Environmental Monitoring Report Project Number: 45021-002 Semestral Report (July - December 2020) December 2020 People's Republic of China: Anhui Intermodal Sustainable Transport Project Prepared by Beijing Zhongzi Huayu Environmental Protection Technology Co., Ltd for the Anhui Provincial Government and the Asian Development Bank This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
China Anhui Multimodal Sustainable
Transport Project Loaned by ADB
No.3112
Half Year Report of
Environmental
Supervision
No.13
Beijing Zhongzi Huayu Environmental Protection Technology Co.,
Ltd
December 2020
1Project Name Anhui Multimodal Sustainable Transport Project
Loaned by ADB
Environmental Beijing Zhongzi Huayu Environmental Protection
Supervision Technology Co., Ltd
Company
Environmental Ye Ping (EIA Engineer)
Supervision Certificate No.: 0004693
engineer
Supervisors Ye Ping
Jiang Cheng
Yang Wenchao
Dong Xiang
Sun Wenchao
2Table of Contents
I.INTRODUCTION............................................................................................................................. 4
A.REPORT PURPOSE AND RATIONALE ................................................................................................... 4
B.PROJECT COMPONENTS AND PROGRESS ............................................................................................ 5
II.INSTITUTIONAL SET UP AND RESPONSIBILITIES FOR EMP IMPLEMENTATION ..... 9
A.ENVIRONMENTAL MANAGEMENT AGENCIES AND RESPONSIBILITIES................................................ 9
B. INCORPORATION OF ENVIRONMENTAL REQUIREMENTS INTO PROJECT CONTRACTUAL
ARRANGEMENTS ................................................................................................................................. 11
III.PERFORMANCE OF PROJECT ENVIRONMENT MANAGEMENT .................................. 12
A.THE PROJECT ENVIRONMENTAL MANAGEMENT SYSTEM, SITE-SPECIFIC ENVIRONMENTAL
MANAGEMENT PLAN (SSEMP) AND WORK PLANS ............................................................................... 12
B.STATUS OF COMPLIANCE WITH LOAN COVENANTS AND DMF INDICATORS..................................... 16
C. IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURES ....................................... 20
D.SITE INSPECTIONS AND AUDIT ........................................................................................................ 24
IV.ENVIRONMENTAL MONITORING RESULTS ....................................................................... 31
A.MONITORING PLAN AND RESPONSIBILITY ....................................................................................... 31
B. ENVIRONMENTAL MONITORING PROGRAM AND QUALITY TARGETS ................................................ 33
C. MONITORING RESULTS AND ANALYSIS ........................................................................................... 36
V.INFORMATION DISCLOSURE, PUBLIC CONSULTATION AND GRM ............................. 47
VI.INSTITUTIONAL STRENGTHENING AND TRAINING........................................................ 53
VII.KEY ENVIRONMENTAL ISSUES AND NEXT-STEP CORRECTIVE ACTION............... 55
VIII. CONCLUSION ........................................................................................................................... 59
A.SUMMARIZATION OF EMP IMPLEMENTATION ................................................................................. 59
B. PROBLEMS IDENTIFIED AND ACTIONS RECOMMENDED .................................................................. 60
3I.INTRODUCTION
A.Report Purpose and Rationale
According to the project loan agreement and project agreement, the environmental
supervision report is undertaken by Beijing Zhongzi Huayu Environmental Protection
Technology Co., Ltd., an external independent environmental supervision unit, as part
of the environmental management plan. This report is the 13th environmental
monitoring report of Anhui multimodal sustainable transport project loaned by ADB.
The supervision time is from July 1, 2020 to December 31, 2020.
Specific work contents: review the construction technical scheme of the
construction company, improve the relevant environmental protection contents; assist
the owner to review the environmental monitoring scheme during the construction
period, and review the environmental monitoring report and relevant data; carry out
environmental protection regulations and technical training for the construction
company and the supervision company; guide the construction company and the
supervision company to prepare the environmental quarterly report; carry out the
environmental monitoring on the construction site every quarter; to patrol and put
forward solutions for environmental problems every quarter; to accompany the owner
and relevant competent departments, ADB inspection team and environmental experts
on environmental site inspection and guidance, and to be responsible for answering
questions related to environmental protection; to help the owner prepare environmental
monitoring semi annual report (in Chinese and English) and submit it to ADB.
The purpose of the report is to ensure the effective implementation of
environmental protection activities during the construction period and trial operation
period, so as to prevent, reduce or mitigate environmental impacts and risks, so as to
achieve the environmental protection objectives of the construction project, and
supervise, manage, inspect and guide the environmental protection work and
environmental protection measures proposed in the environmental impact assessment
report and its approval documents during the project construction, so as to prevent
environmental pollution, and to meet the environmental protection requirements of
4ADB projects and the environmental protection acceptance requirements of domestic
environmental protection authorities.
B.Project Components and Progress
Anhui multimodal sustainable transport project loaned by ADB is the first foreign
capital construction project after the reform of investment system of national and
provincial trunk highway construction in Anhui Province. The project was listed by
National Development and Reform Commission and Ministry of Finance as an
alternative project planning for 2011-2013 of utilizing ADB loan in China, with a total
of US $200 million of foreign capital used for road network reconstruction and water
transport project construction in Anhui Province.
The total investment of the comprehensive transportation infrastructure project in
Anhui Province is about 3.6 billion yuan, which is composed of central and provincial
subsidy funds, ADB loan funds and local supporting funds. The total amount of ADB
loan is 200 million US dollars, among which highway sub project loan is 150 million
US dollars, and water transport sub project loan is 50 million US dollars.
The project takes the construction project of G206 Dongliu to Yaodu section of
Dongzhi County, the reconstruction project of Class I Highway S319 Erjun Road (Erba
to Wuwei) in Wuwei County, the reconstruction project of Kedian to Mujiating section
of Yimu highway in Nanling County, and the reconstruction project of S367 Ma’anshan
section (Northern passage) as the highway subprojects. The total mileage of these four
highways is 122.334km. The water transport subprojects are Shuiyang River Waterway
Improvement project of Anhui section of Wushen canal and Xuanzhou comprehensive
wharf project of Shuiyang River.
Table 1-1 composition of highway subprojects
project name Administrative area Highway design grade Route length
Reconstruction project
of Kedian to Mujiating
section of Nanling Nanling County First class highway 22.36km
County of Yimu
highway
Reconstruction project
of S319 Erjun Road
(Erba to Wuwei) class I Wuwei County First class highway 36.52km
Highway in Wuwei
County
Dongzhi County G206
Dongliu to Yaodu
Dongzhi County First class highway 16.58km
section construction
project
5S367 Ma’anshan section
Hanshan County, he
(Northern passage) Second Class highway 46.874km
County
reconstruction project
Figure 1-1 location of highway subprojects
Table 1-2 composition of water transport subprojects
project name Administrative area Design standard scale
Shuiyang River Length: 50km,
Waterway Xuancheng City Class IV bottom width: 40m,
Improvement project water depth: 2.5m
41000 ton berths,
Xuanzhou 295m long and 20m
Comprehensive Xuancheng City - wide, with a
Wharf Project throughput of 1.5
million T / A
Figure 1-2 location of waterway subprojects
6宣州综合码
As of the end of this reporting period, the progress of major projects is as follows:
Table 1-3 overall implementation of the project
project name Construction unit Project supervision unit Implementation
status
7Dongzhi County Anhui Road and Bridge
Anhui Zhongxing
G206 Dongliu to Engineering Co., Ltd.;
Engineering Completed
Yaodu section Anhui Road and Port
Supervision Co., Ltd
construction project Engineering Co., Ltd
Reconstruction Anhui Highway
Anhui Road and Port
project of S319 Engineering
Engineering Co., Ltd.;
Erjun Road (Erba to Supervision Co., Ltd.;
Liaoning Road and Bridge Completed
Wuwei) class I Anhui High -class
Construction Group Co.,
Highway in Wuwei Highway Engineering
Ltd
County Supervision Co., Ltd
Reconstruction
project of Kedian to Jiangxi Yichun Highway Jiangsu Huaning
Mujiating section of Construction Group Co., Engineering Consulting Completed
Nanling County of Ltd Supervision Co., Ltd
Yimu highway
Anhui Road and Port
Engineering Co., Ltd.;
S367 Ma’anshan Anhui New Road
section (Northern Construction Engineering Anhui Hig-class
passage) Group Co., Ltd.; China Highway Engineering Completed
reconstruction Railway 15th Bureau Supervision Co., Ltd
project Group Co., Ltd.; Jiangxi
Road and Bridge Tunnel
Engineering Co., Ltd
Shuiyang River Anhui Kexing Traffic
Liaoning Road and Bridge
Waterway Engineering
Construction Group Co., Completed
Improvement Construction
Ltd
project Supervision Co., Ltd
Xuanzhou Anhui Zhongxing
Anhui Road Port Phase I project is
comprehensive Engineering
Engineering Co., Ltd completed
Wharf Project Supervision Co., Ltd
By the end of December 2020, the construction project of Dongzhi County G206
Dongliu to Yaodu section, the reconstruction project of Erjun Road (Erba to Wuwei)
class I highway of S319 in Wuwei County, the renovation project of Shuiyang River,
the reconstruction project of Kedian to Mujiating section of Yimu road in Nanling
County, the S367 Ma’anshan section (Northern passage) and the first phase of
Xuanzhou comprehensive wharf project of Anhui multimodal sustainable
transportation subprojects loaned by ADB have been completed. (The ship lock and its
attached office buildings are still under implementation) and the second phase of
Xuanzhou comprehensive wharf project is about to start.
8II. Institutional set up and responsibilities for EMP implementation
A.Environmental Management Agencies and Responsibilities
During the construction and environmental management of Anhui multimodal
sustainable transport project loaned by ADB, it is implemented according to the
environmental management system diagram formulated in the environmental
management plan.
The environmental management system is shown in Figure 2-1:
Foreign Capital Project
Management Office
(Executive Institution)
feedback feedback
General Monitor Office Beijing Zhongzi Huayu Environmental
(Monitor Office) Protection Technology Co., Ltd (External
Environment Monitoring Engineer)
Monitoring Implementation Institutio Monitoring
Monitoring Monitoring
Engineering Monitoring
Company
Monitoring Monitoring
Contractor
Construction Site
Anhui Provincial Department of Transportation has designated its foreign funded
project management office (FFPMO) as the executive body of the project. FFPMO is
responsible for the overall project implementation and the performance of the loan
contract and environmental management plan (including the environmental monitoring
plan). Its specific responsibilities include integrated coordination and supervision,
procurement management and financial matters and institutional strengthening.
9There are 5 implementing agencies in total to ensure compliance with the
environmental management plan; regularly guide on-site inspection; coordinate
environmental quality monitoring to make it consistent with the approved monitoring
plan; serve as the access channel of local grievance compensation mechanism; submit
quarterly monitoring reports of contractors to FFPMO, provincial and local
environmental protection bureaus for confirmation.
The responsibilities of environmental management are shown in table 2-1:
Table 2-1 environmental management and responsibilities
stage Responsible body Environmental responsibility
Design
organization Prepare project feasibility study report,
representing the environmental impact report and environmental
project office of management plan, resettlement plan and guide public
the Provincial consultation
Department
Provincial
Environmental
Protection
Review and approve the project environmental
Project Department and
impact report and environmental management plan
preparation Municipal
stage Environmental
Protection Bureau
Technical
assistance Provide technical assistance, review environmental
consultant for impact reports and prepare environmental impact
project assessment reports
preparation
Asian Review and approve environmental impact
Development assessment and environmental management plan and
Bank make them public
Foreign
Incorporate the mitigation measures in the
Investment Office
environmental management plan into the detailed design
of Design Institute
of the project; cooperate with the project office of the
on behalf of
provincial department and the environmental supervision
Provincial
engineer to update the environmental management plan
Department
Provincial Foreign Employ external independent environmental
Investment Office supervision consultant through competitive bidding
Engineering
Environmental
design stage
supervision
Review the updated environmental management plan
engineer, foreign
and determine the mitigation measures to be included in
investment office
the detailed design of the project
of Provincial
Department
Asian
Approve the updated environmental management
Development
plan and make it public
Bank
Entrust an external environmental supervision unit to
construction Provincial Foreign supervise the effective implementation of the
stage Investment Office environmental management plan, coordinate the appeal
mechanism within the project scope, prepare the quarterly
10stage Responsible body Environmental responsibility
and semi-annual environmental reports of the project and
submit them to ADB to guide the public consultation and
the implementation inspection of mitigation measures
Provide advice on mitigation measures, provide
comprehensive technical support to PMO and provincial
department in environmental management; assist in
preparation of bidding or contract documents; guide
External
training; guide compliance review of semi-annual
independent
environmental management plan; prepare corrective
environmental
action plan; assist PMO in preparing semi-annual
supervision unit
environmental report to ADB; review domestic
environmental acceptance report and prepare
environmental completion report. Assist the site office to
accompany relevant inspection
Urge the contractor to implement environmental
Director’s Office protection measures and carry out environmental
protection work
Urge the contractor to implement environmental
Project resident protection measures such as water environment,
supervision atmosphere, solid waste and ecology, and regularly feed
back to the external environmental supervision unit.
On-site
Responsible for managing the daily supervision unit
management
Assign responsibility for implementation of
Contractor environmental management plan, define health and safety,
implement measures and prepare method guide
Environmental
monitoring station
(sign contract with
Undertake environmental quality monitoring
the
implementation
unit)
Provincial
Environmental
Protection
Department and Guide regular inspection of all construction projects
local according to national laws and regulations
environmental
protection bureaus
of subprojects
According to the project standard, ensure the normal
Operation and operation of the subproject, implement mitigation
maintenance unit measures and guide the public consultation in the early
stage of construction
B. Incorporation of Environmental Requirements into Project Contractual
Arrangements
The environmental protection responsibilities of each construction unit stipulated
in the project contract are as follows: to implement the national and Anhui province
environmental protection laws, regulations, guidelines and policies; to divide
11environmental protection responsibilities in the construction area, to assign
environmental protection personnel or part-time personnel, to strengthen environmental
protection management; to formulate environmental protection management system, to
establish environmental protection archives, and to fully implement environmental
protection measures in the environmental impact assessment documents, water and soil
conservation scheme and approval documents, and environmental management plan in
the construction stage; accept the supervision of the environmental supervision
engineer to implement the environmental protection work in the construction stage;
regularly report the implementation of environmental protection measures in the
construction stage to the environmental supervision engineering; coordinate and
cooperate with the environmental monitoring station to monitor the environmental
quality status in the construction stage of the project, and supervise the construction
road; responsible for the environmental quality of the affected area; strictly abide by
the construction management system to ensure that the construction behavior does not
exceed the red line.
III. Performance of Project Environment Management
A.The Project Environmental Management System, site-specific environmental
management plan (SSEMP) and work plans
Project Management Office
FFPMO has established an environmental protection leading group, with FFPMO
director as the group leader and other department leaders as the Deputy group leaders
and members. The responsibilities of the environmental protection leading group
include: implementation of national and Anhui environmental laws, policies and
guidelines; organization and implementation of environmental protection training for
employees; Determination of environmental monitoring institutions; regular inspection
of environmental protection during construction, supervision of the implementation of
environmental protection measures by the contractor; coordination with local
environmental protection and Water Conservancy Bureau, so as to supervise and
manage the project; coordinate with ADB and submit quarterly progress report and
semi- annual environmental monitoring report to ADB.
Table 3-2 list of implementation organizations of each subproject
project Jurisdiction Implementing body
12Shuiyang waterway and Provincial port investment
Xuancheng City
Xuanzhou Wharf group
Kedian to Mujiating section of Nanling Transportation
Nanling County
Yimu highway Bureau
S319 section from Erba to Wuwei County
Wuwei County
Wuwei Transportation Bureau
Chizhou Highway
G206 Dongliu to Yaodu section Dongzhi County
Administration
S367 MAANSHAN section
Ma’anshan Highway
(North Passage) Hanshan County, he County
Administration
Reconstruction project
Environmental supervision and monitoring unit
The environmental supervision engineer (ESE) is appointed by FFPMO through
public bidding held by Beijing Zhongzi Huayu Environmental Protection Technology
Co., Ltd. ESE is responsible for environmental monitoring of all subprojects.
ESE has set up an environmental supervision project department for the project,
which is composed of general environmental consultant, environmental supervision
engineer and supervision personnel with relevant disciplines, professional
qualifications and experience. The general environmental consultant is an
environmental impact assessment engineer certified by the environmental protection
department, who is fully responsible for the environmental supervision of the whole
project and has independent decision-making power for environmental supervision
activities. Other on-site supervisors have educational background and experience in
environmental protection or related fields, and have obtained professional qualification
certificate for environmental supervision at the construction site. They are responsible
for conducting site inspections to ensure that the contractor implements environmental
protection measures in accordance with the recommended practices in the EMP and
approved domestic environmental impact reports.
ESE reports directly to FFPMO and environmental experts of Anhui
Environmental Protection Department. ESE has the following responsibilities:
implement national and Anhui environmental laws, regulations, policies and guidelines;
assist in project preparation, including revision of environmental management plan;
assist in environmental capacity building and training; organize and supervise the
implementation of environmental protection measures and relevant requirements in
EMP, domestic environmental impact report and water and soil conservation Report;
organize daily management of environmental protection work. Conduct regular (once
a month for each subproject) and temporary (when environmental problems are found
13on site) on-site inspection on the Contractor’s environmental protection performance,
provide explanations if necessary, and supervise the implementation of various
environmental protection measures; identify environmental problems during the
implementation of subprojects, and formulate necessary remedial measures and action
plans; report quarterly progress; provide information for quarterly and semi-annual
environmental monitoring report; prepare documents and reports related to
environmental supervision.
FFPMO has commissioned an environmental monitoring station (EMS), Anhui
Provincial Highway Engineering Testing Center for environmental quality monitoring
of subprojects to carry out environmental quality monitoring during the construction
period and operation period of the project.
Construction unit
The construction unit has established a site office, which is composed of
Engineering Technology Department, Planning and Contract department, Quality
Assurance Department, Finance Department, Material and Equipment Department,
General Office, Safety and Environmental Protection Department and other
departments.
The environmental protection department of the construction unit has the
following responsibilities: to implement the national and Anhui environmental laws,
regulations, policies and guidelines; to designate special environmental personnel and
environmental responsibilities in each department of the construction site to strengthen
environmental protection management; to develop management system and filing
system for environmental protection; to implement various environmental protection
measures and EMP, national environmental impact report and relevant requirements in
the report of water and soil conservation; cooperate with the supervision of ESE to
implement the environmental protection measures during construction; report the
implementation of environmental protection measures to ESE regularly; coordinate and
cooperate with the environmental monitoring station to carry out environmental quality
monitoring on the construction site, and be responsible for the environmental quality in
the area affected by the construction site during this period; strictly abide by the
construction management system to ensure the construction activities are limited to the
red line.
Table 3-3 list of construction units of subprojects
14project Bid section Contractor
01 Bid section Anhui highway and Bridge Engineering
G206 Dongliu to Yaodu
Co., Ltd
section
02 Bid section Anhui Road Port Engineering Co., Ltd
01 Bid section Anhui Road Port Engineering Co., Ltd
02 Bid section Liaoning Road and Bridge Construction
S319 section from Erba to
Group Co., Ltd
Wuwei
03 Bid section Liaoning Road and Bridge Construction
Group Co., Ltd
01 Bid section Jiangxi Yichun Highway Construction
Kedian to Mujiating section Group Co., Ltd
of Yimu highway 02 Bid section Jiangxi Yichun Highway Construction
Group Co., Ltd
01 Bid section Anhui Road Port Engineering Co., Ltd
02 Bid section Anhui New Road Construction
S367 Ma’anshan section Engineering Group Co., Ltd
(Northern passage) 03 Bid section China Railway 15th Bureau Group Co.,
reconstruction project Ltd
04 Bid section Jiangxi Road and Bridge Tunnel
Engineering Co., Ltd
Shuiyang waterway - Liaoning Road and Bridge Construction
improvement Group Co., Ltd
Xuanzhou Wharf - Anhui Road Port Engineering Co., Ltd
Project supervision unit
The project supervision unit shall supervise the construction of subprojects, and
be responsible for supervising the quality, progress, investment and safety of
construction projects. The construction supervision engineer has set up a site office,
which is composed of the following: project manager, project chief engineer,
engineering department, quality inspection department, laboratory, materials
department and finance department.
Table 3-4 list of supervision units of subprojects
project Bid section Project supervision unit
G206 Dongliu to 01 Bid section and 02 Anhui Zhongxing Engineering Supervision
Yaodu section Bid section Co., Ltd
01Bid section Anhui Highway Engineering Supervision
S319 Erba to Wuwei Co., Ltd
section project 02 Bid section and 03 Anhui high grade Highway Engineering
Bid section Supervision Co., Ltd
Kedian to Mujiating
01 Bid section and 02 Jiangsu Huaning engineering consulting
section of Yimu
Bid section Supervision Co., Ltd
highway
S367 Ma’anshan 01, 02, 03 and 04 Bid
section (Northern sections Anhui High-class Highway Engineering
passage) reconstruction Supervision Co., Ltd
project
Shuiyang River First level
Director office: Jiangsu Suke Construction
comprehensive organization
Project Management Co., Ltd
improvement project
15Shuiyang waterway Anhui Kexing Traffic Engineering
project Construction Supervision Co., Ltd
Xuanzhou port Two level mechanism
Anhui Zhongxing Engineering Supervision
comprehensive Wharf
Co., Ltd
Project
B.Status of compliance with Loan Covenants and DMF indicators
Environmental management completed by the project management office
Regular environmental management, organization of training, etc.
Table 3-5 environmental management completed by Project Management Office
project Implementation and
description
Implement national and Anhui Normal implementation.
Environmental regulations,
policies and guidelines
environmental Organize and implement Normal implementation.
management environmental protection training
for employees
work Determine the environmental Normal implementation.
monitoring organization;
Regularly check the Normal implementation.
environmental protection during
construction and supervise the
implementation of environmental
protection measures by the
contractor
Coordinate with local Normal implementation.
environmental protection and
Water Conservancy Bureau to
supervise and manage the project
Coordinate with ADB and Normal implementation.
submit quarterly progress report
and semi-annual environmental
monitoring report to ADB.
Management of the Contractor by environmental supervisor
Daily patrol, issuance of environmental problem notice, monthly supervision
report (or quarterly report, subject to the actual situation), environmental supervision
report, etc.
Table 3-6 management work of contractors by environment supervision
project Implementation and
description
Implement national and Anhui
Normal implementation.
Environmental regulations,
policies and guidelines
Assist in project preparation, During the reporting period, the
including revision of health and safety plan in the
environmental management plan; environmental management plan was
16revised, requiring the sub project
contractors in the construction period
to formulate the epidemic prevention
plan during the new epidemic
environmental
situation according to the
management
requirements of ADB, and accelerate
work the implementation.
Supporting environmental No training was conducted
capacity building and training; during the reporting period.
Organize and supervise the Normal implementation, see
implementation of environmental environmental supervision site
protection measures and relevant inspection for details.
requirements in EMP and domestic
environmental impact report;
Organize the daily Normal implementation, see
management of environmental environmental supervision site
protection work, conduct regular inspection for details.
(once a month for each subproject)
and temporary (when
environmental problems are found
on site) on-site inspection on the
Contractor’s environmental
protection performance, provide
explanations if necessary, and
supervise the implementation of
various environmental protection
measures;
Identify environmental issues Normal implementation, see
during the implementation of environmental supervision site
subprojects and develop necessary inspection for details.
remedial measures and action
plans;
Provide information for Normal implementation, see
quarterly progress report and semi- environmental supervision site
annual environmental monitoring inspection for details.
report; prepare documents and
reports related to environmental
supervision.
Environmental management of contractors
Organization, personnel and system, contractor's monthly or quarterly
Environmental Report
Table 3-7 environmental supervision site inspection of Xuanzhou comprehensive Wharf Project
project Implementation and
description
Implement the environmental
Normal implementation.
laws, regulations, policies and
guidelines of the state and Anhui
Province;
Each department at the Normal implementation.
construction site shall designate
17special environmental personnel
with environmental
environmental responsibilities to strengthen
management environmental protection
management;
work
Develop management system Normal implementation.
and filing system for
environmental protection,
implement various environmental
protection measures and relevant
requirements in EMP, national
environmental impact report and
soil and water conservation report
during the whole construction
period;
Cooperate with ESE Normal implementation.
supervision to implement
environmental protection
measures during construction;
Report the implementation of Normal implementation.
environmental protection
measures to ESE regularly;
Coordinate and cooperate The whole project has been
with the environmental monitoring completed and has entered trial
station to monitor the operation stage. Relevant
environmental quality of the environmental monitoring report has
construction site, and be been received during the reporting
responsible for the environmental period from environmental
quality in the area affected by the monitoring institution.
construction site during this
period; strictly abide by the
construction management system
to ensure that the construction
activities are limited within the red
line.
Implementation of environmental management plan
For the measures proposed in the environmental management plan, check the
implementation point by point and item by item (applicable), put forward the analysis
and evaluation, praise and promote the good measures, and put forward the rectification
requirements for the problems.
Table 3-8 implementation of environmental management plan on site
project Environmental management plan Analysis and evaluation
measures
Before commencement, assist the According to the requirements of
owner to check whether the environmental impact report and its reply
construction organization of the document, the construction
contractor has designed and environmental protection measures are
formulated the construction formulated, and the opinions on rectifying
environmental protection measures the site inspection contents and the water
according to the requirements of the quality monitoring of Shuiyang River
scene environmental impact report, and put during the construction period of
18work forward the rectification opinions and Xuanzhou comprehensive wharf project
suggestions; are put forward.
Check the environmental At present, this work is not ideal and
management documents of the needs to be coordinated by all parties.
construction company and the
supervising engineer, such as the
construction environmental protection
measures, the monthly Environmental
Report of the project environmental
supervisor and the contractor;
Inspect whether the site Insufficient implementation of on-
environmental protection staff and site environmental protection staff and
organization personnel are in place andorganization personnel, and adequate
the implementation of environmental implementation of environmental
protection measures; protection measures.
Put forward rectification Through on-site inspection and
suggestions for existing problems. For report, the existing problems and
good practices, put forward promotion rectification suggestions are put forward
suggestions to the owner; in detail, and the promotion suggestions
are put forward to the owner based on
good practices.
Interview the affected population This work has already been carried
and propose management suggestions out in this reporting period and will be
to the owner according to the survey shown in the second half-year report.
and evaluation results.
Table 3-9 document verification and implementation of environmental management plan
project Environmental management plan Analysis and evaluation
measures
All construction units are required At present, this work is not ideal and
to provide the following information: needs to be coordinated by all parties.
file project environmental protection
To information, construction progress and
examine plan;
environmental organizations of The establishment of environmental
PMO, County Transportation Bureau, institutions is well implemented.
contractor and supervision company;
The Contractor’s environmental At present, this work is noarmally
protection measures during the developed and needs to be coordinated by
construction process, including the all parties. The contractor has been urged
health and safety protection measures to prepare the health and safety
of workers (the implementation of management plan focusing on epidemic
epidemic prevention management plan prevention of COVID-19 according to the
is the focus of this work during the requirements of ADB. The plan has been
period of COVID-19 epidemic), and the reported and implemented.
education of workers; code of conduct.
Table 3-10 communication and implementation of environmental management plan
project Environmental management Analysis and evaluation
plan measures
19During the inspection of Anhui Through the annual
Road maintenance innovation inspection of the delegation of
demonstration project loaned by ADB, the environmental
ADB, the environmental
supervision unit shall communicate
protection action plan has been
Communication with the person in charge of determined, and the
environmental protection work of communication work has been
each construction unit about the made up, and the platform and
implementation of environmental channel for communication have
protection measures, and put been reorganized and
forward corresponding strengthened.
improvement requirements for the
environmental protection related
work of each construction unit;
Establish a contact mechanism Through the annual inspection of
with the contact person of the the delegation of ADB, the
project supervision unit, exchange environmental protection action
the contact information, and
communicate the contents and
plan has been determined, and
methods of environmental the communication work has
supervision work in the future; been made up, and the platform
and channel for communication
have been reorganized and
strengthened.
The members of the project Through the annual
team shall timely feedback the inspection of the delegation of
problems and conditions found ADB, the environmental
during the supervision to the foreign
project management office and
protection action plan has been
actively implement the approval determined, and the
requirements of the executing communication work has been
agency. made up, and the platform and
channel for communication have
been reorganized and
strengthened.
C. Implementation status of environmental mitigation measures
According to the requirements of "Research Report of Anhui multimodal
sustainable transport project loaned by ADB" and environmental management plan
(EMP), combined with the characteristics of environmental impact of the project, the
environmental supervision work during the construction period of highway and water
transport subprojects is mainly implemented.
Table 3-11 targeted requirements for environmental supervision of highway subproject
Environmental targeted requirements for construction site Notes
Factors
Air Each bid section is equipped with a sprinkler along the In different
Environment construction road, the road in and out of the yard for implementation
watering to reduce dust. In dry and hot summer or windy stages of the
weather, the frequency of watering is increased; the yard project, we pay
adopts fully closed operation, and there is no sensitive point attention to the
within 300m around the site. The mixing station adopts the environmental
fully enclosed operation mode, and standardized operation sensitive issues
training for operators is carried out; material shed, wind and in different
20rain proof facilities are set up for material stacking; the periods, and
filling height of transport vehicles does not exceed the relevant
height of protective fence of vehicle body, and tarpaulin is environmental
covered during transportation to prevent loss and scattering. management
Water The waste water from the mixing station and construction has been
Environment camp is recycled after sedimentation in the sedimentation implemented.
tank, and it is forbidden to be discharged into the external
environment to pollute the water body; the machinery and
vessels used in the construction process of bridges and
culverts are inspected for oil leakage, so as to avoid oil
leakage accidents in the construction process, thus polluting
the water quality.
Acoustic Low noise equipment is selected for construction; there is
Environment no sound environment sensitive point within 300m around
the selected site of mixing station; earthwork transportation
is carried out by using the existing road to avoid traffic
reasonably in the daytime; in densely populated areas, noise
control requirements are strictly implemented at night, and
piling, blasting and other high noise construction are
prohibited.
Ecological Before the construction of subgrade and temporary
Environment construction site, the topsoil has been stripped and
transported. Before construction, the construction personnel
shall be trained to strictly protect the trees in the temporary
land. Vegetation restoration should be carried out in the
topsoil stacking area.At the same time, it needs to minimize
the impact on wildlife.
Social During the construction, the side ditch should be excavated
Environment to ensure that the construction slurry does not enter the
farmland and does not affect the farmland cultivation; the
speed of construction vehicles should be strictly managed
to avoid accidents; high noise construction at night (22:00-
6:00 the next day) is strictly prohibited in the dense road
sections of villages, hospitals and schools to avoid
disturbing the residents; warning signs and safety signs
should be set up near the construction site.
Solid Waste The domestic garbage, waste building materials and
Management packaging materials generated in the construction process
of the project can be removed and transported in time.
Construction materials stacking shed is specially set in the
mixing station and construction camp to avoid materials
scattering and dusting; multiple garbage cans are set in the
construction site and mixing station to collect the domestic
garbage generated by the construction personnel, and are
regularly recovered and transported. Construction garbage
and spoil generated in the construction process is mainly
used for stacking and spoil ground, and part of it is used for
compaction road and access road filling. Special attention
should also be paid to excavation and filling, earthwork
balance, and vegetation restoration of spoil and spoil
ground.
Health and During the construction of the project, special attention
Safety should be paid to the sanitation of the construction site and
Management the safety of the construction personnel, and the
occupational diseases of the construction personnel should
be prevented at the same time. The temporary traffic
management should pay attention to the evacuation of
21traffic to avoid the interference of public services. The
COVID-19 should also be paid special attention to during
the epidemic.
Table 3-12 specific requirements for environmental supervision of water transportation subproject
Environmental targeted requirements for construction site Notes
Factors
Air The yard is totally closed, and there is no sensitive point In different
Environment within 300m around the site. The mixing station adopts the implementation
fully enclosed operation mode, and standardized operation stages of the
training for operators is carried out ; material shed, wind and project, we pay
rain proof facilities are set up for material stacking; the attention to the
filling height of transport vehicles does not exceed the environmental
height of protective fence of vehicle body, and tarpaulin is sensitive issues
covered during transportation to prevent loss and scattering. in different
Water Septic tank is built in the office of the project to collect the periods, and
Environment domestic sewage of construction personnel. The material relevant
yard of construction camp is covered by rain proof cloth environmental
during rainfall. During the construction of Xuanzhou wharf, management
it is suggested to set geotextile on one side of the river in has been
the leveling area of Xuanzhou comprehensive wharf site to implemented.
prevent soil loss and soil mass scattering and thus polluting
the water body; in the construction of small Estuary Bridge,
guardrail is set on the side of the river. In the future
construction, the construction of guardrail should be
strengthened to prevent mud from entering the water body
to pollute water quality. It needs to pay attention to the
protection of drinking water intake project (especially the
regulation project of Shuiyang River)
Acoustic Low noise equipment is selected for construction; there is
Environment no sound environment sensitive point within 300m around
the selected site of mixing station; earthwork transportation
is carried out in the daytime, using the existing road to avoid
traffic reasonably; in densely populated areas, noise control
requirements are strictly implemented at night, and piling,
blasting and other high noise construction are prohibited.
Ecological Before construction, the construction personnel shall be
Environment trained to strictly protect the trees in the temporary land.
Social The speed of construction vehicles is strictly managed to
Environment avoid accidents; it is strictly forbidden to carry out high
noise construction at night (22:00-6:00 the next day) to
avoid disturbing the residents; warning signs and safety
signs should be set near the construction site.
Solid Waste The domestic garbage, waste building materials and
Management packaging materials generated in the construction process
of the project can be removed and transported in time.
Construction materials stacking shed is specially set in the
mixing station and construction camp to avoid materials
scattering and dusting; multiple garbage cans are set in the
construction site and mixing station to collect the domestic
garbage generated by the construction personnel, and are
regularly recovered and transported; construction garbage
and spoil generated in the construction process is mainly
used for stacking and spoil ground, and part of it is used for
compaction road and access road filling. The increased soil
resources of Xuanzhou multipurpose wharf should be
22protected. It needs to assess, clean up and manage the
contaminated land, and take corresponding disposal
measures.
The task and objective of environmental supervision is to make suggestions to the
owner by investigating and evaluating the implementation of environmental protection
measures and the effect of mitigation measures during the construction period, so as to
ultimately ensure that the environmental protection work of the project meets the
requirements of the project environmental impact assessment document and its reply.
Table 3-13 basic requirements for environmental supervision of the project
Environmental Requirements of the Requirements of the Suggestions of
Factors Environmental Impact reply document to environmental
report environmental impact supervision and
assessment management
Air The construction site Formulate dust control When the wind speed
Environment shall be surrounded by a measures for is high, the operation
hard closed enclosure of construction site and that is easy to produce
not less than 2 meters; transportation road, and dust should be
the temporary stacking close enclosure, stacking stopped.
yard shall use dust-proof and covering of materials
measures including being shall be implemented in Keep the surface of
fenced, covered,etc; construction site. construction working
vehicles shall transport face moist.
aggregate and asphalt
concrete building
materials shall be
covered with awning; the
construction site area and
transportation channel
shall be watered
regularly to control dust.
Water The domestic sewage - Bridge and water
Environment generated by the bank operation should
construction personnel is be set up to prevent
discharged into the dropping and falling.
residents' toilets along
the line for treatment and
return to the field for
utilization.
Acoustic Low noise machinery Low noise equipment Mobile noise barriers
Environment and equipment shall be shall be selected and should be set up
used as far as possible; mobile noise barriers during the
construction time shall shall be set if necessary. construction of school
be reasonably arranged, adjacent sections
night operation of high during the teaching
noise equipment shall be period.
avoided as far as
possible, and temporary
sound insulation barriers
shall be set in areas with
great noise impact
Ecological - - The vegetation along
Environment the line shall be
prevented from being
23damaged during
construction.
Social - Strengthen The construction site
Environment environmental should set up
supervision during environmental
construction period, protection bulletin
arrange construction time board to accept the
reasonably, take supervision of the
effective measures, public
strictly control the
impact of construction
dust, noise, waste water
and solid waste on the
surrounding
environment, and avoid
disturbing people during
construction.
Solid Waste The domestic garbage Solid waste is properly Garbage collection
Management generated by the disposed. The old bins (including
construction personnel pavement milling surface recyclable, non
shall be properly stacked layer, base old materials recyclable and
and incorporated into the and other wastes are hazardous wastes)
garbage collection vigorously recycled, and shall be set up in the
system along the line; the the construction waste construction site.
construction garbage, and domestic waste that
aggregate and asphalt can not be recycled are
concrete garbage transported to the
generated shall be used designated location of
for rural road filling; the the municipal
decoration garbage administration, and the
generated by the housing environmental sanitation
construction shall be department shall clear
recycled as far as and transport them in
possible, and those that time.
cannot be used shall be The waste engine
properly stacked and sent oil produced by
to the local garbage mechanical maintenance
transfer and landfill sites. and repair shall be
disposed safely
according to the
requirements of
hazardous waste
management.
D.Site Inspections and Audit
Table 3-14 environmental supervision site inspection of Xuanzhou Comprehensive Wharf Project
Xuanzhou Comprehensive Wharf Project (Shuiyang River low water movable dam and ship
lock)
24On- geographi
site cal
pictur position
es
Site description: the main works of Shuiyang River low water movable dam and ship lock of
Xuanzhou comprehensive wharf project have been completed. The picture shows the components
of the main project.The riverbed working surface of one side of the lock on site has been cleaned
and there is no construction leftover.
Table 3-15 environmental supervision site inspection of Xuanzhou Comprehensive Wharf Project
Xuanzhou Comprehensive Wharf Project (Shuiyang River shiplock)
25G
e
o
gr
a
p
hi
ca
l
L
o
ca
O
n- ti
sit
o
e
Pi n
ct
ur
es
Site description: the main project of Shuiyang River shiplock, a sub project of Xuanzhou
comprehensive wharf project, has been completed. The picture shows the components of the main
project. The river bed working face on one side of the shiplock has been cleaned up, and there is
no construction remains. There are still a small amount of construction materials on the
construction road on the side of the river embankment that have not been thoroughly cleared.
Table 3-16 environmental supervision site inspection of Xuanzhou Comprehensive Wharf Project
Xuanzhou Comprehensive Wharf Project (Shuiyang River shiplock)
26G
e
o
gr
a
O p
n- hi
sit ca
e l
Pi L
ct o
ur ca
es ti
o
n
Site description: the main project of Shuiyang River shiplock, a sub project of Xuanzhou
comprehensive wharf project, has been completed. The picture shows the components of the main
project. The river bed working face on one side of the shiplock has been cleaned up, and there is
no construction remains.
Table 3-17 environmental supervision site inspection of Xuanzhou Comprehensive Wharf Project
Xuanzhou Comprehensive Wharf Project (Shuiyang River shiplock)
27G
O e
n- o
sit gr
e a
Pi p
ct hi
ur ca
es l
L
o
ca
ti
o
n
Site description: the main works of Shuiyang River shiplock, a sub project of Xuanzhou
comprehensive wharf project, has been completed, and the whole construction working face has
been cleaned up. The picture shows the dredging construction vessels clearing the cofferdam
during the construction period of the shiplock.
Table 3-18 environmental supervision site inspection of Xuanzhou Comprehensive Wharf Project
Xuanzhou Comprehensive Wharf Project (Shuiyang River ship lock management room)
28G
e
o
gr
a
p
O hi
n- ca
sit l
e L
Pi o
ct ca
ur ti
es o
n
Site description: during the implementation of Shuiyang River shiplock management house, a
sub project of Xuanzhou comprehensive wharf project, the construction site was set up with a
civilized construction bulletin board, and the stacked earthwork was covered with a wind proof
and dust suppression net.
Table 3-19 environmental supervision site inspection of Xuanzhou Comprehensive Wharf Project
Xuanzhou Comprehensive Wharf Project (Shuiyang River ship lock management room)
29G
eo
gr
O ap
n- hi
sit ca
e l
Pi L
ct oc
ur at
es io
n
Site description: during the implementation of Shuiyang River shiplock management room of
Xuanzhou comprehensive wharf project, the materials in some construction areas were stacked
disorderly, the storage of raw material barrels was not standardized, and no rain proof and leakage
proof material shed was set up.
30IV. Environmental Monitoring Results
A.Monitoring Plan and Responsibility
Monitoring plan and responsibilities of Anhui multimodal sustainable transport
project loaned by ADB during construction and operation: monitor the environmental
quality of each subproject according to the environmental monitoring plan formulated
in the project environmental impact report and environmental management
plan.Specific environmental monitoring programs and responsibilities are as follows:
Table 4-1 environmental monitoring scheme and responsibilities of highway subproject IV-G206
Dongliu Yaodu section
project Monitoring parameters Actuator Supervisory body
Chizhou Highway
Dongzhi County Administration
air TSP (total suspended particulate
Environmental Bureau,
quality matter)
Monitoring Station environmental
supervision engineer
Chizhou Highway
Dongzhi County Administration
Noise LAeq Environmental Bureau,
Monitoring Station environmental
supervision engineer
Chizhou Highway
PH, SS, ammonia nitrogen, Dongzhi County Administration
Water
potassium permanganate index Environmental Bureau,
Quality
and petroleum Monitoring Station environmental
supervision engineer
Chizhou Highway
Administration
ecology Species and number of birds Ornithologist Bureau,
environmental
supervision engineer
Table 4-2 environmental monitoring scheme and responsibilities of highway subproject II -
Kedian to Mujiating section of Yimu highway
project Monitoring parameters Actuator Supervisory body
Nanling County
Transportation
air TSP (total suspended particulate Environmental
Bureau;
quality matter) monitoring station
environmental
supervision engineer
Nanling County
Transportation
Environmental
Noise LAeq Bureau;
monitoring station
environmental
supervision engineer
PH, SS, ammonia nitrogen, Nanling County
Water Environmental
potassium permanganate index Transportation
Quality monitoring station
and petroleum Bureau;
31project Monitoring parameters Actuator Supervisory body
environmental
supervision engineer
Table 4-3 environmental monitoring scheme and responsibilities of highway subproject III-S319
from Erba to Wuwei
project Monitoring parameters Actuator Supervisory body
Wuwei County
Transportation
air TSP (total suspended particulate Environmental
Bureau;
quality matter) monitoring station
environmental
supervision engineer
Wuwei County
Transportation
Environmental
Noise LAeq Bureau;
monitoring station
environmental
supervision engineer
Wuwei County
PH, SS, ammonia nitrogen,
Transportation
Water potassium permanganate Environmental
Bureau;
Quality ammonia nitrogen index and monitoring station
environmental
petroleum
supervision engineer
Table 4-4 environmental monitoring scheme and responsibilities of Shuiyang River
Regulation Project
project Monitoring parameters Actuator Supervisory body
Anhui Provincial
air TSP (total suspended particulate Environmental Investment Group;
quality matter) monitoring station environmental
supervision engineer
Anhui Provincial
Environmental Investment Group;
Noise LAeq
monitoring station environmental
supervision engineer
Anhui Provincial
PH, SS, ammonia nitrogen,
Water Environmental Investment Group;
potassium permanganate index and
quality monitoring station environmental
petroleum
supervision engineer
Anhui Provincial
Environmental Investment Group;
SS
monitoring station environmental
supervision engineer
Table 4-5 environmental monitoring scheme and responsibilities of Xuanzhou
comprehensive Wharf Project
project Monitoring parameters Actuator Supervisory body
Anhui Hong Kong
air TSP (total suspended particulate Environmental Investment Group; 2;
quality matter) monitoring station Environmental
Supervision Engineer
Anhui Hong Kong
Environmental Investment Group; 2;
Noise LAeq
monitoring station Environmental
Supervision Engineer
32You can also read