Master Programme Health Science - Prevention and Health Promotion (MHS)
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Welcome and Introduction Winter term 2020/2021 Master Programme Health Science – Prevention and Health Promotion (MHS) Technical University of Munich Department of Sport and Health Sciences Munich, October 27, 2020 Prof. Dr. rer. nat. et med. habil. Stefanie Klug, MPH
Department of Sport and Health Sciences
Office of the Dean, Management, Director of
Course Management
Dean Managing
Director
Prof. Dr. med.
Renate Dr. Till Lorenzen
Oberhoffer
Dean of Studies Dean of Studies Director of Course
B.Sc./ M.Sc. for Teachers Management
Master Health
Prof. Dr. Prof. Dr. Science
Leonie Filip Mess
Sundmacher Prof. Dr. rer. nat. et
med. habil.
Stefanie Klug, MPH
2Postal address: Directions: Automobile: Public transportation: Georg-Brauchle-Ring 60/62 Via the U1, Bus lines 143, 175 80992 Munich Middle Ring About 5 min from the OEZ 5
Master of
Health Science –
Prevention and Health Promotion, M.Sc.
Technical University of Munich
Department of Sport and Health Sciences
6Statistics on application procedures for the
winter term 2020/2021
Applicants for the M.Sc. Health Science – Prevention and Health
Promotion 2020/21
Total number of applicants 388
direct admission 86
direct rejection 171
admission for interview 68
Admissions 31
Rejections / not show 37
total admissions 117
Accepted 73
Enrolled 47
Status as of October 21, 2020
7MHS Data of Origins
All Applications All Admissions
Origin Bachelor degree n=388 n=117
Germany 108 65
Nigeria 50 6
India 29 1 Accepted (n=73)
Ghana 23 4
Bangladesh 20 1 Gender
United States (USA) 18 7 M 7 10%
Pakistan 15 3 W 66 90%
China 11 1
Lebanon 10 3 Age Minimum Maximum Mean
Egypt 8 2 21 43 26,5
Canada 7 2
United Kingdom 7 2
Iran 6 1
Turkey 5 3
Taiwan (Republic of China) 4 3
Brazil 3 1
Eritrea 3 1
Nepal 3 1
Netherlands 3 1
Czech Republic 3 1
Hungary 3 1
Australia 2 1
Austria 2 1
Belgium 1 1
Indonesia 1 1
Japan 1 1
Mexico 1 1
Russian Federation 1 1
8Components of
Master of Health Science at TUM
Health and Prevention Bio Applied
Society Psycho Methods
Health Social
Promotion Scientific
Evidence
9Educational Organization: 5 central units
1 2 3
2 3
3
1
*
*
*
*
4
4
55
* will be offered solely in German in the winter term 2020/21 10Course enrollment: 1. Semester
Schulte-Coerne
11Module coordinators – 1st Semester
Required modules:
Andrea Göttler, M.Sc. (Health and Society)
Prof. Dr. Stefanie Klug, MPH (Scientific Data Processing)
Prof. Dr. Stefanie Klug, MPH (Study Design; Ethics Research)
Elective modules:
Prof. Dr. Hauner (Nutrition - Health Science Research)
Prof. Dr. Joachim Hermsdörfer (Physical Activity – Health Science Research)
Dr. phil. habil Felix Ehrlenspiel (Psychology – Health Science Research)
Prof. Dr. Leonie Sundmacher (Gesundheitsökonomie – Health Science Research)
12Timetable
Dates in winter term 2020/21
• Freshman Reception
Monday, Nov. 02, 2020, from 3:00 p.m. onwards online – see: https://www.tum.de/en/about-
tum/news/events/welcome-at-tum/
• Dates (winter term)
Is available for download from: www.sg.tum.de
(Study programs „News“/ Important Information)
• Lecture period: 02.11.2020 – 12.02.2020
• Lecture registration period: 28.10.2020 – 29.10.2020
• Exam registration period: 16.11.2020 – 27.11.2020
• Examination period: 13.02.2020 – 06.03.2020
• Withdrawal from examinations: 29.01.2021Important information about your study program:
Important information about M.Sc. Health Science you can find on
www.sg.tum.de Study programs M.Sc. Health Science Downloads
e.g.: structure of modules:
https://www.sg.tum.de/fileadmin/tuspfsp/www/Studiengaenge/2Masterstudiengaenge_M.Sc/2
MSC_HS/20200921_MHS_Modular_Structure_WS2021.pdf
e.g.: Academic and Examination Regulations (FPSO) of M.Sc. Health Science:
https://www.sg.tum.de/fileadmin/tuspfsp/www/Studiengaenge/2Masterstudiengaenge_M.Sc/2
MSC_HS/20191009_Lesb._F._FPSO_MA_Health_Science_mit_4._AES_vom_09.10.19.pdf
15Academic progress check (Studienfortschrittskontrolle) §10, General academic and Examination regulations for Bachelor and Master Programs (APSO) at the Technische Universität München: Moreover, in Master programs the following number of credits must be earned in the modules specified in the pertinent FPSO (departmental study and examination regulations) (§38): 1. a minimum of 30 credits by the end of the third semester in which the student is registered for courses awarding credits toward the degree; 2. a minimum of 60 credits by the end of the fourth semester in which the student is registered for courses awarding credits toward the degree; 3. a minimum of 90 credits by the end of the fifth semester in which the student is registered for courses awarding credits toward the degree; 4. a minimum of 120 credits by the end of the sixth semester in which the student is registered for courses awarding credits toward the degree semester. s. https://portal.mytum.de/archiv/kompendium_rechtsangelegenheiten/apso/folder_listing s.https://www.sg.tum.de/fileadmin/tuspfsp/www/Studiengaenge/2Masterstudiengaenge_M.Sc/2MSC_HS/20 191009_Lesb._F._FPSO_MA_Health_Science_mit_4._AES_vom_09.10.19.pdf 16
5
Master Thesis 5
• General regulations applying to the Master thesis can be found in the general
academic and examination regulations (APSO) and the departmental study and
examination regulations (FPSO).
• You have to register for your thesis after you have identified your topic and had it
approved by your principal advisor. You can get registration forms at the office for
exam management and organisation.
• The permissible amount of time that may elapse between registering for and
5
submitting the thesis is specified in the FPSO of your degree program and comprises
12 weeks.
• For the preparation of the Master thesis, 30 credits will be awarded. Calculated in
hours, this is equivalent to a workload of approximately 900 hours for the thesis.
• Once your thesis is finished, you have to submit it within the corresponding deadline.
• The APSO stipulate that, as a rule, the thesis is to be assessed within two months
from the date of submission (§ 18 (11) APSO).
• For the period in which you are working on your thesis at TUM, from registration to
submission, (+ where applicable, any supplementary requirements in conjunction
with your thesis, such as a final colloquium or oral exam) you must remain enrolled in
your degree program (cp. § 6 (3), APSO).
e.g.: Academic and Examination Reagulations (FPSO) of M.Sc. Health Science:
https://www.sg.tum.de/fileadmin/tuspfsp/www/Studiengaenge/2Masterstudiengaenge_M.Sc/2MSC_HS/20191009_Lesb._F._FPSO
_MA_Health_Science_mit_4._AES_vom_09.10.19.pdfCareer Opportunities
The Health Science program prepares students for work in
- Research
- Prevention
- Rehabilitation
- Planning and management of care
- Public Health
- Epidemiology
- Health care systems
- Health economics
- Health politics
- Digital Health
- And many many more opportunities…
18Career Opportunities
Potential areas of employment:
- Prevention centers
- Rehabilitation centers
- Planning, conduct and evaluation of prevention and health promotion programs
e.g. in companies
- Service providers (e.g. pension, health or care insurances)
- Health research e.g. at the University
- Ministeries of Health, Governments, national and local health authorities
- Pharmaceutical industry, Start-up companies
- World Health Organization, NGO‘s
19Contact person for requests at
Technical University of Munich
and the Department
meet and talk to them at the faculty fair afterwards!!
https://www.sg.tum.de/studium/aktuelle-
informationen/infos-fuer-erstsemester/virtuelle-
erstsemestermesse/
20Studienberatung Fakultät für Sport- und Gesundheitswissenschaften Technische Universität München Team Academic and Student Affairs Executive Officers Daniela Pfarr • daniela.pfarr@tum.de Grade and Examination management Beate Hufnagel • beate.hufnagel@tum.de Evaluation: Leonie Herrmann • leonie.herrmann@tum.de
Studienberatung
Fakultät für Sport- und Gesundheitswissenschaften
Technische Universität München
Departmental Student Advisory Service
Departmental Student Advisor (B.Sc. / M.Sc.)
Annette Bauer (Dipl. Soz.-Wiss.)
studienberatung.sg@tum.de
Phone: +49 89 – 289 – 24798
Office hours: currently no personal
consultation hours
Telephone consultation hour: Wed, 08 – 10 a.m.
https://www.sg.tum.de/en/study-programs/student-advisory-service/Studienberatung
Fakultät für Sport- und Gesundheitswissenschaften
Technische Universität München
Lehrveranstaltungsmanagement
Course management
Olena Garmash
E-Mail: lehrveranstaltungsplanung.sg@tum.de
Adresse: Georg-Brauchle-Ring 60, Zimmer: R 611
Tel.: +49 - 89 - 289 - 24763
http://www.sg.tum.de/studium/studierende/lehrveranstaltungs-anmeldung/
http://www.sg.tum.de/en/study-programs/students/information-about-courses/Studienberatung
Fakultät für Sport- und Gesundheitswissenschaften
Technische Universität München
International Office
Student exchange at our department
Application:
from 3. sem. Bachelor‘s and 1. sem. Master‘s
once a year:
in October/November TUMexchange = worldwide
in January Erasmus = Europe Fotonachweis Stock Fotos
good language skills required
Gabriele Fried
International Affairs
Delegate
Working days: Tuesday and
Friday
phone 089 289 24625
sg.international@tum.de Fotonachweis Stock Fotos
Gabriele Fried (TUM) | International Affairs Delegate | 27.10.20 1Studienberatung
Fakultät für Sport- und Gesundheitswissenschaften
Technische Universität München
Gender and Diversity Office
Culture of diversity and inclusion
Promoting diversity and equity as core values of the department
Support and counselling in case of discrimination
Culture of Gender equality
Diversity-sensitive study conditions diversity and and equal
inclusion opportunities
Barrier-free education
Family-friendly structures (for students with children)
Support for equal participation at TUM
Diversity in research and teaching
Yearly diversity awards for diversity-sensitive student theses
Diversity in Diversity-
research and friendly study
teaching conditions
Contact: Andrea Goettler
Georg-Brauchle-Ring 62, Campus D, L 616
Mail: AndreaGoettler@tum.de
Phone: 089 289 24694IT-Support / TUMonline
Services:
TUM Account & TUMCard
E-Mail
Online Storage
Software & Hardware IT-Support
Internet & WiFi E-Mail: it-support@tum.de
Mobile Apps
Phone: +49.89.289.17123
Study Management with TUMonline
Web: www.it.tum.de
eLearning with Moodle
Computer Workplaces
Printing & Scanning
Online CollaborationUniversity Library - Technical University Munich
Student Card Databases
E-Books Courses
Media
Study Areas OPAC
Books
Get in contact with our
First Level Hotline: www.ub.tum.de
Consulting hour starts at 10:30 am via
zoom. We are happy to see you!
© Adobe Stock - LichtmeisterLLL
Lehr- und Lernlabor
(Teaching and educational Lab)
Project Lab & Devices for Students
Workshops
For Seminar-Projects, Degree Thesises…
Dr. Fabian Stöcker
Lehr- und LernzentrumDepartment of Sport and Health Sciences
Continuing Education
TUM Sport and Health for Life
Additional qualifications and
licenses for the fitness and
health market
Accepted by health insurance
companies, health institutions
and associations
Approve for the ECTS in the free
elective area
Over 40 different courses on
sports, exercise and health
Further informations about our courses
www.sg.tum.de/weiterbildungTUM Sport and Health for Life
Fakultät für Sport- und Gesundheitswissenschaften
Technische Universität München
University Sports Center
The Spirit of Sports
Program and booking online: www.zhs-muenchen.de/en
www.facebook.com/zhsmuenchen/
www.instagram.com/zhs_muenchen/Fachschaft Sport und Gesundheit
Student Council Sports and Health
3And what are we doing?
Inform students about the study program, internship and job offers and further education
opportunities at the faculty.
areas of responsibility:
• Higher education policy (faculty council, examination board, student council, ...)
•
• Events (parties, winter tournament day, regulars' table, freshmen days ...)
• Merchandise
3Digital first semester fair
Following this presentation at
https://www.sg.tum.de/en/study-programs/news/first-semester-
students/virtual-freshman-fair/We are looking forward to your
participation in the
Master of
Health Science!
We wish you lots of fun, hard work, and
much success for your studies!
34You can also read