ABOUT
VENTIA
OUR PURPOSE IS TO MAKE
INFRASTRUCTURE WORK FOR
OUR COMMUNITIES. We deliver on our values
BE ENTERPRISING LIVE INTEGRITY
Ventia provides operations, maintenance,
capital works, facilities and asset management
services, as well as telecommunications
and ICT solutions.
Our clients include utility asset owners,
industrial and commercial organisations, LIVE INTEGRITY
LIVE INTEGRITY
INTEGRITY BE ENTERPRISING
ENTERPRISING DELIVER
DELIVER DEMONSTRATE
government and environmental agencies. EXCELLENCE
EXCELLENCE LEADERSHIP
The sectors we operate in reflect the
diversity of our clients: electricity, water, gas,
communications, resources, renewables
and Defence. Our purpose is to make
infrastructure work for our communities, We bring our can-do attitude and the technology required to get the job done:
and our vision is to lead the way in
infrastructure services by harnessing the
power of technology.
We are an independent company formed
by a 50/50 investment partnership between
$$$
funds managed by Affiliates of Apollo Global DONE
DONESAFELY
SAFELY DONE COST
DONE COST DONE DONE
TOGETHER
Management and CIMIC. EFFECTIVELY
EFFECTIVELY TOGETHER
We have operations in Australia and New
Zealand.
VISIONSTREAM INFRASTRUCTURE SERVICES
FIXED & NBN/ ESSENTIAL FACILITIES INFRASTRUCTURE ENVIRONMENT
WIRELESS CHORUS MANAGEMENT MAINTENANCE AND ENGINEERING
SERVICES &
NETWORKS PRIVATE provides facilities focused on delivers engineering
NETWORKS and asset management operations, maintenance solutions and major
services to the health, and asset management projects across all sectors,
government, education, across essential as well as environmental
utilities and energy & infrastructure including remediation services.
resources sectors. water, electricity, gas,
roads, motorways and
tunnels.SAFETY – OUR
NUMBER ONE PRIORITY
AT VENTIA WE PUT SAFETY AND HEALTH ABOVE QUALITY SYSTEMS UNDERPINNING OUR DELIVERY
ALL ELSE.
Our safety culture is built on the foundation of the We operate under an Integrated Management System
Critical Risk Protocols. Our Critical Risk Protocols that meets the requirements of the following standards:
strengthen our focus on the safety risks we face on our
• ISO 9001:2008 - Quality Management Systems
projects and provide clarity about what is expected of us,
our contractors and subcontractors, when conducting • ISO 14001:2004 - Environmental Management
high-risk activities. Systems
• OHSAS 18001:2007 – Occupational Health & Safety
In addition to ensuring every effort is made to eliminate Management Systems
risk, the Critical Risk Protocols reinforce adherence to
• AS/NZS 4801:2001 - Occupational Health & Safety
our systems, standards and processes.
Management Systems.
OUR BRAND PILLARSELECTRICITY TRANSMISSION
AND DISTRIBUTION
VENTIA DELIVERS DESIGN AND Our Transmission and Distribution team Capabilities we deliver for our clients and
CONSTRUCTION, OPERATIONS AND partners with clients to support them their customers include:
MAINTENANCE FOR THE SAFE AND through the lifecycle of their asset - from • Construction and maintenance of
RELIABLE TRANSMISSION AND early project engagement, design, - transmission and sub-transmission
DISTRIBUTION OF ELECTRICITY. constructability assessment, turnkey overhead and underground lines
construction, testing and commissioning - transmission high voltage substations
to ongoing maintenance services. - overhead and underground distribution
assets
Working with our partners, our
• Pole and kiosk transformer upgrades
crews deliver overhead and underground
construction in brownfield and • Greenfield and brownfield new feeder and
greenfield environments, and have the overbuild construction
experience to manage stakeholders, • Substation commissioning
schedules, procurement and logistics, • Maintenance of transmission, distribution
quality and – most importantly – safety. and process plant electrical infrastructure
• High voltage testing of transformers,
generators, motors and switchboards.
DESIGN & We have relationships with proven
CONSTRUCTION reputable overseas manufacturers that
give us access to quality transmission line
Delivering high voltage substation and structures, conductors and componentry,
transmission line design and construct high voltage cables, substation
projects, Ventia brings multi-discipline transformers, switchgear and secondary
capability to assemble and project manage systems.
designers, equipment suppliers, planners,
field engineers, skilled construction and Our teams working on long-term
electrical workers and lineworkers. maintenance contracts routinely deliver
capital augmentation and renewal services
We team with specialist design partners for overhead and underground line
to deliver overhead transmission line, distribution networks.
substation, distribution and underground
projects at voltages up to 500kV. These capital works include customer-
funded works, ranging from new feeder
lines for mine sites, to capacity upgrades
for retail, industrial and commercial
businesses.MAINTENANCE & Some of the routine maintenance works our
ASSET OPTIMISATION crews perform include:
We provide a comprehensive range of • Reconductoring, including replacement
capital investment and maintenance and upgrade to Aerial Bundled Cable (ABC)
services to our transmission and • Pole, cross arm and tie replacements
distribution clients contributing directly • Pole top switch maintenance and
to the stable operations of their networks replacement
and reliability of supply to their customers.
• Earthing, connections and joints
Our knowledge in primary equipment and maintenance on distribution network
secondary/protection systems operation substations (415V–33kV)
and maintenance is diverse and includes • Transformer upgrades
experience across a variety of assets and • Recloser installations
diverse geographical locations.
• Network reinsulation.
This experience has allowed us to tailor a
Our asset optimisation services focus on
suite of capital projects and maintenance
maintaining reliability, maximising the
services that has assisted networks owners
useful life of network infrastructure,
to maximise the return on investment from
increasing transmission capabilities,
their assets over full asset life cycles.
reducing downtime and preventing
Our lineworker capability includes live line outages, always putting employee,
technologies (stick, glove and barrier, and contractor and community safety above
bare hand) on electricity networks up to all else.
500kV.
Our crews hold the appropriate licences to
carry out low voltage and high voltage
switching and issue permits working under
client safety system protocols.TRANSMISSION
& DISTRIBUTION
EXPERIENCE
CLIENT: Utility/Mining Client
CONTRACT: 132kV Mine Power Connection Project
LOCATION: South Australia
DURATION: June 2018-July 2019
Ventia was engaged to provide an entire high voltage
electrical infrastructure solution to supply and power a
new mine facility in outback South Australia.
A complete solution included the full design,
procurement and construction of a 50 kilometre
transmission line and 132/11kV, 3x 35MVA substation.
The transmission line comprised a 132kV, single circuit,
steel pole configuration with a 48 fibre OPGW.
Working in an extremely remote and challenging
environment, our team was responsible for the
engineering design, civil, structural, electrical,
communications and SCADA works, as well as testing
and commissioning of all plant.
The construction phase involved FIFO resource
rostering and close engagement with the local
indigenous community.
This new electricity supply was commissioned in July
2019, and will provide power to one of the largest new
copper-gold mines in Australia, including the on-site
processing plant and nearby village.
OUR PROJECTS
CLIENT: Energy Queensland (previously Services under this contract include: CLIENT: Stanwell
Ergon Energy and Energex) • Construction and maintenance activities CONTRACT: Inspection & Maintenance
CONTRACT: Construction and mainte- on overhead and underground low and LOCATION: Far North Queensland
nance of overhead and underground high voltage networks DURATION: 2016-2021
distribution assets
• Design and construct project delivery Ventia delivers ongoing asset inspection
LOCATION: Queensland
DURATION: 2004 to present • Civil works and maintenance services for the Kareeya
• Low and high voltage underground cable Hydro hydro-electric generator near Tully,
Ventia is a major services provider for jointing, associated cable and pre-com- Queensland.
• Ergon Energy’s distribution area in central missioning testing Operational since 1957, the local communi-
and northern Queensland • Live line and glove and barrier services ty relies on the station’s ability to start up
• Energex’s distribution network in quickly to ensure a secure and reliable
• Estimation, works planning services
southeast Queensland power supply.
including scope for construction
Crews periodically inspect and provide
• Notification and consultation with
maintenance services for the generator, as
customers
well as delivering minor capital works and
• Traffic planning, control and access. emergency response.From 2005-2018, Ventia delivered 40% of Western Power’s
outsourced distribution services, including: Contracted since 2004 delivering for Energy
• HV switching Queensland’s (Ergon Energy & Energex)
• Maintenance and construction outsourced distribution services.
• Transmission maintenance
• Emergency response
• Street light replacement and faults
• Urban and regional network locations Stanwell Limited since 2016 (5 years contract)
• Bush fire mitigation work • Distribution Construction & Maintenance
• Planning and scheduling • Asset inspection and maintenance
• Emergency response
Delivered Infrastructure works for Mining
COMPANIES LIKE:
• BMA (BHP Billiton/Mitsubishi Alliance)
• Rio Tinto
• Anglo American
- Transmission & Distribution
- Construction & Maintenance Contracted since 2005
- Asset Inspection delivering for Energex’s
- Emergency Response outsourced distribution
services.
Contracted since 2008
delivering AusNet Services’
outsourced distribution
services in urban and regional
locations:
• Distribution maintenance
and construction
• Sub-transmission
Contracted to design, construct From2001 to 2008, Ventia maintenance
and procure for the transmission provided 100% of United • Emergency response
line and substation required to Energy’s outsourced distribution • HV operating/switching
connect a mine to the network. services • Planning and scheduling.
2018-2019 • Distribution maintenance and
construction Engaged in July 2017 to replace
• Sub-transmission maintenance 1,076 air break switches along
• Metering and servicing with maintenance work on
• Public lighting TasNetwork’s network. Each of
• Emergency response Ventia’s crews consists of six
• HV operating/switching ‘glove and barrier’ line workers.
• Planning and scheduling.
CLIENT: Pacific Hydro CLIENT: Energex (for CLIENT: Beon Energy
CONTRACT: 132kV Macquarie Group, Thiess Solutions
transmission line conductor repairs and John Holland) CONTRACT: Conductor stringing for the
LOCATION: Kununurra, WA CONTRACT: Service relocations 132kV transmission line for the Moora-
DURATION: August – LOCATION: Brisbane, Qld bool Wind Farm Project
September 2017 DURATION: 2009-2012 LOCATION: Victoria
DURATION: 2018 - 2019
When serious damage to a conductor on a At 15 kilometres long, Brisbane’s Airport Link
132kV steel pole was discovered at Argyle is Australia’s longest tunnelled motorway and Ventia was engaged to provide steel pole
Dam in Western Australia, Pacific Hydro was built between 2008 and 2012. installation and line stringing services. Twin
sought a contractor who could work in a Ventia’s Airport Link team relocated Selenium conductor 61/3.25 AAAC and
difficult and remote environment. overhead lines and underground electricity OPGW 13.2 48F conductor were installed
Partnering with Powerlines Plus, Ventia services. During the construction period, the and
carried out the repair works. The hot team installed 53.6 kilometres of conduit, all relevant OPGS/OFC commissioning tests
weather, lack of vehicle access and 10 kilometres of high voltage cable, 7.3 were delivered under the project. In
helicopter use were all challenges that were kilometres of low voltage cable and 75 pits. a first for the client, Ventia used helicopter
managed with careful planning to success- stringing techniques to speed up the rollout
In addition to these service relocations, our
fully deliver the project in the client’s shut of the conductor across stages of the project.
crews delivered the temporary electrical works
down window. required to energise the project’s multiple,
heavy equipment-intensive work sites.You can also read