PROGRESS REPORT #1 - Dublin 2019

 
CONTINUE READING
PROGRESS REPORT #1 - Dublin 2019
PROGRESS REPORT #1
PROGRESS REPORT #1 - Dublin 2019
DC in 2021 Worldcon Bid                                                                 Gearing up for a
                                                                                         Monumental
                                                                                          Worldcon

                                                     What is DC in 2021?
       Washington, D.C. fandom has played host to many science fiction and fantasy conventions, including
       Disclave, Capclave, and two Worldcons — Discon I (1963) and Discon II (1974). A new generation of area
       fans is bidding to bring the World Science Fiction Convention (Worldcon) to DC for a third time in August
       of 2021 at the Marriott Wardman Park in the Woodley Park neighborhood of Northwest Washington, D.C.
                                 DCin2021.org • info@DCin2021.org • Facebook/Twitter: DCin2021
    Times Three cover illustration for Times Three by Robert Silverberg, Subterranean Press, April 2011 © John Picacio. All rights reserved.
PROGRESS REPORT #1 - Dublin 2019
Dublin 2019: An Irish Worldcon
                          Progress Report #1
         Guests of Honour                                        August 15 - 19, 2019
         Jocelyn Bell Burnell                              Convention Centre Dublin
         Ginjer Buchanan                                       www.dublin2019.com
         Mary & Bill Burns                                     facebook: dublin2019
         Diane Duane                                              twitter: dublin2019
         Steve Jackson                                        info@dublin2019.com
         Ian McDonald

“World Science Fiction Society”, “WSFS”, “World Science Fiction Convention”, “Worldcon”, “NASFIC” “Hugo
Award”, the Hugo Award Logo, and the distinctive design of the Hugo Award Trophy Rocket are service marks of the
World Science Fiction Society, an unincorporated literary society.

                                                       1
PROGRESS REPORT #1 - Dublin 2019
Table of Contents
                 Articles                                                   Pages
                 A Message from the Chair                                       3
                 The Convention with a View                                     4
                 Advertise with us                                              5
                 Programme                                                      6
                 Theatre Call                                                   6
                 Site Selection Vote                                            8
                 Membership list                                                9

Cover art, page 1, and page 5 art by Iain Clark https://iainjclarkart.com

News and Information
The Access policy is online at:
https://dublin2019.com/members-area/accessibility-policy/

Programme brainstorming! To submit ideas go to:
https://dublin2019.com/things-to-do/programming/

To upgrade your membership or see current membership pricing:
https://dublin2019.com/join-us/

To advertise with us:
https://dublin2019.com/about/publications/

Did you know we have an instalment plan?                          For general inquiries
https://dublin2019.com/instalment-plan/                               please email
Want to volunteer?                                               info@dublin2019.com
https://dublin2019.com/members-area/volunteer-
opportunities/

Have a specific question?
https://dublin2019.com/about/contact-us/
                                                  2
PROGRESS REPORT #1 - Dublin 2019
A Message from the Chair
Welcome to our first Progress Report,                news. Our own hotels will be shared with you
                                                     in August, and will be released to the general
As I write this in Dublin, on the banks of the river public in January, with an early release for those
Liffey, from the warm comfort of a public house, with access requirements, it is great to hear fans
I can see the CCD.                                   taking the initiative and doing their own thing,
                                                     be it an apartment, or a small bed and breakfast.
I cannot wait to see you all there. To see all the Go for it!
things that we want to have happen, brought
to fruition, joining us as we enjoy a five-day It is important to me that everyone feels
convention celebrating the world of science welcome and that interactions are positive and
fiction here in Dublin.                              enjoyable. We have had a code of conduct for
                                                     Irish conventions since 2015 and it continues to
It is now six months since we won the bid, and be updated as we get closer to the convention.
it is such an exciting prospect to be bringing the We’ve recently expanded our team, and please
Worldcon to Ireland for the first time. Support do check our code of conduct out.
has been strong, and we have been out flying
the flag.                                            I am tempted to list all the progress we have
                                                     made, but I am limited to a word count (thank
We’ve had a lot of people join the con, and I’d goodness): although our convention is 16
especially like to welcome the 100 members so months away, we are working on so much right
far whose first Worldcon this is. Welcome.           now.

We’ve been recruiting and need to do more of               You can help us, though, and that is important.
that and will be having our first All Staff weekend        Please do make mention online of this progress
here in Dublin on the last weekend in April. That          report, and that you are coming to Dublin 2019-
is exciting, as we start to engage with some of            An Irish Worldcon. Feel free to volunteer, and get
our 400 volunteers and start to work out all the           involved in the many opportunities e on many
details of what we are doing. Will you join us?            levels. We love to hear ideas, and our programme
Would you volunteer? Please do.                            team welcomes them, so do send them in.

Our first price rise occurred on 3 April, but before       It was absolutely amazing to watch the votes get
that we announced our Family and Installment               counted, to see the support and enthusiasm, and
plans. I hope that is something that can help you          to feel it, especially at home in Ireland, when we
spread the cost. We are heavily engaged with               visited Irish Discworldcon, Octocon, Gaelcon,
the Garda (police) vetting department, working             and Leprecon. Also, internationally already this
on how we can deliver children’s programme                 year we have had a strong presence in Boston
and child care in line with local legislation and          and Chicago, and we were out in numbers at
best practice. This is important to us, but in             Eastercon in England as we continue to welcome
many respects we are                                       people and ask them to join us.
breaking new ground.
                                                           Most of all, my thanks, and continued thanks for
Our programme brains trust kicked off in January           your support.
and Exhibits recruited the Art Show team. GDPR
(General Data Protection Regulation) will be live          If you have any query at all, please do not
in May 2018, and we have been working hard,                hesitate to contact us at info@dublin2019.com
to ensure that we comply with these new data               As ever, my very best and sincerest thanks,
rules.                                                     with continued thanks for your support.

I was very excited to see that people are already                                             James Bacon,
booking Air BnB accommodation, which is great                                                        Chair
                                                       3
PROGRESS REPORT #1 - Dublin 2019
The Convention with a View
The venue for Dublin 2019 is the Convention                Worldcons have been far from average size,
Centre Dublin (or CCD), a somewhat unique                  you’ll be happy to note there are facilities
venue for a Worldcon in that it’s located in the           available near the CCD that would allow us to
city centre and its construction is vertical, rather       expand our programme space by up to 50%
than horizontal. This geometry will reduce the             and our social space can be increased by nearly
amount of walking you’ll do, if not your vertical          as much with the construction of a marquee in
movement on escalators and in elevators.                   the CCD grounds.

                                                                           Earlier I mentioned parties,
                                                                           which we are hosting in the
                                                                           CCD. However, these will
                                                                           not be like convention centre
                                                                           parties in the past as we have
                                                                           a beverage and snack waiver
                                                                           that will allow you to serve
                                                                           not only unlimited amounts
                                                                           of non-alcoholic beverages
                                                                           but a reasonable amount of
                                                                           alcohol to boot, along with an
                                                                           unlimited amount of dry goods
                                                                           (crisps, nuts, etc.). The only
                                                                           real restriction is on the serving
                                                                           of food (hot or cold), which will
                                                                           need to be sourced through
Entrance to the CCD is from North Wall Quay                the convention centre.
into a large foyer on the Ground Level, where
you’ll find Registration and all the usual member We will have six standard party rooms each
services functions.                                  night (one of which can be split into two for
                                                     smaller parties), with an average capacity
Behind this area is the Forum, a 2,721m2 double of around 100. We also hope to have some
height hall that will be the home for most of our larger rooms available for large parties with an
Exhibits, Art Show, and Dealers Room.                average capacity of around 250. These rooms
                                                     will be available Thursday, Friday, Saturday, and
Up one floor on Level 1 is a bunch of our Sunday evenings, and the hire cost should be
programme spaces, our 900-seat second comparable with the cost of a similar capacity
stage, and our fan bar and lounge. Up another hotel suite at a North American Worldcon. Each
floor to Level 2 is the rest of our programme hire will include glassware, ice, and lemons/limes
spaces, which in the evening will be turned over that will be replenished by the CCD as required.
to parties. On Level 3 are the entrances to the We expect to open party bookings shortly after
stalls of our 2,000-seat main auditorium, with Worldcon 76.
entrances to the balcony on the next floor, Level
4, and wheelchair access to the back of the The other area I know you’ll all be interested in
balcony on the top floor, Level 5. On every level are the accommodation arrangements for the
are large open foyers that will provide places to convention. It’s too early to give actual rates
sit and just chat or get a coffee and cake, all with right now but we are negotiating for a range of
great views out across the city. All in all, the CCD blocks in variety of hotels and some student
provides the perfect location for an average- accommodations to try to provide a range of
sized European Worldcon.                             rates to match all purses (as best we can, given
                                                     the nature of Dublin hotel rates). Our aim is that
However, given that the last two European all our blocks will either be within a kilometre
                                                       4
PROGRESS REPORT #1 - Dublin 2019
walk of the CCD or within a half-kilometre walk
of a public transport stop on a route that will
take you to the CCD.

We plan to publish our blocks, with full details
of the rates, location and transport options, and
room details (including access room details)
shortly after Worldcon 76. This will enable you to
research the best option for you before standard
room bookings open through a single portal in
early 2019. (We aim to open for access booking
in late 2018. Note that to access this option
you’ll need to be registered with our access
team before that date.)

To contact us with any facility questions, email
us, for now, at facilities@dublin2019.com, but
watch the website for announcements of party
and accommodation-specific email addresses
coming soon.

Steve Cooper
Facilities
                                                                                    Dragon Over Christ Church

Advertise with Us
Dublin 2019: An Irish Worldcon will have a               Ad dates are subject to change. Please contact
number of opportunities for writers, artists,            advertising@dublin2019.com for the most
publishers, fan groups and others to advertise           current release schedule.    To reserve space
with us.                                                 please email the advertising team a month
                                                         before the ad is due.
There will be 5 progress reports in total.
                                                         For page specifications and file types please
PR 2- Ads due September 15th                             visit the publications page on the website:
PR 3- Ads due December 15th                              www.dublin2019.com/about/publications
PR 4- Ads due March 20th
PR 5- Ads due June 20th (Electronic only)

  Rates
                                                                   Fan       Semi Pro                Pro
  Prices are in Euros.            Full page                         100           225                400

  All progress reports will be    Half page                          70           150                275
  printed in full color.          Quarter page                       50           100                200
                                  Inside covers                     200           300                500

     If you have any questions please let us know. Email us at advertising@dublin2019.com
                                                     5
PROGRESS REPORT #1 - Dublin 2019
Programme
Fáilte, a cháirde! Dublin 2019’s programme              Visit the programming page on the website
planning is underway, which likely means you’re         today to submit ideas or participate at:
wondering “What the craic?” Well, you’ve come
to the right place to find out what’s programme         http://dublin2019.com/things-to-do/
up to, and we’ve got a lot to share. From               programming/
brainstorming to recruiting, the Programme
Team is hard at work actively bringing on staff         Slán go fóill.
members to build a programme to remember.

Dublin 2019’s programme will be a wonderful
assortment of panels, presentations, and
discussions designed to delight, entertain,
and educate our members. In addition,
programming will feature a wide selection of
games, music, and demos -- but wait, there’s
more! We will also have an incredible selection
of program participants who will be available for
autographing, readings, and kaffeeklatsches.

Our Programme Team comprises volunteers from
Dublin (Baile Átha Cliath) to Boston, Helsinki to
Thailand, London, The Netherlands, California,
and beyond! Fáilte roimh Gael agus Gall! We’re
keen to have a diverse team that is focused on
bringing together a world-class programme that
includes Éireann’s legends, science, history, and
language -- not to mention our innate love of a
well-spun tale.

Get involved! While we’re well on our way to a
brilliant programme, we’d love a bit of help from
our friends:

 • Anyone interested in volunteering to work as
                                                                Theatre Call
   a staff member for Programme is encouraged              Are you someone who makes theatre
   to fill out the Dublin 2019 General Staff               happen? Are you an actor or playwright?
   Volunteer Form.                                         Do you know one? Dublin 2019 Theatre
 • Got a great programme idea to share? We’re              is looking for a few good people who
   keen to hear it. So, be sure to submit your             would like to stage a play or theatrical
   programme ideas today.                                  event at Dublin 2019. We are open to
 • Coming to Dublin? Fantastic! If you’d like to           any proposals but are particularly looking
   be considered as a programme participant,               for performances of science fiction or
   all you need to do is fill out our programme            fantasy – think genre – with hopefully
   participant request from.                               an Irish connection! Please contact co-
                                                           Theatre Heads Fionna O’Sullivan and
Dublin 2019 is sure to be magical, and we
                                                           Lisa Macklem (theatre@dublin2019.com).
are looking forward to creating a fantastic
                                                           Please contact us if you have an interest
programme for you and with you.
                                                           in volunteering in any capacity for theatre!

                                                    6
PROGRESS REPORT #1 - Dublin 2019
PROGRESS REPORT #1 - Dublin 2019
Site Selection Vote

Taken from the 2017 WSFS Business Meeting Minutes from Worldcon 75, The 75th World
Science Fiction Convention Helsinki, Finland.

                  Join US on Social Media
                                WWW.DUBLIN2019.COM

                                dublin2019       dublin2019

                                             8
Membership List                                         As of April 14, 2018

1/2r                    SF                        Brian Ameringen        Jonas Bagge               Judith Bemis
Aisling                 Sha                       Emjay Ameringen        Margene S Bahm            Jan Bender
Al (S)                  Shadow                    Jonathan Amery         Kathleen Bailey (S)       Itai Ben-ivri
Alytha                  Siobhán                   Matthias Ammon         Mark Bailey               Michael Benveniste
Amy (S)                 Spike                     Rolf Andersen          Matthew Bailey (S)        Simon Beresford
Ash                     Stuart                    Claire Anderson        Catherine Baily           Marianne Berkey
Astrid                  Stuart                    Dave Anderson          Alison Baker              Marina Berlin
Beata                   Suaine                    David Anderson         Chris Baker               Michael Bernardi
Bobby                   Teddy                     Jesper Anderson        Henry Balen               Sarah Berner
Carole-Heidi            The Emperor Penguin       Karen G. Anderson      Alastair Ball             Mark Bernstein
cDave (S)               (S)                       Nancy J Anderson (S)   Derek Balling             Christopher Berry
Chrispy                 Tibs                      Håkan Andersson        Gerri Balter (S)          TJ Berry
Colin                   Tiinatupuna               Lise Andreasen         David Bamford             Tony Berry
David                   Tinu (S)                  Agnes Andrews          Jennifer Barber           Nancy Biancamano
Dina (S)                Trisha                    Graham Andrews         John Barberio             Steph Bianchini
domin-IKA               Vivian                    Maxwell Andrews        Francesca T. Barbini      Robert Biegler
Elin (@hiddeninabook)   Zincht (S)                Nancy Andrews          Asha Bardon               Lee Billings (S)
Elrohill (S)            Helen Foster-Turner       Pedr Andrews           Jan Barenholdt            Joshua Bilmes
Emma                    Josh Hanson               Robert Angell          Gili Bar-Hillel           James Birdsall
Entourage               Ann Morris                Johan Anglemark        Uri Barkai (S)            Richard Bissmire
Gillian                 Caitriona Walsh           Maureen Anglim         Michael Barker            Elisabeth Björkman
Gryphon                 Mihaela @rantalica (S)    María Angulo Ardoy     Piers Barker              Martin Björnebro
Haverholm (S)           Lami A.                   Tiffani Angus          Trevor Barker             Roger Bjugn
Helen                   Tim A.                    Riia Annala (S)        Chris M. Barkley          Derek Blackadder
Incognito               Katja Aalto               Arnal Anouk            Thomas Barnes             Bruce Blackistone
Jack                    Outi Aalto                Linda Antonsson        Erykah Lacie Barrantes    Martin Blacklock
Jarsto (S)              Harald Aanderaa           Rudy Appleby           Susan Bartholomew         Folly Blaine
JBVD                    Salum Abdul-Rahman        Susan Appleby          A.P. Barton               Margaret Blake (S)
Joe                     Johanna Abraham           Karen Arbel            Kate Barton (S)           Harry Blanchard (S)
Joy                     Brad Ackerman             Oded Arbel             Lada Bartova (S)          Gary Blog (S)
karina                  Justin Ackroyd (S)        Bobbi Armbruster       Veronika Bartova (S)      Kent Bloom
Karina                  Andrew Adams              Beth Armitage (S)      Rotem Baruchin            Mary-Rita Blute
Katharine               Nadia Adams               Andrew Armstrong (S)   Diana Joan (DJ) Bass      Sanna Bo Claumarch
(thiefofcamorr)         Mihai Adascalitei         Helen Armstrong (S)    Jan Bass                  Scott Bobo (S)
kechpaja                Adina Adler               Valoise Armstrong      Nick Bate (S)             Бобсън Bobson (S)
Kirsti                  Warren Adler              Ty Arnold              Liz Batty                 Tobias Bodlund
kitten (S)              Gary Agin                 Craig Arnush           Sandra Battye             Tim Boerger (S)
Klas                    Siiri-Selina Ahlqvist     Jacob Arnush           Kurt Baty                 Hans-Ulrich Boettcher
LAKU                    Hanna Ahonen (S)          Miranda Arnush         Ralf Bayer                Edward Boff
Lynn (S)                Teemu Ahonen              René Arnush            Covert Beach              Neil Bond
Mad Elf (S)             Arshad Ahsanuddin         Eemeli Aro             Sally Beasley (S)         bookwench (S)
MaggieMay               Christian Aigner          Paolo Arosio           Alan Beattie              Ruth EJ Booth
Meike                   John Aitken               Inanna Arthen          Joshua Beatty             Clare Boothby
NESFA (S)               Nigel Aitken              C. John Arthur         Alan F. Beck              Christer Boräng
Nettie                  Peter Åkerlund            Charlotte Ashley       Chris Beck                Anette Lauen Borg
Noel                    Paula Alavesa             Hazel Ashworth West    Patricia Beck             Johannes Borgström
Noims                   Piia Alavesa Alavesa      Béryl Asterell         Christopher Becker (S)    (S)
Omega                   Ann Albrecht              Russell Ault (S)       Holly Becker (S)          Krzysztof Bortel
Patrick                 Bruce Albrecht            Juha Autero            Tom Becker                Elizabeth C Boss
Phazedout (S)           Raya G Alexander          Graham Auty            Anne Beckmann             Gregory Norman
Pompino the kregoyne    Rowan Alison              Rene Averett           Jacey Bedford             Bossert
PRK                     Robert Alivojvodic´ (S)   David M Axler          Catriona Beel             Caroline Bottoms
PS Publishing Ltd (S)   David Allan               Chris Ayres            Ruth Behling              Stephen Boucher
PS Publishing Ltd (S)   Nina Allan                Trish B (S)            Thaddeus Bejnar (S)       Liz Bourke (S)
PS Publishing Ltd (S)   Verity Allan              Karen Babcock          Anatoly Belilovsky        Thomas Boutilier
PS Publishing Ltd (S)   Lissa Allcock             Karen Babich (S)       Chris Bell                Peter Boutin
PS Publishing Ltd (S)   Philip Allcock            Babylonlurker Jan      Doug Bell                 William Boyde
Rach                    Duncan Allen (S)          James Bacon            Guest of Jocelyn Bell     Charles Boylan
Rachel (Kalanadi)       Jo-Anne Allen (S)         Andy Bacon (S)         Burnell                   Anna Bradley
Reece                   Stewart Allen (S)         Cathy Bacon (S)        Jocelyn Bell Burnell      Claire Bradley
Reiley                  Todd Allis                Charlie Bacon (S)      Roger Bell_West           Sarah-Beth Bradley
Robert                  Mike Allum                Donna Bacon (S)        David Bellamy             Sian Bradshaw
Sabina                  Nadav Almog               Gayle Bacon (S)        Ralf Belling (S)          Simon Bradshaw
Sally (S)               Noelle Ameijenda          Trevor Bacon (S)       Alan Bellingham           Will Bradshaw
Seb                     Vic Ameijenda             Jonathan Baddeley      Anastasiia Belozertseva   Antje Brand (S)

                                                            9
Membership List
Nicklas Brandin          Steven Cain             Neil Clarke            Caroline Cox             Sondra De Jong
Jennifer Bray            Dan Campbell (S)        Nicola Clarke          Peter Cox                Jim de Liscard
John Bray                Jenny Campbell          Don Clary              Samuel Cox               Jetse De Vries
Jonathan Brazee          Ramsey Campbell         Lars Clausen           Stephen Cox              Peter De Weerdt
Leo Breebaart            Russell Campbell        Elena Clemente         Tammy Coxen              Pol Dee
Potiphor Breen           Tina Campbell           David Clements         John Coxon               Tamara L DeGray (S)
Seth Breidbart           Olivia Canning (S)      Jonathan Clements      Elliot Craggs            Kathryne Del Sesto
Elaine Brennan           Vincent Canning         Gillian Clinton        Helen Craig              Jennifer Delaney
Doug Brenner             Dave Cantor             Brenda W. Clough       Christine Crawshaw       Maria Delaney
Debbie Bretschneider     Elizabeth Carabine      Larry Clough           Richard Crawshaw         Linda Delaurentis
Ric Bretschneider        Carbaes Carbaes         John Cmar (S)          Ann Crimmins             Jay Denebeim
Brett Knight             Mike Card               Rich Coad (S)          Catherine Crockett (S)   Linda Deneroff
Sharon Brevoort          Peter Card              Elaine Coates          Tomas Cronholm           Adi Denis
Claire Brialey           Doug Piero Carey (S)    Ethan Coates           Deborah Crook            Dennis Dennehy
Joni Brill Dashoff       Mary Piero Carey (S)    Joel Coates            Kathleen Crowder         Dennis Dennehy
Tom Brincefield          David Carlile           Mike Cobley            Elizabeth Crowens        Ingeborg Denner
Mike Brind (S)           Jean Carlos             David Cochrane         Mary Cruickshank-        Gay Ellen Dennett (S)
Serge Britz              Rob Carlos              Carolyn Cocklin        Peed (S)                 Clark T Denning
Ian Brogan               Renato Carlotti         Tanja Coen             Jerry Crutcher           Michele Dennis
Chris Broggi             Vivian Carlson          Andrew Coffey          Wendy Cruttenden         Sam Dent
Rosa Bronks              Loïc Carre              Barbara Cohan          John Michael Cule        Emma Dequirez
Steve Brooks             Leonia Carroll          Lawrence Cohan         Serena Culfeather        Daniel Dern
James Brophy             Michael Carroll         Sandy Cohen            Tony Cullen              Steven desJardins (S)
Ben Brown                C.D. “publius” Carson   Sue Cohick             Gloria Cummigs           Zoe Deterding
Flis Brown (S)           (S)                     Michelle Coleman       Catelynn Cunningham      Rosa Devine
Kenneth D. Brown         Caroline Carson (S)     Rachel Coleman (S)     Dónal Cunningham         John DeVoy
Lawrie Brown (S)         Katherine Carson (S)    Alex Coles (S)         Brigid Cupolo-Shorter    Noga Diamant
Tereza Brown (S)         Paul Caruso (S)         Eoin Colfer            Iain Cupples             Jeff Dill
Logan Bruce              Bettina Casati          Jenny Collier          Annie Czajkowski         Robert Dillman (S)
Nancy Kathleen Bruce     Erin Cashier (S)        Sue Ellen Colter (S)   Gideon TJ Da Silva       Jos Dingjan
(S)                      Ruth Cassidy            Steve Coltrin (S)      Janet D’Agostino Neill   Danika Dinsmore
Christian Brunschen      Sheila Cataroche        Ciaran Conliffe        Julia Daly               Annalisa Dione
James Bryant             Hydy Cates              Byron P. Connell       David Damerell           Geri Diorio
Ginjer Buchanan          Norman Cates            Tina Connell Connell   Danni Danni              Jody Dix
Kerry Buchanan           Robert F Cauley         (S)                    Marinda Darnell          Susan Dobell
Colm Buckley             Gianni Ceccarelli       Carol Connolly         Jared Dashoff (S)        Dermot Dobson
Gregory Buckley          Andrew Chamberlain      Susan Connolly         Todd Dashoff             Emmeline Dobson
George Budge             Don Chan                Jess Connor            Christine Davidson       Vincent Docherty
Kelly Buehler            Philippa Chapman        Guy Consolmagno        Corwin Davidson          Bridie Doherty
Antonio Bueno            Philippa Chapman (S)    Brittany Constable     Howard Davidson          Eugene Doherty
Delgado                  Ruth Charles            Jer Constable          Mark Davidson            Tatiana Doherty
Warren Buff              Venetia Charles         Anne Convery           Michael Davidson         Tom Doherty
Barbara Buhlert          Ash Charlton (S)        Norman Cook            Aaron Davies             René-Marc Dolhen
Cora Buhlert             Galen Charlton          Cathy Cooper (S)       Andrew Davies (S)        Tsana Dolichva
Petra Bulic (S)          Kathleen Charters       David Cooper           Andrew Davies            Michael Donaghy
Thomas Bull (S)          Lawrence Charters       Elizabeth Cooper       Cerian Davies            Elsie Donald
Kendall Bullen           Mike Cheater            Jane Cooper            Steve Davies             Chris Donaldson
Margaret Bumby           Bridget Chee            Jon Cooper (S)         Christopher K. Davis     Paul Dormer
Bruce Burdick            Johonn Chiaradia        Matthew Cooper         Elena Davison            Michelle Doty
Kris Burger              Frank Chick             Stephen Cooper         Matthew Davison          Peter Dougherty
Bill Burns               Zen Cho                 Jeffrey Copeland (S)   Andreas Davour (S)       (W2IRT)
Grace Burns              Krystyna Chodorowska    Fred Coppersmith       Anna Davour (S)          John R Douglas
Jackie Burns             Eric Choi               Sharon Corbet          Lionel Davoust           Cheri Douglass
Laura Burns (S)          Michał Cholewa          Helen Corcoran         Martyn Dawe              John Douglass
Mary Burns               Piotr W. Cholewa (S)    PP Corcoran            Guy Dawson               Fran Dowd
Rodger Burns (S)         Joanna Choules (S)      Myles Corcoran-        John Dawson (S)          John Dowd
Pamela Burr              Debi Chowdhury          Mullaney (S)           Sue Dawson               Aidan Doyle
Michael A Burstein (S)   Renny Christopher       Chris Cornell          Lea Day                  Dermot Doyle
Andrew M. Butler         John Chu                Paul Cornell           Rosanna Day (S)          Katie Draisbach
Padraig Butler           Gay Chung (S)           John Corrigan          Aliette de Bodard        Michelle Drayton-
Diana L. Bynum           Kristen Ciccarelli      Robert Corvus          Méabh de Brún            Harrold
Catherine Cable          A.D. Clark (S)          Fredrik Coulter (S)    Giulia De Cesare         Michelle Drew
Liz Cable                David Clark             Jon Courtenay          Christian De Chenu       Filip Drnovšek Zorko
Jonathan cain            Iain Clark              Grimwood               Susan de Guardiola (S)   (S)
Marianne Cain            Janet Clark             Gary Couzens (S)       Ruth de Haas

                                                           10
Kerstin Droege-          Herman Ellingsen        Adrienne Foster         Anne Ghesquiere         Anders Hallin
Macdonald                Sedeer el-Showk (S)     Paul Foth               Lester Gibo             Jukka Halme
Jakob Drud               Bob Embler              Amanda Foubister        Gary Gibson (S)         Päivi Haltilahti (S)
Diane Duane              Diana Embler            Wilson Fowlie (S)       Elizabeth Gilio         Timo Jussi Hämäläinen
Guest of Diane Duane     Adrian Emery            Bobbi Fox               Jerry Gilio             Will Hamilton
Darien Duck              Udo Emmerich            Declan Fox              Niall Gilsenan          Elizabeth Hammack
Jackie Duckworth         Emmihenna (S)           Chuck Fozard            Maria Gilson (S)        Elektra Hammond (S)
Jon Duckworth (S)        Marion Engelke          Colette Fozard          Robert Gilson (S)       Dan Hanks
Tim Duckworth            Marie Engfors           Cory France             Erica Ginter            Jane Hanmer
Anna Dudda               Emma England            Jessica France          Sara Glassman (S)       Judith Hanna
Marc Dudda               Xap Esler               Steve Francis (S)       Graig Glassner (S)      Gwyneth Hannaford
John Duff                David Etherton          Sue Francis (S)         Marsha Glassner         Katariina Hännikäinen
Lynn Ellen Duff          Tameri Etherton         Susan Francis (S)       Pascal Godbillon        Yvonne Hansen
Richard Duffy            Paul Evanby             D. Franklin             Cenk Gökçe              Sandra Hansson
Bridget Duffy-Thorn      Peter Fagan             Jean-Luc Fransen        Lynn Gold (S)           Ole Petter Harbitz
Shaun Duke               Sean Eric Fagan         Simon Fraser            David Goldfarb (S)      Rebecca Hardman
Wendy Duly               Nuala Fahey             Gwen Frazer             Diane Goldman           Henry Harel
Georges Dumbruch (S)     Alison Fairchild        Amy Fredericks          Boaz Goldstein          John Harold (S)
Robin Duncan             Nicholas Faller         Alicia Freeborn (S)     Larry Gomez             Clayton Harris
Tara Duncan              Jeanine Falter          Gail Freedman (S)       Anna Gomez Lagerlöf     Colin Harris
Owen Dunn                Ricky Falter            Kurt Freiberger         (S)                     Hershey Harris
Stephen Dunn             Pat Fanning (S)         Rebecca Freiberger      Laura E. Goodin         Jackie Harris
William Dunn             Jennie Faries           Lisa Freitag            Anne Gooding            Joan Harris
Martin Dunstan           David C. Farmer         Ivan Freitas            Paul Goodman (S)        Marlene Harris
Vivienne Dunstan         Guest of David Farmer   Patricia French         Carol Goodwin (S)       Nin Harris (S)
Dee Durkan               (S)                     Alexander Frenzel (S)   Roelof Goudriaan        Pete Alex Harris
Chris Duval              David Farnell           Manoa Friedson          Inez Gowsell            Irene Harrison
Kathryn Duval            Bruce Farr              Candida Frith-          Anette Grahn            Niall Harrison
Corinne Duyvis (S)       Lea Farr                Macdonald               Magdalena Grajcar (S)   Marcia Hart
Paul Dwyer               E.M. Faulds (S)         Myles Frith-MacDonald   John Granacki (S)       Tim Hart
Danny Dyer               Doug Faunt              Oscar Frith-MacDonald   Elyse Grasso (S)        Trish Hart
Phillip Dyson            Shannon Fay             Richard Frith-          Madaleine Gravette      Vicky Hartell
Christine Dziadosz       Moshe Feder (S)         Macdonald               Kaitlin Gray            Taia Hartman
Martin Easterbrook (S)   Karolina Fedyk          Magnus Fromreide (S)    Lorien Gray             David Harvey (S)
Jill Eastlake            Martin Feeney           Jack Frost              Roy Gray (TTA Press)    Eve Harvey
Donald Eastlake, 3rd     Gary Feldbaum (S)       Karenna Fry             Terry Sisk Graybill     John Harvey
Theresa Ebenhoe (S)      Aaron Feldman (S)       Taiyo Fujii (S)         Rika Graziani           Sara Harville
Nikki Ebright            Sara Felix              James Fulkerson         Siobhán Greaney         Denise Harwood (S)
Gary Echternacht         Thomas R. Feller (S)    Gwen Funnell            Arthur Green            Ilkka Hassi (S)
Hampus Eckerman          Don Felton              Karen Furlong           Cathy Green             Seppo Hätönen (S)
Nicholas Eden (S)        Mary Felton             Nige Furlong            Chris Green             John Hauwiller
Benjamin Edwards         Jaine Fenn              Sabine Furlong          Michael Green (S)       Sam Hawke
Chris Edwards            Sir Cum Ference (S)     Ed G                    Paula Green             William Hay
Chris Logan Edwards      Tommy Ferguson          Kitty G (S)             Valerie Green Schoen    Shigeru Hayashida
(S)                      Sara Fernandes          Barbara G.Tarn          (S)                     Lisa Hayes
Daniel Edwards           Anna Feruglio Dal Dan   Richard Gadsden         Gabriella Gregori       Rose Hayes
Elanor Edwards           J.S. Fields             Dean Gahlon (S)         Aaron Grehan            Jim Hayter (S)
Hannah Edwards (S)       Norbert Fiks            Janice Galeckas (S)     Daryl Greogry           Amit Hazi
Les Edwards              Tony Finch (S)          David Gallaher          Carolyn Griffin         Hannah Hazi
Mark Edwards             Carl Fink (S)           Lenore Gallegos         Eric Grove-Stephensen   Sean Healy
Nick Edwards             Tim Finnegan            Tom Galloway            Marina Gršković         Kate Heartfield
Sue Edwards              Edward Finneran         Louis Galvez III        David Grubbs            Anders Hedenlund
Val Edwards              Naomi Fisher            Gordon Garb             Melodi Grundy           Kathleen Hedges (S)
Jim Edwards-Hewitt       Johan-Martijn Flaton    Arcangelo Garbellini    Stephan Grundy          John Hedtke
Terilee Edwards-Hewitt   Marcus Flavin           Elio García             Aleksander              Marilyn Hedtke
John Gunnar Egeland      Alan Fleming            Jeff Gardiner (S)       Gruszczynski            Nigel Heffernan
Gray Egerton             Emily Fleming           Jaime Garmendia         G Anna Gryaznova        Tero Heikkinen (S)
Gary Ehrlich             Lea Fletcher            Linda Garrison          Diana Grygiencza (S)    Eeva Heikkonen
Sheryl Ehrlich           Flick                   Maxwell Garrison        Jessica Guggenheim      Virve Heilimo
M Jay Eichelberger       Dale Floer (S)          Erez Gavish             Urban Gunnarsson        Minna Heimola
Maddy Eid                Leadie Jo Flowers       Helen Gbala             Melanie Gurk            Annis Heino (S)
Lise Eisenberg           Virpi Flyktman          Liu Ge (S)              Laura Haajanen (S)      Edgar Held
Thomas Eivins            Peter Flynn             Mark Geary              Alexander Haas          Aaron Helenius
Ailish Eklof             Alex Foglio             Deborah Geisler         David Haddock           Tommi Helenius
Kerstin Eksmo (S)        Kaja Foglio             Janice Gelb             Paul Haggerty           Antti Helin
Jacqueline Elderkin      Phil Foglio             Denise A. Gendron       Magdalena Hai           Mona Helland
Alison Eldred            Victor Foglio           Ela Gepfert (S)         Hanna Hakkarainen (S)   Simone Heller
Hisham El-Far            Terry Fong              Chris Gerrib            Gay Haldeman            Christina Hellström (S)
Jessica Elgenstierna     Anne Fortune            Mark Gerrits            Xopher Halftongue       Stacey Helton (S)
Tony Elgenstierna        Edward Fortune (S)      Peter Geusens           Gideon Hallett          Zandy Hemsley

                                                          11
Membership List
Arthur L. Henderson (S)   SL Huang               Eric C. Johnson (S)      Sanna Kellokoski (S)    Outi Korlee
Randy Henderson           Nick Hubble (S)        Frank Johnson            Christine Kelly         Toni Korlee
Rebecca R. Henderson      Crystal Huff (S)       Jean Johnson             David Kelly             Jooel Korpi
(S)                       Elanor Hughes          Robin Johnson            Donna Kelly (S)         Erle M. Korshak (S)
Jack Henighan (S)         Louise Hughes          Zoe Johnson              Graham Kelly            Kaisa Kortekallio (S)
Felicia Herman (S)        David E. Hume          Cameron Johnston         James Patrick Kelly     Meri Kortteenpohja
Judith Herman             Robert Hummerstone     Eileen Johnstone (S)     Kerri-Ellen Kelly (S)   Johanna Koski
Mark Herrup               Kristen Humphrey-      Theo Johnstone (S)       Juliet Kemp             Ron Kotkiewicz
Lisa Hertel (S)           Taylor                 Cat Jones                Kathleen Kemp           Kat Kourbeti (S)
Karen Hetherington        Terry Hunt (S)         Heather Rose Jones       Ann Kennedy             Rick Kovalcik
Kevin Hewett              Walter Hunt            Katharyn Jones           Mike Kennedy (S)        Mika Koverola
Rebecca Hewett            Walter H. Hunt         Lenore Jean Jones        Robert Kennedy Jr (S)   Mikołaj Kowalewski
Bill Higgins              Lucy Huntzinger (S)    Penny Jones              Morag Kerr              Tomasz Kozlowski
Kelley Higgins            David Hurst            Simon Jones              Aleksandra Kesek        Katri Kr
Ross Higgins              Miska Husgafvel (S)    Stephen Jones            Joe Kesselman (S)       Gabe Krabbe
Teemu Hiilinen (S)        Bill Hussar (S)        Tony Jones               Greg Ketter             Ellen Kranzer (S)
Leigh Ann Hildebrand      Malcolm Hutchison      Angela Jones-Parker      Hélène Khamissi         Gérard Kraus
(S)                       Lewis Hutton           Lena Jonsson (S)         Ila Khan                Dina Krause
Jason Hill                Christopher Hwang      Jörgen Jörälv (S)        Naveed Khan             George Krause
Penny Hill                Michael Ibbs           Keith Jordan             Khardan Khardan         Bradley Krentz
Robin Hill (S)            Joonas Iivonen         Sheila Jordan            Joshua Kidd (S)         Laura Krentz (S)
Nathan Hillstrom (S)      Takeshi Ikeda          Eleanor Joslin           Helena Kiel             Louisa Krupp
Ruth Hilsman              Masaharu Imaoka (S)    Mari-Pilvi Junikka       Peter Kievits           Rebecca Krupp
Chucky Hindle             Mutsumi Imaoka (S)     Tomi Junnila (S)         Steve K Kilbane         Roy Krupp
Janica Hindle             Jody Ineson            Lena Jurczuk (S)         Douglas Killings        Thomas Kucera (S)
Corina Hinz               Alex Iordachescu (S)   Bridget Kachoogian       Paul Kincaid            Lutz Küch
Nicholas Hipp             Eija Isoviita          Dan Kachoogian           Maureen Kincaid         E Kuehnle
Scott Hipp                Bernard Ivezić (S)     Diane Kachoogian         Speller                 Petra Kufner
Jack R. Hirai (S)         Janne Jaakola (S)      Karolina Kaczkowska      Judith Kindell          Kerry Kuhn
Samantha Hirst            Marianne Jablon        Lulu Kadhim              Emma J. King            Eya Kuismanen
Jan Hlinovsky             Albert Jackowiak       Katarina Kaj             Paul King               Matthew Kunkel
Satu Hlinovsky            Anna Jackson           Rasmus Kaj               Roxanne King            Tom Kunsman
Shivaun Hoad              Aya Jackson (S)        Niilo Kalakoski (S)      Simon King              Matti Kurkela (S)
Martin Hoare              Glyn Jackson           Frank Kalisz             Steve King              Aleksi Kuutio (S)
Judi Hodgkin              Ian Jackson            Millie Kalisz            Wendy King              Heini Kyllönen
Debbie Hodgkinson (S)     Judith Jackson         Jackie Kamlot            Michael Kingsley (S)    Saija Kyllönen
James Hoffman             Kendra Jackson (S)     Louise Kane              Sean Kirk               Sami Kyllönen
Linda E. Hoffman          Nicholas Jackson (S)   Satu Kangas              Tim Kirk                Ryan Lackey (S)
Ada Hoffmann (S)          Rob Jackson            Jaakko Kangasharju (S)   Kirvesmies              Veikko Laeslehto
Constanze Hofmann         Steve Jackson          Esa Kankaanpää           Marko Kivelä (S)        Mur Lafferty
Kevin Hogan (S)           Wilma Jacobs           Anna Kańtoch             Andreas Kjeldsen        Marjolaine Lafreniere
Andrew Hogg               Saul Jaffe (S)         Jenna Kantor (S)         Ellen Klages            (S)
Robert Holbach            Simon Jagoe            Mary Kay Kare            Marcin Klak             Carolina Gomez
Ellie Holderness          Michał Jakuszewski     Jan Karell               Thomas Klein            Lagerlöf
Eleanor Hollindrake       Laura Jalkanen         Fia Karlsson             Eyal Kless              Laura Lahdensuu (S)
Andy Holloway (S)         Edward James           Naomi Karmi              John Klima              Anni Lähteenmäki
Mike Hollows (S)          Rhodri James           Boaz Karni-Harel         Klaus Kluge             Ghislaine Lai
John-Henri Holmberg       Simon James            Daniella Karni-Harel     Ellen Klugman (S)       Jonathan Laidlow
Anders Holmstrom          Barbara Jane           Jukka Karvonen (S)       Peter Knapp             Charlotte “Lotta”
Ju Honisch                Stephan Janka          Jyrki Kasvi (S)          Kristina Knaving        Laihonen
Vesa Honkasaari (S)       Phil Jansen            Jussi Katajala (S)       Bryan Knight            Petri Laihonen
Robert Hood               Jasper Janssen         Marjut Katajala (S)      Georgie Knight          Kate Laity
David Hook (S)            Andrew January         Keith Kato               Jennifer Knight         Christina Lake
Karen Hopkins             Emily January          Jerry Kaufman            Keith Knight            Nick Lakin
Priscilla Hopkins         John Jarrold           Carol Kavanagh           Sam Knight              Mark Lamki
Tracy L Hopper-           Hanna Järvinen         Gareth Kavanagh          Donna Knight-Olds (S)   Klara Lammers
Riordan                   Riikka Javanainen      Amanda Kear              Agata Koc (S)           Alicia LaMunion
Andreas Hoppler (S)       Benedykt ‘silmeth’     Quentin Keeling          Arnaud Koëbel           Meghan Lancaster
Kathy Horning (S)         Jaworski               Sarah Keeling (S)        Diana Koivunen          Geoffrey Landis
Bruce Howard (S)          Katherine Jay (S)      Kate Keen                Antti Koliseva (S)      James Landis
Dennis Howard             William Jensen (S)     Tony Keen                Arin Komins             Yoav Landsman (S)
Geordie Howe              Debra Jess             Philip Kehoe             Katja Kontturi          Eva Lang
John Howells              Samantha Jewell        Kathryn Keislng (S)      David Koren             Henk Langeveld
William Howliston         Emily Jin              Gregory Keith            Teemu Korkeakoski       Karin Langeveld
J.C. Hsyu                 Denys Johnson          Lorna Keith              Miriam Korlee           David Langford

                                                           12
David Langley            Martin Lister           Benedict MacLennan-     Guest of Ian McDonald   Mike Moir
Fred Langridge           Riitta Lister           Patton                  Ian McDonald            Grace K.E. Molloy
Heidi Lappalainen        Simon Litten            J. MacQuinn (S)         Jane McDonnell          Patrick Molloy
Markku Lappalainen (S)   Vivien Little           Hmpf MacSlow            Bill McGeachin          Fergal Monster
Knud Larn (S)            Ken Liu (S)             J. R. “Mad Dog”         Cillian McGillycuddy    Rachel Monte (S)
Beth Larrabee            Olov Livendahl (S)      Madden (S)              Stephen McGinness       Helen Montgomery (S)
Peggy Larreau            Colin Lloyd             Juha Mäenalusta         Gwen McGinty            Allan Moore
Christer Larrson         Joyce Lloyd             Gloria Magid            Martin McGrath          Fiona Moore
Nick Larter              Sherry Lochhaas         Clarrie Maguire         Paula McGrath (S)       Ian Moore
Phoebe Lau               Oscar Logger            Tim Maguire             Maura McHugh            Karen Moore
Bill Laubenheimer (S)    Jerry Lohr              Pat Maher (S)           Elaine McIonyn          Mary Ellen Moore
William Lawhorn          Liz Loikkanen (S)       Shane Maher             Juliet E McKenna        Murray Moore
Duncan Lawie             Brian Lombard           Ehud Maimon             Marjorie McKenna        Cherie Moore-White
Joann Lawler             Brendan Lonehawk (S)    Joyce Mains             Alex McKenzie           Lynn Moran
Alice Lawson             Adrian Long             Laura Majerus           Alissa McKersie         Patrick Moreau (S)
Kristoffer Lawson        Gavin Long              Veera Mäkelä            Patrick McManamon       Cheryl Morgan (S)
Leslie Lawson (S)        Katrina Long            Joakim Mäki (S)         Rebecca McManamon       Tim Morgan (S)
Steve Lawson             Luo Longxiang (S)       Joonas Mäkinen (S)      Mark McMenamin          Erling Mork (S)
Alexis Layton            Ann-Cathrine Loo        Ritva Mäkinen           Pat McMurray            Mari Morko (S)
Esther Le Mair           Sandra Loohs            Tiina Mäkinen           Andrew McMurry          Sheilagh Morlan
J. Patrick Leahy         Nancy Loomis            Robert S. Malan         John McNabb             Mary Morman
Bill LeBorgne (S)        Steven Lopata           Andrey Malyshkin        Amy McNally             Melissa Morman
William Ledbetter        Sanna-Kreetta Lopperi   Hartmut Malzahn         Dinah McNutt            John Morris
Evergreen Lee            Robert Lopresti         Patrick Manion          Andrew Meaney           Kendall Morris
Faith D. Lee             India Lovekin           Jim Mann                Mike Meara              William Morris
Gary Lee                 Kate Lovekin            Laurie Mann             Pat Meara               Paul Morrison
Kara Lee                 Kris Lovekin            Jim Manning             Aileen Meek             Sheena Morrison
Michael Lee (S)          Caroline Loveridge      Sandy Manning           Mark Meenan             Sousa
Sharon Lee (S)           Raymond Low             Maurizio Manzieri       Sara Megibow            Kevin James Mortimer
Veini Lehkonen           Louise Lowenspets       Paul Mara               Wilma Meier             Judith Mortimore
Tom Lehmann (S)          Gino Lucrezi            Beth Marble             Michelle Melendez       Craig Moseley
Katrina Lehto (S)        Christoph Luehr         Chris Marble            Susan Melendez          Ilya Moskvichev
Ruth Leibig (S)          Hannes Luhtasela (S)    Mark Pitman             Joseph Meltzer (S)      Miriam Moss
Hope Leibowitz (S)       Vicki Lukas (S)         Nikolay Markov          Lori Meltzer            Richard Mosses
Denise Leigh             Don Lundry (S)          Marta Markowska         Farah Mendlesohn        Fred Moulton
Stephen Leigh            Peg Lundry (S)          Juli Marr               Margaret Menzies        Steve Mowbray
Andy Leighton            Robert Luoma            Yvonne Marron de        Sandi Merchant          Fi Moxey (S)
Katri Leikola (S)        Perrianne Lurie         Martin                  Peruzzi Meredith (S)    Nicky Moxey
Karoliina Leikomaa (S)   Jolund Luther           Darlene Marshall        J.S. Meresmaa           Lee Moyer
Marianna “Kisu”          Monica Luther           B. Diane Martin         Caroline Mersey         Tom Moylan
Leikomaa                 Elija Lutze             George RR Martin        Wendy Metcalfe (S)      Jenni Muhonen
Unni-Päivä Leino         Bradford Lyau           Carlos Martín (S)       Harry R Meyer           Matthew Mulhall
Anne Leinonen            Anne Lyle               Arkady Martine (S)      Michael Michela         Thomas Mulhall
Onerva Leisti            David Lyman             Eckhard Marwitz         Jeremy Michelson        Caroline Mullan
Teemu Leisti             Deanna Lyman            Jonathan Mathieu        Christine Middlemass    Munchkin
Rena Leith               Dennis Lynch            Trevin Matlock (S)      (S)                     Bradley Munn
Nina Lempiäinen (S)      Morgan Lynch            Debbie Matsuura (S)     Perry Middlemiss        Alysia Murphy (S)
Taina Lempinen           Nicki Lynch             David Matthewman        Sonja Mikkonen (S)      Fionnuala Murphy
Adam Lenrow (S)          Rich Lynch              Julie Matthews          Taina Mikkonen          James J. Murray
Bruce Leonard            Jenn Lyons              Winton Matthews         Daniel Milburn          Paula Helm Murray
Chrissy Leonhardt        Mike Lyons              Anna Mattila            Miles Shaw              Outi Mussalo
Fred Lerner              Andrea Ma               Inguar Mattsson         Jack Miller             Mikko Mustajärvi (S)
Charles Levi             Ron Maas                Maciej Matuszewski      Steve Miller (S)        Riikka Mustajärvi (S)
David D. Levine          David Mac Rory          Ian Maughan             Theodore Miller         Matti Mustonen (S)
Debbie Levy              David Macarthur         Janet Maughan           Robyn Mills             Mervi Mustonen (S)
Sandra Levy              Craig Macbride          Robert Maughan          Ian Millsted            Ilana C. Myer
Anthony Lewis            Esther MacCallum-       Karin May               Dragos Miloiu           Sanna Mykkanen
Judith Lewis             Stewart                 Ian Mc Grattan          Mona Miltner            Sasquatch N
Philip Lewis             Ceallaigh S.            Parris McBride          Terrence Miltner        Teemu Naarajärvi (S)
Suford Lewis             MacCath-Moran (S)       Friend of Parris        Jacob Minne             Naath (S)
Kaia Licht (S)           Meg MacDonald           McBride-Martin 1        Elliott Mitchell        Lex Nakashima
Gregory Lind             Steve Macdonald         Friend of Parris        Keith Mitchell          Phil Nanson
Mikaela Lind             Allison MacGregor       McBride-Martin 2        Mary Ann Mitchell       Tom Nanson
Jan Lindgren             Janet MacGregor         Mark McCann             Rose Mitchell           Helena Nash
Kjartan Lindøe           Cristina Macía          David McCarty (S)       Andrzej Młynarz         S. Kay Nash (S)
Janne Lindroos           Robert Macintosh        Elizabeth McCarty       Natalia Młynarz         Terry Neill
Ben Lindsay              David Mackie (S)        Ashley McConnell        Howard Modell           Olivia Nelis
Jo Lindsay Walton (S)    Lisa Macklem (S)        Michael McConnell (S)   Rick Moen               Michael Nelson
Mark Linneman            Thomas MacLaney         Tod McCoy               Klaus Mogensen          Stephen Nelson
Liisa Lister             Patricia MacLennan      Guest of Ian McDonald   Debby Moir              Winkle Nemeth (S)

                                                          13
Membership List
Sini Neuvonen           Ron Ontell                Tommy Persson               Anna Raftery           Darren J Rout
Diana Nevins            Val Ontell                Lincoln Peters              Chris Ragan            Frances Rowat
Emma Newman             Finbarr O’Reilly          David Peterson (S)          Tarja Rainio (S)       Cameron Rowe
Peter Newman            Ruth O’Reilly             Polly Peterson              Susanna Rajanen        Dan Rowe
Barry Newton            Andrew O’Rorke            Tamara Petroff              Christine Rake         Tim Rowe
Judith Newton           Joan Manel Ortiz (S)      Sandy Pettinger (S)         Laurie Ramey           C.N. Rowen
M. Newton (S)           Diana Osborn (S)          Pierre E Pettinger Jr (S)   Malcolm Ramsay         Marcus Rowland
Ha Nguyen               Helene Osborne (S)        Roy Pettis                  Liisa Rantalaiho (S)   Sally Rowse (S)
Joseph Nicholas         Billy O’Shea              Diego Euo Peutend           Pekka Rantasaari       Yvonne Rowse
Kevin Nickerson         Catriona O’Shea           Andrea Philipps (S)         Flemming Rasch         Rozek (S)
Paula Niemi             Charlotte O’Shea          Ronni Phillips              Hanna Räty (S)         Lynda Rucker
Tobias Niemitz          Christopher O’Shea        Aidan Phillis               Mikko Rauhala          Ann Marie Rudolph
Shelagh Nikkel          Ciara O’Shea              Frank Phillis               Douglas Raxworthy      Yolande Rufiange
Brian Nisbet            Paul O’Shea               Tony Pi                     Colette Reap           Linda Ruggles (S)
Nina Niskanen           Richard O’Shea            Eric Picholle               Thomas Recktenwald     Ville Ruokonen (S)
Hanna Nissinen          Fionna O’Sullivan         Alexandra Pierce            Marjorie Redding       Ed Rush
Ryker Noble             Mick O’Sullivan           Sharon Pierce               Peter Redfarn          Simon Russell
Eric Nolan              Neil Ottenstein (S)       Dan Pierson                 Brianne Reeves (S)     Martin Ryan
Val Nolan               Frida Otterhag            Raija Pietilä               Erez Regev             Paul Ryan (S)
Gerald Nordley          Kathi Overton             Rait Piir                   Irina Rempt            Sarah Ryan
Sharon Nordley          Paul Owens                Donna Pilletere             Theresa Renner         Helen Ryder
Karl-Johan Norén        Robin Owens (S)           Michael Pilletere           Heli Repo (S)          Phillippa Ryder
Therese Norén           Susanna Paarma            Marion Pitman               Teppo Repo (S)         Gareth Ryder-
H. Norén                Santeri Palin (S)         Shirley Babine Pitman       Anders Reutersward     Hanrahan (S)
Sara Norja              Ada Palmer (S)            Jörg Plate                  James Reynolds (S)     Beverly Ryng (S)
Bennett North           Craig Palmer (S)          Jo Playford                 Pat Reynolds           Marko Saaresto
Ceecy Nucker            Doug Palmer (S)           Nicolai Plum                Trevor Reynolds        Jelena Šaban (S)
Abigail Nussbaum        Catherine Palmer-Lister   Mark Plummer                Evgeny Reznikov        Ruth Sachter (S)
Janet Nussbaum          Henrick Palsson           Gillian Polack              Christopher Rhodes     Ian Sales
Tommy Nyberg            Sezgii Paltsun            Michał Politowski           Steve Rice             Senja Salokannel
Jostein Nygård          Michael Pargman           Kent Pollard (S)            Mark Richards          Laura Salovaara (S)
Pádraig Ó Méalóid       Kenny Park                Sari Polvinen               Ranylt Richildis       Annika Samuelsson
Harvey O’Brien          Bill Parker               John Pomeranz               Carl Rigney (S)        Elijahu Sandler
Ron Oakes (S)           Carole Parker             Yehuda Porath               Stephen J Riordan IV   Juan Sanmiguel
Tara Oakes (S)          Cindy Parker              Andrew Porter (S)           Joerg Ritter (S)       Helen Sansum
Clare O’Beara           Tony E. Parker            Marianne Porter             Gary Robe              Deirdre Saoirse Moen
Sorcha O’Brien          Walter Parker             Patrick Porter              Dave Roberts, USA      John T. Sapienza, Jr
Anna O’Connell          Penny L Parkin            Auri Poso                   Dave M. Roberts, UK    Lesley Sapsford
Guest of Irene O’Dowd   Arwel Parry               Roxana Postolache           Estelle Roberts        Rinna Saramäki
Irene O’Dowd            Nigel Parsons             Pekka Poutanen              Tansy Rayner Roberts   Rhet Sark
Wolfgang Oeller         Sue Parsons               David Power                 (S)                    Jukka Särkijärvi (S)
Aimee Ogden             Joan Paterson             Calvin Powers               Tristan Roberts        Rie Sasaki
Peadar Ó’Guilín         Orjo Pättiniemi           Lothar Powitz               Emlyn Roberts-Harry    Anniina Savinainen
Kyoko Ogushi            Hal Payne                 Joseph Pregracke            Linda Robinett         Eric Sayle (S)
Colin O’Hagan           Harry Payne               Virginia Preston            Madeleine Robins       Greta Sayle (S)
Christina O’Halloran    Jodie Payne               Nick Price                  Kelly Roche            Sharon Sbarsky
John O’Halloran         Irina Pchelintseva        Christopher Priest          Kevin Roche            Rachel Scanlon
Roderick O’Hanlon       Eileen D Pearlman         Marion Naomi                Bob Roehm (S)          Seamus Scanlon
Carl Öhrn (S)           Sidsel Pedersen (S)       Pritchard                   Steve Rogerson         Ina Schaefer
Olli Oja (S)            Sidsel Pedersen           Steve Pritchard             Roberta Rogow (S)      Karen Schaffer
Mirkka Ojala            Andrew Peed (S)           Liam Proven                 Ben Roimola (S)        Isabel Schechter
Charles O’Keefe         Kid Peed (S)              Brith Walstad Pulido        Olav Rokne             Klaus Scheffler
Brian Oldham (S)        Leena Peippo              Iida Pullinen               Dave Romm (S)          Judy Scheiner
Ian Oldroyd (S)         Kristin Pelletier         Jozef Purdes                Leena Romppainen       Sam Scheiner
Mandy Oldroyd (S)       Cecy Pelz (S)             Olli Purma (S)              Arwen Rosenbaum        Lauren Schiller (S)
Paul Oldroyd            Elayne F. Pelz            Larry Van Der Putte         Jennifer Rosenberg     Ben Schilling
Ana Oliveira (S)        Michael Penick            Tuuli Pyy (S)               June Rosenblum         Patric Schirrmann
Mark Olson              Helen Pennington          Leila Qışın (S)             Diane Rosenburg (S)    Dieter Schmidt
Priscilla Olson         Maggie Percival           Roberto Quaglia             Jack Rosenstein        Gene Schneider
Thomas Olsson           Mike Percival             Laura Quin                  Rilla Rosenvall        Martin Schneider (S)
Frank Olynyk            Michael Perkins (S)       Mike Quin                   Andrew Ross            Lawrence M. Schoen
Connor Omond            Anne-Marie Perks          Annemarie Nugent            Scarlet Ross (S)       (S)
Corina Onderstijn       Leon Perniciaro           Quinlan (S)                 Maria Rossi (S)        Spring Schoenhuth
Paul O’Neil             Stephanie Perniciaro      Anders Qvist                Stephen Rothman        Patrick Scholz
Morag O’Neill           Kelly Persons             Rivqa Rafael (S)            Claire Rousseau        Susanne Schörner

                                                             15
Hanno Schreiber          Karen Haber Silverberg   Albert Sousa               Joseph Supple            Charles Timpko
David Schrotenboer (S)   Robert Silverberg        Alison Southern            Gayle Surrette           Allen Tipper
Christian Schuetz        Steve Silverberg         John Southern              Tim Susman (S)           Kimiye Tipton (S)
Ell Schulman             Sarianna Silvonen        Cat Sparks                 Malte Sussdorff (S)      Cathriona Tobin
Eric Schulman            Hildegard Simboeck       Daniel M. Spector (S)      Brenda Sutton            Visa Toivonen
Harald Schwartz          Alison Simons            Douglas Spencer            William Sutton           Michelle Tolcher
Molly Schwartz (S)       Matthew Simons           Henry Spencer              Mima Suvinen             Christine Toleson
Richard Schwartz         Keith Simpson            Kari Sperring              Mårten Svantesson        David Tompkins (S)
Ivo Schwarz (S)          Neil Simpson (S)         Juliana Spink Mills        Sveinn Sandvik           Suzanne Tompkins
Alison Scott             Karen Simpson Nikakis    Suzan Spitzberg            Svendsen                 Geoffrey Toop
Cindy Scott              David Singer             Jason Spitzer              Hanna Svensson           Terhi Törmänen (S)
Donna Scott              Ginda Singh (S)          Claudia Spix               Estara Swanberg          Nina Törnudd
Lesley Scott             Harpal Singh             Michael Sprague            Michael Swanwick         Luigi Toscano
Mike Scott               Victoria Sinton-Martin   William Spratt (S)         Edward Swatschek         Mike Towers
Teri N. Sears            (S)                      Christy Staats             Anton Sweeney            Kate Towner
JB Segal                 Tarja Sipiläinen (S)     Frederick Staats           Cathy Sweeney            William Tracy
Marcin Segit             Outi Sippo-Purma (S)     Jesper Stage               Lorna Sweetman           Paul Treadaway
Haim Semo                Jouni Siren              Flora Staglianò (S)        Amy Sykes                Andrew Trembley
Roi Semo                 Giani Siri               Kevin Standlee             Yulia Syromolot          Hayden Trenholm
Tali Semo                Vesa Sisättö             Corina Stark               Joseph Szczepaniak       Micci Trolio
Andrea Senchy            Aaron Sito               Hester Stasse              III (S)                  Liza Trombi
Ivan Sennikov            Aaron Sito               Howard Stateman (S)        Timothy Szczesuil        Justin Trotter (S)
Maria Sereno (S)         Nesa Sivagnanam          Karina Steffens            Alok T                   Clive Troubman
Charles Serface          Madona Skaff             Harold Stein (S)           Anna T                   Mark Tucker
Ian Sewell               Paul Skevington (S)      Bärbel Steininger          Ian Taft                 Anne-Marie Tuikka (S)
Sabine Seyfarth (S)      Sam Skevington (S)       Aleksi Stenberg            Michael Tallan           Kári Tulinius (S)
Elizabeth Shack          Woj Skraskowski (S)      Egil Stenseth              David Tamlyn             Antti Tuominen
Rob Shade                Jennifer Skwarski        Conor Stephens             Tiariia Tamminen         Saku Tuominen
Niamh Shanahan           Mandy Slater             Kate Stephens              Siv Tapper (S)           Leslie Turek
Robin Shantz             Mark Slater              Monica Jean Stephens       Taralyn Taralyn          Heather Turnbull
Hu Shaoyan (S)           Don Slaughter (S)        Brad Stephenson            Michael Tax              Peter Turner
Ron Shapland             Libby Slaughter (S)      David Stephenson           Charles Taylor           Tanya Turner
Donna Shapleigh          Graham Sleight           Laura Stephenson           Charlotte Taylor         James Turner
Catherine Sharp          John Sloan               Richard Stephenson         Ian Taylor               MaryBrigid Turner
Ariel Shattan            Kathleen Sloan           Susan Stepney              Kathy Taylor             Maria Turtschaninoff (S)
David G Shaw             Hadas Sloin              Edie Stern                 Martyn Taylor            Helinä Turumore
Kate Shaw                Joanna Słupek            Steve                      Nicolette Taylor         Mary Turzillo
Jannie Shea              Martin Smart             Maria Stevens              Paul Taylor              R-Laurraine Tutihasi (S)
Nicholas Shectman        Bret Smith (S)           Tim Stevens                Richard Taylor           Elizabeth Twitchell (S)
Antiqueight Sheehy (S)   Dennis Smith             Maisie Stevenson           Suzanna Taylor           Michael Twomey
Michael Sheffield        Henry Smith (S)          Alan Stewart               Adrian Tchaikovsky       Vicky Twomey-Lee
Sharon Sheffield         Jeanni Smith (S)         Barbara Stewart            Jenny Teerikangas (S)    Gen Tyrrell
Grant Shepert (S)        Kathryn Smith            John Stewart               Allan Tennent            Jon Tyrrell
Randall Shepherd         Luke Smith               Neil Stewart               Gek Puay Teo             Madeleine Tyrrell
T.G. Shepherd            Marguerite Smith         Billy Stirling             Gyrd Thane Lange         Nick Tyrrell
Karen Shergold           Melica Smith             Ian E Stockdale            Evangeline Thaning (S)   David Ul
Paul Sheridan            Paul Smith               FC Stoffel                 Sten Thanning            Cristina Pulido Ulvang
Mindy Sherwood-Lewis     Perri Smith              David Stokes               David Thayer             Tor C. Ulvang (S)
James Shields            Peter Smith              V Anne Stokes              Diana Thayer             Kadri Umbleja
Masabumi Shiina          Randy Smith (S)          Willard Stone              Markus Thierstein        Shona Underhill (S)
Sergei Shikin            Stephani Smith           Sylvain St-Pierre          Bill Thomas              Erin Underwood
Milla Shikina            Victoria Smith           Jonathan Strahan           Lois M Thomas            Emma Urquhart
Yoichi Shimada (S)       Dan Smithers             (Agency name)              W. A. (Bill) Thomasson   Emilia Uusitalo
Ivaylo “Evil Ivo”        Jane Smithers            Kelly Strait (S)           Jean Thompson            Brandy V
Shmilev                  Lucy Smithers (S)        Matthew Strait (S)         Karen Thompson           David V
Joey Shoji               Michele Smith-Moore      Erwin S. (Filthy Pierre)   Leona Thompson           Lori V
Alexis Shorter           Robert Sneddon (S)       Strauss                    Maria Markham            Suzanne Vachet
Jen Shortt               Anna Snodgrass           Birgitta Stridh            Thompson (S)             Edwards
Paul Anthony Shortt      Paul Snook               Charles Stross (S)         Mel Thompson             Pasi Välkkynen (S)
Brian Showers            Kris Snyder              Alex Stuart                Amy Thomson              Toby Valos
Meli San-San Siah        Jan Søderberg            Michele Stuart (S)         David Thomson            Billy Van Ark
Joseph Siclari           Augustinowicz            Tara Stuckless             Dominic Thoreau (S)      Erwin Van Ballegoÿ
Kurt Sidaway             Szymon Sokół             Achim Sturm                John R. Thorn            Marcel van der Rijst
Renée Sieber             Joseph Sokola (S)        Cathy Sullivan             Deirdre Thornton         Heidi Van Der Vloet
Ellen Sieraski           Nadja Sokura             Geri Sullivan              Monty Thorp (S)          David Van Deusen
Madelyn Sieraski         Rodney Somerstein        Kathryn Sullivan           Geoffrey Thorpe          Tess Van Dexter
Gerður Halldóra          Kevin Sonney (S)         Robert Sullivan            Jennifer Tifft (S)       Blokkland
Sigurðardóttir (S)       Ian Sorensen             Iiris Sumu (S)             Marko Tiihonen (S)       Penny Van Dine Palmer
Nikodemos Siivola        Julie Soskins (S)        Virpi Sumu                 Don A. Timm              (S)
Harun Siljak             Sylvia Sotomayor (S)     Amy Sundberg               Pekka Timonen (S)        Vincent Van Dyck

                                                             16
Membership List
Paul Van Oven           Päivi Vuorio          David Weingart        Susan L. Williams        Janet Yelle
Angélique van Toorn     Ellie W               Norbert Weiser        Walter Jon Williams      Johnathan Yik
Kees van Toorn          John Waggott          Michael Welch         Neil Williamson          Inka Ykspetäjä
Jan Vaněk jr.           Amanda Wakaruk        Alex Wells            Amy Willis               Tero Ykspetäjä
Antti Vanhatalo         Christianne Wakeham   Martha Wells          Phil Willis              Jani Ylönen
Jan van’t Ent           Jacob Waldman         Linda Wenzelburger    Mike Willmoth            Jim Young
Bambara Vantilburg      Dale B Walker (S)     James Wesley          Anna Wilson              Margaret Young (S)
Olena Vasylkivska       Jim Walker            Andy West             John Wilson              Mark Young
Olexandr Vasylkivsky    Mitchell Walker       Julian West           Miriam Winder Kelly      Stephanie Young (S)
Hannah Vaughan-         Vanessa Walker        Liz Westbrook-        Robert Winfield          James Youngman
Spickers                Dave Wallace          Trenholm              Suzanne Winfield         Maeve Youngman
Julian Vaughan-         Kali Wallace          Håkan Wester (S)      Rychard Winslade         Helen YSDC
Spickers                Kern Wallace          Henrik Wester (S)     Dion Winton-Polak        Paul YSDC
Carrie Vaughn           Evelyn Walling        Axel Westerlund (S)   Oskar Wistbacka          Joseph Yu (S)
Pablo Vazquez III (S)   René Walling          Kathy Westhead        Lovisa Wistrand          Bartek Żak (S)
Becky Veal              Claudia Wallraf       Mike Westhead         Jason Wodicka            Joel Zakem
Tom Veal (S)            Michael Walls         Peter Westhead        Kai Wodicka              Anne Zanoni
Tom Veal                Michael Walsh         Örjan Westin          Sally Woehrle            Ann Zeddies
Nico Veenkamp           Jo Walton (S)         Ian Whates            Krzysztof Wójcikiewicz   Timothy Zeddies
Frans Venema            Regina Kanyu Wang     Richard Wheatley      Taras Wolansky           Maria Zelenova
Alexander Verbeek (S)   Michael Ward (S)      Laura Wheatly         Rainer Wolf (S)          JK Zeljeznjak
Kimberley Verburg       John Wardale (S)      Mike Wheeler          Lew Wolkoff              Michelle Zellich (S)
Leane Verhulst          John F. Wardale (S)   Susan Wheeler         Garrett Wollman          Rich Zellich (S)
Matthew Vernon          Dr. Claire Wardell    Corey J. White        Tom Womack               Mark Zeman (S)
Sally Vernon            Peter Wareham         Donna White           Kate Wood                Elizabeth Zipser
Ursula Vernon (S)       Damien Warman (S)     Patrick White         Liz Woodburne            Michael Zipser
Francesco Verso         Richard Warren        Tom Whitmore          Alan Woodford            Liz Zitzow (S)
Stephen T Vessels (S)   Ville Warsta          Charles A. Whyte      Anne Woodford            Alon Ziv
Elina Vesterinen        Colin Watson          Nicholas Whyte        Jennifer Woods           Michal Ziv
William Vick            Ghoti Watson          Clark Wierda          Kat W Woods              Carl Zwanzig
Alessandro Vietti       Ian Watson            Gayle Wiesner         Karen Woodward
Pasi Vihinen            Jay Watson            Colin Wightman        Simon Woolf
Kristina Viitala        Mike Weasner (S)      Sarah Wightman        Jeff Wormsley
Britt-Louise Viklund    Janeen Webb           Axel Wiklund          Kathy Wormsley
Marie Vincent           Eric Weber            Rick Wilber           Shana Worthen
Tamara Vining (S)       Dave Weddell          Jeffrey Wildman (S)   Gareth Worthington (S)
Kaisa Vitikainen        Robert Weight         Kris Wildman          Peter Wright
Toivo Voll              Paul Weimer           Bridget Wilkinson     Steve Wright (S)
Ylva von Löhneysen      Jon Weinberg (S)      Jennifer Wilkinson    Tom Wright
Ville Vuorela           Terri Weiner          Debbie Willcox        Ben Yalow
Juhani Vuorio           Toni Weiner           Laurie Williams (S)   Cindy Yan

                                                        17
19 -21
                                                                                       th st
                                                                                   October 2018
Octocon, The National Science Fiction Convention, is a weekend celebration
 of everything strange and spectacular, bringing together artists, authors,
                film-makers and fans from across the galaxy.

   Guest of Honour 2018,

   PatCadigan                          w inner for Best Novelette
                                wa r d
                          Hugo a

                                        Traders
             of                                                                         Additional
      Out rld                            Hall
        i s wo                                                    Come                   Guests:
    t h       ls
         Pane
                                                                         Deirdre Sulliv
                                                                 along                     an,
                                                             bring     ,  Peadar O’Guil
                                                                   you                    in,
                                                              friend r       C
          ial                                                       s          E Murphy,
      e c
    Sp sts                                                                 Oisin McGann,
     Gue                                                      Fan      Ruth Frances
                                                                                        Long,
                                                           Meetups
               e                                                        Claire Hennes
          i bl                                                                           sy,
      e ss e                                                Games       Michael Carr
                                                                                      oll,
   c c nu                                                               Edmond Barra
  A Ve                                                                                  tt,
                     i ly                               Follow us
                                                                           a nd more...
                   m                                   on Facebook
                 Fa un                                 and Twitter
                    F

                 Find out more and follow us on social media:
                 www.octocon.com          www.facebook.com/octocon            Twitter: @octocon

                                                                €40 FREE
                                                                                           Children under 13
Crowne Plaza Hotel                             Weekend
                                               Membership
Blanchardstown                                 currently...
                                               Concession rate available                   with accompanying adult.
You can also read