EXPO 2021 DOHA PROGRESS REPORT - International Association of Horticultural ...

Page created by James Alvarez
 
←
CONTINUE READING
→
EXPO 2021 DOHA PROGRESS REPORT - International Association of Horticultural ...
70TH AIPH ANNUAL CONGRESS
EXPO 2021 DOHA
 PROGRESS REPORT

                             Padova, Italy
                   17th – 22nd September
EXPO 2021 DOHA PROGRESS REPORT - International Association of Horticultural ...
EXPO 2021 DOHA PROGRESS REPORT - International Association of Horticultural ...
EXPO 2021 DOHA PROGRESS REPORT - International Association of Horticultural ...
EXPO 2021 DOHA PROGRESS REPORT - International Association of Horticultural ...
Cooperation Agreement with the Netherlands

• Governments of Qatar and the Netherlands
  signed an agreement for cooperation as host
  countries of two consecutive A1 International
  Horticultural Exhibitions.

                   FEB 2018 MEETING BETWEEN MINISTRIES IN
                             THE NETHERLANDS
EXPO 2021 DOHA PROGRESS REPORT - International Association of Horticultural ...
Kick-off meeting was held on 9 August 2018, with the
   participation of the Minister of Environment and
        Municipality and BIE Secretary General.

Preparations for BIE registration process was discussed in
                       the meeting.
EXPO 2021 DOHA PROGRESS REPORT - International Association of Horticultural ...
17 August 2018

Recognition
Documents
Submitted to BIE
EXPO 2021 DOHA PROGRESS REPORT - International Association of Horticultural ...
EXPO 2021 DOHA
   THEME &       GREEN DESERT,

  SUB-THEMES        BETTER
                 ENVIRONMENT
EXPO 2021 DOHA PROGRESS REPORT - International Association of Horticultural ...
EXPO 2021 DOHA PROGRESS REPORT - International Association of Horticultural ...
The goal is to encourage, inspire and inform people about
    innovative solutions for reducing desertification and
           establishing a sustainable environment.
  EXPO 2021 Doha believes that achieving successful results
requires international cooperation around the same goal and
                    key strategic solutions.
TECHNOLOGY & INNOVATION:
            Will be the operator of future green
    solutions while playing an important role in
changing direction in the use of fossil fuels, creating
    solutions for urban industrial pollution and
   advancing alternatives for chemical-intensive
                    agriculture.
MODERN AGRICULTURE:
provides new innovations, research and
scientific advancements to produce safe,
 sustainable and affordable food for the
   increasing population of the world.
ENVIRONMENTAL AWARENESS
Is a tool for encouraging the protection of
    natural resources, raising a sense of
    connection to the natural world and
   promoting sustainable development.
SUSTAINABILITY:
   Is humans’ common objective for
balancing different needs along with the
awareness about economy, technology,
   environment and social sciences.
EXPO 2021 DOHA
LOCATION OF THE EXHIBITION AREA
               &
   PRELIMINARY MASTERPLAN
LOCATION OF THE EXHIBITION AREA
The Site is in a
PROJECT LOCATION   strategic location
                   which is:
                   - 15 Minutes away from
                       the West BayArea
                   - 20Minutes away
                       from Doha Port
                   - 20-25 minutes away from
                       Hamad International
                       Airport
The site is well connected
CONNECTIVITY   and surrounded by 3 major
               roads:
               - Al Rayyan Road
               - Jawaan Street
               - Al Amir Street

               The site is highly accessible
               by public transportation
               with the Green line and the
               Gold line passing through.
Connectivity& Accessibility

The site is accessible via four main
streets
-   Al Rayyan Road
-   Jawaan Street
-   Al Amir Street
-   Al Saad Street

It is also well connected to public
transport with the green line and
gold line passing through the site.
There are three main metro stations
and 2 main bus stations highlighted
in the following diagram.

          Gold Metro Line
          Green Metro Line
          Metro Stations

          Bus Stations
Surrounding LandUses
 The Existing Site Containsthe
 following:

 -Vacant Developable Land(140
 Ha)
 - A metro Development
   Construction Site
 - 2 Schools
 - A private Villa
 - Darb Al Saei EventSite

          Gold Metro Line
          Green Metro Line
          Metro Stations
          Bus Stations
          Schools

          Darb Al Saei EventArea
Surrounding Hotels

The site is well connected to hotels
thatare within a walking distance.
The Major hotels alongsidetheir
capacity are highlighted in the
following diagram.

        Major Surrounding Hotels
Healthcare
     in
Surroundings

Major Hospital in
surroundings
Potential
  Access
  Points
The site has 4
major potential
access points
CONTEXTUAL ANALYSIS   The Cultural and Historical
                      Sites proximate toProject site:

                             Cultural and Historical
                                  Sites
CONTEXTUAL ANALYSIS        Cultural and Historical
                           Sites
                      The major Hotels proximateto
                      Project site:

                             Hotels
                      **All the major hotels Highlighted are
                      within a 20 minute driving time from the
                      project site.
CONTEXTUAL ANALYSIS        Cultural and Historical
                           Sites
                           Hotels

                      The Major Hospitalsproximate
                      tothe project site:
                       H   Hospitals
EXHIBITION AREA
PRELIMINARY MASTER PLAN
           EXPLORATION &
               RESEARCH

     ART, CULTURE
         & EVENTS

                           EXPO 2021
  RELAXATION &
    RECREATION               DOHA
                           Exhibition
                              Site
       SPORTS &
      ACTIVE LIFE

                FOOD &
              BEVERAGE
NORTHERNMAIN
                                      ENTRANCE
EXHIBITIONAREA
PRELIMINARY
MASTERPLAN

 Exhibition Area: 80 Ha

 Exhibition area for
 International
 Participants: 16 Ha
 Total closed/covered     SECONDARY
                                                            VIP ENTRANCE
 areas (including         ENTRANCE

 facilities, toilets,
 kiosks..): c.37,500sqm
 Biodome: c.
 25,000sqm

                                                     SOUTHERN ENTRANCE &
                                                     PARKING
Qatar Pavilion+50
Participating Countries
ExhibitionGardens

The areas are                                          ASIA
allocated to the 50
Countries based on
Continents. The
total area allocated
for the 50 countries
                          EUROPE
is 16 Ha.
                                                     QATAR

                               SOUTHAMERICA
                                                NORTH AMERICA
                                    AUSTRALIA
The areas are allocated
to the 50 Countries
based on Continents.
The      total     area                               ASIA
allocated for the 50
countries is 16 Ha.

                          EUROPE
                                                    QATAR

                                               NORTH AMERICA
                                   AUSTRALIA
INDOOR
 GARDENS FOR
 PARTICIPATING
  COUNTRIES

                     QATAR
18,000 -25,000 sqm
MAIN PROJECT                           02
         COMPONENTS                             07
1. Iconic Expo Tower
                                                                    05
2. Biodome (Indoor Show Gardens for Participating
   Countries)

3. 50 Horticulture Show Gardens (Exhibition Space
                                                     03
   for 50 Participating Countries and Qatar)
                                                               01         04
4. Sports/ Recreational Areas (Shaded Walking
   and Cycling Paths, Exercise Areas)

5. Education and ResearchCenter                                     06
6. Botanical Garden/ Public Park
                                                          08
7. Amphitheatre
                                                                     07
8. Recreational and Cultural Facilities              02

9. Expo Museum and Exhibition Hall

                                                               09
LANDUSES

 BIO-DOME
WORLDSHOW GARDEN
EXPO TOWER

QATAF
QATAF
EDUCATIONAND RESEARCHCENTRE
LIBRARY ANDREADING GARDENS

                                     Library & Reading
                                     Garden

                                                   Qatar Pavilion &
                              QatariTraditional    Indoor Garden
                              Souq

                                                         Education Park&
                                   Conference & Events   ResearchCentre
                                   Halls

                                                             Family & Children
                                                             ParkGreen
                                                             Classrooms
DESERT
AMPHITHEATRE&
DESERTPARK

                Sand Dunes
                Amphitheatre
QuranicGardens
Design Concept: Greening the Desert
if we can turn a harsh desert into a greener place,
        we can help to solve desertification

                                  Thank You

                             International Association of HorticulturalProducers
        Horticultual House, Chilton, Didcot, Oxfordshire, OX11 0RN, United Kingdom Tel: +44 (0)1235
                             776 230 | Email: sg@aiph.org | Web: www.aiph.org

                             VAT number: GB184353007. Registration number: 546 558178
You can also read