitruim Glass, 18 Feature Soffit Longboard Soffit, V-groove, 6" Exposure,
Benjamin Moore HC-104 Copley Gray Colour: Pewter Colour: Light Cherry
4c Wall Panel Hardie Reveal Panel System, Smooth 11 Curtain Wall Smooth, Matt Finish, 19 Window Flashing Prefinished Aluminum
Benjamin Moore HC-87 Ashley Gray Black Colour: See Supplementary Colour Board
5 Wood Cladding HardiePlank Lap Siding, 6" Exposure, 12 Curtain Wall Spandrel Vitrum Glass, 20 Fascia Flashing Prefinished Aluminum
Colour: Opaci-coat #3-0586 Medium Gray Colour: See Supplementary Colour Board
6 Brick Venner Yankee Hill Brick, Smooth 13 Metal Canopy Powder Coated Steel, 21 Gutter & RWL Prefinished Aluminum,
A-3.02
Standard Running Bond, Dark Iron Spot Benjamin Moore 2132-10 Black Colour: See Supplementary Colour Board3.51M SETBACK LINE
3.51M SETBACK LINE
PROPERTY LINE
PROPERTY LINE
C
A-1.05
21 4b 19 9 10 8b 17 5 4a 3 1 2 2
Copyright. All rights reserved. Reproduction in
Elevator El. 124.45m whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
Roof El. 121.53m
Top Plate El. 120.77m Revisions
Issued For Rezoning, Development Permit
January 28, 2021
OBS
6th El. 118.00m
OBS
5th El. 114.94m
Building Height
OBS
4th El. 111.88m
OBS
3rd El. 108.82m
OBS
Lane 2nd El. 105.76m W20th Street
OBS
Main El. 102.70m
P1 El. 99.35m
6 7
Project
P2 El. 96.30m
Crystal
Apartments Ltd.
WEST ELEVATION 124 W 20th Street
North Vancouver
Exterior Finish Legend Spatial Calculations
1 Roof 2-ply SBS Membrane, 7 Concrete Copings Caps, Headers, Lintels and Sills 14 Balcony Fascia Fibre Cement Trim Board,
Light Grey Colour to match brick Benjamin Moore 2132-10 Black
2 Soffit Hardie Panel 8a Vinyl Window Vinyl Frame 15 Columns Wood,
Benjamin Moore AF-680 Wish Black Colour: Broda Stain, Natural 111
3 Roof Fascia Fiber Cement Trim Board 8b Vinyl Window Vinyl Frame 16 Beams Fibre Cement Trim Board,
Benjamin Moore 2132-10 Black White Benjamin Moore 2132-10 Black
West Elevation
4a Wall Panel Hardie Reveal Panel System, Smooth 9 Guardrails Aluminum Frames, Powder Coated, 17 Trellis Wood,
Benjamin Moore OC-57 White Heron Makin Metals, Iron Ore Colour: Broda Stain, Natural 111 Scale: 1/8"=1'-0"
January 28, 2021
4b Wall Panel Hardie Reveal Panel System, Smooth 10 Guardrail Glazing Tempered Glass Panels, Vitruim Glass, 18 Feature Soffit Longboard Soffit, V-groove, 6" Exposure,
Benjamin Moore HC-104 Copley Gray Colour: Pewter Colour: Light Cherry
4c Wall Panel Hardie Reveal Panel System, Smooth 11 Curtain Wall Smooth, Matt Finish, 19 Window Flashing Prefinished Aluminum
Benjamin Moore HC-87 Ashley Gray Black Colour: See Supplementary Colour Board
5 Wood Cladding HardiePlank Lap Siding, 6" Exposure, 12 Curtain Wall Spandrel Vitrum Glass, 20 Fascia Flashing Prefinished Aluminum
Colour: Opaci-coat #3-0586 Medium Gray Colour: See Supplementary Colour Board
6 Brick Venner Yankee Hill Brick, Smooth 13 Metal Canopy Powder Coated Steel, 21 Gutter & RWL Prefinished Aluminum,
A-3.03
Standard Running Bond, Dark Iron Spot Benjamin Moore 2132-10 Black Colour: See Supplementary Colour Board2 Soffit - Typical
Hardie Panel
Colour: Benjamin Moore AF-680 Wish
17 Trellis
Wood. Colour: Broda Stain, Natural 111
1 Roofing
2-Ply SBS Membrane,
Cap Sheet, Min 2% Slope, Light Grey
3 Roof Fascia Copyright. All rights reserved. Reproduction in
Fiber Cement Trim Board whole or in part is prohibited. This drawing as an
Colour: Benjamin Moore 2132-10 Black
1 Typical Roofing 3 Fascias 2 Soffits instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
IKO Cambridge Dual Grey Fibre Cement Trim Board Hardie Panel System 18 Soffit - Feature have precedence over scaled dimensions.
Colour: BM 2132-10 Black Colour: BM AF-680 Wish Longboard Soffit, V-groove, 6" Exposure Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
Colour-Matched, Embedded Colour: Light Cherry shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
Screws
16 Feature Drop Beam
Fiber Cement Trim Board Revisions
Colour: Benjamin Moore 2132-10 Black
Issued For Rezoning, Development Permit
January 28, 2021
8a Feature Vinyl Windows
Colour: Black
Glazed Guardrail
Aluminum Frames Powder Coated
Colour: Iron Ore
Tempered Glass Panels Vitruim Glass
Colour: Pewter
Feature Balcony Fascia
Fiber Cement Trim Board
Colour: Benjamin Moore HC-104 Copley Gray
13 Metal Canopy 4b Exterior Wall Panel 4c Exterior Wall Panel
Powder Coated Steel, Hardie Reveal Panel System Hardie Reveal Panel System 15 Wood Columns
Colour: BM 2132-10 Black Colour: BM HC-104 Colour: BM HC-87 Ashley Gray Colour: Broda Stain, Natural 111
18 Feature Soffit Copley Gray Colour-Matched, Embedded 8b Vinyl Windows
Soffit: Longboard V-groove, Colour-Matched, Embedded Screws Colour: White
Colour: Light Cherry Screws
4b Wall Panel - Feature
Fiber Cement Panels: HardiePanel Smooth
Hardie Reveal Panel System
Colour: Benjamin Moore HC-104 Copley
5 Feature Wood Cladding
Aluminum Horizontal Siding, 6" Exposure
Longboard Siding, Wood Colour
4a Wall Panel - Light
Fiber Cement Panels: HardiePanel Smooth
Hardie Reveal Panel System
Colour: Benjamin Moore OC-57 White Heron
4a Exterior Wall Panel 5 Feature Siding 9 Railngs
Hardie Reveal Panel System Longboard V-groove, Colour: Makin Metals - Iron Ore 1 Concrete Copings
Colour: BM OC-57 Colour: Light Cherry Caps, Headers, Lintels & Sills
White Heron Colour to Match Brick
Colour-Matched, Embedded
Screws
13 Metal Canopy
Powder Coated Steel
Colour: Benjamin Moore 2132-10 Black
Soffit: Longboard, V-groove, 6" Exposure,
Colour: Light Cherry
Soffit - Feature
Longboard Soffit, V-groove, 6" Exposure
Colour: Light Cherry
11 Curtain Wall Project
Colour: Black
Anodized, Vitrum Glass
12 Curtain Wall - Spandrel
Crystal
10 Balcony Glazing 11 Curtain Wall 12 Curtain Wall Spandrel Vitrum Glass
Colour: Opaci-coat #3-0586 Medium Gray Apartments Ltd.
Vitrum Glass Group Frames Vitrum Glass Group
124 W 20th Street
Colour: Pewter Colour: Black Colour: Opaci-coat #3-0586
North Vancouver
Medium Gray 6 Brick Veneer
Yankee Hill Brick
Standard Modular, Running Bond
Colour: Dark Iron Spot, Smooth
22 Feature Guardrailing
Perforated Metal Panel
Colour: Makin Metals, Regent Gray
19 Window Flashing
Prefinished Aluminum
Colour: Colour-Matched to Window
Material
Board
20 Fascia Flashing
6 Brick Veneer 8a Vinyl Windows Prefinished Aluminum
Colour: -
Scale: 1/4"=1'-0"
January 28, 2021
Yankie Hill Feature: Black
Colour: Dark Iron Spot Smooth
8b
Standard: White
124 West 20th
21 Gutter & RWL
Running Bond Dark Colour
A-3.10Lonsdale Avenue
Lonsdale Avenue
Lonsdale Avenue
Copyright. All rights reserved. Reproduction in
whole or in part is prohibited. This drawing as an
instrument of service is the property of the architect
and may not be used in any way without the written
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the job. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the drawing.
Revisions
Issued For Rezoning, Development Permit
January 28, 2021
West 20th Street West 20th Street West 20th Street
March 21st, 9:00 A.M. March 21st, 12:00 P.M. March 21st, 3:00 P.M.
Lonsdale Avenue
Lonsdale Avenue
Lonsdale Avenue
West 20th Street West 20th Street West 20th Street
June 21st, 9:00 A.M. June 21st, 12:00 P.M. June 21st, 3:00 P.M.
Lonsdale Avenue
Lonsdale Avenue
Lonsdale Avenue
Project
Crystal
Apartments Ltd.
124 W 20th Street
North Vancouver
West 20th Street West 20th Street West 20th Street
Shadow Analysis
December 21st, 9:00 A.M. December 21st, 12:00 P.M. December 21st, 3:00 P.M. Scale: NTS
January 28, 2021
A-3.11ADAPTABILITY REQUIREMENTS FOR LEVEL 2 UNITS
ALL UNITS NOT DEFINED AS ADAPTABLE LEVEL 2 ARE
A. SUMMARY OF LEVEL 2 DESIGN ELEMENTS REQUIRED TO BE ADAPTABLE LEVEL 1
Storage/Tech
Bath Entry 1. 34" SUITE ENTRY DOOR MINIMUM. SOLID BLOCKING IN BATHROOM WALLS OF
2. ROUGH IN WIRING FOR AUTO OPENER OF SUITE TUB/SHOWER & TOILET AREAS & BEHIND TOWEL BARS.
Kitchen ENTRY DOOR.
3. FLUSH THRESHOLDS 1/2" MAX INCLUDING
BALCONY DOOR.
4. 5'-0" TURNING RADIUS INSIDE & OUTSIDE SUITE
Unit
UnitB:
B:11Bed
Bed
Unit A: Studio ENTRY DOOR.
5. 2'-0" CLEAR WALL ADJACENT TO DOOR LATCHES
WHERE DOOR SWINGS TOWARD USER.
Level2-Adaptable
Level 2-Adaptable
Area: 426 sf 6. 34" DOORS FOR ONE BEDROOM, ONE BATHROOM Area:576
Area: 576sfsf
Dining/Kitchen & PATIO DOOR Co r t All r ts reserve e ro to
Units: 5 of 57 7. 5'-0" TURNING RADIUS ON BALCONY Units:
Units:1111ofof5757 ole or art s ro te s ra as a
str e t o serv e s t e ro ert o t e ar te t
Balcony Balcony
8. WINDOW OPENING MECHANISM 46" AFF MAXIMUM
WIC
Master Bedroom Master Bedroom
Living Living
a a ot e se a a t o t t e r tte
Dining
D
Bedroom 1
9. 6'-0" WINDOW (MINIMUM) IN LIVING/DINING & Dining
D
Bedroom 1
er ss o o t s o e r tte e s o s s all
Balcony
Ensuite
2'-6" SILLS (MAXIMUM) IN ONE BEDROOM
Balcony
Ensuite
ave re e e e over s ale e so s
Master Bedroom
Bedroom 2
Master Bedroom
Bedroom 2
Co tra tors s all ver a e res o s le or all
Balcony
Living Kitchen Bath Living Kitchen Bath
C2
Bedroom
Balcony 10. CONTINUOUS COUNTER BETWEEN SINK & STOVE C2
Bedroom
Balcony
e so s a o t o s o t e o Ar te t
11. TOILET LOCATED ADJACENT TO 3'-0" LONG WALL s all e or e o a s re a e or var at o s
Dining Dining
C3 C3
Ensuite Master Bedroom Entry Kitchen/ Dining Ensuite Master Bedroom Entry Kitchen/ Dining
Living Living Balcony Living Living Balcony
Kitchen
Bath
Kitchen
C1 Bedroom
WIC
Entry
FOR GRABBAR. Kitchen
Bath
Kitchen
C1 Bedroom
WIC
Entry ro t e e so sa o t o s o t e ra
12. 3'-0" CLEARANCE ALONG THE FULL LENGTH OF
Bedroom Bedroom
Bath Bath
Ensuite Ensuite
Dining/Kitchen Dining/Kitchen
Balcony Bath Balcony Bath
A A
Tech Tech
Living/ Dining
Elevators
Master Bedroom
BATHTUB. Living/ Dining
Elevators
Master Bedroom
Revisions
Ensuite Ensuite
Entry Entry
Entry Laundry Entry Laundry
Bedroom Bath Bedroom Bath
Entry
Entry
Bath
Bedroom
Bath
Bedroom
Living/ Dining Elec.
Storage/Tech Storage/Tech
B. FIXTURES & FINISHES Elec.
Storage/Tech Storage/Tech
Issued For Rezoning, Development Permit
Kitchen
Kitchen
Entry Entry Bath Entry Bath Entry Entry Entry Bath Entry Bath Entry
Laundry Laundry
January 28, 2021
Bath Bath Bath Bath
Ensuite
Ensuite
Dining/Kitchen Dining/Kitchen Dining/Kitchen Dining/Kitchen
Dining/Kitchen Dining/Kitchen
WIC WIC
1. LEVER HANDLES ON ALL DOORS Dining/Kitchen Dining/Kitchen
WIC WIC
Dining
Dining
Bedroom
Master Bedroom
Master Bedroom
Bedroom Bedroom Bedroom Bedroom
2. ADJUSTABLE DOOR CLOSERS ON SUITE ENTRY Bedroom Bedroom Bedroom Bedroom
B1 B2 B B C B1 B2 B B C
Living
Living
Living Living Living Living Living Living Living Living
DOORS (22N MAX. FORCE)
Balcony
Balcony
Balcony Balcony Balcony Balcony Balcony Balcony Balcony Balcony
3. SUITE ENTRY DOOR HANDLES TO BE 40" AFF & DB
DIRECTLY ABOVE.
Living 4. NON SLIP FLOORING IN KITCHENS & MIN. ONE
BATHROOM.
5. HIGH DENSITY, LOW LEVEL LOOP CARPET &
UNDERLAY.
Bedroom Bath 6. OUTDOOR LIGHT & RECEPTACLE ON BALCONIES
REQUIRED.
7. FURTHER ELECTRICAL REQUIREMENTS ON ELEC.
DWGS.
8. LEVER HANDLE KITCHEN FAUCETS & KITCHEN
Balcony CABINET HANDLES.
9. ADJUSTABLE KITCHEN CABINET SHELVES.
10. KITCHEN PULL-OUT WORK SHELF AT 2'-8" AFF
11.SOLID BLOCKING IN BATHROOM WALLS OF
TUB/SHOWER & TOILET AREAS & BEHIND TOWEL
BARS.
12.PRESSURE BALANCED TUB/SHOWER VALVES.
13.FURTHER MECHANICAL REQUIREMENTS ON MECH.
DWGS
Entry Entry
Laundry
Bath Bath
Unit B1: 1 Bed Unit
UnitB2:
B2:11Bed
Bed
Area: 585 sf Area:
Area:560
560sfsf
Units: 6 of 57 Balcony
Units:
Units:6 6ofof5757 Balcony
Master Bedroom Master Bedroom
Living Living
Dining/Kitchen D
Bedroom 1
D
Bedroom 1
Balcony
Dining
Ensuite
Dining/Kitchen Balcony
Dining
Ensuite
Master Bedroom Master Bedroom
Bedroom 2 Bedroom 2
Kitchen Bath Living Kitchen Bath
Living
C2
Bedroom
Dining
Balcony
C2
Bedroom
Dining
Balcony
C3 C3
Ensuite Master Bedroom Entry Kitchen/ Dining Ensuite Master Bedroom Entry Kitchen/ Dining
Living Living Balcony Living Living Balcony
Kitchen
Bath
Kitchen
C1 Bedroom
WIC
Entry
Kitchen
Bath
Kitchen
C1 Bedroom
WIC
Entry
Bedroom Bedroom
Bath Bath
Project
Ensuite Ensuite
Dining/Kitchen Dining/Kitchen
Balcony Bath Balcony Bath
A A
Tech Tech
Living/ Dining Living/ Dining
Master Bedroom Master Bedroom
Elevators Ensuite Elevators Ensuite
Crystal
Entry Entry
Entry Laundry Entry Laundry
Bedroom Bath Bedroom Bath
Entry
Entry
Bedroom
Bath
Bath
Bedroom
Elec. Elec.
Storage/Tech Storage/Tech Storage/Tech Storage/Tech
Kitchen
Kitchen
Entry Entry Bath Entry Bath Entry Entry Entry Bath Entry Bath Entry
Laundry Laundry
Bath Bath Bath Bath
Ensuite
Ensuite
Apartments Ltd.
Dining/Kitchen Dining/Kitchen Dining/Kitchen Dining/Kitchen
Bedroom
Dining/Kitchen WIC WIC Dining/Kitchen WIC WIC
Dining/Kitchen Dining/Kitchen
Dining
Dining
Bedroom
Master Bedroom
Bedroom Bedroom Bedroom Bedroom Master Bedroom Bedroom Bedroom Bedroom Bedroom
B1 B2 B B C B1 B2 B B C
Living
Living
Living Living Living Living Living Living Living Living
Balcony
Balcony
Balcony Balcony Balcony Balcony Balcony Balcony Balcony Balcony
124 W 20th Street
North Vancouver
Living Living
Balcony Balcony
Unit Plans
Studio & 1 Bedroom
Scale: 1/4"=1'-0"
January 28, 2021
A-5.00ADAPTABILITY REQUIREMENTS FOR LEVEL 2 UNITS
Balcony ALL UNITS NOT DEFINED AS ADAPTABLE LEVEL 2 ARE
A. SUMMARY OF LEVEL 2 DESIGN ELEMENTS REQUIRED TO BE ADAPTABLE LEVEL 1
1. 34" SUITE ENTRY DOOR MINIMUM. SOLID BLOCKING IN BATHROOM WALLS OF
2. ROUGH IN WIRING FOR AUTO OPENER OF SUITE TUB/SHOWER & TOILET AREAS & BEHIND TOWEL BARS.
ENTRY DOOR.
Balcony Master Bedroom 3. FLUSH THRESHOLDS 1/2" MAX INCLUDING
Ensuite
Living
BALCONY DOOR.
4. 5'-0" TURNING RADIUS INSIDE & OUTSIDE SUITE Unit C1: 2 Bed
Bedroom
Master Bedroom
Unit
Unit C:
C: 22 Bed
Bed ENTRY DOOR.
5. 2'-0" CLEAR WALL ADJACENT TO DOOR LATCHES
WHERE DOOR SWINGS TOWARD USER.
Level 2-Adaptable
Area:881
Area: 881sfsf Bedroom 6. 34" DOORS FOR ONE BEDROOM, ONE BATHROOM Area: 864 sf
& PATIO DOOR Co r t All r ts reserve e ro to
Units:
Units:66ofof57
57 7. 5'-0" TURNING RADIUS ON BALCONY Units: 6 of 57 ole or art s ro te s ra as a
str e t o serv e s t e ro ert o t e ar te t
Balcony Balcony
Living
Master Bedroom
8. WINDOW OPENING MECHANISM 46" AFF MAXIMUM Living
Master Bedroom
a a ot e se a a t o t t e r tte
Dining
D
Bedroom 1
9. 6'-0" WINDOW (MINIMUM) IN LIVING/DINING & Dining
D
Bedroom 1
er ss o o t s o e r tte e s o s s all
WIC ave re e e e over s ale e so s
Ensuite Ensuite
2'-6" SILLS (MAXIMUM) IN ONE BEDROOM
Balcony Balcony
Master Bedroom
Living Kitchen Bath
Bedroom 2
Master Bedroom
Living Kitchen Bath
Bedroom 2
Co tra tors s all ver a e res o s le or all
C2
Bedroom
Balcony 10. CONTINUOUS COUNTER BETWEEN SINK & STOVE C2
Bedroom
Balcony
e so s a o t o s o t e o Ar te t
11. TOILET LOCATED ADJACENT TO 3'-0" LONG WALL s all e or e o a s re a e or var at o s
Dining Dining
C3 C3
Ensuite Master Bedroom Entry Kitchen/ Dining Ensuite Master Bedroom Entry Kitchen/ Dining
Living Living Balcony Living Living Balcony
Kitchen
Bath
Kitchen
C1 Bedroom
WIC
Entry
FOR GRABBAR. Kitchen
Bath
Kitchen
C1 Bedroom
WIC
Entry ro t e e so sa o t o s o t e ra
12. 3'-0" CLEARANCE ALONG THE FULL LENGTH OF
Bedroom Bedroom
Bath Bath
Ensuite Ensuite
Dining/Kitchen Dining/Kitchen
Balcony Bath Balcony Bath
A A
Tech Tech
Living/ Dining
Elevators
Master Bedroom
BATHTUB. Living/ Dining
Elevators
Master Bedroom
Revisions
Ensuite Ensuite
Entry Entry
Entry Laundry Entry Laundry
Bedroom Bath Bedroom Bath
Entry
Entry
Bath
Bedroom
Bath
Bedroom
Elec.
Storage/Tech Storage/Tech
B. FIXTURES & FINISHES Elec.
Storage/Tech Storage/Tech
Issued For Rezoning, Development Permit
Kitchen
Kitchen
Entry Entry Bath Entry Bath Entry Entry Entry Bath Entry Bath Entry
Bath
Laundry Laundry
January 28, 2021
Bath Bath Bath Bath
Ensuite
Ensuite
Kitchen Dining Dining/Kitchen Dining/Kitchen
WIC
Dining/Kitchen
WIC
Dining/Kitchen
1. LEVER HANDLES ON ALL DOORS Dining/Kitchen Dining/Kitchen
WIC
Dining/Kitchen
WIC
Dining/Kitchen
Dining
Dining
Living
Master Bedroom
Master Bedroom
Bedroom Bedroom Bedroom Bedroom
2. ADJUSTABLE DOOR CLOSERS ON SUITE ENTRY Bedroom Bedroom Bedroom Bedroom
B1 B2 B B C B1 B2 B B C
Living
Living
Living Living Living Living Living Living Living Living
DOORS (22N MAX. FORCE)
Ensuite
Balcony
Balcony
Balcony Balcony Balcony Balcony Balcony Balcony Balcony Balcony
3. SUITE ENTRY DOOR HANDLES TO BE 40" AFF & DB
DIRECTLY ABOVE.
Dining/Kitchen 4. NON SLIP FLOORING IN KITCHENS & MIN. ONE
Bath BATHROOM.
5. HIGH DENSITY, LOW LEVEL LOOP CARPET &
UNDERLAY.
6. OUTDOOR LIGHT & RECEPTACLE ON BALCONIES
REQUIRED.
7. FURTHER ELECTRICAL REQUIREMENTS ON ELEC.
Entry DWGS.
8. LEVER HANDLE KITCHEN FAUCETS & KITCHEN
CABINET HANDLES.
9. ADJUSTABLE KITCHEN CABINET SHELVES.
10. KITCHEN PULL-OUT WORK SHELF AT 2'-8" AFF
Entry 11.SOLID BLOCKING IN BATHROOM WALLS OF
Laundry TUB/SHOWER & TOILET AREAS & BEHIND TOWEL
BARS.
12.PRESSURE BALANCED TUB/SHOWER VALVES.
13.FURTHER MECHANICAL REQUIREMENTS ON MECH.
DWGS
Balcony
Kitchen/ Dining
Living Balcony
Master Bedroom
Living Unit C3: 2 Bed
Entry Area: 748 sf
Bedroom
Units: 5 of 57 Balcony
Master Bedroom
Living
Dining
D
Bedroom 1
Ensuite
Balcony
Master Bedroom
Bedroom 2
Living Kitchen Bath
C2
Bedroom
Dining
Balcony
C3
Ensuite Master Bedroom Entry Kitchen/ Dining
Living Living Balcony
C1 Bedroom
Dining
Unit
Unit C2:
C2: 22 Bed
Bed
Bath
Entry
WIC
Kitchen
Kitchen
Bedroom
Bedroom Project
Bath
Ensuite
Ensuite
Dining/Kitchen
Balcony Bath
A
Tech
Living/ Dining
Master Bedroom
Crystal
Elevators
Area:
Area:879
879sfsf
Ensuite
Entry
Entry Laundry
Bath Bedroom Bath
Entry
Bath
Bedroom
Elec.
Units:
Units:55ofof57
57
Storage/Tech Storage/Tech
Kitchen
Entry Entry Bath Entry Bath Entry
Laundry
Bath Bath
Ensuite
Apartments Ltd.
Balcony Dining/Kitchen Dining/Kitchen
Dining/Kitchen WIC WIC
Dining/Kitchen
Dining
Master Bedroom
Living
D
Master Bedroom
Bedroom 1 Bedroom Bedroom Bedroom Bedroom
B1 B2 B B C
Living
Living Living Living Living
Dining
Ensuite
Balcony
Balcony
124 W 20th Street
Balcony Balcony Balcony Balcony
Master Bedroom
Bedroom 2
Living Kitchen Bath
Bath C2
Bedroom
Dining
Balcony
North Vancouver
C3
Ensuite Master Bedroom Entry Kitchen/ Dining
Living Living Balcony
Kitchen
Bath
Kitchen
C1 Bedroom
WIC
Entry
Bedroom
Bath
Ensuite
Dining/Kitchen
Balcony Bath
A
Tech
Living/ Dining
Master Bedroom
Entry Elevators Ensuite
Entry Laundry
Kitchen
Bedroom Bath
Entry
Bath
Bedroom
Elec.
Storage/Tech Storage/Tech
Kitchen
Entry Entry Bath Entry Bath Entry
Laundry
Bath Bath
Master Bedroom
Ensuite
Dining/Kitchen Dining/Kitchen
Dining/Kitchen WIC WIC
Dining/Kitchen
Dining
Ensuite
Master Bedroom
Bedroom Bedroom Bedroom Bedroom
B1 B2 B B C
Living
Living Living Living Living
Balcony
Balcony Balcony Balcony Balcony
Unit Plans
2 Bedroom
Tech Scale: 1/4"=1'-0"
January 28, 2021
Entry
A-5.01Co yri ht. All ri hts reserve . e ro ction in
hole or in art is rohibite . his ra in as an
instr ment of service is the ro erty of the architect
an may not be se in any ay itho t the ritten
ermission of this office.Written imensions shall
have rece ence over scale imensions.
Contractors shall verify an be res onsible for all
imensions an con itions on the ob. Architect
shall be informe of any iscre ancie or variations
from the imensions an con itions on the ra in .
Revisions
Issued For Rezoning, Development Permit
January 28, 2021
Balcony
Balcony
Master Bedroom
Living
Master Bedroom Bedroom 1
Living
Unit D: 3 Bed
Bedroom 1 Area: 1,014 sf
Units: 6 of 57 Dining
Balcony
Living
Master Bedroom
Ensuite
Dining
D
Bedroom 1
Ensuite
Balcony
Master Bedroom
Bedroom 2
Living Kitchen Bath
C2
Bedroom
Balcony
Dining Ensuite
Dining
Living
Master Bedroom Entry Kitchen/ Dining
C3Living Balcony
Bath
C1 Bedroom
Unit D1: 3 Bed
Entry
WIC
Kitchen
Kitchen
Bedroom
Bath
Ensuite
Dining/Kitchen
Balcony Bath
Ensuite A
Tech
Living/ Dining
Master Bedroom
Bath
Entry Elevators Ensuite
Area: 989 sf
Entry Laundry
Bedroom Bath
Entry
Bath
Bedroom
Elec.
Units: 1 of 57
Storage/Tech Storage/Tech
Kitchen
Entry Entry Bath Entry Bath Entry
Laundry
Bath Bath
Ensuite
Dining/Kitchen Dining/Kitchen
Balcony
Dining/Kitchen WIC WIC
Dining/Kitchen
Dining
Master Bedroom
Living
Master Bedroom
Bedroom
B1
Bedroom
B2
Bedroom
B
Bedroom
B C D
Bedroom 1
Living
Living Living Living Living
Kitchen
Dining
Ensuite
Balcony
Balcony
Balcony Balcony Balcony Balcony
Master Bedroom Bedroom 2
Bedroom 2
Living Kitchen Bath
Ensuite
D1
Bedroom 1
Dining
Balcony
Master Bedroom Entry
Living
Amenity
Bedroom 2 Bath
C1 Bedroom
WIC
3sf
Bath
Kitchen
Bedroom 2
Stair 1 Stair 2
Kitchen Tech
Dining/Kitchen
Bath
Ensuite
Wash Entry Elevators
Entry Laundry
Office
Entry
Bath
Bedroom
Elec.
Mail
Storage/Tech
Kitchen
Entry Entry Bath Entry
Laundry
Bath Bath
Ensuite
Dining/Kitchen
Dining/Kitchen Dining/Kitchen
WIC Lobby
Dining
2 3sf Amenity
33 sf
Master Bedroom
Bedroom Bedroom Bedroom
B1 B2 B C
Vest.
Living
Living Living Living
Balcony
Balcony Balcony Balcony
Tech
Entry Project
Crystal
Entry Apartments Ltd.
124 W 20th Street
North Vancouver
Unit Plans
3 Bedroom
Scale: 1/4"=1'-0"
January 28, 2021
A-5.02Copyri ht. All ri hts reserved. eprod ction in
hole or in part is prohibited. his dra in as an
instr ment of service is the property of the architect
and may not be sed in any ay itho t the ritten
permission of this office.Written dimensions shall
have precedence over scaled dimensions.
Contractors shall verify and be responsible for all
dimensions and conditions on the ob. Architect
shall be informed of any discrepancie or variations
from the dimensions and conditions on the dra in .
Revisions
Issued For Rezoning, Development Permit
D D January 28, 2021
(AH)
D1 C2
(AH)
C1 Amenity C3
(Adpt/ C1
AH) (Adpt)
Stair 1 Stair 2
Exit
A
Wash Elevators Elevators
Exit
Office FFE: 102.70m FFE: 105.76m
Elec. Elec.
Mail
Lobby
Amenity Project
Crystal
Vest. Apartments Ltd.
B1 B2 B C B1 B2 B B C 124 W 20th Street
(AH) (AH) (Adpt) (AH) (Adpt) (Adpt) North Vancouver
Main Floor Area Overlay Level 2 Area Overlay Main & Level 2
- -
Area Overlay
Scale: 1/8"=1'-0"
January 28, 2021
A-9.00You can also read