PALISADES S90 SERIES BI-FOLDING DOOR AND WALL SYSTEM
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
GLASS DRILL INSTRUCTION
INSTALLATION MANUAL
INSTRUCTIONS
crlaurence.com
PALISADES S90
SERIES BI-FOLDING DOOR
AND WALL SYSTEM
IMPORTANT: Please read these instructions completely before you start installation. The Palisades Door
System is a unique operational system that requires precision and attention to detail during installation. To
ensure proper door operation, the Top and Bottom Roller Tracks must be perfectly aligned to each other and
every component of the frame must be installed square, plumb and level.
NOTE: This manual covers the Installation, Operation, Maintenance, and Warranty of the Palisades System.
It is to be used by the Installer for installation and kept by the Owner for reference. Replacement parts should
be ordered ONLY from C.R. Laurence.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
FEBRUARY 2021PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
TABLE OF CONTENTS
GUIDELINES FOR ALL INSTALLATIONS ���������������������������������������������������������� 3
CONFIRM YOUR SHIPMENT ���������������������������������������������������������������������� 4
SITE PREPARATION ����������������������������������������������������������������������������� 5
FASTENER SPACING ���������������������������������������������������������������������������� 6
FLUSH SILL INSTALLATION (Optional) ������������������������������������������������������������ 7
COMPENSATION CHANNEL INSTALLATION ����������������������������������������������������� 8
Install Top Compensation Channel ������������������������������������������������������������� 8
Cut and Install Side Compensation Channels �������������������������������������������������� 8
RAISED SILL INSTALLATION ��������������������������������������������������������������������� 9
Install Raised Sill ������������������������������������������������������������������������������ 9
MAIN FRAME INSTALLATION ���������������������������������������������������������������� 10 - 12
Place Main Frame Top Track ����������������������������������������������������������������� 10
Place Jambs ��������������������������������������������������������������������������������� 10
Secure Jambs �������������������������������������������������������������������������������� 11
Secure Top Track ���������������������������������������������������������������������������� 11
Final Adjustments ���������������������������������������������������������������������������� 12
FRAME SPLICING INSTALLATION (OPTIONAL) ������������������������������������������������� 13
DOOR GLAZING ����������������������������������������������������������������������������� 14 - 16
Determine Bracing Direction ������������������������������������������������������������������ 14
Determine Shim Thickness ������������������������������������������������������������������� 14
Glass Installation ����������������������������������������������������������������������������� 15
Bracing and Spacing Shim Installation �������������������������������������������������������� 15
Glass Stop and Gasket Installation ����������������������������������������������������������� 16
DOOR INSTALLATION ����������������������������������������������������������������������� 17 - 19
Operating Catches ��������������������������������������������������������������������������� 17
Installing Hinge Pins �������������������������������������������������������������������������� 17
Installing Auxiliary Handles (Out Swing Systems Only) ���������������������������������������� 17
Install First Panel ����������������������������������������������������������������������������� 18
Install Second Panel ������������������������������������������������������������������������� 18
Install Third Panel with Roller and Bottom Guide ���������������������������������������������� 18
Roller Installation ����������������������������������������������������������������������������� 19
Bottom Guide Installation ��������������������������������������������������������������������� 19
Install Remaining Panels ��������������������������������������������������������������������� 19
DOOR HANDLE INSTALLATION ����������������������������������������������������������������� 20
FINAL ADJUSTMENTS ��������������������������������������������������������������������������� 21
Check Door and Handle Operation ����������������������������������������������������������� 21
Check Latching Panel ������������������������������������������������������������������������ 21
Secure All Hinge Pins ������������������������������������������������������������������������ 21
Seal Perimeter for Exterior Installations ������������������������������������������������������� 21
OPERATION �������������������������������������������������������������������������������� 22 - 23
Operating Systems with Swing Door Attached to Folding Doors ������������������������������� 22
Operating Systems with Folding Doors Only (without Swing Door) ����������������������������� 23
Operating Systems with Floating Panels ������������������������������������������������������ 23
CARE AND MAINTENANCE ���������������������������������������������������������������������� 24
LIMITED WARRANTY ���������������������������������������������������������������������������� 25
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 2PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
GUIDELINES FOR ALL INSTALLATIONS
IMPORTANT: READ COMPLETE INSTRUCTIONS BEFORE BEGINNING INSTALLATION. INSTALL AS
RECOMMENDED; OTHERWISE, THE UNIT MAY NOT FUNCTION PROPERLY AND ANY WARRANTY,
WRITTEN OR IMPLIED, WILL BE VOID.
REVIEW CONTRACT DOCUMENTS: Check Shop Drawings, Installation Instructions, Architectural
Drawings, and Shipping Lists to become thoroughly familiar with the project. The Shop Drawings take
precedence and include specific details for the project. Note any field verified notes on the Shop Drawings
prior to installing. The installation instructions are of a general nature and cover most conditions.
CHECK ARRIVING MATERIALS: The system is fabricated specifically for your order and shipped with all
necessary components. Not included are screws, bolts, shims, etc. to anchor the unit to the rough opening.
The frame includes compensation channels for jambs, top tracks. Flush Sill models do not include Sub Sills.
Compensation Channels and Flush Sills are shipped long for field cutting. All other frame components are cut
to size. Frame is to be assembled during installation. Panels are factory assembled with or without glass. In
most cases, all hinges, weather stripping, multiple locking, and flat handles are factory installed to the panels
and frame components. Some loose parts will be shipped separately. Be sure to locate and store in a safe
place until needed.
Upon receipt, inspect the shipment to ensure it is in good condition and all components are included. Ensure
system configuration and size match initial order and included Shop Drawings. Note that Shop Drawings are
viewed from interior.
INSTALLATION: The installation of the Palisades System requires a working knowledge and experience
in the use of tools, equipment and methods necessary for the installation of aluminum doors, windows,
storefronts and/or partitions. This practice assumes a familiarity with preparing a proper and structurally
sound opening, proper anchorage, waterproofing, caulking and sealing and assumes an understanding of
the fundamentals of building construction that affect the installation of large aluminum door systems. Use a
trained installer with experience in installing these kind of systems. Precise measuring equipment should be
used during installation. All materials are to be installed plumb, level, and true.
BUILDING CODES: As regulations governing the use of glazed windows, doors, storefronts and/or partitions
vary widely, it is the responsibility of the building owner, architect, contractor or installer to insure that
products selected conform to all applicable codes and regulations, including federal, state and local. C.R.
Laurence assumes no obligation or responsibility whatsoever for failure of the building owner, architect,
contractor or installer to comply with all applicable laws and ordinances and safety and building codes.
SURROUNDING CONDITIONS: For better performance it is recommended that all dead loads such as upper
levels, roof, etc. be constructed before a unit is installed. Any exterior system should be installed under an
overhang, or with other similar protection.
Properly flash and waterproof around the perimeter of the opening, especially at the sill. Make sure you seek
proper professional advice for the appropriate construction needed for your particular application. Do not
install unit in structures that do not allow for proper management/drainage of moisture.
A qualified engineer or architect should be used to determine the proper construction details and header to
be used in your particular application. Customer is responsible to check to comply with applicable codes for
maximum gap space allowed, especially in high wind areas, and correct opening size.
IMPORTANT: Because of the large opening sizes and the weight and movement of the panels, any
application should take into consideration the following:
The structural integrity of the header is critical for proper operation. Vertical deflection of the header under full
live and dead loads should be the lesser than 1/16”. Structural support for lateral loads (both wind load and
when the panels are stacked open) must also be provided.
HANDLING MATERIALS: Store in a clean and dry location and protect against defacement or damage,
especially to the edges of panels. It is important that during the construction phase the unit be kept closed,
covered and protected from damage. During this phase, a unit is often subject to the most extreme conditions
from all types of construction operations that can permanently damage and destroy it. A unit can be damaged
by cement splatter, tar, paint, weld splatter, falling objects, construction dust, sand blasting, etc. Do not use
the large opening of an installed system for easy ingress and egress by tradesmen.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 3PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
CONFIRM YOUR SHIPMENT
This Palisades Door System is fabricated specifically for the dimensions of your order. The Compensation
Channels are shipped approximately 3” (76 mm) oversize for field cutting.
Consult the included Shop Drawings when checking your shipment. Lay the components on a clean, flat
surface in the position they are to be installed. Dry fit the parts, double check measurements against your
opening and inspect for damage. NOTE: For orders with multiple units, do not mix and match panels and
frames, even if two units are exactly the same.
If you notice damaged or missing parts, or have any questions, please contact the C.R. Laurence Technical
Sales Department immediately at (800) 421-6144. Refer to the order number shown on your Packing List.
NOTE: Doors Will Not Function Properly if Any Part of the Main Frame is Not Level and Plumb or the Top
and Bottom Roller Track are Not Perfectly Aligned.
IMPORTANT: It is critical to install Top Compensation Channel and Sub Sill level and plumb. Ensure the
Raised Sill, Jambs and Top Track are installed level and plumb. Align Top and Bottom Roller Tracks.
Check Small Parts Before you begin, check to ensure
Check Packing List to determine which parts are required for your
installation. Locate and store loose parts in safe place until needed. nothing is missing or damaged. Lay
All Installations: components on clean, flat surface.
Measure components and compare
2
Shop Drawings Hinge Stile Gasket Hinge Pins 1
Installation Manual Hinge Pin Tool (for Hinge Pin Installation)
to details on your Shop Drawings.
Non-glazed Installations:
Setting Blocks Glazing Gasket General Order of Assembly
Select Installations:
Vinyl Track Gasket (Spliced Top and Bottom Tracks Only)
Weep Hole Covers 1 Top Compensation Channel
Lock Handle End Dams Swing Panel Holder
2 Side Compensation Channels
1 3 Raised Sill or Flush Sill
4 4 Top Track
5 Jambs
6 Door Panels TOP CHANNEL 1
2 5 6 6 6 5 2
1 TOP CHANNEL
4
TOP TRACK
ALIGN ROLLER TRACK
3
4 OR
TOP TRACK
ALIGN ROLLER TRACK
5 Jamb Jamb 5
3
2 2
3
RAISED SILL
FLUSH SILL
INTERIOR
See next page for detail
NOTE: Units are available with Raised or Flush Sills. Refer to Shop Drawings for details on your installation.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 4PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
SITE PREPARATION
Check the Rough Opening
Verify that the rough opening is square and plumb as possible. Compensation Channels for use at head
and jambs are supplied with your order to assist in problematic openings. We recommend installation of
Compensation Channels to a maximum of 1/4” (6 mm) out of plumb or level. If opening is out more than this,
these Channels should be shimmed to be within this maximum.
VERTICAL DIMENSION HORIZONTAL DIMENSION
Measure
Measure
Measure top to bottom at left, center, and right to Measure side to side at top, middle and bottom
confirm proper height. to confirm proper width.
Verify Floor and Header Condition
The floor and header surface of the rough opening should be clean and in good condition. For better
performance and protection, any exterior system should be installed under an overhang, or with other similar
protection.
Flush Sill configurations require a recessed groove in the floor. Ensure it is straight and level. For exterior
installations, a trench drain is required for proper drainage. A completely weather-tight seal is not possible
with this sill and some air/water infiltration will occur.
Raised Sill configurations attach directly to the floor. In exterior applications the Sill must be level for proper
drainage.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 5PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
FASTENER SPACING
Compensation Channel and Sub Sill Fastener Spacing
12” 2”
(305 mm) (51 mm)
On Center from Ends
2”
(51 mm)
Top Compensation Channel from Ends
12”
(305 mm)
On Center
Side Side
Compensation Compensation
Channel Channel
Stagger
Holes
IMPORTANT: Use fasteners appropriate for substrate. Stagger fastener holes to prevent Compensation
Channel and Sub Sill from twisting.
Main Frame Fastener Spacing 14”
4” 14” (356 mm) 4”
(102 mm) (356 mm) On Center (102 mm)
from Ends On Center Stack Area from Ends
Leveler Leveler Leveler Leveler Leveler Leveler Leveler
4”
(102 mm)
from Ends Top Track Stack Area
Leveler
Leveler
14”
(356 mm)
On Center
Leveler
Leveler
Strike Hinge
Jamb Jamb
Leveler
Leveler
Leveler
Leveler
Raised or Flush Sill
NOTE: Fastener installation shown on this sheet is capable of withstanding design wind
load pressure for AAMA CW 40 Rating. For installations that are above limitations a 12” 2”
(305 mm) (51 mm)
structural engineer should be consulted for specific fastening requirements.
On Center from Ends
IMPORTANT: Levelers are factory installed at Jambs and Head. Fasten at each Leveler location with
#10 fasteners appropriate to carry load. Do not overtighten fasteners. This can damage frame and
interfere with door operation.
THE DOORS WILL NOT FUNCTION PROPERLY IF ANY PART OF THE FRAME IS NOT PERFECTLY
SQUARE, LEVEL AND PLUMB. CONSTANTLY CHECK DURING INSTALLATION.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 6PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
FLUSH SILL INSTALLATION (OPTIONAL)
IMPORTANT: Ensure required recessed groove is straight and level. Use fasteners appropriate for substrate.
Shim at fasteners to ensure the Sill does not move. For exterior installations, a trench drain is required for
proper drainage. Do not continue installation until sill is flat and level, does not tilt inward or outward and
does not move from side to side.
Note proper orientation of Flush Sill. Sill must be straight, flat and level. Install securely.
DO NOT TWIST
1/4” (6 mm) DO NOT DO NOT
2 7/16” FORCE
(62 mm) ALLOW
MOVEMENT
Do not overtighten fasteners. This can cause the sill to bow and/or distort and interfere with door operation.
Clean cuttings from drill holes and any other debris from track.
NOTE: A completely weathertight seal is not possible and some air/water infiltration will occur.
Prepare straight, level groove NOTE: Install drainage system Use Sill as template to drill
in floor. for Exterior Installations. pilot holes for anchors.
Stack Side
.250
Exterior
3” Trench Drain
by Others
Remove Sill to drill holes NOTE: Apply silicone under
and install anchors. Shim at all anchor points. Sill for Exterior Installations.
Stack Side
Secure but do not over tighten.
Shim to prevent movement.
Stack Side
If Needed,
Shim at Sides
to Prevent Side
to Side Movement
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 7PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
COMPENSATION CHANNEL INSTALLATION
Install Top Compensation Channel
IMPORTANT: Ensure Top Compensation Channel is level, flat and straight. Plumb to Sub Sill or Flush Sill.
Use fasteners appropriate for substrate.
TOP
COMPENSATION CHANNEL
Top Channel must be level and straight.
DO NOT TWIST
Stagger holes to prevent Channel from twisting.
Plumb Line
Top Channel must be plumb to Flush Sill.
DO NOT MISALIGN
Stack Side
FLUSH SILL
NOTE: Comp. Channels are shipped 3” oversized
Cut and Install Side Compensation Channels
Measure from bottom of Top Compensation Channel to top of either Flush Sill or bottom of rough opening.
Cut and install Side Channels as above. NOTE: Seal Channels at butted joints before installing main frame.
IMPORTANT: Do not continue installation until Side Channels are flat and level, and in the same planes
as the Top Channel and Flush Sill.
TOP
TOP COMPENSATION CHANNEL
COMPENSATION CHANNEL
Stack Side Side Channel to Length
Measure and Cut
Flush Sill
Jamb Channel to Length
Measure and Cut
Stack Side
RAISED SILL
FLUSH SILL
Side Channels sit on Flush Sill aligned
with interior shoulder edge.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 8PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
RAISED SILL INSTALLATION
Install Raised Sill
IMPORTANT: Use fasteners appropriate for substrate. For exterior installations, install End Dams and
seal seams. Do not overtighten fasteners. This can cause frame to bow and/or distort and interfere with
door operation. Ensure Sill is flat and level and does not tilt inward or outward. Clean cuttings from drill
holes and any other debris from track.
Comp Channel to sit at finish floor with edges aligned. Raised Sill fits inside at ends.
Note: End Dam shown for exterior installation.
Weep Holes
to Exterior
Stack Side
Do NOT Block
Seal seam
Jamb Comp.
Jamb Comp.
for exterior Finished Floor
installation
Center Sill to Jamb Comp.
Seal seam for exterior installation Raised Sill
Center Raised Sill between Jamb Comp. Channels and secure with #10 fasteners appropriate for substrate.
Install on flat leveled finished floor. If installed on rough floor shim flat leveled.
Raised Sill must be flat and level. Do not overtighten fasteners. Ensure sill is plumb to top
comp. channel. See page 8 for drawing.
Top
Compensation Channel
Plumb Line
Plumb Line
KEEP LEVEL Align Top Channel
and Sill Sides
PLS3
Laser Tool
RAISED SILL
DO NOT TILT
Stack Side
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 9PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
MAIN FRAME INSTALLATION Top Compensation
Channel
Place Main Frame Top Track
Note proper orientation
of Top Track. Top Track
Stack Side
Top Track
1 Carefully angle Main Frame Top Track into Top Stack Side
Compensation Channel. Push to top of Channel Top Track 1
and temporarily pin with three screws. Stack Side
Stack Area Stack Area
Leveler Leveler Leveler Leveler Leveler Leveler
Levele
r
Levele
r
Levele
r
Levele
r
Levele
r
Levele
r
Push Top Track to Top of Compensation
Angle Top Track into Top Compensation Channel Channel and Pin in Place
Place Jambs
2 Angle Jambs into Side Compensation Channels. Hinge Jamb is located at Stack Area.
Rest Jamb bottoms on top of Sill. Jambs Notched
at Top and Bottom
Stack Area
Adjust Jamb Levelers Leveler Leveler Leveler Leveler Leveler Leveler
to 1/4” (6 mm).
6 mm
Hex Key
Le
ler
ve
ve
ler
1/4”
Le
(6 mm) Note proper orientation 3 3
Hi
of Jambs.
ng
Le
ler
eJ
ve
ve
ler
Le
Jamb Jamb
am
b
Le
ler
ve
ve
ler
Le
Hinge Jamb
at Stack Area
Stack Side Stack Area
3 Measure opening at top, middle, and bottom and compare to opening measurement on Shop Drawings.
Adjust Levelers as needed. Stack Area
Use 6 mm Hex Key to Adjust Jamb Levelers as Needed. Leveler Leveler Leveler Leveler Leveler Leveler
Jamb Channel
Measure and Adjust
Leveler
Leveler
Jamb
6 mm 6 mm
Jamb Channel Allen Wrench Allen Wrench
Jamb Channel
Measure and Adjust
Leveler
Leveler
6 mm
Jamb Hex Key Jamb
Measure and Adjust
Leveler
Leveler
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 10PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
MAIN FRAME INSTALLATION (CONTINUED)
Secure Jambs
Jambs must be level and plumb.
4 Ensure Hinge Jamb is square, level and plumb.
Secure at Levelers.
Stack Area Jamb
Leveler Leveler Leveler Leveler Leveler
Leveler
Leveler
#10 Screw
Leveler
Leveler
Leveler
Leveler
Leveler
DO NOT TILT
NOTE: Insert #10 fasteners appropriate for substrate into
center of Levelers to secure. Do not overtighten fasteners.
5 Double check measurements against shop drawings. Make sure Jamb is plumb and square.
Secure at Levelers. Do not overtighten fasteners.
Stack Area Stack Area
Leveler Leveler Leveler Leveler Leveler Leveler Leveler Leveler Leveler Leveler
Measure and Adjust
Leveler
Leveler
Leveler
Leveler
Measure and Adjust
Leveler
Leveler
Leveler
Leveler
6 mm
Allen Wrench
Measure and Adjust
Leveler
Leveler
Leveler
Leveler
NOTE: Final lateral adjustments may be required after panels are installed.
Secure Top Track Top Track must be flat.
Top Track must be level.
Leveler Leveler Leveler Leveler Leveler Leveler Leveler Leveler Leveler
Leveler
Leveler
Leveler
Leveler
Leveler
DO NOT TILT
Leveler
Leveler
Leveler
Leveler
Leveler
Leveler
Leveler
Leveler
DO NOT FORCE
6 Lower Top Track so it rests on Jambs. Level and secure with fasteners appropriate to carry the load.
Stack Area Stack Area
Leveler Leveler Leveler Leveler Leveler Leveler Leveler Leveler Leveler Leveler
Leveler
Leveler
Leveler
Leveler
Loosen Screws and Lower Top Track
to Rest on Jambs
Leveler
Leveler
Leveler
Leveler
Fasteners Suitable to Carry Load
Leveler
Leveler
Leveler
Leveler
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 11PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
MAIN FRAME INSTALLATION (CONTINUED)
Final Adjustments
IMPORTANT: Check that the frame is level and installed correctly before installing doors. Make sure all
measurements match those on your Shop Drawings. If there is a discrepancy, contact Technical Sales
at (800) 421-6144.
1 Measure between top of Sill and bottom of Top Track at interior and exterior corners along both
ends and middle of opening. Make sure those numbers are equal and match Shop Drawings.
Stack Area
Leveler Leveler Leveler Leveler Leveler Leveler Leveler
Leveler
Leveler
Top Track Top Track
Measure Frame Measure Frame
Leveler
Measure Height at Middle and at Each End of Frame Opening
Leveler
Opening Height Opening Height
at Interior at Interior
and Exterior and Exterior
Corners Corners
Leveler
Stack Side
Leveler
Stack Side
Flush Sill
Raised Sill
2 Measure from top to bottom of each Door Frame excluding the gasket.
Gaskets Gaskets
Measure Measure
Door Frame Door Frame Measure Door Frame Height without Gaskets
Height Height
Gaskets Gaskets
Door Door
Flush Sill Raised Sill
3 Check both measurements against Shop Drawings.
If there is a discrepancy, contact Technical Sales at (800) 421-6144 before continuing.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 12PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
FRAME SPLICING INSTALLATION (OPTIONAL)
Compensation Channel Splicing
Maximum length before splice is 250” (6350 mm). Splice Top Track, Raised Sill and
Flush Sill. Offset Compensation Channels splice by 12” (305 mm). Follow installation
procedures and order shown in this manual.
NOTE: Splice Compensation Channel with included splice plates.
Apply double sided tape if needed.
Center
Frame
12” (305 mm) Compensation
Channel
Offset Compensation Splice Top Track S85SPL1CECC
and Raised Sill Splice Plate
Channel Splice
by 12” (305 mm) at center frame.
Top Compensation
Channel
Top Track Splicing Top Track
A
Top Track
Top Roller Guide Splice
Raised Sill Splicing OUTSWING
Raised Sill INSWING
Raised Sill
Bottom Roller Guide Splice A
B
RAISED SILL
Flush Sill Splicing Flush Sill
Bottom Roller Guide Splice
FLUSH SILL
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 13PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
DOOR GLAZING
Your Palisades Door System has been engineered for a specific size glass panel. Review your Shop
Drawings to determine the correct dimensions.
Determine Bracing Direction
The glass panel acts as a structural element of the Palisades Door so proper installation is crucial. To hold
the door square and avoid sagging, brace the glass diagonally. Refer to diagram below and position shims
in bracing locations to distribute weight to hinge side where it is supported. Then install shims at spacing
locations to provide rigidity and prevent glass movement.
IMPORTANT: Glass is a structural part of the Palisades Door System so proper installation is essential.
Correct bracing is required for proper door function. Observe glass fit and bracing location for each door.
NOTE: Flat Shims are combined with Corner and Side Shims to properly space and brace glass in frame.
Use included Shims only. Corner Shims are factory installed.
Exterior Fold Side
Hinge Jamb
Roller Side
Hinge Side
Lock Jamb
Lock Side
Bra
Bra
n
ctio
cing
cing
Dire
Dire
Dire
cing
ctio
ctio
Bra
n
n
Bracing Locations Spacing Locations
Determine Shim Thickness
Calculate shim thicknesses to use at bracing locations for each door.
Top and Bottom Shims = Opening Height minus Glass Height divided by two.
Side Shims = Opening Width minus Glass Width divided by two.
IMPORTANT: Use included Shims ONLY. Panels should fit
Opening Height
Measure
snugly but not be forced. With insulated glass, both panes
Glass Height
Opening Measure Factory
Width Glass must be supported evenly. Do not obstruct drainage holes. Installed
Width Corner
Measure Opening Height
Shim
Two Side Shims and four sets of Flat Shims in various
Measure Glass Height
thicknesses are included for each panel. Install Side Shim
as spacer at vertical. Combine thicknesses of Flat Shims
with Side and Corner Shims to obtain required thickness
to properly brace panels.
Set of Four Flat Shim Thicknesses Two Side Shims Door
(Four sets included for each door) for Verticals.
Flush Sill
1/64” 1/32” 1/16” 1/8” NOTE: Include Factory
(.4 mm) (.8 mm) (1.6 mm) (3.2 mm) Installed Shim in calculations.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 14PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
DOOR GLAZING (CONTINUED) 8 8
Glass Installation
6
Lay door frame flat with glass cavity facing up. 8
1 Place Side Shims at verticals. 7
2 Place glass in frame. 5
8 3
3 Center glass.
4
1 8 8
2
2
1
1/64” 1/32” 1/16” 1/8”
(.4 mm) (.8 mm) (1.6 mm) (3.2 mm)
NOTE: Select and combine widths of
included Flat Shims for proper thickness.
IMPORTANT: Correct bracing is
mandatory for proper operation.
Bracing and Spacing Shim Installation
Begin shimming at bracing corners to keep door square. Use thickness calculated on Page 14 and install
in order shown below. Then shim in spacing locations to provide rigidity and prevent glass movement.
To compensate for sagging when installed, push the frame slightly out of square with thicker shims at top
and bottom bracing corners to raise top braced corner up to 1/16” (2 mm) higher.
Top Braced
7 8 Corner 1/16”
(2 mm)
6 8 Position Shims to support glass edges.
Insulated
Bra
Use Slightly Glass
Thicker Flat Shims
c
Support Both
ing
Shims at
Panes Evenly
8 8 Top and
Dir
Bottom
ect
Bracing
ion
Corners
to Raise
Top Braced
Corner
up to 1/16”
8 5
8 4 NOTE: 1/16” Flat Shim shown for glass placement only.
NOTE: When installed, the doors pull down slightly due to weight and the out of square doors become almost
even. If there are any issues with door operation, shim thickness needs to be adjusted. Doors must be
braced correctly for proper operation.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 15PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
DOOR GLAZING (CONTINUED) Glass Size Glass Stop
Horizontal Vertical
Wedge Gasket
Glass Stop and Gasket Installation 1” IGU
(25 mm)
NOTE: Refer to chart for correct combination of Gasket and
Glass Stop for glass size. WH416 Wedge Gasket used with
S85GLHV WH416
all stops. 1” IGU shown in illustrations.
9 Install Top and Bottom Glass Stops.
10 Install Side Glass Stops.
Hook Glass Stop and snap into place.
10
9
9 10
Factory
9 Installed
Corner Shim
10
NOTE: Vertical Glass
Stops run through.
11 Beginning at top center, roll in
Glazing Gasket. Notch gasket at corners. Factory Installed Bulb Gasket
NOTE: Spray with Cat. No. 1973
to prevent gaskets from binding. 12
Start at
Top Center Cat. No. 1973
Glass Cleaner
Notch Gasket at Corners.
NOTE: Do not stretch gasket when installing.
It should be cut approximately 1/8” (3 mm)
longer per foot and squashed in to allow for
gasket shrinkage.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 16PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
DOOR INSTALLATION
Operating Catches
Catches are factory installed on the inside of the installation. The Catch activates bolts into the top and
bottom track to lock the doors in closed position.
The Catch Handle faces down in closed position. Pull handle out toward you to angle away from the plate
when rotating into open or closed positions. Rotate handle to face up position to unlock during installation.
Catch Handle faces Lift Handle away from Catch Handle faces
down when locked. plate to rotate up into up when unlocked.
unlocked position.
NOTE: Do not use Catch Handles to pull doors open. Vertical glass stops have built in handles.
Install panels with Handles facing up in unlocked position. Two Catches, one controlling the top bolt
and the other controlling the bottom, are used on very tall panels.
Installing Hinge Pins
Hinge Pins are used at all hinges except where the Rollers or Guides are installed. Loosen hinge pin
set screws. Insert hinge pins into hinges with tapered side down. Do not ever force. When installation is
finished, secure using hinge pin set-screws.
Insert Hinge Pin with
Tapered Side Down
Loosen Hinge
Pin Set Screw
Hinge Pin Tool
Note: Use included tool to lightly tap tapered hinge pins into location. Do not use
excessive force to set pins as this will damage doors.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 17PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
DOOR INSTALLATION (CONTINUED) Hinge Jamb
1 Install First Panel With Catch Post
Refer to Shop Drawings for type, location, and orientation of each door panel. Start with door
number one at the Hinge Jamb. The door panels are also numbered in the order of installation.
Align door hinges with hinges on the frame at a 45 degree angle
and insert Hinge Pins at all hinges. Do not force. Hinge Pins are
secured using included hinge pin set screws after all doors are 1 Stack Side
installed and final adjustments are made. an
e l
tP
rs
Fi
2 Install Second Panel
Align second door hinges to first at a 45 degree angle at
level height. Shim to hold in place. Insert all hinge pins.
Hinge Jamb
3 Install Post With
Bottom Rollers Catch Post
and Top Guide
Angle post into top and Se
bottom tracks. Make sure co
nd
2
bottom rollers sit on stainless Pa
ne an
el
Stack Side
steel track and top guide l
r st
P
Fi
sits in guide groove. Align
second door hinges with post
at 45 degree angle and insert Hinge Jamb
all hinge pins. Roller Post
4 Install
3
Remaining Catch Post
Panels Se
Repeat instructions co
nd ne
l
a Stack Side
for second and third Pa
rs
tP
ne Fi
panels to install l
remaining panels.
Catch Post
IMPORTANT:
Completely Insert Hinge Pins. Locations w/ Red dot are to
have gasket installed after
panel installation.
DO NOT USE
EXCESSIVE FORCE
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 18PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
DOOR HANDLE INSTALLATION
Insert Actuator Post through hole in door.
Install Handles on each side with included screws.
R
KE
OC
1
23
2
DL
24
24 A
RE
TH
31
242
KER
LOC
EAD
242 THR
* Loctite is recommended on all screw threads during final assembly.
®
Seal and tool handle base and key hole at exterior. Fit cover over end of handle, slide to base and snap
(Required for exterior applications.) into place. Repeat to install cover on each handle.
NOTE: Install cylinder before
sealing around key hole.
Exterior
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 19PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
FINAL ADJUSTMENTS
Check Door and Handle Operation
Open and close all the doors to ensure they function properly. Also check that the handles and locks move
freely and make any adjustments if necessary. Failure to adjust the doors for proper operation will put stress
on the lock and cause damage.
Check Latching Panel
Ensure the latching panel engages properly with the strike jamb. If you need to adjust the gap between panel
and jamb, refer to Page 9 to adjust the levelers as needed for proper clearance. Ensure the jamb is plumb
and insert the screws again.
Secure All Hinge Pins
Secure all hinge pins by tightening
hinge pin set screws.
Roller height adjustment:
3/16" MAX
Top guide should have a max top clearance
of 3/16”. Turn adjustment screw clockwise to
lift post. This is necessary to adjust clearance.
Bottom Roller
Height
Adjustment
Screw
Roller tilt screw:
Post can be slightly tilted towards stock jamb if gap
adjustment is needed. Raise height adjustment up
and twist set screw clockwise.
Bottom Roller
Tilt Screw
Seal Perimeter for Exterior Installations
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 20PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
OPERATION
IMPORTANT: The doors open and close smoothly when operating properly. Do not force the system.
Contact a qualified technician if your doors are not functioning correctly.
WARNING: Do not place fingers between panels when opening or closing doors. Physical harm may occur.
Do not allow children to play with doors. Follow the operating procedure for your system.
NOTE: Panels must be opened and closed in a specific order that depends on the system configuration.
Follow correct operating procedure for one of three system configurations shown on these two pages.
Operating Systems with Swing Door Attached to Folding Doors
Opening Door Panels
NOTE: Units require user to apply enough force to compress gaskets. For outswing user is to use vertical glass stop handles to pull inwards.
For inswing user is to apply light force above catch handle to compress top gaskets.
1 Unlatch Swing Panel and rotate all Catch Handles to retract Bolts from the top and bottom track.
Lift Catch Handle away from plate Catch Handle faces
to rotate up into unlocked position. up when unlocked.
A B
2 Open Swing Panel into second panel 45 degrees.
TOP VIEW
Anchor 45
Clips
Anchor
Clips
A C
B
Fold Doors Together and Move to End.
3 Fold third door away from track and slide with first two doors.
Repeat until all doors are folded together at one end. D
A C
Engage Anchor Clips at top of first
B D two doors to hold them together.
Closing Door Panels
Follow steps above in reverse order to close panels.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 21PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
OPERATION (CONTINUED)
IMPORTANT: The doors open and close smoothly when operating properly. Do not force the system.
Contact a qualified technician if your doors are not functioning correctly.
WARNING: Do not place fingers between panels when opening or closing doors. Physical harm may occur.
Do not allow children to play with doors. Follow the operating procedure for your system.
NOTE: Panels must be opened and closed in a specific order that depends on the system configuration.
Follow correct operating procedure for one of three system configurations shown on these two pages.
Operating Systems with Folding Doors Only (without Swing Door)
Opening Door Panels 2 Retract Shoot Bolts from next pair of
1 Turn Catch Handle to retract Shoot Bolts from top and panels and fold away from track.
bottom track on first pair of panels. Fold doors from track. 1 B
Lift and Rotate
Catch Handle
1 A A 2 A
3 Slide first pair of panels together and continue moving folded pairs to end.
2 B
1 B 2 B
3 C
Fold Panelss Together and Move
to End of Track.
3 D
3 C 3 D
Closing Door Panels
Follow steps above in reverse order to close panels.
Operating Systems with Floating Panels (Even Numbered Panels Only)
Opening Door Panels
Floating Panels are generally used in large openings that exceed maximum folding sets. Follow steps above
to fold panels on either side of Floating Panels into stacking position. Then repeat same process beginning
with primary pair of each set of Floating Panels.
Fold Panels Fold Floating Panels Fold Floating Panels Fold Doors
Together and Together and Move to Together and Move to Together and
Move to End Stacking Position. Stacking Position. Move to End
of Track. of Track.
Closing Door Panels
Follow steps above in reverse order to close panels.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 22PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
CARE AND MAINTENANCE
NOTE: The Palisades System must be correctly installed or it will not function properly, causing abnormal
stress on components and lead to premature failure.
Your system should be easily operated. The doors should not bind or drag on the floor and locking points
should engage smoothly. When the doors are closed, the reveal between panels and head, and between
panels and sill should be consistent with no daylight seen from the inside.
As soon as you notice any problems, have them corrected by a qualified technician. A qualified technician
may need to adjust the system periodically to compensate for any building movement or settlement.
Proper Operation
Panels should be opened and closed in the proper order and manner shown in the Operation section of this
manual. Locking points should be gently opened and closed and not forced. If force is necessary, contact a
qualified technician to adjust your system.
General Maintenance
Routine maintenance is required to maintain the appearance and safe operation of your system. Wash and
inspect your system on a regular basis following these guidelines. Have a qualified technician replace worn
or damaged components or perform any necessary repairs.
FRAME PERIMETER: Check the top track for signs of deflection or bowing in the middle. It should have little
or no sag as you look down the length from one end to the other. Tighten and replace fasteners as needed.
Inspect the exterior perimeter seal. Replace old, loose caulking and seal any gaps with a good quality
sealant.
TOP TRACK: Inspect inside the top track for debris. Small obstacles can damage both the track and rollers,
resulting in rough or noisy operation. Clean the inside surface of the track with a small brush or damp cloth
and vacuum cleaner fitting.
BOTTOM TRACK: Remove debris and other foreign bodies that have dropped into the sill track immediately
to prevent damaging the guides. Ensure all weep holes are clean and clear of any obstructions. Do not allow
standing water in the track.
ALUMINUM COATING: Exposed surfaces should be cleaned regularly. Wash with soap or mild detergent
and warm water followed by rinsing with clean cold water and wipe dry. Do not use aggressive alkaline or
acid cleaners. Any chips or scratches must be repaired immediately with proper touch up paint.
GASKETS: Check gaskets for proper seating and condition. Remove dust and any deposits from gaskets
and lubricate with a silicone spray applied to a soft cloth.
ROLLERS, GUIDES, BRACKETS AND HINGES: Wipe exposed surfaces with warm soapy water and a
soft rag, and then rinse clean and wipe dry. Apply Cat. No. SP295 Dry Lubricant to all surfaces and remove
excess with clean cloth.
HARDWARE: All hardware, hinges and handles should be periodically cleaned with a soft cloth and mild
cleanser. Rinse clean and wipe dry. Ensure all fasteners are tight and in good condition.
FREQUENCY: These maintenance procedures need to be performed as often as necessary to prevent
deterioration in the installed environment. As a guide, if a window or door requires washing then wash and
inspect the hardware. At the minimum we recommend washing and inspecting your system every 6 months in
general environments and every 3 months in marine and industrial environments.
Environments within one mile of a seacoast can be extremely corrosive and extra care should be taken to
maintain your system. Open and close completely a system at least once a week and inspect all surfaces.
Do not allow salt or sand to build up on surfaces. Wash and inspect your system at least once a month, more
frequently as needed.
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 23PALISADES S90 BI-FOLDING DOOR AND WALL SYSTEM
LIMITED WARRANTY
Limited Warranty
Palisades Bi-Folding Glass Wall Products
CRL warrants for a period of three (3) years from the date of invoice that its Palisades
Bi-Folding Glass Wall Products shall be free from defects that substanially impair product
operation or performance, provided that the materials are used in an appropriately designed
application and are installed and maintained in strict accordance with all applicable safety
codes, building standards and CRL recommendations.
This Warranty will not apply if it is determined that the products have been installed and
maintained in a manner that is not in conformity with the instructions and guidelines set forth by
CRL for proper installation and maintenance, alterations, modifications, neglect, fire, war, flood,
earthquake, and other acts of God.
CRL’s sole responsibility to provide a remedy under this Warranty shall be limited to either
a refund of the purchase price of the product, or to repair or provide a replacement of the
product. The refund, repair, or replacement shall constitute the limit of CRL’s liability and
obligation for any material defect or defect in workmanship in the product. CRL reserves the
exclusive right to select any one of the above mentioned remedies.
This Warranty is exclusive, and CRL makes no other warranty, express or implied, including
without limitation, any implied warranty of merchantability or fitness for a particular purpose.
In no event shal CRL be liable under any legal theory (including but not limited to contract,
negligence, strict liability in tort, or warranty of any kind) for any indirect, special, incidental,
consequential, or exemplary damages (including, but not limited to, lost profits).
C.R. Laurence Co., Inc.
2503 E. Vernon Avenue, Los Angeles CA 90058
crlaurence.com
C.R. Laurence Co., Inc. • 2503 E. Vernon Ave., Los Angeles, CA 90058 • 1.800.421.6144 • crlaurence.com
P. 24You can also read