RESIDENTIAL

JURONG EAST COURT
Public Housing Development comprising of 2 blocks of
16-storey apartment buildings and 2 blocks of 12-storey
apartment buildings making a total of 867 units. The units
are of 1 to 3 rooms and have access to lifts at every storey.

The development scheme is composed of a R.C. frame
structure, which includes the RC precast beams and RC
precast walls, and together with cast in situ columns, lift
walls and storey shelter walls. The structure is supported by
the reinforced concrete bored piles.

CLIENT: Housing and Development Board

PROJECT VALUE: S$82.8M

ECAS’ ROLE: Consulting Services

COMPLETION DATE: 2014
RESIDENTIAL JURONG EAST COURT - ECAS Consultants Pte Ltd
GREENWICH V                                 CITYLIGHTS                                THE MEZZO
                                            CONDOMINIUM

Greenwich V is an integrated                The project involved one block of         The Mezzo is a 28-storey commercial
commercial and residential                  41-storey and three blocks of 42-storey   and residential development comprising
development. It comprises of 7 blocks       condominium housing development           of 6-storey commercial and carpark
of 5-storey residential condominium         and consists of basement, multi storey    podium block and 28-storey residential
with basement carparks, swimming            car parks, swimming pool, communal        tower block.
pool and communal facilities together       facilities and retention conservation
with 2-storey commercial buildings with     houses.                                   The structural framing for the podium
shops/supermarkets.                                                                   consists of mainly RC slab and beam
                                            The framing of the superstructure is      system, and the framing for the tower
The structural system is the conventional   a combination of RC flat slab with        consists of mainly flat slab system. The
RC beam and slab system for the             perimeter beams and RC beam/ slab         transfer floor is at the 7th storey to
superstructure and flat slab system for     system. The structure is founded on       meet the architectural requirements.
the basement. The structure is founded      cast-in-situ reinforced concrete bored    The structure is founded on cast-in-situ
on precast RC driven/jack-in piles.         piles.                                    reinforced concrete bored piles.

CLIENT: Far East Square Pte Ltd
                                            CLIENT: Woodsvale Land Pte Ltd            CLIENT: SB (Ruby) Development Pte Ltd
PROJECT VALUE: S$80M
                                            PROJECT VALUE: S$95M                      PROJECT VALUE: S$35M
ECAS’ ROLE: Consulting Services
                                            ECAS’ ROLE: Accredited Checking           ECAS’ ROLE: Consulting Services
COMPLETION DATE: 2013
                                            COMPLETION DATE: 2007                     COMPLETION DATE: 2011

                                                                                                      www.ecas.com.sg
RESIDENTIAL JURONG EAST COURT - ECAS Consultants Pte Ltd
RESIDENTIAL

ALBA CONDOMINIUM
Alba is a luxurious condomoinium located in Carinhill
Rise. The building is a Y-shaped, 18-storey residential
development comprising of 50 units with basement car
parks, swimming pool and recreational facilities.

The framing of the superstructure for the development
consists mainly of RC slab and beam system, and the
framing for the basement consists mainly flat slab
system. The transfer floor is at the 1st storey and 2nd
storey to meet the architectural requirements. The
structure is founded on cast-in-situ reinforced concrete
bored piles.

CLIENT: Far East Organization Centre Pte Ltd

PROJECT VALUE: S$60M

ECAS’ ROLE: Consulting Services

COMPLETION DATE: 2015
RESIDENTIAL JURONG EAST COURT - ECAS Consultants Pte Ltd
LUMOS CONDOMINIUM                         HILLTOPS CONDOMINIUM                       TREVISTA CONDOMINIUM

Lumos is a 35-storey residential          The Hilltops condominium project           The Trevista condominium is a 39-storey
apartment with basement car parks,        consisted of 2 blocks of 24-storey         residential development with two
swimming pool and recreational            residential buildings with basement car    basement car parks, swimming pool and
facilities.                               parks, swimming pool and communal          communal facilities.
                                          facilities.
The structural framing for the                                                       The framing of the superstructure for
development consists of RC beam           The framing of the superstructure for      the development consists mainly of
and slab system for superstructure of     the development consists mainly of         RC flat slab system, and the basement
the podium and flat slab system for       RC flat slab system with RC Columns.       framing consist of flat slab system. The
basement slab. Flat Slab with perimeter   The structure is founded on cast-in-situ   transfer structure is at the 1st storey to
beams were adopted for typical floor      reinforced concrete bored piles.           meet the architectural requirements.
of the tower block. The structure is                                                 The structure is founded on cast-in-situ
founded on cast-in-situ reinforced                                                   reinforced concrete bored piles for the
concrete bored piles.                                                                main residential towers whereas the
                                                                                     podium is supported on spun piles.
                                          CLIENT: SC Global Developments

CLIENT: Build Home Pte Ltd.               PROJECT VALUE: S$158M

                                          ECAS’ ROLE: Accredited Checking            CLIENT: Choice Homes Gamma Pte Ltd
PROJECT VALUE: S$66.7M
                                          COMPLETION DATE: 2011                      PROJECT VALUE: S$150M
ECAS’ ROLE: Consulting Services
                                                                                     ECAS’ ROLE: Accredited Checking
COMPLETION DATE: 2011
                                                                                     COMPLETION DATE: 2013

                                                                                                      www.ecas.com.sg
RESIDENTIAL JURONG EAST COURT - ECAS Consultants Pte Ltd
RESIDENTIAL
SEASTRAND CONDOMINIUM
Erection of 9 blocks of 11 or 12-storey residential building (total of
473 units) in Pasir Ris.

Carparks, substation at partial of 1st & 2nd floor: Cast in-situ
reinforced concrete beams and slab system supported by rows of
reinforced concrete columns. One way slab are proposed at middle
portion of the drive way area to provide space for M&E requirement.

Environmental Deck at 3rd floor including landscape & swimming
pool and deck: Cast in-situ reinforced concrete beams and slab
system. Transfer beams are provided to transfer the loading from the
load bearing/shear wall above to the columns below. Appropriate
waterproofing system is provided to the architect’s specifications.
Floor slab of third story of the apartment blocks are raised up from
the transfer beam level to provide space for M&E requirements, i.e.
floor drains & Sunken tubs.

Apartment Blocks Partial of 1st to 3rd floor, 4th to Roof: Cast in situ
reinforced concrete flat plate with reinforced concrete perimeter
edge beams supported by rows of reinforced concrete walls and
columns. Generally, the slab soffit is flat throughout for ease of
construction with limited beam at the M&E opening areas.

CLIENT: F.E. Lakeside Pte Ltd

PROJECT VALUE: S$63M

ECAS’ ROLE: Consulting Services

COMPLETION DATE: 2014
RESIDENTIAL JURONG EAST COURT - ECAS Consultants Pte Ltd
VIDA CONDOMINIUM                           ALBA CONDOMINIUM                            GREENWICH V

20-storey residential apartment with a     Alba is a luxurious condomoinium            Greenwich V is an integrated
total of 137 units. Includes a 5-storey    located in Carinhill Rise. The building     commercial and residential
basement carpark, swimming pool and        is a Y-shaped, 18-storey residential        development. It comprises of 7 blocks
recreational facilities.                   development comprising of 50 units          of 5-storey residential condominium
                                           with basement car parks, swimming           with basement carparks, swimming
The structural system for 20-storey        pool and recreational facilities.           pool and communal facilities together
residential flat is partially flat slab                                                with 2-storey commercial buildings with
system, from 1st to roof storey with       The framing of the superstructure for       shops/supermarkets.
peripheral beam as well as the             the development consists mainly of RC
conventional beam/slab system at multi-    slab and beam system, and the framing       The structural system is the conventional
story carpark and landscape area. The      for the basement consists mainly flat       RC beam and slab system for the
basement system comprised of flat slab     slab system. The transfer floor is at the   superstructure and flat slab system for
system together with pilecap casted at     1st storey and 2nd storey to meet the       the basement. The structure is founded
the same level. The structure is founded   architectural requirements. The structure   on precast RC driven/jack-in piles.
on concrete bored-piles.                   is founded on cast-in-situ reinforced
                                           concrete bored piles.
                                                                                       CLIENT: Far East Square Pte Ltd
CLIENT: Wan-Li Development Pte Ltd
                                                                                       PROJECT VALUE: S$80M
                                           CLIENT: Far East Organization Centre
PROJECT VALUE: S$30M                       Pte Ltd                                     ECAS’ ROLE: Consulting Services
ECAS’ ROLE: Consulting Services            PROJECT VALUE: S$60M                        COMPLETION DATE: 2013
COMPLETION DATE: 2009                      ECAS’ ROLE: Consulting Services
                                           COMPLETION DATE: 2015

                                                                                                       www.ecas.com.sg
RESIDENTIAL JURONG EAST COURT - ECAS Consultants Pte Ltd
RESIDENTIAL

GREENWICH V
Greenwich V is an integrated commercial and residential
development. It comprises of 7 blocks of 5-storey
residential condominium with basement carparks,
swimming pool and communal facilities together with
2-storey commercial buildings with shops/supermarkets.

The structural system is the conventional RC beam and
slab system for the superstructure and flat slab system
for the basement. The structure is founded on precast
RC driven/jack-in piles.

CLIENT: Far East Square Pte Ltd

PROJECT VALUE: S$80M

ECAS’ ROLE: Consulting Services

COMPLETION DATE: 2013
RESIDENTIAL JURONG EAST COURT - ECAS Consultants Pte Ltd
VIDA CONDOMINIUM                           ALBA CONDOMINIUM                            SEASTRAND
                                                                                       CONDOMINIUM

20-storey residential apartment with a     Alba is a luxurious condomoinium            Erection of 9 blocks of 11 or 12-storey
total of 137 units. Includes a 5-storey    located in Carinhill Rise. The building     residential building (total of 473 units) in
basement carpark, swimming pool and        is a Y-shaped, 18-storey residential        Pasir Ris.
recreational facilities.                   development comprising of 50 units          Carparks, substation at partial of 1st &
                                           with basement car parks, swimming           2nd floor: Cast in-situ reinforced concrete
The structural system for 20-storey        pool and recreational facilities.           beams and slab system supported by
residential flat is partially flat slab                                                rows of reinforced concrete columns.
system, from 1st to roof storey with       The framing of the superstructure for       One way slab are proposed at middle
peripheral beam as well as the             the development consists mainly of RC       portion of the drive way area to provide
conventional beam/slab system at multi-    slab and beam system, and the framing       space for M&E requirement.
story carpark and landscape area. The      for the basement consists mainly flat       Environmental Deck at 3rd floor
basement system comprised of flat slab     slab system. The transfer floor is at the   including landscape & swimming
system together with pilecap casted at     1st storey and 2nd storey to meet the       pool and deck: Cast in-situ reinforced
the same level. The structure is founded   architectural requirements. The structure   concrete beams and slab system.
on concrete bored-piles.                   is founded on cast-in-situ reinforced       Transfer beams are provided to transfer
                                           concrete bored piles.                       the loading from the load bearing/
CLIENT: Wan-Li Development Pte Ltd                                                     shear wall above to the columns
                                           CLIENT: Far East Organization Centre        below. Appropriate waterproofing
PROJECT VALUE: S$30M                       Pte Ltd                                     system is provided to the architect’s
ECAS’ ROLE: Consulting Services            PROJECT VALUE: S$60M
                                                                                       specifications.
                                                                                       Apartment Blocks Partial of 1st to
COMPLETION DATE: 2009                      ECAS’ ROLE: Consulting Services             3rd floor, 4th to Roof: Cast in situ
                                                                                       reinforced concrete flat plate with
                                           COMPLETION DATE: 2015                       reinforced concrete perimeter edge
                                                                                       beams supported by rows of reinforced
                                                                                       concrete walls and columns. Generally,
                                                                                       the slab soffit is flat throughout for ease
                                                                                       of construction with limited beam at the
                                                                                       M&E opening areas.

                                                                                       CLIENT: F.E. Lakeside Pte Ltd

                                                                                       PROJECT VALUE: S$63M

                                                                                       ECAS’ ROLE: Consulting Services

                                                                                       COMPLETION DATE: 2014

                                                                                                        www.ecas.com.sg
RESIDENTIAL JURONG EAST COURT - ECAS Consultants Pte Ltd
COMMERCIAL
AND HOSPITALITY

SEACARE HOTEL AND OFFICE
The Seacare Hotel project involved erection of a 16-storey
(103 rooms) hotel block and additions and alterations works
to the existing 9-storey office tower. Transfer trusses were
proposed at the 13th storey to cater for the loads from the
upper storey of the hotel building and support the transfer
floors. All columns and beams are steel structures in order to
reduce the self-weight of the building above the 13th storey.

Seacare Hotel was the recipient of the the Merit Award
for “The Innovative, Efficient and Productive Use of Steel
Structures in the Build Environment” in the category of
Commercial or Retail Structures at the 2014 Structural Steel
Excellence Awards.

CLIENT: Seacare Co-operative Ltd

PROJECT VALUE: S$17M

ECAS’ ROLE: Consulting Services

COMPLETION DATE: 2012

AWARD: Structural Steel Excellence Award 2014
RESIDENTIAL JURONG EAST COURT - ECAS Consultants Pte Ltd
SILOSO BEACH RESORT                           HOTEL KAI                                     SCOTTS SQUARE

Siloso Beach resort is a rustic eco-          Kai Hotel is a heritage hotel in the          34/43-storey building with a 3-storey
hotel on Sentosa Island. The project          heart of Bugis. ECAS was appointed            commercial podium and 25/34-storey
consists of 2 blocks of 3-storey buildings    C&S Consultant for the addition and           residential flats with basement shops
& ancillary single storey buildings           alteration to a 2-storey conservation         and carpark, swimming pool and
involving the addition of 1-storey to a       block with attic and addition of a new        communal facilities. The foundation
3-storey building and 12 nos. of single       5-storey rear extension. The building         adopted for the project is cast-in-situ
storey villas. The Resort is built within     conserves the shophouse exterior              bored pile with pilecap.
nature giving a feeling of relaxation.        while the interiors are nicely fitted for a
                                              comfortable hotel.                            The framing of the superstructure
The foundation adopted for the project                                                      predominantly consists of cas-in-situ
is RC driven pile with pilecap. CBP wall      The hotel has been awarded with the           RC shear walls and RC columns. The
and RC retaining wall are involved in         BCA Green Mark Award (Gold) due to            structural floor system on the podium
this project. The super structural system     its structural conservation and energy        floors consists of conventional beams
adopted is conventional cast in-situ          efficiency.                                   and slabs as well as post-tensioned
reinforced concrete beams and one-way                                                       beams and slabs for long span floor
slab system. Glass skylight canopy is on      Picture credits: Hotel Kai website            located at shops and the carparks
roof level of Block A.                                                                      area on 1st to 6th storey, 7th to 8th
                                                                                            storey at podium and 11th storey
Picture credits: Siloso Beach Hotel website                                                 floors at block-1. 10th storey at block-2
                                              CLIENT: Sinves Investment Consultancy         consists of transfer beams/plates with
                                              Pte Ltd                                       conventional beams and slabs to form
                                              ECAS’ ROLE: Consulting Services               whole building main transfer structural
CLIENT: Siloso Beach Resort Pte Ltd                                                         system.
PROJECT VALUE: S$12M                          COMPLETION DATE: 2013
                                                                                            Picture credits: Scotts Square website
ECAS’ ROLE: Consulting Services

COMPLETION DATE: 2006
                                                                                            CLIENT: Wheelock Properties
                                                                                            (Singapore) Limited

                                                                                            PROJECT VALUE: S$200M

                                                                                            ECAS’ ROLE: Consulting Services

                                                                                            COMPLETION DATE: 2010

                                                                                                              www.ecas.com.sg
COMMERCIAL
AND HOSPITALITY
SCOTTS SQUARE
34/43-storey building with a 3-storey commercial podium and
25/34-storey residential flats with basement shops and carpark,
swimming pool and communal facilities. The foundation adopted
for the project is cast-in-situ bored pile with pilecap.

The framing of the superstructure predominantly consists of cas-in-
situ RC shear walls and RC columns. The structural floor system on
the podium floors consists of conventional beams and slabs as well
as post-tensioned beams and slabs for long span floor located at
shops and the carparks area on 1st to 6th storey, 7th to 8th storey
at podium and 11th storey floors at block-1. 10th storey at block-2
consists of transfer beams/plates with conventional beams and
slabs to form whole building main transfer structural system. From
12th storey and above, the structural floor system predominantly
consists of conventional perimeter beams and flat slab system, and
partial transfer structure located at the 3rd to 4th storey of podium
and 36th storey of block-2.

CLIENT: Wheelock Properties (Singapore) Limited

PROJECT VALUE: S$200M

ECAS’ ROLE: Consulting Services

COMPLETION DATE: 2010
SILOSO BEACH RESORT                           HOTEL KAI                                     SEACARE HOTEL AND
                                                                                            OFFICE

Siloso Beach resort is a rustic eco-          Kai Hotel is a heritage hotel in the          The Seacare Hotel project involved
hotel on Sentosa Island. The project          heart of Bugis. ECAS was appointed            erection of a 16-storey (103 rooms) hotel
consists of 2 blocks of 3-storey buildings    C&S Consultant for the addition and           block and additions and alterations
& ancillary single storey buildings           alteration to a 2-storey conservation         works to the existing 9-storey office
involving the addition of 1-storey to a       block with attic and addition of a new        tower. Transfer trusses were proposed
3-storey building and 12 nos. of single       5-storey rear extension. The building         at the 13th storey to cater for the
storey villas. The Resort is built within     conserves the shophouse exterior              loads from the upper storey of the
nature giving a feeling of relaxation.        while the interiors are nicely fitted for a   hotel building and support the transfer
                                              comfortable hotel.                            floors. All columns and beams are steel
The foundation adopted for the project                                                      structures in order to reduce the self-
is RC driven pile with pilecap. CBP wall      The hotel has been awarded with the           weight of the building above the 13th
and RC retaining wall are involved in         BCA Green Mark Award (Gold) due to            storey.
this project. The super structural system     its structural conservation and energy
adopted is conventional cast in-situ          efficiency.                                   Seacare Hotel was the recipient of the
reinforced concrete beams and one-way                                                       the Merit Award for “The Innovative,
slab system. Glass skylight canopy is on      Picture credits: Hotel Kai website            Efficient and Productive Use of Steel
roof level of Block A.                                                                      Structures in the Build Environment” in
                                                                                            the category of Commercial or Retail
Picture credits: Siloso Beach Hotel website                                                 Structures at the 2014 Structural Steel
                                              CLIENT: Sinves Investment Consultancy         Excellence Awards.
                                              Pte Ltd

                                              ECAS’ ROLE: Consulting Services
CLIENT: Siloso Beach Resort Pte Ltd                                                         CLIENT: Seacare Co-operative Ltd
PROJECT VALUE: S$12M                          COMPLETION DATE: 2013                         PROJECT VALUE: S$17M

ECAS’ ROLE: Consulting Services                                                             ECAS’ ROLE: Consulting Services

COMPLETION DATE: 2006                                                                       COMPLETION DATE: 2012

                                                                                            AWARD: Structural Steel Excellence
                                                                                            Award 2014

                                                                                                            www.ecas.com.sg
COMMERCIAL
AND HOSPITALITY

SILOSO BEACH RESORT
Siloso Beach resort is a rustic eco-hotel on Sentosa Island.
The project consists of 2 blocks of 3-storey buildings &
ancillary single storey buildings involving the addition of
1-storey to a 3-storey building and 12 nos. of single storey
villas. The Resort is built within nature giving a feeling of
relaxation.

The foundation adopted for the project is RC driven pile with
pilecap. CBP wall and RC retaining wall are involved in this
project. The super structural system adopted is conventional
cast in-situ reinforced concrete beams and one-way slab
system. Glass skylight canopy is on roof level of Block A.

Picture credits: Siloso Beach Hotel website

CLIENT: Siloso Beach Resort Pte Ltd

PROJECT VALUE: S$12M

ECAS’ ROLE: Consulting Services
COMPLETION DATE: 2006
GREENWICH V                                 POMO PARADIZ                                THE MEZZO

Greenwich V is an integrated                A&A to basement, 1st to 6th storey of       The Mezzo is a 28-storey commercial
commercial and residential                  existing shopping cum office complex at     and residential development comprising
development. It comprises of 7 blocks       1 Selegie Road (Paradiz Centre).            of 6-storey commercial and carpark
of 5-storey residential condominium                                                     podium block and 28-storey residential
with basement carparks, swimming            The structural system of the existing       tower block.
pool and communal facilities together       building is mainly RC system and the
with 2-storey commercial buildings with     building is resting on a raft foundation.   The structural framing for the podium
shops/supermarkets.                         For the new A&A works, conventional         consists of mainly RC slab and beam
                                            reinforced concrete (RC) slab and beam      system, and the framing for the tower
The structural system is the conventional   system, steel columns and beams with        consists of mainly flat slab system. The
RC beam and slab system for the             composite slab are adopted. New             transfer floor is at the 7th storey to
superstructure and flat slab system for     micro piles are introduced at the new       meet the architectural requirements.
the basement. The structure is founded      passenger lift area.                        The structure is founded on cast-in-situ
on precast RC driven/jack-in piles.                                                     reinforced concrete bored piles.

CLIENT: Far East Square Pte Ltd             CLIENT: Paradiz Investment Pte Ltd
                                                                                        CLIENT: SB (Ruby) Development Pte Ltd
PROJECT VALUE: S$80M                        PROJECT VALUE: S$14.5M
                                                                                        PROJECT VALUE: S$35M
ECAS’ ROLE: Consulting Services             ECAS’ ROLE: Consulting Services
                                                                                        ECAS’ ROLE: Consulting Services
COMPLETION DATE: 2013                       COMPLETION DATE: 2009
                                                                                        COMPLETION DATE: 2011