    OVERVIEW OF ENERGY SECTOR IN VIET NAM
AND PARTNERSHIP INVESTMENT OPPORTUNITIES

                                 Nguyen Thai Son
                         Director of Planning Department

                     General Directorate of Energy – MOIT
OVERVIEW OF ENERGY SECTOR IN VIET NAM AND PARTNERSHIP INVESTMENT OPPORTUNITIES - Nguyen Thai Son - ASEAN-KOREA CENTRE
Content

   Overview of socioeconomic
   Strategy for national energy development
   Current status and development plan
     Power sector
     Renewable energy sector
     Oil and gas sector
     Coal sector
   Investment proposals
   Q&A

                                              1
OVERVIEW OF ENERGY SECTOR IN VIET NAM AND PARTNERSHIP INVESTMENT OPPORTUNITIES - Nguyen Thai Son - ASEAN-KOREA CENTRE
Introduction
                                                        Overview of socialeconomic
Current status and development plan

      Area                              331.150,4 km2
      Population                        86,2 mil
      Number of provinces               63
      GDP growth rate
      - 2006-2010                       7%/year
      - Year 2011                       5,9%/year
      - First 4months of year 2012      4%
      - Planning for period of 2011-2015 6,5-7%/year

                                                               2
Development stratery
Strategy for national energy development
(Decision 1855/QĐ-TTg dated 27th December 2007)
 -   - Energy development must be closely linked to national social -
 economic development strategy and ensure a step ahead at high
 speed,    sustained,   coordinated,     diversification of   energy
 sources and energy saving technologies.
 -   Gradually set up the energy market, diversification of ownership
 and business methods, aims to satisfy the best interests of
 consumers. Accelerate the abolishing subsidies and remove exclusive,
 advanced     to    eliminate   the    implementation      of  social
 policy through energy prices;
 -    Synchronized and rational development of energy            system:
 electricity,   petroleum,  coal,  new   and    renewable        energy,
 including    interest   in  clean  energy   development,        priority
 development of new and renewable energy;
 -   Improve efficiency, energy efficiency         business.   Focus   on
 investment in energy efficiency, reduce losses;
 -   Development of energy tied to preserving the ecological
 environment, ensuring the implementation of sustainable energy
 development.                                                                                      3
Power sector

                                                                                                                                                      Current status & devpt. plan
Current status – Generation share & load growth

 2011
 Total installed capacity                            23500MW
 Commercial electricity                              93,8 bil kWh
 Electricity growth rate
 Period of 2006-2010                                 13,7%
 Year 2011                                           9,5%

CURRENT STATUS OF GENERATION SHARE
Depend on owner                                                    Depend on kind of source
                                  Nhập khẩu   Khác
                          PVN        4%        1%
                          10%
IPP, BOT nước                                                                                     Nhập khẩu   Khác
     ngoài                                                                                          3.7%      2.8%
      10%
                                                                                                                                                      Thủy điện
                                                                    Tuabin khí                                                                         40.3%
                                                                     33.1%
       TKV                                                   EVN
        3%                                                   54%

                Cổ phần
                 15%            Tư nhân
                                  3%
                                                                                                                                Nhiệt điện chạy khí

                                                                                                                                                                                     4
                                                                                 Nhiệt điện dầu
                                                                                     2.7%                     Nhiệt điện than          2.3%
                                                                                                                  15.1%
Power sector

                                                                    Current status & devpt. plan
Current status – Grid

                                                                   Substation
                                             Voltage   Line (km)
                                                                    (MVA)
                                             500kV       3,890       10,650

                                                                   Substation
                                             Voltage   Line (km)
                                 U« n g BÝ

                                                                    (MVA)
                                              220kV      10,015      22,004
                                              110kV      13.449      5.960
                          Ph-ícLong

                                              6-35kV    135,371      39,804
                                                LV      240,424

                                                                                                   5
Power sector

                                                                                   Current status & devpt. plan
Viewpoints for development

  a) Development of the power sector must be associated with national social -
  economic development strategy, ensure enough electricity to supply the
  national economy and social life.
  b) Efficient use of energy resources for power development internally the
  country, combined with the import of power, reasonable fuel imports,
  diversification of primary energy sources for electricity production, fuel
  conservation and ensure energy security for the future
  c) Gradually      improve      the    quality   of     electric  power     to
  provide electricity services to the increasing quality. Implementation of the
  electricity price under the market mechanism to encourage investment
  in power sector development and encourage the use of power saving and
  effective.
  d) Power development along with protecting natural resources, environmental
  protection ecological guarantee the country's sustainable development
  e) Progressive formation and development of competitive electricity markets,
  diversifying forms of investment and trading. Only State monopoly transmission
  grid to ensure the security of national energy system.
  f) Development of power sector based on the rational use and
  effective source of primary energy resources of each region; to
  continue promoting rural electrification, guaranteed to provide full
  and continuous and safety for electricity demand in all regions nationwide.
                                                                                                                  6
Power sector

                                                                                            Current status & devpt. plan
Development Plan – Generation share
& elect. growth rate

                    Electricity growth rate
                    Period of 2011-2015       14,1-16%/yr
                    Period of 2016-2020       11,3-11,6%/yr
                    Period of 2021-2030       7,8-8,8%/yr
   160,000

   140,000

   120,000

                                                          Nuclear Power
   100,000
                                                          Renewable Energy

    80,000                                                Imported
                                                          Coal Fired Thermal Power
    60,000                                                Oil and Gas Fired Thermal Power
                                                          Hydropower & Pump Storage
    40,000

    20,000

        0
             2015          2020       2025       2030                                                                      7
Power sector

                                                                                                           Current status & devpt. plan
Development Plan – Transmission grid
CHINA
                        Thac Ba
          Lai Chau
                Viet Tri    Soc Son
          Son La               PhLaiUong Bi
                         Chem
                    Ha Dong MaiaDong       Quang Ninh
                                       Hai Phong
               HOA BINH          Thuong
                                  Din    Tin
                               Nhoh Quan
                                  Ninh Binh
        LAOS                   Thanh Hoa
                                      NORTHERN
                                      REGION
                               Vinh
                                  Ha Tinh
                                                 CENTRAL
                                       Dong Hoi  REGION                 MAP FOR NATIONAL
                                           Quang Tri
                                                                        POWER SYSTEM PLANNING TO 2030
                                                     Da Nang

                                 Ban Sok                     Doc Soi
                                            Yaly             Vinh Son                             NOTE
                                       Plei Ku                                                500kV: 500kV line (- 2020)
                                                                Quy Nhon
                                 Sam Bor                                                      500kV: 500kV line (- 2010)
                 CAMBODIA                            Krong                                    500kV: Existing 500kV line
                                                     Buk SongHinh                             220kV: Existing 220kV line
                                      D.Nai3&4Di Linh     Nha Trang                           500kV       substation(-
                                                    Da Nhim                                   2020)
                                      Thac Mo
                                                                                              500kV       substation(-
                          Tan Dinh       Tri An    Bao Loc                                    2010)
                                                                                              Existing           500kV
                                        Song
                                         NhonMayTrachNuclear Power
                             Hoc Mon                                                          substation
                                                                                              Existing           220kV
                         Phu Lam         Phu My
                                   Nha Be                                                     substation
                     O          Cai Lay   B Ria     SOUTHERN
                   Rach Gia TrNoc         a
                                                                                              Existing TPP
                     Mon                            REGION
                           a

                                                                                                                                          8
Power sector

                                                                                                                                                    Current status & devpt. plan
Development Plan – Construction volume

500kV transformer
                  Period of 2011-2015              Period of 2016-2020           Period of 2021-2025                     Period of 2026-2030

  Region                                         No.                                                     Cap.      No.
            No. of       No. of       Cap.               No. of      Cap.        No. of       No. of                         No. of         Cap.
                                                  of                                                    (MVA        of
             stat.       transf.     (MVA)               transf.    (MVA)         stat.       transf.                        transf.       (MVA)
                                                 stat.                                                    )        stat.

 Northern     8            11         6750        11          13    13100         11            14      12700       6           9          7500
 Central      1            2           900        4           4      2400          1            1        900        4           4          2550
 Southern    11            14         9450        11          13    11250         10            13      10800       10         13          10350
   Total     20            27        17100        26          30    26750         22            28      24400       20         26          20400

500kV transmission line
                   Period of 2011-2015                 Period of 2016-2020             Period of 2021-2025                 Period of 2026-2030
   Region     No. of trans.                       No. of trans.                    No. of trans.                           No. of trans.   Length
                                   Length (km)                     Length (km)                          Length (km)
                 lines                               lines                            lines                                   lines         (km)

 Northern            8                1443               18           2015                7                680                  5           760
 Central             3                1074               4            630                 0                    0                3           920
 Southern            13               1361               11           1890                3                1554                 6           1044
    Total            24               3878               33           4535                10               2234                 14          2724

                                                                                                                                                                                   9
Power sector

                                                                                                                                               Current status & devpt. plan
Development Plan – Construction volume

220kV transformer
              Period of 2011-2015                   Period of 2016-2020          Period of 2021-2025                Period of 2026-2030

   Region   No.                               No.                                No.                          No.
                      No. of       Cap.                  No. of        Cap.                  No. of Cap.                No. of         Cap.
             of                                of                                 of                           of
                      transf.     (MVA)                  transf.      (MVA)                  transf. (MVA)              transf.       (MVA)
            stat.                             stat.                              stat.                        stat.

 Northern    68           74      155438       75            82       18063       64          76    17400      72         87          21250
 Central     22           24       3925        20            20        3750       26          27     6000      26         27          5750
 Sounthen    47           73      16500        56            75       17250       66          81    19375      78        107          26250
    Total   137           171     175863      151            177      39063      156          184   42775     176        221          53250

220kV transmission lines
                  Period of 2011-2015                 Period of 2016-2020              Period of 2021-2025             Period of 2026-2030
   Region    No. of trans.                     No. of trans.                     No. of trans.                        No. of trans.   Length
                                Length (km)                        Length (km)                      Length (km)
                lines                             lines                             lines                                lines         (km)

 Northern           60             3864                41             1584               44            1606                31          2168
 Central            28             2867                15             1546               9             1362                5           916
 Sounthen           70             3906                45             2175               41            2584                41          1936
    Total           158           10637                101            5305               94            5552                77          5020

                                                                                                                                                                              10
Power sector

                                                                                        Current status & devpt. plan
Development Plan– Capital investment
Total Capital Investment needed/ Average Capital Investment per year (Bil. USD)

                           2011-      2016-        2021-           2026-      2011-
         Items              2015       2020         2025            2030       2030

 I- For Power              22,076/    28,830/      27,005/         32,441/   110,322/
 generation                 4,415      5,766        5,401           6,482     5,516

                           7,245/     10,523/      12,345/         15,868/   45,981/
 II- For Grid              1,449       2,105        2,469          3,174      2,299
                           29,321/    39,353/      39,349/         48,280/   156,303/
 Total                      5,864      7,871        7,870           9,656     7,815

Investment ratio of power project in period of 2011-2020
                              Capacity
   No.          Investor                        Investment ratio
                               (MW)
    1    EVN + TKV+PVN            26.874            49,49%
    2          BOT                16.128            29,70%
    3      IPP + Others           11.292            20,80%
              Total               54.294           100,00%
                                                                                                                       11
Power sector

                                                                                                   Current status & devpt. plan
Roadmap for electricity tariff

     Competitive Generation          Electricity Wholesale Market          Electricity Retail Market
            Market
              (VCGM)

         2010                 2014         2016                     2022        2024

    Pilot         Full             Pilot              Full               Pilot              Full
  Operation                      Operation                             Operation
                Operation                           Operation                            Operation

                                                                                                                                  12
Renewable Energy sector

                                                                    Current status & devpt. plan
Avoided cost tariff
(Decision 18/2008/QĐ-BCT dated 18th July 2008)
-The avoided costs of the national power system is
calculated when there is a (01)kWh power from small power
plants using renewable energy is emitted into the distribution
grid;
-Avoided              costs           as              production
costs of the generator 1kWh have the highest cost in the national
electricity     system,      these       costs       can       be
avoided if buyers purchase1kWh from a small power
plants using renewable energy replacement.

SUPPORTING MECHANISM FOR WIND POWER DEVELOPMENT
PROJECS (Decision 37/2011/QĐ-TTg dated 29th June 2011)
• Underwriting electricity produced from grid-connected wind
 power plants;
• Investment incentives, taxes, fees;
• Preferential land infrastructure;
• Support price of electricity for grid-connected wind
 power project
                                                                                                   13
Renewable Energy sector

                                                                                Current status & devpt. plan
Development Plan– Resource
Capacity of Renewable Energy on-grid (MW)
        Capacity            2011-2015 2016-2020     2021-2030    2011-2030
 Total                          1198        2408         9588        13194
 Wind power                      213         780         5200         6193
 Small Hydro power               895        1100         2380         4375
 Biomass (solid)                  50         305         1500         1855
 Waste                            39         100          200          339
 Geothermal                        0          80          198          278
 Solar power                       1           9           45           55
 Biogas                            1          34           65          100

Capacity of Renewable Energy off-grid (MW)
              Capacity                 2011-2015    2016-2020     2011-2020
 Solar system                                12,3           10             14
 Small Hydro power (off grid)                31,2         25,6             58
 Biogas                                       1,3            1              5
 Wind power-diesel system                     3,6            3              8
 Solar-diesel system                          4,6          3,8              8
 wind-diesel-solar system                     3.6          2,3              9

                                                                                                               14
 Total                                       56,7         45,7          102,4
Renewable Energy sector

                                                                        Current status & devpt. plan
Development Plan– Capital investment

     For grid-connected electricity from renewable energy sources
for the period of the chosen scenario (20 years) with average
investment rate of 1.34 million USD/MW (13.194MW). However,
this capital will be invested by the mobilize capital of enterprises.
Capital estimated 350.000 billion VND.
    For electricity from off-grid renewable energy source: Total
investment of 14.969 billion VND. This support capital is invested
by the state.
     For renewable energy use for heating: The total investment
for the period was 42,000 billion VND. This capital is invested by
people for household equipment and installation. It will be
considered a small support in the early stage to stimulate using
renewable energy movement and market development.
     The total subsidies for the basic plan implemented in the
period from 2011 to 2020 with the current calculation is 20.773
billion VND. In particular for electricity from renewable energy
on-grid is 3953 billion (19%), renewable electricity off-grid is
14.969 billion VND (72%) renewable heat is 1857 billion VND
(9%).                                                                                                  15
Oil &Gas sector

                                                                    Current status & devpt. plan
Viewpoints for development

     Effective use of petroleum resources in the country, and
 to promote investment, search, exploration and exploitation
 of oil and gas abroad, combined import and export as a basis
 for     sustainable   development    of     the     petroleum
 industry firmware, ensure energy security for the economy.
     -    Developing      internal     resources,     combined
 with expanding international cooperation, attracting foreign
 investment in search activity, exploration, increases in oil and
 gas reserves verified.
     - Prioritize search, exploration        and    exploitation
 of the deep water, offshore.
     - Encourage participation of all economic sectors and
 foreign   investment      in   developing    the     field of
 processing, distributing products and services etc..

                                                                                                   16
Oil &Gas sector

                                                                                                                          Current status & devpt. plan
Planning – Exploration, exploitation,
processing, transportation

       1. Search, petroleum exploration: oil and gas reserves reach 35-45 million tons of oil equivalent / year.
       2. Oil and gas exploration:

                                Exploitation
                                                 Exploiting overseas        Crude Oil               Gas
                               (million tons oil
                                                 (million tons / year) (million tons / year) (million m3/year)
                              equivalent / year)
Period to 2015                     25 – 38                                    18 – 20              8 --19
Period 2016 -2025                  40 – 45              7 --14                12 – 16              8 --19
       3. Development of gas industry:
      + Development towards diversification of markets, gas will be provided to the industry: power generation, fertilizer,
chemical, industrial, transportation and civil-scale production of about 19 billion m3 in 2025.
       + Research pipeline connecting East - South West, a gas pipeline as a basis for transnational connection with gas
pipeline in Southeast Asia.
      +    Strengthening   international   cooperation     and    selection    of     strategic   partner   capable      of                       long-
term gas supply LNG, CNG, DME ... from Russia, the Middle East, Australia, Africa ... etc..
       + Prepare infrastructure, promote and encourage the construction contractor collection systems offshore.
       + Cooperation, research technology solutions to recover gas is burned off at the platform in separating the high-
value products such as Ethan, propane-butane(LPG). Development and exploitation of gas fields with high CO2 content.
       + Research and Development projects of gas to                      form combinations of oil and             gas industry,
building separation Ethan tower system at the treatment                   plants to build gas processing           plants Ethan-
ethylene; processing gas into liquid fuels (GTL), DME from methanol.
       4. Oil and gas processing industry:
       + By 2015, finish 3-5 petrochemical refineries construction with total capacity of filter around 26-32 million tons/year,
construction and commissioning of 1-2 production of petrochemical products basic petrochemicals.

                                                                                                                                                                17
        + By 2025, complete the expansion and completion of construction 6-7 petrochemical                         refineries                            with
total refining capacity of 45-60 million tons/year,50% meet the needs basic petrochemical products. ...
Oil &Gas sector

                                                               Current status & devpt. plan
Development Plan– Capital investment (mil. USD)

  No.               Type of Investment      2011-15
        High Scenario (Billion USD)          65,170
   1    Oil and gas exploration              28,784
   2    Transportation &collection of gas     2,467
   3    Gas Processing Plant                  1,816
   4    Oil Refinery & Petrochemical         18,785
   5    Petroleum Services                   10,983
   6    Petrol & LPG depots                   2,100
   7    Topics, scientific research             235
        The participation of the PVN:        26,020

                                                                                              18
Coal sector

                                                                                       Current status & devpt. plan
Current status

Opencast:          + 5 mines with a capacity of over 2 million tons/year
                   + 15 mines with a capacity of 0,1-0,7 million tons/year
                    + A number of extraction with a capacity of less than 0.1
              million tons/year

Underground:       + 9 mines with a capacity of over 1 million tons/year
                   + over 20 mines with a capacity of less than 1 million tons/year

                            Mining production in the period 2003-2010
 Extraction
                Unit     2003 2004   2005     2006   2007   2008    2009    2010      Total
 method
 Opencast      Mil. tons 12.98 17.33 22.06     26.1 26.78 25.33     25.76    26.52              182.86

 Underground Mil. tons    6.81   9.78 12.48   14.71 16.33    17.6   18.17    20.44                116.32
                 Mil.
 Total                   19.79 27.11 34.54    40.81 43.11 42.93     43.93    46.96              299.18
                tons

                                                                                                                      19
Coal sector

                                                                    Current status & devpt. plan
Viewpoints for development

  -   Developing the coal industry on the basis of mining,
  processing, cost-effective use of coal resources of the
  country, to serve the domestic demand is primarily to
  ensure national energy security.
  -   Development of sustainable coal industry, associated
  with       effective      protection,  improve       the
  ecological environment of coal
  -  Maximize internal resources (capital, ability to design and
  manufacture of equipment in the country, etc.)
  -    Promoting foreign investment in         exploration   and
  exploitation   to   supplement  the         long-term      coal
  for domestic needs.
  -   To diversify forms of investment and business in the coal
  industry. To do business under the coal market is the
  management of the State to serve the aim of ensuring
  national energy security.
                                                                                                   20
Coal sector

                                                                                             Current status & devpt. plan
Planning – Exploration, exploitation, processing

     1. Coal exploration:
a) Northeast coalfield:
- Distribution mainly in Quang Ninh, a part in Bac Giang and Hai Duong. This area
has resources and reserves of the country's largest anthracite coal are mobilized
primarily                     on                       2030             planning.
      - By the end of 2015, completing the resources exploration and coal
reserves of upper-level and a minus 300m area for the North East coalfield. By
2020, basically complete the exploration of coal to the bottom floor.
b) Red River delta coal basin:
- Distribution is mainly in the provinces of Thai Binh and Hung Yen, Nam Dinh, have
great potential in type A bituminous coal (sub - bituminous), low levels of
exploration, mining conditions difficult, complex and sensitive environment, ecology.
       - During the period 2012 - 2015, selected area contains some promising coal,
geological conditions - suitable for conducting mining exploration investment for the test
                                         harness.
       - By 2030, completed basic exploration area contains coal mining favorable
conditions improve Khoai Chau - Tien Hai.
2. Coal Mining:
+ Year 2012: 45 - 47 million tons; Year 2015: 55 - 58 million tons; Year 2020: 60 - 65
million tons; Year 2025: 66 - 70 million tons; Year 2030: greater than 75 million tons.
3. Processing of coal: Strive to 2020, processing of coal development in
product diversification (direct fuel combustion, coal for metallurgy, coal
gasification, coal to liquid fuels, raw materials for chemical industry etc. ..)                                            21
Coal sector

                                                        Current status & devpt. plan
Development Plan– Capital investment

 - From year 2015, Vietnam will have to import coal;
 - Total capital investment needs for the coal sector
 to 2030 about 691 trillion VND (equivalent to
 33billion USD);
 - The average capital investment needs for the coal
 sector to 2030 about 34.55 trillion VND/year
 (equivalent to 1,6 billion USD/year).

                                                                                       22
Invest. proposals
Power sector

                                                                              Total
                            Type of     Location     Operation   Capacity   investme
 STT      Project name                                                                                 Progress
                          investment    (province)     year       (MW)        nt (bil
                                                                              USD)
                                                                                            The project is preparing bidding
  1    O Mon II              BOT         Can Tho       2016        750         0,6           document to select investors.
                                                                                                  International bidding.
                           IPP/BOT                                                          Ministry of Industry and Trade is
  2    Quang Tri           (potential   Quang Tri    2019-2020    2x600        2,3       studying the investment guidelines of
                             BOT)                                                                  project preparation.
                                                                                            The project is preparing bidding
  3    Vung Ang 3            BOT         Ha Tinh     2026-2028    4x600        5             document to select investors.
                                                                                                  International bidding.
       Pump storage PP
  4                           IPP       Ninh Thuan   2028-2030    4x300        0,8
       No.3
  5    Van Phong 2           BOT        Khanh Hoa      2021      2x660MW       2,4               Not yet implemented

  6    Nam Đinh 2            BOT        Nam Đinh       2025      2x660MW       2,4               Not yet implemented
                                                                                             Ministry of Industry and Trade is
                                                                                         studying the proposals of the investors
                                                                                         for investment in BOT type and plan to
  7    Son My 1              BOT        Binh Thuan     2018      5x390MW       2
                                                                                           evaluate and approve the feasibility
                                                                                        study (in case the project is approved by
                                                                                           competent authorities as BOT type)
                                                                                            Ministry of Industry and Trade are
  8    Song Hau 2            BOT        Hau Giang      2027      2x1000MW      3,5         working to guide investors in project

                                                                                                                                      23
                                                                                                        preparation
                  Total                                          12140MW       19
Invest. proposals
Oil & Gas sector

                                                                                              Calling
                                                                                     Total      for
                                                                                   investm foreign         Status &
  No.     Project name            Size              Location      Operation year
                                                                                   ent (bil. investm       progress
                                                                                     USD)       ent
                                                                                               ratio
                                                                    To begin the
                                                   Dung Quat
        Upgrading and            from 6.5                          construction in
                                                Economic Zone,                                            Investment
   1    expanding Dung      (existing) to 10                      the period 2014-    2,7      49%
                                                  Quang Ngai                                          project are set up
        Quat oil refinery   million tons/year                    2017, commercial
                                                    province
                                                                 operation in 2017
                                                                                                          Investment
                                                   Van Phong
                                                                                                      project are set up
        The Nam Van            10 million       Economic Zone,
   2                                                                 2015-2020         8       49%     and looking for
        Phong refinery         tons/year           Khanh Hoa
                                                                                                         joint venture
                                                    province
                                                                                                            partners
                            ~400km length,                                                              set the overall
        Gas Pipeline Nam                         Ba Ria – Vung      Commercial
   3                         capacity of 7                                            1,3      49% technical design
        Con Son 2                                 Tau province operation in 2015
                            billion m3 /year                                                                (FEED)
                                                Long Son oil and
                                                 gas industrial
        Long Son oil           10 million                                                             Study and calling
   4                                             zone, Ba Ria -      2015-2020         8       75%
        refinery               tons/year                                                               for investment
                                                    Vung Tau
                                                    province
        Total                                                                          20                                     24
Invest. proposals
Coal sector

  To request assistance in the field of research in the
 Red River Delta coal basin.
  Support the implementation of projects related to
 environmental protection and safety in coal mining.
  Enhancing ODA aid for projects in infrastructure
 development in Vietnam's coal industry, human
 resources training.

                                                                               25