A member of Antea Group - Iceacsa

Page created by Carl Mccormick
 
CONTINUE READING
A member of Antea Group - Iceacsa
A member of Antea Group

S PA I N   COLOMBIA   ME XICO   PERU   U R U G U AY                PANAMA
A member of Antea Group - Iceacsa
A member of Antea Group - Iceacsa
A member of Antea Group

Developing regions for people
A member of Antea Group - Iceacsa
_01

        CORPORATE         4
      INFORMATION
          INTRODUCTION

ICEACSA GRUPO WORLDWIDE

         ICEACSA PANAMA
A member of Antea Group - Iceacsa
_02                                        _03

         ACTIVITY AND          10                           CLIENTS       22
       SERVICE AREAS                    INSTITUTIONAL AND GOVERNMENT
    PLANNING AND FEASIBILITY                            AGENCY CLIENTS

        STUDY AND DESIGN OF                  CONSTRUCTION COMPANIES
            INFRASTRUCTURES

  STUDY AND DESIGN OF URBAN                           CONCESSIONAIRES
 PLANNING AND ARCHITECTURE
                                      INDUSTRIAL AND SERVICE COMPANIES
CONSTRUCTION AND OPERATION
             PHASE SERVICES
                                                      PRIVATE INVESTORS

   TECHNICAL CONSULTANCY IN
                                             PUBLIC AND PRIVATE BANKING
  PUBLIC WORKS PROCUREMENT
                                    INSTITUTIONS, AND INVESTMENT FUNDS
A member of Antea Group - Iceacsa
01   CORPORATE INFORMATION
A member of Antea Group - Iceacsa
INTRODUCTION

     MAIN
STRATEGIES

                                                                                                                                                        5

             PROVISION OF
             COMPREHENSIVE
             SERVICES TO CLIENTS
             DURING THE ENTIRE LIFE
             CYCLE OF THEIR PROJECTS

                                       Since it was founded in 1985, ICEACSA has achieved      Our track record is backed by a portfolio of more
             COMBINING
             INTERNATIONAL             an outstanding market position as a pioneering leader   than 2,500 projects Comprehensive regional plan-
             EXPERIENCE WITH LOCAL     in turnkey projects in the engineering, construction,   ning in the highway, port, water engineering, regional
             KNOWLEDGE                 regional and urban development and environ-             and urban planning and project development fields
                                       mental, industrial and energy generation fields.        for more than € 40,000 million (45,000 million USD)
                                       ICEACSA Grupo has become an international engi-         firmly endorses our governance. Studies, designs,
             TO PROVIDE                neering group by continuous development of its          structuring, project management and works super-
             INSTANT                   experience and know-how and by carefully planned        vision for more than € 10,000 million (11,000 million
             RESPONSE                  international expansion.                                USD) certify this.

                                       Experience, quality and a result-oriented approach      Welcome to ICEACSA Grupo.
             R&D+I CONTINUOUS          provide our clients with the peace of mind that         A member of the ANTEA Group.
             IMPROVEMENT               comes from knowing that they are dealing with a fully
             QUALITY PROCEDURES        accredited and highly solvent company. The results
             AND CONTROL               are guaranteed by the talent of a large, multidisci-
                                       plinary team.
A member of Antea Group - Iceacsa
UNITED KINGDOM
                                                                                                                                                                  THE NETHERLANDS   POLAND
                                                                                                                                                           BELGIUM
                                                USA
                                                                                                                                                GALICIA                         ROMANIA
                                                                                                                                                / SPAIN     FRANCE
                                                                                                                               PORTUGAL

                                                                                                                                                                                                                                       INDIA

                                                                   DOMINICANAN REP.
                                                                                                                                            BURKINA FASO
                                  NICARAGUA
                                                       PANAMA                                                                GUINEA                        BENIN
                                                                                                                            CONAKRY
                                                                                                                                      LIBERIA
6                                                    COLOMBIA

                                              PERU                                    BRAZIL
                                                         BOLIVIA

                                                                          URUGUAY

                                                                                                                               COUNTRIES WITH ICEACSA GRUPO COMPANY OFFICES

                                                                                                                               OTHER COUNTRIES WITH RECENT INTERNATIONAL PROJECTS BY ICEACSA GRUPO COMPANIES

                                                                                                                               COUNTRIES WITH OTHER ANTEA GROUP OFFICES

    HEAD OFFICES
    Glorieta de América, 5-1º
                                                                                         MEXICO
    15004 A Coruña (Spain)
                                                                                                                            PANAMA
    Tel.: +34 981 279 231 (switchboard)                                                  Avenida Insurgentes Sur 1425, 7A
                                               COLOMBIA                                                                                                                  PERU
    Fax: +34 981 279 406                                                                 Colonia Insurgentes Mixcoac        Calle 60 Este, Obarrio
                                                                                                                                                                                                       URUGUAY
    iceacsa@iceacsa.com                        Carrera 21 Nº100-20, Of. 1.001            Alcaldía Benito Juárez             Edificio Obarrio 60, piso 14, Of. A          Av. Reducto Nº1370, Of. 201
    International Service:                     110111 Bogotá D.C.                        03920 Ciudad de México             Ciudad de Panamá                             Miraflores                    C/ 25 de Mayo Nº 477, Esc. 28
    Tel.: +34 981 148 747                      Tel.: + 57 1 300 3106                     Tel.: +52 55 8790 7800             Tel.: +507 397 8607                          Lima 18                       11000 Montevideo
    internacional@iceacsa.com                  colombia@iceacsa.com                      mexico@iceacsa.com                 panama@iceacsa.com                           peru@iceacsa.com              uruguay@iceacsa.com
A member of Antea Group - Iceacsa
ICEACSA GRUPO WORLDWIDE

                                                                                                               7

In an increasingly globalized environment,              the services we provide. As a result, we are endowed
ICEACSA Grupo is committed to boosting its              with full capacity to tackle any kind of project our
international presence while maintaining the same       clients may require in the engineering, construc-
principles of sustainability, value creation, compet-   tion, regional and urban development, envi-
itiveness, experience and instant response that         ronmental, industrial and energy generation
have made it what it is today.                          fields. A team of more than 3,100 qualified experts
                                                        around the world distributed among the more than
ICEACSA Grupo operates internationally to               80 offices in Europe, America and Asia, enables us
provide cross-border services in the areas in which     to provide our clients with comprehensive services
it operates from its permanent offices in Spain,        that contribute real added value. Our mission is
Colombia, Mexico, Panama, Peru and Uruguay.             to assist our clients to meet all the requirements
Thus, the teams based in these places also work         encountered in the development of their business
in neighboring countries to provide solutions that      projects until execution and commissioning of the
exactly meet the client’s needs and ensure transfer     works and start-up of the commercial activity.
of know-how to the client with the frank, open and
at the same time comprehensive approach that            In addition, ICEACSA Grupo has set up stable
characterizes the group as a whole.                     strategic alliances with important local partners
                                                        in the countries where we operate. These connec-
In 2017 all the ICEACSA Grupo companies joined          tions ensure comprehensive knowledge of the
the ANTEA Group, thus further reinforcing their         various markets and a high response capacity to
international positioning and complementarity in        any project the client may propose.
A member of Antea Group - Iceacsa
5 5
                                                                                                                           8

                                                                                                 BOCAS DEL TORO

                                                                                                                                                                       COLÓN

                                                                                                                                               10
    ICEACSA PANAMA                                                                                       CHIRIQUÍ
                                                                                                              4
                                                                                                                               NGÄBE-BUGLÉ
                                                                                                                                                                           1
                                                                                                                                                                               4

                                                                                                                                                                   COCLÉ

                                                                                                                                   11   6 7

8
                                                                                                                               5

                                                                                                                                              VERAGUAS

                                                                                                                                                                   7

                                                                                                                                                         HERRERA

                                                                                                                                                                       8

                                                                                                                                                                           LOS SA
    ICEACSA Panama opened its doors in 2012 within           investment amounts of more than 1,000 million
    the framework of an ambitious international expan-       dollars, including including aqueduct and drainage
    sion campaign, identifying Panama as a strategic         projects, urban and inter-urban infrastructures and
    market in the context of Latin America.                  construction; intervening in strategic projects of the
                                                             country’s infrastructure development.
    ICEACSA Panama’s success with the studies and
    designs for planning of 100 kilometers of the main       The ICEACSA Panama team, together with qualified
    collector network of the Institute of Aqueducts and      experts from the other ICEACSA Grupo countries,
    Sewers of Panama (IDAAN) was the beginning of            ensure provision of the highest quality service closely
    an outstanding track record in which we have been        adjusted to the client’s real needs, with the frank, open
    awarded a succession of public and private-sector        and at the same time comprehensive approach that
    engineering, consulting and project management           characterizes the group as a whole. ICEACSA Panama
    contracts in various phases of the project life cycle.   has developed local, multidisciplinary work teams to
                                                             tackle the engineering development, supervision and
    Since then ICEACSA Panama has played an active           project management areas in the engineering, archi-
    part in the development of infrastructures involving     tecture and environmental and social study disciplines.
3
                           4
                      9

                                              GUNA YALA

                                       PANAMA
                           9 7                                        MADUGANDÍ
                           7 4 5
                        1 12 3
                         2 3 4                                                                                   CERTIFICATIONS
                     6 2 6 3
                  6 2 2     6
               2  1 5 1                                                                 WARGANDÍ
        PANAMA     8
         WEST   1

                                                                                                                                 Quality Management System in accordance with ISO
                                                                                                                                 9001 certified by AENOR.

            3
                                                                                                       EMBERÁ-
                                                                                    9                 WOUNAAN                    Environmental Management System in accordance
                                                                                                                                 with ISO 14001 certified by AENOR.

                                                                                                                                                                                    9
                                                                                                                                 Occupational Health and Safety Management System
                                                                                                                                 in accordance with ISO 45001 certified by AENOR.

                                                                                                   DARIÉN

                                                                                   EMBERÁ-
                                                                                  WOUNAAN

  13
                                                                                                                 ACCREDITATION
ANTOS

                                                                                                                 ICEACSA Panama is a pioneer in the adoption of
                                                                                                                 benchmarking and certification in the consulting and
                                                                                                                 engineering sector, which is why it has acquired a
                                                                                                                 commitment to apply the most demanding quality
                                                                                                                 standards to its projects. This policy enhances the
                          PLANNING AND FEASIBILITY                                                               efficiency and competitiveness of the company and
                                                                                                                 drives its firm commitment to sustainability and the
                          STUDY AND DESIGN OF INFRASTRUCTURES                                                    environment.

                          STUDY AND DESIGN OF URBAN PLANNING AND ARCHITECTURE                                    ICEACSA Panama is certified and enabled to enter
                                                                                                                 into contracts with official bodies, institutions and
                          CONSTRUCTION AND OPERATION PHASE SERVICES
                                                                                                                 government agencies, with multilateral financial
                          TECHNICAL CONSULTANCY IN PUBLIC WORKS PROCUREMENT                                      organizations and cutting-edge private companies
                                                                                                                 at the international level.
02   ACTIVITY AND SERVICE AREAS
ICEACSA Grupo provides services in
the following areas:

                                              TRANSPORT                 INFRASTRUCTURE          WATER AND THE ENVIRONMENT
                                           INFRASTRUCTURES                MANAGEMENT

                                                                                                                                          11

                                         COASTAL, MARINE, AND      REGIONAL/URBAN DEVELOPMENT      INDUSTRY AND ENERGY
                                       FLUVIAL INFRASTRUCTURES          AND ARCHITECTURE

                                       PROJECT
                                     LIFE CYCLE
                                                                                   05
                                                                          OPERATIONAL
                                                   CONSULYANCY                  PHASE
                                                                             SERVICES

                                     ENGINEERING
                                                                                                                            01
                                                                                                SERVICES                    PLANNING

                                                        PROJECT                                                             02
                                                                                    04
                                                      MANAGEMENT                                                            FEASIBILITY
                                                                         CONSTRUCTION
                                                                                PHASE
                                                                              SERVICES                                      03
                                                                                                                            DESIGN
PLANNING AND FEASIBILITY

     Planning is choosing the future. The rational use of public
     resources, the main driving force of this type of infrastructure,
     requires a thorough preliminary reflection.

     ICEACSA Panama has extensive experience providing tech-
     nical support to government agencies, developers and inves-
     tors to identify the most suitable alternatives to achieve their
     objectives, always taking a comprehensive approach to ensure
     that the selected solutions are feasible from the technical, finan-
     cial, social, environmental and risk-management viewpoints,
     among others.
12

           GENERAL INFRASTRUCTURE PLANS

                                                                           01.   Preliminary engineering and technical specifi-
           URBAN PLANNING MASTER PLANS                                           cations of upgrade of the Valle de Antón tourist
                                                                                 resort, Antón district, province of Coclé. 22,018 m2
                                                                                 / investment of 6.7 million USD.

                                                                           02.   Reception services, technological empowerment
           FEASIBILITY STUDIES                                                   and operating model for the centralized tra-
                                                                                 ffic-light system of Panama City. 1 control center
                                                                                 / 75 cameras / 35 panels / 1,000 loops / 210 traffic   02
                                                                                 intersections / investment: 1.4 million USD.
           COMPREHENSIVE PROJECT STRUCTURING

           STRATEGIC CONSULTANCY

           PRELIMINARY ENGINEERING
03.   Preliminary engineering and technical specifica-
                tions of upgrade of the Isla Grande tourist resort,
                Portobelo district, province of Colón. 4,295 m2 /
                investment: 2.4 million USD.

          04.   Preliminary design for a new water intake, treat-
                ment station and aqueduct for Panama City. 23 km
                of conduits / 43 km of impulsion line / investment:
                300 million USD.

01   05   05.   Preliminary engineering and technical specifica-           13
                tions of upgrade of the Lajas tourist resort, San
                Félix district, province of Chiriquí. 6,300 m2 / invest-
                ment: 1.3 million USD.

          06.   Feasibility studies, drawings and technical speci-
                fications for construction of various buildings in
                the Ngäbe – Buglé area. 154,355 beneficiaries /
                5,475.61 m2.

          07.   Preliminary projects and tender documents for
                procurement the design and construction moda-
                lity of sports centers located in Mateo Iturralde,
                Marcos Gelabert and Belisario Frías, province of
                Panama. 22,236 m2 / investment: 8.3 million USD.

          08.   Preliminary engineering and technical specifica-
                tions of upgrade of the Isla Colon tourist resort,
                province of Bocas de Toro. 11,054.74 m2 / invest-
                ment: 4 million USD.

          09.   Technical, special, economic, social and financial
07   08         feasibility studies for construction of a penitentiary
                center.
STUDY AND DESIGN
     OF INFRASTRUCTURES
     Drawing up detailed construction plans requires accurate calcu-
     lation and design of all components to be executed including
     those that can be considered unique such as viaducts, tunnels,
     drainage infrastructures, drinking water treatment plants,
     wastewater treatment plants, etc.

     The quality of the projects managed by ICEACSA Panama
     ensures its clients the peace of mind of knowing that they are
     dealing with a fully accredited and highly solvent company.

14                                                                                                                                   01

          PRELIMINARY DESIGN STUDIES

          DEVELOPMENT OF ALTERNATIVES

          SOCIAL AND ENVIRONMENTAL ASSESSMENT
                                                                       01.   Design, construction and maintenance plans for
                                                                             extension to six (6) lanes of the Las Playas corridor
          LAND STUDIES                                                       on the Pan-American Highway, section 1: La Cho-
                                                                             rrera - Santa Cruz. 32.75 km / 3 new bridges and 9
          TOPOGRAPHY                                                         extensions / 12 junctions / investment: 543 million
                                                                             USD.

                                                                       02.   Design, construction operation and maintenance
                                                                             of the Arraiján Este wastewater treatment plant
                                                                             (WWTP), the trunk system and its connections and
          CONSTRUCTION DESIGN                                                operation and maintenance of the sewage network
                                                                             of Burunga and Arraiján City. WWTP capacity 1.00
                                                                             m3/s year 2050 horizon / 190,000 inhabitants / 5,000    02
                                                                             m2 of buildings / investment: 60.5 million USD.
          HIGHWAYS

          BRIDGES

          STRUCTURES

          AQUEDUCT AND DRAINAGE SYSTEMS

          PORTS

          AIRPORTS
03.   Final studies and designs for the works and upgra-
                ding of the aqueduct and sewage of Panama City
                (Panama). 100 km piping / 13 tanks / maximum
                diameter 42” / 807,000 inhabitants / investment:
                100 million USD.

          04.   Study, design, construction and commissioning
                of the toll plaza, adaptation of carriageways and
                upgrade of public spaces in the San Isidro area,
                Omar Torrijos district, San Miguelito, Panama City.
                100,000 inhabitants / investment: 29 million USD.

          05.   Studies and designs for the Juan Díaz River Basin
                Collectors” project and complementary works of

03   05
                the Panama City and Bay Area sewage project
                (Panama). 21 km of conduit / maximum diameter          15
                72” / 700,000 inhabitants / investment: 55 million
                USD.

          06.   Construction project of the main collector,
                pumping station and impulse line in the Chorrillo
                sector, Panama City. 41,233 inhabitants / invest-
                ment: 6 million USD.

          07.   Design for upgrading the drinking water network
                of Parita, province of Herrera. 5 km / 3,500 inhabi-
                tants / investment: 1.7 million USD.

          08.   Environmental impact study for extension to six (6)
                lanes of the Las Playas corridor on the Pan-Ame-
                rican Highway, section 1: La Chorrera - Santa Cruz.
                32.75 km / 3 new bridges and 9 extensions / 12
                junctions / investment: 543 million USD.

          09.   Study and design for works to upgrade the aque-
                duct system of the Maria Chiquita community in
                the town of Maria Chiquita, district of Portobelo,
04   06         province of Colón. 5.5 km / investment: 1 million
                USD.
STUDY AND DESIGN OF URBAN
     PLANNING AND ARCHITECTURE

     Drawing up detailed construction plans requires accurate
     calculation and design of all components to be executed
     including those that can be considered unique. ICEACSA
     Panama approaches its work in this field with a transversal
     focus, combining the three guiding principles of creativity,
     design and management.

     The quality of the projects managed by ICEACSA Panama
     ensures its clients the peace of mind of knowing that they are
     dealing with a fully accredited and highly solvent company.
16                                                                                                                                01

          PRELIMINARY DESIGN STUDIES

          DEVELOPMENT OF ALTERNATIVES                                 01.   Final designs of unpaved roads and infrastruc-
                                                                            tures for the Ciudad Esperanza project, district of
          SOCIAL AND ENVIRONMENTAL ASSESSMENT                               Arraiján, province of Panama. 36 km / 9,000 inhabi-
                                                                            tants / 2,250 dwellings / investment: 137.7 million
          LAND STUDIES                                                      USD.
          TOPOGRAPHY
                                                                      02.   Architectural designs of the control, administra-
                                                                            tion, plant personnel and industrial buildings to
                                                                            house the treatment equipment of the Arraiján         03
                                                                            Este WWTP. 5,000 m2 buildings.

          CONSTRUCTION DESIGN

          RESIDENTIAL PROJECTS

          BUILDINGS

          PUBLIC SPACE PROJECTS
03.   Studies and designs for the reform project of the

     02
                Roberto Kelly sports center in the Don Bosco dis-
                trict, Panama City. 2,600 spectators / 2,300 m2 built
                                                                        17
                area / investment: 7.5 million USD.

          04.   Drafting of plans and technical reports for cons-
                truction of the Basilo Lakas correctional center in
                Maria Chiquita, province of Colón. Capacity: 72
                young offenders / plot: 40,000 m2 / buildings: 4,238
                m2 / investment: 4.5 million USD.

          05.   Study and design of the works required to revita-
                lize the tourist industry in Isla Colón, province of
                Bocas del Toro. 9,000 inhabitants / 20,000 m2 /
                investment: USD 3.5 million.

          06.   Design of the structure and roof of the University
                of the Isthmus (Universidad del Istmo). 4,040 m2 /
                investment: USD 1.4 million.

          07.   Construction plans and technical specifications
                for construction of various buildings in the Ngäbe
                – Buglé area. 154,355 beneficiaries / 5,475.61 m2
                built area.
04   06
CONSTRUCTION AND
     OPERATION PHASE SERVICES
     The support of an engineering firm is also a key factor during
     execution of the works, both to conduct supervision to check
     compliance with the specifications set in the design phase and
     to for control and monitoring of environmental and occupa-
     tional health and safety impact mitigation measures. Further-
     more, ICEACSA Panama has the capacity to provide the tech-
     nical support to construction companies to help to optimize
     their construction processes and to draw up the as-built draw-
     ings that represent the works actually executed.

     ICEACSA Panama’s experience in these areas is manifested in
18   the trust its clients repeatedly place in the Company.                                                                      01

           PROJECT MANAGEMENT

           WORKSITE SUPERVISION,
           INSPECTION AND CONTROL

           COORDINATION OF OCCUPATIONAL HEALTH
           AND SAFETY ACTIVITIES DURING WORKS                         01.   Management, administration, coordination and
                                                                            technical inspection assistance services for the
                                                                            Howard DWTP project, Arraiján district, province
           TECHNICAL SUPPORT FOR THE                                        of Panama West. 4.5 km network / 1.75 m2/s /
           WORKS OFFICE                                                     248,000 inhabitants / investment: 211 million USD.

                                                                      02.   Construction supervision of the La Mitra distribu-
           ENVIRONMENTAL MONITORING                                         tion network, Chorrera, province of Panama. 7.3      01
                                                                            km of network / investment: 3.2 million USD..
           OF THE WORKS

           WORKS ASSESSMENT

           PROCESSING PERMITS

           AS-BUILT DRAWINGS
02   04   03.   Management, administration, coordination and            19
                technical inspection assistance services for the
                works of the sewage system of the district of San
                Carlos, province of Panama West. 20.000 inhabi-
                tants / 7.8 km of network / investment: 4 million
                USD.

          04.   Technical supervision and inspection of the design
                and construction plans of the sewage conduit
                system of La Pintada, province of Coclé. 9.4 km of
                network / 2,217 inhabitants / investment: 4 million
                USD.

          05.   Processing and follow-up of approval of the
                construction drawings for the Ciudad Esperanza
                project, Arraiján district, province of Panama. 36 ha
                of urban development / investment: 137.7 million
                USD.

          06.   Management, administration, coordination and
                technical inspection assistance services for the
                Arraiján Cabecera aqueduct project, Arraiján dis-
03   05         trict, province of Panama West. 40,000 inhabitants
                / investment: 10.7 million USD.
TECHNICAL CONSULTANCY IN
     PUBLIC WORKS PROCUREMENT
                                                                      01.   Engineering and technical assistance services for
                                                                            the procurement process of the study, design,
     The process that public bodies in Panama habitually employ             construction and commissioning of the toll plaza,
                                                                            carriageway adaptation and upgrading of public
     for procurement of works is known as “studies, designs and             spaces in the San Isidro area, Omar Torrijos district,
     construction”.                                                         San Miguelito, Panama City. 100,000 inhabitants /
                                                                            investment: 29 million USD.

     This means that bidders must draw up and submit a technical      02.   Engineering and technical assistance for the pro-
     proposal that describes the works to be executed in detail             curement process of the design, construction and
                                                                            maintenance plans for extension to six (6) lanes
     during the bidding stage of the contract award process. The            of the Las Playas corridor, section 1: La Chorrerv–
     aim of conducting these studies is to reduce risks, optimize           Santa Cruz. 32.75 km / 3 new bridges and 9 exten-
     solutions and achieve proper definition of the plans to enable         sions / 12 junctions / investment: 543 million USD.
     the construction company to draw up the financial tender.        03.   Engineering and technical assistance for the pro-
     The technical solution has the greatest weighting among the
20   assessment criteria in these procurement processes.
                                                                            curement process of the study, design, construc-
                                                                            tion and maintenance of works for refurbishment          01
                                                                            of the Transistmica highway, Plaza Ágora section
                                                                            - San Isidro Station (Panama). 8 km / 3 pedestrian
     ICEACSA Panama has wide experience in drawing up technical             overpasses / investment: 88 million USD.
     proposals for the procurement processes of various awarding
                                                                      04.   Engineering and technical assistance for the procu-
     bodies in Panama and is able to boost our clients’ chances of          rement process of the works, studies and designs
     success                                                                for the design and construction of an aqueduct,
                                                                            sewage network and WWTP for the Boquete dis-
                                                                            trict, province of Chiriquí. 14.4 km network / 16,000
                                                                            beneficiaries / investment: 40 million USD.

                                                                      05.   Engineering and technical assistance services for
                                                                            the procurement process of a study for upgrading
                                                                            the sewage system of Isla Colón and a new sewage
                                                                            system for Isla Carenero in the province of Bocas
                                                                            del Toro. 20 km of network / investment: 16 million
                                                                            USD.
          PROCUREMENT RFQ                                             06.   Engineering and technical assistance services for
                                                                            the procurement process of the study, design,
                                                                            construction and maintenance of works for exten-
                                                                            sion and refurbishment of the Pan-American               05
          CONSTRUCTION METHODS                                              Highway, Puente de las Américas - Arraiján section.
                                                                            11 km / investment: 300 million USD.

          ENVIRONMENTAL BASELINE

          RENDER AND VIDEOS
07.   Engineering and technical assistance services
                for the procurement process of the study, design
                and construction of works for sustainable upgra-
                ding of the drinking water system of Panama City:
                extension and refurbishment of the Panama North
                aqueduct. 52 km of network/ 184,000 inhabitants /
                investment: 80 million USD.

          08.   Engineering and technical assistance services for
                the procurement process of the study, design and
                construction of works for sewage system, WWTP
                and upgrade of the community aqueduct system
                of Macaracas Cabecera, province of Los Santos. 15
                km of network / investment: 25 million USD.

          09.   Drafting of the procurement RFQ for Phase Three
                of the sewage network of San Miguelito. 36 km of
                network / investment: 21 million USD.

06   08   10.   Engineering and technical assistance services          21
                for the procurement process for the design and
                construction of the Guabal - Rio Luis - Calovébora
                highway, Santa Fe district, province of Veraguas. 33
                km / 4 bridges / investment: 20 million USD.

          11.   Engineering and technical assistance for the
                procurement process of the works, studies and
                designs for the design and construction of the San
                Félix - Hato Culantro road. 17.7 km / 1 bridge /
                investment: 12 million USD.

          12.   Engineering and technical assistance services for
                the procurement process of the extension and
                upgrading of the aqueduct and sewage systems
                of Panama City. 52 km of network/ 455,000 inhabi-
                tants / investment: 293 million USD.

          13.   Engineering and technical assistance services
                for the procurement process of the works and
                final design of the project for study, design and
                construction of works for construction of streets,
06   11         sewage system and WWTP in Paritilla, province
                of Herrera. 7 km of network / investment: 9 million
                USD.
03   CLIENTS
AUTORIAD DEL TRÁNSITO Y TRANSPORTE TERRESTRE -ATT | AUTORIDAD DE TURISMO DE PANAMÁ - ATP | CARIBBEAN TRADING & ASSETS
CORP. | CHINA CONSTRUCTION AMERICA (CCA) | CONALVIAS CONSTRUCCIONES, S.A. | CONSEJO NACIONAL PARA EL DESARROLLO
SOSTENIBLE - CONADES | CONSTRUCCIONES CIVILES GENERALES, S.A. - COCIGE | CONSTRUCTORA ININCO, S.A. | CONSTRUCTORA
QUEIROZ GALVAO, S.A. | CONSTRUCTURA MECO, S.A. | ESTUDIOS DE INGENIERÍA, S.A. | EXTRACO, S.A. | FCC CONSTRUCCIÓN, S.A. | INSTI-
TUTO DE ACUEDUCTOS Y ALCANTARILLADOS NACIONALES - IDAAN | MCM GLOBAL, S.A. | PENTECH | PORTA NORTE INVESTMENTS, S.A. |
PROYECTOS CONCABA, S.A. | SACYR, S.A. | SECRETARIA NACIONAL PARA LA PREVENCION DE LA DELINCUENCIA JUVENIL | TEDAGUA, S.A. |
UNIVERSIDAD DEL ISTMO | AUTORIAD DEL TRÁNSITO Y TRANSPORTE TERRESTRE -ATT | AUTORIDAD DE TURISMO DE PANAMÁ - ATP | CARIB-
BEAN TRADING & ASSETS CORP. | CHINA CONSTRUCTION AMERICA (CCA) | CONALVIAS CONSTRUCCIONES, S.A. | CONSEJO NACIONAL
PARA EL DESARROLLO SOSTENIBLE - CONADES | CONSTRUCCIONES CIVILES GENERALES, S.A. - COCIGE | CONSTRUCTORA ININCO, S.A. |
CONSTRUCTORA QUEIROZ GALVAO, S.A. | CONSTRUCTURA MECO, S.A. | ESTUDIOS DE INGENIERÍA, S.A. | EXTRACO, S.A. | FCC CONSTRUC-
CIÓN, S.A. | INSTITUTO DE ACUEDUCTOS Y ALCANTARILLADOS NACIONALES - IDAAN | MCM GLOBAL, S.A. | PENTECH | PORTA NORTE
INVESTMENTS, S.A. | PROYECTOS CONCABA, S.A. | SACYR, S.A. | SECRETARIA NACIONAL PARA LA PREVENCION DE LA DELINCUENCIA
JUVENIL | TEDAGUA, S.A. | UNIVERSIDAD DEL ISTMO | AUTORIAD DEL TRÁNSITO Y TRANSPORTE TERRESTRE -ATT | AUTORIDAD DE TURISMO
DE PANAMÁ - ATP | CARIBBEAN TRADING & ASSETS CORP. | CHINA CONSTRUCTION AMERICA (CCA) | CONALVIAS CONSTRUCCIONES,
S.A. | CONSEJO NACIONAL PARA EL DESARROLLO SOSTENIBLE - CONADES | CONSTRUCCIONES CIVILES GENERALES, S.A. - COCIGE
| CONSTRUCTORA ININCO, S.A. | CONSTRUCTORA QUEIROZ GALVAO, S.A. | CONSTRUCTURA MECO, S.A. | ESTUDIOS DE INGENIERÍA,
S.A. | EXTRACO, S.A. | FCC CONSTRUCCIÓN, S.A. | INSTITUTO DE ACUEDUCTOS Y ALCANTARILLADOS NACIONALES - IDAAN | MCM
GLOBAL, S.A. | PENTECH | PORTA NORTE INVESTMENTS, S.A. | PROYECTOS CONCABA, S.A. | SACYR, S.A. | SECRETARIA NACIONAL PARA LA
PREVENCION DE LA DELINCUENCIA JUVENIL | TEDAGUA, S.A. |                     UNIVERSIDAD DEL ISTMO | AUTORIAD DEL TRÁNSITO
Y TRANSPORTE TERRESTRE -ATT | AUTORIDAD DE                                           TURISMO DE PANAMÁ - ATP | CARIBBEAN
TRADING & ASSETS CORP. | CHINA CONSTRUC-                                                   TION AMERICA (CCA) | CONALVIAS
CONSTRUCCIONES,                     S.A.        |     CONSEJO                                    NACIONAL PARA EL DESARROLLO
SOSTENIBLE - CONADES | CONSTRUC-                                                                   CIONES CIVILES GENERALES,
S.A. - COCIGE | CONSTRUCTORA                                                                          ININCO, S.A. | CONSTRUC-
TORA QUEIROZ GALVAO, S.A. |                                                                               CONSTRUCTURA MECO,
S.A. | ESTUDIOS DE INGENIERÍA,                                                                              S.A.          |   EXTRACO,
S.A. | FCC CONSTRUCCIÓN,                                                                                     S.A.     |       INSTITUTO                                                                             23
DE ACUEDUCTOS Y ALCA-                                                                                            NTA RIL L A D OS
                                                                                                                                                The quality of the projects carried out by ICEACSA Panama is
NACIONALES           -   IDAAN             |                                                                       MCM             GLOBAL,
S.A. | PENTECH | PORTA                                                                                             NORTE           INVEST-
                                                                                                                                                reflected in the prestige of the public and private organizations
MENTS, S.A. | PROYECTOS                                                                                             C O N C A B A ,             in our client portfolio:
S.A.   |    SACYR,           S.A.     |                                                                             S EC R E TA R I A
NACIONAL         PARA               LA                                                                              PREVENCION
DE     LA    DELINCUENCIA                                                                                           JUVENIL                 |                 INSTITUTIONAL CLIENTS
TEDAGUA, S.A. | UNIVER-                                                                                             SIDAD                 DEL                 AND GOVERNMENT AGENCIES
ISTMO | AUTORIAD DEL                                                                                                TRÁNSITO                Y
TRANSPORTE TERRESTRE                                                                                                -ATT       |    AUTO-
RIDAD DE TURISMO DE                                                                                                PANAMÁ - ATP                               CONSTRUCTION COMPANIES
|    CARIBBEAN           TRADING                                                                                   & ASSETS CORP.
|    CHINA    CONSTRUCTION                                                                                       AMERICA             (CCA)
|    CONALVIAS           CONSTRUC-                                                                            CIONES,              S.A.     |                 CONCESSIONAIRES
CONSEJO        NACIONAL                   PARA                                                              EL            DESARROLLO
SOSTENIBLE           -       CONADES                  |                                                   CONSTRUCCIONES
CIVILES GENERALES, S.A. - COCIGE                                                                      |            CONSTRUCTORA
ININCO,       S.A.       |      CONSTRUCTORA                                                        QUEIROZ        GALVAO,          S.A.    |                 INDUSTRIAL AND SERVICE COMPANIES
CONSTRUCTURA                 MECO,             S.A.       |   ESTU-                              DIOS DE INGENIERÍA, S.A.                   |
EXTRACO, S.A. | FCC CONSTRUCCIÓN, S.A.                                                      |   INSTITUTO   DE     ACUEDUCTOS               Y
ALCANTARILLADOS NACIONALES - IDAAN | MCM                                               GLOBAL, S.A. | PENTECH | PORTA NORTE                                   PRIVATE INVESTORS
INVESTMENTS, S.A. | PROYECTOS CONCABA, S.A. | SACYR,                           S.A. | SECRETARIA NACIONAL PARA LA PREVEN-
CION DE LA DELINCUENCIA JUVENIL | TEDAGUA, S.A. | UNIVERSIDAD DEL ISTMO | AUTORIAD DEL TRÁNSITO Y TRANSPORTE TERRESTRE
-ATT | AUTORIDAD DE TURISMO DE PANAMÁ - ATP | CARIBBEAN TRADING & ASSETS CORP. | CHINA CONSTRUCTION AMERICA (CCA)                                             PUBLIC AND PRIVATE BANKING INSTITUTIONS
| CONALVIAS CONSTRUCCIONES, S.A. | CONSEJO NACIONAL PARA EL DESARROLLO SOSTENIBLE - CONADES | CONSTRUCCIONES                                                  AND INVESTMENT FUNDS
CIVILES GENERALES, S.A. - COCIGE | CONSTRUCTORA ININCO, S.A. | CONSTRUCTORA QUEIROZ GALVAO, S.A. | CONSTRUCTURA
MECO, S.A. | ESTUDIOS DE INGENIERÍA, S.A. | EXTRACO, S.A. | FCC CONSTRUCCIÓN, S.A. | INSTITUTO DE ACUEDUCTOS Y ALCAN-
TARILLADOS NACIONALES - IDAAN | MCM GLOBAL, S.A. | PENTECH | PORTA NORTE INVESTMENTS, S.A. | PROYECTOS CONCABA, S.A. |
SACYR, S.A. | SECRETARIA NACIONAL PARA LA PREVENCION DE LA DELINCUENCIA JUVENIL | TEDAGUA, S.A. | UNIVERSIDAD DEL ISTMO |
A member of Antea Group

       Version date: May 2020
Calle 60 Este, Obarrio
Edificio Obarrio 60, piso 14, Of. A
Ciudad de Panamá

Tel.: +507 397 8605
Email: panama@iceacsa.com

iceacsa.com                           S PA I N   COLOMBIA   ME XICO   PA N A M A   PERU   U R U G U AY
You can also read