GOOD DESIGN FOR A BETTER IMPLEMENTATION - SUDPROGETTI
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Sudprogetti was incorporated, as a joint stock company, in 1973, when a
project for the new Isab refinery in Priolo, Sicily, was implemented.
Its aim was to supply engineering services to the main industrial groups in
the Siracusa area.
THE WAYAfterWE WERE: THE WAY WE ARE
strengthening its standing in the territory and reaching a leading position
in the local market, Sudprogetti extended its operating capacity to all of Sicily
and to other industrial sites throughout Italy with increased renown for high
flexibility in organization and operation.
Nowadays Sudprogetti does business in the field of engineering and construction
of petrochemical plants, mainly in revamping and plant shutdown maintenance
activities. The company and its subsidiaries have an overall manpower of
150.000 engineering hours per year.
Throughout more than three decades of activity, Sudprogetti improved its
qualifications in the engineering field, by offering a wide range of high technology
services with its very flexible and highly qualified organization. Sudprogetti
can provide a well coordinated team of professionals committed to meeting
schedules and staying within budget. In Sudprogetti, throughout the company,
there is a keen awareness of the need for sound safety and environmental
practices.
Sudprogetti was awarded a Quality System Certificate, based on UNI EN ISO
9001 standards, by Moody International Certification.
The steady revenue growth achieved by Sudprogetti over the last decade of
its operating life shows that the company’s expansion strategy was well planned
and its management very careful and professional.
Recently Sudprogetti initiated a promotion and marketing campaign in Europe
and in several African and Middle East countries, where a sound chemical
and petrochemical industry is well established.Process design and development: Sudprogetti offers, by itself or through
specific exclusive agreements with companies specialized in the relevant field,
leading edge technologies and processes in the petrochemical sector.
Problem solving know-how for maintenance activities: As an engineering
company and general contractor, Sudprogetti has dealt with the main issues
related to the implementation of technology, upgrading projects for major
plants in the petrochemical sector, by developing a series of operating practices
– based on the use of dedicated software – to optimize shutdown schedule
and costs as well as plant update requirements.
Project flexibility: On account of its medium size dimension, Sudprogetti can
carry out projects with extreme flexibility in terms of objectives sought and
achieve assignments that others would consider problematic.
OUR STRENGTHS
Methodology approach: In the course of its business life Sudprogetti has
dealt mostly with projects characterized by different forms of involvement in
accountability for the project success (turn-key agreements, cost plus fee with
maximum guaranteed amount, etc.). The approach normally followed by the
company, which is now its “structural mentality”, is to find the best solution for
a project that is a good compromise between quality, time and costs, always
having in mind safety as a priority factor.BUSINESS AREA
Chemical and Petrochemical Industry, Industrial Plants, Water and Energy
Facilities, Environmental Protection
Process engineering
Preliminary studies and feasibility studies
Basic and detailed engineering
Materials procurement: purchasing, expediting, inspections and tests
Contracting for: plant erection, field supervision, startup and personnel training
Project management: coordination, estimating, planning and cost control
Maintenance plant turnaround management: planning of works, detailed
engineering, material procurement, contracting, work scheduling and relevant
control, cost control, safety management, field supervision
“Turn-key” contract
SERVICESAGIPPETROLI S.p.A.
Priolo Refinery
FCCU plant - Interconnecting
of electrostatic precipitator CONDEA AUGUSTA S.p.A.
REFERENCES system
Turn - Key contract 1995/1996
Augusta Plant
Pacol 2 plant energetic
optimization
ESSO ITALIANA S.p.A. Turn - Key contract 1999/2000
Augusta Refinery
Planning, engineering and field ESSO ITALIANA S.p.A.
supervision for FCCU plant Augusta Refinery
turnaround Planning, engineering and field
EPS contract 1995/1996 supervision for FCCU and LUBE2
plants turnaround
AGIPPETROLI S.p.A. EPS contract 1999/2001
Priolo Refinery
Revamping of flushing oils DAMATO S.r.l.
desulfurization plant Barletta Plant
Turn - Key contract 1996/1997 New mineral oil coastal depot
Turn - Key contract 1999/2001
ESSO ITALIANA S.p.A.
Augusta Refinery AGIPPETROLI S.p.A.
Infoil project Gela Refinery
The Sudprogetti Group is Turn - Key contract 1997/1998 Revamping of FCC plant for
constituted also by two metallurgical adequacy
wholly owned operating ERG PETROLI S.p.A. Turn - Key contract 2000/2001
subsidiary companies: Priolo Refinery
TEXIR S.r.l. specialized in DCS installation in blending ISAB ENERGY S.r.l.
supplying engineering and control house Priolo Plant
construction management Turn - Key contract 1998/1999 Engineering, supervision and
services. scheduling for General
ESSECO S.r.l. specialized CONDEA AUGUSTA S.p.A. Maintenance turnaround 2001
in supplying technical Augusta Plant EPS contract 2001/2001
advice with particular focus New Tower installation on LAB
to CAD technologies. plant ERG PETROLI S.p.A.
The Sudprogetti group Turn - Key contract 1998/1999 Priolo Refinery
believes that its system has Engineering, supervision and
the advantages of offering scheduling for General
a wide range of high Maintenance turnaround 2002 ES
technology services in a
cost-effective, fast, flexible,
customizable way.
CLIENTS contract 2001/2002
ENI S.p.A. – R & M
Api Raff. di Livorno
Revamping of HDS plant
Sasol Italy (ex Condea Augusta) Turn-Key contract 2002/2003
Esso Italiana ENI S.p.A. – R & M
Venezia Refinery
Enel Group Revamping of Visbeaker and
Thermal Cracking plants
Turn - Key contract 2003/2005
Eni Group
RAFFINERIA DI MILAZZO S.C.p.A.
Erg Petroli Group
Gasoline Project - Revamping
of Alky and Cracking plants
Isab Energy EPS contract 2003/2005
Polimeri Europa RAFFINERIA DI MILAZZO S.C.p.A.
Sulphur Project - New
Raffineria di Gela Exchangers for Vacuum Plant
Turn - key contract 2004/2005
Raffineria di Milazzo
Raffineria di Roma
Sarasinfo@sudprogettigroup.it
REPRESENTATIVE AND COMMERCIAL OFFICE
20129 MILANO - VIA JUVARA, 9
T / F +39 02 26681855
www.sudprogettigroup.it
SUDPROGETTI S.P.A.
HEADQUARTERS AND OPERATING OFFICE
96100 SIRACUSA - VIA STENTINELLO, 1
CONTRADA TARGIA - STRADA STATALE 114
T +39 0931 409211 - F +39 0931 491101You can also read