CMS Pixel Upgrade for Phase I

                                G.M. Bilei

                          Per il consorzio Tracker

Bari, Catania, Firenze, Genova, Milano, Padova, Pavia, Pisa, Perugia, Torino

                              Roma July 3rd 2013
CMS Pixel Upgrade for Phase I - G.M. Bilei Per il consorzio Tracker Bari, Catania, Firenze, Genova, Milano, Padova, Pavia, Pisa, Perugia, Torino ...
New Pixel Detector layout

•   Extra layer in barrel and end-cap
•   Efficient seeding + robust tracking in increasing track density
•   L4↑ reduce gap to TIB, L1↓ reduce impact of MS on dxy/dz resolution
•   TDR approved last Sep. 2012 with strong support from LHCC
Pisa 19.3.2013                  G.M. Bilei
CMS Pixel Upgrade for Phase I - G.M. Bilei Per il consorzio Tracker Bari, Catania, Firenze, Genova, Milano, Padova, Pavia, Pisa, Perugia, Torino ...
Parameters: present layout vs upgrade

Roma 3.72013                      G.M. Bilei           3
CMS Pixel Upgrade for Phase I - G.M. Bilei Per il consorzio Tracker Bari, Catania, Firenze, Genova, Milano, Padova, Pavia, Pisa, Perugia, Torino ...
Pixel Upgrade for Phase I : news and short term

•   The Pixel project is progressing pretty much according to the plan

•   ROC PSI46dig / TBM08: Engineering run submitted in Jan. was delivered in Apr.
    Performance of new ROC according to specs. High rate test beam end of July.
          - 6 ROC wafers delivered in first half of April 2013
          - 24 ROC additional wafers (delivered end of May)
            (more than enough for 3-4 wafers for each production center)
•   High rate Test Beam in DESY (end of July) and at FNAL (Nov.)
•   Sensors: Ready to launch production. PRR (Production Readiness Review passed)
•   HDI: High Density Interconnect circuit pre-series launched
•   Digital Test Boards in production at PSI (ready by Sep.)
•   Preparation of few pilot Forward Pixel modules to be installed in CMS in 2014
    to be tested as pilot system with collisions.
•   Goal: to produce in each consortium few and final digital module by end of 2013
•   Goal: Launch pixel module production by late spring 2014.
      Roma 3.72013                                   G.M. Bilei              4
CMS Pixel Upgrade for Phase I - G.M. Bilei Per il consorzio Tracker Bari, Catania, Firenze, Genova, Milano, Padova, Pavia, Pisa, Perugia, Torino ...
Overall draft schedule Pixel Construction

We are on track so far with the schedule.
Installation in CMS planned for winter shutdown 2016-17
    Roma 3.72013                 G.M. Bilei               5
CMS Pixel Upgrade for Phase I - G.M. Bilei Per il consorzio Tracker Bari, Catania, Firenze, Genova, Milano, Padova, Pavia, Pisa, Perugia, Torino ...
INFN Contribution to 50% of BPix layer 3

                                   Draft INFN Plan

                                   2011 Start setting up
                                   2012-13 Production ~ 8 old analog modules
                                   Dec. 2013 Production of few new modules
                                   Late spring 2014 Start mass production
                                   Late spring 2015 complete module prod
                                   2016 Commissioning and Installation

Half Layer 22 faces
8 modules/faces =176 modules
Needs ∼ 250 modules                   Primo modulo analog ROC
allowing for 80% yield                prodotto in ITALIA
and 15% spares
     Roma 3.72013                 G.M. Bilei                        6
CMS Pixel Upgrade for Phase I - G.M. Bilei Per il consorzio Tracker Bari, Catania, Firenze, Genova, Milano, Padova, Pavia, Pisa, Perugia, Torino ...
INFN plan and objectives for 2013

• Completing construction of 8 old modules with analog ROC at IZM
        - All parts are available. First 4 modules bump bonded and in testing
        - INFN production centers basically ready for assembly, testing and
          qualification
• In parallel starting with KIT the qualification of the Selex BB process and
  assessing costs.
•   Set up the readout systems for digital ROC in the lab and get experience.
•   Select Bump Bonding vendor by Oct 2013 at latest.

•   Construction of first prototypes with new digital pixel modules end of 2013

•   Participate to the DESY high rate test beam in beginning of Aug. 2013
•   Preparation for mass construction (new readout cards, database, software
    analysis, quality control procedures etc.) to start in late spring 2014
Milestone INFN Gruppo I Pixel Upgrade: on track
1/12/2013 Realizzazione primi prototipi nuovi moduli Pixel Upgrade con ROC Digitale

     Roma 3.7.2013                           G.M. Bilei                           7
CMS Pixel Upgrade for Phase I - G.M. Bilei Per il consorzio Tracker Bari, Catania, Firenze, Genova, Milano, Padova, Pavia, Pisa, Perugia, Torino ...
Module construction flow chart
             Pisa
 Sensors                       Pisa
 test
                                                               Perugia
             Company       Bare
                                       SiN-rails
             Bump          Module
                                       glue
             bond          test
                                                                 module
                                                               characteri-   Perugia/Pisa
ROC                                                              zation
Test after
dicing                                                                         Half Layer
                                      Bond                                     Assembly
                       Glue HDI to                   Module
                                      ROCs to                   Burn-in           and
                       bare module                   testing
 Padova                               HD                                        testing

                                                   Bari           X-ray
                                                               calibration

  TBM          Glue/bond        Test before
 and HDI       TBM to           glue HDI to
 testing       HDI              sensor

                           Catania
CMS Pixel Upgrade for Phase I - G.M. Bilei Per il consorzio Tracker Bari, Catania, Firenze, Genova, Milano, Padova, Pavia, Pisa, Perugia, Torino ...
Centro di produzione di Pisa

Tasks di Pisa:

- Pixel Wafer Sensors QA

- Bump Bonding & Bare Module QA

                       1	
  
- ROC Wafers management

                                                        2	
  
- Assemblaggio Base strips

   – Test del Bare Module

                                      3	
  
      • Test Board for DAQ (1)

      • Probe card (2)

      • Bare module Jig (3)

   – Assemblaggio Base strips

      • Incollaggio Base strips (4)

      • Incollaggio bare module

         su base strips (5)

                                                  5	
                             4	
  
      • Module handle per trasporto (6)	
  
   	
     Roma 3.7.2013      A. Messineo
                                                                          6	
  
CMS Pixel Upgrade for Phase I - G.M. Bilei Per il consorzio Tracker Bari, Catania, Firenze, Genova, Milano, Padova, Pavia, Pisa, Perugia, Torino ...
Pisa: Attività Bump Bonding

2	
  Linee	
  di	
  possibile	
  produzione	
  
       – Proge(o	
  con	
  IZM	
  (Bump	
  Sn/Ag)	
  
           • Prodo7	
  I	
  primi	
  4	
  Pixel	
  Bare	
  Modules	
  	
  
                 – In	
  tes?ng	
  a	
  Pisa	
  

     – Prog(o	
  con	
  Selex	
  (Bump	
  In)	
  
        • INFN	
  +	
  KIT	
  
                 – Produzione	
  prevista	
  a	
  se(embre	
                 Primo prototupo INFN
                                                                             Bare Module BPIX
                                                                             prodotto da IZM
                                                   A. Messineo

      Roma 3.7.2013
Pisa: Piano immediato futuro

• Entro	
  2013	
  
    – Adeguamento	
  set-­‐up	
  al	
  nuovo	
  ROC	
  	
  
            • Digitale	
  
            • Nuova	
  geometria	
  
                             – 4	
  @8-+>"%-,>,>A3)",B"C)9"()*+,-".,/01)
                                    wafers	
  8”gia	
  	
  disponibili:	
  in	
  QA	
  al	
  PSI	
  
               C,>)K"L848>51"G$."B,-"$%&'"M0--)*>1A"*,>"5=5815N1)" O)P3)M>)/"(3-8*4":;
Centro di ROC Testing di Padova

Task di Padova:
Test di wafers con ROC psi46dig dopo procedura
di taglio, assottigliamento e metallizzazione.

 • Setup (in camera pulita a Padova):
  Alessi probe-station, Testboard per DAQ,
  Probe-card, Software sviluppato dal PSI.

                                             • ad oggi: Testati singoli ROCs ‘analogici’.
                                             6 ROCs tagliati, senza bumps.
                                             6 ROCs tagliati, assottigliati e con bumps di Sn/Ag
                                             depositati dalla IZM.

                                             • prossimi mesi:
                                             - visita al Paul Scherrer Institute (PSI) per collaborare
                                             al test dei primi wafers con ROC dig.
                                             - upgrade del setup ed inizio test di 4 wafers.

      Roma 3.7.2013                           M. Dall’Osso
Catania – HDI Production

      TBM gluing jig           Bonding jig on bonder                     Electric test setup            (mockup) Shipping box

                                      Center Setup
•     Mechanical jigs, holders, fixtures: built 2011-2013
•     Electronics boards for test: procured 2011-2012
•     Shipping boxes: Plastic mokups:5 available and in use
                       Anodized Aluminum: 20 under construction in 2013
                                              10 more planned for beginning 2014
•     Vacuum-gas sealer for 1) long-term storing and 2) shipping: bought early 2013

                             Old-HDI test prod: ongoing
                                  36 HDIs obtained from PSI                                           Vacuum-gas sealer
     all either known-faulty or deteriorated because stored for years with no care
Ø    1 used as mechanical model for TBM gluing and bonding                                     Test prod of upgraded HDI:
Ø    3 glued, bonded, tested OK è shipped to Bari for module construction                                next
Ø    9 glued, bonded, ready to be tested                                                      • Planned to start in fall 2013
Ø    8 available for production (will use only if needed, otherwise give to Germany           • Samples of new cable ordered
Ø    15 (4 known-faulty and used for initial gluing and bonding practice, 11 found faulty     • Some electronics boards for
      for various reasons at different prod steps) released to Germany, DESY or Bari for         test ‘ordered’ to collaborating
      mechanical practice.                                                                       producing Institutes

       Salvatore Costa - Catania                                                                                          13
Centro di assemblaggio di Bari

Tasks di Bari:
- Mechanical assembly bare module e HDI
- Wire bonding e test modulo

           In Corso                                                              Piani Futuri
 •                       Setup	
  completato	
  per	
  la	
  pre-­‐        •   Assemblaggio	
  rimanen?	
  moduli	
  
                         produzione	
                                          con	
  ROC	
  analogici	
  	
  
 • Prove	
  di	
  assemblaggio	
  a	
  secco	
  e	
                        •   Definizione	
  procedure	
  di	
  test	
  
                         con	
  la	
  colla	
  su	
  modulo	
  dummy	
     •   Avviamento	
  finalizzazione	
  	
  dei	
  
 • Assemblato	
  il	
  primo	
  modulo.	
                                      tools	
  di	
  produzione	
  
                         Microsaldatura	
  e	
  fast	
  test	
  del	
      •   Assemblaggio	
  primi	
  moduli	
  
                         primo	
  modulo	
  ROC	
  analogico	
                 digitali	
  entro	
  2013	
  
 	
  	
  	
  	
  	
  	
  in	
  corso	
  

     Roma 3.7.2013                                                              L. Fiore
Centro di assemblaggio di Bari

                                          Setup Assemblaggio

       Setup Test

Roma 3.7.2013                                L. Fiore
Centro di qualificazione di Perugia

Tasks di Perugia:
- Module thermal cycle tests
- Module Xray qualification
- Module calibration
- Contribution test beam
                                   Thermal	
  test	
  box	
  
 • Construction of Thermal test box completed
 • Ongoing optimization of thermal cycles parameter in order to
   reach the target low temperature of -20 °C
 • Control software tested
 •Software integrated with El comandante test bench software
    Roma 3.7.2013                      M. Menichelli              16
 
       	
  
       	
               Centro di qualificazione di Perugia
       	
  
       Full	
  Pixel	
  module	
  tested	
  with	
  small	
  Xray	
  tube	
  	
  

Tube	
  characterisAcs	
  
	
  
• AcceleraAng	
  Voltage:	
  40	
  kV	
  
• Current:	
  90	
  µA	
  

Fluorescence	
  target:	
  
	
  
• Molybdenum(Mo):	
  17.48	
  keV	
  
• Silver(Ag):	
  22.16	
  KeV	
  
• Cadmium(Cd):	
  23,3	
  KeV	
  
	
  
17     Roma 3.7.2013            M. Menichelli
Perugia: Setting up high rate test

                • 900 W (200 kV max) tube taken from AMS
                (designed for radiation damage studies)

                • Tube under optimization both for X-ray
                fluorescence characterization and for radiation
                damage studies

Roma 3.7.2013                      M. Menichelli              18
INFN Pixel Upgrade: status of funding

Roma 3.72013                                           19
Richieste Sblocco SJ Pixel Luglio 2013
Chiediamo lo sblocco SJ per le seguenti voci
Cotruzione Apparati:
•   10 K€ su Pisa per Bumb Bonding (ad integrare gli altri 10 K€ assegnati a Pisa
    Set. 2012)
    Obiettivo è costruire pre-prototipi moduli digitali entro 2013 quindi si necessita
    intero budget per far partire ordine.
•   47 K€ su Perugia per chips ROC e TBM e circuiti HDI. Set. 2012 era stata
    assegnata una prima parte e messo SJ una seconda.
    Gli engineering run dei chip ROC e TBM sono stati consegnati, I chip sono in
    test e funzionano secondo specs. Emissione ordine entro Nov. per produzione
Sviluppo:
•   15 K€ su MiB per acquisto rivelatori a diamanti della società II-VI.
    Primi test condotti da RD42 incoraggianti. I dispositivi sembrano avere
    migliore performance di altri vendors e potrebbero rivelarsi utili anche per
    capir meglio gli effetti di polarizzazione,
     Roma 3.7.2013                           G.M. Bilei                         20
Pixel: Funding Requests for 2014

Roma 3.7.2013                    G.M. Bilei        21
Pixel MoU in preparation – (April RRB table)

 INFN contribution to construction 803 Ke (963 KCHF).

Roma 3.72013                        G.M. Bilei          22
Human Resources for Pixel Phase I

In Totale circa 15 FTE

In linea con quanto previsto e discusso
al Gruppo I in Apr. 2011.

Composizione e FTE stabile nel
periodo 2012-2015

    Roma 3.7.2013                         G.M. Bilei    23
Tracker personnel and activities                                            !"#$     !"#%         !"#&       !"#'     !"#(

                                                                 )*+,-.-/01-023*4,      &5(          %56      %5&        %5&      %5&
                                                                !"#$%&'()*+,-.          /01          203      203        203      203
                                                                       !"#$4-+5,6,
                                                                    !"#$7&$!+6'$8       /09          /09          /      803      80/

Difficile fare stima distribuzioni di lungo termine.
                                                                    !"#$7&$!+6'$/       20:            /          /      /03      /0;
                                                                     !"#$&?.
                                                             7*3*8,*-.-/01-023*4,       '5#       '5$         '5$        &5$      &5$
                                                                !"#$%&'()*+,-.         8093      20@3        80/3       80/3     8093
                                                                       !"#$4-+5,6,     8013      80;3         801       8013     /023

Distribuzione temporale ed impegni dei gruppi
                                                                    !"#$7&$!+6'$8         /       /08           /       8023        2
                                                                    !"#$7&$!+6'$/         8       809        8093       80A3      80;
                                                                     !"#$&?.           2         2           2          2        2
                                                             /,+98:9-.-/01-023*4,      #%56      #!5;        #"5#        65#      65#

Tracker sono ben bilanciati tra le attività di Operazioni       !"#$%&'()*+,-.
                                                                       !"#$4-+5,6,
                                                                    !"#$7&$!+6'$8
                                                                                        808
                                                                                        ;0@
                                                                                        203
                                                                                                  80/
                                                                                                  :08
                                                                                                  209
                                                                                                              80;
                                                                                                              A0@
                                                                                                              209
                                                                                                                         80;
                                                                                                                         /0@
                                                                                                                         20A
                                                                                                                                  80;
                                                                                                                                  /0@
                                                                                                                                  20/

e Maintanence, Costruzione di Fase I,
                                                                    !"#$7&$!+6'$/       90/       A0@         A0@          9      908
                                                                     !"#$&?.         20/       20/         208        208      208
                                                             ?@&A.      612    613    210    210       210        !"#$%&'()*+,-.
                                                                      !"#$4-+5,6,
                                                                                        80A
                                                                                        A08
                                                                                                  20@
                                                                                                  A0;
                                                                                                              80/
                                                                                                              /0:
                                                                                                                         80/
                                                                                                                         /0:
                                                                                                                                  80/
                                                                                                                                  /03
                                                                   !"#$7&$!+6'$8          2         2           2          2        2
                                                                   !"#$7&$!+6'$/        A09         /         /09        /09      A03
                                                                    !"#$&?.            2       20:         20A        20A      20A
                                                                                     !"#$     !"#%         !"#&       !"#'     !"#(
INFN Gruppo I April 2011

Roma 3.72013                G.M. Bilei    25
Phase 2 R&D

Roma 3.7.2013         G.M. Bilei   26
Requirements: HL LHC Tracker Upgrade

• Increased radiation hardness to 3000 fb-1
     – Detector meant to survive without maintenance.
     – Robustness and redundancy.
• Increased granularity to resolve 140 → 200 mb/BX
• Reduce material and improve tracking performance
• Provide tracking @ Level-1

• CMS HL Upgrade Technical Proposal planned end of 2014
• Tracker Technical Design Reports in ~ 2016

• Aim at delivering upgraded Tracker for LS3 (2022-2023)

Roma 3.7.2013                         G.M. Bilei           27
News: Tracker Baseline layout defined

                             Option

•   ×4 granularity in strip sensors (on average)
•   3 more layers of pixellated sensors
     – Unambiguous 3d coordinates – helps track finding in high pile-up
•   pT modules in all layers
     – All coordinates available at Level-1 (with cut at ~2 GeV)
     – Powerful pattern recognition for HLT and offline
•   Greatly reduced material.
     – In the whole rapidity range. Up to a factor of 4 at 1.0 < η < 1.5.
•   Tracking resolution improved in all aspects
•   Cost under revision and scrutiny. Draft by October 2013 RRB
     Roma 3.7.2013                                G.M. Bilei                28
Overview INFN CMS Pixel and Tracker R&D
3 main areas of R&D activities in Italy : Readout Chip, Sensors, TK Trigger.
Synergies and common projects (PRIN, GR5 calls, RD53) with ATLAS in the 3
areas of R&D
1. Pixel Readout Chip
    –   65 nm CMOS technology for future pixel chip (smaller pixel, lower thresh. & power)
    –   CMS Bari, Torino, Perugia, Pisa, Padova, Pavia (CERN, FNAL)
    –   2014 funding request for 70 K€ submitted SJ (Torino)
    –   RD53 common project approved by LHCC (collaboration with ATLAS)
    –   CHIPIX65 project submitted to GR5 Call (CMS-ATLAS common effort)
2. Pixel Sensors
    – Different technologies and material under consideration
    – Pixel Planar and 3D Silicon sensors (CMS Bari, Firenze, Milano, Pisa, Torino)
      Pixel Diamond (Milano)
    – Collaboration with many groups in CMS (FNAL, Purdue, KIT, CERN etc.) ATLAS
    – ACTIVE project submitted to Gr5 call (CMS-ATLAS common effort)
    – Need to start in 2014 either financed by GR5 or GR1.
    Roma 3.7.2013                              G.M. Bilei
Overview INFN Pixel and Tracker R&D

3. Track Trigger with AM
   Develop a L1 triggering system based on AM
   New generation of faster and denser AM.
   Pisa, Perugia (Hardware), Padova, Firenze (Simulations)
   Common ATLAS and CMS R&D since the last PRIN 2010
   PRIN submitted in 2012
   Funding request for 11 k€ submitted to GR1
     New mezzanine card to be developed and programmed to perform latency
     measurements on the VME test stand currently under installation in Perugia and Pisa.

4. Simulations
         - Simulations studies for Phase 1 Pixel upgrade
           Catania, Firenze
         - Simulations studies on different layouts for Phase 2 Tracker and Pixel upgrade
           Catania, Firenze
         - Track Trigger simulations
           Padova, Pisa, Firenze

   Roma 3.7.2013                               G.M. Bilei                            30