CHESTERFIELD TOWNSHIP PROGRESS AT A GLANCE PROGRESS AT A GLANCE PROVIDES A SNAPSHOT LOOK INTO THE ACTIVITIES OF YOUR MUNICIPAL GOVERNMENT, TOWNSHIP PROJECTS, AND SPECIAL SERVICES. NOVEMBER 2021
NOVEMBER 2021 Upcoming Meeting Schedule Planning Commission 11/2, 11/16, 12/7 7:00 PM Township Board 11/9, 11/23, 12/14, 12/21 7:00 PM Zoning Board 11/10, 11/24, 12/8 7:00 PM Beautification Committee 11/4, No December Meeting 7:00 PM Historical Society 11/1, 12/6 6:30 PM Parks & Recreation Commission 11/17, No December Meeting 6:30 PM Public Engagement: Looking Ahead Township Offices closed November 25-26, 2021 for Thanksgiving. Township Offices closed December 22, 2021 at 12:00 PM - January 2, 2021 for the Christmas and New Year holidays. 2022 Budget Planning The Chesterfield Township Board will be meeting on November 18, 2022 beginning at 5:00 PM for the final budget planning session. Chesterfield At Your Service Days November 18, 2021 (4:30 - 7:30 PM) December 9, 2021 (4:30 - 7:30 PM) The entire team at Chesterfield Township is offering extended hours on two select nights before the end of the year. Leisure Services, Assessing, Planning, Building, Treasurer’s Office, and the Supervisor’s Office will have staff available for you to chat with. The Clerk’s Office will be offering passport services by appointment only. To make an appointment please register online at https://mi-chesterfieldtownship.civicplus.com/404/Events or call (586) 949-0400, opt. 5.
Leisure Services Events New and exciting programs will be headed your way in mid-December! Visit Leisure Services online at parks.chesterfieldtwp.org for program availability and to register for events. Santa is Coming to Town: Wednesday, December 1 (6:00 PM) Watch the magic of Santa’s arrival as he is brought to town on a fire truck! Listen as he delivers a cheerful holiday message. Walk the Historical Village, see favorite holiday characters, & explore the vintage scene as you stroll along to Christmas played by the Anchor Bay Christmas Pep Band & the L’Anse Creuse North Marching Band. The event is sponsored by Biggby Coffee (New Baltimore, MI) and Genisys Credit Union. Christmas in Chesterfield: Friday, December 3 (3:30 - 7:30 PM) Join us this holiday season for in-person visits with Santa outdoors in our Historical Village. Each child must be registered. Visit parks.chesterfieldtwp.org for complete details and to register. Registration is required for this cost-free event. Holiday Coloring Contest: Now through December 15th (4:30 PM Deadline) Sponsored by Genisys Credit Union, this always popular contest is now available. Different age groups are able to pick up coloring sheets in the Municipal Offices during normal business hours, or find them online at parks.chesterfieldtwp.org. Township Office Construction Updates Senior Park: Phase I of this project has been completed. Phase II will begin in 2022. Bridge Replacement, Front Entrance Drive, & Parking Lot: This project is substantially complete. The blue payment drop box has been permanently relocated to its new home in the front drive, now with easy access from the driver’s side! Historical Society Events Village Winter Walk: The Historical Society is looking for support from the community and local businesses. The Historical Village will be open for visitors to stroll through out winter holiday themed village. $150 will sponsor a pre-decorated lamp post. The lamp post will fresh cut evergreen strung with lights and sponsorship signage. $25/$50 will sponsor a 10’ x10’ ground display. You’ll provide your own decorations to create a “winter wonderland” space. Themes should be from the 1950s or earlier…Think fairy tales, Christmas sons, Currier & Ives, etc. No inflatables please. You provide all decorations. Limited spots with electricity are available.
Township Business New Chesterfield Connection Headed for Your Mailboxes A new edition of our community magazine, Chesterfield Connection, will be mailed in mid-December. Keep your eyes open for information from all departments. Leisure Services Eagle Scout Project The Leisure Services Department is continuing to facilitate an Eagle Scout project in conjunction with the Public Safety Fire Team and Facilities and Operations to place 10 emergency markers in 3 different zones along the Salt River. The Eagle Scout is currently seeking funding. If funded, this project will allow an emergency caller to easily identify their location when phoning for help, and allow first responders to quickly locate the best access point for rescue.
TABLE OF CONTENTS Project Management Reports 1023-2020 Senior Park 1027-2020 Civic Center Bridge Construction 1028-2020 Civic Center Pavement Rehabilitation 1030-2021 Maurice DeMuynck Bay Harbor Pump Station Study 1032-2021 Peggy Lane Water Main Project 1033-2021 Jefferson Avenue Water Main Project - Phase 1 1034-2021 2021 Sidewalk Program Special Assessment Districts (SAD) Reports Building Reports Monthly Service Metric Dashboard
SENIOR PARK (1023-2020) November 1, 2021 Project Manager: Josh Sonnenberg Funding Source: CBDG $149,734.75 & Township $63,272.50 Phase: Construction Estimated Project Budget: $213,007.25 Project Cost to Date: $115,829.40 Estimated Completion Date: August 2021 Change Orders: $11,220.05 Project Details Our Seniors have a beautiful indoor space for all-season recreational programming, but their outdoor space is limited. The addition of a Senior Park will permit individuals, who are 55 and older to experience the outdoors in an area they can call their “own.” This park will provide outdoor activities for both the active and passive populations of aging adults. It will include an equipment-based exercise area, raised garden bed, open green space, ADA accessible concrete pathways, a patio pavilion, and shaded areas for programming; all of which will be contained within a fenced perimeter, complete with a locked gate, lush landscape, and park sign with designated use. This project will be finished in two phases. Phase One 2020: • Phase one will include site survey, fence, cement and flat work, patio pavilion foundation, garden bed foundation, courts/programming area foundation, entrance sign, turf, green space and exercise equipment. Upon completion of this phase, senior citizens will have an outdoor recreation area immediately available for use. Phase Two 2021: • Phase two includes a covered patio/pavilion for permanent shade to the patio, a doorway leading into the Senior Center, and the raised garden/flower bed * Engineering for both phases will occur during phase one. Total Project Funding is $213,007.25 with $149,734.75 from CBDG Bricks & Mortar Grant and $63,272.50 Township General Fund Timeline for Phase 1 Concept Idea (Ways and Means) January 15, 2020 Grant Applications Due to Macomb County: February 21, 2020 Grants Awarded: April/May 2020 Grant Agreement Executed: October/November 2020 Engineering Design & Bid Package: December 2020
Bid (MTTN): Posted by: April 30,2021 Bid Opening: May 13, 2021 Board Approval - Bid Award: June 2021 Formal Grant Agreement has been executed Construction Start: July 2021 Construction End: September 2021 Project Status • Site work is ongoing • Footings are in place for the sun shade area and the pavilion • Flat cement work is complete • Fence columns are erected and stone veneer work has begun • Final restoration is scheduled for September 2021 • New grass is growing in • Waiting for fence to come in for installation
Civic Center Bridge Construction (1027-2020) & Civic Center Pavement Rehabilitation (1028-2020) November 1, 2021 Project Manager: Mitch O’Connor Funding Source: GL# 101-265-975.000 Phase: Construction Estimated Project Budget: $1,024,893.40 Project Cost to Date: $610,983.32 Estimated Completion Date: Fall 2021 Project Details The paving project is for the existing surfaces be milled 2” with isolated full depth repairs where the pavement is showing signs of base failure as well as a crush and shape for the main driveway with 4” HMA cap from Sugarbush to the parking area. Using this approach and with proper maintenance the pavement should last another 10 years. The bridge project will replace the existing timber superstructure with a comparable but thicker timber structure
Project Status The project is approximately 80% complete. The bridge has been replaced and the contractor is currently completing the paving to Sugarbush. Change Orders None.
Maurice DeMuynck Anchor Bay Pump Station Study (1030-2021) November 1, 2021 Project Manager: Kevin J. Johnson Funding Source: General Fund Phase: Construction Estimated Project Budget: $162,097.00 Project Cost to Date: $98,160.37 Estimated Substantial Completion Date: September 30, 2021 Project Details The Maurice DeMuynck Anchor Bay Pump Station is in need of some overdue repairs and maintenance. While Public Works has been maintaining the station to the best of its ability, there are some major maintenance and repairs that need to be done that are beyond the scope of the department. We partnered with OHM Advisors to create a package to bring to the board that can begin the overall assessment and recommendation of what needs to be completed, and to create a capital improvement plan (CIP) that will help improve the station's functionality. As of right now the station has four pumps on site, of which three are known to need a fair amount of maintenance or replacement. The study will take roughly four months to complete. Project Status OHM Advisors, Public Works, and Engineering had a workshop on February 8 to discuss the project, as well as have an on-site visit to the pump station to gather more information. A 360-degree walkthrough was created for the building, giving a great depiction of the station and its operation. Additional meetings were held to determine the potential configuration options of the four pumps currently in the station. The meetings gathered information on the potential use of electric, diesel, or natural gas pumps in the station.
A meeting was held with Detroit Pump on July 21 and it was determined that the entirety of the pump shaft and column is beyond repair and will need to be fully replaced. The inspection of this shaft and column is the basis for the condition of all four pumps. The Water and Sewer, Engineering, and Facilities & Operations Departments are working together to determine the course of action to take on this station, as a replacement shaft and column has a 30-week lead time for replacement. Emergency backup plans are also being established in preparation for large rain events. A meeting scheduled for October 5 will shed more light on the path of improvements and a determination on how to proceed with the station moving forward. OHM will be getting the final report to Public Works by November 5, 2021. Public Works will review the report and then prepare to present the report to the township board. Change Orders None
Peggy Lane Water Main Project (1032-2021) November 1, 2021 Project Manager: Kevin J. Johnson Funding Source: Enterprise Fund Phase: Design Estimated Project Budget: $2,179,500.00 Project Cost to Date: $44,805.00 Estimated Completion Date: December 31, 2022 Project Details The Peggy Lane Water Main Replacement Project includes replacing roughly 5,000 feet of water main along the following roads: • Peggy Lane (Seaden to Sugarbush) • Short Court (off of Peggy Lane) • Seaden Drive (23 Mile to Bower Rd) Project Status A project kickoff meeting was held on April 23. OHM Advisors is currently beginning the design phase of the project. Design is currently 60% complete. Meeting will be scheduled for the week of November 8 to go over design of project, make any necessary changes before project goes out to bid in Winter 2021-2022. Change Orders None.
Jefferson Avenue Water Main Project - Phase 1 (1033-2021) November 1, 2021 Project Manager: Kevin J. Johnson Funding Source: Enterprise Fund Phase: Design Estimated Project Budget: $2,380,900.00 Project Cost to Date: $52,035.00 Estimated Completion Date: December 31, 2022 Project Details The Jefferson Avenue Water Main Replacement Project - Phase 1 includes the following water main replacement: • Jefferson Avenue from William P Rosso Highway to 21 Mile Rd - Approximately 4,500 feet • Rosso Highway east of Jefferson Avenue - Approximately 1,000 feet Project Status A project kickoff meeting was held on April 23. OHM Advisors is currently beginning the design phase of the project. Design is currently 50% complete. Meeting was scheduled for October 5 to go over design of project, OHM is making the necessary changes before project goes out to bid in Winter 2021-2022. Change Orders None.
2021 Sidewalk Replacement Program November 1, 2021 Project Manager: Mitch O’Connor Funding Source: GL# 101-446-928.000. Phase: Substantially Complete Estimated Project Budget: $439,348.35 Project Cost to Date: $193,747.84 Estimated Completion Date: Fall 2021 Project Details Area of work Zone 1 (see map) This project is to remove and replace the current sidewalk that is rated a #5, or #4 by homeowner request. Rating criteria is: 1. Lip Between Slabs #4 - 3/4 Inch - 1/4 IN length = 2FT #5 - 2+ Cracks > 1/4 IN Wide length > 2FT 3. Cross Slope #4 - Slope > 4% #5 - Slope > 6%
4. Longitudinal Slope #4 - Noticeable Tilt 1IN per FT (>8.33%) 5. Surface of Slab Scaled #4 - 1/4IN Deep #5 - >25% Scaling > 1/4IN Deep 6. Water Ponding #4 - Ponding 1/2IN Deep #5 - Ponding ≥ 3/4IN Deep Project Status This project is substantially complete and final payment has been processed. Change Orders None.
Brandenburg Sport Court Rehabilitation (1029-2020) November 1, 2021 Project Manager: Mitch O’Connor Funding Source: GL: 101-265-975-000 Phase: Substantially Complete Estimated Project Budget: $250,000.00 Project Cost to Date: $186,630.99 Completion Date: June 2021 Project Details This project resurfaced the existing basketball and tennis court and replaced the auxiliary court with three pickleball courts. Project Status Asphalt Specialist Inc. have completed construction and courts are striped and open for use. The courts have developed rust spots from trace iron in the bituminous mix. The Contractor and Township will resolve in Spring 2022. Change Orders Change Order No. 1: Change from replacement of existing fence to new black vinyl chain link fence. Change Order No. 2: Additional surfacing material & addition of 1 fence post.
BBUILDING UILDINGRREPORTS EPORTS ProgressStatus Progress StatusUpdate Updateasasofof10.31.2021 8.31.2020
125 Single Family Residential Permits Processed this fiscal year. 11/10/2021 77 Multi-Family Residential Permits Processed this fiscal year 26 Minor Commercial/Industrial Projects (Interior Buildouts, Remodel, Miscellaneous Improvements ect…) 4544 Miscellaneous Permits Processed this fiscial yeat (Fence, Windows, Roofs, Sheds, Plumbing, Mechanical, Etc…) - Jan. Feb Mar. Apr. May Jun. Single Family 13 8 39 6 13 10 Multi Family 0 0 2 0 29 0 Commercial/Industrial 1 2 3 4 3 2 Total Permit: 268 298 359 584 600 571 - Jul. Aug. Sept. Oct. Nov. Dec. Single Family 5 10 2 14 Multi Family 10 2 0 30 Commercial/Industrial 4 2 2 2 Miscellaneous 433 492 420 428 Plan Review Stage Milestone Dates Project Name Address Project Type Applied Permit Issued Final C/O Status Home 2 Suites 29328 23 Mile Rd New Building(Bldg) 9/19/2018 Review in Process New Building(Eng) 3/2/2019 11/15/2017 Approved 4/11/2019 *Plan revision Submitted Cabela's 45959 Towne Center Addition/Remodel(Bldg) 6/2/2020 Review in Process Addition/Remodel(Eng) N/A N/A *Re-submitting new Design Gordon Foods 51630 Gratiot Remodel (BLDG) 3/30/2021 Review Complete, Permit Ready Remodel (ENG) N/A N/A Ascension St. Johns Health Center 37000 26 Mile Rd New Building (BLDG) 8/10/2021 Review in Process New Building(Eng) Not submitted HP Plaza 30464 23 Mile Rd Interior Remodel(BLDG) 10/25/2021 Review in Process Interior Remodel(ENG) N/A N/A Construction Stage Milestone Dates Project Name Address Project Type Applied Permit Issued Final C/O Status Tru Hotel 45301 Market Place New Building(Bldg) 2/20/2019 6/10/2019 Under Construction New Building(Eng) 1/16/2019 3/29/2019 Approved Town Place Suites 45255 Market Place New Building(Bldg) 2/11/2018 6/10/2019 Under Construction New Building(Eng) 7/24/2019 3/29/2019 Approved Great Lake Foot & Ankle 32743 23 Mile Rd Interior Remodel(Bldg) 12/11/2019 6/30/2020 Under Construction Interior Remodel(Eng) N/A N/A Leo's Coney Island 51848 Gratiot Interior Remodel(Bldg) 8/17/2020 10/5/2020 Temp CofO 8/24/2021 Interior Remodel(Eng) N/A N/A Dental Office 52840 Gratiot New Building(Bldg) 5/29/2020 10/7/2020 Under Construction Sadikoff Dentistry 09-17-227-017 New Building(Eng) 5/29/2020 10/7/2020 Under Construction Gallo Companies 45313 Market Place New Building(Bldg) 6/4/2020 10/8/2020 Under Construction Chesterfield Corner, LLC New Building(Eng) 1/31/2020 9/28/2020 Under Construction Villiage of East Harbor Kiely New Building(Bldg) 11/22/2019 11/24/2020 Under Construction *Multi. Cottage Unit within PUD New Building(Eng) 10/1/2019 2/18/2020 Review Completed 2/18/20 Villiage of East Harbor 50900 Gerring Dr New Building(Bldg) 11/15/2019 11/24/2020 Under Construction Independent Living Building New Building(Eng) 10/1/2019 2/18/2020 Review Completed 2/18/20 Villiage of East Harbor 33875 Kiely Addition(Bldg) 11/15/2019 11/24/2020 Under Construction (Additon to Existing Heathcare/Wellness) Addition(Eng) 10/1/2019 2/18/2020 Review Completed 2/18/20 Monicatti Auto Sales 55800 New Haven New Building(Bldg) 11/9/2020 11/25/2020 Under Construction New Building(Eng) 11/9/2020 11/18/2020 Review Completed 11/18/2020 *In house Review GT Auto 54191 Gratiot New Building(Bldg) 10/21/2020 12/9/2020 Under Construction *Multi-Unit Industrial Building New Building(Eng) N/A Fitbody Boot Camp 52396 Gratiot Interior Remodel(BLDG) 1/8/2021 2/10/2021 Under Construction Interior Remodel(ENG) N/A N/A Clear Water Fresh Farm 50750 E. Russell Schmidt Interior Remodel(BLDG) 1/8/2021 3/11/2021 Under Construction Interior Remodel(ENG) N/A N/A Prestige Commons 33503 23 Mile Rd Addition (BLDG) 3/4/2021 8/3/2021 Under Construction Addition (ENG) 3/4/20201 Under Construction US Mattress 51405 Gratiot Build-Out(BLDG) 5/12/2021 7/28/2021 Under Construction Build-out(ENG) N/A N/a Motor City Stamping 47783 Gratiot New Building(Bldg) 7/1/2021 7/13/2021 Under Construction New Building(Eng) 7/1/2021 Under Construction Chesterfield Laundromat 45429 Market Place Interior Build-Out(Bldg) 6/25/2021 7/29/2021 Under Construction Interior Build-Out(Eng) N/a N/A Maxi Mini Storage 47555 Gratiot New Building(Bldg) 6/19/2021 8/27/2021 Under Construction New Building(Eng) 6/19/2021 Approved New Restaurant 27801 23 Mile Rd Remodel (BLDG) 9/13/2021 9/29/2021 Under Construction Remodel (ENG) N/A N/A N/A 23 Mile Senior 31150, 31244, 31260 New Building(Bldg) 9/23/2020 10/7/2021 Under Construction Apartments 23 Mile Rd New Building(Eng) 9/23/2020 Under Construction SE Michigan Vets Facility Sugarbush New Building(Bldg) 3/18/2019 State Agency New Building(Eng) 1/29/2019 State Agency 5/23/2019 *State of Michigan Performing Insecptions and Approvals
Completion / Certificate of Occupancy Stage Milestone Dates Project Name Address Project Type Applied Permit Issued Final C/O Status AIT 29700 Commerce Addition(Bldg) 8/9/2018 12/14/2018 9/29/2020 C of O Issued Addition(Eng) 10/1/2018 11/4/2018 Site Work Finaled Comerica Bank 32777 23 Mile Rd Interior Reno(Bldg) 5/8/2020 7/2/2020 9/15/2020 C of O Issued Interior Reno(Eng) N/A N/A N/A N/A Presbyterian Village 33875 Kiely Remodel(Bldg) 11/16/2016 2/16/2017 10/7/2020 C of O Issued Remodel(Eng) N/A N/A N/A N/A Presbyterian Village 33875 Kiely Additon(Bldg) 11/16/2016 5/18/2017 10/7/2020 C of O Issued Addition(Eng) 10/4/206 3/6/2017 Site Work Finaled Olive Garden 27169 23 Mile Rd New Building(Bldg) 10/18/2018 5/17/2019 9/1/2020 C of O Issued New Building(Eng) 11/15/2019 4/5/2019 Site Work Finaled Schaller 29933 Commerce Addition(Bldg) 12/5/2018 6/19/2019 10/7/2020 C of O Issued Addition(Eng) 9/21/2018 6/19/2019 10/7/2020 Site Work Finaled Bj's Construction 46385 Contintental New Building(Bldg) 3/12/2019 6/25/2019 10/7/2020 C of O Issued New Building(Eng) 3/12/2019 6/25/2019 10/7/2020 Site Work Finaled Best Buy 50400 Waterside Interior Remodel(Bldg) 1/8/2020 1/24/2020 10/8/2020 C of O Issued Interior Remodel(Eng) N/A N/A N/A N/A Interior Reno/Expansion Of Turbo/Industrial 46460 Continental Office(Bldg) 12/3/2019 1/27/2020 11/11/2020 C of O Issued Interior Reno/Expansion Of (Reno & Mezzanine Build out) Office(Eng) N/A N/A N/A N/A Aldi 50700 Waterside New Building(Bldg) 8/20/2019 4/22/2020 11/12/2020 C of O Issued New Building(Eng) 8/20/2019 3/2/2020 11/12/2020 Site Work Finaled Bj's Warehouse 45101 Towne Center New Building(Bldg) 3/14/2019 5/31/2019 12/2/2020 C of O Issued New Building(Eng) 3/27/2019 5/31/2019 12/2/2020 Site Work Finaled Value City Furniture 50400 Gratiot Interior Buildout(Bldg) 9/11/2020 10/8/2020 11/11/2020 C of O Issued Interior Buildout(Eng) N/A N/A N/A N/A Center For TLC 30330 Hickory Addition(Bldg) 5/19/2020 7/29/2020 1/12/2021 Addition(Eng) N/A N/A Burlington Coat Factory 50355 Waterside New Building(Bldg) 12/4/2019 2/12/2020 2/19/2021 C of O Issued New Building(Eng) 11/26/2019 2/12/2020 2/19/2021 Site Work Finaled Beaumont Hospital 50630 Chestefield Rd Interior Buildout(Bldg) 8/17/2020 10/5/2020 3/2/2021 C of O Issued Suite Building Out Interior Buildout(Eng) N/A N/A 3/2/2021 N/A Beaumont - Ugrent Care 50964 Gratiot Interior Buildout(Bldg) 9/3/2020 11/24/2020 3/2/2021 C of O Issued Interior Buildout(Eng) N/A N/A Green Car Wash 45115 Market Place New Building(Bldg) 6/2/2020 7/15/2020 5/10/2021 CofO issued New Building(Eng) 5/12/2020 5/10/2021 Site Work Finaled Savvy Sliders 27830 23 Mile Rd. New - Interior Build out (BLDG) 3/24/2021 4/13/2021 5/25/2021 C of O issued New - Interior Build out (ENG) N/A N/A Fire Station 1 26001 22 Mile Rd Addition(Bldg) 8/13/2019 9/10/2019 6/18/2021 CofO issued Addition(Eng) 8/13/2019 N/a Arctic Circle Brewery 27663 23 Mile Rd Interior Remodel(Bldg) 3/23/2020 9/18/2020 6/4/2021 CofO issued Interior Remodel(Eng) N/A N/A Home Goods 26303 Bay Vista Drive New Building(Bldg) 2/3/2020 9/26/2020 6/28/2021 CofO issued New Building(Eng) 2/3/2020 9/29/2020 6/28/2021 Site Work Finaled Grace Assisted Living 29891 23 Mile Rd New Building(Bldg) 8/28/2017 10/30/2017 12/21/2018 CofO issued New Building(Eng) 9/7/2017 1/2/2018 8/23/2021 Site Work Finaled 5/23/2019 Operating under a Temporary Certificate of Occupancy *Site work under Construction Leo's Coney Island 51800 Gratiot New Building(Bldg) 4/15/2020 6/4/2020 8/11/2021 CofO issued 51848 Gratiot New Building(Eng) 4/15/2020 8/11/2021 Site Work Finaled Attendant Care Services 32525 23 Mile Rd Major Office Reno.(Bldg) 8/18/2020 10/6/2020 8/13/2021 CofO issued Major Office Reno.(Eng) N/A N/A Macomb Power Sports 46301 Gratiot New Sales Facility(Bldg) 8/30/2020 10/9/2020 8/31/2021 CofO issued New Sales Facility(Eng) 8/30/2020 9/25/2020 8/31/2021 Site Work Finaled Kohl's 50500 Gratiot Interior Remodel(BLDG) 2/17/2021 3/24/2021 9/6/2021 CofO issued Interior Remodel(ENG) N/A N/A Viscount Pools 27659 23 Mile Rd New - Interior Build out (BLDG) 3/25/2021 5/19/2021 9/7/2021 CofO issued New - Interior Build out (ENG) N/A N/A Chesterfield Twp. PRV 31000 Concordia New Construction(Bldg) 9/11/2020 9/25/2020 9/23/2021 CofO issued Station 55800 Gratiot New Construction(Eng) In-House Review In House Review Serenity Village 47640 Gratiot New Building(Bldg) 7/14/2016 9/12/2016 11/4/2021 CofO issued New Building(Eng) 6/6/2016 7/27/2016 11/4/2021 Site Work Finaled Bayview Medical 32743 23 Mile Rd Ste. 150 Remodel & Tank Install(BLDG) 2/8/2021 2/25/2021 11/8/2021 CofO issued 2/2/21 Admin Remodel & Tank Install (ENG) 2/2/2021 Approval 11/8/2021 In House Review Evident Church 52101 Gratiot Addition (BLDG) 3/15/2021 5/18/2021 10/13/2021 CofO issued Addition (ENG) 3/15/2021 5/18/2021 10/13/2021 Site Work Finaled
MONTHLY SERVICE METRIC DASHBOARD Data available as of 10.31.2021
(Goal 1) Chesterfield strives for a safe and desirable community with common sense enforcement. ( Chesterfield Township is committed to being a community that focuses on the health, safety, and welfare of the residents it serves. ) # of Water Main Breaks 2 Miss Dig Tickets 489 # of Code Enforcements Completed 241 (Goal 2) Chesterfield works to promote sustainable growth while protecting and enhancing its existing character ( Chesterfield Township will focus on preserving the open greenspace as well as creating character that is unique to Chesterfield. ) Active Residential Meters 15,036 Inspections Completed 930 Residential Permits issued 429 (Goal 3) Chesterfield works to provide engaging community activities for all ages that are safe, convenient, and affordable. ( Chesterfield Township will focus on creating programs where residents of all ages can participate during the year, close to their homes, and affordable. The township will also ensure that residents have quality parks and open space to enjoy year-round. ) # of in "House" League Play (Baseball, Basketball, Kickball, Cornhole, etc..) 1,382 # of Summer Camp Attendees 28 # of Community Programs Offered 54
(Goal 4) Chesterfield works to provide sustainable, consistent, high quality services while protecting our environment and natural resources. ( Chesterfield Township will focus on current infrastructure and future needs of the community to make it sustainable for the long term and will continue to provide township services to the residents at an affordable rate. ) # of Passports Processed 63 # of Absentee Voter Ballots Mailed 200 (Goal 5) Chesterfield strives to keep residents, visitors, and employees well informed with an accurate, effective, and consistent message. ( Chesterfield Township will work at increasing communication to our residents, stakeholders, and employees and will focus on clear, precise, messaging as well as creating a brand for our community in which everyone can simulate with. ) # of Social Media Followers for Parks & Rec. 13,680 # of Township Facebook Followers 749 # of People reaching out on Township Facebook Page 10,905 (Goal 6) Chesterfield strives to maximize utility within our monetary resources protecting the citizen’s investments. ( Chesterfield Township will continue to concentrate on transparency with the tax-payers money and investments and will focus on creating trust and confidence in the residents it serves while maintaining a competitive tax base. ) # of Agenda Items Processed for Board Meetings 21 # of Public Bid Opens Completed 3 # of Reviewed Appraisals 143 # of Property Transfers Processed 151
You can also read