2022 MEDIA INFORMATION - INFORMATION THAT BUILDS THE WORLD - KHL Group
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
INFORMATION THAT BUILDS THE WORLD
WE WORK WITH:
2022
MEDIA INFORMATION
www.khl.com International Construction @ international construction mag @KHLConstruction International Construction www.international-construction.comTHE BRAND
The Covid-19 pandemic has changed the way we work, the way we greet people and where we are allowed to travel. It has also impacted
the construction industry, acting as a force accelerator to trends that were already in place. It has sped up the adoption of new technology,
such as the ability for staff to work on projects remotely and wearable technology that tracks the movement and health of workers.
While the pandemic has accelerated the adoption of new tech, in other ways the construction industry has been surprisingly unaffected.
While many other industries suffered declines in productivity and sales, construction — in most parts of the world — was able to continue.
Contractors and OEMs have been releasing their latest financial reports and the overwhelming trend is that of strong increases in sales.
In many cases, sales for 2021 are higher than in 2019, in a world before Covid-19, highlighting just how quickly the sector has bounced back.
Construction is a truly global industry. As governments continue to use new infrastructure investment as a way of giving their economies
a boost then, combined with the need to maintain existing infrastructure, it will remain one of the world’s most important sectors.
WE REACH KEY BUYERS IN THE GLOBAL International Construction has embarked on a substantial change to its editorial programme as we work to bring you the best and most
interesting articles. Our goal is to inform you, in print and online, and to help you in your role in this most essential of industries.
CONSTRUCTION INDUSTRY ANDY BROWN Editor
MAGAZINE WEBSITE NEWSLETTER SOURCING GUIDE EVENTS
(Click here for more information) (Click here for more information) (Click here for more information) (Click here for more information) (Click here for more information)
JULY-AUGUST 2021 Vol 60 No 6
www.international-construction.com A KHL Group publication
WATCH
JULY-AUGUST 2021 Vol 60 No 6
OUR LATEST
WEBINAR
POWERED BY
www.international-construction.com A KHL Group publication
World’s top 200
contractors ranked
World’s top 200
contractors ranked
INSIDE: 16 PAGE
SUPPLEMENT
JULY-AUGUST 2021 | No 8 A KHL GROUP PUBLICATION
STEPHANE ASSELIN YU HONG FU ANDREA CASSONI INSIDE: 16 PAGE
SUPPLEMENT
Aurecon Sany ABB JULY-AUGUST 2021 | No 8 A KHL GROUP PUBLICATION
STEPHANE ASSELIN YU HONG FU ANDREA CASSONI
IN ASSOCIATION WITH INTERNATIONAL CONSTRUCTION AND CONSTRUCTION EUROPE
PRODUCT REPORT SURVEYING
Aurecon Sany ABB
JCB’S 525-60E ELECTRIC THE NEXT GENERATION IN ASSOCIATION WITH INTERNATIONAL CONSTRUCTION AND CONSTRUCTION EUROPE
LOADALL TELESCOPIC PRODUCT REPORT SURVEYING
HANDLER JCB’S 525-60E ELECTRIC
LOADALL TELESCOPIC THE NEXT GENERATION
HANDLER
INTERVIEW INTERVIEW:
ANDREA SCOTT
CASSONI, CROZIER,
ABB TRIMBLE
WEARABLES
INTERVIEW INTERVIEW: BOOSTING PRODUCTIVITY
AND SAFETY
ANDREA SCOTT
CASSONI, CROZIER,
ABB TRIMBLE
TEST DRIVE: JCB’S ELECTRIC LOADALL TELESCOPIC HANDLER
WEARABLES
BOOSTING PRODUCTIVITY ICON 07-08 2021 Front Cover JH.indd 1 12/07/2021 09:46:45
AND SAFETY
TEST DRIVE: JCB’S ELECTRIC LOADALL TELESCOPIC HANDLER
ICON 07-08 2021 Front Cover JH.indd 1 12/07/2021 09:46:45
T E S T D R I V E : J C B ’ S E L E C T R I C L O A D A L L T E L E S C O P I C H A N D 12/07/2021
ICON 07-08 2021 Front Cover JH.indd 1
LER 09:46:45
AND SAFETY ICON 07-08 2021 Front Cover JH.indd 1 12/07/2021 09:46:45
BOOSTING PRODUCTIVITY
WEARABLES
TEST DRIVE: JCB’S ELECTRIC LOADALL TELESCOPIC HANDLER
ABB TRIMBLE
CASSONI, CROZIER,
ANDREA SCOTT AND SAFETY
INTERVIEW INTERVIEW: BOOSTING PRODUCTIVITY
WEARABLES
ABB TRIMBLE
CASSONI, CROZIER,
ANDREA SCOTT
INTERVIEW INTERVIEW:
25,724 37,721 22,979 5,082 2021 “OEM OPPORTUNITIES”
HANDLER
HANDLER LOADALL TELESCOPIC
JCB’S 525-60E ELECTRIC THE NEXT GENERATION
SURVEYING
LOADALL TELESCOPIC THE NEXT GENERATION
PRODUCT REPORT
JCB’S 525-60E ELECTRIC
Aurecon Sany ABB
IN ASSOCIATION WITH INTERNATIONAL CONSTRUCTION AND CONSTRUCTION EUROPE
PRODUCT REPORT SURVEYING
Aurecon Sany ABB STEPHANE ASSELIN YU HONG FU ANDREA CASSONI
IN ASSOCIATION WITH INTERNATIONAL CONSTRUCTION AND CONSTRUCTION EUROPE
JULY-AUGUST 2021 | No 8 A KHL GROUP PUBLICATION
SUPPLEMENT
JULY-AUGUST 2021 | No 8 A KHL GROUP PUBLICATION
STEPHANE ASSELIN YU HONG FU ANDREA CASSONI INSIDE: 16 PAGE
SUPPLEMENT
INSIDE: 16 PAGE
contractors ranked
WEBINAR ATTRACTED:
World’s top 200
contractors ranked
World’s top 200
CIRCULATION PAGE VIEWS/MONTH WEEKLY DISTRIBUTION PAGE VIEWS/MONTH
549
www.international-construction.com A KHL Group publication
PUBLISHER’S OWN DATA JULY-AUGUST 2021 Vol 60 No 6
AVERAGE (SEP 2020-JAN 2021) AVERAGE (JULY 2021) AVERAGE (MAY 2021)
PUBLISHER’S OWN DATA PUBLISHER’S OWN DATA PUBLISHER’S OWN DATA
REGISTERED DELEGATES
9 ISSUES PER YEAR
www.international-construction.com A KHL Group publication
JULY-AUGUST 2021 Vol 60 No 6
SOURCE: GOOGLE ANALYTICS
Google Analytics is the most widely used
368
web analytics service on the internet and COMPANIES
considered the most accurate. REPRESENTED
2 International Construction @international construction mag @KHLConstruction International Construction www.international-construction.comTHE GLOBAL CONSTRUCTION MARKET
UNEXPECTED PANDEMIC BOUNCE CONSTRUCTION OUTPUT GROWTH
EQUIPMENT SALES IN THE 2010S national lockdowns came into force it was feared that
PLAY THE VIDEO BELOW TO LEARN
l A fter a period of weakness in the early and mid-part global markets would crash and declines of 20-40% According to analytics company Global Data, global
of the 2010s, global equipment sales picked up were anticipated in worldwide equipment sales. MORE ABOUT EQUIPMENT SALES construction output will see growth of 5.7% in 2021.
at the end of 2016. However, the final result for 2020 was that there was This predicted growth would be a robust figure,
l R obust growth followed in 2017 and 2018, taking the almost no change in global sales. Indeed, it is striking given that the industry saw a 2.4% decline in 2020 and
global market to a record 1.1 m units sold in 2018. that the market performed better in the pandemic than that cases of those infected with Covid-19 is still high
l T his level was more or less maintained in 2019. it was expected to prior to the Covid outbreak. around the world.
l T he market began to soften and it was anticipated
that 2020 would see a modest downturn in 2021 AND BEYOND Many markets have managed to regain growth
global construction equipment sales. According to Off-Highway Research, 2021 could see momentum and have already returned to pre-Covid-19
record-high levels of equipment sales. Beyond levels. Out of 65 markets that have produced quarterly
COVID-19 2021, the forecast is for continued high equipment data for the first quarter of 2021, 25 had recorded year-
As the pandemic took hold around the world and sales worldwide. on-year (Y-o-Y) growth in that period, including China,
France, Italy, India and Saudi Arabia.
GLOBAL SALES SHOWING PRE AND POST COVID FORECAST While the report does acknowledge that, apart from
Covid-19, the industry has a number of issues such as
1,200,000 disruptions to supply chains and materials shortages
it pointed to the high level of construction activity
around the world as being very positive.
1,000,000
GLOBAL CONSTRUCTION OUTPUT
800,000
6%
4%
3.7%
600,000
2%
400,000 -2.4%
0%
5.7%
200,000 -2%
-4%
0
-6%
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2020 2021 2022-2025,
Average
Historic sales Pre-Covid-19 forecast Revised forecast Source: Off-Highway Research Source: Global Data
3 International Construction @international construction mag @KHLConstruction International Construction www.international-construction.comCIRCULATION
INTERNATIONAL CONSTRUCTION REACHES BY BUSINESS TYPE
EVERY COUNTRY IN THE WORLD 57% Contractor/Sub-contractor
9% Consulting Engineer/Architect/Quantity Surveying and Consultant
9% Equipment Rental
MAGAZINE l Our circulation targets buyers of equipment:
Contractors and equipment rental companies
purchase 75-80% of all construction equipment
8% Manufacturer
in the world; we reach 15,000+ contractors and 8% Distributor/Agent/Equipment Sales
JULY-AUGUST 2021 Vol 60 No 6
2,200+ rental companies each issue
6% End Users (including energy/oil & gas/mining/utilities)
www.international-construction.com A KHL Group publication
JULY-AUGUST 2021 Vol 60 No 6
l O ur circulation is fluid and determined by the
construction output in each country
3% Other
www.international-construction.com A KHL Group publication
World’s top 200
contractors ranked
World’s top 200
l W
e target both the developing markets
INSIDE: 16 PAGE
SUPPLEMENT
JULY-AUGUST 2021 | No 8 A KHL GROUP PUBLICATION
STEPHANE ASSELIN YU HONG FU ANDREA CASSONI INSIDE: 16 PAGE
contractors ranked
worldwide and the established construction If your company operates just in Europe, request a media pack from our sister publication,
markets
SUPPLEMENT
Aurecon Sany ABB
Construction Europe, to see further advertising opportunities
IN ASSOCIATION WITH INTERNATIONAL CONSTRUCTION AND CONSTRUCTION EUROPE
JULY-AUGUST 2021 | No 8 A KHL GROUP PUBLICATION
STEPHANE ASSELIN YU HONG FU ANDREA CASSONI
PRODUCT REPORT SURVEYING
Aurecon Sany ABB
JCB’S 525-60E ELECTRIC THE NEXT GENERATION IN ASSOCIATION WITH INTERNATIONAL CONSTRUCTION AND CONSTRUCTION EUROPE
LOADALL TELESCOPIC PRODUCT REPORT SURVEYING
HANDLER JCB’S 525-60E ELECTRIC
LOADALL TELESCOPIC THE NEXT GENERATION
HANDLER
INTERVIEW INTERVIEW:
ANDREA SCOTT
CASSONI, CROZIER,
ABB TRIMBLE
WEARABLES
INTERVIEW INTERVIEW: BOOSTING PRODUCTIVITY
AND SAFETY
ANDREA SCOTT
CASSONI, CROZIER,
ABB TRIMBLE
TEST DRIVE: JCB’S ELECTRIC LOADALL TELESCOPIC HANDLER
WEARABLES
BOOSTING PRODUCTIVITY ICON 07-08 2021 Front Cover JH.indd 1 12/07/2021 09:46:45
AND SAFETY
TEST DRIVE: JCB’S ELECTRIC LOADALL TELESCOPIC HANDLER
ICON 07-08 2021 Front Cover JH.indd 1 12/07/2021 09:46:45
TEST DRIVE: JCB’S ELECTRIC LOADALL TELESCOPIC HANDLER
ICON 07-08 2021 Front Cover JH.indd 1 12/07/2021 09:46:45
AND SAFETY ICON 07-08 2021 Front Cover JH.indd 1 12/07/2021 09:46:45
BOOSTING PRODUCTIVITY
WEARABLES
TEST DRIVE: JCB’S ELECTRIC LOADALL TELESCOPIC HANDLER
ABB TRIMBLE
CASSONI, CROZIER,
ANDREA SCOTT AND SAFETY
INTERVIEW INTERVIEW: BOOSTING PRODUCTIVITY
WEARABLES
BY REGION*
ABB TRIMBLE
CASSONI, CROZIER,
ANDREA SCOTT
INTERVIEW INTERVIEW:
25,724 5,917
HANDLER
HANDLER LOADALL TELESCOPIC
JCB’S 525-60E ELECTRIC THE NEXT GENERATION
SURVEYING
LOADALL TELESCOPIC THE NEXT GENERATION
PRODUCT REPORT
JCB’S 525-60E ELECTRIC
Aurecon Sany ABB
IN ASSOCIATION WITH INTERNATIONAL CONSTRUCTION AND CONSTRUCTION EUROPE
PRODUCT REPORT SURVEYING
Aurecon Sany ABB STEPHANE ASSELIN YU HONG FU ANDREA CASSONI
IN ASSOCIATION WITH INTERNATIONAL CONSTRUCTION AND CONSTRUCTION EUROPE
EUROPE
JULY-AUGUST 2021 | No 8 A KHL GROUP PUBLICATION
SUPPLEMENT
JULY-AUGUST 2021 | No 8 A KHL GROUP PUBLICATION
STEPHANE ASSELIN YU HONG FU ANDREA CASSONI INSIDE: 16 PAGE
SUPPLEMENT
INSIDE: 16 PAGE
contractors ranked
World’s top 200
contractors ranked
GERMANY 881
TOP 2
World’s top 200
CIRCULATION NORTH AMERICA 5,659 UK 836
USA 4,197
TOP 2
www.international-construction.com A KHL Group publication
PUBLISHER’S OWN DATA JULY-AUGUST 2021 Vol 60 No 6
MEXICO 699 MIDDLE EAST 2,572 ASIA & ASIA PACIFIC 7,203
UAE 816 INDIA 1,885
9 ISSUES PER YEAR
TOP 2
TOP 2
www.international-construction.com A KHL Group publication
IRAN 470 AUSTRALIA 767
JULY-AUGUST 2021 Vol 60 No 6
AFRICA 1,286
SOUTH AFRICA 287
TOP 2
LATIN AMERICA 3,087 NIGERIA 218
BRAZIL 1,061
TOP 2
COLOMBIA 402
For more information, or to advertise, please contact Simon Kelly: simon.kelly@khl.com | T: +44 (0)1892 786223 | M: +44 (0) 7850 203298
4 International Construction @international construction mag @KHLConstruction International Construction www.international-construction.comEDITORIAL PROGRAMME 2022
JAN-FEB MARCH APRIL MAY-JUN PRINT REMAINS NUMBER 1
CONTECH FOCUS: CONTECH FOCUS: MARKET INTELLIGENCE: MARKET INTELLIGENCE:
Next generation surveying: drones Boosting productivity through software Equipment Market Report Yellow Table
and new software
Concrete equipment: latest techniques CONTECH FOCUS:
Earthmoving equipment: heavy and technology New power options: electric,
Engines: the benefits of diesel power Quarrying and mining: how new tech is hydrogen and fuel cells
being practically used CONTECH FOCUS:
NEW How to solve construction’s Automating construction’s jobsites High rise construction: challenges Our audience, your current and
skills shortage NEW Trends: sustainable
construction materials and opportunities prospective clients, tell us that print
COUNTRY REPORT: America COUNTRY REPORT: India Road construction 2030: how will NEW ICON’s Industry Snapshot remains their number one source of
the sector evolve? NEW Trends: how urbanisation will information. Read these independent
FREE MARKET RESEARCH: NEW How to boost jobsite impact construction’s future reports for more information:
Free independent advertising health & safety COUNTRY REPORT: Australia
research for full pages or larger COUNTRY REPORT: Germany HAND-POINTER Format Preference
BONUS DISTRIBUTION:
World of Asphalt BONUS DISTRIBUTION: GIC BONUS DISTRIBUTION: Hillhead HAND-POINTER A
d Performance: Print v Digital
JUL-AUG SEPTEMBER OCTOBER GLOBAL NOV-DEC
PREVIEWS SHOW GUIDE LAST MINUTE NEWS
CONSTRUCTION CONTECH FOCUS:
GUIDE The digitisation of the construction
industry
Global Outlook
Sustainable road building: the ways
MARKET INTELLIGENCE: CONTECH FOCUS: PREVIEWS KHL Toplists analysis in which the sector is turning
ICON200 Inside construction’s R&D increasingly green
departments
CONTECH FOCUS: Supply chains: how contractors and
Connected construction: is 5G OEMs are managing supply chains
Concrete: new tech and sustainability
a game changer? CONTECH FOCUS: NEW ICON’s Industry Snapshot
Global crane projects Wearable Technology
NEW Trends: Mega projects – the key
Earthmoving equipment: compact NEW Trends: modular construction
factors for success
best practice Falsework and formwork: global
NEW How to make construction COUNTRY FOCUS: China
more sustainable COUNTRY REPORT: Brazil projects examined
Drilling and foundations: new products
COUNTRY REPORT: UAE
and innovations
NEW How to upskill operators
COUNTRY FOCUS: South Africa
BONUS DISTRIBUTION:
M&T Expo Bauma BONUS DISTRIBUTION: BONUS DISTRIBUTION: BONUS DISTRIBUTION:
International Rental Conference Bauma Bauma China Bauma Bauma China BC India
5 International Construction @international construction mag @KHLConstruction International Construction www.international-construction.comCREATIVE PRINT ADVERTISING
UNIQUE ADVERTISING POSITIONS FOR SHOW GUIDE ISSUES OR
SUPPORTING PRODUCT LAUNCHES OFFER A GREAT OPPORTUNITY
FOR SOME HIGH IMPACT, HIGH VISIBILITY MARKETING.
BARN DOOR BELLY BAND/WRAPAROUND SUPPLEMENT
Meet innovation. No 6
JULY-AUGUST 2021 Vol 60 No 6
CONCRETE ERA
Discover diversity. Tools for sustainable
60
ility
1 Vol material manufacturer Forterra.
UGU
ST 202 The collaboration also includes façade BHS-Sonthofen helps turn the tide
JULY-A construction specialist PCE, engineering firm
reli b
Curtins and sustainability consultants Accelar. A 32km-long dam in the Netherlands is in the process of being renovated and expanded,
According to a joint statement released having first been established in 1932.
construction
by all the parties involved in the project, The company providing innovative new concrete blocks called Quattroblocks to stabilise
JULY-AUG “traditional concrete manufacture is a fuel- the structure is Holcim Coastal, which is using mixing technology from BHS-Sonthofen to
Tr us t,
FLAP UST 2021
JULY THIS WILLAREA 45MM,
Vol 60 intensive, electro-intensive and therefore CO2 ensure the dam can deal with high levels of stress.
-AUG ATTACH
No 6
UST 2021 TO DPS intensive process.” After extensive testing at a vast water basin facility in Delft, the new blocks were found to
Vol 60
No 6 Y The DPC project team said, “While be 40% more stable than the pure concrete blocks originally used on the dam.
. addressing its material makeup to lower With testing complete, Holcim Coastal asked BHS-Sonthofen to assist with the production
ion
www.international-construction.com A KHL Group publication
www manufacturing and embodied emissions of the large quantity of blocks required for the enormous project.
.internat
tat
www.inter
ional-con
tion
national-c is critical to decarbonising, the pathway to At the Dutch Holcim factory in Alphen aan den Rijn, BHS-Sonthofen installed two DKX The European Rental Association on
epu
struction onstructio ERA SUSTAINABLE
publica
net zero relies upon a holistic view: with type twin-shaft batch mixers, capable of producing the required daily throughput of 520m3
.com
Group 400 Se BACK n.com
n have it all. and r
intelligent design that minimises material of concrete. how to measure and reduce your SUPPLIER FRAMEWORK
hine ca
PANEL:
A KHL
Performrie s 210mm use without affecting a structure’s integrity, The mixers operate on a three-dimensional mixing principle: two shafts generate circular
project’s carbon footprint
The ERA Sustainable Supplier
mac
ance and width as well as an understanding of a product’s movements with a turbulent overlapping area, so that the energy introduced is optimally Framework aims to set the
by a comFLAP
BACK PANEL: 210mm width FRONT PANEL: 210mm width reliability
r transport and installation emissions.” used for an even distribution of the mix. industry best practice guidelines and raise common practices across
Yo u
FLAP AREA 45MM, AREA 45MM,
I
THIS WILL ATTACH TO DPS pact
THIS WILL
solution. deliv
ATTACH TO DPS
The DPC project is being undertaken in In this way, a high level of mixture homogeneity can be achieved with the lowest amount n March, the European Rental of construction equipment the industry in sustainability assessments of suppliers. The goals
ered
Liebherr at 850 Se .
three stages, starting with the Design Solution
Optimisation stage, which aims to minimise
of energy required, an important factor for a project of this size.
André Däschlein, Sales Director Mixing and Crushing Technology at BHS, recommended
Association (ERA) webinar –
‘Building a sustainable future
over its entire lifecycle and
is applicable to all types of
are to reduce the administrative burden from supplier assessments
for rental companies and suppliers and provide rental company
neering A KHL Group
A KHL the Bauma 2013 400 Series Leadingrie s 80 year
s of engi publicatio
the materials used in concrete production.
Next, the Material Development and
the use of the industry standard twin-shaft batch mixer of type DKX for the task at hand.
“Decades of high-level expertise in the concrete sector have enabled us to draw on
– Transitioning towards a circular
and low-carbon construction
equipment, from mini excavators
and wheel loaders to generators,
customers with a better understanding of how rental companies
approach sustainable supply chains.
of own power dens built on
Grou gn, n
p publ Performance and reliability delivered ership. ity and tion is hine desi Testing stage will use new cement and clinker experience from a great number of similar projects,” says Däschlein. “This made us very sector’ – put circular and low boom lifts and access platforms. The framework helps rental companies to define minimum
ication
er solu FROinto your mac deliver high
4
Visit us at Bauma, Munich 15 to 21 April low cost substitution technologies and admixtures to confident that the twin-shaft batch mixer would provide the necessary high level of carbon construction practices in The results provide an estimate sustainability requirements and aspirations for all suppliers to rental
by a compact solution. 4 pow rate NT PAN istently
80inn Your Tier
Open air exhibition stand 809-813 and develop low-carbon concrete, while the final homogeneity that the client requested.” the spotlight and looked at the of the carbon footprint per hour companies, in the areas of human rights and working conditions,
reli bility
tion
.com Trust, 1200 Se years . Easy
to integ cons
EL:
solutions the 210 d’s lead
ing stage will look at the production and logistics Having been installed in 2019, the mixers will continue to produce concrete for 22 hours a policy and industry perspectives of use, allowing construction health and safety, responsible sourcing of components and raw
80innovation
1003/2, Components in hall A4, booth115. worlmm
onstruc years expertise power widtsolutions
850 Series ries of
of involved in manufacturing concrete for ways day, six days a week for a further two years. for transitioning to a sustainable equipment users to compare materials, environmental performance, business ethics and product
tion
al-c Dependa ovati ndable king with Tier 4 h to further reduce carbon emissions. By 2023, it is anticipated that all the construction sector. different use scenarios, see which sustainability performance.
nterna www.liebherr-bauma.com a solu ble power on our depe you. Wor ufacturers, our
www.i Leading power density and low cost tion that’ and ce for man
Gareth Jones, head of MMC & Technical blocks will have been integrated into the As the speakers at the event part of the lifecycle contributes Rental companies can adopt the Framework as a code of
performan equipment
reli b 80
of ownership. s right quality –
for you. www.ti Tru st, ion mind .
Services at the Ministry of Justice, said, “This
study demonstrates how collaboration
dam – a total of 700,000m2 of concrete
protecting the region from flooding.
made clear, construction is the
priority sector for reducing
most to the carbon footprint and
evaluate the alternative fuels.
conduct and request their suppliers declare compliance with the
requirements by completing and signing the supplier checklist, or
er4air.c construct you in
FLAP
THIS WILLAREA 45MM,
www.tier4air.com/ic om/ic through the supply chain can carbon emissions in the context The Calculator has six easy adapt the template according to their own requirements.
gned with
The new ATTACH
TO DPS
bring subject matter experts Part of the 32km-long Afsluitsdijk of the European Green Deal, steps, requiring basic information Suppliers will be able to send the signed declaration directly to
are desi
Perkin
1200 Series chine can have it all.
The heart s Tier
ility
of every 4 engines.
The new Perkins Tier 4 engines.
and r together to develop innovative dam protecting the Netherlands with the economic weight and about the characteristics and rental companies and post adherence to the Framework on their
e p u t a t i o n . Yo u r m a years of tion
great
com/ic
The heart of every great machine. mach solutions for decarbonising.” from the North Sea technology to drive the ‘Green use of a piece of equipment websites. Any supplier to the rental companies can use this tool to
Dependable power and quality – 19226 ine.
innova
World’s top 200
ier4air.
Belly Initially to be used in the Recovery’, and the industry itself – equipment production, self-assess against the harmonised requirements of the rental sector
Band
AW V3.indd
a solution that’s right for you.
www.t
1 construction of prisons has a strong commitment to transportation, lifetime and and to demonstrate fulfilment of these requirements.
es. within the UK, the team sustainability. utilisation, energy consumption, The Sustainable Supplier Framework is available in English, Dutch,
Tier 4 engin
Perkins ine. said it intended to make As an inherently circular maintenance and end-of-life – French, German, Italian, Polish and Spanish: https://erarental.org/
mach
Wo
great
W
The new the outcomes of the project business model that minimises and the users are guided through sustainable-suppliers/
or
t of every
an
contractors ranked
contrrld’s top 00
The hear
contrald’s top 20
transferable to other sectors financial commitments and the process step-by-step. Users
d rep and development types, risk for equipment users, the can then directly compare
uta “including student and rental equipment rental industry is well different scenarios, making equipmentcalculator.org/ set targets and report progress
t i o n . Yo u r m a c
hine can h
housing, and major health and
education infrastructure.”
The two BHS-Sonthofen DKX batch
mixers in Alphen aan den Rijn
placed to facilitate sustainability
in the construction sector and
it easier to make the most
sustainable choice when using
You can watch the video here:
https://youtu.be/yadO7JAyU1k
against these targets.
For this reason, ERA has
ave
actor op 2200 d ctors 0
19226 Belly Band AW V3.indd 1 29/02/2012 09:39 it a In construction, we may address the twin challenges of equipment.
CSR KPI FRAMEWORK
developed a new CSR KPI
ll .
swap diesel engines for electric motors,
then look at hydrogen and other fuel material, with more than 4 billion tonnes industry, the importance of reducing its
decarbonisation and the ‘Green
Recovery’ from the pandemic.
It can be used to evaluate
a single ownership period of Rental industry customers and
Framework to enable equipment
rental companies to implement
st e ranke
alternatives. While we do, concrete will produced each year. impact on the environment can hardly be As a European association one piece of equipment and, other stakeholders (investors, different levels of KPIs,
ld’s raannkk
remain untouchable, the ubiquitous building As both a blessing and a curse for the overstated. ce with members including furthermore, to determine the staff, suppliers, regulators, depending on their level of
d
national rental associations, climate impact of entire fleets of Government agencies, NGOs, maturity. The minimum KPI set is
Wor ors r ed
The DPC project’s view on decarbonising construction includes rental companies, equipment equipment or the total carbon etc.) increasingly expect the perfect “starter” framework.
INSIDE INSIDE: 16 PAGE examining transportation and installation emissions manufacturers and other footprint of all machines on a equipment rental companies to Once companies have experience
SUPPLEMENT INSIDE suppliers to the rental industry, given construction site. put in place Key Performance implementing and using the
SUPP : 16 PAGE
ract
SUPPLE: 16 PAGE
ERA supports sustainability You can access the Indicators (KPIs) to measure minimum set, they can progress
LEMEN in the industry and across Calculator here: https:// their CSR performance levels, to implementing good practices
T
JULY-AUGUST 2021 | No 8 A KHL GROUP PUBLICATION
STEPHANE ASSELIN YU HONG FU ANDREA CASSONI MENT the construction sector more and, finally, to developing best
cont
JULY-AUGUST
Aurecon Sany ABB
2021 |
No 8
widely by developing tools practices and becoming industry
JULY-AUGUST
2021 | No
8
A KHL
GROUP
PUBLICATION
IN ASSOCIATION WITH INTERNATIONAL CONSTRUCTION AND CONSTRUCTION EUROPE A KHL GROUP
PUBLICATION
for companies to adopt more leaders.
PRODUCT REPORT
sustainable practices. The CSR KPI Framework covers
IN ASSOCIATION SURVEYING
April 2012
WITH
JCB’S 525-60E ELECTRIC THE NEXT GENERATION
STEPH STEPHA
INTERNATION LOADALL TELESCOPIC IN ASSOCIATION
16 -21
PRODUCT HANDLER
JCB’S 525-60EREPORT
AL CONSTRUCTIO WITH INTERNATIONAL centre
‘People’, ‘Health and Safety’,
NE ASS nes exhibition 29/02/2
ANE AS
LOADALL ELECTRIC N AND PRODUCT CONSTRUCTION
new engi
012
I
CONSTRUCTIO JCB’S 525-60EREPORT Villepinte
CO2 CALCULATOR
TELESCOPIC AND CONSTRUCTION
HANDLER N EUROPE LOADALL ELECTRIC Paris, Nord 09:39 ‘Training’, ‘Environment’, ‘Supply
SSON Aureco ELIN
SURVEYING TELESCOPIC EUROPE
Aureco SELIN exciting
THE NEXT HANDLER SURVEYING
GENERATION THE NEXT
002 First released on 13 January and Chain’, ‘Anti-Corruption and
EA CA of our Stand
GENERATION
n n launch YU HONAisle J,
PM updated on 16 March, the ERA Bribery’, ‘Circularity’ and ‘Other’
YU HO ANDR ABB See the d: Hall 5b, G FU
3:17:55
3/2/2012 Equipment CO2 Calculator is a KPIs. It is available to download
NG PM Untitled-
eltitnU
stan Sany
Sany FUFU
3:18:14 2 2 3 2-d
INTERVIEW
free-to-use online tool to enable here: https://erarental.org/
at our AND
INTERVIEW:
ANDREA SCOTT 3/2/2012
REA CAS
INTERVIEW CASSONI, CROZIER,
ANDREA ABB TRIMBLE
equipment stakeholders to make publications/csr-kpi-framework
NG ANDR
CASSONI, INTERVIEW: INTERVIEW
SONI
ABB ANDREA
YU HOny
SCOTT CASSONI, INTERVIEW:
more sustainable choices when For more information about any
EA CA
CROZIER,
ABB
TRIMBLE ABB SCOTT
WEARABLES CROZIER,
SSONI using construction equipment. It of these tools, contact the ERA
BOOSTING PRODUCTIVITY TRIMBLE
Sa ce
AND SAFETY
The Group
ABB determines the carbon footprint team at era@erarental.org.
LIN
ASSE
WEARABLES
BOOSTING
TEST DRIVE: JCB’S ELECTRIC LOADALL TELESCOPIC HANDLER
PRODUCTIVIT WEARABLES
BOOSTING
20 47
AND SAFETY PRODUCTIVITY
HANE
Y
TES
T D : 16 PAGE
AND SAFETY CONSTRUCTION EUROPE JUNE 2021 CONSTRUCTION EUROPE JUNE 2021
STEP Aurecon TEST
2007-022 BarnDoor AZ Bauma_07+++.indd 1-3
R I V NT
DE
31.01.13 19:12 d 2
DRIV 27/08/20
INSI LEMEE: J
DPS.ind 15 15:58:36
ICON 07-08 2021 Front Cover JH.indd 1 12/07/2021 09:46:45 72
E: J /80/06
ICON CE 06 2021 Concrete JG MH.indd 20 25/06/2021 16:27:54 02CE 2021 ERA JG MH.indd 47 25/06/2021 15:25:54
07-08 d 3 51 51
2021
PP
Front CB’ ICON DPS.ind
07-08
CB’ 25:85:
S E S EL
PUBLICATION
2021
SU
Cover
GROUP
A KHL
Front
LE
JH.ind Cover
d 1
CTR
JH.indd
1 EC TRIC
IC L R
DLE LOAD
| No 8
2021
OA
JULY-AUGUST
EUROPE
ALL
TION
DAL HAN
CONSTRUC
AND
TION
TELE
G
CONSTRUC ON
L T 6:45
ONAL SURVEYIN
PIC
GENERATI
SCOP
INTERNATI THE NEXT 09:4
EL
ON WITH
21
ESC CO
REPORT
IN ASSOCIATI 7/20
PRODUCT ELECTRIC
525-60E
IC 12/0
IC H
E SO P I
JCB’S TELESCOP
AN
LOADALL
HANDLER
EL C H DLER
L T AN
DAL
DLE
R
LOA
12/07/2
021
IC
09:46:4
5
CTR
:
INTERVIEW 12/07
W SCOTT /2021
ELE
INTERVIE CROZIER,
TRIMBLE
09:46
ANDREA
CASSONI, LES IVITY
:45
ABB WEARAB
’S
PRODUCT
AND SAFETY
BOOSTING
JCB
VE:
T DRI
TES dd
1
.
r JH.in
t Cove
tion
Fron
8 2021
07-0
ova y.
ICON
Mee t inniversit
M etein d
Discco
o v r novati
Dis veinnovation.
r div on
Meet ersity.
CONCRETE ERA
Discover diversity. . Tools for sustainable
material manufacturer Forterra.
The collaboration also includes façade BHS-Sonthofen helps turn the tide
at 3 construction specialist PCE, engineering firm
herr 201 Trust,
bility reli bility
Curtins and sustainability consultants Accelar. A 32km-long dam in the Netherlands is in the process of being renovated and expanded,
Lieb uma 15 to 21 April
According to a joint statement released having first been established in 1932.
Trust,
construction
reli bility
Ba
by all the parties involved in the project, The company providing innovative new concrete blocks called Quattroblocks to stabilise
Trust,
reli
the Bauma, Mu nich 3 and 15. “traditional concrete manufacture is a fuel- the structure is Holcim Coastal, which is using mixing technology from BHS-Sonthofen to
809-81booth1 intensive, electro-intensive and therefore CO2 ensure the dam can deal with high levels of stress.
stand A4, intensive process.” After extensive testing at a vast water basin facility in Delft, the new blocks were found to
us at ion hall
Visit air exhibit nts in
The DPC project team said, “While be 40% more stable than the pure concrete blocks originally used on the dam.
one addressing its material makeup to lower With testing complete, Holcim Coastal asked BHS-Sonthofen to assist with the production
Open , Comp
a.com manufacturing and embodied emissions of the large quantity of blocks required for the enormous project.
1003/2
rr-b
aum is critical to decarbonising, the pathway to At the Dutch Holcim factory in Alphen aan den Rijn, BHS-Sonthofen installed two DKX The European Rental Association on
iebhe net zero relies upon a holistic view: with type twin-shaft batch mixers, capable of producing the required daily throughput of 520m3 ERA SUSTAINABLE
www.l intelligent design that minimises material of concrete. how to measure and reduce your SUPPLIER FRAMEWORK
. Y use without affecting a structure’s integrity, The mixers operate on a three-dimensional mixing principle: two shafts generate circular The ERA Sustainable Supplier
YYo u r m a c h i n e c a n h a v e i and reputation as well as an understanding of a product’s movements with a turbulent overlapping area, so that the energy introduced is optimally project’s carbon footprint Framework aims to set the
. Y. .
8
transport and installation emissions.” used for an even distribution of the mix. industry best practice guidelines and raise common practices across
a tui ot ant i o n t al I
The DPC project is being undertaken in In this way, a high level of mixture homogeneity can be achieved with the lowest amount n March, the European Rental of construction equipment the industry in sustainability assessments of suppliers. The goals
a n da nr edpruet p l.
three stages, starting with the Design Solution of energy required, an important factor for a project of this size. Association (ERA) webinar – over its entire lifecycle and are to reduce the administrative burden from supplier assessments
Liebherr at
Lie
Optimisation stage, which aims to minimise André Däschlein, Sales Director Mixing and Crushing Technology at BHS, recommended ‘Building a sustainable future is applicable to all types of for rental companies and suppliers and provide rental company
thebh
the materials used in concrete production. the use of the industry standard twin-shaft batch mixer of type DKX for the task at hand. – Transitioning towards a circular equipment, from mini excavators customers with a better understanding of how rental companies
err
Bauma 2013 Next, the Material Development and “Decades of high-level expertise in the concrete sector have enabled us to draw on and low-carbon construction and wheel loaders to generators, approach sustainable supply chains.
th e Baumat Testing stage will use new cement and clinker
substitution technologies and admixtures to
experience from a great number of similar projects,” says Däschlein. “This made us very
confident that the twin-shaft batch mixer would provide the necessary high level of
sector’ – put circular and low
carbon construction practices in
boom lifts and access platforms.
The results provide an estimate
The framework helps rental companies to define minimum
sustainability requirements and aspirations for all suppliers to rental
Visit us at Bauma,
Visit
Openus
a 20
Munich
airatexhibition stand
15 to 21 April
13and
809-813 Your Tier 4 power solution is built on 80 years of engineering
develop low-carbon concrete, while the final
stage will look at the production and logistics
homogeneity that the client requested.”
Having been installed in 2019, the mixers will continue to produce concrete for 22 hours a
the spotlight and looked at the
policy and industry perspectives
of the carbon footprint per hour
of use, allowing construction
companies, in the areas of human rights and working conditions,
health and safety, responsible sourcing of components and raw
Ope Bauma, involved in manufacturing concrete for ways day, six days a week for a further two years. for transitioning to a sustainable equipment users to compare materials, environmental performance, business ethics and product
n airComponents
1003/2, Munin hall A4, booth115.
1003/2, exhibitio ich 15 expertise. Easy to integrate into your machine design, to further reduce carbon emissions. By 2023, it is anticipated that all the construction sector. different use scenarios, see which sustainability performance.
Compon n stand to 21 Gareth Jones, head of MMC & Technical blocks will have been integrated into the As the speakers at the event part of the lifecycle contributes Rental companies can adopt the Framework as a code of
April our dependable power solutions consistently deliver high
ents in 809-813
www.liebherr-bauma.com Services at the Ministry of Justice, said, “This dam – a total of 700,000m2 of concrete made clear, construction is the most to the carbon footprint and conduct and request their suppliers declare compliance with the
www hall A4, and
.liebherr booth11 performance for you. Working with the world’s leading study demonstrates how collaboration protecting the region from flooding. priority sector for reducing evaluate the alternative fuels. requirements by completing and signing the supplier checklist, or
-bauma. 5. through the supply chain can carbon emissions in the context The Calculator has six easy adapt the template according to their own requirements.
com construction equipment manufacturers, our Tier 4 solutions bring subject matter experts Part of the 32km-long Afsluitsdijk of the European Green Deal, steps, requiring basic information Suppliers will be able to send the signed declaration directly to
together to develop innovative dam protecting the Netherlands with the economic weight and about the characteristics and rental companies and post adherence to the Framework on their
are designed with you in mind. solutions for decarbonising.” from the North Sea technology to drive the ‘Green use of a piece of equipment websites. Any supplier to the rental companies can use this tool to
Initially to be used in the Recovery’, and the industry itself – equipment production, self-assess against the harmonised requirements of the rental sector
construction of prisons has a strong commitment to transportation, lifetime and and to demonstrate fulfilment of these requirements.
within the UK, the team sustainability. utilisation, energy consumption, The Sustainable Supplier Framework is available in English, Dutch,
www.tier4air.com/ic said it intended to make As an inherently circular maintenance and end-of-life – French, German, Italian, Polish and Spanish: https://erarental.org/
the outcomes of the project business model that minimises and the users are guided through sustainable-suppliers/
The new Perkins Tier 4 engines.
The heart of every great machine. 80innovation
years of transferable to other sectors
and development types,
“including student and rental
housing, and major health and The two BHS-Sonthofen DKX batch
financial commitments and
risk for equipment users, the
equipment rental industry is well
placed to facilitate sustainability
the process step-by-step. Users
can then directly compare
different scenarios, making
it easier to make the most
equipmentcalculator.org/
You can watch the video here:
set targets and report progress
against these targets.
education infrastructure.” mixers in Alphen aan den Rijn in the construction sector and sustainable choice when using https://youtu.be/yadO7JAyU1k For this reason, ERA has
In construction, we may address the twin challenges of equipment. developed a new CSR KPI
swap diesel engines for electric motors, decarbonisation and the ‘Green It can be used to evaluate CSR KPI FRAMEWORK Framework to enable equipment
then look at hydrogen and other fuel material, with more than 4 billion tonnes industry, the importance of reducing its Recovery’ from the pandemic. a single ownership period of Rental industry customers and rental companies to implement
alternatives. While we do, concrete will produced each year. impact on the environment can hardly be As a European association one piece of equipment and, other stakeholders (investors, different levels of KPIs,
remain untouchable, the ubiquitous building As both a blessing and a curse for the overstated. ce with members including furthermore, to determine the staff, suppliers, regulators, depending on their level of
national rental associations, climate impact of entire fleets of Government agencies, NGOs, maturity. The minimum KPI set is
The DPC project’s view on decarbonising construction includes rental companies, equipment equipment or the total carbon etc.) increasingly expect the perfect “starter” framework.
19:12 examining transportation and installation emissions manufacturers and other footprint of all machines on a equipment rental companies to Once companies have experience
.13
31.01 suppliers to the rental industry, given construction site. put in place Key Performance implementing and using the
ERA supports sustainability You can access the Indicators (KPIs) to measure minimum set, they can progress
in the industry and across Calculator here: https:// their CSR performance levels, to implementing good practices
the construction sector more and, finally, to developing best
p widely by developing tools practices and becoming industry
2007-02
Grou for companies to adopt more leaders.
The
2 BarnDo
or AZ
Bauma_ sustainable practices. The CSR KPI Framework covers
07+++.i
ndd
1-3 15:44
:14 ‘People’, ‘Health and Safety’,
CO2 CALCULATOR 21/08
/2015 ‘Training’, ‘Environment’, ‘Supply
First released on 13 January and Chain’, ‘Anti-Corruption and
Untitled
-4 2 updated on 16 March, the ERA Bribery’, ‘Circularity’ and ‘Other’
Equipment CO2 Calculator is a KPIs. It is available to download
free-to-use online tool to enable here: https://erarental.org/
15 15:44:14
21/08/20
equipment stakeholders to make publications/csr-kpi-framework
more sustainable choices when For more information about any
See the launch of our exciting new engines Untitled using construction equipment. It of these tools, contact the ERA
The Gr DPS.indd 2 16 -21 April 2012
3/2/2012 3:17:55 PM
-4 2
determines the carbon footprint team at era@erarental.org. ce
oup at our stand: Hall 5b, Aisle J, Stand 002 Paris, Nord Villepinte exhibition centre
The Group DPS.indd 2 3/2/2012 3:17:55 PM
20 CONSTRUCTION EUROPE JUNE 2021 CONSTRUCTION EUROPE JUNE 2021 47
21/08/2
015 15:43:5 3
d-4
5 Untitle 4 3 ERA JG MH.indd 47
CE 06 2021 Concrete JG MH.indd 20 25/06/2021 16:27:54 CE 06 2021
Untitled- 25/06/2021 15:25:54
2007-022 BarnDoor AZ Bauma_07+++.indd 1-3 31.01.13 19:12 DPS.indd 2 3/2/2012 3:17:55 PM DPS.indd 3 3/2/2012 3:18:14 PM
21/08/20
15 15:43:55
d 1-3 31.01.1
++.ind 3 19:12
a_07+
Baum
oor AZ
BarnD
022
2007-
A split cover revealing your advert comprising a full Your belly band wrapped around the magazine with A supplement bound in the magazine consisting of
page and two half page verticals. the option of linking to your double page spread of four, eight, 12 or 16 pages.
advertising inside the magazine.
6 International Construction @international construction mag @KHLConstruction International Construction www.international-construction.comCREATIVE PRINT ADVERTISING
MAGAZINES GIVE YOU THE SPACE TO TURN YOUR ADVERTISEMENT
INTO A VISUAL STORY, NOT JUST A ONE-LINE PRODUCT PITCH.
GATEFOLD: COVER OR INSIDE POSITION POSTCARD
NTS
CONTE
E
IS ISSU
IN TH
I O N
U C T
I O N
S T R
C O N JULY-AUGUST 2021 Vol 60 No 6
U C T CONTENTS CONTENTS
www.construction-europe.com
publication
Group
A KHL
INDUSTRY
CONSTRUCTION
FOR EUROPE’S
S T R
2021
THE MAGAZINE
| Number
5 | June
32
Volume
& ELECTRIC
HYBRID new
COVER
Adopting
C O N
technology
IN THIS ISSUE
p22
IN THIS ISSUE
ON THE
& EFFICIENCY
FUELS
Hydrogen,
C O N S T R U C T I O N C O N S T R U C T I O N
biofuels
REGULARS
and more
4 R60D
Volvo’s
p32
FOCUS
r is put
PROJECT
A high-rise
challenge
rigid haule
p36
Q&A
its paces
VOLVO
Lars Arnold: of
2021 8
NEWS
The benefits
n
r 5 JUNE through
electromobility
Low emissiog
p39
32 Numbe JULY-A in a quarry. quarryin p26
NEWS UGUST
Volume 16:29:20
202126.
25/06/2021
Volume 32 Number 5 JUNE 2021
11 Volume 32 Number 5 JUNE 2021
WORLD See page Vol 60 No REGULARS REGULARS
1
Cover.indd
2021 Front
6 45
CE 06
C O N S T R U C T I O N C O N S T R U C T I O N
665 2021
ISSN 0964–0
NEWS
Group
ht KHL 14 THE MAGAZINE FOR EUROPE’S CONSTRUCTION INDUSTRY
TECH
THE MAGAZINE FOR EUROPE’S CONSTRUCTION INDUSTRY www.construction-europe.com www.construction-europe.com
© Copyrig
Volume 32 | Number 5 | June 2021 A KHL Group publication Volume 32 | Number 5 | June 2021 A KHL Group publication
on
47 NEWS 4 ON THE COVER NEWS 4 ON THE COVER
HYBRID & ELECTRIC HYBRID & ELECTRIC
issue is mailed
Adopting new Adopting new
technology technology
a year. This US$345. FIEC ISSN 0964–0665 ISSN 0964–0665
p22 p22
36 Volvo’s R60D Volvo’s R60D
FINANCE
10 times
FUELS & EFFICIENCY FUELS & EFFICIENCY
© Copyright KHL Group 2021 © Copyright KHL Group 2021
Hydrogen, Hydrogen,
€260, biofuels biofuels
is published on rates: £215, and more and more
on Europe 49 WORLD NEWS 8 rigid hauler is put WORLD NEWS 8 rigid hauler is put
p32 p32
Constructi Annual subscriptivisit www.khl.
com IC ERA
PROJECT FOCUS PROJECT FOCUS
W: WINV
A high-rise A high-rise
July 2021. Construction Europe is published 10 times a year. This issue is mailed on Construction Europe is published 10 times a year. This issue is mailed on www.international-construction.com A KHL Group publication
challenge challenge
n please 39 through its paces through its paces
INTERVIE
5thwww.
p36 p36
For further internationa
informatio e 5th July 2021. Annual subscription rates: £215, €260, US$345. 5th July 2021. Annual subscription rates: £215, €260, US$345.
VOLVO Q&A VOLVO Q&A
Lars Arnold: Lars Arnold:
by BPA Worldwid 50 TECH NEWS 11 in a quarry. TECH NEWS 11 in a quarry.
The benefits of The benefits of
For further information please visit www.khl.com
l-cons For further information please visit www.khl.com
electromobility electromobility
EFCA
p39
audited
p39
Circulation truction.com O 40 See page 26. Low emission See page 26. Low emission
Q&A: VOLV T quarrying
CONTRAC
quarrying
Chile. FINANCE 14 FINANCE 14
LAW &
Circulation audited by BPA Worldwide
p26
Circulation audited by BPA Worldwide
p26
Santiago,
Las Condes, 7493 T
CE 06 2021 Front Cover.indd 1 25/06/2021 16:29:20 CE 06 2021 Front Cover.indd 1 25/06/2021 16:29:20
KHL KINGDOMOFFICES (HEAD OFFICE)
Tel: +56
9 7798
ters@khl.c
om
EQUIPMEN
44
INTERVIEW: WINVIC 36 FIEC 45 INTERVIEW: WINVIC 36 FIEC 45
UNITED
e-mail: cristian.pe 17 KHL OFFICES KHL OFFICES
CHINA OFFICE UNITED KINGDOM (HEAD OFFICE) Las Condes, Santiago, Chile. UNITED KINGDOM (HEAD OFFICE) Las Condes, Santiago, Chile.
KHL Group Southview Road, China ions
KHL Group Plaza, CECE E Q&A: VOLVO 39 ERA 47 KHL Group Q&A: VOLVO 39 ERA 47
e the emiss
s, UK. KHL Group Tel: +56 9 7798 7493 Tel: +56 9 7798 7493
Southfield Sussex TN5 6TP,
CONCRET
Poly
East Room 769, Dong Zhi Men Street, to reduc of Southfields, Southview Road, e-mail: cristian.peters@khl.com Southfields, Southview Road, e-mail: cristian.peters@khl.com
AisKHL facture
FEATURES
Wadhurst, 784088 No.14, SouthDistrict, on Group ts Wadhurst, East Sussex TN5 6TP, UK. CHINA OFFICE Wadhurst, East Sussex TN5 6TP, UK. CHINA OFFICE
The race by the manu
(0)1892
Tel: +44 784086 publication projec EQUIPMENT 40 EFCA 49 EQUIPMENT 40 EFCA 49
Dong Cheng 100027
some vast of
(0)1892 Tel: +44 (0)1892 784088 KHL Group China Tel: +44 (0)1892 784088 KHL Group China
Fax: +44 China ced
m Beijing, PR 65536676 produ Meanwhile e, many as Fax: +44 (0)1892 784086 Room 769, Poly Plaza, Fax: +44 (0)1892 784086 Room 769, Poly Plaza,
e-mail: ce@khl.co (0)10
www.khl.
com/ce Tel: +86 khl.com concrete. g ahead in Europ ative ways,
e-mail: ce@khl.com No.14, South Dong Zhi Men Street,
CECE 44 LAW & CONTRACT 50
e-mail: ce@khl.com No.14, South Dong Zhi Men Street,
CECE 44 LAW & CONTRACT 50
e-mail: cathy.yao@ www.khl.com/ce Dong Cheng District, www.khl.com/ce Dong Cheng District,
USA OFFICEAmericas
GERMAN
OFFICE are forgin ‘green’ in innov USA OFFICE Beijing, PR China 100027 USA OFFICE Beijing, PR China 100027
KHL Group Glow Way, are s FEATURES
Ember
3726 East 85050, USA.
KHL Group 9,
strasse
which report KHL Group Americas Tel: +86 (0)10 65536676 FEATURES KHL Group Americas Tel: +86 (0)10 65536676
Mike Hayes
AZ Niemöller 3726 East Ember Glow Way, e-mail: cathy.yao@khl.com 3726 East Ember Glow Way, e-mail: cathy.yao@khl.com
, Germany
Phoenix, 6590578
480 73760 Ostfildern 16 74 0 com 22 Phoenix, AZ 85050, USA. GERMAN OFFICE Phoenix, AZ 85050, USA. GERMAN OFFICE
Tel: +1 khl.com Tel: +49
711 34 Tel: +1 480 6590578 KHL Group CONCRETE 17 Tel: +1 480 6590578 KHL Group CONCRETE 17
e-mail: americas@ OFFICE
e-mail: gabriele.d
insel@khl.
TRIC and electric e-mail: americas@khl.com Niemöllerstrasse 9, e-mail: americas@khl.com Niemöllerstrasse 9,
AMERICA & ELEC The race is on to reduce the emissions The race is on to reduce the emissions
HYBRID pment of hybridis generally
SOUTH Américas SOUTH AMERICA OFFICE 73760 Ostfildern, Germany SOUTH AMERICA OFFICE 73760 Ostfildern, Germany
KHL Group e Sur 520, of. 205, ES KHL Group Américas Tel: +49 711 34 16 74 0 produced by the manufacture of KHL Group Américas Tel: +49 711 34 16 74 0 produced by the manufacture of
Av. Manquehu ESENTATIV 010 5704948 The develofor construction . So where Av. Manquehue Sur 520, of. 205, e-mail: gabriele.dinsel@khl.com concrete. Meanwhile some vast projects Av. Manquehue Sur 520, of. 205, e-mail: gabriele.dinsel@khl.com concrete. Meanwhile some vast projects
S REPR Tel: +39 iapointsrl.
it
tunity
machineshuge oppor in terms of its
KHL SALE REA e-mail: info@med a tly KHL SALES REPRESENTATIVES
are forging ahead in Europe, many of
KHL SALES REPRESENTATIVES
are forging ahead in Europe, many of
SALES MANAGE
R/UK/KO
Office GERMAN
Y/SPAIN
seen as ry curren Steve Ducke
r
SALES MANAGER/UK/KOREA Tel: +39 010 5704948
which are ‘green’ in innovative ways, as SALES MANAGER/UK/KOREA Tel: +39 010 5704948
which are ‘green’ in innovative ways, as
is the indust
UK Head Petra Kaiser 34167472
Simon Kelly, 786223 (0)711 D&RI editor Simon Kelly, UK Head Office e-mail: info@mediapointsrl.it Mike Hayes reports Simon Kelly, UK Head Office e-mail: info@mediapointsrl.it Mike Hayes reports
adoption?up to speed
(0)1892 Tel: +49 m
Tel: +44 y@khl.com er@khl.co Tel: +44 (0)1892 786223 GERMANY/SPAIN Tel: +44 (0)1892 786223 GERMANY/SPAIN
e-mail: petra.kais us
e-mail: simon.kellMANAGER brings e-mail: simon.kelly@khl.com Petra Kaiser e-mail: simon.kelly@khl.com Petra Kaiser
SALES Office TURKEY 26
Attach a postcard to the front cover
DEPUTY , UK Head
Emre Apa
DEPUTY SALES MANAGER Tel: +49 (0)711 34167472
HYBRID & ELECTRIC 22 DEPUTY SALES MANAGER Tel: +49 (0)711 34167472
HYBRID & ELECTRIC 22
Eleanor
Shefford
532 3243616 T Eleanor Shefford, UK Head Office e-mail: petra.kaiser@khl.com Eleanor Shefford, UK Head Office e-mail: petra.kaiser@khl.com
EQUIPMEN
786236 Tel: +90 ilik.com.tr The development of hybrid and electric The development of hybrid and electric
Tel: +44
(0)1892 l.com apayayinc ahead TURKEY TURKEY
move
QUARRY
Tel: +44 (0)1892 786236 Tel: +44 (0)1892 786236
efford@kh e-mail: emre.apa@ ues to
World’s top 200
e-mail: eleanor.sh n, Emre Apa machines for construction is generally Emre Apa machines for construction is generally
CHINA e contin l missio sector e-mail: eleanor.shefford@khl.com e-mail: eleanor.shefford@khl.com
AVIA
As Europ neutra Tel: +90 532 3243616 seen as a huge opportunity. So where Tel: +90 532 3243616 seen as a huge opportunity. So where
Head Office
carbon the quarrying
SCANDIN SCANDINAVIA SCANDINAVIA
Leary, UK Cathy Yao 65536676 for
with its e-mail: emre.apa@apayayincilik.com.tr is the industry currently in terms of its e-mail: emre.apa@apayayincilik.com.tr is the industry currently in terms of its
within e a focal point
World
Bridget (0)10 Bridget Leary, UK Head Office Bridget Leary, UK Head Office
(0)1892
786220 Tel: +86 khl.com CHINA CHINA
equipment other –
Tel: +44 om Tel: +44 (0)1892 786220 adoption? D&RI editor Steve Ducker Tel: +44 (0)1892 786220 adoption? D&RI editor Steve Ducker
ary@khl.c e-mail: cathy.yao@ becom
bridget.le to have host of s Cathy Yao Cathy Yao
seems ion – and a
e-mail: e-mail: bridget.leary@khl.com e-mail: bridget.leary@khl.com
brings us up to speed brings us up to speed
contrac’s top 200
JAPAN a Tel: +86 (0)10 65536676 Tel: +86 (0)10 65536676
Kawahar report
contractors ranked
Office BENELUX BENELUX
BENELUX UK Head Michihiro 32123671
low emiss , as Leila Steed e-mail: cathy.yao@khl.com e-mail: cathy.yao@khl.com
FLAP AREA 45MM,
BACK PANEL: 210mm width FRONT PANEL: 210mm width FLAP AREA 45MM,
Ollie Hodges, 786253 Tel: +81
(0)3 p Ollie Hodges, UK Head Office Ollie Hodges, UK Head Office THIS WILL ATTACH TO DPS THIS WILL ATTACH TO DPS
innovations
(0)1892 @rayden.j JAPAN JAPAN
Tel: +44 m Tel: +44 (0)1892 786253
es@khl.co e-mail: kawahara 32 Tel: +44 (0)1892 786253
Michihiro Kawahara
e-mail: ollie.hodg ADA Y e-mail: ollie.hodges@khl.com
Michihiro Kawahara
QUARRY EQUIPMENT 26 e-mail: ollie.hodges@khl.com QUARRY EQUIPMENT 26
EFFICIENC
USA/CAN Tel: +81 (0)3 32123671 Tel: +81 (0)3 32123671
sing FRANCE As Europe continues to move ahead FRANCE As Europe continues to move ahead
of the magazine for high visibility
Wil Holloway
re of increa
400 Series
FRANCE
& FUEL e-mail: kawahara@rayden.jp e-mail: kawahara@rayden.jp
FUELS feels the pressu tion, the
Pearman 9292563
tors ran
Hamilton Tel: +1 312 ay@khl.co
m Hamilton Pearman
USA/CANADA with its carbon neutral mission, Hamilton Pearman
USA/CANADA with its carbon neutral mission,
+33 (0)1 45930858 o.fr wil.hollow Tel: +33 (0)1 45930858 Tel: +33 (0)1 45930858
Tel: @wanado e-mail:
Asdiesel e regula r their
Wil Holloway equipment within the quarrying sector Wil Holloway equipment within the quarrying sector
y and minutfirms powe
Kavooras
e-mail: hpearman LAND/ Thomas
9293478
e-mail: hpearman@wanadoo.fr Tel: +1 312 9292563 seems to have become a focal point for
e-mail: hpearman@wanadoo.fr Tel: +1 312 9292563 seems to have become a focal point for Performance and reliability delivered
/SWITZER
Tel: +1 312 l.com scrutin
been more
uction AUSTRIA/SWITZERLAND/ AUSTRIA/SWITZERLAND/
ked
AUSTRIA
EUROPE Head Office e-mail: thomas.ka
vooras@kh
way constr has never reports EASTERN EUROPE
e-mail: wil.holloway@khl.com
low emission – and a host of other – EASTERN EUROPE
e-mail: wil.holloway@khl.com
low emission – and a host of other – by a compact solution.
reli bility
Thomas Kavooras Thomas Kavooras
Trust,
EASTERN y, German
Simon Battersb34167470 Alister Williams equipmentas Mike Hayes Simon Battersby, German Head Office Tel: +1 312 9293478 innovations, as Leila Steed reports Simon Battersby, German Head Office Tel: +1 312 9293478 innovations, as Leila Steed reports
80innovation
6374127
Tel: +1 843
important,
(0)711 .com
l.com Tel: +49 (0)711 34167470 Tel: +49 (0)711 34167470
years of
850 Series
Tel: +49 iams@khl e-mail: thomas.kavooras@khl.com e-mail: thomas.kavooras@khl.com
tersby@kh
e-mail: simon.bat e-mail: alister.will e-mail: simon.battersby@khl.com Alister Williams e-mail: simon.battersby@khl.com Alister Williams
TS ITALY Tel: +1 843 6374127 ITALY Tel: +1 843 6374127
ITALY ASSISTAN FUELS & FUEL EFFICIENCY 32 FUELS & FUEL EFFICIENCY 32
Fabio Potestà FINANCE Fabio Potestà e-mail: alister.williams@khl.com Fabio Potestà e-mail: alister.williams@khl.com Leading power density and low cost
INSIDE:OF DESIGNER
Carole Couzens ens@khl.co
e-mail: carole.couz786250
m As diesel feels the pressure of increasing As diesel feels the pressure of increasing
of ownership. INSIDE: 16 PAGE
16 DIGITAL scrutiny and minute regulation, the MEMBER OF scrutiny and minute regulation, the
PLEMENPAGE
MEMBER OF
SUPBER
PRINT & (0)1892 Kate Trevillion
SUPPLEMENT
marketing that every subscriber will
MEM Tel: +44
Mitch Logue MANAGER
DESIGN Clare Grant,
Jo Keen, way construction firms power their way construction firms power their www.tier4air.com/ic
T OFFICE MANAGER equipment has never been more equipment has never been more
1200 Series
& CREATIVE EVENTS
a Head
EVENTS Gary Brinklow Samanth .head@kh
l.com
important, as Mike Hayes reports important, as Mike Hayes reports The new Perkins Tier 4 engines. JULY-AUGUST 2021 | No 8 A KHL GROUP PUBLICATION
a nSTEPHANE ASSELIN m a cYU
h i HONG n h a v e i tANDREA
n e c aFU a l l . CASSONI
d rep
u t a t i o n . Yo u r
DIRECTOR ES e-mail: samantha786201
JULY-AUGUST
MEDIA DIRECTOR
2021 | No
8
roft
Saara Rootes ION EXECUTIV The heart of every great machine.
EDITORIA
L MANAGER PRODUCT DIGITAL
Peter Watkinso
n BA (Hons)DEPUTY (0)1892
Tel: +44 SERVICES Julie
Wolstenc
KHL TEAM KHL TEAM Dependable power and quality – Aurecon Sany ABB
KHL TEAM
SENIOR MENT
A KHL GROUP
PUBLICATION
Alex Dahm DIRECTOR Anita Bhakta E DEVELOP SUPPORT Paul Baker
IN ASSOCIATION EDITORIA
L
STEPHAN ta@khl.com
e-mail: anita.bhak786246
AUDIENC L OFFICER Trevor Pease EDITOR EDITORIAL MANAGER EVENTS & CREATIVE PRINT & DIGITAL DESIGNER FINANCE ASSISTANTS EDITOR EDITORIAL MANAGER EVENTS & CREATIVE PRINT & DIGITAL DESIGNER FINANCE ASSISTANTS a solution that’s right for you. IN ASSOCIATION WITH INTERNATIONAL CONSTRUCTION AND CONSTRUCTION EUROPE
E ASSCharlotte
Pollok CORRESPONDENT MANAGER CHIEF FINANCIA G OFFICER
WITH PRODUCT REPORT
EDITORPRODUCT INTERNATIONAL CONSTRUCTION (0)1892
James King
SURVEYING
Murray T Masons
Tel: +44 Kemp Mike Hayes Alex Dahm DIRECTOR Mitch Logue Carole Couzens Mike Hayes Alex Dahm DIRECTOR Mitch Logue Carole Couzens
ELIN
JCB’S 525-60E ELECTRIC
Anna Philo
THE NEXT GENERATION
Mike Hayes LAW & CONTRAC on with Pinsent @khl.com CHIEF OPERATINE OFFICER
JCB’S 525-60EREPORT AND LOADALL TELESCOPIC
s@khl.com CONSTRUCTION EUROPE com
Aurecon e-mail: e-mail: mike.hayes@khl.com EDITORIAL DIRECTOR Saara Rootes EVENTS DESIGN MANAGER e-mail: carole.couzens@khl.com HANDLER
LOADALL ELECTRIC e-mail: mike.hayes@khl.com EDITORIAL DIRECTOR Saara Rootes EVENTS DESIGN MANAGER e-mail: carole.couzens@khl.com
e-mail: mike.haye
TELESCOPIC
in co-operati ONDENT emp@khl. e-mail: anna.philo CHIEF EXECUTIV
Produced EUROPE CORRESP
SURVEYING
YU HON FINANCE MANAGER
HANDLER
786234 THE NEXT charlotte.k Tel: +44 (0)1892 786234 Murray Pollok SENIOR PRODUCTION EXECUTIVES Gary Brinklow Tel: +44 (0)1892 786250 Tel: +44 (0)1892 786234 Murray Pollok SENIOR PRODUCTION EXECUTIVES Gary Brinklow Tel: +44 (0)1892 786250
(0)1892 GENERATION
786262
Tel: +44 SOUTH EAST 3
G FUFiltness
(0)1892 LAW & CONTRACT CORRESPONDENT Anita Bhakta Clare Grant, Jo Keen, Kate Trevillion LAW & CONTRACT CORRESPONDENT Anita Bhakta Clare Grant, Jo Keen, Kate Trevillion
Tel: +44 2021
UTING EDITORS Nikola Čanić MANAGER JUNE CONTRIBUTING EDITORS Produced in co-operation with Pinsent Masons e-mail: anita.bhakta@khl.com DIGITAL MEDIA DIRECTOR OFFICE MANAGER CONTRIBUTING EDITORS Produced in co-operation with Pinsent Masons e-mail: anita.bhakta@khl.com DIGITAL MEDIA DIRECTOR OFFICE MANAGER
SanyAlison
DESIGNCommittee
on with the t EUROPE
CONTRIB
Steve Ducker
CECE REPORT
in co-operati Jeff Gilbert
Produced Construction Equipmen
ANDREA CONSTRUCTION Steve Ducker SOUTH EAST EUROPE CORRESPONDENT Tel: +44 (0)1892 786246 Peter Watkinson BA (Hons) Samantha Head Steve Ducker SOUTH EAST EUROPE CORRESPONDENT Tel: +44 (0)1892 786246 Peter Watkinson BA (Hons) Samantha Head
CASSON
1
see and be engaged.
Leila Steed Nikola Čanić Charlotte Kemp AUDIENCE DEVELOPMENT DEPUTY e-mail: samantha.head@khl.com Leila Steed Nikola Čanić Charlotte Kemp AUDIENCE DEVELOPMENT DEPUTY e-mail: samantha.head@khl.com
Leila Steed
DESIGNER 6 015 14:56:2
INTERVIEW L TEAM
for European
FIEC REPORT
Jade Hudson
on with the
European
ABB I 25/06/2
021 16:52:4 28/08/2
EDITORIAL TEAM
CECE REPORT
Produced in co-operation with the Committee
e-mail: charlotte.kemp@khl.com
Tel: +44 (0)1892 786262
MANAGER
Anna Philo
Tel: +44 (0)1892 786201
SUPPORT SERVICES Julie Wolstencroft Gatefol EDITORIAL TEAM
CECE REPORT
Produced in co-operation with the Committee
e-mail: charlotte.kemp@khl.com
Tel: +44 (0)1892 786262
MANAGER
Anna Philo
Tel: +44 (0)1892 786201
SUPPORT SERVICES Julie Wolstencroft INTERVIEW
, Andy Brown, in co-operati d pages.i INTERVIEW:
ANDREA
EDITORIA
ANDREA Produced Industry Federation Lindsey Anderson, Andy Brown, for European Construction Equipment DESIGN MANAGER e-mail: anna.philo@khl.com ndd 2 Lindsey Anderson, Andy Brown, for European Construction Equipment DESIGN MANAGER e-mail: anna.philo@khl.com CASSONI,
SCOTT
CASSONI,Anderson
CROZIER,
Fausto Oliveira,
INTERVIEW:
Lindsey ,SCOTT on Jenny Lescohier, Fausto Oliveira, FIEC REPORT Jeff Gilbert CHIEF FINANCIAL OFFICER Paul Baker
ABB TRIMBLE
ABB
CROZIER, Constructi Jenny Lescohier, Fausto Oliveira, FIEC REPORT Jeff Gilbert CHIEF FINANCIAL OFFICER Paul Baker
Jenny LescohierTRIMBLE Shiffler,
Peters, D.AnnYoudale Cristián Peters, D.Ann Shiffler, Produced in co-operation with the European DESIGNER FINANCE MANAGER CHIEF OPERATING OFFICER Trevor Pease Cristián Peters, D.Ann Shiffler, Produced in co-operation with the European DESIGNER FINANCE MANAGER CHIEF OPERATING OFFICER Trevor Pease
19226 Belly Band AW V3.indd 1 29/02/2012 09:39
Cristián
Smart, Euan Belinda Smart, Euan Youdale Construction Industry Federation Jade Hudson Alison Filtness CHIEF EXECUTIVE OFFICER James King Belinda Smart, Euan Youdale Construction Industry Federation Jade Hudson Alison Filtness CHIEF EXECUTIVE OFFICER James King WEARABLES
Belinda BOOSTING PRODUCTIVITY
AND SAFETY
WEARABLES
BOOSTING
PRODUCTIVITY
AND SAFETY
CONSTRUCTION EUROPE JUNE 2021 3 CONSTRUCTION EUROPE JUNE 2021 3
TEST ndd 3
TEST DRIVE: JCB’S ELECTRIC LOADALL TELESCOPIC HANDLER
D R I V EGatefold pages.indd d pages.i
3 : JCB 2 Gatefol
Gatefold pages.indd 1 28/08/2015 14:56:17 Gatefold pages.indd
CE 1
06 2021 Contents.indd 3 28/08/2015 14:56:17 25/06/2021 16:52:46
28/08/2
Gatefold
015 pages.indd 1 28/08/2015 14:56:17 Gatefold pages.inddCE106 2021 Contents.indd 3 28/08/2015 14:56:17 25/06/2021 16:52:46
ICON 07-08 s.indd
2021 Content ’S EL 14:56:1
8 ICON 07-08 2021 Front Cover JH.indd 1 12/07/2021 09:46:45
E
2021 Front
CE 06 Cover
JH.indd CTRIC
1
LOAD
ALL T
ELES COPIC
HAND
LER 28/08/2
015 14:56:1
8
12/07/20
21 09:46:45
Three pages of advertising opening out as a gatefold from either the front cover or back cover.
Or, opening out as a four- or six-page gatefold inside the magazine.
BOOKMARK OR TABBED AD
CONCRETE ERA CONCRETE ERA JULY-AUGUST 2021 Vol 60 No 6
Tools for sustainable Tools for sustainable
material manufacturer Forterra. material manufacturer Forterra.
The collaboration also includes façade
construction specialist PCE, engineering firm
BHS-Sonthofen helps turn the tide The collaboration also includes façade
construction specialist PCE, engineering firm
BHS-Sonthofen helps turn the tide
Curtins and sustainability consultants Accelar. A 32km-long dam in the Netherlands is in the process of being renovated and expanded, Curtins and sustainability consultants Accelar. A 32km-long dam in the Netherlands is in the process of being renovated and expanded,
According to a joint statement released having first been established in 1932. According to a joint statement released having first been established in 1932.
construction construction
by all the parties involved in the project, The company providing innovative new concrete blocks called Quattroblocks to stabilise by all the parties involved in the project, The company providing innovative new concrete blocks called Quattroblocks to stabilise
“traditional concrete manufacture is a fuel- the structure is Holcim Coastal, which is using mixing technology from BHS-Sonthofen to “traditional concrete manufacture is a fuel- the structure is Holcim Coastal, which is using mixing technology from BHS-Sonthofen to
intensive, electro-intensive and therefore CO2 ensure the dam can deal with high levels of stress. intensive, electro-intensive and therefore CO2 ensure the dam can deal with high levels of stress.
intensive process.” After extensive testing at a vast water basin facility in Delft, the new blocks were found to intensive process.” After extensive testing at a vast water basin facility in Delft, the new blocks were found to
The DPC project team said, “While be 40% more stable than the pure concrete blocks originally used on the dam. The DPC project team said, “While be 40% more stable than the pure concrete blocks originally used on the dam.
addressing its material makeup to lower With testing complete, Holcim Coastal asked BHS-Sonthofen to assist with the production addressing its material makeup to lower With testing complete, Holcim Coastal asked BHS-Sonthofen to assist with the production
manufacturing and embodied emissions of the large quantity of blocks required for the enormous project. manufacturing and embodied emissions of the large quantity of blocks required for the enormous project. www.international-construction.com A KHL Group publication
is critical to decarbonising, the pathway to At the Dutch Holcim factory in Alphen aan den Rijn, BHS-Sonthofen installed two DKX The European Rental Association on is critical to decarbonising, the pathway to At the Dutch Holcim factory in Alphen aan den Rijn, BHS-Sonthofen installed two DKX The European Rental Association on
net zero relies upon a holistic view: with type twin-shaft batch mixers, capable of producing the required daily throughput of 520m3 ERA SUSTAINABLE net zero relies upon a holistic view: with type twin-shaft batch mixers, capable of producing the required daily throughput of 520m3 ERA SUSTAINABLE
intelligent design that minimises material of concrete. how to measure and reduce your SUPPLIER FRAMEWORK intelligent design that minimises material of concrete. how to measure and reduce your SUPPLIER FRAMEWORK
use without affecting a structure’s integrity, The mixers operate on a three-dimensional mixing principle: two shafts generate circular The ERA Sustainable Supplier use without affecting a structure’s integrity, The mixers operate on a three-dimensional mixing principle: two shafts generate circular The ERA Sustainable Supplier
as well as an understanding of a product’s movements with a turbulent overlapping area, so that the energy introduced is optimally project’s carbon footprint Framework aims to set the as well as an understanding of a product’s movements with a turbulent overlapping area, so that the energy introduced is optimally project’s carbon footprint Framework aims to set the
transport and installation emissions.” used for an even distribution of the mix. industry best practice guidelines and raise common practices across transport and installation emissions.” used for an even distribution of the mix. industry best practice guidelines and raise common practices across
The DPC project is being undertaken in
three stages, starting with the Design Solution
Optimisation stage, which aims to minimise
In this way, a high level of mixture homogeneity can be achieved with the lowest amount
of energy required, an important factor for a project of this size.
André Däschlein, Sales Director Mixing and Crushing Technology at BHS, recommended
I n March, the European Rental
Association (ERA) webinar –
‘Building a sustainable future
of construction equipment
over its entire lifecycle and
is applicable to all types of
the industry in sustainability assessments of suppliers. The goals
are to reduce the administrative burden from supplier assessments
for rental companies and suppliers and provide rental company
The DPC project is being undertaken in
three stages, starting with the Design Solution
Optimisation stage, which aims to minimise
In this way, a high level of mixture homogeneity can be achieved with the lowest amount
of energy required, an important factor for a project of this size.
André Däschlein, Sales Director Mixing and Crushing Technology at BHS, recommended
I n March, the European Rental
Association (ERA) webinar –
‘Building a sustainable future
of construction equipment
over its entire lifecycle and
is applicable to all types of
the industry in sustainability assessments of suppliers. The goals
are to reduce the administrative burden from supplier assessments
for rental companies and suppliers and provide rental company
the materials used in concrete production. the use of the industry standard twin-shaft batch mixer of type DKX for the task at hand. – Transitioning towards a circular equipment, from mini excavators customers with a better understanding of how rental companies the materials used in concrete production. the use of the industry standard twin-shaft batch mixer of type DKX for the task at hand. – Transitioning towards a circular equipment, from mini excavators customers with a better understanding of how rental companies
Next, the Material Development and “Decades of high-level expertise in the concrete sector have enabled us to draw on and low-carbon construction and wheel loaders to generators, approach sustainable supply chains. Next, the Material Development and “Decades of high-level expertise in the concrete sector have enabled us to draw on and low-carbon construction and wheel loaders to generators, approach sustainable supply chains.
Testing stage will use new cement and clinker experience from a great number of similar projects,” says Däschlein. “This made us very sector’ – put circular and low boom lifts and access platforms. The framework helps rental companies to define minimum Testing stage will use new cement and clinker experience from a great number of similar projects,” says Däschlein. “This made us very sector’ – put circular and low boom lifts and access platforms. The framework helps rental companies to define minimum
substitution technologies and admixtures to confident that the twin-shaft batch mixer would provide the necessary high level of carbon construction practices in The results provide an estimate sustainability requirements and aspirations for all suppliers to rental substitution technologies and admixtures to confident that the twin-shaft batch mixer would provide the necessary high level of carbon construction practices in The results provide an estimate sustainability requirements and aspirations for all suppliers to rental
develop low-carbon concrete, while the final homogeneity that the client requested.” the spotlight and looked at the of the carbon footprint per hour companies, in the areas of human rights and working conditions, develop low-carbon concrete, while the final homogeneity that the client requested.” the spotlight and looked at the of the carbon footprint per hour companies, in the areas of human rights and working conditions,
stage will look at the production and logistics Having been installed in 2019, the mixers will continue to produce concrete for 22 hours a policy and industry perspectives of use, allowing construction health and safety, responsible sourcing of components and raw stage will look at the production and logistics Having been installed in 2019, the mixers will continue to produce concrete for 22 hours a policy and industry perspectives of use, allowing construction health and safety, responsible sourcing of components and raw
involved in manufacturing concrete for ways day, six days a week for a further two years. for transitioning to a sustainable equipment users to compare materials, environmental performance, business ethics and product involved in manufacturing concrete for ways day, six days a week for a further two years. for transitioning to a sustainable equipment users to compare materials, environmental performance, business ethics and product
to further reduce carbon emissions. By 2023, it is anticipated that all the construction sector. different use scenarios, see which sustainability performance. to further reduce carbon emissions. By 2023, it is anticipated that all the construction sector. different use scenarios, see which sustainability performance.
Gareth Jones, head of MMC & Technical blocks will have been integrated into the As the speakers at the event part of the lifecycle contributes Rental companies can adopt the Framework as a code of Gareth Jones, head of MMC & Technical blocks will have been integrated into the As the speakers at the event part of the lifecycle contributes Rental companies can adopt the Framework as a code of
Services at the Ministry of Justice, said, “This dam – a total of 700,000m2 of concrete made clear, construction is the most to the carbon footprint and conduct and request their suppliers declare compliance with the Services at the Ministry of Justice, said, “This dam – a total of 700,000m2 of concrete made clear, construction is the most to the carbon footprint and conduct and request their suppliers declare compliance with the
study demonstrates how collaboration protecting the region from flooding. priority sector for reducing evaluate the alternative fuels. requirements by completing and signing the supplier checklist, or study demonstrates how collaboration protecting the region from flooding. priority sector for reducing evaluate the alternative fuels. requirements by completing and signing the supplier checklist, or
through the supply chain can carbon emissions in the context The Calculator has six easy adapt the template according to their own requirements. through the supply chain can carbon emissions in the context The Calculator has six easy adapt the template according to their own requirements.
bring subject matter experts Part of the 32km-long Afsluitsdijk of the European Green Deal, steps, requiring basic information Suppliers will be able to send the signed declaration directly to bring subject matter experts Part of the 32km-long Afsluitsdijk of the European Green Deal, steps, requiring basic information Suppliers will be able to send the signed declaration directly to
together to develop innovative dam protecting the Netherlands with the economic weight and about the characteristics and rental companies and post adherence to the Framework on their together to develop innovative dam protecting the Netherlands with the economic weight and about the characteristics and rental companies and post adherence to the Framework on their
solutions for decarbonising.” from the North Sea technology to drive the ‘Green use of a piece of equipment websites. Any supplier to the rental companies can use this tool to solutions for decarbonising.” from the North Sea technology to drive the ‘Green use of a piece of equipment websites. Any supplier to the rental companies can use this tool to
Initially to be used in the Recovery’, and the industry itself – equipment production, self-assess against the harmonised requirements of the rental sector Initially to be used in the Recovery’, and the industry itself – equipment production, self-assess against the harmonised requirements of the rental sector
World’s top 200
construction of prisons has a strong commitment to transportation, lifetime and and to demonstrate fulfilment of these requirements. construction of prisons has a strong commitment to transportation, lifetime and and to demonstrate fulfilment of these requirements.
within the UK, the team sustainability. utilisation, energy consumption, The Sustainable Supplier Framework is available in English, Dutch, within the UK, the team sustainability. utilisation, energy consumption, The Sustainable Supplier Framework is available in English, Dutch,
said it intended to make As an inherently circular maintenance and end-of-life – French, German, Italian, Polish and Spanish: https://erarental.org/ said it intended to make As an inherently circular maintenance and end-of-life – French, German, Italian, Polish and Spanish: https://erarental.org/
the outcomes of the project business model that minimises and the users are guided through sustainable-suppliers/ the outcomes of the project business model that minimises and the users are guided through sustainable-suppliers/
transferable to other sectors financial commitments and the process step-by-step. Users
contractors ranked
transferable to other sectors financial commitments and the process step-by-step. Users
and development types, risk for equipment users, the can then directly compare and development types, risk for equipment users, the can then directly compare
“including student and rental equipment rental industry is well different scenarios, making equipmentcalculator.org/ set targets and report progress “including student and rental equipment rental industry is well different scenarios, making equipmentcalculator.org/ set targets and report progress
housing, and major health and The two BHS-Sonthofen DKX batch placed to facilitate sustainability it easier to make the most You can watch the video here: against these targets. housing, and major health and The two BHS-Sonthofen DKX batch placed to facilitate sustainability it easier to make the most You can watch the video here: against these targets.
education infrastructure.” mixers in Alphen aan den Rijn in the construction sector and sustainable choice when using https://youtu.be/yadO7JAyU1k For this reason, ERA has
education infrastructure.” mixers in Alphen aan den Rijn in the construction sector and sustainable choice when using https://youtu.be/yadO7JAyU1k For this reason, ERA has
In construction, we may address the twin challenges of equipment. developed a new CSR KPI
In construction, we may address the twin challenges of equipment. developed a new CSR KPI
swap diesel engines for electric motors, decarbonisation and the ‘Green It can be used to evaluate CSR KPI FRAMEWORK Framework to enable equipment
swap diesel engines for electric motors, decarbonisation and the ‘Green It can be used to evaluate CSR KPI FRAMEWORK Framework to enable equipment
then look at hydrogen and other fuel material, with more than 4 billion tonnes industry, the importance of reducing its Recovery’ from the pandemic. a single ownership period of Rental industry customers and rental companies to implement U
then look at hydrogen and other fuel material, with more than 4 billion tonnes industry, the importance of reducing its Recovery’ from the pandemic. a single ownership period of Rental industry customers and rental companies to implement -de ltitn
alternatives. While we do, concrete will produced each year. impact on the environment can hardly be As a European association one piece of equipment and, other stakeholders (investors, different levels of KPIs, 2 2
alternatives. While we do, concrete will produced each year. impact on the environment can hardly be As a European association one piece of equipment and, other stakeholders (investors, different levels of KPIs,
remain untouchable, the ubiquitous building As both a blessing and a curse for the overstated. ce with members including furthermore, to determine the staff, suppliers, regulators, depending on their level of
remain untouchable, the ubiquitous building As both a blessing and a curse for the overstated. ce with members including furthermore, to determine the staff, suppliers, regulators, depending on their level of
national rental associations, climate impact of entire fleets of Government agencies, NGOs, maturity. The minimum KPI set is
national rental associations, climate impact of entire fleets of Government agencies, NGOs, maturity. The minimum KPI set is
The DPC project’s view on decarbonising construction includes rental companies, equipment equipment or the total carbon etc.) increasingly expect the perfect “starter” framework.
The DPC project’s view on decarbonising construction includes rental companies, equipment equipment or the total carbon etc.) increasingly expect the perfect “starter” framework.
examining transportation and installation emissions manufacturers and other footprint of all machines on a equipment rental companies to Once companies have experience
examining transportation and installation emissions manufacturers and other
suppliers to the
Untitled-2 rental industry,
footprint of all machines on a
given construction site.
equipment rental companies to
put in place Key Performance
Once companies have experience
implementing and using the
suppliers to the rental industry, given construction site. put in place Key Performance implementing and using the INSIDE: 16 PAGE
3
ERA supports sustainability You can access the Indicators (KPIs) to measure minimum set, they can progress
ERA supports sustainability
in the industry and across
You can access the
Calculator here: https://
Indicators (KPIs) to measure
their CSR performance levels,
minimum set, they can progress
to implementing good practices
SUPPLEMENT
in the industry and across Calculator here: https:// their CSR performance levels, to implementing good practices
the construction sector more and, finally, to developing best
the construction sector more and, finally, to developing best
widely by developing tools practices and becoming industry
JULY-AUGUST 2021 | No 8 A KHL GROUP PUBLICATION
STEPHANE ASSELIN YU HONG FU ANDREA CASSONI
widely by developing tools
for companies to adopt more
practices and becoming industry
leaders.
for companies to adopt more leaders. Aurecon Sany ABB
sustainable practices. The CSR KPI Framework covers IN ASSOCIATION WITH INTERNATIONAL CONSTRUCTION AND CONSTRUCTION EUROPE
sustainable practices. The CSR KPI Framework covers PRODUCT REPORT
‘People’, ‘Health and Safety’, JCB’S 525-60E ELECTRIC SURVEYING
THE NEXT GENERATION
‘People’ , ‘Health and Safety’, LOADALL TELESCOPIC
27/08/201 CO2 CALCULATOR ‘Training’, ‘Environment’, ‘Supply
HANDLER
CO2 CALCULATOR ‘Training’ 5 15:58:52
, ‘Environment’, ‘Supply
First released on 13 January and Chain’, ‘Anti-Corruption and
First released on 13 January and Chain’, ‘Anti-Corruption and
updated on 16 March, the ERA Bribery’, ‘Circularity’0and 2/80 ‘Other’
/72
updated on 16 March, the ERA Bribery’, ‘Circularity’ and ‘Other’ Untitled-2
Equipment CO2 Calculator is a KPIs. It3is2available
51
U 51 to download
2 -delti6tn3:85:
Untitled- Equipment CO2 Calculator is a KPIs. It is available to download free-to-use online tool to enable here: https://erarental.org/
2 2 eltitnU
free-to-use online tool to enable 3 2-d
here: https://erarental.org/ equipment stakeholders to make publications/csr-kpi-framework INTERVIEW
ANDREA
INTERVIEW:
SCOTT Gatefol
equipment stakeholders to make publications/csr-kpi-framework more sustainable choices when For more information about any
CASSONI,
ABB
CROZIER,
TRIMBLE
d pages.i
ndd 2
more sustainable choices when For more information about any using construction equipment. It of these tools, contact the ERA
using construction equipment. It of these tools, contact the ERA determines the carbon footprint team at era@erarental.org. ce WEARABLES
ce
BOOSTING PRODUCTIVITY
determines the carbon footprint team at era@erarental.org. AND SAFETY
20 CONSTRUCTION EUROPE JUNE 2021 CONSTRUCTION EUROPE JUNE 2021 47
20 47
CONSTRUCTION EUROPE JUNE 2021 CONSTRUCTION EUROPE JUNE 2021 27/08/20
15 15:58:36
1 510
2/80/72 TEST DRIVE: JCB’S ELECTRIC LOADALL TELESCOPIC HANDLER
25:85:5
27/08/20 CE 06 2021 Concrete JG MH.indd 20 25/06/2021 16:27:54 CE 06 2021 ERA JG MH.indd 47 25/06/2021 15:25:54
15 15:58:36 72 28/08/2
CE 06 2021 Concrete JG MH.indd 20 25/06/2021 16:27:54 /80/06
02CE 2021 ERA JG MH.indd 47 25/06/2021 15:25:54 Gatefold
015 pages.indd 1 28/08/2015 14:56:17 Gatefold pages.indd 1
51 51 ICON 07-08 2021 Front Cover JH.indd 1 12/07/2021 09:46:45 14:56:1
25:85: 8
You can guarantee all subscribers see your
advertisement with a bookmark added to your ad
or highlighted with a tabbed insert.
7 International Construction @international construction mag @KHLConstruction International Construction www.international-construction.comYou can also read