Environmental Monitoring Report

Project Number: 45021-002
Semestral Report (July - December 2020)
December 2020

People's Republic of China: Anhui Intermodal
Sustainable Transport Project

Prepared by Beijing Zhongzi Huayu Environmental Protection Technology Co., Ltd for the
Anhui Provincial Government and the Asian Development Bank

This environmental monitoring report is a document of the borrower. The views expressed herein do not
necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary
in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or
reference to a particular territory or geographic area in this document, the Asian Development Bank does
not intend to make any judgments as to the legal or other status of any territory or area.
Environmental Monitoring Report - Asian ...
China Anhui Multimodal Sustainable
  Transport Project Loaned by ADB
              No.3112

   Half Year Report of
     Environmental
       Supervision
                          No.13

Beijing Zhongzi Huayu Environmental Protection Technology Co.,
                             Ltd

                       December 2020

                              1
Environmental Monitoring Report - Asian ...
Project Name   Anhui Multimodal Sustainable Transport Project
               Loaned by ADB

Environmental Beijing Zhongzi Huayu Environmental Protection
Supervision   Technology Co., Ltd
Company

Environmental Ye Ping (EIA Engineer)
Supervision   Certificate No.: 0004693
engineer

Supervisors    Ye Ping

               Jiang Cheng

               Yang Wenchao

               Dong Xiang

               Sun Wenchao

                               2
Environmental Monitoring Report - Asian ...
Table of Contents
I.INTRODUCTION............................................................................................................................. 4
   A.REPORT PURPOSE AND RATIONALE ................................................................................................... 4
   B.PROJECT COMPONENTS AND PROGRESS ............................................................................................ 5
II.INSTITUTIONAL SET UP AND RESPONSIBILITIES FOR EMP IMPLEMENTATION ..... 9
   A.ENVIRONMENTAL MANAGEMENT AGENCIES AND RESPONSIBILITIES................................................ 9
   B. INCORPORATION OF ENVIRONMENTAL REQUIREMENTS INTO PROJECT CONTRACTUAL
   ARRANGEMENTS ................................................................................................................................. 11
III.PERFORMANCE OF PROJECT ENVIRONMENT MANAGEMENT .................................. 12
   A.THE PROJECT ENVIRONMENTAL MANAGEMENT SYSTEM, SITE-SPECIFIC ENVIRONMENTAL
   MANAGEMENT PLAN (SSEMP) AND WORK PLANS ............................................................................... 12
   B.STATUS OF COMPLIANCE WITH LOAN COVENANTS AND DMF INDICATORS..................................... 16
   C. IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES ....................................... 20
   D.SITE INSPECTIONS AND AUDIT ........................................................................................................ 24
IV.ENVIRONMENTAL MONITORING RESULTS ....................................................................... 31
   A.MONITORING PLAN AND RESPONSIBILITY ....................................................................................... 31
   B. ENVIRONMENTAL MONITORING PROGRAM AND QUALITY TARGETS ................................................ 33
   C. MONITORING RESULTS AND ANALYSIS ........................................................................................... 36
V.INFORMATION DISCLOSURE, PUBLIC CONSULTATION AND GRM ............................. 47
VI.INSTITUTIONAL STRENGTHENING AND TRAINING........................................................ 53
VII.KEY ENVIRONMENTAL ISSUES AND NEXT-STEP CORRECTIVE ACTION............... 55
VIII. CONCLUSION ........................................................................................................................... 59
   A.SUMMARIZATION OF EMP IMPLEMENTATION ................................................................................. 59
   B. PROBLEMS IDENTIFIED AND ACTIONS RECOMMENDED .................................................................. 60

                                                                        3
Environmental Monitoring Report - Asian ...
I.INTRODUCTION

A.Report Purpose and Rationale
    According to the project loan agreement and project agreement, the environmental
supervision report is undertaken by Beijing Zhongzi Huayu Environmental Protection
Technology Co., Ltd., an external independent environmental supervision unit, as part
of the environmental management plan. This report is the 13th environmental
monitoring report of Anhui multimodal sustainable transport project loaned by ADB.
The supervision time is from July 1, 2020 to December 31, 2020.
    Specific work contents: review the construction technical scheme of the
construction company, improve the relevant environmental protection contents; assist
the owner to review the environmental monitoring scheme during the construction
period, and review the environmental monitoring report and relevant data; carry out
environmental protection regulations and technical training for the construction
company and the supervision company; guide the construction company and the
supervision company to prepare the environmental quarterly report; carry out the
environmental monitoring on the construction site every quarter; to patrol and put
forward solutions for environmental problems every quarter; to accompany the owner
and relevant competent departments, ADB inspection team and environmental experts
on environmental site inspection and guidance, and to be responsible for answering
questions related to environmental protection; to help the owner prepare environmental
monitoring semi annual report (in Chinese and English) and submit it to ADB.
    The purpose of the report is to ensure the effective implementation of
environmental protection activities during the construction period and trial operation
period, so as to prevent, reduce or mitigate environmental impacts and risks, so as to
achieve the environmental protection objectives of the construction project, and
supervise, manage, inspect and guide the environmental protection work and
environmental protection measures proposed in the environmental impact assessment
report and its approval documents during the project construction, so as to prevent

environmental pollution, and to meet the environmental protection requirements of

                                          4
Environmental Monitoring Report - Asian ...
ADB projects and the environmental protection acceptance requirements of domestic
environmental protection authorities.
B.Project Components and Progress
     Anhui multimodal sustainable transport project loaned by ADB is the first foreign
capital construction project after the reform of investment system of national and
provincial trunk highway construction in Anhui Province. The project was listed by
National Development and Reform Commission and Ministry of Finance as an
alternative project planning for 2011-2013 of utilizing ADB loan in China, with a total
of US $200 million of foreign capital used for road network reconstruction and water
transport project construction in Anhui Province.
     The total investment of the comprehensive transportation infrastructure project in
Anhui Province is about 3.6 billion yuan, which is composed of central and provincial
subsidy funds, ADB loan funds and local supporting funds. The total amount of ADB
loan is 200 million US dollars, among which highway sub project loan is 150 million
US dollars, and water transport sub project loan is 50 million US dollars.
     The project takes the construction project of G206 Dongliu to Yaodu section of
Dongzhi County, the reconstruction project of Class I Highway S319 Erjun Road (Erba
to Wuwei) in Wuwei County, the reconstruction project of Kedian to Mujiating section
of Yimu highway in Nanling County, and the reconstruction project of S367 Ma’anshan
section (Northern passage) as the highway subprojects. The total mileage of these four
highways is 122.334km. The water transport subprojects are Shuiyang River Waterway
Improvement project of Anhui section of Wushen canal and Xuanzhou comprehensive
wharf project of Shuiyang River.

                            Table 1-1 composition of highway subprojects
       project name         Administrative area Highway design grade       Route length
  Reconstruction project
  of Kedian to Mujiating
    section of Nanling        Nanling County       First class highway      22.36km
     County of Yimu
         highway
 Reconstruction project
 of S319 Erjun Road
 (Erba to Wuwei) class I      Wuwei County         First class highway      36.52km
 Highway in Wuwei
 County
 Dongzhi County G206
 Dongliu     to   Yaodu
                             Dongzhi County        First class highway      16.58km
 section     construction
 project
                                               5
Environmental Monitoring Report - Asian ...
S367 Ma’anshan section
                            Hanshan County, he
(Northern       passage)                             Second Class highway           46.874km
                                 County
reconstruction project

                             Figure 1-1 location of highway subprojects

                       Table 1-2 composition of water transport subprojects
    project name           Administrative area        Design standard                 scale
   Shuiyang River                                                           Length:            50km,
     Waterway               Xuancheng City                Class IV          bottom width: 40m,
Improvement project                                                         water depth: 2.5m
                                                                            41000     ton      berths,
     Xuanzhou                                                               295m long and 20m
   Comprehensive             Xuancheng City                  -              wide,       with        a
    Wharf Project                                                           throughput        of   1.5
                                                                            million T / A

                           Figure 1-2 location of waterway subprojects

                                                 6
Environmental Monitoring Report - Asian ...
宣州综合码

As of the end of this reporting period, the progress of major projects is as follows:

                         Table 1-3 overall implementation of the project
    project name          Construction unit       Project supervision unit   Implementation
                                                                                 status

                                              7
Environmental Monitoring Report - Asian ...
Dongzhi         County    Anhui Road and Bridge
                                                          Anhui         Zhongxing
 G206 Dongliu to           Engineering   Co.,     Ltd.;
                                                          Engineering                    Completed
 Yaodu           section   Anhui Road and Port
                                                          Supervision Co., Ltd
 construction project      Engineering Co., Ltd
 Reconstruction                                           Anhui          Highway
                           Anhui Road and Port
 project    of    S319                                    Engineering
                           Engineering   Co.,     Ltd.;
 Erjun Road (Erba to                                      Supervision Co., Ltd.;
                           Liaoning Road and Bridge                                      Completed
 Wuwei)      class     I                                  Anhui     High     -class
                           Construction Group Co.,
 Highway in Wuwei                                         Highway Engineering
                           Ltd
 County                                                   Supervision Co., Ltd
 Reconstruction
 project of Kedian to      Jiangxi Yichun Highway         Jiangsu          Huaning
 Mujiating section of      Construction Group Co.,        Engineering Consulting         Completed
 Nanling County of         Ltd                            Supervision Co., Ltd
 Yimu highway
                           Anhui Road and Port
                           Engineering   Co.,     Ltd.;
 S367       Ma’anshan      Anhui     New          Road
 section    (Northern      Construction Engineering       Anhui          Hig-class
 passage)                  Group Co., Ltd.; China         Highway Engineering            Completed
 reconstruction            Railway   15th       Bureau    Supervision Co., Ltd
 project                   Group Co., Ltd.; Jiangxi
                           Road and Bridge Tunnel
                           Engineering Co., Ltd
 Shuiyang         River                                   Anhui Kexing Traffic
                           Liaoning Road and Bridge
 Waterway                                                 Engineering
                           Construction Group Co.,                                       Completed
 Improvement                                              Construction
                           Ltd
 project                                                  Supervision Co., Ltd
 Xuanzhou                                                 Anhui         Zhongxing
                           Anhui      Road        Port                                Phase I project is
 comprehensive                                            Engineering
                           Engineering Co., Ltd                                          completed
 Wharf Project                                            Supervision Co., Ltd
     By the end of December 2020, the construction project of Dongzhi County G206
Dongliu to Yaodu section, the reconstruction project of Erjun Road (Erba to Wuwei)
class I highway of S319 in Wuwei County, the renovation project of Shuiyang River,
the reconstruction project of Kedian to Mujiating section of Yimu road in Nanling
County, the S367 Ma’anshan section (Northern passage) and the first phase of
Xuanzhou         comprehensive       wharf      project of        Anhui multimodal sustainable
transportation subprojects loaned by ADB have been completed. (The ship lock and its
attached office buildings are still under implementation) and the second phase of
Xuanzhou comprehensive wharf project is about to start.

                                                     8
Environmental Monitoring Report - Asian ...
II. Institutional set up and responsibilities for EMP implementation

A.Environmental Management Agencies and Responsibilities

    During the construction and environmental management of Anhui multimodal
sustainable transport project loaned by ADB, it is implemented according to the
environmental management system diagram formulated in the environmental
management plan.

    The environmental management system is shown in Figure 2-1:

                                 Foreign    Capital     Project
                                   Management Office
                                 (Executive Institution)

                        feedback                                      feedback

        General Monitor Office                                  Beijing Zhongzi Huayu Environmental
           (Monitor Office)                                     Protection Technology Co., Ltd (External
                                                                Environment Monitoring Engineer)

                    Monitoring      Implementation Institutio            Monitoring

                 Monitoring                                               Monitoring
                                   Engineering         Monitoring
                                   Company
                    Monitoring                                       Monitoring

                                                 Contractor

                                          Construction Site

    Anhui Provincial Department of Transportation has designated its foreign funded
project management office (FFPMO) as the executive body of the project. FFPMO is
responsible for the overall project implementation and the performance of the loan
contract and environmental management plan (including the environmental monitoring
plan). Its specific responsibilities include integrated coordination and supervision,
procurement management and financial matters and institutional strengthening.

                                            9
There are 5 implementing agencies in total to ensure compliance with the
environmental management plan; regularly guide on-site inspection; coordinate
environmental quality monitoring to make it consistent with the approved monitoring
plan; serve as the access channel of local grievance compensation mechanism; submit
quarterly monitoring reports of contractors to FFPMO, provincial and local
environmental protection bureaus for confirmation.

     The responsibilities of environmental management are shown in table 2-1:
                   Table 2-1 environmental management and responsibilities
     stage       Responsible body                   Environmental responsibility
                       Design
                    organization          Prepare     project     feasibility study     report,
                  representing the   environmental impact report and environmental
                  project office of  management plan, resettlement plan and guide public
                   the Provincial    consultation
                    Department
                      Provincial
                   Environmental
                      Protection
                                          Review and approve the project environmental
    Project       Department and
                                     impact report and environmental management plan
  preparation         Municipal
     stage         Environmental
                 Protection Bureau
                      Technical
                      assistance          Provide technical assistance, review environmental
                   consultant for    impact reports and prepare environmental impact
                       project       assessment reports
                     preparation
                        Asian             Review and approve environmental impact
                    Development      assessment and environmental management plan and
                        Bank         make them public
                       Foreign
                                          Incorporate the mitigation measures in the
                 Investment Office
                                     environmental management plan into the detailed design
                 of Design Institute
                                     of the project; cooperate with the project office of the
                    on behalf of
                                     provincial department and the environmental supervision
                      Provincial
                                     engineer to update the environmental management plan
                    Department
                 Provincial Foreign       Employ external independent environmental
                 Investment Office supervision consultant through competitive bidding
  Engineering
                   Environmental
  design stage
                     supervision
                                          Review the updated environmental management plan
                  engineer, foreign
                                     and determine the mitigation measures to be included in
                 investment office
                                     the detailed design of the project
                    of Provincial
                    Department
                        Asian
                                          Approve the updated environmental management
                    Development
                                     plan and make it public
                        Bank
                                          Entrust an external environmental supervision unit to
  construction   Provincial Foreign supervise the effective implementation of the
     stage       Investment Office environmental management plan, coordinate the appeal
                                     mechanism within the project scope, prepare the quarterly
                                              10
stage      Responsible body                      Environmental responsibility
                                       and semi-annual environmental reports of the project and
                                       submit them to ADB to guide the public consultation and
                                       the implementation inspection of mitigation measures
                                             Provide advice on mitigation measures, provide
                                       comprehensive technical support to PMO and provincial
                                       department in environmental management; assist in
                                       preparation of bidding or contract documents; guide
                       External
                                       training; guide compliance review of semi-annual
                     independent
                                       environmental management plan; prepare corrective
                    environmental
                                       action plan; assist PMO in preparing semi-annual
                   supervision unit
                                       environmental report to ADB; review domestic
                                       environmental     acceptance    report    and     prepare
                                       environmental completion report. Assist the site office to
                                       accompany relevant inspection
                                             Urge the contractor to implement environmental
                   Director’s Office   protection measures and carry out environmental
                                       protection work
                                             Urge the contractor to implement environmental
                   Project resident    protection measures such as water environment,
                     supervision       atmosphere, solid waste and ecology, and regularly feed
                                       back to the external environmental supervision unit.
                       On-site
                                           Responsible for managing the daily supervision unit
                     management
                                            Assign responsibility for implementation of
                      Contractor       environmental management plan, define health and safety,
                                       implement measures and prepare method guide
                  Environmental
               monitoring station
               (sign contract with
                                           Undertake environmental quality monitoring
                        the
                 implementation
                       unit)
                    Provincial
                  Environmental
                    Protection
                Department and             Guide regular inspection of all construction projects
                       local           according to national laws and regulations
                  environmental
               protection bureaus
                  of subprojects
                                            According to the project standard, ensure the normal
                    Operation and      operation of the subproject, implement mitigation
                   maintenance unit    measures and guide the public consultation in the early
                                       stage of construction

B. Incorporation     of    Environmental      Requirements       into    Project    Contractual
Arrangements

    The environmental protection responsibilities of each construction unit stipulated
in the project contract are as follows: to implement the national and Anhui province
environmental protection laws, regulations, guidelines and policies; to divide
                                               11
environmental protection responsibilities in the construction area, to assign
environmental protection personnel or part-time personnel, to strengthen environmental
protection management; to formulate environmental protection management system, to
establish environmental protection archives, and to fully implement environmental
protection measures in the environmental impact assessment documents, water and soil
conservation scheme and approval documents, and environmental management plan in
the construction stage; accept the supervision of the environmental supervision
engineer to implement the environmental protection work in the construction stage;
regularly report the implementation of environmental protection measures in the
construction stage to the environmental supervision engineering; coordinate and
cooperate with the environmental monitoring station to monitor the environmental
quality status in the construction stage of the project, and supervise the construction
road; responsible for the environmental quality of the affected area; strictly abide by
the construction management system to ensure that the construction behavior does not
exceed the red line.
III. Performance of Project Environment Management

A.The Project Environmental Management System, site-specific environmental
management plan (SSEMP) and work plans

     Project Management Office

     FFPMO has established an environmental protection leading group, with FFPMO
director as the group leader and other department leaders as the Deputy group leaders
and members. The responsibilities of the environmental protection leading group
include: implementation of national and Anhui environmental laws, policies and
guidelines; organization and implementation of environmental protection training for
employees; Determination of environmental monitoring institutions; regular inspection
of environmental protection during construction, supervision of the implementation of
environmental protection measures by the contractor; coordination with local
environmental protection and Water Conservancy Bureau, so as to supervise and
manage the project; coordinate with ADB and submit quarterly progress report and
semi- annual environmental monitoring report to ADB.
               Table 3-2 list of implementation organizations of each subproject
            project                       Jurisdiction                 Implementing body

                                             12
Shuiyang waterway and                                      Provincial port investment
                                       Xuancheng City
       Xuanzhou Wharf                                                   group
 Kedian to Mujiating section of                                Nanling Transportation
                                       Nanling County
        Yimu highway                                                   Bureau
  S319 section from Erba to                                        Wuwei County
                                       Wuwei County
            Wuwei                                               Transportation Bureau
                                                                  Chizhou Highway
G206 Dongliu to Yaodu section          Dongzhi County
                                                                   Administration
  S367 MAANSHAN section
                                                                Ma’anshan Highway
       (North Passage)            Hanshan County, he County
                                                                  Administration
    Reconstruction project
     Environmental supervision and monitoring unit

     The environmental supervision engineer (ESE) is appointed by FFPMO through
public bidding held by Beijing Zhongzi Huayu Environmental Protection Technology
Co., Ltd. ESE is responsible for environmental monitoring of all subprojects.

     ESE has set up an environmental supervision project department for the project,
which is composed of general environmental consultant, environmental supervision
engineer and supervision personnel with relevant disciplines, professional
qualifications and experience. The general environmental consultant is an
environmental impact assessment engineer certified by the environmental protection
department, who is fully responsible for the environmental supervision of the whole
project and has independent decision-making power for environmental supervision
activities. Other on-site supervisors have educational background and experience in
environmental protection or related fields, and have obtained professional qualification
certificate for environmental supervision at the construction site. They are responsible
for conducting site inspections to ensure that the contractor implements environmental
protection measures in accordance with the recommended practices in the EMP and
approved domestic environmental impact reports.

     ESE reports directly to FFPMO and environmental experts of Anhui
Environmental Protection Department. ESE has the following responsibilities:
implement national and Anhui environmental laws, regulations, policies and guidelines;
assist in project preparation, including revision of environmental management plan;
assist in environmental capacity building and training; organize and supervise the
implementation of environmental protection measures and relevant requirements in
EMP, domestic environmental impact report and water and soil conservation Report;
organize daily management of environmental protection work. Conduct regular (once
a month for each subproject) and temporary (when environmental problems are found
                                            13
on site) on-site inspection on the Contractor’s environmental protection performance,
provide explanations if necessary, and supervise the implementation of various
environmental protection measures; identify environmental problems during the
implementation of subprojects, and formulate necessary remedial measures and action
plans; report quarterly progress; provide information for quarterly and semi-annual
environmental monitoring report; prepare documents and reports related to
environmental supervision.

     FFPMO has commissioned an environmental monitoring station (EMS), Anhui
Provincial Highway Engineering Testing Center for environmental quality monitoring
of subprojects to carry out environmental quality monitoring during the construction
period and operation period of the project.
     Construction unit

     The construction unit has established a site office, which is composed of
Engineering Technology Department, Planning and Contract department, Quality
Assurance Department, Finance Department, Material and Equipment Department,
General Office, Safety and Environmental Protection Department and other
departments.

     The environmental protection department of the construction unit has the
following responsibilities: to implement the national and Anhui environmental laws,
regulations, policies and guidelines; to designate special environmental personnel and
environmental responsibilities in each department of the construction site to strengthen
environmental protection management; to develop management system and filing
system for environmental protection; to implement various environmental protection
measures and EMP, national environmental impact report and relevant requirements in
the report of water and soil conservation; cooperate with the supervision of ESE to
implement the environmental protection measures during construction; report the
implementation of environmental protection measures to ESE regularly; coordinate and
cooperate with the environmental monitoring station to carry out environmental quality
monitoring on the construction site, and be responsible for the environmental quality in
the area affected by the construction site during this period; strictly abide by the
construction management system to ensure the construction activities are limited to the
red line.
                     Table 3-3 list of construction units of subprojects
                                           14
project                  Bid section                     Contractor
                                    01 Bid section      Anhui highway and Bridge Engineering
    G206 Dongliu to Yaodu
                                                                      Co., Ltd
           section
                                    02 Bid section      Anhui Road Port Engineering Co., Ltd
                                    01 Bid section      Anhui Road Port Engineering Co., Ltd
                                    02 Bid section      Liaoning Road and Bridge Construction
   S319 section from Erba to
                                                                   Group Co., Ltd
            Wuwei
                                    03 Bid section      Liaoning Road and Bridge Construction
                                                                   Group Co., Ltd
                                    01 Bid section      Jiangxi Yichun Highway Construction
  Kedian to Mujiating section                                      Group Co., Ltd
      of Yimu highway               02 Bid section      Jiangxi Yichun Highway Construction
                                                                   Group Co., Ltd
                                    01 Bid section      Anhui Road Port Engineering Co., Ltd
                                    02 Bid section          Anhui New Road Construction
    S367 Ma’anshan section                                   Engineering Group Co., Ltd
      (Northern passage)            03 Bid section      China Railway 15th Bureau Group Co.,
     reconstruction project                                              Ltd
                                    04 Bid section         Jiangxi Road and Bridge Tunnel
                                                                 Engineering Co., Ltd
      Shuiyang waterway                    -            Liaoning Road and Bridge Construction
         improvement                                               Group Co., Ltd
       Xuanzhou Wharf                      -            Anhui Road Port Engineering Co., Ltd
     Project supervision unit

     The project supervision unit shall supervise the construction of subprojects, and
be responsible for supervising the quality, progress, investment and safety of
construction projects. The construction supervision engineer has set up a site office,
which is composed of the following: project manager, project chief engineer,
engineering department, quality inspection department, laboratory, materials
department and finance department.
                            Table 3-4 list of supervision units of subprojects
         project                  Bid section                 Project supervision unit
     G206 Dongliu to         01 Bid section and 02    Anhui Zhongxing Engineering Supervision
      Yaodu section               Bid section                         Co., Ltd
                                 01Bid section         Anhui Highway Engineering Supervision
   S319 Erba to Wuwei                                                 Co., Ltd
     section project         02 Bid section and 03     Anhui high grade Highway Engineering
                                  Bid section                   Supervision Co., Ltd
   Kedian to Mujiating
                             01 Bid section and 02      Jiangsu Huaning engineering consulting
      section of Yimu
                                  Bid section                    Supervision Co., Ltd
          highway
     S367 Ma’anshan          01, 02, 03 and 04 Bid
     section (Northern              sections            Anhui High-class Highway Engineering
  passage) reconstruction                                       Supervision Co., Ltd
           project
      Shuiyang River               First level
                                                      Director office: Jiangsu Suke Construction
      comprehensive               organization
                                                            Project Management Co., Ltd
   improvement project

                                                 15
Shuiyang waterway                                         Anhui Kexing Traffic Engineering
          project                                             Construction Supervision Co., Ltd
      Xuanzhou port          Two level mechanism
                                                      Anhui Zhongxing Engineering Supervision
   comprehensive Wharf
                                                                     Co., Ltd
         Project

B.Status of compliance with Loan Covenants and DMF indicators
     Environmental management completed by the project management office
     Regular environmental management, organization of training, etc.
         Table 3-5 environmental management completed by Project Management Office
                                    project                        Implementation                 and
                                                                    description

                            Implement national and Anhui             Normal implementation.
                       Environmental           regulations,
                       policies and guidelines
  environmental             Organize and implement                   Normal implementation.
  management           environmental protection training
                       for employees
  work                      Determine the environmental              Normal implementation.
                       monitoring organization;
                            Regularly       check       the          Normal implementation.
                       environmental protection during
                       construction and supervise the
                       implementation of environmental
                       protection measures by the
                       contractor
                            Coordinate      with      local          Normal implementation.
                       environmental protection and
                       Water Conservancy Bureau to
                       supervise and manage the project
                            Coordinate with ADB and                  Normal implementation.
                       submit quarterly progress report
                       and semi-annual environmental
                       monitoring report to ADB.
     Management of the Contractor by environmental supervisor
     Daily patrol, issuance of environmental problem notice, monthly supervision
report (or quarterly report, subject to the actual situation), environmental supervision
report, etc.
               Table 3-6 management work of contractors by environment supervision
                                     project                          Implementation              and
                                                                        description

                            Implement national and Anhui
                                                                     Normal implementation.
                       Environmental           regulations,
                       policies and guidelines
                            Assist in project preparation,           During the reporting period, the
                       including        revision         of     health and safety plan in the
                       environmental management plan;           environmental management plan was
                                                 16
revised, requiring the sub project
                                                            contractors in the construction period
                                                            to formulate the epidemic prevention
                                                            plan during the new epidemic
  environmental
                                                            situation     according      to    the
  management
                                                            requirements of ADB, and accelerate
  work                                                      the implementation.
                          Supporting      environmental          No training was conducted
                     capacity building and training;        during the reporting period.
                          Organize and supervise the             Normal implementation, see
                     implementation of environmental        environmental      supervision     site
                     protection measures and relevant       inspection for details.
                     requirements in EMP and domestic
                     environmental impact report;
                          Organize        the       daily        Normal implementation, see
                     management of environmental            environmental      supervision site
                     protection work, conduct regular       inspection for details.
                     (once a month for each subproject)
                     and        temporary         (when
                     environmental problems are found
                     on site) on-site inspection on the
                     Contractor’s         environmental
                     protection performance, provide
                     explanations if necessary, and
                     supervise the implementation of
                     various environmental protection
                     measures;
                          Identify environmental issues          Normal implementation, see
                     during the implementation of           environmental      supervision site
                     subprojects and develop necessary      inspection for details.
                     remedial measures and action
                     plans;
                          Provide     information     for        Normal implementation, see
                     quarterly progress report and semi-    environmental      supervision site
                     annual environmental monitoring        inspection for details.
                     report; prepare documents and
                     reports related to environmental
                     supervision.

     Environmental management of contractors

     Organization, personnel and system, contractor's monthly or quarterly
Environmental Report
 Table 3-7 environmental supervision site inspection of Xuanzhou comprehensive Wharf Project

                                   project                              Implementation         and
                                                                         description

                          Implement the environmental
                                                                Normal implementation.
                     laws, regulations, policies and
                     guidelines of the state and Anhui
                     Province;
                          Each department at the                Normal implementation.
                     construction site shall designate

                                               17
special environmental personnel
                      with                   environmental
  environmental       responsibilities to strengthen
  management          environmental              protection
                      management;
  work
                            Develop management system             Normal implementation.
                      and       filing      system      for
                      environmental             protection,
                      implement various environmental
                      protection measures and relevant
                      requirements in EMP, national
                      environmental impact report and
                      soil and water conservation report
                      during the whole construction
                      period;
                            Cooperate        with     ESE         Normal implementation.
                      supervision       to      implement
                      environmental              protection
                      measures during construction;
                            Report the implementation of          Normal implementation.
                      environmental              protection
                      measures to ESE regularly;
                            Coordinate and cooperate               The whole project has been
                      with the environmental monitoring       completed and has entered trial
                      station       to     monitor      the   operation       stage.       Relevant
                      environmental quality of the            environmental monitoring report has
                      construction      site,    and     be   been received during the reporting
                      responsible for the environmental       period      from        environmental
                      quality in the area affected by the     monitoring institution.
                      construction site during this
                      period; strictly abide by the
                      construction management system
                      to ensure that the construction
                      activities are limited within the red
                      line.

      Implementation of environmental management plan
     For the measures proposed in the environmental management plan, check the
implementation point by point and item by item (applicable), put forward the analysis
and evaluation, praise and promote the good measures, and put forward the rectification
requirements for the problems.
                  Table 3-8 implementation of environmental management plan on site
  project        Environmental management plan                         Analysis and evaluation
            measures
                 Before commencement, assist the              According to the requirements of
            owner to check whether the                   environmental impact report and its reply
            construction organization of the             document,          the        construction
            contractor    has    designed     and        environmental protection measures are
            formulated       the      construction       formulated, and the opinions on rectifying
            environmental protection measures            the site inspection contents and the water
            according to the requirements of the         quality monitoring of Shuiyang River
  scene     environmental impact report, and put         during the construction period of

                                                 18
work       forward the rectification opinions and      Xuanzhou comprehensive wharf project
           suggestions;                                are put forward.

                Check       the     environmental          At present, this work is not ideal and
           management documents of the                 needs to be coordinated by all parties.
           construction    company      and     the
           supervising engineer, such as the
           construction environmental protection
           measures, the monthly Environmental
           Report of the project environmental
           supervisor and the contractor;
                Inspect     whether     the     site    Insufficient implementation of on-
           environmental protection staff and     site environmental protection staff and
           organization personnel are in place andorganization personnel, and adequate
           the implementation of environmental    implementation       of    environmental
           protection measures;                   protection measures.
                Put      forward      rectification     Through on-site inspection and
           suggestions for existing problems. For report, the existing problems and
           good practices, put forward promotion  rectification suggestions are put forward
           suggestions to the owner;              in detail, and the promotion suggestions
                                                  are put forward to the owner based on
                                                  good practices.
                Interview the affected population       This work has already been carried
           and propose management suggestions out in this reporting period and will be
           to the owner according to the survey shown in the second half-year report.
           and evaluation results.

   Table 3-9 document verification and implementation of environmental management plan
project         Environmental management plan                    Analysis and evaluation
           measures
                All construction units are required      At present, this work is not ideal and
           to provide the following information: needs to be coordinated by all parties.
file       project    environmental      protection
To         information, construction progress and
examine plan;
                environmental organizations of           The establishment of environmental
           PMO, County Transportation Bureau, institutions is well implemented.
           contractor and supervision company;
                The Contractor’s environmental           At present, this work is noarmally
           protection measures during the developed and needs to be coordinated by
           construction process, including the all parties. The contractor has been urged
           health and safety protection measures to prepare the health and safety
           of workers (the implementation of management plan focusing on epidemic
           epidemic prevention management plan prevention of COVID-19 according to the
           is the focus of this work during the requirements of ADB. The plan has been
           period of COVID-19 epidemic), and the reported and implemented.
           education of workers; code of conduct.

     Table 3-10 communication and implementation of environmental management plan
project                Environmental management                   Analysis and evaluation
                  plan measures

                                              19
During the inspection of Anhui          Through      the     annual
                     Road maintenance innovation             inspection of the delegation of
                     demonstration project loaned by         ADB,      the      environmental
                     ADB,        the       environmental
                     supervision unit shall communicate
                                                             protection action plan has been
  Communication      with the person in charge of            determined,        and        the
                     environmental protection work of        communication work has been
                     each construction unit about the        made up, and the platform and
                     implementation of environmental         channel for communication have
                     protection measures, and put            been       reorganized       and
                     forward               corresponding     strengthened.
                     improvement requirements for the
                     environmental protection related
                     work of each construction unit;
                          Establish a contact mechanism      Through the annual inspection of
                     with the contact person of the          the delegation of ADB, the
                     project supervision unit, exchange      environmental protection action
                     the contact information, and
                     communicate the contents and
                                                             plan has been determined, and
                     methods       of     environmental      the communication work has
                     supervision work in the future;         been made up, and the platform
                                                             and channel for communication
                                                             have been reorganized and
                                                             strengthened.
                          The members of the project              Through      the     annual
                     team shall timely feedback the          inspection of the delegation of
                     problems and conditions found           ADB,      the      environmental
                     during the supervision to the foreign
                     project management office and
                                                             protection action plan has been
                     actively implement the approval         determined,        and        the
                     requirements of the executing           communication work has been
                     agency.                                 made up, and the platform and
                                                             channel for communication have
                                                             been       reorganized       and
                                                             strengthened.

C. Implementation status of environmental mitigation measures
     According to the requirements of "Research Report of Anhui multimodal
sustainable transport project loaned by ADB" and environmental management plan
(EMP), combined with the characteristics of environmental impact of the project, the
environmental supervision work during the construction period of highway and water
transport subprojects is mainly implemented.

      Table 3-11 targeted requirements for environmental supervision of highway subproject
  Environmental              targeted requirements for construction site            Notes
  Factors
  Air               Each bid section is equipped with a sprinkler along the In different
  Environment       construction road, the road in and out of the yard for implementation
                    watering to reduce dust. In dry and hot summer or windy stages of the
                    weather, the frequency of watering is increased; the yard project, we pay
                    adopts fully closed operation, and there is no sensitive point attention to the
                    within 300m around the site. The mixing station adopts the environmental
                    fully enclosed operation mode, and standardized operation sensitive issues
                    training for operators is carried out; material shed, wind and in different
                                                20
rain proof facilities are set up for material stacking; the       periods, and
              filling height of transport vehicles does not exceed the          relevant
              height of protective fence of vehicle body, and tarpaulin is      environmental
              covered during transportation to prevent loss and scattering.     management
Water         The waste water from the mixing station and construction          has been
Environment   camp is recycled after sedimentation in the sedimentation         implemented.
              tank, and it is forbidden to be discharged into the external
              environment to pollute the water body; the machinery and
              vessels used in the construction process of bridges and
              culverts are inspected for oil leakage, so as to avoid oil
              leakage accidents in the construction process, thus polluting
              the water quality.
Acoustic      Low noise equipment is selected for construction; there is
Environment   no sound environment sensitive point within 300m around
              the selected site of mixing station; earthwork transportation
              is carried out by using the existing road to avoid traffic
              reasonably in the daytime; in densely populated areas, noise
              control requirements are strictly implemented at night, and
              piling, blasting and other high noise construction are
              prohibited.
Ecological    Before the construction of subgrade and temporary
Environment   construction site, the topsoil has been stripped and
              transported. Before construction, the construction personnel
              shall be trained to strictly protect the trees in the temporary
              land. Vegetation restoration should be carried out in the
              topsoil stacking area.At the same time, it needs to minimize
              the impact on wildlife.
Social        During the construction, the side ditch should be excavated
Environment   to ensure that the construction slurry does not enter the
              farmland and does not affect the farmland cultivation; the
              speed of construction vehicles should be strictly managed
              to avoid accidents; high noise construction at night (22:00-
              6:00 the next day) is strictly prohibited in the dense road
              sections of villages, hospitals and schools to avoid
              disturbing the residents; warning signs and safety signs
              should be set up near the construction site.
Solid Waste   The domestic garbage, waste building materials and
Management    packaging materials generated in the construction process
              of the project can be removed and transported in time.
              Construction materials stacking shed is specially set in the
              mixing station and construction camp to avoid materials
              scattering and dusting; multiple garbage cans are set in the
              construction site and mixing station to collect the domestic
              garbage generated by the construction personnel, and are
              regularly recovered and transported. Construction garbage
              and spoil generated in the construction process is mainly
              used for stacking and spoil ground, and part of it is used for
              compaction road and access road filling. Special attention
              should also be paid to excavation and filling, earthwork
              balance, and vegetation restoration of spoil and spoil
              ground.
Health  and   During the construction of the project, special attention
Safety        should be paid to the sanitation of the construction site and
Management    the safety of the construction personnel, and the
              occupational diseases of the construction personnel should
              be prevented at the same time. The temporary traffic
              management should pay attention to the evacuation of
                                            21
traffic to avoid the interference of public services. The
                   COVID-19 should also be paid special attention to during
                   the epidemic.

Table 3-12 specific requirements for environmental supervision of water transportation subproject

  Environmental           targeted requirements for construction site               Notes
  Factors
  Air           The yard is totally closed, and there is no sensitive point        In different
  Environment   within 300m around the site. The mixing station adopts the         implementation
                fully enclosed operation mode, and standardized operation          stages of the
                training for operators is carried out ; material shed, wind and    project, we pay
                rain proof facilities are set up for material stacking; the        attention to the
                filling height of transport vehicles does not exceed the           environmental
                height of protective fence of vehicle body, and tarpaulin is       sensitive issues
                covered during transportation to prevent loss and scattering.      in different
  Water         Septic tank is built in the office of the project to collect the   periods, and
  Environment   domestic sewage of construction personnel. The material            relevant
                yard of construction camp is covered by rain proof cloth           environmental
                during rainfall. During the construction of Xuanzhou wharf,        management
                it is suggested to set geotextile on one side of the river in      has been
                the leveling area of Xuanzhou comprehensive wharf site to          implemented.
                prevent soil loss and soil mass scattering and thus polluting
                the water body; in the construction of small Estuary Bridge,
                guardrail is set on the side of the river. In the future
                construction, the construction of guardrail should be
                strengthened to prevent mud from entering the water body
                to pollute water quality. It needs to pay attention to the
                protection of drinking water intake project (especially the
                regulation project of Shuiyang River)
  Acoustic      Low noise equipment is selected for construction; there is
  Environment   no sound environment sensitive point within 300m around
                the selected site of mixing station; earthwork transportation
                is carried out in the daytime, using the existing road to avoid
                traffic reasonably; in densely populated areas, noise control
                requirements are strictly implemented at night, and piling,
                blasting and other high noise construction are prohibited.
  Ecological    Before construction, the construction personnel shall be
  Environment   trained to strictly protect the trees in the temporary land.
  Social        The speed of construction vehicles is strictly managed to
  Environment   avoid accidents; it is strictly forbidden to carry out high
                noise construction at night (22:00-6:00 the next day) to
                avoid disturbing the residents; warning signs and safety
                signs should be set near the construction site.
  Solid Waste The domestic garbage, waste building materials and
  Management    packaging materials generated in the construction process
                of the project can be removed and transported in time.
                Construction materials stacking shed is specially set in the
                mixing station and construction camp to avoid materials
                scattering and dusting; multiple garbage cans are set in the
                construction site and mixing station to collect the domestic
                garbage generated by the construction personnel, and are
                regularly recovered and transported; construction garbage
                and spoil generated in the construction process is mainly
                used for stacking and spoil ground, and part of it is used for
                compaction road and access road filling. The increased soil
                resources of Xuanzhou multipurpose wharf should be
                                                22
protected. It needs to assess, clean up and manage the
                   contaminated land, and take corresponding disposal
                   measures.

     The task and objective of environmental supervision is to make suggestions to the
owner by investigating and evaluating the implementation of environmental protection
measures and the effect of mitigation measures during the construction period, so as to
ultimately ensure that the environmental protection work of the project meets the
requirements of the project environmental impact assessment document and its reply.

           Table 3-13 basic requirements for environmental supervision of the project
  Environmental Requirements of the Requirements of the Suggestions                           of
  Factors         Environmental Impact reply           document      to environmental
                  report                      environmental      impact supervision         and
                                              assessment                 management
  Air             The construction site Formulate dust control When the wind speed
  Environment     shall be surrounded by a measures                 for is high, the operation
                  hard closed enclosure of construction site and that is easy to produce
                  not less than 2 meters; transportation road, and dust           should      be
                  the temporary stacking close enclosure, stacking stopped.
                  yard shall use dust-proof and covering of materials
                  measures including being shall be implemented in Keep the surface of
                  fenced,        covered,etc; construction site.         construction working
                  vehicles shall transport                               face moist.
                  aggregate and asphalt
                  concrete          building
                  materials      shall     be
                  covered with awning; the
                  construction site area and
                  transportation channel
                  shall      be      watered
                  regularly to control dust.
  Water           The domestic sewage              -                     Bridge and water
  Environment     generated       by      the                            bank operation should
                  construction personnel is                              be set up to prevent
                  discharged into         the                            dropping and falling.
                  residents' toilets along
                  the line for treatment and
                  return to the field for
                  utilization.
  Acoustic        Low noise machinery Low noise equipment Mobile noise barriers
  Environment     and equipment shall be shall be selected and should be set up
                  used as far as possible; mobile noise barriers during                      the
                  construction time shall shall be set if necessary. construction of school
                  be reasonably arranged,                                adjacent      sections
                  night operation of high                                during the teaching
                  noise equipment shall be                               period.
                  avoided as far as
                  possible, and temporary
                  sound insulation barriers
                  shall be set in areas with
                  great noise impact
  Ecological            -                          -                     The vegetation along
  Environment                                                            the line shall be
                                                                         prevented from being

                                               23
damaged        during
                                                                             construction.
  Social               -                         Strengthen                  The construction site
  Environment                                    environmental               should     set     up
                                                 supervision         during environmental
                                                 construction        period, protection    bulletin
                                                 arrange construction time board to accept the
                                                 reasonably,            take supervision of the
                                                 effective       measures, public
                                                 strictly    control     the
                                                 impact of construction
                                                 dust, noise, waste water
                                                 and solid waste on the
                                                 surrounding
                                                 environment, and avoid
                                                 disturbing people during
                                                 construction.
  Solid Waste     The domestic garbage           Solid waste is properly Garbage collection
  Management      generated      by        the   disposed.     The       old bins       (including
                  construction personnel         pavement milling surface recyclable,          non
                  shall be properly stacked      layer, base old materials recyclable          and
                  and incorporated into the      and other wastes are hazardous            wastes)
                  garbage         collection     vigorously recycled, and shall be set up in the
                  system along the line; the     the construction waste construction site.
                  construction      garbage,     and domestic waste that
                  aggregate and asphalt          can not be recycled are
                  concrete           garbage     transported     to      the
                  generated shall be used        designated location of
                  for rural road filling; the    the             municipal
                  decoration         garbage     administration, and the
                  generated by the housing       environmental sanitation
                  construction shall be          department shall clear
                  recycled as far as             and transport them in
                  possible, and those that       time.
                  cannot be used shall be              The waste engine
                  properly stacked and sent      oil      produced        by
                  to the local garbage           mechanical maintenance
                  transfer and landfill sites.   and repair shall be
                                                 disposed             safely
                                                 according      to       the
                                                 requirements             of
                                                 hazardous            waste
                                                 management.

D.Site Inspections and Audit

Table 3-14 environmental supervision site inspection of Xuanzhou Comprehensive Wharf Project
 Xuanzhou Comprehensive Wharf Project (Shuiyang River low water movable dam and ship
 lock)

                                                 24
On-                                                                                geographi
  site                                                                               cal
  pictur                                                                             position
  es

Site description: the main works of Shuiyang River low water movable dam and ship lock of
Xuanzhou comprehensive wharf project have been completed. The picture shows the components
of the main project.The riverbed working surface of one side of the lock on site has been cleaned
and there is no construction leftover.

Table 3-15 environmental supervision site inspection of Xuanzhou Comprehensive Wharf Project
  Xuanzhou Comprehensive Wharf Project (Shuiyang River shiplock)

                                               25
G
                                                                                               e
                                                                                               o
                                                                                               gr
                                                                                               a
                                                                                               p
                                                                                               hi
                                                                                               ca
                                                                                               l
                                                                                               L
                                                                                               o
                                                                                               ca
 O
 n-                                                                                            ti
 sit
                                                                                               o
 e
 Pi                                                                                            n
 ct
 ur
 es

 Site description: the main project of Shuiyang River shiplock, a sub project of Xuanzhou
 comprehensive wharf project, has been completed. The picture shows the components of the main
 project. The river bed working face on one side of the shiplock has been cleaned up, and there is
 no construction remains. There are still a small amount of construction materials on the
 construction road on the side of the river embankment that have not been thoroughly cleared.

Table 3-16 environmental supervision site inspection of Xuanzhou Comprehensive Wharf Project
 Xuanzhou Comprehensive Wharf Project (Shuiyang River shiplock)

                                               26
G
                                                                                                e
                                                                                                o
                                                                                                gr
                                                                                                a
  O                                                                                             p
  n-                                                                                            hi
  sit                                                                                           ca
  e                                                                                             l
  Pi                                                                                            L
  ct                                                                                            o
  ur                                                                                            ca
  es                                                                                            ti
                                                                                                o
                                                                                                n

  Site description: the main project of Shuiyang River shiplock, a sub project of Xuanzhou
  comprehensive wharf project, has been completed. The picture shows the components of the main
  project. The river bed working face on one side of the shiplock has been cleaned up, and there is
  no construction remains.

Table 3-17 environmental supervision site inspection of Xuanzhou Comprehensive Wharf Project
  Xuanzhou Comprehensive Wharf Project (Shuiyang River shiplock)

                                                27
G
  O                                                                                        e
  n-                                                                                       o
  sit                                                                                      gr
  e                                                                                        a
  Pi                                                                                       p
  ct                                                                                       hi
  ur                                                                                       ca
  es                                                                                       l
                                                                                           L
                                                                                           o
                                                                                           ca
                                                                                           ti
                                                                                           o
                                                                                           n

  Site description: the main works of Shuiyang River shiplock, a sub project of Xuanzhou
  comprehensive wharf project, has been completed, and the whole construction working face has
  been cleaned up. The picture shows the dredging construction vessels clearing the cofferdam
  during the construction period of the shiplock.

Table 3-18 environmental supervision site inspection of Xuanzhou Comprehensive Wharf Project
  Xuanzhou Comprehensive Wharf Project (Shuiyang River ship lock management room)

                                             28
G
                                                                                            e
                                                                                            o
                                                                                            gr
                                                                                            a
                                                                                            p
 O                                                                                          hi
 n-                                                                                         ca
 sit                                                                                        l
 e                                                                                          L
 Pi                                                                                         o
 ct                                                                                         ca
 ur                                                                                         ti
 es                                                                                         o
                                                                                            n

 Site description: during the implementation of Shuiyang River shiplock management house, a
 sub project of Xuanzhou comprehensive wharf project, the construction site was set up with a
 civilized construction bulletin board, and the stacked earthwork was covered with a wind proof
 and dust suppression net.

Table 3-19 environmental supervision site inspection of Xuanzhou Comprehensive Wharf Project
 Xuanzhou Comprehensive Wharf Project (Shuiyang River ship lock management room)

                                             29
G
                                                                                                eo
                                                                                                gr
O                                                                                               ap
n-                                                                                              hi
sit                                                                                             ca
e                                                                                               l
Pi                                                                                              L
ct                                                                                              oc
ur                                                                                              at
es                                                                                              io
                                                                                                n

Site description: during the implementation of Shuiyang River shiplock management room of
Xuanzhou comprehensive wharf project, the materials in some construction areas were stacked
disorderly, the storage of raw material barrels was not standardized, and no rain proof and leakage
proof material shed was set up.

                                              30
IV. Environmental Monitoring Results

A.Monitoring Plan and Responsibility
    Monitoring plan and responsibilities of Anhui multimodal sustainable transport
project loaned by ADB during construction and operation: monitor the environmental
quality of each subproject according to the environmental monitoring plan formulated
in the project environmental impact report and environmental management
plan.Specific environmental monitoring programs and responsibilities are as follows:

Table 4-1 environmental monitoring scheme and responsibilities of highway subproject IV-G206
                                   Dongliu Yaodu section

  project   Monitoring parameters               Actuator                Supervisory body
                                                                        Chizhou Highway
                                                Dongzhi County          Administration
  air       TSP (total suspended particulate
                                                Environmental           Bureau,
  quality   matter)
                                                Monitoring Station      environmental
                                                                        supervision engineer
                                                                        Chizhou Highway
                                                Dongzhi County          Administration
  Noise     LAeq                                Environmental           Bureau,
                                                Monitoring Station      environmental
                                                                        supervision engineer
                                                                        Chizhou Highway
            PH, SS, ammonia nitrogen,           Dongzhi County          Administration
  Water
            potassium permanganate index        Environmental           Bureau,
  Quality
            and petroleum                       Monitoring Station      environmental
                                                                        supervision engineer
                                                                        Chizhou Highway
                                                                        Administration
  ecology   Species and number of birds         Ornithologist           Bureau,
                                                                        environmental
                                                                        supervision engineer

   Table 4-2 environmental monitoring scheme and responsibilities of highway subproject II -
                       Kedian to Mujiating section of Yimu highway

  project   Monitoring parameters               Actuator                Supervisory body
                                                                        Nanling County
                                                                        Transportation
  air       TSP (total suspended particulate    Environmental
                                                                        Bureau;
  quality   matter)                             monitoring station
                                                                        environmental
                                                                        supervision engineer
                                                                        Nanling County
                                                                        Transportation
                                                Environmental
  Noise     LAeq                                                        Bureau;
                                                monitoring station
                                                                        environmental
                                                                        supervision engineer
            PH, SS, ammonia nitrogen,                                   Nanling County
  Water                                         Environmental
            potassium permanganate index                                Transportation
  Quality                                       monitoring station
            and petroleum                                               Bureau;

                                               31
project     Monitoring parameters               Actuator                Supervisory body
                                                                         environmental
                                                                         supervision engineer

Table 4-3 environmental monitoring scheme and responsibilities of highway subproject III-S319
                                    from Erba to Wuwei

 project     Monitoring parameters               Actuator                Supervisory body
                                                                         Wuwei County
                                                                         Transportation
 air         TSP (total suspended particulate    Environmental
                                                                         Bureau;
 quality     matter)                             monitoring station
                                                                         environmental
                                                                         supervision engineer
                                                                         Wuwei County
                                                                         Transportation
                                                 Environmental
 Noise       LAeq                                                        Bureau;
                                                 monitoring station
                                                                         environmental
                                                                         supervision engineer
                                                                         Wuwei County
             PH, SS, ammonia nitrogen,
                                                                         Transportation
 Water       potassium permanganate              Environmental
                                                                         Bureau;
 Quality     ammonia nitrogen index and          monitoring station
                                                                         environmental
             petroleum
                                                                         supervision engineer

           Table 4-4 environmental monitoring scheme and responsibilities of Shuiyang River
                                      Regulation Project

project Monitoring parameters                   Actuator                 Supervisory body
                                                                         Anhui Provincial
air        TSP (total suspended particulate     Environmental            Investment Group;
quality    matter)                              monitoring station       environmental
                                                                         supervision engineer
                                                                         Anhui Provincial
                                                Environmental            Investment Group;
Noise      LAeq
                                                monitoring station       environmental
                                                                         supervision engineer
                                                                         Anhui Provincial
           PH, SS, ammonia nitrogen,
Water                                           Environmental            Investment Group;
           potassium permanganate index and
quality                                         monitoring station       environmental
           petroleum
                                                                         supervision engineer
                                                                         Anhui Provincial
                                                Environmental            Investment Group;
           SS
                                                monitoring station       environmental
                                                                         supervision engineer

             Table 4-5 environmental monitoring scheme and responsibilities of Xuanzhou
                                 comprehensive Wharf Project

 project     Monitoring parameters               Actuator                Supervisory body
                                                                         Anhui Hong Kong
 air         TSP (total suspended particulate    Environmental           Investment Group; 2;
 quality     matter)                             monitoring station      Environmental
                                                                         Supervision Engineer
                                                                         Anhui Hong Kong
                                                 Environmental           Investment Group; 2;
 Noise       LAeq
                                                 monitoring station      Environmental
                                                                         Supervision Engineer

                                                32