The New HIS Campus Sept 2019
The New HIS Campus
             Sept 2019
The New HIS Campus Sept 2019
• The History and Future

          • The Location
          • The Brief
Welcome   • The Challenges and
            Opportunities
          • The Latest Schematic Designs

          •Q &A
The New HIS Campus Sept 2019
A Little History…
2002                     2017                       Spring 2019                  Fall 2019                     Spring 2020                    Fall 2020

The Start of             The Agreement to           Testing and                  Foundation                    Main Building                  Inspections and
Something                Re-locate                  Government                   Construction                  Construction                   Handover
Completely Different                                Approvals
                                                                                                                                              Completion
                                                    Overall Construction                                                                      November 2020 11
                                                    Design
                                                    Contractor Selection

                                                    Temporary Power
                                                    Supply
               The Need to                          Piling
               Expand

                                                                   Groundbreaking and                                          Exterior Construction
               (PAC Center                                         Foundation                   Basement                                                        Planned Transition
               Designed)              Construction Begins          Construction                 Construction                   Interior Construction            Sem II Next SY January
               PAC                                                                                                                                              2021

               2015                                                Summer 2019                  Winter 2020                    Summer 2020                      Winter 2021
                                      Fall 2018
The New HIS Campus Sept 2019
The Location…
    @Yincui and Huxi Roads
Baimahu (White Horse Lake)
            Binjiang District
The New HIS Campus Sept 2019
The Location…
    Parks
The New HIS Campus Sept 2019
The Location…
   Canals
The New HIS Campus Sept 2019
The Location…
   Canals Straightened
The New HIS Campus Sept 2019
The Location…
   Mountains
The New HIS Campus Sept 2019
More Mountains…
The New HIS Campus Sept 2019
The Location…
The New Land: 70 MU (approx.                                                            24

50,000m2)
Current Land is 30 MU (approx. 20,000m2)
       70          50,000                                                           路
                                                                                东
       30          20,000                                               湘
                                                                            滨

Mandated Challenges:
1/3 Green space, parking, setback and
fire lanes, orientation, access, building                            SITE AREA:about 50000 s q m.
density, plot ratio, and building heights.                       SETBACK AREA:about 45900 s q m.

                                  1/3

Opportunities:
Design for future needs, use of space,                              湖
                                                                        西                    33
                                             面积约50003平方米(约75亩)              路
flow of people, acoustics, colors,
flooring, environments.
                                             Actual land
The Location…
• About 12-20 minutes by
  car from current location
• 12-20
• About 2 hour walk (3
  hours over the mountain)
• 2              3

• Auto transport likely to be
  more consistent at 15
  minutes w/ new roads
•
      /
                15
New Housing
Developments in
Area
Most Essentials will not Change:

                 • Vision and Mission
                 • General Learning Targets
                 • IB Commitment IB
The              • International School in China Context
Opportunities…   • Small Class Size Ratios
                 • Highest Quality Teachers

                 • Dragon Spirit
                 • Commitment to Safety and Security of
                   Students
HIS will Maintain its Unique
Identity
HIS
   •   Community-Centered and Inclusive
   •   IB World School IB
   •   University Preparation
   •   Strong Opportunities in Academics, Arts, and
       Athletics

   • Promoting International-Mindedness &
     Multilingualism
   • Celebrating Diversity while Promoting Unity

   • Celebrating Host Country Language and Culture

   • Targeting Individual Learning Needs

   • Caring Supportive Environment
Some Positive Changes to
Look Forward to…
• SPACE!!!
• World Class Theater and Black Box

• Swimming Pool
• Two Full-sized 7-aside Soccer Pitches 2 7
• 3-4 Full-sized Basketball and Volleyball Courts 3-4

• Design and Innovation Centers
• Purpose-built Facilities
• Expansion to Medium-sized school (more academic, arts, and
  athletics programs)
• Targeting Individual Learning Needs
• Caring Supportive Environment
• Canal Boating!
• Purposeful Divisions and Orientation
• View of Mountains and Canals, not Star Wars Building

• SPACE!!!
ARRANGEMENT
OF CLASSROOMS
Building Layout
• FLOW and BREAKOUT
  SPACE
•
DESIGN CENTERS

        DESIGN CENTERS
• ATTRACTIVE MULTIPURPOSE
  ENTRANCE HALLS and FOYERS
•
Attractive Gardens and
Outdoor Inquiry Spaces…
Butterfly Garden?
600-650 Seat Theater   600-650
Black Box Theater Connected to Exhibition Hall
Swimming Pool 6-Lanes 25m 6   25
Open Cafeteria
Purpose Built Libraries
Connecting Café
Purpose-Built Breakout Learning and Common Areas
Outdoor Playgrounds
and Fitness Circuit
The Brief…

                                                                      Merge International w/
                                 Design for 1300 Students (4-5
                                                                   Traditional and Modern China
                                   Classes per Grade Level)                                             25 Meter Swimming Pool           Attractive Outdoor Gardens
        General                                                               Features
                                            1300                                                               25
                                             4-5

                                                                   Gyms and Libraries for Upper
                                                                   School, Lower School and ECE      400 seat Blackbox Theater and
   Community Area and Café            Separate ECE Facility            with Strategic Views                                                600-650 Seat Theater
                                                                                                        Performing Arts Center
                                                                                                                                             600-650
                                                                                                     400

                                                                                                         Strong Consideration for
                                 100x60 Meter pitch (allows two                                      Environmental Planning, Energy
Large Main Campus and Separate    45x60 Meter 7-aside pitches      Purposeful Designs of Learning     Efficiencies and Sufficient Safe     One Drop-Off Point for
         ECE Cafeterias                    inside)                Spaces Based on Ages of Students   Indoor Space on Rainy/Poor AQ            Transportation
                                 100*60                       2                                      Days
                                   45*60 7
Early Childhood Center (ECE)
             • Very Large 110m2 Classrooms to Support Inquiry Centers
               Inside Classrooms
             • 110
             • Early Childhood Literacy Library
             •
             • Inquiry Garden, Indoor and Outdoor Playground Areas
               Designed for Children 2-5 Years Old
             •
The Brief…   • Large Rhythm and Movement/Gym/Assembly Space
             •
             • Separate Access from Main Campus
             •
             • Joined by Chinese Garden to Main Campus
             •
             • ECE Cafeteria
             • ECE
Lower School (Grades 1-5)
             • Large 85m2 Classrooms to Support Inquiry Centers Inside
               Classrooms
             • 85
             • Large Library for Reading, Investigation, Collaboration,
               and Study
             •
             • Outdoor Playground Areas Designed for Children 5-12
The Brief…
               Years Old
             • 5-12
             • Large Gym that can Accommodate at least One
               Volleyball/Basketball Competition Court
             •                             /
             • STEAM (Science, Technology, Engineering, Arts, and
               Mathematics) Center
             • STEAM
             • Grade Level Classrooms Together with Common Space for
               Breakout Learning
             •
Upper School (Grades 6-12)
             •   Large Upper School Library for Archives, Research and Collaboration (ARC) and attached to
                 Common Café
             •
             •   Some Smaller 45m2 Classrooms for World Languages and other Specialists
             •   45
             •   Large Gym that can Accommodate at least Two Volleyball/Basketball Competition Courts
             •                           2
             •   Design Center for Technology, Creativity and Innovation
             •
             •   Common Spaces outside of Classrooms for Breakout Learning and Socializing during, between
                 and after Classes

The Brief…
             •
             •   Fitness Center
             •
                                                 Middle School (Grades 6-8)
             •   Large 85m2 Classrooms Grouped by Grade Level for Math, English, Science and Social Studies
             •   85
             •   Outdoor Area Designed for Children 12-15 Years Old
             •     12-15
                                                  High School (Grades 9-12)
             •   Classrooms Organized by Department
             •
             •   Accessible Laboratories, Design Center, and Music Rooms
             •
January 2021-August 2022 Transition Phases
2021 1 -2022 8

      • Criteria for move
      • Able to stay on current HIS campus until August 2023                         2023 8
      • Phase I: Move all Upper School in January 2021, Early Years through Grade 5 continues on
        current HIS Campus              2021 1                            -5
        HIS
      • Phase II: Move ECE and Lower School to new HIS Campus in August 2021                   2021
          8
      • Options to Consider: Allow 1-3 classes of Lower School to transition to New Campus in
        August 2021                2021 8                  1-3
      • Community will be surveyed as to preferences. Space and staffing will allow us to be
        flexible for 18 months                                                         18

      • All grades will hosted at new HIS Campus by August 2022              2022 8
Answers before Questions…

• Local design firm and international group oversight

• Tuition will NOT be increased more than past (3-9%) and most fees remain
  consistent, exception for Upper School where reduced tuition increase to
  meet BYOM goal                              (3-9%)
                                           BYOM
• The construction has commenced (planned timeline is 12-14 months with
  scheduled launch in January 2021)                            12-14
                  2021 1
• We will be hosting several events on new site with students, faculty and
  parents
• There will be significant attention on the emotions of transition

• Yes, we will still host Welcome Back BBQs, WESTLAKE MUN, Halloween
  Parade, International Day and Fun Run events                   WELCOME
  BACK BBQ,
• Yes, we will expand transportation services to the new campus, including
  After-School Activities (ASA) service

• Yes, there are major housing developments going up in the area at various
  costs
• Until we can safely move, we will continue improving current campus for
  learning and aesthetics
Want to See More? Have a Visit!!!
Thank you…
     Questions???