TEMPLAR PLACE SHD ARCHITECTURAL DESIGN STATEMENT - STAGE 3 SUBMISSION
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
REVISION RECORD ISSUE NO. DATE STATUS PREPARED CHECKED A 07/05/2020 FEASIBILITY STUDY Sylwia Allen Robert McCauley B 23/09/2020 S247 Sylwia Allen Robert McCauley C 03/11/2020 S247 Sylwia Allen Robert McCauley D 08/12/2020 PAC Silvia Meehan Robert McCauley E 29/07/2021 SHD3 Silvia Meehan F G H I J 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 2
CONTENTS SITE a. Site measures 1.05 acres b. Located between High Street, Quay Street and Bridge Street in Balbriggan 1.0 Introduction c. Located within Architectural Conservation Area 2.0 Existing Context 3.0 Context for New Residential Design NEIGHBOURHOOD 4.0 Layout for New Residential Design 5.0 Inclusivity for New Residential Design 6.0 Variety for New Residential Design 7.0 Efficiency for New Residential Design 8.0 Distinctiveness for New Residential Design SITE 9.0 Public realm for New Residential Design 10.0 Adaptability for New Residential Design 11.0 Privacy/ Amenity for New Residential Design HOME 12.0 Parking for New Residential Design 13.0 Detailed Design - Materials 14.0 Conclusion 14.0 Response to ABP Opinion. MCCAULEY DAYE O’CONNELL ARCHITECTS 3
1.0 1.1 1.2 THE TEAM SUMMARY OF DEVELOPMENT INTRODUCTION 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 4
1.1. | THE TEAM This architectural design statement has been prepared by McCauley Daye O’Connell Architects on behalf of Rhonellen Development to demonstrate how the proposed development of the circa 0.42 ha subject site at Templar Place, High Street & Quay Street, Balbriggan, Co. Dublin, addresses the design criteria set out in the ‘Urban Design Manual-A Best Practice Guide.’ The design statement has been informed by and where necessary is consistent with the criteria set out in: - Guidelines for Planning Authorities on Sustainable Residential Development in Urban Areas (2009); - Delivering Homes, Sustaining Communities (2008) / Quality Housing for Sustainable Communities (2008); - Sustainable Urban Housing: Design Standards for New Apartments (2018); - Urban Design Manual – A Best Practice Guide (2009); - Urban Development and Building Heights (2019). - Fingal Development Plan 2017- 2023 The information presented in this report has been informed by a team of the following consultants: McCauley Daye O’Connell - Architects Molloy & Associates - Conservation Architects McGill Planning Ltd - Planning Consultants ORS Consulting Engineers - Civil, Structural, Traffic Consultants / Waste Management Consultants Varming - M&E Consultants / Public Lighting Consultants Cunnane Stratton Reynolds - Landscape Architects IN2 - Daylight, Sunlight and Overshadowing Consultants / Wind micro-climate Consultants Goldsmith Engineering - Fire Safety Consultants Traynor Environmental - Waste Management Consultants Aramark Property - Resident Support Facilities and Resident Services & Amenities Report / Building Lifecycle Report D3D - CGIs SUPPORTING DOCUMENTS Along with the drawings required by regulation, this architectural design report forms a part of the full submission to ABP for Pre-Application Consultation and should be read in conjunction with the supporting technical reports prepared by the project team and the architecture, landscape and engineering services drawings supplied. McCauley Daye O’Connell is a leading award winning architecture, urban design and interior design firm offering programming, planning, design, strategic masterplanning and consulting services - specialising in innovative design that exceeds client goals and produces environments of high quality. McCauley Daye O’Connell is a company formed in 2004 by directors who have practiced in Ireland, the USA and Australia over the past 30 years, have collaborated together for many years and have offices in Dublin and London. We have over 30 staff including architects, interior architects, interior designers, architectural technicians, financial control and support staff. McCauley Daye O’Connell has acted as lead design architect for this project. 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 5
1.2. | SUMMARY OF DEVELOPMENT This architectural design statement will analyse the site and its context, set out the adopted design principles based on the DoEHLG Urban Design Manual and demonstrate how the proposed development achieves the policies and objectives of the National Planning Framework (2018), Regional Economic and Spatial Strategy (RSES), Sustainable Urban Housing: Design Standards for New Apartments (2018), the Fingal Development Plan 2017- 2023 and the Urban Development and Building Heights Guidelines (2019). The proposed development comprises a Build to Rent (BTR), Strategic Housing Development (SHD) as follows: Demolition of the existing buildings (former shopping centre and associated structures). Construction of 3 no. apartment blocks (Blocks A - C) ranging in height from 3 to 6 storeys (with Block B over 3 no. lower courtyard floors) providing a total of 101 units (19 no. studios, 41 no. 1-beds, 41 no. 2-beds). Provision of Resident Support Facilities/Resident Services and Amenities, 2 no. retail units, car parking (at ground floor), cycle parking, ESB substation/switch room, plant, bin stores, open space, landscaping, boundary treatments, all associated site works and services provision. The proposed development is referred to as Templar Place Development SHD. A full, detailed development description is provided in the Planning Report and Statement of Consistency prepared by McGill Planning Ltd. The site slopes from the perimeter of High Street down to Quay Street with the highest point being the southern corner of the property. The development provides vehicular access from Quay Street, at its lowest end being the northern corner of the site. The site plan has been devised to minimise impacts on the lands and visual amenities of the local area. The apartment buildings are carefully sculpted and terraced to have regard for the existing scale of the residences surrounding the site. Fully enclosed, private pedestrian link connecting Quay Street and High Street will allow the permeability of the site. The overall layout and landscaping design will provide a high level of amenity for the future residents and help create individual character areas within the development. The proposed courtyard is extensively landscaped, in order to ensure a high standard of living to all new residents. The scheme is a considered response to its zoning, context and history with a total provision of open space in line with the Fingal Development Plan minimum requirements. The proposed scheme will create a new vibrant district in the heart of Balbriggan, proximate to high-quality public transport and services, and will represent a considerable enhancement of the residential character of the area. 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 6
2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 SITE CONTEXT CONNECTIVITY SITE ZONING EXISTING SITE PLAN EXISTING SITE PLANS & ELEVATIONS SITE PHOTOGRAPHS PLANNING HISTORY NEIGHBOURHOOD - EXISTING 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 7
2.1 | SITE CONTEXT SITE Site of Former Balbriggan Shopping Centre - The Mall The subject site is ideally situated for development being located in the heart of Balbriggan, a bustling coastal town located within the Greater Dublin Area (GDA). Balbriggan Town Core is an Architectural Conservation Area containing many buildings that are protected stuctures of special interest. The town contains a mix of architectural styles and has a well developed sense of place. Balbriggan contains a series of outstanding local amenities that contribute to its character including a railway viaduct built in 1843, Balbriggan Lighthouse, Balbriggan Harbour, Balbriggan Beach and Martello Tower. The land is a strategic infill site located just 350m away from Balbriggan Train Station, 1 200m from Balbriggan Beach and Harbour and 3km from the M1 motorway. It is located within an existing employment center and is within easy walking distance of numerous local facilities and amenities. The site has a frontage on two prominant streets, Quay Street and High Street. High street is a predominantly residential street with a mixture of single and double storey houses and 3- 4storey apartment buildings. Quay Street contains a mixture of retail Key : N and commercial uses to the west and residential uses to the east. Quay Street directly AI ON TR ATI N connects to Bridge Street which is one of the main pedestrian and retail arteries within ST GA Site Boundary R IG UR Balbriggan Town. LB H BO BA AC R BE HA N GGA B RI L ST . BA AY 2 QU RK . ST K PA Y A AR QU R P CA T 1 Loreto Secondary School Balbriggan EE TR AYS 2 Afterschool & Montessori School QU EET 3 Montessori Pre-School TREET E STR Playground HIGH S BRIDG Medical Centre Supermarket Train Station 3 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 8
Protected Structure A 2.1 | SITE CONTEXT Appendix A NIAH structure (not on RPS) Architectural Conservation Area A1.5.5 Quality The site is within immediate access of urban space excellent and including facilities public realm network Weekday versus weekend footfall A1.5.3 Existing land uses numerous shops, grocery stores, pubs, restaurants, civic facilities Legend Footfall in the town centre was not observed to have A qualitative public space survey was carried out. The key findings of the Martello Tower such as Balbriggan Library Land use activities in the plan areasurvey can be and 2No. divided up schools, into several all within broad are summarised here as follows: but a 500 m. changed from weekday to weekend. Weekend footfall radius. The site is located distinct character area types. These are: around the corner from Bridge Street, one Newsagent Religious measured on a Saturday (13:40-16:00) was 90% of the Restaurant of the main thoroughfares Observations in the on typical town, weekday footfall populated with small locally weekday average.Barber Cafe / delicatessen This can / hairbe accounted for by the Cinema salon • Openowned spaces and (including the river run businesses. corridor, car parks, the beach and • High proportion of parents with pre-school children, often in buggies, in following factors: harbour); particular during morning time. Supermarket Solicitors Take away • Contribution of schools, in particular secondary • Proximate Institutional to the site lands (schools are a variety and religious grounds);of green open spaces, parks, • Very low visible proportion of business persons. Ethnic foodstore schools to midweek footfall. pedestrian walkways, sports pitches, playgrounds, Balbriggan Beach Real estate agent Health-related • Mixed-use core area; and Harbour. • • 6 7 Surge of activity on Drogheda Street during lunch hour and from 3.00pm Our Balbriggan 2019 – 2025 Plan New Thinking, Fresh Leadership, Ambitious Initiatives Balbriggan town centre is not performing as a Pub / loungebar Bank / credit union Civic / community • Residential hinterland; onwards as children finish school. / nightclub destination for comparison retail or retail ‘high st’. Hotel Bookshop / stationary Educational • Infrastructure including station• area. Low proportion of cyclists; less than 0.5 per min at busiest along • Commuter function of town and rail station subdued Beach Drogheda Street. at weekends.Furniture / car showroom The land use survey highlights the extent to which mixed uses are Betting office Residential Railway Balbriggan PURPOSE Brian MacCraith, Paul Reid, concentrated on the historic spine •of the Limited THE RATIONALE main provision of mixed street. The cyclestands. use core President DCU, Chief Executive, Viaduct Harbour To connect with residents, Clothes shop Chairperson Other local shop / service Fingal County Vacant Council / unused runs in a north-south direction alongin a Dublin Street Balbriggan has witnessed rapid public services and business to the north, Bridge Street expansion of new housing areas and a Balbriggan Leadership Group at the centre and Drogheda Street to the north. The meaningful way. To create positive change and build a prosperous, Bracken River corridor retail centre outside the traditional town Petrol station Unsurveyed core during the 2000s. It is now the runs parallel to the west of Dublin Street and bisects vibrant, inclusive town that is theand youngest mixed-use core one of the most area ethnically united, ambitious and committed. diverse towns in Ireland (Census, 2016). at Bridge Street as it bends to the east to meet the harbour Amenities have area. not keptVacancy pace with or In agreeing to oversee the development There is absolutely no doubt in my of a socio-economic strategy for mind that in the not too distant future Playground population growth, the local economy and unused buildings are in evidence at several points within the mixed-use core Balbriggan, I first had to satisfy myself Balbriggan, will become more widely ‘Balbriggan is area with several prominent buildings notably vacant. main street have struggled, perception The Town Centre Health of place is poor, and previous plans have that the approach that would be taken known again, as a fantastic place to live, would meet the expectations expressed work and do business. at a critical failed to be implemented. to me by the people of the town, and Check survey of 2010 counted 21 vacant buildings. Clusters of fast food moment, get There is now a need for a sustained focus that the strategy would lead to real and Balbriggan's youthfulness, natural Current disused / vacant buildings outlets feature heavily at certain points, while evening time activities such as sustained transformation. amenity, heritage, diversity and location this right and on rejuvenating the original town and main street and how they relate centre are just some of the qualities which make restaurants and pubs are notably sparse by comparison. That necessary desire and commitment it great. Playground a new vibrant to the expanded town, with a view to creating a more attractive, connected was evident to me in the Chief Executive Prominent landresilient and management team of Fingal County In my role as Chief Executive I am proud uses in the surrounding area include a large place that peoplearea want tooflive and spend Council, the locally elected members to have worked with the elected members Balbriggan can time in for work, shopping or recreational enterprise, employment and light industry to the southwest, the purposes. Further, ‘Mill there is a Field’ need to and representatives from civic, business, to secure a significant ¤20 million public and social life, whose sense of capital investment towards the town’s Pub / loungebar / nightclub be district shopping achieved.’ centre focus on community driven renewal by scheme to the west and recently developed suburban strengthening the relationships between purpose, commitment and leadership rejuvenation. When the total spend across made my job easier and guaranteed a council departments is taken into account Hotel housing estatesNeil toMclnroy, the northwest. the public, social and commercial economy, to create a more resilient, positive outcome. I expect this amount will be closer to ¤50 Restaurant CEO, Centre for million by 2021. Fingal County Councils Local Economic sustainable Balbriggan. The voice of the people of Balbriggan commitment will not end there; I expect Cinema Strategies, was to the forefront throughout the strong leadership and financial support Manchester, UK process. They have proved themselves will continue beyond this period again. Above: Image of Balbriggan Train Viaduct and Balbriggan Harbour, Looking north towards new developments at Linen Hall more than equal to the task of grasping PL Chadwick, www.geograph.ie/photo/4318181 from High Street the opportunity for change, and I look The people of Balbriggan met the forward to their continued involvement challenge to ‘Get Involved’, and engaged in shaping Ireland’s youngest and most in their thousands, influencing the plans diverse large town. for the town. I expect their continued Glebe North involvement working alongside Fingal The journey so far has been one of County Council and leaders from Football Club engagement, ambition, creativity, and academic, business, civic and public life Glebe North intent. The next stages will reveal a town transformed, harnessing its economic, will result in many more positive changes. Football Club physical and human advantages and I look forward to watching progress enabling an excellent quality of life for all throughout the lifetime of this plan, 2025 of its people. and beyond. I remain committed to overseeing the implementation of the plan in what will be an exciting and uplifting time for Balbriggan and its citizens. Mini footfall Balbriggan Town Centre and surrounding survey statutory carried land out as part use zoning and of qualitative publicBalbriggan objec- space View Town Centre current towards land uses viaduct at green open space adjacent to Open space and public realmnight Current network timeasuses existing Above: Image of Balbriggan Beach analysis tives (Fingal County Development Plan). and Balbriggan Lighthouse, Our Bal- Above: Map extracts from The public car Heart park of Balbriggan, a plan for streets and public spaces in the Town Centre, An action of the Fingal Heritage Plan 2005-2010, funded by Fingal briggan 2019- 2025 Rejuvenation Plan produced by Fingal Co. Co. Co. Co.and The Heritage Council The Heart of Balbriggan The Heart of Balbriggan 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 9
C R O SS ! ! ! ! ! t BA5 NC O UR BA2 R12 BA2 ! T !! ! ! HE BA3 IG E HT 2 M BA2 2 S 1 BA4 R1 D DE OA R LR HA 2 U M NA BA4 2 PA R1 CLONARD RK ST BA2 6 EP R122 2.2 |!CONNECTIVITY !! H ! EN M 2 2 1 R1 ST 2 O BA2 2 W BA4 BA1 R1 6 2 2 N R1 2 BA4 2 M1 R1 2 NE 2 6 DE MES ST R1 UT H HA MPT ON EP H SO KILSO UG FG1 / N5 H ! EN 2 2 R122 R12 2 NE R1 G AN ST BR IG W BAL O 6 TO W NE W TO BA1 M1 N WN E WN N Public Transportation BL M1 LA AC KH N MA W TT AL NE DE MES TO LA L H HA MPT ON N SO U T S E UG H FG1 / N5 LK KILSO FO G AN BR IG WT The site is well served by public transportation. It is located within BAL OW N E BL N LA AC 350m. of Balbriggan Train Station which is served by the Northern IN C KH N MA H W M1 TT RO AL TO LA AD L N M1 S Commuter Train Line and 500m. (6min walk) of several bus stops. E ! LK FO MAT T BOW HILL BA1 IN Bridge Street is served by 4 different bus routes: MAT C H IN C M1 RO H T LA AD FG1 / N5 M1 - Bus Eireann 101 Dublin- Drogheda ! IN C H NE M1 M1 MAT T BOW HILL BA1 Every 20-40 minutes WOO D VIEW ! RO S E PAR IN K - Bus Eineann 101X Drogheda-Balbriggan-Dublin City FG1 / N5 C AT T H SK1 ! FG1 / N5 GG AN LA N IN C H Morning and Evening rush hour service Every 20-40 M1 M1 SK3 E M1 RI KELLY 'S BAY DA RCYSTO WN BALB IN LET M1 WOO D VIEW minutes !! RO S TH E VI E PAR EW K FG1 / N5 ! N HO AR - Balbriggan Express 191 Stamullen - Balbriggan - Balrothery SK1 RO CK TO W MAT T GG AN M1 SK1 ! O TS City Center via Port Tunnel. This provides an express service SK3 E LA N LA N E E M1 E NT M1 RI RI M KELLY ! NG V CO N F6 BALTRAS NA 'S BAY DE R DA RCYSTO WN BALB TH E IN LET M1 every 20-40 minutes during peak times F1 in the mornings 2 and ! ! RI W AY N G CO I TH E VI EW V ! HO AR SK3 evenings MM RO CK BO MAT T E ON FG1 / N5 GO M1 S ! !! SK1 ! F NE - Bus Eireann B1- Route local to Balbriggan Town LA N E BA G T LA TH M1 E R IN VE N DA KN OC ! BOG O F TH SK1 SK2 LT CO N F6 BALTRAS NA BE OWN IN G ER BOG TH E OF T R KY R M1 EET HE R DA RC YS SK3 CY AS TO WN E Old Market Green is served by 3 different bus routes: ! IN IN G TH HE R ! G F1 K YST ST W AY NA STR V KN DA RC YS OW SKERRIES OC TO WN OF T C NS SK3 EL K DA R BO N - Dublin Bus 33 Lower Abbey Street towards Balbriggan BAL GR EE NLAW AP FG1 / N5 GO TR A HY N BOG ! ! ! I2 S NA M1 SALMON CH BRID TH E AR FT M DL ± G RA BA - Dublin Bus 33a Lower Abbey Street to Balbriggan via AI E G A E R IN N NG E SPA DA KN OC HE O F TH SK1 R SK2 LT BE OWN O BOG AD R KY R M1 DA RC YS R IN CY SK3 RK AS TO WN E TH Dublin Airport K YST ST GE S NA G KN R1 DA RC YS SKERRIES OW 3 M1 SKERRIES OC 2 TO WN SH C EN KILL AL AN NS ! K AD IC K DA R N ! O IN R - Dublin Bus 33X Custom House Quay/ St. Stephen’s Green UG H BAL AV GR EE NLAW DE LV M1 TR A E NU HY N M2 S NA E M1 TREE AD RC SALMON RO 1 3O AR SK2 TL O TO N LV IN TH E 2 URT MA DE GR DL E A towards Skerries, morning and evening rush hour service ALANEAN G E SPA KILL RG E R MILVER 2 I CO U R1 R127 LOU AR 3 RK TO N 2 VER ET T KILLAL ANE Chapel Street is served by the Local Link 195 Bus Ashbourne- Bal- MIL GH G IN SKERRIES VER TO N MIL ST NA M1 K SH EN KILL AL AN OC TO N OW IC K ! KN UG H AV briggan Route N M1 E M1 AD NU MILVER TON OL LA NE VER TOB ER SO E RO CO FG1 / N5 SK2 TL O TO N MA ES MIL TH U RI E ! AD KILL ALANE R TL RG E R ER MILVER RO CO U GR D SK R127 G IN OA AR M1 OU NA SNR ! TO AN D RN F1 K RIE ET OC VER KILLAL ANE AR MILVE GH KN MILER GE ! R TO N H BA Cycling ST SK IC K SK2 TO N OW FG1 / N5 LR G F4 N LO U MILVERTON N IN M1 AD BA M1 MILVER TON VER RO DR ! CUN O ES G MIL TH HE I TOB ERSOO L 5 ! F1 RR DA E BAL ST E M1 GR AD SK The Greater Dublin Area Cycle Network Plan 2013 produced by RE M1 ET RO AN !!! RN IES F1 Title: Legend: RR GE E !! H BA SK the NTA has described plans for a future greenway called the East SK2 FG1 / N5 0 250 G Primary/Secondary F4 LO U Feeder MILVERTON N IN PROPOSED Skerries-Balbrig-CYCLEBA1NETWORK E Employment Zones } Town Centre M1 Coast Trail (National PLANRoute FOR5) to connect Rush- CUN E NETWORK ! 5 EN AD D SC Inter-Urban Minor Greenway ! U University BAL BAL H Hospitals M1 gan-Gormanstown) along the coast BALBRIGGAN & SKERRIES Legend: ( EN GREATER DUBLINTitle: AREA I Institute of Technology ! D AD Greenway P ! V Village Centre S C AL Permeability Link G B SHEET N11 A ! EG Primary/Secondary ! ! BR Feeder- Primary PROPOSED CYCLE NETWORK Dublin E Employment Zones Town Centre 2 Stations I U } MAP KEY: LAN FOR BA2 ! t Shopping Centre Inter-Urban Minor -Greenway Dublin Secondary ! County Council Boundaries H Hospitals ! U University OLD MAR D LIN AREA Balbriggan TrainBALBRIGGAN & SKERRIES BALBRIGGAN ! 2 I ( KET GREE CL O Greenway BA1 P !I Institute of Technology ! V Village Centre N N AR D Permeability Link T Station SHEET N11 E AT CRO LG Dublin - Primary PE 2 I Stations F ! A ! CH SS V t Shopping Centre BALBRIGGAN w Bus Stops Dublin - Secondary ! County Council Boundaries GR OU GA M ! 1 BA3 FG1 / N5 M 1 BA3 LANE CL Northern Commuter Train Line ! O N M AR 1 ! !! D FA C R BA5 N CO ! O UR SS t BA2 T HE BA3 Bus Eireann 101 and 101X IG E HT S AD DE L RO R HA U M ! NA PA M CLONARD RK 1 Bus Eireann B1 BA2 R122 ! ! 2 M BA2 2 ! 1 BA4 R1 Dublin Bus 33,33a, 33X 2 BA4 2 R1 ST 6 EP H ! EN Local link 195 Bus M 2 2 R1 1 ST O Above: Google Maps Image with overlay describing Public Transportation routes W BA1 6 2 2 N R1 M1 NTA GDA Cycle Network Plan Left: NTA GDA Proposed Cycle Network Plan, Part 4c, Proposed Cycle Network in Towns, Sheet N11 E R1 22 6 DE MESN UT H HA MPTON R122 R1 22 KILSO UG H SO FG1 / N5 NE R122 G AN BR IG W BAL 6 TO NE W TO M1 WN E WN DE RMOT N BL M1 LA AC KH N MA W TT AL TO LA L S TO WN N S E LK FO 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 IN CH MCCAULEY DAYE O’CONNELL ARCHITECTS 10 M1 RO AD M1 MAT T BOW HILL
2.3 | SITE ZONING FINGAL DEVELOPMENT PLAN 2017-2023 The site is located within Balbrgiggan which has been designated in the Fingal County Development Plan as a Lage Growth Town. The site is zoned Objective MC: “To protect, provide for and/ or improve major town centre facilities.” Vision: To “Consolidate the existing Major Towns in the County, (Blanchardstown, Swords and Balbriggan). The aim is to further devel- op these centres by densification of appropriate commercial and resi- dential developments ensuring a mix of commercial, recreational, civic, cultural, leisure, residential uses, and urban streets, while delivering a quality urban environment which will enhance the quality of life of resi- dent, visitor and workers alike. The zone will strengthen retail provision in accordance with the County Retail Strategy, emphasise urban con- servation, ensure priority for public transport, pedestrians and cyclists while minimising the impact of private car based traffic and enhance and develop the existing urban fabric.” A specific objective has been placed on High Street for an Indicative Cycle/ Pedestrian Route. Objective MT13 of theFingal County Development Plan aims to “Pro- mote walking and cycling as efficient, healthy, and environmental- ly-friendly modes of transport by securing the development of a network of direct, comfortable, convenient and safe cycle routes and footpaths, particularly in urban areas.” 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 11
2.3 | SITE ZONING FINGAL DEVELOPMENT PLAN 2017-2023 The site is located within the designated Balbriggan Town Core Ar- chitectural Conservation Area. ET Balbriggan Town Core ACA SE AP O IN T RE ST AY ACA I LW RA T The Architectural Conservation Area (ACA) is a place, area, group EE LA ST TANKARDSTOWN R NE ST RE L IL ET M Y UA Q of structures or townscape that this is of special architectural, his- torical, archaeological, cultural, artistic, scientific, social or technical T EE TR L LS IL H PE E'S A CH RG EO interest aims to identify areas of special character and architectur- G al interest or value or contributes to the appreciation of Protected D E'S R R AD OU L RG O RO RB HIL EO G H HA G E D A structures. The goal is to provide a framework that will permit a ET RE ST ET RE EL AP ST ST CH degree of flexibility in terms of design consistent with the main- RE ET NE L IL LA M NT tenance and improvement of the essential character of the ACA. OI T EE AP S TR SE AY QU To fulfil this objective all new development in the area of the ACA CH AP EL should be implemented and carried out in accordance with the out- MI LL lined policies/objectives. CO UR T RA CE Objective DMS 157 - “Ensure that any new development or altera- BRID tion of a building within an adjoinging ACA positively enhances the GE ET ST RE character of the area and is appropriate in terms of the proposed design, including: scale, mass, height, proportions, density layout, ET ET RE ST R RE HIGH ST materials, plot ratio and building lines.” ST EE T BALBRIGGAN H RD C UR O NA CL CH Objective: DMS 158: “All planning applications for works in an Ar- TANKARDSTOWN chitectural Conservation Area shall have regard to the information outlined in Table 12.11. THE SQ UARE Please note in response to the above a detailed Architectural Con- servation Report has been prepared by Molloy and Associates to St Pe te r's Te rra T ce EE TR accompany this submission. LS L HA UX VA E AC PL N O PT M HA HA MP TO N ST RE ET ST REET MA CLONARD or FOLKSTOWN GREAT RK ET CLONARD COURT SCALE:- 1:2500 GREE N St M ola ga 's Te E ET rra ce S TR DUBLIN HA LL VAUX 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 12
2.4 | EXISTING SITE Site of Former Balbriggan Shopping Centre The site comprises: 2No. existing buildings; the former Balbriggan Shopping Centre - The Mall and rooftop car park to the north and an existing shed building to the east containing a Cycling and Angling Store and ESB sub-station. Both buildings are of little architectural merit and do not compliment the character of the ACA or Balbriggan Town K center. It is proposed to demolish these. R PA CAR Along Quay street there is currently pedestrian access into the existing “Shopping Centre” along with delivery V EL E LE vehicle acess into a small service yard to the north. The primary vehicular access for the site is from High Street AC R F onto a rooftop car park. There is a very steep embankment to the north-east of the site, with a difference in level SU from High Street to Quay street of c. 9m. Hight Street slopes upwards from North to South and consists of primarily residential development. A terrace of single storey cottages is situated along the north-east boundary of the site. Across the road are double storey terraced houses. Bounding the site to the south is a 4 storey apartment building containing a set back penthouse level. Directly beside it is Balbriggan Library which consists of the 18th century 2-storey Carnegie Library, a protected structure and a contemporary 3 storey extension with a frontage onto St. George’s Square. T EE TR YS Along Bridge Street, next to Balbriggan Library is the Bracken Court Hotel, a stepped 5 storey building with a Q UA formal street frontage. Bridge street is one of the busiest streets in Balbriggan Town, containing a variety of shops, cafes, banks and other civic and commercial amenities. The heights of the buildings on Bridge Street, that share a boundary with the site vary from 2- 5 storeys. Although the site is located in the bustling heart of Blabriggan Town, with many buildings of architectural merit nearby, it is unfortunate that there are also many disused, boarded up shop frontages that are falling into disrepair in the town center. This includes the former Mall Shopping Centre, which forms part of the site, and several other building along Quay street. BRID REET There are plans to revitalise Balbriggan Town Centre as outlined in the ‘Our Balbriggan 2019- 2025 Rejuvenation GE ST Plan’ produced by Fingal Co. Co. The plan proposes for Quay Street to become an important pedestrian link HIGH ST between the town center and the coastal amenities of Balbriggan Park, Balbriggan Beach and Harbour. REET BRA The proposed development presents a real opportunity to activate and improve the currently unfriendly pedestrian CKE realm on Quay Street and for the scheme to play a vital role in the regeneration of Balbriggan Town core. NC OU RTHO TEL BA LIB LBR RA IGG RY AN ST. GEO 5 Storey Building Upward Slope Existing “Mall Shopping Centre” RGE’S S QUARE & Cycling and Angling Store to 4 Storey Building Active Commercial Street Frontage CURTH be demolished OUSE 3 Storey Building Inactive/ Disused Street Frontage Protected Structures HA MP TO 2 Storey Building Active Civic Street Frontage Pedestrian Access N STR EET 1 Storey Building Residential Street Frontage Vehicle Access Right of Way 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 13
A1 2.5 | EXISTING SITE SECTIONS & ELEVATIONS A1 A1 31 30 29 28 27 26 25 25 The topography of the site is unique, containing a very 24 24 23 23 steep slope. There is a level change of c. 9m. from 22 21 22 BOUNDARY BOUNDARY 21 High Street down to Quay street as demonstrated by 20 19 20 19 the survey section to the right. 18 17 YS TR EE T 18 17 A 16 QU 16 15 15 14 14 13 13 12 12 11 11 10 10 9 8 9 Malin Head Datum 7 8 Malin Head Datum 6 7 Elevation 5 6 Elevation 4 5 4 Single storey cottage Steep Slope Existing Shopping Centre “The Mall” to be demolished 31 30 29 BOUNDARY BOUNDARY 28 27 26 20 25 19 24 18 23 17 22 16 21 15 20 14 19 ISSUE FOR PLANNING 13 18 17 12 16 REV DATE DESCRIPTION BY 11 1 23/09/2020 ISSUE FOR SECTION 247 Client: Rhonellen Development 15 10 Project: BALBRIGGAN - HIGH STREET / QUAY STREET 14 9 Title: SITE LOCATION MAP 13 8 Malin Head Datum 12 7 1164-MDO-XX-XX-DR-A-01001 4 storey Apartment Building with set back penthouse5 level APPROVED BY Balbriggan Library Existing boundary walls to be demolished Existing shed to be demolished Single storey cottages 11 6 Sheet No.: Elevation 10 Scale as: 1 : 1000 Current Rev.: 1 Project No.: 1164 DO NOT SCALE ● USE FIGURED DIMENSIONS ONLY ● NOTIFY THE ARCHITECTS OF ANY DISCREPENCIES ON THE DRAWING PRIOR TO WORK PROCEEDING ● THIS DRAWING IS COPYRIGHT OF MCCAULEY DAYE O'CONNELL ARCHITECTS 9 02/11/2020 11:45:38 4 C:\Users\mreyt\Downloads\1164-MDO-ZZ-ZZ-M3-A-0006_Mreyt.rvt 8 Malin Head Datum Above: High Street Elevation - Survey by ORS Engineers 7 6 Elevation 5 4 19 BOUNDARY BOUNDARY 18 17 16 15 14 13 12 11 10 9 8 Malin Head Datum 7 6 Elevation 5 4 Single storey Morelli’s Ice cream shop Double storey house Existing boundary walls, Existing Shopping Centre “The Mall” to be demolished cottage facing Quay Street, to be demolished Above: Quay Street Elevation - Survey by ORS Engineers INFORMATION REV NO: DATE: REVISION NOTE: DWN BY: CKD BY: CLIENT: RHONELLEN GROUP P01 26/08/2020 ISSUED FOR CLIENT KM CG P02 16/09/2020 ISSUED TO CLIENT KM CG RESIDENTIAL DEVELOPMENT AT © ORS PROJECT: This drawing and any design hereon is the copyright of the BALBRIGGAN SHOPPING CENTRE, CO DUBLIN Consultants and must not be reproduced without their written consent. All drawings remain the property of the Consultants. STREET ELEVATIONS TITLE: 1164 - toTEMPLAR be checked on site. PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN Figured dimension only to be taken from this drawing. All dimensions | 1164-606-DESIGN STATEMENT 20210728 DRAWN: CHECKED: APPROVED: JOB NO: MCCAULEY DAYEREV: O’CONNELL ARCHITECTS 14 Consultants to be informed immediately of any KM KM CG 201_321 INFORMATION REV NO: DATE: REVISION NOTE: DWN BY: CKD BY: discrepancies before work proceeds. P02 P01 26/08/2020 ISSUED FOR CLIENT KM CG DATE: SCALE: Dublin | London | Mullingar DRAWING NO: T: +353 4493 42518 | W: www.ors.ie | E: info@ors.ie
2.6 | SITE BOUNDARY PHOTOGRAPHS High Street views Existing Site Boundary 4 Storey Apartment 5 Storey Bracken Existing shed building containing 1. 2. Wall (to be demolished) Building Court Hotel Cycling and Angling Store / ESB substation (to be demolished) 3. E T RE Y ST A QU 4. 2. 1. Quay Street views Overgrown & Steeply Existing Site The former Shopping Centre ‘The Disused Building - The former ‘Shopping Centre’ (to Sloping Embankment Boundary Wall Mall’ (to be demolished) Former Casino be demolished) 3. 4. REV DATE DESCRIPTION BY 1 23/09/2020 ISSUE FOR SECTION 247 DO NOT SCALE ● USE FIGURED DIMENSIONS ONLY ● NOTIFY THE ARCHITECTS OF ANY DISCREPENCIES ON THE DRAWING PRIOR TO WORK PROCEEDING ● THIS DRAWING IS COPYRIGHT OF MCCAULEY DAYE O'CONNELL ARCHITECTS 02/11/2020 11:45:38 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 15
2.6 | SITE PHOTOGRAPHS High Street views 1. A1 E T RE Y ST A QU 1. 2. Neighbouring Single Steeply Sloping The former Shopping Centre ‘The Storey Cottages Grade Mall’ (to be demolished) T ST RE E 2. A Y QU REV DATE DESCRIPTION BY 1 23/09/2020 ISSUE FOR SECTION 247 DO NOT SCALE ● USE FIGURED DIMENSIONS ONLY ● NOTIFY THE ARCHITECTS OF ANY DISCREPENCIES ON THE DRAWING PRIOR TO WORK PROCEEDING ● THIS DRAWING IS COPYRIGHT OF MCCAULEY DAYE O'CONNELL ARCHITECTS 02/11/2020 11:45:38 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 16
2.6 | SITE PHOTOGRAPHS High Street views Quay Street Car Park View to Quay View to Balbriggan Train Street Park Viaduct 1. 2. E T RE ST 2. QU A Y 1. A1 3. 4. Rear View of neighbouring 4 storey Rear View of the The former Shopping Centre ‘The apartment building Bracken Court Mall’ Rooftop Car Park T EE STR A Y QU 3. 4. REV DATE DESCRIPTION BY 1 23/09/2020 ISSUE FOR SECTION 247 DO NOT SCALE ● USE FIGURED DIMENSIONS ONLY ● NOTIFY THE ARCHITECTS OF ANY DISCREPENCIES ON THE DRAWING PRIOR TO WORK PROCEEDING ● THIS DRAWING IS COPYRIGHT OF MCCAULEY DAYE O'CONNELL ARCHITECTS 02/11/2020 11:45:38 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 17
2.6 | PLANNING HISTORY PREVIOUSLY GRANTED PLANNING APPLICATION • Planning Reference: F00A/0707 • Applicant Name: Balbriggan Shopping Centre • Description: Demolition of High Street shop units and shopping centre roof top structures and the construction of 41 dwellings in 2/3 storey blocks consisting of 1, 2, 3 bed apartments and duplex apartments, 627 sq.m. offices, 375 sq.m. retail, 741 sq.m. exten- sion to shopping centre facilities, pedestrian retail street, an un- derground carpark structure for 184 cars and associated landscap- ing and enabling works. Balbriggan Shopping Centre, Quay Street, Balbriggan, Co. Dublin. Decision Date: July 10, 2001 • Decision: GRANT PERMISSION • Site Area m2: 3,727.96 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 18
3.0 3.1 4.1 5.1 6.1 CONTEXT FOR NEW RESIDENTIAL DESIGN DEVELOPMENT LAYOUT INCLUSIVITY VARIETY NEIGHBOURHOOD - PROPOSED 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 19
3.1 | CONTEXT FOR NEW RESIDENTIAL DESIGN Existing Bike Shop/ Existing Carpark 1. 3. How does the development respond to its surroundings ? ESB Area to be levelled / FFL green courtyard created Existing ’Shopping Urban • The development seems to have evolved naturally as part of its Centre’ Design surroundings Manual: • Appropriate increases in density respect the form of buildings and landscape around the site’s edges and the amenity enjoyed Entrance at High Street by neighbouring users High Street • Form, architecture and landscaping have been informed by the level development’s place and time • The development positively contributes to the character and identity of the neighbourhood • Appropriate responses are made to the nature of specific boundary conditions To po Response: The principal elements of the proposed residential development include: et gr tre ap • 101 No. studios, 1 & 2 apartments within 3 No. apartment blocks Concept S Diagrams hy ay • 25 No. associated car parking spaces located on ground floor of Qu Block A on Quay Street, under landscaped podium; Entrance at Quay • 182 No. bike parking spaces - 130 No. long stay spaces and 52 Street level No. short stay visitor spaces • 2 No. Ground floor Residents’ Amenity Spaces - 217.03 sqm. • 2 No. Ground floor retail units • Landscaping to include central courtyard and playground and small courtyard forming the entrance to Block C and car park • 1 No. ESB substation integrated into Block A on Quay Street Demolish 2. 4. The primary design concept for the site is to demolish the disused former Demolish ‘Shopping Centre’ and existing shed building containing a Cycling & Angling Store and ESB substation, and to replace these with three residential buildings that will create new active frontages to Quay Street and High Building Pedestrian (stair) connection Street. It is proposed to create a south-west facing communal courtyard set backs between two coourtyards between the three residential blocks that will act as a nucleus for the High Street development, providing strong visual and physical connections between the apartment buildings. A podium at first floor level will conseal a small Building residential car park below and contain an elevated, sunny courtyard set back connecting all three buildings. The courtyard will provide a lively outdoor amenity space for residents to meet, play, relax, and congreagate. The proposed buildings are designed to senstively address the existing neighbouring context. The design incorporates set backs To Building p accross the upper levels of each of the blocks. The blocks are og Slo set back et ra designed to be tallest facing the central courtyard and step down pe e Str p of hy towards the site boundaries in order to minimise visual impact on c. ay Retail adjacent properties and narrow streets and prevent over-shadowing. 9m Qu Building et re recessed & s Relocated set back ESB Retail 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 20
3.1 | CONTEXT FOR NEW RESIDENTIAL DESIGN How does the development respond to its surroundings ? A1 Access to the site is provided on two levels, one from Quay Street and the other from High Street. A vehicular entrace to a small car park is located XX-XX-DR-A-05000 on Quay Street below Block A. The car park is located at ground level, ac- 2 commodating the car parking and mechanical plant-room requirements 23501 XX-XX-DR-A-05005 for the development. Provision has been made for 25 car parking spac- 1 es, a reduced figure based on the development's central location in Bal- briggan Town Center and access to multiple public transportation links. Addiotionally, there are a total of 182 bike parking spaces provided at 17695 ground level, that can be easily and conveniently accessed from the 1 XX -X 1 X- DR secondary entrance on Quay street and High Street. These include 130 20845 2 XX-XX-DR-A-06001 00 -A 05 2 -0 - 50 -A 06 XX-XX-DR-A-06000 DR secure, long-stay bicycle parking spaces, and 52 short stay visitor spac- 2 X- XX -X XX -X X- DR es. -A 1 -0 50 02 17995 XX 1 68 -X 22 X- DR -A 2 -0 The majority of existing wayleaves and escape routes from the adjascent 50 05 properties will be maintained. One new wayleave is proposed, to provide H a revised fire escape route from the Bracken Court Hotel subject to IG 41 75 9 25805 H XX-XX-DR-A-05004 agreement between parties (as indicated on the diagram to the left). 1 30175 23 25 3 S 61367 25075 T R 3 27025 The development aims to achieve a balance between density XX-XX-DR-A-05001 E 59 72 E XX-XX-DR-A-06001 and open space provision in this central, urban location. It is pro- 1 XX-XX-DR-A-05000 T 1 posed to provide 0.15ha of high quality, useable and well land- 3 6 STORIES 5 STORIES scaped communal open space / Class 2 'Pocket Park'. This will ex- 14824 4701 COURTYARD XX-XX-DR-A-06000 ceed the 10% minimum open space requirement stated within the 1 30175 XX Department of Housing, Local Government and Heritage Sustain- -X 25075 X- DR STREET -A able Residential Development in Urban Areas Guidelines 2009. BLOCK B -0 50 06 4 1 XX 30175 -X X- 6 XX-XX-DR-A-06001 DR 46 20 -A -0 50 1 71 03 22 XX-XX-DR-A-05003 UPPER 3 19264 COURTYARD 17725 BLOCK C QUAY 5 2 3 70 00 11 05- -A 14800 2 DR Primary Pedestrian Entrances into the Proposed Apartment Buildings X- 4989 -X XX 4300 XX-XX-DR-A-06001 1651 3 STORIES 12630 1818 23480 XX-XX-DR-A-05003 Secondary Entrances into the Central Communal Areas and Courtyards 4300 2 8648 17393 BLOCK A XX-XX-DR-A-05001 2 4 Vehicular Access into Underground Car Park XX-XX-DR-A-05004 Proposed Wayleave (Subject to agreement between parties) 13728 Proposed Gate (Subject to agreement between parties) Children’s Playground Communal Open Space ISSUE FO REV DATE DESCRIPTION BY NORTH POINT 1 08/12/2020 PAC Client: Rhonellen Development 2 12/07/2021 SHD STAGE 3 PLANNING APPLICATION Project: Templar Place SHD Title: GA - ROOF LEVEL 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS ONLY FOR REFERENCE WITH PLAN DRAWINGS 21 APPROVED BY Sheet No.: 1164-MDO-XX-RF-DR-A-02
4.1. | DEVELOPMENT LAYOUT Building Heights & Massing Careful consideration was taken of the existing neighbouring context, site topography, density and appropriate distances between buildings, in the development and location 6 Storey of each block. The proposed massing of Block A is broken into smaller volumes via vertical splits, 5 Storey 5 Storey material alteration and a series of set backs. The block steps from 6 storeys, facing the central courtyard, down to 1 storey facing the north boundary of the site, to 4 Storey 4 Storey sensitively address the adjacent two-storey residential property. Similarly, it is proposed for the block to step down to 5 storeys to the southern and 4 storeys to ck the western boundaries to address the neighbouring urban context on Quay Street. t ba The steps in height will minsimise the visual impact of the Block on the adjacent n of se o 1 Storey ec ti properties whilst creating generous, outdoor terraces for the penthouse apartments. Dir The use of carefully chosen lightweight materials on the upper floors, light gray metal cladding for the set back 5th floor and curtain walling with a combination of glass and spandrel for the recessed 6th floor, aid in breaking down the scale and massing of the Fac block. The use of curtain walling on the top floor will provide reflections of the sky and Fac a de R a de R ece diminish the visual impact of this level when viewed from a distance. The elevations of the ece ss lower floors of Block A, facing onto Quay Street, are vertically divided to resemble a series ss of 4 storey town homes. This is achieved by alternating the use of two-tone buff brick SECTIONS & VIEWS DESCRIBING HEIGHTS AND SETBACKS and coloured render, with separations between materials created either through shadow gaps or deeper recesses in the facade, in order to create a dynamic street frontage. Quay Street All windows on the western facade have been designed with controlled aspect louvers to prevent the overlooking of the adjacent properties and private gardens. PROPOSED BLOCK B BUILDING ON HIGH STREET 31325 29240 27000 25375 BA - Lift Overrun 25395 24745 BLOCK A 1400 23975 BA-06 3150 21223 20825 BA-05 3150 17675 BA-04 17975 3150 20675 14525 BA-03 3150 11375 BA-02 3150 8225 BA-01 8525 3525 4700 BA-00 4100 4568 4000 STONE TO MATCH EXISTING WALL HIGH ST. RESIDENTIAL / COMMERCIAL BUILDINGS NEIGBOUR BUILDING PROPOSED BLOCK A BUILDING ON QUAY STREET NEIGBOUR BUILDINGS COMMERCIAL COMMERCIAL UNITS FOLLOWING UP THE BRIDGE STREET 1 CONTEXTUAL ELEVATION QUAY STREET 02 1 : 200 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 22
4.1. | DEVELOPMENT LAYOUT Building Heights & Massing 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 23
4.1. | DEVELOPMENT LAYOUT Building Heights & Massing Block B has been designed to compliment the existing architecture on High Street. The height of the neighbouring apartment building to the south is three storeys with a set back 4th storey penhouse level. Similarly, it is proposed for Block B to have a 3 storey street frontage with two set back levels to minimise the visual impact onto High Street. To the northern boundary, the block terraces down from 5 storeys to 3 storeys in order A1 to sensitively address the neighbouring terrace of houses. All windows on the northern facade have been designed with controlled aspect louvers to prevent the overlooking of the adjacent properties and private gardens. Vertical recesses in the facade add visual 5 Storey interest and break down the massing of the block further. PROPOSED BLOCK B BUILDING ON HIGH STREET PROPOSED BLOCK A BUILDING ON QUAY STREET 31325 BB - Lift Overrun 4 Storey 31325 30575 BB-EV 30575 1500 It is proposed to use predominantly brick for the lower 3 storeys of Block B in order to 29825 BB-08 3 Storey seamlessly tie in with the existing streetscape. 26675 ManyBB-07of the neighbouring buildings are 3150 27295 redbrick. The introduction of white render to the central bay of the building in combination ck 25375 3150 24745 t ba 24355 with the use of recessed balconies works to vertically 23525 break down the scale of the building BB-06 e of s 16500 and provide a visually interesting street facade. 20375 BB-05 n 3150 ctio 21223 e Dir 3150 It is proposed to clad the recessed 4th storey in a grey metal panel and the 5th storey in 17975 17225 BB-04 glazed curtain walling in order to break down the14075mass of the building further and reduce 3150 BB-03 the visual impact of the structure on the neighbouring buildings. Similarly to Block A, the Controlled aspect, OUTLINE OF EXISTING HOUSING use of curtain walling on the top floor will provide reflections of the sky and diminish the louvered,11340 visual impact of this level when viewed from a distance. pop-outs prevent overlooking High Street EXISTING HOUSING HIGH STREET PATH EXISTING NEIGHBOUR LAND QUAY STREET 1 CONTEXTUAL ELEVATION 04 1 : 200 31325 BB - Lift Overrun BLOCK B 31325 PROPOSED QUAY STREET BLOCK A BUILDING 30575 BB-EV 1500 29825 BB-08 3150 26675 BB-07 3150 23525 BB-06 17250 3150 20375 BB-05 3150 17225 BB-04 3150 14075 BB-03 EXISTING APARTMENT BUILDING ON HIGH STREET PROPOSED BLOCK B BUILDING ON HIGH STREET PEDESTRIAN GATE NEIGHBOUR DWELLINGS ON HIGH STREET CONTEXTUAL 21164 ELEVATION - TEMPLAR HIGH STREET PLACE SHD,1 03QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 24 : 200
15375 4.1. | DEVELOPMENT LAYOUT Building Heights & Massing Block C is set back from the street. It is designed as a small garden pavilion containing 2 Storey above couryard 3 Storey only four apartments overlooking a communal landscaped courtyard. It is access through 2660 a small, semi-private courtyard off Quay Street. 4700 CAR PARK LEVEL While designing the building, a careful consideration was taken of the existing neighboring context and the height of the adjacent buildings on Bridge Street. It is designed to complete the garden walls and create a focal point of the residents' courtyard. Controlled aspect, louvered, Similarly, to Block A, the elevations are finished mainly with a buff brick. White render is pop-outs prevent used only to the lower level emphasizing the entrance to the building. 3 BLOCK C FRONT N/E ELEVATION overlooking 1 : 200 The windows on the western façade, in close proximity to Block A, have been designed with controlled aspect louvers to prevent the overlooking. 11 9 9 14 3 17250 21200 18582 26625 16150 16150 15375 15375 EXISTING GARDEN WALL 1500 7875 2660 2650 4700 CAR PARK LEVEL 4700 CAR PARK LEVEL 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 25
1028 3150 BB-04 17225 3150 BB-03 14075 12950 4.1. | DEVELOPMENT LAYOUT Building Heights & Massing 1 BLOCK B STREET FRONT EAST ELEVATION 1 : 200 8 1 9 6 3 12 7 11 BLOCK B 31325 BB - Lift Overrun 31345 30575 BB-EV 30575 1500 29825 BB-08 BLOCK A 29240 3150 27295 26675 BB-07 3150 24725 24355 23525 BB-06 17250 17250 3150 13220 20375 BB-05 10280 3150 17225 BB-04 3150 14075 BB-03 3150 10925 BB-02 9375 3150 COURTYARD 7775 BB-01 800 CAR PARK SHARED RESIDENTIAL AMENITY 3075 2650 4700 BB-00 4700 2 BLOCK B NORTH ELEVATION 1 : 200 A1 31345 30575 BB - Lift Overrun BB-EV 31325 30575 ISSUE FOR PLANNING 1500 BB-08 29825 REV DATE DESCRIPTION BY Rhonellen Development 3150 1 08/12/2020 PAC Client: 2800 N MATERIALS LEGEND IO 27295 AT 2 12/07/2021 SHD STAGE 3 PLANNING APPLICATION BB-07 26675 EV Templar Place SHD N EL BL Project: OC H RT 25375 BA - Lift Overrun 1- Red Brick 10 - Stone window sill K NO 25375 B ST 3150 2- Orange Brick 11 - Stainless steel balustrade BLOCK B - ELEVATIONS B 2800 24745 Title: RE K 1400 OC 24355 23975 BA-06 ET 3- White colour render 12 - Glass balustrade BL BB-06 23525 FR ON 4- Light blue colour render 13 - Light green colour render T EA 3150 5- Lime stone 14 - Buff brick type 01 ST 2800 3150 EL 2800 6- Zinc colour spandrel panels 15 - Buff brick type 02 1164-MDO-XX-XX-DR-A-05002 EV 21223 20825 BA-05 A BB-05 APPROVED 20375 BY TI 7- Light grey curtain wall panels ON Sheet No.: 8- Control aspect louvers KEY PLAN 3150 2800 9- Double glazing with dark grey frame 1 : 200 2 1164 3150 Scale as: Current Rev.: Project No.: 2800 26625 17675 BA-04 17975 DO NOT SCALE ● USE FIGURED DIMENSIONS ONLY ● NOTIFY THE ARCHITECTS OF ANY DISCREPENCIES ON THE DRAWING PRIOR TO WORK PROCEEDING ● THIS DRAWING IS COPYRIGHT OF MCCAULEY DAYE O'CONNELL ARCHITECTS BB-04 17225 14/07/2021 09:12:41 C:\Users\sallen\Downloads\1164-MDO-ZZ-ZZ-M3-A-3002_Sallen.rvt 3150 2800 3150 2800 14525 BA-03 BB-03 14075 19275 3150 2800 3150 2800 11375 BA-02 BB-02 10925 COURTYARD 3150 2800 3150 2800 8225 BA-01 8525 BB-01 7775 3525 CAR PARK 3175 3075 2650 3775 4700 CAR PARK LEVEL 4700 BB-00 4700 4100 STREAM N. BUILDINGS QUAY STREET PROPOSED BLOCK A BUILDING PROPOSED PODIUM PROPOSED BLOCK B BUILDING HIGH STREET EXISTING HOUSES 3 Contextual Section AA 1 : 200 31325 BB - Lift Overrun 31325 30575 BB-EV 30575 BB-08 29825 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 MCCAULEY DAYE O’CONNELL ARCHITECTS 26 2800 BOUNDARY LINE 27275 27000 BB-07 26675 00
A1 27 XX-XX-DR-A-05000 2 XX-XX-DR-A-05005 MCCAULEY DAYE O’CONNELL ARCHITECTS 1 7154 8225 23400 2850 10750 9800 9550 9500 XX 1 -X X-D 2 Bed Apt 1 37 21 R-A 10200 02 50 Type 03 SH 9899 XX-XX-DR-A-06001 BIK OR -0 -0 50 85.07 m² 75 91 XX-XX-DR-A-06000 R-A ES T S - N TA 4 2 06 X-D o2 Y XX XX -X 2 00 99 XX-XX-DR-A-06001 00 -X X-D 95 R-A 5.1. | INCLUSIVITY & ACCESS FOR NEW RESIDENTIAL DEVELOPMENT -0 50 1 02 XX SMOKE SHAFT 1 Bed Apt 67 0 0 -X 22 AO 185 X-D V 6200 1 Bed Apt Type 02 R-A Type 02B 52.23 m² 34 2 -0 50 6200 93 62 15073 00 2 05 ø1 54.35 m² ø 1800 9500 80 XX-XX-DR-A-06001 0 H 2 Bed Apt L BIK ON Type 01 IG ES G S 0 13899 - N TAY 9 50 o1 83.14 m² 14400 Studio 33 0 00 BLOCK B 41 H 5100 Type 01 72 0 34 13375 1 Bed Apt 40.54 m² 22 SM ESB SH OK 12 6200 AF E 72 Type 02A 0 XX-XX-DR-A-05004 T S ø 1800 56.79 m² 91 99 0 1 Bed Apt 13375 62 00 T 5 18 Type 01 MECH/ELEC 1 Bed Apt 1 2700 R ø 1800 Type 01 53.53 m² 3 14075 22 13 E 62 53.53 m² ME CH 00 3 ø1 E /E ACCESS 14525 LE 80 1200 ROOF C S XE 62 ø 1800 0 XX-XX-DR-A-05001 T BLOCK A 2 Bed Apt 14075 BO 00 ST 54099 1 Bed Apt 6600 4700 17450 PO XX-XX-DR-A-06001 5850 Type 06 XX-XX-DR-A-05000 89.45 m² 1 Type 01A COURTYARD 62 51 m² 14075 1 Bed Apt 00 1 Type 01G 12901 52.38 m² 69 00 98 45050 3 00 28 ø 1800 00 2 Bed Apt 48 1 Bed Apt 5850 8525 25 16 COURTYARD XX-XX-DR-A-06000 50 76 6600 Type 06 55 13390 0 0 89.45 m² 18 5 Type 01G 61 2 1 Bed Apt 1200 ø1 14525 52.38 m² 80 X Type 01 0 X-X 1 00 V 16 AO X-D 40 53.53 m² 28 MECH/ELEC 50 62 00 R-A 0 00 0 1 Bed Apt 2700 0 -0 13 ø 1800 14075 STREET 50 1 Bed Apt 06 BLOCK B 1 Bed Apt Type 01E 00 GROUND FLOOR LEVEL (HIGH STREET) 59.17 m² 00 95 X 00 73 X-X 1 Type 01 6200 Type 02A 54 E Studio X-D 1:20 OK T 56.79 m² R-A 62 53.53 m² SM HAF S 5100 Type 01 00 13800 -0 13805 40.54 m² 50 50 ø 1800 03 18 0 65 XX-XX-DR-A-05003 22 21 17100 50 1 Bed Apt 3 Terrace Type 01B 50 76 BLOCK C 13805 2 Bed Apt 60.14 m² 00 69 95 9400 Type 05 ø1 2 Bed Apt 00 80 8250 QUAY 86.33 m² 2 03 0 Type 02 50 BLOCK C 55 50 -0 98 12 R-A 71.89 m² 4652 X-D 22 -X 52 XX 4300 7850 2400 1850 9500 4989 1933 23400 XX-XX-DR-A-05003 2 AOV 4300 14800 6699 BLOCK A XX-XX-DR-A-05001 2 4 3923 XX-XX-DR-A-05004 2177 1889 1858 A1 ISSUE FOR PLANNING REV DATE DESCRIPTION BY NORTH POINT 1 08/12/2020 PAC APARTMENT TYPE LEGEND Client: Rhonellen Development 2 12/07/2021 SHD STAGE 3 PLANNING APPLICATION Studio SITE ACCESS Project: Templar Place SHD XX-XX-DR-A-05000 1 Bed Type Title: GA - THIRD FLOOR PLAN 2 2 Bed Type ONLY FOR REFERENCE WITH PLAN DRAWINGS XX-XX-DR-A-05005 DUAL ASPECT APARTMENTS APPROVED BY Sheet No.: 1164-MDO-XX-03-DR-A-02004 Scale as: 1 : 200 Current Rev.: 2 Project No.: 1164 DO NOT SCALE ● USE FIGURED DIMENSIONS ONLY ● NOTIFY THE ARCHITECTS OF ANY DISCREPENCIES ON THE DRAWING PRIOR TO WORK PROCEEDING ● THIS DRAWING IS COPYRIGHT OF MCCAULEY DAYE O'CONNELL ARCHITECTS 1 22/07/2021 12:54:43 C:\Users\rcollins\Documents\1164-MDO-ZZ-ZZ-M3-A-3002_MDO-rcollins.rvt 8225 23400 2850 10750 9800 9550 9500 XX 1 -X X-D 9050 11658 2 Bed Apt 1 R-A 10200 02 50 9900 -0 Type 03A XX-XX-DR-A-06001 -0 4 50 82.67 m² XX-XX-DR-A-06000 R-A 2 06 X-D XX XX -X 2 XX-XX-DR-A-06001 -X 728 X-D R-A ø1 -0 80 5 0 00 1 2 1850 XX SMOKE SHAFT 1 Bed Apt -X X-D 6200 Type 02 R-A 1 Bed Apt 52.23 m² 34 2 -0 50 6200 Secondary Pedestrian Routes & Fire Escape Type 02B 93 54.35 m² 62 00 2 05 XX-XX-DR-A-06001 0 85 12 13899 0 Studio 11 65 Fire Tender & Emergency Vehicle Access BLOCK B 5100 1 Bed Apt Type 01 62 12200 ø 1800 00 Type 02A 40.54 m² 1 Bed Apt SM 25 SH OK 57 6200 56.79 m² Type 01C AF E 0 68 XX-XX-DR-A-05004 T 98 66.87 m² MECH/ELEC 1 2700 48 50 50 50 83 18 1 Bed Apt ME CH ø1 8225 Type 01A /E ACCESS LE 80 1200 ROOF C 0 2 Bed Apt XX-XX-DR-A-05001 BLOCK A 51 m² 54100 62 6600 Type 06 00 5850 COURTYARD XX-XX-DR-A-05000 89.45 m² 1 7775 1 VENT 25 ø 1800 Vehicular Acess into Car Park 45050 57 3 0 1 Bed Apt 8525 2 Bed Apt Type 01D 5850 COURTYARD XX-XX-DR-A-06000 6600 Type 06 Primary Pedestrian Routes 66.86 m² 89.45 m² 00 98 1200 ø1 8225 0 80 XX 65 11 850 0 1 V 14162 AO -X 12 X-D MECH/ELEC 1850 R-A 2700 -0 STREET 50 30000 BLOCK B 06 50 12 1 Bed Apt XX 1 6200 Type 02A -X Studio X-D 56.79 m² Type 01 R-A 5100 16 -0 15 50 14630 40.54 m² 5 03 FIRST FLOOR LEVEL (QUAY STREET) ACCESS & ROUTES THROUGH SITE XX-XX-DR-A-05003 19142 1750 1750 8225 8125 3 9400 7980 BLOCK C 2 Bed Apt Type 05 9400 ø1 QUAY 86.33 m² 1 Bed Apt 80 2 03 1850 BLOCK C 0 50 6200 Type 02 -0 52.23 m² R-A X-D Apartments 5039 2 Bed Apt Studio -X 9125 XX Type 05A Type 05 Retail Unit 8300 4300 78.02 m² 53.48 m² 1933 12542 AOV 7850 2400 9500 XX-XX-DR-A-05003 23400 Amenity 4300 2 6699 BLOCK A 4 1164 - TEMPLAR PLACE SHD, QUAY STREET/HIGH STREET, BALBRIGGAN | 1164-606-DESIGN STATEMENT 20210728 XX-XX-DR-A-05001 2 ø1 1850 1850 AOV 80 8250 3890 4770 1285 0 XX-XX-DR-A-05004 MECH/ELEC LIFT 1800 2750 1500 FROSTED GLASS ISSUE FOR PLANNING REV DATE DESCRIPTION BY NORTH POINT 1 08/12/2020 PAC Client: Rhonellen Development 2 12/07/2021 SHD STAGE 3 PLANNING APPLICATION APARTMENT TYPE LEGEND Project: Templar Place SHD Studio steps have been provided to the south as a secondary means is located to the north of Block B leading to an external glazed Response: The development has been laid out to maximise the use of the existing steeply sloped site. A varied mix of studio, 1 and 2 bed units are provided in three blocks across the scheme meeting the aspirations of a wide range of households. The buildings and outdoor spaces in the development have all ground floor of Block A has been raised above street level taking into account flood risk. Level entry has been provided to the north of the development along Quay Street with fire A level approach and primary access point is provided to Block level and the communal courtyard on the 1st floor. External of external connection, accessed from a small terrace on the The approach and primary access to Block A is provided along been designed to be Part M compliant, following universal Quay Street which naturally slopes down to the east. The into a formal lobby with elegantly designed steps and a chair lift provided, bringing residents and visitors into the ground floor. There is a secondary access point to the site along Quay Street, to the west providing level access to bike parking facilities. Vehicle access to a proposed single-storey car park is provided tender and emergency vehicle access to Blocks A and C also B along High Street at 3rd floor level. A secondary access path elevator that provides an accessible connection between this Title: GA - FIRST FLOOR PLAN 1 Bed Type amenity spaces and facilities for children of different ages, • New homes meet the aspirations of a range of people and ONLY FOR REFERENCE 2 Bed Type WITH PLAN DRAWINGS • Areas defined as public open space that have either been DUAL ASPECT APARTMENTS APPROVED BY Sheet No.: 1164-MDO-XX-01-DR-A-02002 Scale as: 1 : 200 Current Rev.: 2 Project No.: 1164 DO NOT SCALE ● USE FIGURED DIMENSIONS ONLY ● NOTIFY THE ARCHITECTS OF ANY DISCREPENCIES ON THE DRAWING PRIOR TO WORK PROCEEDING ● THIS DRAWING IS COPYRIGHT OF MCCAULEY DAYE O'CONNELL ARCHITECTS 21/07/2021 17:44:42 C:\Users\rcollins\Documents\1164-MDO-ZZ-ZZ-M3-A-3002_MDO-rcollins.rvt • New buildings present a positive aspect to passers by, • There is a range of public, communal and/or private taken in charge or privately managed will be clearly avoiding unnecessary physical and visual barriers Fire tender access for Block B is along High Street. • Design and layout enable easy access by all How easily can people use and access the development? defined, accessible and open to all. provided along Quay Street. parents and the elderly design principles. households 3rd Floor. Manual: Design Urban
You can also read