Detailed programme of presentations in the paper sessions - CIGRE - 2020 e-session / Paper presentations
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
CIGRE - 2020 e-session / Paper presentations
Detailed programme
of presentations
in the paper sessions
Last update: 21/8/2020
Page 1 de 50CIGRE - 2020 e-session / Paper presentations
Paper Session of Day
Paper title (A1 sessions)
Main author's
Main author
number country presentation (CEST)
Is reliance on synchronous machines holding us back from Tue.
A1-101 D. VAUGHAN AUSTRALIA A1 - Session 1
evolving the power grid to facilitate renewables? Aug. 25
The benefits of implementing Synchronous Compensators in Tue.
A1-102 H BIELLMANN FRANCE A1 - Session 1
Grids with high penetration of renewables Aug. 25
Generator Stability and Efficiency Enhancement in Power
Tue.
A1-NGN 1 System with Abruptly Variable Load by use of Electrical Energy G. NESTERENKO RUSSIA A1 - Session 1
Aug. 25
Storage System
Experimental Study of Vibration Sparking Erosion on Stator Tue.
A1-201 H. ZHU USA A1 - Session 1
Bars Aug. 25
Diagnosis and Prognosis of Wind Turbines using Machine Tue.
A1-202 F. FREITAS BRAZIL A1 - Session 1
Learning Algorithms on SCADA and Gearbox Vibration Datasets Aug. 25
Evaluation of the Behavior of Partial Discharges in Generator Tue.
A1-203 P. VILHENA BRAZIL A1 - Session 1
Heating and Operating Range Tests Aug. 25
Developments in maintenance processes increase operational
Tue.
A1-204 availability and contribute to the operating efficiency of the M. MAURO BRAZIL A1 - Session 1
Aug. 25
hydroelectric plant of Itaipu.
Partial discharge characterization of stator windings taken Tue.
A1-205 E. EBERG NORWAY A1 - Session 1
from a hydro generator after 50 years of service Aug. 25
Features of the design and operating modes of the Wed.
A1-206 M. ROYTGARTS RUSSIA A1 - Session 2
asynchronized turbogenerator T3FSU-320 Aug. 26
A Study on the Resonance problems and Anti-Vibration Design Not
A1-207 K.Y. KIM KOREA 0
of Large Vertical Motor-Pump sets presented
Motor Maintenance Management for Power Plant Operation
Tue.
A1-208 Reliability with Work Optimization by On-Line Condition Based C. SUPHATTANA THAILAND A1 - Session 1
Aug. 25
Monitoring
PD Measurement Of Rotating Machine For Condition SANJAY KUMAR Tue.
A1-209 INDIA A1 - Session 1
Monitoring PRASAD Aug. 25
Optimization of turbogenerator's core suspension system
Wed.
A1-210 reconstruction methods for life time extension in the power D. KUZNETSOV RUSSIA A1 - Session 2
Aug. 26
plant conditions.
A study of the drop test to detect damper faults and sensitivity
Wed.
A1-211 analysis in order to identify the parameters that have an K.L. ZAPPELLINI FRANCE A1 - Session 2
Aug. 26
impact on the test results
Potential of VLF PD measurements for diagnosis of stator Tue.
A1-212 T. BRUEGGER SWITZERLAND A1 - Session 1
insulation of large hydro generators Aug. 25
Evaluation of High Voltage Isolation Systems - Electrodynamic Wed.
A1-213 J. ROCHA SC A1 A1 - Session 2
Meaning of Typically Specified Tests Aug. 26
Thermal Optimization of a Radially Air-Cooled Rotor for a
Wed.
A1-301 Pumped Storage Hydro Power Motor Generator, applying T. HILDINGER BRAZIL A1 - Session 2
Aug. 26
advanced 3D Conjugate Heat Transfer Simulations
Static Eccentricity Fault Detection Method for Electrical
Wed.
A1-302 Rotating Machines Based on The Magnetic Field Analysis in the S. TVORIC CROATIA A1 - Session 2
Aug. 26
Air Gap by Measuring Coils
Page 2 de 50CIGRE - 2020 e-session / Paper presentations
Magnetic Balancing System for Synchronous Machines – A Full Wed.
A1-303 F EVESTEDT SWEDEN A1 - Session 2
Scale Demonstration of Unbalanced Pull Mitigation Aug. 26
Technical challenges and solutions for the new Terna's Tue.
A1-304 M. REBOLINI ITALY A1 - Session 1
standardized synchronous condensers/flywheel systems Aug. 25
Wed.
A1-305 How To Choose Electric Drive According IEC 60034-1? M. DIGALOVSKI MACEDONIA A1 - Session 2
Aug. 26
Considerations on IEEE 1310-2012, Numbers of Start-Stops Wed.
A1-306 T. HILDINGER GERMANY A1 - Session 2
and Life Time of Stator Windings in Hydro-Generators Aug. 26
Development of Reliable Stator Coil End Design of Large Wed.
A1-308 S. MURAMATSU JAPAN A1 - Session 2
Turbine Generator Aug. 26
Impact of the q-axis sub-transient reactance on the rotor Wed.
A1-309 L. ROUCO SPAIN A1 - Session 2
oscillations of a hydro generator Aug. 26
The Design and Application of New Fast-response, Large- Tue.
A1-310 Y. JIN CHINA A1 - Session 1
scaled Rotary Condensers in UHV Power Grid Aug. 25
Design, Implementation and Field Application of a New
Wed.
A1-311 Generation Flexible Excitation System for High-Power J. ZHANG CHINA A1 - Session 2
Aug. 26
Synchronous Generators
Failures of Large Turbo-Generators on Prolonged Site Storage - Wed.
A1-312 HIRDESH GUPTA INDIA A1 - Session 2
Case Studies of Indian Power Utility Aug. 26
Design and Application of State-of-the-art Synchronous Tue.
C4-129 K. CHAN SWITZERLAND A1 - Session 1
Condensers to facilitate the energy transition Aug. 25
Page 3 de 50CIGRE - 2020 e-session / Paper presentations
Paper Session of Day
Paper title (A2 sessions)
Main author's
Main author
number country presentation (CEST)
Distributed Energy Resources (DERs): Impact of Reverse Power Tue.
A2-101 P. UPADHYAY USA A2 - Session 3
Flow on Transformer Sept. 1
Active power control with 400/130 kV transformers. Tue.
A2-102 P NORBERG SWEDEN A2 - Session 3
Experience from two recent projects Sept. 1
Tue.
A2-103 Dynamic thermal behavior of wind power transformers T LANERYD SWEDEN A2 - Session 3
Sept. 1
Solar Farm Transformer Condition Monitoring and Automated UNITED Not
A2-104 C V SIMMONS 0
Anomaly Detection Using Micro-Synchrophasors KINGDOM presented
Smart dynamic shunt compensation - inductive and capacitive Not
A2-105 R. FRITSCHE GERMANY 0
reactive power based on common transformer technology presented
Effects of TVR application on various voltage changes caused
Tue.
A2-106 by reverse power flow, distributed power supply and M. KAKIHARA JAPAN A2 - Session 3
Sept. 1
renewable energy
Enhanced cooling of dry-type transformers for wind Tue.
A2-107 A. NOGUÉS SPAIN A2 - Session 3
applications Sept. 1
Study on key technology and demonstration application of Tue.
A2-108 X. WANG CHINA A2 - Session 3
UHV AC controlled shunt reactor Sept. 1
System for on-line evaluation of power transformer dynamic Tue.
A2-109 TIM GRADNIK SLOVENIA A2 - Session 3
thermal capability Sept. 1
Tue.
A2-110 Thermal design aspects of subsea transformers E. VIRTANEN FINLAND A2 - Session 3
Sept. 1
Influence of harsh operation conditions present on offshore
S UNITED Tue.
A2-111 platforms to the design of power transformers and shunt RAJAMANICKAM KINGDOM
A2 - Session 3
Sept. 1
reactors
Simulations and tests based on dielectric studies to improve
Mon.
A2-201 the power transformers technical specifications and their M RYADI FRANCE A2 - Session 2
Aug. 31
performances
Resonant overvoltages inside power transformer windings and
Mon.
A2-203 the measures improving their ability to withstand high- V. LARIN RUSSIA A2 - Session 2
Aug. 31
frequency stresses
Electric Field Analysis for Valve-side Lead-out Insulation Mon.
A2-204 J. ZHENG CHINA A2 - Session 2
Structure of UHVDC Converter Transformer Aug. 31
Partial Discharge Localization Algorithm for Power Not
A2-205 B. W. MIN KOREA 0
Transformer using UHF Signals presented
Advances of Dielectric Frequency Response testing for HV OIP Mon.
A2-206 R. ALVAREZ ARGENTINA A2 - Session 2
bushings Aug. 31
Simulation and Measurements of Special Termination Not
A2-207 D. VIR USA 0
Lightning Impulse Test on Power Transformers presented
Verification of Withstand Capability for Very Fast Transients of Mon.
A2-208 A. RABEL AUSTRIA A2 - Session 2
a 200 MVA, 500 kV GSU-Transformer by Modelling and Testing Aug. 31
Ten Years of Experience with Natural Ester in 245 kV: Shunt Mon.
A2-301 R. IGNACIO BRAZIL A2 - Session 2
Reactor of Vilhena Substation Aug. 31
Page 4 de 50CIGRE - 2020 e-session / Paper presentations
Investigation on the Operating Conditions of MV/LV
WAHIB Mon.
A2-302 Transformers and Recommendations to Improve their CHABANE
ALGERIA A2 - Session 1
Aug. 31
Reliability
Continuous improvement of transformer specifications at a Mon.
A2-303 C. RAJOTTE CANADA A2 - Session 1
large utility Aug. 31
Power Transformers using Esters next generation - ready to Not
A2-304 R. FRITSCHE GERMANY 0
cope with all grid operation challenges presented
Compatibility tests between solid and liquid materials for Mon.
A2-305 C PERRIER FRANCE A2 - Session 2
reliable transformers Aug. 31
Reliability Evaluation of Ester Oil Filled Onload Tap Changers RV Mon.
A2-306 INDIA A2 - Session 2
through Critical Tests TALEGAONKAR Aug. 31
Improving the reliability of key power transformers (GSU for Mon.
A2-307 P HURLET FRANCE A2 - Session 1
Nuclear Power Plants) through specifications Aug. 31
GIC Magnetic and Thermal Assessment of a Large Fleet of Mon.
A2-308 R. GIRGIS USA A2 - Session 2
Power Transformers - A Case Study Aug. 31
Health Index and Hierarchizing Scale Methodologies for
Mon.
A2-309 Prioritizing On-line Monitoring of Power Transformers and M. ALVES BRAZIL A2 - Session 1
Aug. 31
Reactors in the Brazilian Transmission Grid
Improving transformer reliability through operation, Mon.
A2-310 L. QUEIROZ BRAZIL A2 - Session 1
maintenance, repair and asset management for extended life Aug. 31
Transformer management by learning from condition, failure Mon.
A2-311 J. FOROS NORWAY A2 - Session 1
and scrapping data collected nation-wide Aug. 31
Fleet Asset Management Opportunities Arising From Transient Mon.
A2-312 T. ZUPAN CROATIA A2 - Session 1
Monitoring of Power Transformers and Shunt Reactors Aug. 31
Mon.
A2-313 Fleet screening of HVDC transformers E ERMAKOV SWEDEN A2 - Session 1
Aug. 31
Field experience of small quasi DC bias on power transformers
Mon.
A2-314 A first classification of low-frequency current pattern and D. ALBERT AUSTRIA A2 - Session 2
Aug. 31
identification of sources
Rationalization and high precision of transformer lifetime Mon.
A2-315 S. MIYAZAKI JAPAN A2 - Session 1
evaluation method Aug. 31
Large Power Autotransformers filled with natural ester – Mon.
A2-316 L. LOMBINI ITALY A2 - Session 2
Working parameters from the field and Maintenance notes Aug. 31
Mon.
A2-317 Experiences in Transformer Onsite Refurbishment R. LI AUSTRALIA A2 - Session 1
Aug. 31
Application of Conditional Probability assessment to optimise Mon.
A2-318 C. BECKETT AUSTRALIA A2 - Session 1
Transformer Design, Operation and Maintenance practices Aug. 31
Development and Implementation of Intelligent Condition Mon.
A2-319 SHALI RAJ INDIA A2 - Session 1
Monitoring System for Transformers and Reactors Aug. 31
Increasing Reliability Tertiary Voltage Side of Power Not
A2-320 S. LAOHANAN THAILAND 0
Transformer by Installing Relay Protection presented
An innovative solution to assess the Reliability of Transformers Mon.
A2-321 RAJAG KOMMU INDIA A2 - Session 1
by Integrated Transformer Health Monitoring Aug. 31
Mon.
A2-322 Advancements in Transformer Site Dryouts E. TENYENHUIS CANADA A2 - Session 1
Aug. 31
Mon.
A2-323 Power Transformer Life Extension Rebuilds T. O'NEILL SC A2 A2 - Session 1
Aug. 31
Page 5 de 50CIGRE - 2020 e-session / Paper presentations
Burak Tue.
A2-NGN 1 Solid-state transformer for solar integration USA A2 - Session 3
ESENBOGA Sept. 1
Oasis Mon.
A2-NGN 2 Impregnation of insulation by ester liquids USA A2 - Session 2
SANCIBRIAN Aug. 31
Sam Mon.
A2-NGN 3 Impact of weather on transformer failures USA A2 - Session 1
McCORMICK Aug. 31
Tue.
WG A2.60 Dynamic Thermal Performance of Power Transformers Tim GRADNIK SLOVENIA A2 - Session 3
Sept. 1
Stefan Mon.
WG A2.62 Reliability of ac transformers GERMANY A2 - Session 2
TENBOHLEN Aug. 31
Ebrahim Mon.
WG A2.63 Transformer impulse testing GERMANY A2 - Session 2
RAHIMPOUR Aug. 31
Page 6 de 50CIGRE - 2020 e-session / Paper presentations
Paper Session of Day
Paper title (A3 sessions)
Main author's
Main author
number country presentation (CEST)
Wed.
A3-101 EDISON: A New Generation DC Circuit Breaker L. GRABER USA A3 - Session 1
Aug. 26
Environmental Performance of Dead-Tank Circuit Circuit Wed.
A3-102 V. HERMOSILLO USA A3 - Session 2
Breakers with SF6 and Alternative Gases Aug. 26
VARC DC circuit breaker – a versatile concept for non-zero Wed.
A3-103 L ÄNGQUIST SWEDEN A3 - Session 1
current interruption Aug. 26
Innovative T&D Switching Equipment and Development of its Wed.
A3-104 R.P.P SMEETS NETHERLANDS A3 - Session 1
Testing Technology Aug. 26
Wed.
A3-105 Low loss DC circuit breakers and DC GIS equipment M. KOSAKADA JAPAN A3 - Session 1
Aug. 26
First CO2-neutral 145 kV and up to 63 kA Dead Tank Circuit
Wed.
A3-106 Breakers based on Vacuum Switching and Clean Air Insulation S. KOSSE GERMANY A3 - Session 2
Aug. 26
Technology
Fault current limiters for electrical grids 220 kV on the base of Thu.
A3-107 N. NOVIKOV RUSSIA A3 - Session 3
the fast-acting highvoltage explosive commutators Aug. 27
Studying the characteristics of non-traditional current and Wed.
A3-108 A. YABLOKOV RUSSIA A3 - Session 1
voltage converters for digital substations Aug. 26
Power plants Modernization by Smart integrated vacuum Wed.
A3-109 G. URQUIZA SPAIN A3 - Session 2
generator breaker switchgears Aug. 26
Development and Electrical Performance Research of a 12kV Wed.
A3-110 R. ZHANG CHINA A3 - Session 2
C4F7N/CO2 Ring Main Unit Aug. 26
Experience of Capacitive Current Switching of EHV and UHV AC Wed.
A3-111 G. LI CHINA A3 - Session 1
Circuit Breaker in Power System and Test Aug. 26
Basic aspects of switching with series-connected vacuum
Wed.
A3-112 interrupter units in high-voltage metal-enclosed and live tank P. G. NICOLIC GERMANY A3 - Session 2
Aug. 26
arrangements
Interrupting Performance Evaluation of High-Voltage Gas
Wed.
A3-113 Circuit Breakers Using CFD Simulation and Data Analysis H. K KIM KOREA A3 - Session 2
Aug. 26
Technique
The First Development of SF6-free 170kV 50kA 60Hz GIS with Wed.
A3-114 H.E. JUNG KOREA A3 - Session 2
Fluoronitile (C4F7N) Mixtures Aug. 26
Case Study – Improving Reliability of Circuit Breaker by using Wed.
A3-115 JIVESH KHANNA INDIA A3 - Session 2
Controlled Switching and removing Pre Insertion Resistor (PIR) Aug. 26
Innovative SF6 Free Load Break Switch with Shunt Vacuum Wed.
A3-116 C PREVE FRANCE A3 - Session 2
Interruption (SVI) Technology Aug. 26
Return of experience of the SF6-free solution by the use of
Wed.
A3-117 fluoronitrile gas mixture and progress on coverage of full J OZIL FRANCE A3 - Session 2
Aug. 26
range of transmission equipment
C5 fluoroketone based gas mixtures as current interrupting Wed.
A3-118 P. STOLLER SWITZERLAND A3 - Session 2
media in high voltage switchgear Aug. 26
Theoretical and Practical Behaviour of Eco-friendly SF6 Wed.
A3-119 J. MANTILLA SWITZERLAND A3 - Session 2
Alternatives in High Voltage Switchgear Aug. 26
H. ITO ON
Thu.
A3-201 CIGRE Reliability Survey on Equipment BEHALF OF SC A3 A3 - Session 3
Aug. 27
CIGRE AG A3.01
Page 7 de 50CIGRE - 2020 e-session / Paper presentations
Operational Experience, Field Test and EMT Simulation for EHV Wed.
A3-202 G. BLANCHET NORWAY A3 - Session 2
Shunt-Reactor Switching Aug. 26
In-service Diagnosis of Grading Capacitor Dielectric UNITED Thu.
A3-204 P MOORE A3 - Session 3
Deterioration KINGDOM Aug. 27
Circuit Breaker De-Rating Assessment under High DC Time UNITED Thu.
A3-205 Z EMIN A3 - Session 3
Constant KINGDOM Aug. 27
Actual use survey and maintenance practice of circuit breakers Thu.
A3-206 J. KIDA JAPAN A3 - Session 3
for frequent switching applications Aug. 27
A campaign for the ageing evaluation of station hollow core Thu.
A3-207 M. MARZINOTTO ITALY A3 - Session 3
composite insulators after a number of years of service Aug. 27
Overvoltages research in switching modes of cable and mixed
overhead-cable lines, power transformers, shunt reactors and Wed.
A3-208 V. SMEKALOV RUSSIA A3 - Session 2
capacitor banks of 110-750 kV and development of a Aug. 26
controlled switching device for the above electrical equipment
X-ray inspection of operating high-voltage oil-filled circuit Not
A3-209 L. DARIAN RUSSIA 0
breakers presented
Wed.
A3-210 On-line monitoring of paper-oil insulated current transformers J.M. NOGUEIRAS SPAIN A3 - Session 1
Aug. 26
Influence of Contact Heating on Main Circuit Resistance
Thu.
A3-211 Measurement and Dynamic Contact Resistance Measurement T. CHENG CHINA A3 - Session 3
Aug. 27
in High Voltage Circuit Breakers
Research on Simulation Testing Method of System Level's Wed.
A3-212 L. CHENG CHINA A3 - Session 1
Strong Electromagnetic Disturbance in Substations Aug. 26
Operational Aged Switchgear With The Age Up To 50 Years -
Thu.
A3-213 Investigations, Testing, Results - Considerations For The Design T. GRÄF GERMANY A3 - Session 3
Aug. 27
And Operation Of Old and New Switchgear
Investigation of ferroresonance oscillations in the systems
Wed.
A3-214 with electromagnetic potential transformers by experimental A. SIVKOV RUSSIA A3 - Session 1
Aug. 26
and calculation methods
Development of 362kV 63kA 60Hz Self-Blast Breaker without
Thu.
A3-215 additional capacitors to prevent ferro-resonance by improving J. H. YOON KOREA A3 - Session 3
Aug. 27
the SLF performance
Damping Performance of VFTO using Magnetic Rings in 800kV Thu.
A3-216 J. W. KIM KOREA A3 - Session 3
GIS Aug. 27
Approach & Experience of IoT Based Predictive Maintenance HUKUM CHAND Thu.
A3-217 INDIA A3 - Session 3
Technologies in Power Distribution Network SHARMA Aug. 27
Technical-Economic Study on Spark Gaps Replacement by WAHIB Wed.
A3-218 ALGERIA A3 - Session 2
Surge Arresters on Pole-Mounted MV/LV Transformers CHABANE Aug. 26
Pollution and Humidity Effects on Air Insulated Switchgear WAHIB Wed.
A3-219 ALGERIA A3 - Session 2
(AIS) of MV/LV Substations CHABANE Aug. 26
Digital Disconnector and smart sensors: example of integration Thu.
A3-221 T PEGOURET FRANCE A3 - Session 3
in the condition base asset management cloud tool Aug. 27
Thu.
A3-222 External flashover of a 245kV live tank circuit breaker D CHUN FRANCE A3 - Session 3
Aug. 27
Page 8 de 50CIGRE - 2020 e-session / Paper presentations
Monitoring of asymmetric short circuit currents at a hydro Wed.
A3-223 T. HEID SWITZERLAND A3 - Session 1
power plant using electronic fibre optical current transformers Aug. 26
Accuracy study of a combined low-power instrument Wed.
A3-224 T. HEID SWITZERLAND A3 - Session 1
transformer in different climatic and pollution conditions Aug. 26
Thu.
A3-225 Development of Light Asset Models based on Data Mining T MAUFFREY FRANCE A3 - Session 3
Aug. 27
First 170 kV / 50 kA GIS with Clean Air and Vacuum Interrupter Wed.
A3-301 K. KIM KOREA A3 - Session 2
Technology as a Climate-neutral Alternative to SF6 Aug. 26
Page 9 de 50CIGRE - 2020 e-session / Paper presentations
Paper Session of Day
Paper title (B1 sessions)
Main author's
Main author
number country presentation (CEST)
Life-Cycle Experiences for 115kV Underground Pipe-Type Mon.
B1-101 E.C. BASCOM III USA B1 - Session 1
Transmission Circuit Cooling System Aug. 31
Development of a New High-Voltage Dry Type Cable
Mon.
B1-102 Terminator with Optional Integrated Partial Discharge R. MIDDLETON USA B1 - Session 1
Aug. 31
Monitoring
ALEGrO – Extended type testing of the HVDC XLPE cable Mon.
B1-103 B. MAMPAEY BELGIUM B1 - Session 1
system and additional tests for Transient Over Voltages (TOV) Aug. 31
Mechanical characterization of smooth welded copper sheaths Mon.
B1-104 T. KOUTI FINLAND B1 - Session 1
for high voltage submarine cables Aug. 31
Extended Thermal Rating Calculations of 400 kV XLPE Cables
Mon.
B1-105 for Urban Grid Applications based on long-term Experimental A. AINHIRN AUSTRIA B1 - Session 1
Aug. 31
Data
UNITED Mon.
B1-106 Online prognostic system for cable joints for Industry 4.0 S CHRISTOU
KINGDOM
B1 - Session 1
Aug. 31
Mon.
B1-107 Development HV External Gas Pressure Cable Systems Retrofit J. VAN ROSSUM NETHERLANDS B1 - Session 1
Aug. 31
Total System Development on Innovative and Large Scaled
Mon.
B1-108 HVDC Cable System towards Expanded Installation of Large K. KOYAMA JAPAN B1 - Session 1
Aug. 31
Offshore Wind Farms
Machine Learning Based Temperature Forecast for Offshore Mon.
B1-109 S. H. H. KAZMI DENMARK B1 - Session 1
Windfarm Export Cables Aug. 31
Comprehensive tests of the 1200 m HTS DC cable system for Mon.
B1-110 A. KASHCHEEV RUSSIA B1 - Session 1
Saint-Petersburg Aug. 31
A Novel Self-healing Intelligent Power Cable Sheathing Not
B1-111 L. PENG CHINA 0
Material presented
A Commercial Implementation of an Innovative
Mon.
B1-112 Superconducting Cable System and Its Future Prospect in C. H. RYU KOREA B1 - Session 1
Aug. 31
Korea
Application of Horizontal Directional Drilling and Other Mon.
B1-201 E.C. BASCOM III USA B1 - Session 2
Trenchless Methods to Electric Power Cable Installations Aug. 31
230 kV Mixed Transmission Line: Submarine, Underground and Mon.
B1-202 J. LOPES BRAZIL B1 - Session 2
Overhead Aug. 31
Qualifying an extruded 420 kV cable system for installation in a Mon.
B1-203 K. RØNNINGEN NORWAY B1 - Session 2
4 km long blasted tunnel Aug. 31
System Analysis of Fiber Optic Cable Faults in Underground Mon.
B1-204 R. STØLAN NORWAY B1 - Session 2
Cable Systems Aug. 31
Cable design for deep water applications and low losses M. Mon.
B1-206 GREECE B1 - Session 2
transmission links: first project experience CHATZIPANOS Aug. 31
Rigorous calculation of external thermal resistance in non- A. I. Mon.
B1-207 GREECE B1 - Session 2
uniform soils CHRYSOCHOS Aug. 31
Evaluation of Degrees of Freedom for the Design of Metallic
Mon.
B1-208 Screen Grounding Systems of Long HVDC Underground Cable A. WAGNER GERMANY B1 - Session 2
Aug. 31
Systems
Long Horizontal Directional Drill for 220 kV Subsea Cable Mon.
B1-209 T. RALPH IRELAND B1 - Session 2
Installation Aug. 31
Page 10 de 50CIGRE - 2020 e-session / Paper presentations
Statistics, experiences and learnings from failures in power
P. VAN DER Mon.
B1-210 cable systems during pq and type tests, tests after installation WIELEN
NETHERLANDS B1 - Session 2
Aug. 31
and service operation
Induced voltages issues in relation with long export cables for Mon.
B1-211 P CHRISTENSEN DENMARK B1 - Session 2
large offshore wind farms Aug. 31
Mon.
B1-212 Lessons learned from joint bay implementation A. MARTÍN SPAIN B1 - Session 2
Aug. 31
Study on Recognition and Location of Partial Discharge in XLPE Mon.
B1-213 L. ZHANG CHINA B1 - Session 2
Cable under Damped AC Voltage Aug. 31
Tue. Sep.
B1-214 Qualification process of ±400 kV HVDC extruded cable system X. GU CHINA B1 - Session 3
1
3D-FEM modelling of losses in armoured submarine power Tue. Sep.
B1-215 S. STURM GERMANY B1 - Session 3
cables and comparison with measurements 1
Proposal for a non-destructive protocol for the Verification of Tue. Sep.
B1-216 P. MIREBEAU FRANCE B1 - Session 3
Absence of Voltage of Insulated Cable Systems 1
Construction of underground conduits through structures with Tue. Sep.
B1-217 P. SRIWAN THAILAND B1 - Session 3
a depth of more than 25 meters under the canal 1
Development of Self-healable Insulator Applicable to High Tue. Sep.
B1-218 D. H. SHIN KOREA B1 - Session 3
Voltage Pre-molded Joint 1
Tue. Sep.
B1-219 Development of Wet Type AC 66kV TR-XLPE Insulated Cable K.S KIM KOREA B1 - Session 3
1
A Numerical Study on DC Electric Field Distribution in HVDC MI- Tue. Sep.
B1-220 I. K. KWON KOREA B1 - Session 3
PPLP Cable Considering Parameters Related to Load Cycle Test 1
Design and Development of Back-to-Back Gas-to-Cable M. MOHANA Tue. Sep.
B1-221 INDIA B1 - Session 3
Termination for 420kV Gas Insulated Switchgear RAO 1
Power Cables insulation & establishing relationship between Tue. Sep.
B1-222 ROBIN GIRI INDIA B1 - Session 3
insulation level selection and aging 1
Damage on the 110 kV cable during measurements on the Tue. Sep.
B1-223 JURE STRMEC SLOVENIA B1 - Session 3
earthing system 1
Use of Augmented Reality (AR) for Asset Management of HV Tue. Sep.
B1-301 I. JOVANOVIC USA B1 - Session 4
Devices and Training of Field Personnel 1
On line monitoring of partial discharge on an underground Not
B1-302 E. INUCENCIO BRAZIL 0
transmission line presented
Tue. Sep.
B1-303 Practical experience and challenges for DTS/RTTR systems S. STUL BELGIUM B1 - Session 4
1
Deep Water 500 kV HVDC Mass Impregnated Cable Tue. Sep.
B1-304 L LERVIK NORWAY B1 - Session 4
Interconnection between Montenegro and Italy 1
Tue. Sep.
B1-305 Dynamic Current Rating - Thermal Transient Response E. OLSEN NORWAY B1 - Session 4
1
Reducing the likelihood of power transmission cable failures Tue. Sep.
B1-306 M JEROENSE SWEDEN B1 - Session 4
by increasing the role of quality assurance and quality control 1
Implementation of an integrated monitoring system for real-
Tue. Sep.
B1-307 time assessment of HV cable links in the Terna's Italian L. GUIZZO ITALY B1 - Session 4
1
electrical grid
Failure Analysis and Asset Management of Cable Trifurcating UNITED Tue. Sep.
B1-308 S TEE B1 - Session 4
Joints KINGDOM 1
Tue. Sep.
B1-310 Enhanced Cable Security through Fibre Optic Monitoring J. CAIRNS AUSTRALIA B1 - Session 4
1
Page 11 de 50CIGRE - 2020 e-session / Paper presentations
Automated sheath current monitoring system for cable sheath Tue. Sep.
B1-311 F. GARNACHO SPAIN B1 - Session 4
diagnostics purposes 1
Non-Electrical Multi-Sensor Solution for Partial Discharge Tue. Sep.
B1-312 K. VATERRODT GERMANY B1 - Session 4
Detection in HV Cable Accessories 1
Construction Products Regulation: HVAC and HVDC cable Tue. Sep.
B1-313 G CAPON FRANCE B1 - Session 4
classification criteria and application 1
Complete offshore cable condition monitoring and load Tue. Sep.
B1-314 E. ROCHAT SWITZERLAND B1 - Session 4
management using distributed fibre optic sensing 1
Determination of the pre-qualification rules for the acceptance Mon.
B1-NGN 1 A. SANTOSH NETHERLANDS B1 - Session 2
testing of medium voltage DC cable systems Aug. 31
UNITED Tue. Sep.
B1-NGN 2 Wimbledon Digital Engineering Cross Site Cable Systems G.RICCARDI B1 - Session 3
KINGDOM 1
Page 12 de 50CIGRE - 2020 e-session / Paper presentations
Paper Session of Day
Paper title (B2 sessions)
Main author's
Main author
number country presentation (CEST)
Wed.
B2-101 Monitoring of a New Transmission Line Design M. FULK USA B2 - Session 1
Sep. 2
A structural reliability approach to transmission line
Wed.
B2-102 engineering – a consistent way to make use of monitoring and A. ISTAD LEM NORWAY B2 - Session 1
Sep. 2
inspection data
Development of sensors for real-time monitoring of ice loads Wed.
B2-103 B. E. NYGAARD NORWAY B2 - Session 1
on overhead lines Sep. 2
The THOR Hammer Tester – A Step Change in the UNITED Wed.
B2-104 R EYRE-WALKER B2 - Session 1
Management of Wooden Utility Poles KINGDOM Sep. 2
An Approach to Determine Temperature Exceedance in Wed.
B2-105 T. KAVANAGH IRELAND B2 - Session 1
Overhead Line Compression Fittings Sep. 2
Utilization of environmental factor maps and corrosion rate
Wed.
B2-106 maps for advanced maintenance of overhead transmission S. OHARA JAPAN B2 - Session 1
Sep. 2
towers
Experimental Study and Mechanism Analysis of Abnormal Wed.
B2-108 M. LU CHINA B2 - Session 1
Fever Composite Insulators in AC 500kV Overhead Line Sep. 2
A Development of Compact Corrosion Detector to Diagnosis of Wed.
B2-109 Y.H. KIM KOREA B2 - Session 1
Aged Overhead Conductor Sep. 2
Indian Experience of Refurbishment of Tower Foundation CHAITANYA Wed.
B2-110 INDIA B2 - Session 1
located in water bodies KUNTE Sep. 2
Creation of a geographic information system of thunderstorm A.
Wed.
B2-111 activity based on the existing complex of 6-110 kV grids using KUCHERIAVENK RUSSIA B2 - Session 1
Sep. 2
OV
the devices for identifying faults in OHL
Practical Procedure to Define the Maintenance Priority of Not
B2-112 S. ASTO PERU 0
Transmission Line Cables presented
Holistic Regulatory Framework of Resilience for Electrical Wed.
B2-113 R. SERRANO CHILE B2 - Session 2
Facilities against Wildfire Sep. 2
Overhead powerline LiDAR inspection with unmanned aerial Wed.
B2-114 A. COELHO PORTUGAL B2 - Session 2
vehicles Sep. 2
N. PINHO DA Wed.
B2-115 Remote monitoring overhead lines using satellite images SILVA
PORTUGAL B2 - Session 1
Sep. 2
Wed.
B2-116 Condition Assessment Study of OHTL Steel Towers in Iceland A. B. JONASSON ICELAND B2 - Session 1
Sep. 2
Artificial Intelligence (AI) Augmented Transmission Line Wed.
B2-117 J. TOTH ICELAND B2 - Session 1
Inspection Sep. 2
Limits of vibration amplitude measurement based conductor Wed.
B2-118 K. SCHILLAI SWITZERLAND B2 - Session 1
fatigue design Sep. 2
Hydrophobicity Classification of Composite Insulators Using Wed.
B2-119 C. C. KOKALIS GREECE B2 - Session 1
Convolutional Neural Networks Sep. 2
Thu. Sep.
B2-201 Flexible HTLS-High Temperature Low Sag Conductor S. UEDA BRAZIL B2 - Session 3
3
Sensitivity Effects of High Temperature Overhead Line (OHL) Thu. Sep.
B2-202 A. ABBOUD USA B2 - Session 3
Conductors to Line Rating Variables 3
Mega High Strength steel core for HTLS conductor on 2nd
Wed.
B2-203 Scheldt long span crossing of new 380 kV line in the port of J.F. GOFFINET BELGIUM B2 - Session 2
Sep. 2
Antwerp
Page 13 de 50CIGRE - 2020 e-session / Paper presentations
A. KVAMME Wed.
B2-204 Electrical design and testing of composite towers for 420 kV BERSTAD
NORWAY B2 - Session 2
Sep. 2
Thu. Sep.
B2-205 Optimization of losses in new 400 kV overhead lines K LENARCZYK POLAND B2 - Session 3
3
RTV Coated OHL Insulators in Harsh Desert Environment
ENG. AHMAD Wed.
B2-206 Optimization of Coating Thickness & Assessment of Sand ALTHAGFI
GULF STATES B2 - Session 2
Sep. 2
Blasting Impact
Field experience and laboratory results on the application of Wed.
B2-208 M. MARZINOTTO ITALY B2 - Session 2
RTV coating on HVDC lines Sep. 2
compactLine - Experience with a Pilot installation of an Wed.
B2-209 R. SCHLOSSER GERMANY B2 - Session 2
innovative overhead transmission line concept for 400kV Sep. 2
Overhead Transmission Line Performance with Respect to Thu. Sep.
B2-210 S. PACK AUSTRIA B2 - Session 3
Grounding Impedance on Alpine Terrain 3
Design Validation of HTLS Conductor through a High Wed.
B2-211 P. PORTER IRELAND B2 - Session 2
Temperature Field Test Sep. 2
Conception, Construction and Realisation of an innovative OHL Wed.
B2-212 S. STEEVENS GERMANY B2 - Session 2
Design Sep. 2
Development and implementation of digital line-to-cable
Wed.
B2-213 termination points for connecting 110 kV overhead and cable M. ERMOSHINA RUSSIA B2 - Session 2
Sep. 2
lines
Advantage Analysis of Composite Insulated Crossarm in
Wed.
B2-214 Uprating Voltage and Transmission Capacity of Transmission Y. LI CHINA B2 - Session 2
Sep. 2
Lines
Research on Design of Compact Transmission Line Tower Wed.
B2-215 P. ZHAO CHINA B2 - Session 2
Based on Composite Cross-arm Sep. 2
Transient Overvoltage by pole-to-ground fault on ±500kV 8GW
Thu. Sep.
B2-216 HVDC Double Bi-pole System with Metallic Return Conductor G.M. KWON KOREA B2 - Session 3
3
in Korea
Experience of Live Line or Zero Shutdown Reconductoring in Thu. Sep.
B2-217 SHACHIDEVI T. K. INDIA B2 - Session 3
India 3
Assessment of performance of insulators through leakage Wed.
B2-218 J.M. GEORGE FRANCE B2 - Session 2
current monitoring under contaminated conditions Sep. 2
Development and realization of a complex transmission line Wed.
B2-219 BALINT NEMETH HUNGARY B2 - Session 2
management system Sep. 2
Research of steel - aluminium plastically compacted Wed.
B2-220 V. KURYANOV RUSSIA B2 - Session 2
conductors for overhead lines (OHL) Sep. 2
Technical Demands to Improve Today's Composite Insulator Wed.
B2-221 C. BAER SWITZERLAND B2 - Session 2
Reliability Sep. 2
Comparing the Corona Performance of AC and DC Overhead
Wed.
B2-222 Lines in both Indoor and Outdoor Experiments Using novel P. BLEULER SWITZERLAND B2 - Session 2
Sep. 2
Techniques
An integral approach to ensuring the integrity of the tower and NENAD Wed.
B2-223 SLOVENIA B2 - Session 2
conductors GUBELJAK Sep. 2
Case of Dynamic Line Rating (DLR) for Overhead Transmission SMRUTI RANJAN Thu. Sep.
B2-224 SC B2 B2 - Session 3
in Context of Tropical Countries Like India MOHAPATRA 3
Development of an Overhead Transmission Line Portable Thu. Sep.
B2-302 A.J. PHILLIPS USA B2 - Session 3
Protective Arrester (PPA) for Live Work 3
Page 14 de 50CIGRE - 2020 e-session / Paper presentations
Robotic installation of aircraft warning markers on Thu. Sep.
B2-303 L. M. DICKIE NORWAY B2 - Session 3
transmission lines 3
Exposure of workers to electric and magnetic field during Thu. Sep.
B2-304 MAJA GRBIC SERBIA B2 - Session 3
maintenance work on double-circuit overhead power lines 3
Audible Noise Management of Newly Reconductored Thu. Sep.
B2-305 J. RANIGA AUSTRALIA B2 - Session 3
Transmission Lines 3
Selecting Equipment for Construction of Overhead Lines Based Thu. Sep.
B2-307 F. GHELICHI IRAN B2 - Session 3
on CO2 Emissions Calculation 3
UAV (Unmanned Aerial Vehicle) Electromagnetic Fields (EMF) Thu. Sep.
B2-308 C. ROZE FRANCE B2 - Session 3
Compatibility and Tests requirements for use in OHL 3
Thu. Sep.
B2-309 Development of Vertical Separated Tubular Steel Pole for OHL W. K. LEE KOREA B2 - Session 3
3
Optimal Placement of Anti-Cascading Structures in Overhead Thu. Sep.
B2-310 A. HALDAR CANADA B2 - Session 3
Line Design – A Probabilistic Framework 3
Peruvian Experience on Insulation Design for 500 kV Overhead Thu. Sep.
B2-311 A. MARAVI PERU B2 - Session 3
Transmission Lines at Very High Altitude 3
New solution for reduction of the ground potential rise around ROBERT Thu. Sep.
B2-312 SLOVENIA B2 - Session 3
construction of high voltage overhead lines MARUŠA 3
THE METHODOLOGY FOR OVERHEAD POWER
Wed.
B2-NGN 01 TRANSMISSION LINES TECHNICAL STATE ASSESSMENT A.STEPANOVA RUSSIA B2 - Session 2
Sep. 2
BASED ON MACHINE LEARNING
Corona Protection of HV composite Insulators with considering
Wed.
B2-NGN 02 Weather Conditions and Pollution layer R.GHASEMI IRAN B2 - Session 2
Sep. 2
(Design / Simulation)
Page 15 de 50CIGRE - 2020 e-session / Paper presentations
Paper Session of Day
Paper title (B3 sessions)
Main author's
Main author
number country presentation (CEST)
Water-Oil Separation Device for Mitigating Environmental and Wed.
B3-101 J. QUERIDO BRAZIL B3 - Session 1
Safety Risks in Substations Sep. 2
New 420-kV GIS Substation Design in the Norwegian
Wed.
B3-102 Transmission System – Up-to-date Technology, Design G. BLANCHET NORWAY B3 - Session 1
Sep. 2
Optimisation and Connection Interface Issues
Wed.
B3-103 Safety Aspects related to Electric Fields in Converter Stations J HERNANDEZ SWEDEN B3 - Session 1
Sep. 2
TenneT's giant leap to be able to replace 140 substations
Wed.
B3-104 within next 10 year, while in service and coming from different A. LATHOUWERS NETHERLANDS B3 - Session 1
Sep. 2
lay-outs
Arc flash hazard in high voltage substations: incident energy Wed.
B3-105 A. VALANT ITALY B3 - Session 1
calculation and statistical risk evaluation Sep. 2
Wed.
B3-106 Seismic Design Optimization of Substation Equipment in Japan S. IWASAKI JAPAN B3 - Session 1
Sep. 2
First 145 kV / 40 kA gas-insulated switchgear with climate-
neutral insulating gas and vacuum interrupter as an alternative Wed.
B3-107 M. KUSCHEL GERMANY B3 - Session 1
to SF6 - Design, Manufacturing, Qualification and Operational Sep. 2
Experience
Flexible integration of phase-shifting transformers in AIS Wed.
B3-108 H. KÖRNER GERMANY B3 - Session 1
substations - Comparison of approaches Sep. 2
Wed.
B3-109 Design Changes in GIS Substations after experience from i-DE A. RICONDO SPAIN B3 - Session 1
Sep. 2
Operation Scheme of Modular Green Substation with BESS for Wed.
B3-110 I. LIM KOREA B3 - Session 1
Transmission and Distribution System Sep. 2
Influence of power harmonics on the non-ionizing EMF Wed.
B3-112 L. ROCHA PORTUGAL B3 - Session 2
exposure values in electrical installations Sep. 2
SF6 circuit breakers' monitoring system – development and Wed.
B3-113 B. STOGNII UKRAINE B3 - Session 2
implementation in Ukrainian power industry Sep. 2
Health and safety partnership approach to improve safety Wed.
B3-114 V GUIGNARD FRANCE B3 - Session 2
records Sep. 2
Alternative to SF6: an on-site 145kV GIS pilot project from a Wed.
B3-115 M INVERSIN FRANCE B3 - Session 2
TSO perspective Sep. 2
French Offshore Substation - Analysis of the HV equipment Wed.
B3-116 V CHATEL FRANCE B3 - Session 2
design and maintenance Sep. 2
Impact assessment of optimization methods for the Wed.
B3-117 M. MONTOYA COLOMBIA B3 - Session 2
construction of high voltage air-insulated substations Sep. 2
Specification, project planning and design of the World's first Wed.
B3-118 N. MAHDIZADEH SWITZERLAND B3 - Session 2
420 kV SF6-free GIS substation Sep. 2
Bus-Node Substations – Lower Lightning Overvoltages and
Wed.
B3-119 Easier Lightning Protection (Georg Koeppl, Thomas G. KOEPPL SWITZERLAND B3 - Session 2
Sep. 2
Aschwanden th.aschw@bluewin.ch)
Wed.
B3-120 HVDC gas-insulated systems for compact substation design U. RIECHERT SWITZERLAND B3 - Session 2
Sep. 2
Prototype Installation Test of HVDC GIS for Meshed Offshore Wed.
B3-121 M. GATZSCHE SWITZERLAND B3 - Session 2
Grids Sep. 2
Page 16 de 50CIGRE - 2020 e-session / Paper presentations
Integration of Condition Monitoring into Substation Asset Risk Thu. Sep.
B3-201 T. MCGRAIL USA B3 - Session 4
Management 3
Thu. Sep.
B3-202 Additive Manufacturing of spare parts for Power Equipment A. PINHEL BRAZIL B3 - Session 4
3
Refurbishment and Replacement of a 132 kV Substation
Thu. Sep.
B3-203 Coupled to Hydroelectric Power Plant with State-of-the-art G. BLANCHET NORWAY B3 - Session 4
3
Technologies with high level of Service Continuity
Contractors as modern Master Builders: Virtual Design and
Thu. Sep.
B3-204 Construction (VDC) as an enabler of meaningful experiences to A. FOSKULO CROATIA B3 - Session 4
3
project teams for achieving optimized substation management
Value Quantification for Digital Substations in HV Transmission Thu. Sep.
B3-205 L. ASGARIEH GERMANY B3 - Session 4
Grids 3
Investigation on the dynamic rating of tubular busbars in Thu. Sep.
B3-206 K. REICH AUSTRIA B3 - Session 4
substations 3
Evolution of skills and managing competency in high voltage Thu. Sep.
B3-207 T. CONDON IRELAND B3 - Session 4
substation engineering design 3
A Novel Evaluation Method for the Integrity of Grounding
Thu. Sep.
B3-208 Grids in High Voltage Substations Based on Magnetic Field M. MISRA NETHERLANDS B3 - Session 4
3
Measurements
Thu. Sep.
B3-209 Repair cost planning as a reliability factor Y. ZHILKINA RUSSIA B3 - Session 4
3
Thu. Sep.
B3-210 Non-intrusive diagnostic methods for AIS & GIS HV equipment J. TOURIGUINE FRANCE B3 - Session 4
3
Optimization of Health Indices for Power Assets in Substation Thu. Sep.
B3-211 J. R. JUNG KOREA B3 - Session 4
Using Machine Learning Method 3
Thu. Sep.
B3-212 Aeolian vibration challenges at Renewable substation NIHAR RAJ INDIA B3 - Session 4
3
Maintenance, Monitoring & Strengthening of Substation Thu. Sep.
B3-213 ASHA AGRAVATT INDIA B3 - Session 4
Grounding – Experience of GETCO 3
3D Design/BIM/Digital Twin for Electrical Substation - P.
Thu. Sep.
B3-301 Exaggerated Expectations, Current Realities, and Future SOMBOONYANO USA B3 - Session 3
3
N
Opportunities
Data to Decisions: Future-proof Integration of Substation Thu. Sep.
B3-302 G. RAJAPPAN USA B3 - Session 3
Intelligence 3
A fleet of digital substations at Alliander, a blessing after an Thu. Sep.
B3-303 M. VAN RIET NETHERLANDS B3 - Session 3
intense learning curve 3
FITNESS: Performance Evaluation & Comparison Across
UNITED Thu. Sep.
B3-304 Conventional, Non-Conventional, Analog & Digital Substation S W A CLARK
KINGDOM
B3 - Session 3
3
Measurement Chains
Intelligent IoT-connected transmission equipment in Thu. Sep.
B3-305 D. HELBIG GERMANY B3 - Session 3
substations 3
Implementation of Artificial Neural Networks in Design of Steel OMER BURAK Thu. Sep.
B3-306 TURKEY B3 - Session 3
Cap Plates of Substation Support Structures YUCEL 3
Thu. Sep.
B3-307 Pre-Qualification Testing of Digital Substations B. BAUM NETHERLANDS B3 - Session 3
3
Digitalization solutions for substation planning, design, Thu. Sep.
B3-308 M. NAKAHATA JAPAN B3 - Session 3
construction, operation and maintenance 3
Page 17 de 50CIGRE - 2020 e-session / Paper presentations
Innovation Practices of Substation Maintenance Operation Thu. Sep.
B3-309 Y. ZHOU CHINA B3 - Session 3
Scheme based on VR Visualization 3
Experience with reconstruction of industrial SVC analogue CZECH & Thu. Sep.
B3-310 M CERNAN B3 - Session 3
controller SLOVAK Reps. 3
Group Specification for Power Transformers Using Edge Thu. Sep.
B3-311 T.Y. KIM KOREA B3 - Session 3
Computing Technology 3
Green and Digital GIS Substation Substation 50 kV Thu. Sep.
B3-312 R TROOST FRANCE B3 - Session 3
Middelharnis II 3
Interface of large offshore windturbines into the electrical grid Wed.
B3-313 L. TREIER SWITZERLAND B3 - Session 2
at 66kV voltage level Sep. 2
Position on application of substation equipment using SF6 Wed.
B3-NGN 01 K. NAKAMURA JAPAN B3 - Session 1
alternative technologies in Japan Sep. 2
Challenges and Expectations of Transitioning to Digital Thu. Sep.
B3-NGN 02 D. STAFFORD AUSTRALIA B3 - Session 3
Substations 3
Return on Experience on Condition-Based Circuit Breaker Thu. Sep.
B3-NGN 03 N. GADACZ NORWAY B3 - Session 4
Monitoring Applications 3
Page 18 de 50CIGRE - 2020 e-session / Paper presentations
Paper Session of Day
Paper title (B4 sessions)
Main author's
Main author
number country presentation (CEST)
Brazilian Experience in Switching 800 kV LCC Converter Mon.
B4-101 R. TENORIO BRAZIL B4 - Session 2
Transformers Aug. 31
Principles for paralleling HVDC-LCC converters: point-to-point Mon.
B4-102 P. TOLEDO BRAZIL B4 - Session 2
transmission, multi-terminal and HVDC grids Aug. 31
Mon.
B4-103 The measurement of HVDC ground electrodes resistance P. FREIRE BRAZIL B4 - Session 2
Aug. 31
Large-capacity multi-infeed HVDC configuration – Managing
Mon.
B4-104 simultaneously scheduled line outages to ensure power P. GOMES BRAZIL B4 - Session 2
Aug. 31
system security
Simulation and Development of HVDC Control Room with
Mon.
B4-105 Advanced HMI, Interface Systems, Analytical Tools and S.P. ASHOK USA B4 - Session 2
Aug. 31
Cybersecurity Infrastructure and Monitoring
Compacting HVDC VSC and LCC Converter Stations for Land Mon.
B4-106 R. ADAPA USA B4 - Session 2
Use Minimization Aug. 31
Towards a deployment plan for a future European offshore Tue. Sep.
B4-107 O. ANTOINE BELGIUM B4 - Session 3
grid: development of topologies 1
Black-start and system restoration utilizing the NEMO Modular
Mon.
B4-108 Multilevel Converter – a practical test in the Belgian J. RIMEZ BELGIUM B4 - Session 1
Aug. 31
transmission system
Commissioning of VSC HVDC converters for STATCOM Tue. Sep.
B4-109 S. BØDAL NORWAY B4 - Session 3
operation 1
Tue. Sep.
B4-110 Open-Source HVDC Control - a High-Level Perspective K. SHARIFABADI NORWAY B4 - Session 4
1
European Experiences in HVDC System Reliability and Tue. Sep.
B4-111 P. LINDBLAD FINLAND B4 - Session 4
Availability 1
Challenges of HVDC standardization in external insulation Tue. Sep.
B4-112 L AREVALO SWEDEN B4 - Session 4
design of converter stations 1
HVDC Lifecycle management – a Reliability & Availability Tue. Sep.
B4-113 U ELGQVIST SWEDEN B4 - Session 4
perspective 1
Mon.
B4-114 Improved VSC HVDC for over head line HVDC transmission Y HÄFNER SWEDEN B4 - Session 2
Aug. 31
System studies for the Baihetan-Jiangsu ±800 kV Hybrid Mon.
B4-115 M ANDERSSON SWEDEN B4 - Session 1
UHVDC project Aug. 31
Planning and implementation of an HVDC link embedded in a
Mon.
B4-116 low fault level AC system with high penetration of wind K LINDEN SWEDEN B4 - Session 1
Aug. 31
generation
Levelized Energy Cost Improvement through Concept Selection
Mon.
B4-117 and Availability Optimization for the Norfolk Windfarms' C.A. PLET NETHERLANDS B4 - Session 2
Aug. 31
Export Links
Dynamic stability issues of VSC-HVDC systems in AC
Mon.
B4-118 Transmission Emulation Control: the Piossasco - Grande Ile C. PISANI ITALY B4 - Session 1
Aug. 31
case
Design and functional aspects of a new HVDC link of Crete Mon.
B4-119 K. LEONTARITIS GREECE B4 - Session 1
Island with the mainland Transmission System of Greece Aug. 31
Multi Terminal Extension of Embedded Point to Point VSC UNITED Mon.
B4-120 O D ADEUYI B4 - Session 1
HVDC Schemes KINGDOM Aug. 31
Page 19 de 50CIGRE - 2020 e-session / Paper presentations
UNITED Mon.
B4-121 A new approach to operational type testing of HVDC valves C C DAVIDSON
KINGDOM
B4 - Session 2
Aug. 31
Combined Bridge MMC as efficient solution for HVDC systems Tue. Sep.
B4-122 S. SEMMLER GERMANY B4 - Session 3
with DC fault ride through requirements 1
Towards a deployment plan for a future European offshore Mon.
B4-123 J. MOORE NETHERLANDS B4 - Session 1
grid: cost-benefit analysis of topologies Aug. 31
Demonstration of Multi-terminal DC Grid Integration with an Mon.
B4-124 F. LOKU GERMANY B4 - Session 2
MMC Test Bench Aug. 31
Improving synthetic inertia provision by power electronic Mon.
B4-125 W. GAWLIK AUSTRIA B4 - Session 2
interfaced power sources to support future system stability Aug. 31
The Celtic Interconnector – linking the electricity grids of Mon.
B4-126 K. FRENCH IRELAND B4 - Session 2
Ireland and France Aug. 31
Functions and Commissioning test of New Hokkaido-Honshu Tue. Sep.
B4-127 M. MORI JAPAN B4 - Session 3
HVDC Link 1
Experience in the HVDC equipment development for Vyborg Tue. Sep.
B4-128 E. DAVYDOV RUSSIA B4 - Session 4
converter complex upgrade at SS 400 Vyborg PJSC FGC UES 1
Method for detecting of faulted section in cable-overhead Tue. Sep.
B4-129 J. KAPITULA RUSSIA B4 - Session 4
HVDC line 1
Improvement of the oscillatory behaviour of the HVDC link Mon.
B4-130 A. DÍAZ-GARCÍA SPAIN B4 - Session 2
between Spain and France Aug. 31
Optimization and Simulation for Network Performance of Back Tue. Sep.
B4-131 L. LIU CHINA B4 - Session 3
to Back VSC-HVDC Systems 1
Calculation method for peak short-circuit currents for the Tue. Sep.
B4-132 A. SACIAK GERMANY B4 - Session 3
security of HVDC grids 1
System Design and Development of HYOSUNG 200MW BTB Tue. Sep.
B4-133 J. H. KIM KOREA B4 - Session 3
VSC-HVDC in a KEPCO System 1
The Method of Components Critical Priority Assessment for Tue. Sep.
B4-134 Y. M. KIM KOREA B4 - Session 3
HVDC Station Asset Management System 1
Tue. Sep.
B4-135 Seismic Design and Validation of the HVDC Valve Structure S.M. KIM KOREA B4 - Session 3
1
Fundamental Frequency Blocking Filters for Champa-
Tue. Sep.
B4-136 Kurukshetra HVDC ±800kV, 6000MW HVDC Parallel Bipole AAKAN DUGAR INDIA B4 - Session 3
1
Transmission System – Design Consideration
Tue. Sep.
B4-137 Assessment of protection strategy options for future DC grids A BERTINATO FRANCE B4 - Session 4
1
Technical solutions to predict and mitigate inadvertent
Tue. Sep.
B4-138 interaction of two parallel connected VSC-HVDC schemes S DENNETIERE FRANCE B4 - Session 3
1
feeding an islanded offshore Oil and Gas grid
A Survey of the Reliability of HVDC Systems throughout World Mon.
B4-139 M.G. BENNETT SC B4 B4 - Session 2
during 2017 – 2018 Aug. 31
Engineering Design and Control Method for Hangzhou's Mon.
B4-201 J. LIAN CHINA B4 - Session 1
Flexible DC Distribution Network Aug. 31
A New Method for Distinguishing DC Line Faults in Flexible DC Mon.
B4-202 J. YANG CHINA B4 - Session 1
Distribution System Aug. 31
Development of Multi-Terminal DC link in Distribution Mon.
B4-203 C. HAN KOREA B4 - Session 1
Network Aug. 31
The Flexible Power Link of Western Power Distribution: A Case Mon.
B4-204 P. MAIBACH SWITZERLAND B4 - Session 1
Study Aug. 31
Page 20 de 50CIGRE - 2020 e-session / Paper presentations
Advantages of M-SSSC Devices over Traditional Series Tue. Sep.
B4-301 B. BOJORQUEZ USA B4 - Session 4
Compensation 1
Recent FACTS Applications in Chesf Power Grid: Aspects of Tue. Sep.
B4-302 M. LIMA BRAZIL B4 - Session 4
Technological Development 1
Phoenix: The World's First Hybrid Synchronous Condenser Mon.
B4-303 R RIVAS SWEDEN B4 - Session 1
System Aug. 31
Capability and Flexibility of Energy Storage Enhanced Mon.
B4-304 T SOONG SWEDEN B4 - Session 1
STATCOMs in Low Inertia Power Grids Aug. 31
Evaluating Modular Voltage Source Converter Based UNITED Tue. Sep.
B4-306 R GUPTA B4 - Session 4
Technology in the GB Transmission System with EMT Studies KINGDOM 1
Not
B4-307 Development of active filter function for STATCOM T. TATSUMI JAPAN
presented
0
NSSS STATCOM – The Optimal Dynamic Reactive Support Tue. Sep.
B4-309 J. HU CANADA B4 - Session 4
Solution for a Weak Network 1
Study and Operational Experiences of STATCOM for Emerging Mon.
B4-310 SANGI JANA INDIA B4 - Session 1
Grid with Renewable Power Network Aug. 31
Tue. Sep.
B4-311 Ascutney SVC - Engineering, Testing and Commissioning J. HU CANADA B4 - Session 4
1
Analysis and Protection of Valve-Side Single-Phase-to-Ground UNITED Tue. Sep.
B4-NGN 01 Gen Li B4 - Session 3
Faults in HB-MMC based Bipolar HVDC Systems KINGDOM 1
Malsha Tue. Sep.
B4-NGN 02 Inverter Design Considerations for Low Inertia Weak Grids CANADA B4 - Session 4
Annakkage 1
Page 21 de 50CIGRE - 2020 e-session / Paper presentations
Paper Session of Day
Paper title (B5 sessions)
Main author's
Main author
number country presentation (CEST)
Impact of Standardization of PACS on Reducing Human Errors Thu.
B5-101 A.P. APOSTOLOV USA B5 - Session 2
in Engineering and Testing Aug. 27
Prevention of Human Errors in Transmission Line Protection
Thu.
B5-102 and Fault Location Functions by Eliminating the Need for F. LOPES BRAZIL B5 - Session 2
Aug. 27
Settings
Challenges and experiences of utilities in Brazil to new
Thu.
B5-103 procedures and human resources management to reduce PAC P. FLORES BRAZIL B5 - Session 2
Aug. 27
systems risks in a new complex digital enviroment
Thu.
B5-104 Formal Methods to Power-System Automation L. LISBOA BRAZIL B5 - Session 2
Aug. 27
Human Aspects in Protection, Automation and Control Thu.
B5-105 S. CAMPOS BRAZIL B5 - Session 2
Systems (PACS) Aug. 27
The challenge of tackling human errors in the PACS Thu.
B5-106 A. PEREIRA BRAZIL B5 - Session 2
environment Aug. 27
Human Errors related to PACS: Experience and Expectations of Fri. Aug.
B5-107 C. MOORS BELGIUM B5 - Session 3
Elia, the Belgian TSO 28
The central role of human resources in PACS Asset Fri. Aug.
B5-108 M. PETRINI ITALY B5 - Session 3
Management 28
Process bus based Busbar Protection – Easier Installation and UNITED Fri. Aug.
B5-109 C TEOH B5 - Session 3
Life-Cycle Management for the Digital Substation KINGDOM 28
Engineering and Validation Support Framework for Power Fri. Aug.
B5-110 J. RESCH AUSTRIA B5 - Session 3
System Automation and Control Applications 28
Common Errors and Traps in Design, Testing and Fri. Aug.
B5-111 S. BHOLA AUSTRALIA B5 - Session 3
Commissioning of Protection and Control Schemes 28
Human aspects related to IEC 61850 testing: How to believe or Fri. Aug.
B5-112 J. CARDENAS SPAIN B5 - Session 3
don´t believe in testing 28
Benefits derived from the use of Digital Twins of Protection Fri. Aug.
B5-113 J. ROMÁN SPAIN B5 - Session 3
and Control Systems 28
How to Improve Human Decisions with a PMU´S Automatic
Fri. Aug.
B5-114 System for the Control of Stability of a HVDC Link in Red J. MARTÍN SPAIN B5 - Session 3
28
Eléctrica de España (REE)
The Decision Tree Forest for the Defects and Weak Points of Fri. Aug.
B5-115 Y. LIU CHINA B5 - Session 3
Relay Protection Devices 28
Human Errors in Maintenance and Modification of Protection Fri. Aug.
B5-116 B. KONGKAEO THAILAND B5 - Session 3
System in Thailand 28
Human aspects in testing and commissioning of digital Fri. Aug.
B5-117 S. MEIER SWITZERLAND B5 - Session 3
substations, based on experiences from real installations 28
Model-Based Systems Engineering Views of Software Defined Thu.
B5-201 D.K. HOLSTEIN USA B5 - Session 2
Process Bus Networks Aug. 27
Thu.
B5-202 Analyzing the Limits of Data Transmission in the Process Bus P. JUNIOR BRAZIL B5 - Session 2
Aug. 27
Digitalization at Eletrobras Eletrosul – Challenges on fully
M. Thu.
B5-203 digital substation PACS communication network architecture ALEXANDRINO
BRAZIL B5 - Session 2
Aug. 27
specifications
Page 22 de 50CIGRE - 2020 e-session / Paper presentations
Best practices and challenges on designing a LAN Thu.
B5-204 M. ZAPELLA BRAZIL B5 - Session 2
communication network for 61850 Digital Substations Aug. 27
Test Systems Consideration in the Design of Communications Thu.
B5-205 A.P. APOSTOLOV USA B5 - Session 2
Networks for Digital Substations Aug. 27
Architecture of Communication Network in Statnett Digital Thu.
B5-206 N. HURZUK NORWAY B5 - Session 1
Substation Aug. 27
Experience gained and Recommendations for Implementation
Thu.
B5-207 of Process Bus in Protection, Automation and Control Systems R. LØKEN NORWAY B5 - Session 1
Aug. 27
(PACS)
FITNESS: Live comparison of reliability and availability of
UNITED Thu.
B5-208 different communication and redundancy architectures for P MOHAPATRA
KINGDOM
B5 - Session 1
Aug. 27
digital substations
Development of Advanced Communication Unit for Ring
Thu.
B5-209 Topology Network and Application to Special Protection M. KUWABARA JAPAN B5 - Session 1
Aug. 27
Scheme
Implementation of Overload Protection Relay System based on Thu.
B5-210 K. NISHIZAWA JAPAN B5 - Session 1
IEC 61850 for Simplification of communication network Aug. 27
Data segregation and traffic anomaly detection within the Thu.
B5-211 E. CASALE ITALY B5 - Session 2
transmission substations and the whole power system Aug. 27
Experience in organization of communication network PMU
Thu.
B5-212 data transmission in protection, automation and control D. DUBININ RUSSIA B5 - Session 1
Aug. 27
systems
IEC 61850 communications monitoring and diagnostics system Thu.
B5-213 D. ZHUKOV RUSSIA B5 - Session 1
implementation experience Aug. 27
Optimising LAN Architecture For Improved Reliability And Not
B5-214 R. HUGHES AUSTRALIA 0
Resilience presented
5G wireless communications for smart grid: a PACS case with Thu.
B5-215 Y. CAO CHINA B5 - Session 2
network slice Aug. 27
Design constraints and choices for the LAN in RTE's R#SPACE Thu.
B5-216 X. MICHAUT FRANCE B5 - Session 1
system Aug. 27
Redundancy in the IEC 61850-Based Digital Substation System Thu.
B5-217 S. Y. MOON KOREA B5 - Session 1
for KEPCO's 154kV Substations Aug. 27
Engineering and Management of Communication Networks in BARIN DE Thu.
B5-218 INDIA B5 - Session 1
Powergrid's Full Digital Substations BHOWMICK Aug. 27
Assessment of Dynamic and Programmable Network
UNITED Thu.
B5-219 Redundancy Management Method based on Software Defined H LI
KINGDOM
B5 - Session 1
Aug. 27
Network Technology in A Fully Digital Substation
Experience in Communication Network Design for High
Thu.
B5-220 Performance Requirements in IEC 61850 Process Bus based PRAVEEN A.N INDIA B5 - Session 1
Aug. 27
Substation
Implementation of QOS in the process bus for Digital Not
B5-221 N. NELIS CHILE 0
Substations presented
The ‘Protection over MPLS' project - Testing line differential
Thu.
B5-222 protection and teleprotection over an IP/MPLS J. CASEIRO PORTUGAL B5 - Session 1
Aug. 27
communication network
Page 23 de 50CIGRE - 2020 e-session / Paper presentations
Pilot Experience of IEC 61850 real-time communication
Thu.
B5-223 between digital substations enabling new protection and P. KREUTZER SWITZERLAND B5 - Session 1
Aug. 27
automation concepts in Al-Dhafrah in Transco Power system
Testing, Commissioning and Operational Aspects of Substation
Fri. Aug.
B5-NGN 01 Automation System – Areas of Human Intervention and S.K.JADAV INDIA B5 - Session 3
28
Approach to Mitigate Human Errors
Page 24 de 50CIGRE - 2020 e-session / Paper presentations
Paper Session of Day
Paper title (C1 sessions)
Main author's
Main author
number country presentation (CEST)
Quantifying Extreme Events Impacts Using a Coupled Mon.
C1-101 V. KUMAR USA C1 - Session 2
Electricity Economy Model Aug. 31
Methodology for Defining the Configuration of Transmission
Lines in Two Simple Circuits Instead of a Double Circuit – Mon.
C1-102 M. CURY BRAZIL C1 - Session 1
Approach under Electric and Environmental Aspects and Aug. 31
Forced Shutdown Susceptibility
Brazil's Power Transmission Grid Geographic Database Mon.
C1-103 S. FEITOSA BRAZIL C1 - Session 2
Regulation Aug. 31
Mon.
C1-104 Development of a Resilient Master Plan For Dominica F. SPARAVIER BELGIUM C1 - Session 2
Aug. 31
Improving reliability and stability of supply industrial customer
Mon.
C1-105 by grid reinforcement and installation of intra-factory M PRZYGRODZKI POLAND C1 - Session 1
Aug. 31
generation
Multicriterial analyses and selection of the best option for
revitalization and development of the southern part of Not
C1-106 G. MAJSTROVIC CROATIA 0
Croatian 400 kV network and connection to the power system presented
of Bosnia and Herzegovina
Planning Studies for Connection of 500 MW Photovoltaic ENG. HISHAM AL Mon.
C1-107 GULF STATES C1 - Session 2
Power Plant to Oman Grid at Ibri RIYAMI Aug. 31
OPEX benchmarking exercise amongst GCC Transmission ENG. ABDULLAH Mon.
C1-108 GULF STATES C1 - Session 2
Utilities HASSAN Aug. 31
Sizing of the series and shunt compensation of the COA-WOA
Mon.
C1-109 interconnection and impacts on the maximum transfer ENG. AL-ASERI GULF STATES C1 - Session 1
Aug. 31
capacity
Techno-Economic Evaluation of 1500MW Generation
Mon.
C1-110 Connection to the Main Interconnected Transmission System ENG. AL SIYABI GULF STATES C1 - Session 2
Aug. 31
in Oman
A methodology to compute resilience indicators for the Italian Mon.
C1-111 E. CIAPESSONI ITALY C1 - Session 1
Transmission System Aug. 31
"Elicitation of Structured Expert Judgment to estimate the UNITED Mon.
C1-112 K BELL C1 - Session 1
probability of a major power system unreliability event " KINGDOM Aug. 31
Planning for 100% Variable Renewable Energy (VRE) on an Mon.
C1-113 P. TUSON SOUTH AFRICA C1 - Session 2
Island Power System Aug. 31
Development of Resilience Issues and Challenges in the SEERC Not
C1-114 K. REICH AUSTRIA 0
Region (South East European Regional Council of CIGRE) presented
Mon.
C1-115 Bulk System Planning Aiming to Improve System Resilience D. SEKIGUCHI JAPAN C1 - Session 1
Aug. 31
North Sea Wind Power Hub – System Configurations, Grid Mon.
C1-116 G. MISYRIS DENMARK C1 - Session 1
Implementationand Techno-economic Assessment Aug. 31
Software and hardware complex for making decisions on the
impact on power grid equipment, taking into account its Not
C1-117 A. GUSAROVA RUSSIA 0
technical condition and importance index using modern presented
methods of diagnostics and data processing
Economic and social Contribution from Red Electrica Group Mon.
C1-118 R. DE LA FUENTE SPAIN C1 - Session 2
Investments Aug. 31