NETWORK PRICE LIST: ANCILLARY NETWORK SERVICES - 2020-2021 Version 1.0 Effective 1 July 2020 - Endeavour ...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Document Amendment History
Version No. Publication Date Comments
1.0 20 May 2020 Final
Disclaimer
Endeavour Energy may change the information in this document without notice. All changes take effect on the
date made by Endeavour Energy.TABLE OF CONTENTS 1. Introduction .................................................................................................................................1 2. Network Price List - Ancillary Network Services (ANS) ................................................................1 3. Enquiries .....................................................................................................................................1 4. Ancillary network services ...........................................................................................................1 5. Ancillary network service charges ...............................................................................................1 6. Labour Rates ............................................................................................................................19 7. ANS Definitions .........................................................................................................................20 8. Additional Information for Excluded Distribution Charges ..........................................................37 i | Network Price List: Ancillary Network Services 2020-21
ANCILLARY NETWORK SERVICES
1. Introduction
In this document “we”, “us”, “our” and “ours” refers to Endeavour Energy; “you”, “your” and “yours” refers to you,
the customer.
Words in italics are explained in your customer connection contract. This contract is available for download from
our website at:
www.endeavourenergy.com.au
Alternatively, you can obtain a copy by calling our Contact Centre on 133 718.
2. Network Price List - Ancillary Network Services (ANS)
Endeavour Energy has compiled this Network Price List to provide you with details of:
a) a description of ANS charges payable under your customer connection contract for services provided or
arranged by us;
b) the charges or method of calculation for any installation work done on a customer’s premises; and
c) work incidental to the provision of customer connection services.
3. Enquiries
If you have any questions in relation to this Network Price List please contact:
network.pricing@endeavourenergy.com.au
Network Pricing
Endeavour Energy
PO Box 811
Seven Hills NSW 1730
or contact our Contact Centre on 133 718.
For specific enquires related to the application of charges in this Network Price List, please refer to the Retail
Operations Contact List (ROCL).
4. Ancillary network services
Ancillary network services are non-routine services distributors provide to individual customers on an 'as needs'
basis.
For the avoidance of doubt, the AER Distribution Determination refers to ancillary network services for which a
charge is approved as 'fee-based services'. That is, the fee for the cost of providing the service (labour rates) and
the average time to perform the service. These services fees are fixed and apply irrespective of the actual time
on-site to perform the service, even if that time varies from the benchmark used in the AER’s decision making.
By contrast, quoted services are once-off and specific to a particular customer's request. The cost of these
services will depend on the actual time taken to perform the service. With the hourly rate set, the longer it takes
the distributor to perform the service, the more the customer will pay.
5. Ancillary network service charges
The AER approved ancillary network service charges for 2020-21 are as follows:
1 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
Table 1a: Ancillary network service charges
ANS ANS
Fee Charges Charges
Fee Type Fee Category Rate Code Driver
Type 2020-21 2020-21
(Ex. GST) (Inc. GST)
Site Establishment - Per NMI NMIA Per NMI Fee $42.90 $47.19
Non-market Site Establishment NMNA Per NMI Fee $12.30 $13.53
Site Establishment assessment that
does not result in the allocation of a NMII Per NMI Fee $10.20 $11.22
NMI.
Site
Error correction due to incorrect
Establishment
information received from Retailers or NPTC Per NMI Fee $123.00 $135.30
Fee
Metering Providers (Site Visit)
Error correction due to incorrect
information received from Retailers or NINV Per NMI Fee $164.00 $180.40
Metering Providers (no Site Visit)
NMI Extinction NABO Per NMI Fee $30.70 $33.77
Connection Offer Service (Basic) -
COFE Per Job Fee $26.80 $29.48
Existing
Connection Connection Offer Service (Basic) -
COFN Per Job Fee $26.80 $29.48
Offer Services New
Connection Offer Service (Basic) -
COFS Per Job Fee $26.80 $29.48
Solar
Off Peak Conversions DM02 Per Job Fee $129.50 $142.45
Off Peak
Off Peak Conversion – site visit (no
Conversions OPNA Per Job Fee $116.60 $128.26
access)
Fitting of Tiger Tails (Labour) Per Hour Quote $155.40 $170.94
Fitting of Tiger Tails (Material) - Per Tiger
Quote $5.70 $6.27
Weekly Hire Tail
Rectification
High Load Escorts - Per Hour Per Hour Quote $155.40 $170.94
Works
Rectification of illegal connections CI03 Per Job Fee $621.90 $684.09
Provision of service crew / additional
Per Hour Quote $155.40 $170.94
crew (Additional person per crew)
Meter Test Fee - Per Request MT01 Per Job Fee $466.40 $513.04
Meter Test Fee
Meter test Fee - Site Visit MTSV Per Job Fee $116.60 $128.26
2 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Rate Code Driver
Type 2020-21 2020-21
(Ex. GST) (Inc. GST)
Disconnections (Meter Box) -
CDF3 Per Disco Fee $77.70 $85.47
Includes Reconnection
Disconnections (Meter Load Tail) -
DMLT Per Disco Fee $293.80 $323.18
Includes Reconnection
Reconnections (Site Visit) CDS3 Per Visit Fee $65.90 $72.49
Disconnections (Site Visit) CDS3 Per Visit Fee $65.90 $72.49
Reconnections outside normal
AC02 Per Reco Fee $74.40 $81.84
Reconnections / business hours
Disconnections Disconnections (Pole Top / Pillar Box)
DS18 Per Disco Fee $485.60 $534.16
- Includes Reconnection
Disconnections at Pole Top / Pillar
NS18 Per Visit Fee $208.30 $229.13
Box - Site Visit
Reconnection of already connected
MRIR Per Job Fee $132.70 $145.97
site
Disconnections (Meter Load Tail) -
DVLT Per Job Fee $233.20 $256.52
Site Visit ONLY
Special Meter Special Meter Reads AM01 Per Job Fee $38.80 $42.68
Reads Special Meter Reads - Site Visit CDH3 Per Job Fee $31.00 $34.10
Move In / Move Move In Meter Reads MIMR Per Job Fee $38.80 $42.68
Out Meter Reads Move Out Meter Reads MOFR Per Job Fee $38.80 $42.68
Isolation Completed - Outage
GSIC Per Job Fee $609.70 $670.67
Distributor Arrangements
arranged outage
Isolation Not/Unable to be Completed GSNS Per Job Fee $415.30 $456.83
for purposes of
Initial Assessment GSNO Per Job Fee $298.70 $328.57
replacing meter
Initial Assessment - No Access GSNA Per Job Fee $182.10 $200.31
Meter recovery CT Meter Removal & Disposal MDCT Per Job Fee $176.50 $194.150
and disposal -
type 5 and 6 WC Meter Disposal MDWC Per Job Fee $176.50 $194.150
(legacy meters)
3 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Rate Code Driver
Type 2020-21 2020-21
(Ex. GST) (Inc. GST)
Organising and providing a security
escort where we have determined it
Security escort DCNS Per Job Quote $106.60 $117.260
necessary to ensure the safety of
staff.
Emergency
Maintenance of
Emergency maintenance - In hours EMIH Per Job Quote $161.30 $177.430
failed metering
equipment not
owned by
distributor
Emergency maintenance - After hours EMAH Per Job Quote $282.30 $310.530
(contestable
meters)
Metering
Investigation Metering Investigation services MINS Per Job Fee $236.70 $260.370
services
Vegetation
defect Vegetation defect management VGDM Per Job Fee $155.40 $170.940
management
De-energisation De-energising wires for safe
DWSA Per Job Fee $360.80 $396.880
safety services approach (e.g. for tree pruning)
Note: Unless otherwise stated, all rates are applicable to work conducted during normal business hours.
4 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
Table 1b: Ancillary network service charges
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Subdivision - URD - Underground - 1-
Per Job Fee $426.75 $469.425
5 lots
Subdivision - URD - Underground - 6-
Per Job Fee $533.44 $586.784
10 lots
Subdivision - URD - Underground -
Per Job Fee $746.82 $821.502
11-40 lots
Subdivision - URD - Underground -
Per Job Fee $853.51 $938.861
41+ lots
Subdivision - Non Urban -
Per Job Fee $320.06 $352.066
Underground - 1-5 lots
Subdivision - Non Urban -
Per Job Fee $426.75 $469.425
Underground - 6-10 lots
Subdivision - Non Urban -
Per Job Fee $533.44 $586.784
Underground - 11-40 lots
Subdivision - Non Urban -
Per Job Fee $640.13 $704.143
Underground - 41+ lots
Subdivision - Non Urban - Overhead -
Per Job Fee $426.75 $469.425
1-5 poles
Subdivision - Non Urban - Overhead -
Per Job Fee $533.44 $586.784
6-10 poles
Administration
Fee Subdivision - Non Urban - Overhead -
Per Job Fee $960.20 $1,056.220
11+ poles
Subdivision - Industrial & Commercial
Per Hour Quote $106.69 $117.359
- Per Hour
Connection of Load - URD - Per Hour Per Hour Quote $106.69 $117.359
Connection of Load - Industrial &
Per Hour Quote $106.69 $117.359
Commercial - Per Hour
Connection of Load - Non Urban -
Per Hour Quote $106.69 $117.359
Underground - Per Hour
Connection of Load - Non Urban -
Per Job Fee $426.75 $469.425
Overhead - 1-5 poles
Connection of Load - Non Urban -
Per Job Fee $640.13 $704.143
Overhead - 6-10 poles
Connection of Load - Non Urban -
Per Job Fee $853.51 $938.861
Overhead - 11+ poles
Other - Asset Relocation - Per Hour Per Hour Quote $106.69 $117.359
Other - Public Lighting - Per Hour Per Hour Quote $106.69 $117.359
Subdivision - URD - Underground - 1-
Per Job Fee $483.99 $532.389
Design 5 lots
Information Fee Subdivision - URD - Underground - 6-
Per Job Fee $645.32 $709.852
10 lots
5 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Subdivision - URD - Underground -
Per Job Fee $1,129.31 $1,242.241
11-40 lots
Subdivision - URD - Underground -
Per Job Fee $1,451.97 $1,597.167
41+ lots
Subdivision - Non Urban - Per Hour Per Hour Quote $161.33 $177.463
Subdivision - Industrial & Commercial
Per Hour Quote $161.33 $177.463
- Per Hour
Connection of Load - Industrial &
Per Hour Quote $161.33 $177.463
Commercial -ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Asset Relocation - Designer Per Hour Quote $161.33 $177.463
Public Lighting - Engineer Per Hour Quote $161.33 $177.463
Public Lighting - Designer Per Hour Quote $161.33 $177.463
Subdivision - URD - Underground - 1-
Per Job Fee $322.66 $354.926
5 lots
Subdivision - URD - Underground - 6-
Per Job Fee $483.99 $532.389
10 lots
Subdivision - URD - Underground -
Per Job Fee $806.65 $887.315
11-40 lots
Subdivision - URD - Underground -
Per Job Fee $967.98 $1,064.778
41+ lots
Subdivision - Non Urban -
Per Job Fee $161.33 $177.463
Underground - 1-5 lots
Subdivision - Non Urban -
Per Job Fee $483.99 $532.389
Underground - 6-10 lots
Subdivision - Non Urban -
Per Job Fee $645.32 $709.852
Underground - 11-40 lots
Subdivision - Non Urban -
Per Job Fee $645.32 $709.852
Underground - 41+ lots
Subdivision - Non Urban - Overhead -
Per Job Fee $322.66 $354.926
1-5 poles
Subdivision - Non Urban - Overhead -
Per Job Fee $483.99 $532.389
6-10 poles
Subdivision - Non Urban - Overhead -
Design Per Job Fee $806.65 $887.315
11+ poles
Certification Fee
Subdivision - Industrial & Commercial
Per Job Fee $483.99 $532.389
- Underground - 1-10 lots
Subdivision - Industrial & Commercial
Per Job Fee $645.32 $709.852
- Underground - 11-40 lots
Subdivision - Industrial & Commercial
Per Job Fee $967.98 $1,064.778
- Underground - 41 + lots
Subdivision - Industrial & Commercial
Per Job Fee $322.66 $354.926
- Overhead - 1-5 poles
Subdivision - Industrial & Commercial
Per Job Fee $483.99 $532.389
- Overhead - 6-10 poles
Subdivision - Industrial & Commercial
Per Job Fee $806.65 $887.315
- Overhead - 11+ poles
Connection of Load - Industrial &
Per Hour Quote $161.33 $177.463
Commercial -ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Connection of Load - Industrial &
Per Hour Quote $161.33 $177.463
Commercial - Transmission
Connection of Load - Multi-Dwelling -
Per Hour Quote $161.33 $177.463ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Subdivision - Industrial & Commercial
Per Hour Quote $106.69 $117.359
- per hour for early notification
Subdivision - Non Urban - per hour for
Per Hour Quote $106.69 $117.359
early notification
Subdivision - URD - per hour for early
Per Hour Quote $106.69 $117.359
notification
Connection of Load - Industrial &
Per Job Fee $213.38 $234.718
Commercial - Per Compliance Cert
Connection of Load - Non Urban - Per
Per Job Fee $320.06 $352.066
Compliance Cert
Connection of Load - URD - Per
Per Job Fee $213.38 $234.718
Compliance Cert
Compliance
Connection of Load - Industrial &
Certificate Per Hour Quote $106.69 $117.359
Commercial - Per hour for early cert
Connection of Load - Non Urban - Per
Per Hour Quote $106.69 $117.359
hour for early cert
Connection of Load - URD - Per hour
Per Hour Quote $106.69 $117.359
for early cert
Subdivision - URD - Underground -
Per Job Fee $80.66 $88.726
Per Lot (1 - 10) - Grade A
Subdivision - URD - Underground -
Per Job Fee $48.40 $53.240
Per Lot (11 - 50) - Grade A
Subdivision - URD - Underground -
Per Job Fee $16.13 $17.743
Per Lot (51 +) - Grade A
Subdivision - URD - Underground -
Per Job Fee $185.53 $204.083
Per Lot (1 - 10) - Grade B
Subdivision - URD - Underground -
Per Job Fee $112.93 $124.223
Per Lot (11 - 50) - Grade B
Subdivision - URD - Underground -
Per Job Fee $64.53 $70.983
Per Lot (51 +) - Grade B
Subdivision - URD - Underground -
Per Job Fee $403.32 $443.652
Inspection of Per Lot (1 - 10) - Grade C
Service Work Subdivision - URD - Underground -
(Level 1) Per Job Fee $225.86 $248.446
Per Lot (11 - 50) - Grade C
Subdivision - URD - Underground -
Per Job Fee $104.86 $115.346
Per Lot (51 +) - Grade C
Subdivision - URD - Underground -
Per Hour Quote $161.33 $177.463
Per hour + $44 travel time
Subdivision - Non Urban -
Underground - Per Lot (1 - 10) - Per Job Fee $80.66 $88.726
Grade A
Subdivision - Non Urban -
Underground - Per Lot (11 - 50) - Per Job Fee $48.40 $53.240
Grade A
Subdivision - Non Urban -
Underground - Per Lot (51+) - Grade Per Job Fee $16.13 $17.743
A
9 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Subdivision - Non Urban -
Underground - Per Lot (1 - 10) - Per Job Fee $193.59 $212.949
Grade B
Subdivision - Non Urban -
Underground - Per Lot (11 - 50) - Per Job Fee $104.86 $115.346
Grade B
Subdivision - Non Urban -
Underground - Per Lot (51+) - Grade Per Job Fee $64.53 $70.983
B
Subdivision - Non Urban -
Underground - Per Lot (1 - 10) - Per Job Fee $411.39 $452.529
Grade C
Subdivision - Non Urban -
Underground - Per Lot (11 - 50) - Per Job Fee $241.99 $266.189
Grade C
Subdivision - Non Urban -
Underground - Per Lot (51+) - Grade Per Job Fee $112.93 $124.223
C
Subdivision - Non Urban - Overhead -
Per Job Fee $96.80 $106.480
Per Pole (1 - 5) - Grade A
Subdivision - Non Urban - Overhead -
Per Job Fee $80.66 $88.726
Per Pole (6 - 10) - Grade A
Subdivision - Non Urban - Overhead -
Per Job Fee $64.53 $70.983
Per Pole (11 +) - Grade A
Subdivision - Non Urban - Overhead -
Per Job Fee $548.52 $603.372
Per Pole Sub - Grade A
Subdivision - Non Urban - Overhead -
Per Job Fee $193.59 $212.949
Per Pole (1 - 5) - Grade B
Subdivision - Non Urban - Overhead -
Per Job Fee $161.33 $177.463
Per Pole (6 - 10) - Grade B
Subdivision - Non Urban - Overhead -
Per Job Fee $104.86 $115.346
Per Pole (11 +) - Grade B
Subdivision - Non Urban - Overhead -
Per Job Fee $1,129.31 $1,242.241
Per Pole Sub - Grade B
Subdivision - Non Urban - Overhead -
Per Job Fee $322.66 $354.926
Per Pole (1 - 5) - Grade C
Subdivision - Non Urban - Overhead -
Per Job Fee $298.46 $328.306
Per Pole (6 - 10) - Grade C
Subdivision - Non Urban - Overhead -
Per Job Fee $225.86 $248.446
Per Pole (11 +) - Grade C
Subdivision - Non Urban - Overhead -
Per Job Fee $1,371.30 $1,508.430
Per Pole Sub - Grade C
Subdivision - Industrial & Commercial
- Overhead - Per Pole (1 - 5) - Grade Per Job Fee $96.80 $106.480
A
Subdivision - Industrial & Commercial
- Overhead - Per Pole (6 - 10) - Grade Per Job Fee $80.66 $88.726
A
10 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Subdivision - Industrial & Commercial
- Overhead - Per Pole (11 +) - Grade Per Job Fee $64.53 $70.983
A
Subdivision - Industrial & Commercial
Per Job Fee $564.65 $621.115
- Overhead - Per Pole Sub - Grade A
Subdivision - Industrial & Commercial
- Overhead - Per Pole (1 - 5) - Grade Per Job Fee $177.46 $195.206
B
Subdivision - Industrial & Commercial
- Overhead - Per Pole (6 - 10) - Grade Per Job Fee $161.33 $177.463
B
Subdivision - Industrial & Commercial
- Overhead - Per Pole (11 +) - Grade Per Job Fee $112.93 $124.223
B
Subdivision - Industrial & Commercial
Per Job Fee $1,129.31 $1,242.241
- Overhead - Per Pole Sub - Grade B
Subdivision - Industrial & Commercial
- Overhead - Per Pole (1 - 5) - Grade Per Job Fee $354.92 $390.412
C
Subdivision - Industrial & Commercial
- Overhead - Per Pole (6 - 10) - Grade Per Job Fee $321.05 $353.155
C
Subdivision - Industrial & Commercial
- Overhead - Per Pole (11 +) - Grade Per Job Fee $241.99 $266.189
C
Subdivision - Industrial & Commercial
Per Job Fee $1,419.70 $1,561.670
- Overhead - Per Pole Sub - Grade C
Subdivision - Industrial & Commercial
- Underground - Per Lot (1 - 10) - Per Job Fee $80.66 $88.726
Grade A
Subdivision - Industrial & Commercial
- Underground - Per Lot (11 - 50) - Per Job Fee $80.66 $88.726
Grade A
Subdivision - Industrial & Commercial
- Underground - Per Lot (51+) - Grade Per Job Fee $80.66 $88.726
A
Subdivision - Industrial & Commercial
- Underground - Per Lot (1 - 10) - Per Job Fee $193.59 $212.949
Grade B
Subdivision - Industrial & Commercial
- Underground - Per Lot (11 - 50) - Per Job Fee $193.59 $212.949
Grade B
Subdivision - Industrial & Commercial
- Underground - Per Lot (51+) - Grade Per Job Fee $193.59 $212.949
B
Subdivision - Industrial & Commercial
- Underground - Per Lot (1 - 10) - Per Job Fee $403.32 $443.652
Grade C
Subdivision - Industrial & Commercial
- Underground - Per Lot (11 - 50) - Per Job Fee $403.32 $443.652
Grade C
11 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Subdivision - Industrial & Commercial
- Underground - Per Lot (51+) - Grade Per Job Fee $403.32 $443.652
C
Connection of Load - URD -
Underground - Per hour (Inspector) + Per Hour Quote $161.33 $177.463
travel time
Connection of Load - URD -
Underground - Per hour (Engineer) + Per Hour Quote $161.33 $177.463
travel time
Connection of Load - Non Urban -
Underground - Per hour (Inspector) + Per Hour Quote $161.33 $177.463
travel time
Connection of Load - Non Urban -
Underground - Per hour (Engineer) + Per Hour Quote $161.33 $177.463
travel time
Connection of Load - Non Urban -
Per Job Fee $96.80 $106.480
Overhead - Per Pole (1 - 5) - Grade A
Connection of Load - Non Urban -
Per Job Fee $193.59 $212.949
Overhead - Per Pole (1 - 5) - Grade B
Connection of Load - Non Urban -
Per Job Fee $354.92 $390.412
Overhead - Per Pole (1 - 5) - Grade C
Connection of Load - Non Urban -
Overhead - Per Pole (6 - 10) - Grade Per Job Fee $80.66 $88.726
A
Connection of Load - Non Urban -
Overhead - Per Pole (6 - 10) - Grade Per Job Fee $161.33 $177.463
B
Connection of Load - Non Urban -
Overhead - Per Pole (6 - 10) - Grade Per Job Fee $321.05 $353.155
C
Connection of Load - Non Urban -
Per Job Fee $64.53 $70.983
Overhead - Per Pole (11 +) - Grade A
Connection of Load - Non Urban -
Per Job Fee $112.93 $124.223
Overhead - Per Pole (11 +) - Grade B
Connection of Load - Non Urban -
Per Job Fee $241.99 $266.189
Overhead - Per Pole (11 +) - Grade C
Connection of Load - Non Urban -
Per Job Fee $548.52 $603.372
Overhead - Per Pole Sub - Grade A
Connection of Load - Non Urban -
Per Job Fee $1,129.31 $1,242.241
Overhead - Per Pole Sub - Grade B
Connection of Load - Non Urban -
Per Job Fee $1,371.30 $1,508.430
Overhead - Per Pole Sub - Grade C
Connection of Load - Industrial &
Commercial - Underground - Per Hour Per Hour Quote $161.33 $177.463
(Inspector) + travel time
Connection of Load - Industrial &
Commercial - Underground - Per Hour Per Hour Quote $161.33 $177.463
(Engineer) + travel time
12 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Connection of Load - Industrial &
Commercial - Overhead - Per Pole (1 Per Job Fee $96.80 $106.480
- 5) - Grade A
Connection of Load - Industrial &
Commercial - Overhead - Per Pole (1 Per Job Fee $185.53 $204.083
- 5) - Grade B
Connection of Load - Industrial &
Commercial - Overhead - Per Pole (1 Per Job Fee $354.92 $390.412
- 5) - Grade C
Connection of Load - Industrial &
Commercial - Overhead - Per Pole (6 Per Job Fee $80.66 $88.726
- 10) - Grade A
Connection of Load - Industrial &
Commercial - Overhead - Per Pole (6 Per Job Fee $161.33 $177.463
- 10) - Grade B
Connection of Load - Industrial &
Commercial - Overhead - Per Pole (6 Per Job Fee $321.05 $353.155
- 10) - Grade C
Connection of Load - Industrial &
Commercial - Overhead - Per Pole Per Job Fee $64.53 $70.983
(11+) - Grade A
Connection of Load - Industrial &
Commercial - Overhead - Per Pole Per Job Fee $112.93 $124.223
(11+) - Grade B
Connection of Load - Industrial &
Commercial - Overhead - Per Pole Per Job Fee $241.99 $266.189
(11+) - Grade C
Connection of Load - Industrial &
Commercial - Overhead - Per Pole Per Job Fee $564.65 $621.115
Sub - Grade A
Connection of Load - Industrial &
Commercial - Overhead - Per Pole Per Job Fee $1,129.31 $1,242.241
Sub - Grade B
Connection of Load - Industrial &
Commercial - Overhead - Per Pole Per Job Fee $1,419.70 $1,561.670
Sub - Grade C
Asset Relocation - Asset Relocation -
Underground - Per Hour (Inspector) + Per Hour Quote $161.33 $177.463
travel time
Asset Relocation - Asset Relocation -
Underground - Per Hour (Engineer) + Per Hour Quote $161.33 $177.463
travel time
Public Lighting - Public Lighting -
Underground - Per Hour (Inspector) + Per Hour Quote $161.33 $177.463
travel time
Public Lighting - Public Lighting -
Underground - Per Hour (Engineer) + Per Hour Quote $161.33 $177.463
travel time
13 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Administration Fee $53.78 $59.158
Inspection of
works outside Overtime Hours Rate $80.66 $88.726
normal working Access Permits $2,401.80 $2,641.980
hours
Reinspection Fee
Reinspection Fee (Level 1 & Level 2
(Level 1 & Level Per Hour Quote $161.33 $177.463
work)
2 work)
Per
Per NOSW - A Grade Fee $56.47 $62.117
NOSW
Inspection of
service work Per
Per NOSW - B Grade Fee $96.80 $106.480
(Level 2 work) NOSW
Per
Per NOSW - C Grade Fee $322.66 $354.926
NOSW
Normal Time - 1 x Visit - Open / Close
Per Job Fee $155.48 $171.028
- 1 hour - Per Job
Normal Time - 1 x Visit - Open /
Isolate & CSO to close - 1 hour - Per Per Job Fee $316.81 $348.491
Job
Normal Time - 2 x Visit - Open / Close
Per Job Fee $310.96 $342.056
& no isolation - 2 hours - Per Job
Normal Time - 2 x Visit - Open /
Provision of Per Job Fee $633.62 $696.982
Isolate / Close - 2 hours - Per Job
Access Fee
Overtime - 1 x Visit - Open / Close - 1
(Standby) Per Job Fee $272.10 $299.310
hour - Per Job
Overtime - 1 x Visit - Open / Isolate &
Per Job Fee $554.42 $609.862
CSO to close - 1 hour - Per Job
Overtime - 2 x Visit - Open / Close &
Per Job Fee $544.18 $598.598
no isolation - 2 hours - Per Job
Overtime - 2 x Visit - Open / Isolate /
Per Job Fee $1,108.84 $1,219.724
Close - 2 hours - Per Job
Subdivision - URD - Per Lot Per Lot Fee $55.47 $61.017
All Other - Industrial & Commercial -
Per AA or
Per access authorisation (AA) or Fee $2,401.80 $2,641.980
ATW
authority to work (ATW)
All Other - Non Urban - Per access
Per AA or
authorisation (AA) or authority to work Fee $2,401.80 $2,641.980
ATW
Access Permits (ATW)
All Other - URD - Per access
Per AA or
authorisation (AA) or authority to work Fee $2,401.80 $2,641.980
ATW
(ATW)
All Other - Asset Relocation - Per
Per AA or
access authorisation (AA) or authority Fee $2,401.80 $2,641.980
ATW
to work (ATW)
14 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
All Other - Public Lighting - Per
Per AA or
access authorisation (AA) or authority Fee $2,401.80 $2,641.980
ATW
to work (ATW)
Subdivision - URD - Per Lot Per Lot Fee $67.70 $74.470
Per
All Other - Industrial & Commercial -
Substatio Fee $1,963.26 $2,159.586
Per Substation
n
Per
All Other - Non Urban - Per
Substatio Fee $1,963.26 $2,159.586
Substation
n
Per
Substation
All Other - URD - Per Substation Substatio Fee $1,963.26 $2,159.586
Commission Fee
n
Per
All Other - Asset Relocation - Per
Substatio Fee $1,963.26 $2,159.586
Substation
n
Per
All Other - Public Lighting - Per
Substatio Fee $1,963.26 $2,159.586
Substation
n
Cost of excluded distribution
services for interruption avoidance
measures for contestable work
planned electricity supply
interruptions
Install & remove HV live line links -
Per Job Fee $4,485.92 $4,934.512
One set
Install & remove HV live line links -
Per Job Fee $2,880.83 $3,168.913
Each additional set
Break & remake HV bonds - One set Per Job Fee $3,470.88 $3,817.968
Break & remake HV bonds - Each
Per Job Fee $1,930.56 $2,123.616
additional set
Access permits, Break & remake LV bonds - One set Per Job Fee $2,152.07 $2,367.277
oversight and
facilitation Break & remake LV bonds - Each
Per Job Fee $1,019.26 $1,121.186
additional set
Install & remove LV live line links -
Per Job Fee $2,122.33 $2,334.563
One set
Install & remove LV live line links -
Per Job Fee $989.52 $1,088.472
Each additional set
Connect & disconnect generator to LV
Per Job Fee $2,065.69 $2,272.259
OH mains - One generator
Connect & disconnect generator to LV
Per Job Fee $932.89 $1,026.179
OH mains - Each additional generator
Connect & disconnect generator to a
padmount / indoor substation - One Per Job Fee $2,065.69 $2,272.259
generator
15 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Connect & disconnect generator to a
padmount / indoor substation - Each Per Job Fee $932.89 $1,026.179
additional gen
Cost of excluded distribution
services to terminate cable at zone
substations and first joint out from
the zone substation
Zone substation access and
supervision for installation of cable(s) Per Job Fee $3,315.39 $3,646.929
for one feeder
Protection setting Per Job Fee $4,221.47 $4,643.617
Testing cable prior to commissioning Per Job Fee $4,786.12 $5,264.732
11kV Zone substation circuit breaker
Termination of Per Job Fee $3,941.25 $4,335.375
cable termination
cable at zone
substation – 22kV Zone substation circuit breaker
Per Job Fee $4,087.95 $4,496.745
distributor cable termination
required 11kV Padmount/Indoor substation
Per Job Fee $4,274.77 $4,702.247
performance cable termination
22kV Padmount/Indoor substation
Per Job Fee $5,187.67 $5,706.437
cable termination
11kV Pole top termination (UGOH)
Per Job Fee $5,067.45 $5,574.195
and bonding to OH
22kV Pole top termination (UGOH)
Per Job Fee $5,677.45 $6,245.195
and bonding to OH
11kV Straight through joint Per Job Fee $4,207.88 $4,628.668
22kV Straight through joint Per Job Fee $4,394.05 $4,833.455
Traffic Control
Traffic Management to install &
remove, break & remake, connect &
Per Job Fee $4,456.09 $4,901.699
Network Safety disconnect excluded distribution
Services services
Traffic Management to test, terminate
and joint excluded distribution Per Job Fee $4,084.13 $4,492.543
services
Per
Authorisation - Renewal Authorisa Fee $413.91 $455.301
tion
Authorisation
Per
Authorisation - New Authorisa Fee $460.55 $506.605
tion
Conveyancing Supply of conveyancing information - Per
Fee $53.35 $58.685
Information Per Desk Inquiry Inquiry
Carrying out planning studies and
analysis relating to distribution
Planning Studies (including subtransmission and dual Per Hour Quote $201.67 $221.837
function assets) connection
applications - SIMPLE JOBS
16 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Carrying out planning studies and
analysis relating to distribution
(including subtransmission and dual Per Hour Quote $221.82 $244.002
function assets) connection
applications - COMPLEX JOBS
Connection Offer Service (Basic) -
Per Job Fee $26.80 $29.480
Existing
Connection Offer Service (Basic) -
Connection Offer Per Job Fee $26.80 $29.480
New
Service
Connection Offer Service (Basic) -
Per Job Fee $26.80 $29.480
Solar
Connection Offer Service (Standard) Per Job Fee $241.99 $266.189
Customer
Customer Interface co-ordination for
Interface co- Per Hour Quote $201.67 $221.837
contestable works
ordination
Investigation,
review &
implementation Investigation, review &
of remedial implementation of remedial actions
Per Hour Quote $161.33 $177.463
actions associated with ASP's connection
associated with work.
ASP's
connection work
Preliminary Enquiry Service - SIMPLE
Per Hour Quote $106.69 $117.359
Preliminary JOBS
Enquiry Service Preliminary Enquiry Service -
Per Hour Quote $221.82 $244.002
COMPLEX JOBS
Services Services involved in obtaining deeds
involved in of agreement in relation to property
Per Hour Quote $161.33 $177.463
obtaining deeds rights associated with contestable
of agreement connections work
Clearance to
Clearance to Work Per Job Fee $2,371.03 $2,608.133
Work
Type 5-7 Non
Type 5-7 Non Standard Meter data
Standard Meter Per Job Fee $17.93 $19.723
Services
data Services
Customer
initiated Asset Customer initiated Asset Relocations -
Per Hour Quote $159.51 $175.461
Relocations - network safety
network safety
Private inspection of privately owned
low voltage or high voltage network
Private
infrastructure (i.e. privately owned Per Hour Quote $161.33 $177.463
inspection
distribution infrastructure before the
meter).
Planned
interruption - Planned interruption - customer
Per Job Quote $159.02 $174.922
customer requested
requested
17 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
ANS ANS
Fee Charges Charges
Fee Type Fee Category Driver
Type
2020-21 2020-21
(Ex. GST) (Inc. GST)
Training services
Training services to ASPs Per Hour Quote $155.48 $171.028
to ASPs
D. Design and
build costs (of
shared network) D. Design and build costs (of shared
Per Job Quote Quote Basis Quote Basis
beyond network) beyond distributor standards
distributor
standards
C. Part design
and build costs
C. Part design and build costs beyond
beyond Per Job Quote Quote Basis Quote Basis
distributor standards
distributor
standards
Customer
requested
provision of
Customer Data Request Per Job Fee $17.93 $19.723
additional
metering/consum
ption data
Cable ID & Spike Cable ID & Spike Per Job Fee $645.32 $709.852
Services provided in relation to a
ROLR Per Job Quote Quote Basis Quote Basis
Retailer of Last Resort (ROLR) event
18 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
6. Labour Rates
The AER approved maximum hourly rates (including on-costs and overhead) for quoted service charges for 2020-
21 are as follows:
Table 2: Labour rates
2020-21 2020-21
Classification Driver
(ex GST) (inc GST)
Admin Per Hour $106.69 $117.359
Technical Per Hour $161.33 $177.463
Engineer Per Hour $201.67 $221.837
Field Worker Per Hour $155.48 $171.028
Senior Engineer Per Hour $221.82 $244.002
Traffic Controllers & Supervisors - External Contractors Per Hour $92.99 $102.289
Operations Manager Per Hour $201.67 $221.837
Engineering Officer / Project Manager Per Hour $196.86 $216.546
EFM Per Hour $131.16 $144.276
All staff involved in disconnections / reconnections (Meter Box) Per Hour $155.48 $171.028
All staff involved in disconnections / reconnections (Site Visit) Per Hour $65.90 $72.490
All staff involved in disconnections / reconnections (Meter Box) Per Hour $74.43 $81.873
R4 - Field Worker Per Hour $155.48 $171.028
R1 - Admin Per Hour $107.55 $118.305
R2 - Technical Specialist Per Hour $161.33 $177.463
R3 - Engineer Per Hour $201.67 $221.837
R4 - Field Worker Per Hour $155.48 $171.028
Blended (69% R2 Tech & 31% R4 Field Worker) Per Hour $159.51 $175.461
19 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
7. ANS Definitions
Table 3a: ANS Definitions
Rate
Fee Type Fee Category Definition
Code
Site establishment, including liaising with the Australian
Energy Market Operator (AEMO) or market participants
for the purpose of establishing NMIs in market systems,
for new premises or for any existing premises for which
Site Establishment - Per NMI NMIA
AEMO requires a new NMI and for validation of and
updating network load data. This includes processing
and assessing requests for a permanently unmetered
supply device.
Non-market Site Creating a NMI for non-market purposes (e.g. NBN
NMNA
Establishment node/kiosks).
Site Establishment
assessment that does not Conducting preliminary assessment following a NMI
NMII
result in the allocation of a request that indicates NMI cannot (yet) be provided.
NMI.
Site
A site visit to confirm/correct metering or billing
Establishment Error correction due to
information due to incorrect or insufficient information
Fee incorrect information
from the retailer or metering provider.
received from Retailers or NPTC
Metering Providers (Site
May be charged in addition to system work (NINV)
Visit)
where a site visit is also required.
Error correction due to
incorrect information System work to confirm/correct metering or billing
received from Retailers or NINV information due to incorrect or insufficient information
Metering Providers (no Site from the retailer or metering provider.
Visit)
NMI extinction, processing extinction of a NMI in market
NMI Extinction NABO
systems.
Upgrade to existing:
Connection and supply of electricity for permanent or
temporary load if:
Connection Offer Service · Land zoned as urban by the local council
COFE
(Basic) - Existing · Maximum demand for electricity is no greater than
100 amperes 230 volts (single phase) or 63
amperes 400 volts (three phase)
· Dwelling is up to four strata units
Connection Offer
Services New:
Connection and supply of electricity for permanent or
temporary load if:
Connection Offer Service · Land zoned as urban by the local council
COFN
(Basic) - New · Maximum demand for electricity is no greater than
100 amperes 230 volts (single phase) or 63
amperes 400 volts (three phase)
· Dwelling is up to four strata units
20 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
Rate
Fee Type Fee Category Definition
Code
Connection of a solar system where the total inverter
Connection Offer Service capacity will be no more than:
COFS
(Basic) - Solar · 5 kilowatts for single connection
· 30 kilowatts for three phase connection
The alteration of the off-peak (controlled load) meter at
Off Peak Conversions DM02 a customer’s premises for the purpose of changing the
hours of the meter’s operation.
A site visit to a customer’s premises for the purpose of
actioning a request, complaint or enquiry about the
Off Peak customer’s off peak service but was unable to complete
because the customer no longer has an off peak
Conversions
Off Peak Conversion – site service or the off peak service is not controlled by a
OPNA
visit (no access) device owned by Endeavour Energy. This fee is
applicable when the Metering Provider who removed
Endeavour Energy’s control load device does not
inform us of the removal via a Notification of Metering
Works.
Work undertaken by DNSP, to the property of DNSP or
to the property of another person in order to:
· Rectify damage; or
· Prevent injury to persons or property.
resulting from conduct that constitutes an offence under
Part 6, division 1 of the Electricity Supply Act. For
Rectification Rectification of illegal example, to rectify an unauthorised connection to
CI03
Works connections Endeavour Energy’s distribution system.
Note: the supply would be left disconnected until the
customer employed their own electrical contractor/ASP
to rectify any faulty wiring or equipment which had been
interfered with e.g. full replacement of customer’s
mains.
The testing of a meter at the request of a customer or
retailer. It excludes metering installation types 1 to 4,
the testing of which is an unregulated distribution
service.
If the meter test is undertaken on premises serviced by
more than one meter associated with the NMI, the
Meter Test Fee - Per following applies:
MT01
Request · if the meter test reveals that all of the meters
Meter Test Fee associated with the NMI are operating
satisfactorily, Endeavour Energy will only levy one
charge for the provision of the service; or
· if the meter test reveals that one or more of the
meters associated with the NMI are not operating
satisfactorily, Endeavour Energy will not levy any
charge for the provision of the service.
Work unable to be completed through no act or
Meter test Fee - Site Visit MTSV
omission of Endeavour Energy.
21 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
Rate
Fee Type Fee Category Definition
Code
A site visit to a customer’s premises for the purpose of
disconnecting the customer’s supply of electricity for
breach by the customer of a customer supply contract
or a customer connection contract, or where a retailer
has requested that the supply to the customer to be
disconnected.
Your Retailer will request a preferred disconnection
method. However, the actual disconnection method
may vary in specific situations, depending on the meter
type and access. Where the preferred disconnection
method is unavailable the disconnection method used
will be at Endeavour Energy’s discretion and will involve
one of the following methods:
Disconnections (Meter Box) - · rotate plug in meter; or
CDF3
Includes Reconnection · turn off and sticker covering main switch; or
· service fuse removal.
If your Retailer has indicated that the disconnection
method is at our discretion then we will attempt to
disconnect at the meter box when your Retailer
provides one of the following disconnection reason:
· Customer Requested
· Move Out
· Non-Payment (DNP)
Reconnections / · Unauthorised Usage (DNI)
· Breach of Contract
Disconnections
· Other
This fee includes reconnection of supply following the
disconnection.
A site visit to a customer’s premises for the purpose of
disconnecting the customer’s supply of electricity for
breach by the customer of a customer supply contract
or a customer connection contract, or where a retailer
has requested that the supply to the customer to be
disconnected.
Disconnections (Meter Load
DMLT Your Retailer will request a preferred disconnection
Tail) - Includes Reconnection
method. However, the actual disconnection method
may vary in specific situations. Where the preferred
disconnection method is unavailable the disconnection
method used will be at Endeavour Energy’s discretion,
for example de-energised at the fuse. The fee
associated with the actual disconnection method
performed will be applied for this service.
A site visit to a customer’s premises for the purpose of
disconnecting the customer’s supply at the request of a
Retailer based on the customer’s breach of a Customer
Disconnections (Site Visit) CDS3 Supply Contract or for breach of Endeavour Energy’s
Connection Contract, or due to customer moving out
and Retailer requests site to be de-energised.
22 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
Rate
Fee Type Fee Category Definition
Code
Disconnection may not occur due to a number of
reasons, such as, but not limited to the following:
· Customer has paid retail bill; or
· Breach of customer connection contract has been
rectified; or
· Unable to access main switch board or metering; or
· Safety of installation or Endeavour Energy's
employee; or
· Late cancellation by Retailer; or
· Change of customer or Retailer for the NMI.
A site visit to a customer’s premises for the purpose of
performing the reconnection component of the services
described in “Disconnections (Meter Box” or “Meter
Load Tail”), where the reconnection cannot be
completed due to a number of reasons but not limited to
the following:
Reconnections (Site Visit) CDS3 · Breach of customer connection contract has not
been rectified; or
· Unable to access main switch board or metering; or
· Safety of installation or Endeavour Energy's
employee; or
· Late cancellation by Retailer.
a) The provision of the reconnection component of
the services described in “Disconnections (Meter
Box” or “Meter Load Tail”) between the hours of
4.00pm and 5.00pm on a working day, at the
request of a customer; or
Reconnections outside b) The connection of electricity to a new customer
AC02
normal business hours between the hours of 4.00pm and 5.00pm on a
working day at the request of the customer.
For reasons of Occupational Health & Safety, any
reconnection in accordance with section a), or any
connection as in accordance section b), are only
available at a meter box.
A site visit to a customer’s premises for the purpose of
disconnecting the customer’s supply of electricity for
breach by the customer of a customer supply contract
or a customer connection contract, or where a retailer
has requested that the supply to the customer to be
disconnected.
Disconnections (Pole Top /
Pillar Box) - Includes DS18 Your retailer will indicate this disconnection method
Reconnection when the supply to a customer is to be disconnected,
where the customer has denied access to the meter or
had prior to the visit, reconnected supply without
authorisation by Endeavour Energy following a previous
disconnection.
If your Retailer has indicated that the disconnection
method is at our discretion then we will attempt to
23 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
Rate
Fee Type Fee Category Definition
Code
disconnect at the pole top or pillar box when your
Retailer provides one of the following disconnection
reason:
· Illegal Usage
· No Access
· Safety
· Defect
This fee includes reconnection of supply following the
disconnection.
A site visit to a customer’s premises for the purpose of
disconnecting the customer’s supply at the request of a
Retailer based on the customer’s breach of a Customer
Supply Contract or for breach of Endeavour Energy’s
Connection Contract. Disconnection may not occur due
to a number of reasons, such as, but not limited to the
following:
Disconnections at Pole Top /
NS18 · Customer has paid retail bill; or
Pillar Box - Site Visit
· Breach of customer connection contract has been
rectified; or
· Safety of installation or Endeavour Energy's
employee; or
· Late cancellation by Retailer; or
· Change of customer or Retailer for the NMI.
Reconnection of already Actioning a reconnection request at a site Endeavour
MRIR
connected site Energy has not previously disconnected.
Reconnection and/or disconnection at meter load tail
Disconnections (Meter Load not completed due to factors outside of Endeavour
DVLT
Tail) -Site Visit ONLY Energy's control (e.g. no access, incorrect/insufficient
board labelling, job cancelled etc.)
This service has the same meaning as the meaning
given to the expression ‘special meter reading’ in the
AEMO Metrology Procedure: Part A National Electricity
Market.
It excludes any special meter reading of metering
installation types 1 to 4, which is an unregulated
distribution service, but subject to a ‘light-handed’ form
of control under Independent Pricing and Regulatory
Special Meter Tribunal of NSW (IPART) Rule 2004/1 Regulation of
Special Meter Reads AM01 Excluded Distribution Services; and applies in each of
Reads
the following circumstances:
· where a customer or a retail supplier requests
Endeavour Energy to undertake a special meter
read, (but does not apply where the special meter
read was requested solely to verify the accuracy of
a scheduled meter read and the special meter read
reveals that the scheduled meter read was
inaccurate or in error).
24 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
Rate
Fee Type Fee Category Definition
Code
A charge will not be levied for this service (‘special
meter reading’) where the service reveals that a
scheduled meter reading was inaccurate (as outlined
above).
A special meter read may also be charged if a
"Reconnection" service order is raised by a Retail
supplier for a site that is already energised in an
attempt to avoid paying for the special meter read.
This service has the same meaning as the meaning
given to the expression ‘special meter reading’ in the
AEMO Metrology Procedure: Part A National Electricity
Market.
It excludes any special meter reading of metering
installation types 1 to 4, which is an unregulated
distribution service, but subject to a ‘light-handed’ form
of control under Independent Pricing and Regulatory
Tribunal of NSW (IPART) Rule 2004/1 Regulation of
Excluded Distribution Services; and applies in each of
the following circumstances:
· where Endeavour Energy attends at a customer’s
premises for the sole purpose of discharging
Endeavour Energy's obligation to read the
Special Meter Reads - Site
CDH3 customer’s meter within the period specified by law
Visit
(but not where Endeavour Energy merely chooses
to read the customer’s meter without being under a
legal obligation to do so) and on attending the
customer’s premises Endeavour Energy is unable
(through no act or omission of Endeavour Energy),
to gain access to the meter; or
· where Endeavour Energy and the customer agree
on an appointed time at which Endeavour Energy
may attend the customer’s premises to enable
Endeavour Energy to discharge our legal obligation
referred to in the above paragraph and when
Endeavour Energy attended at the customer’s
premises at the appointed time Endeavour Energy
(through no act or omission of Endeavour Energy),
was unable to gain access to the customer’s meter.
A site visit where a Retailer has requested re-
energisation although the site is already energised.
Move In Meter Reads MIMR These services are in addition to the special meter
reading, disconnection/reconnection and testing
Move In / Move services (which are charged as separate ancillary
Out Meter Reads network service fees).
A request from a Retailer to obtain a final read. These
Move Out Meter Reads MOFR services are in addition to the special meter reading,
disconnection/ reconnection and testing services (which
25 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
Rate
Fee Type Fee Category Definition
Code
are charged as separate ancillary network service
fees).
A site visit to a customer’s premises to perform the
temporary isolation as requested from a Retailer.
The group isolation will be performed, Endeavour
Isolation Completed - Outage Energy will wait for the Meter Provider to install the
GSIC Meter Protection Device (MPD) before reenergising to
Arrangements
the MPD and other premises.
This fee includes the site visit to a customer’s premises
to identify and notify impacted customers of a
temporary isolation.
After the notification has been completed, a site visit to
a customer’s premises to perform the temporary
isolation as requested from a Retailer but was unable to
complete due to a number of reasons, such as, but not
limited to the following:
· Unable to access main switch board or metering; or
Isolation Not/Unable to be · Safety of installation or Endeavour Energy's
Completed employee; or
GSNS
· Metering Provider fails to attend at the nominated
Labelled in AER decision as
“Other party fails to arrive” time; or
· Impacted life support customer requests for the
Distributor temporary isolation to not go ahead; or
arranged outage · Late cancellation by Retailer.
for purposes of This fee includes the site visit to a customer’s premises
replacing meter to identify and notify impacted customers of a
temporary isolation.
A site visit to a customer’s premises to identify and
notify impacted customers of a temporary isolation
request from a Retailer but the request is cancelled
before attending site to complete the temporary
Initial Assessment isolation due to a number of reasons, such as, but not
GSNO limited to the following:
Labelled in AER decision as
· Retailer is no longer the customer’s retailer on the
“Notification only”
agreed date for the temporary isolation; or
· Late cancellation by Retailer.
This fee is also applicable if we determine that the retailer
is the retailer for all impacted customers.
A site visit to a customer’s premises for the purpose of
identifying and notifying impacted customers for a
Initial Assessment - No
temporary isolation request from a Retailer but the
access
customers are not notified due to a number of reasons,
GSNA such as, but not limited to the following:
Labelled in AER decision as
“No access” · Unable to access main switch board or metering; or
· Safety of installation or Endeavour Energy's
employee; or
26 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
Rate
Fee Type Fee Category Definition
Code
· Late cancellation by Retailer.
Disposing Type 5 or 6 CT meters or the CT which
CT Meter Removal &
Meter recovery MDCT should have been disposed of by the party who
Disposal
and disposal - removed the meter or CT
type 5 and 6 Disposing Type 5 or 6 whole current meters which
(legacy meters) WC Meter Disposal MDWC should have been disposed of by the party who
removed the meter.
Organising and providing a
Organising and providing a security escort where we
security escort where we
Security escort DCNS have determined it necessary to ensure the safety of
have determined it necessary
staff.
to ensure the safety of staff.
Within business hours:
Work where an external metering provider's metering
equipment has failed or an outage has been caused by
the metering provider and the distributor has had to
Emergency maintenance - In restore power to the customer's premises. This may
EMIH
hours result in an unmetered supply arrangement at this site.
Emergency This fee will also be levied where a metering provider
Maintenance of has requested the distributor to check a potentially
failed metering faulty network connection and when tested by the
equipment not distributor, but no fault is found.
owned by Outside business hours:
distributor Work where an external metering provider's metering
(contestable equipment has failed or an outage has been caused by
the metering provider and the distributor has had to
meters)
Emergency maintenance - restore power to the customer's premises. This may
EMAH
After hours result in an unmetered supply arrangement at this site.
This fee will also be levied where a metering provider
has requested the distributor to check a potentially
faulty network connection and when tested by the
distributor, but no fault is found.
Metering Requests raised to investigate a meter installation. For
Metering Investigation
Investigation MINS example, possible cross wiring or incorrect label
services
services information.
Issues identified by the distributor and work involved in
Vegetation
Vegetation defect managing and resolving pre-summer bush fire
defect VGDM
management inspection customer vegetation defects or aerial mains
management where the customer has failed to do so.
De-energising wires for safe
De-energisation De-energising wires for safe approach (e.g. for tree
approach (e.g. for tree DWSA
safety services pruning)
pruning)
27 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
Table 3b: ANS Definitions
Ancillary Network Service Definition
Work of an administration nature (not including work of an administrative nature
described in service - Notice of Arrangement or Authorisation of ASPs), including the
processing of Level 1 and/or Level 3 work where the customer is lawfully required to
pay for the Level 1 and/or Level 3 work.
This may include without limitation:
· Checking supply availability;
· Processing applications;
· Correspondence from application to completion;
· Record keeping;
Administration Fee · Requesting and receiving fees (initially, then prior to design and after certification);
· Receiving design drawings (registering and copying);
· Raising order for high voltage (HV) work;
· Calculating HV reimbursements;
· Calculating the cost of a project and warranty / maintenance bond;
· Organising refunds to developers for HV work;
· Liaising with developers via phone and facsimile;
· Updating Geographic Information Systems (GIS) and mapping; and
· Supporting the process of design information, design certification and design
rechecking.
The electronic provision of necessary technical information to enable an ASP to prepare
a design drawing and submit it for certification.
This may include without limitation:
· Deriving the estimated loading on the system, technically known as the ADMD (After
Diversity Maximum Demand). This estimate depends on such factors as the number
of customers served and specific features of the customer’s demand;
· Provide drawings electronically that show existing low and high voltage circuits
(geographically & schematically) and adjacent projects;
· Provision and maintenance of systems necessary to facilitate ASP electronic access
Design Information Fee
to data and information allowing electronic drawing transfer and retrieval of
standards;
· Specify the preferred sizes for overhead conductors or underground cable;
· Specify switchgear configuration type, number of pillars, lights etc;
· Determine Network Planning requirements necessary to make electrical supply
available to a development and cater for future works;
· Nominating network connection points; and
· Provision of any of the above information (GIS, STANDARDS, ADMD etc.)
electronically as determined by the DNSP.
28 | Network Price List: Ancillary Network Services 2020-21ANCILLARY NETWORK SERVICES
Ancillary Network Service Definition
DNSP is required to certify the design will not compromise the safety or operation of the
distribution network.
This may include without limitation:
· Certify that the design information / project definition have been incorporated in the
design;
· Certify that easement requirements and earthing details are shown and are in order;
· Considering design issues, including checking for over-design and mechanisms to
permit work on high voltage systems without disruption to customer’s supply;
· Certify that funding details for components in the scope of works are correct;
· Certify that there are no obvious errors that depart from design standards and
Design Certification Fee specifications;
· Certify that shared assets are not over-utilised to minimise developer’s connection
costs and that all appropriate assets have been included in the design;
· Audit design calculations such as voltage drop calculations, conductor clearance
(stringing) calculations etc;
· Certify that a bill of materials has been submitted;
· Check and certify that an environmental assessment has been submitted by an
accredited person;
· Check asset valuation documentation; and
· Check design package contents.
DNSP is required to recheck a design initially found to be not certifiable, except where
Design Re-certification Fee the modifications to a design are of a trivial or minor nature.
Work of an administrative nature performed by a DNSP where a local council requires
evidence in writing from a DNSP that all necessary arrangements have been made to
supply electricity to a development.
This may include without limitation a:
- Notification of Arrangement (NoA); or
- Compliance Certificate
involving:
· Receiving and checking linen plans and 88B Instruments;
· Checking and recording easement details;
Notification of Arrangement /
· Prepare records for conveyance officers;
Compliance Certificate
· Liaise with developers if errors occur or changes are required;
· Check and receive duct declarations and any amended linen plans and 88B
instruments approved by a conveyance officer;
· Confirm the works are completed in accordance with the DNSP's requirements
including substations and ducts, service mains to the customer’s ‘point of supply’ and
peg all easements and lot frontages and complete the works.
The DNSP, may issue a NoA or Compliance Certificate prior to completion of the
contestable works provided:
· the contestable design has been certified, and
29 | Network Price List: Ancillary Network Services 2020-21You can also read