2020 Israel Global Blogs Network
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
Infrastructure for Growth 2020 Government of Israel
TABLE OF CONTENTS
Introduction: Acting Director-General, Prime Minister’s Office, Ronen Peretz ............................................. 3
Reader’s Guide............................................................................................................................................ 4
Summary of infrastructure projects for the years 2020-2024
Ministry of Transportation and Road Safety................................................................................................. 8
Ministry of Energy....................................................................................................................................... 28
Ministry of Water Resources........................................................................................................................ 38
Ministry of Finance...................................................................................................................................... 48
Ministry of Defense..................................................................................................................................... 50
Ministry of Health....................................................................................................................................... 53
Ministry of Environmental Protection.......................................................................................................... 57
Ministry of Education.................................................................................................................................. 59
Ministry of Communications........................................................................................................................ 61
Closing Remarks - The Governance and Social Affairs Division and the Department of Economy
and Infrastructures in the Prime Minister’s Office........................................................................................ 63
INFRASTRUCTURE FOR GROWTH 2020 | 2INTRODUCTION: ACTING DIRECTOR-GENERAL - PRIME MINISTER’S OFFICE, RONEN PERETZ
This booklet presents the multiyear government program for infrastructure development for 2020 and the government’s continuing efforts to promote the planning and implementation processes
for infrastructure projects in Israel. The projects summarized in this program constitute an essential foundation during the formulation of a government strategy that is based on infrastructure data,
and the program’s objectives are to set uniform high standards for the planning and execution of infrastructure projects, to instill an advanced organizational culture, to attract investments from
local and international infrastructure firms and to improve the mechanisms for monitoring the conformance of the State of Israel’s major projects to budgets and timetables.
Publication of the program enables the government to publicize its infrastructure activities and to make the necessary in-depth changes in its working methodologies. This change in the government’s
work is expressed not only by its monitoring of the planning and implementation processes in major infrastructure projects in the economy, but also in other areas, such as its monitoring of the
implementation of government resolutions, publishing of government Work Plans and of the yearly report on Reducing the Regulatory Burden.
The program constitutes an essential foundation for making the improvements needed in infrastructure development in Israel. The importance of this publication is magnified considering the
coronavirus crisis as well as the government’s ongoing efforts to encourage economic activities, increase productivity and reduce unemployment. We are committed to continuing this work in order
to increase the implementation of government policies and improve the effectiveness of its activities for the benefit of the general Israeli public.
Ronen Peretz
Acting Director-General - the Prime Minister’s Office
INFRASTRUCTURE FOR GROWTH 2020 | 3READER’S GUIDE
About the multiyear program for infrastructure development
This booklet presents the State of Israel’s multiyear program for infrastructure development for 2020-2024. The program includes a list of infrastructure projects valued above ILS 100 million, which
have already started construction or expected to commence construction between 2020-2024.
The projects presented are either in progress or already approved by government ministries, support units and the government companies under their responsibility. The projects described in this
program have been approved by government resolutions or by the appropriate authorization bodies. Additionally, some projects have not yet been approved, but have undergone economic feasibility
studies or other impact analyses and are highly likely to be approved and for construction to commence within the next five years.
This program makes it possible to present a transparent and concentrated view of all major infrastructure investments in Israel, how they are funded and implemented and their implementation
timetables. This program also provides information, clarity and an implementation horizon to encourage new private investments from Israel and around the world to facilitate higher competition,
higher-quality services and lower costs. This centralized project status report also contributes significantly to the government’s analysis of these projects from an overarching strategic perspective in
order to coordinate and improve infrastructure planning and implementation in Israel and to highlight the new government’s infrastructure development planning and implementation processes.
The proposed program is the outcome of the efforts of many government entities: the government ministries, support units and government companies included in this program, the Prime Minister’s
Office and the Ministry of Finance.
INFRASTRUCTURE FOR GROWTH 2020 | 4CONTENTS OF EACH MINISTRY’S PROJECT STATUS REPORT
1
MINISTRY OF TRANSPORTATION AND ROAD SAFETY
2 3 4 5 6 7 8 9 10 11 12 13 14 15
Type of Project Status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
Light rail Detailed NTA Purple Line - The Purple Line is Tel-Aviv 11,000 Q3 / 2019 Q3/2019 6 Yes Franchise Lower Lower
infrastructure Planning Metropolitan Tel Aviv designed to connect (franchise (lower structure - structure -
Mass Transit the eastern areas of tender) structure) Budgetary, Contractor
System Ltd. Metropolitan Tel-Aviv Upper tender, Upper
with Tel-Aviv’s city structure - structure - PPP
center at street level. Combined
The total length of the
line is expected to be
about 28 km. Initially,
the line will run through
Ramat-Gan and Tel-Aviv.
IN THE TITLE:
1. Name of the government ministry: The ministry under whose responsibility or regulation the projects listed in the table will be constructed.
IN THE TABLE:
2. The specific type of infrastructure.
3. Project status - The current stage of the projects listed in the table. There are four stages in the process:
A. Initiation - From the initial consideration of the project until the publication of the tender for planning and construction. This stage may include: the original brainstorming, an economic feasibility
study, preliminary planning, statutory planning, examination of its suitability as a PPP (a partnership between the public and private sectors)1, planning and formulation of the project contents, an RFI
process, drafting of a government resolution on the matter, drafting of a resolution to proceed with the project, promoting the project availability and preliminary work in the field.
B. Tender - As of the publication of the tender or preliminary screening and up to the selection of the tender winner.
C. Detailed planning and/or financial closure - Detailed planning of the project or, in the instance of a project designated for implementation under a PPP - detailed planning, preliminary works and
financial closure up until the start of construction.
D. Construction - Projects whose construction is underway on site or that are ready for construction to commence.
1 http://mof.gov.il/AG/Projects/ProjectsPrivateSector/Pages/PresentationPPP.aspx
INFRASTRUCTURE FOR GROWTH 2020 | 54. The authority or company that is managing the project.
5. The name of the project.
6. A description of the project.
7. The project’s geographic location: This location may be nationwide (infrastructure crossing/located throughout Israel), regional (infrastructure crossing/located in several local authorities but
within one district), or local (in or adjacent to a single community). The regional location is determined according to the Ministry of the Interior’s district jurisdictions.
8. Construction cost estimate: An assessment of the project’s cost in ILS millions. The construction cost estimate does not include the project’s future operating or maintenance costs after the
start-up of its operation. Please note: this is solely a current assessment and revisions are likely as time passes (and progress is made on the project planning and formulation). If an estimate
cannot be determined, it will be answered as TBD. Additionally, an estimate is not specified for some projects that are at a preliminary stage prior to or during publication of a tender.
9. Forecasted tender publication date: Stated in quarters. Ministries that cannot yet determine a date at this stage, answered TBD.
10. Forecasted construction start date: Stated in quarters. Ministries that cannot yet determine a date at this stage, answered TBD.
11. Forecasted construction duration: An assessment of the expected number of years of construction.
12. Has suitability for a PPP been examined? Pursuant to Government Resolution no. 3012 dated September 3, 2017, regarding a “multiyear program for infrastructure development in Israel,”
projects costing more than ILS 250 million must be analyzed to ascertain suitability for execution under a PPP. The possible answers are:
A. Yes
B. No
C. TBD
D. Under review.
E. N/A.
13. Ownership method: The possible answers are:
A. Public - The State (including government companies) owns the land and the project.
B. Private - The private sector owns the project.
C. Franchise - The private sector holds a right to the land and is entitled to collect payments from the public or receive payment from the State. At the end of the franchise period, the land and
the project return to State ownership.
D. TBD.
INFRASTRUCTURE FOR GROWTH 2020 | 614. Funding method. The possible answers are:
A. Budgetary - The project is publicly owned, and all project funding comes from the State’s budget.
B. Tariff - The project is publicly owned, and the costs will be funded by supply tariffs (electricity/water.)
C. Private - The State does not fund the construction costs.
D. Combined - Construction costs are funded by the private and public sectors. For example: The government grants a construction grant, while all other funding comes from the private sector.
E. TBD.
F. Other.
15. Expected implementation method. The possible answers are:
A. Contractor tender - Execution (and detailed planning where necessary) by private contractor.
B. Self-implementation - Execution by employees of the managing company themselves or of the relevant government company (such as employees of the Electric Corporation or of Mekorot
water company).
C. Combined self and contractor execution - part of the project is implemented by employees of the managing company and part by a private contractor through a tender.
D. PPP - Detailed planning, implementation and operation by a private concessionaire.
E. Private implementation - Project that is privately owned and privately funded and is implemented by a private company (the State is the regulatory authority). For example: The Electricity
Authority issues a license to a private producer of electricity.
F. TBD.
INFRASTRUCTURE FOR GROWTH 2020 | 7MINISTRY OF
TRANSPORTATION
AND ROAD SAFETY
INFRASTRUCTURE FOR GROWTH 2020 | 8MINISTRY OF TRANSPORTATION AND ROAD SAFETY
Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
Light rail Initiation Trans-Israel Light rail Construction of a light rail line - Haifa - North 5,900 TBD TBD 6 Yes Franchise Lower Contractor
infrastructure Ltd. -Haifa Nazareth (the project is in a preliminary structure - tender
-Nazareth stage of determining the funding Budgetary,
method.) The cash outlay is for an initial Upper
estimate for the preliminary works that structure -
the State will be required to perform. Combined
Light rail Detailed NTA Green Line The line connects the southern areas Tel Aviv 19,000 Q3 / 2019 Q3 / 2019 6 Yes Franchise Lower Lower
infrastructure planning Metropolitan - Tel-Aviv of Metropolitan Tel-Aviv (Holon and (Franchise (lower structure - structure -
and/ or Mass Transit the outskirts of Rishon LeZion) and tender) structure) Budgetary, Contractor
financial System Ltd. its northern areas (Herzliya) to Tel- Upper tender, Upper
closure + Aviv, meeting the needs of future structure structure - PPP
construction developments through the main -Combined
business center in northwest Tel-Aviv
and western Herzliya, and enabling
access to employment centers in Ramat
HaHayal, in Tel-Aviv University, in Holon,
in Rishon LeZion and in Herzliya Pituah.
The length of the line is approximately
39 km, of which some 4.5 km are
underground, with 61 stations, including
4 underground stations (Carlebach,
Dizengoff, Rabin Square and Arlozorov.)
Light rail Detailed NTA Purple Line The Purple Line is designed to connect Tel Aviv 11,000 Q3 / 2019 Q3 / 2019 6 Yes Franchise Lower Lower
infrastructure planning Metropolitan - Tel Aviv the eastern areas of Metropolitan (Franchise (lower structure - structure
and/ or Mass Transit Tel-Aviv with Tel-Aviv’s city center at tender) structure) Budgetary, -Contractor
financial System Ltd. street level. The total length of the line Upper tender, Upper
closure + is expected to be about 28 km. Initially, structure structure - PPP
construction the line will run through Ramat-Gan and -Combined
Tel-Aviv.
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 9Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
Light rail Detailed Transport JNET The project includes an extension of the Jerusalem 11,000 Q4 / 2018 Q4 / 2020 5 Yes Franchise Lower Lower
infrastructure planning Master Plan existing Red Line (up to Neve Yaakov structure - structure -
and/or Team in in the north and up to Hadassah Ein Budgetary, Contractor
financial Jerusalem Kerem Hospital in the south) and the Upper tender, Upper
closure + Green Line (from Mount Scopus to Gilo, structure - structure - PPP
construction including branches to Giv’at Ram, Giv’at Combined
Shaul and Malcha). The expanded Red
Line will be at a total length of about
21 km and the Green Line at a length of
about 20 km.
Light rail Detailed Transport Blue Line - A light rail line from the Ramot Jerusalem 10,250 Q3 / 2020 Q2 / 2022 7 Yes Franchise Lower Lower
infrastructure planning Master Plan Jerusalem neighborhood in the north of Jerusalem structure - structure -
and/or Team in to the Gilo neighborhood in the south Budgetary, Contractor
financial Jerusalem of Jerusalem, with a branch to Emek Upper tender, Upper
closure Refa’im. structure - structure - PPP
Combined
Light rail Construction NTA Red Line - A light rail line connecting Petach Tikva, Tel Aviv 16,500 Q4 / 2015 Q4 / 2015 7 Yes Public Budgetary Contractor
infrastructure Metropolitan Tel-Aviv Bnei Brak, Ramat Gan, Tel-Aviv and Bat tender
Mass Transit Yam.
System Ltd.
Heavy rail Tender Netivei Israel Eastern Eastern track to Route 6. Center 8,500 Q1 / 2019 Q2 / 2020 6 No Public Budgetary Contractor
tracks Ltd. + Israel Tracks tender
Railways
Heavy rail Detailed Netivei Israel Fourth rail Addition of a fourth track in the Ayalon Center 4,330 Q4 / 2020 Q2 / 2021 TBD No Public Budgetary Contractor
tracks planning Ltd. at Ayalon area. tender
and/or
financial
closure
Heavy rail Detailed Israel Track for A track connection from Moshe Dayan Center 3,200 Q3 / 2020 Q1 / 2021 5 No Public Budgetary Contractor
tracks planning Railways Train 431 Station in Rishon LeZion to Anava to tender
and/or improve the link with Modiin and
financial Jerusalem.
closure
Heavy rail Construction Israel Electrification The electrification of the national railway National 4,800 Q4 / 2015 Q4 / 2016 8 No Public Budgetary Contractor
tracks Railways of railway network for a transition to electrical tender
tracks propulsion of the fleet of trains
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 10Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
Public Tender Netivei Israel Route Providing a response to the need for Center 1,800 Q4 / 2018 Q4 / 2020 4 No Public Budgetary Contractor
transport Ltd. 4 - public public transportation in both directions tender
lanes transport on Route 4 - in the Pardesiya - Bar Ilan
lane segment. Adding another lane and,
in some segments, using the existing
shoulder.
Public Tender Netivei Fast lanes Project for the construction of fast lanes Center 4,700 Q4 / 2018 Q1 / 2020 5 Yes Franchise Combined PPP
transport Ayalon Ltd. on Route 20 and Route 2 from Rishon
lanes LeZion in the south and up to Netanya in
the north, by adding a new designated
lane for public transportation and for
carpooling. Excess capacity will be sold
by paying a toll.
Public Tender Netivei Israel Route 5, Widening of the road and adding Center 670 Q4 / 2019 Q4 / 2020 3 No Public Budgetary Contractor
transport Ltd. Netivei another lane so that the left lane can be tender
lanes Israel - designated for public transportation in
promoting both directions.
the
availability
of public
transport
lanes
Public Detailed Netivei Israel Route 40 Arrangement of preference for public Center 135 Q2 / 2021 Q3 / 2021 3 N/A Public Budgetary Contractor
transport planning Ltd. - public transportation on Route 40 and on tender
lanes and/or transport Route 483 within the framework of the
financial lane, Express to the City project, arrangement
closure Adanim of a designated public transport lane
- Segula and/or a public transport lane on
-Ganim the shoulder in accordance with the
directive in the existing statute regarding
planning on both sides of Route 40,
in the segment between the Adanim
Junction and the Segula Junction, as well
as the planning of a public transport
lane only at the entrance to Petach
Tikva on Route 483 - from Kibbutz Giv’at
HaShlosha to the Segula Junction.
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 11Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
Public Construction Netivei Israel Route 57 - Arrangement of a public transport lane Center 200 Q4 / 2018 Q1 / 2019 3 N/A Public Budgetary Contractor
transport Ltd. Preferential along Route 57 in both directions, in tender
lanes arteries the Netanya - Kfar Yonah west segment.
Adding another lane and, in some
segments, using the existing shoulder.
Public Construction Netivei Express to A holistic project of a 160 km network Center 3,500 Q4 / 2018 Q4 / 2018 4 No Public Budgetary Contractor
transport Ayalon Ltd. the City of preferential lanes for public tender
lanes transportation, including the addition
of new lanes, repair of infrastructures,
preferences at traffic lights,
enforcement, streamlining of operations
and augmented service.
Public Construction Netivei Israel Route 461 The project includes the construction Center 153 Q1 / 2018 Q4 / 2018 3 No Public Budgetary Contractor
transport Ltd. - public of an additional designated public tender
lanes transport transport lane in both directions and a
lane, bicycle lane (within the framework of
HaTayasim Dan Bicycles), arrangement of the Ariel
Road - Sharon Park Junction, installing traffic
HaTayasim lights, relocating the "40” Mekorot
Junction water line and arranging infrastructures.
Total length of about 2 km.
High capacity Initiation Yefe Nof Ltd. Public Public transport project - Metronit on Haifa TBD TBD TBD 5 No Public Budgetary Contractor
buses (Bus transport Carmel Ridge, from Carmel Center up to tender
Rapid Transit - Mount Haifa University. Integrates three exits
- BRT) Carmel from the Ridge for private vehicles and
two level separations on Horev and
Shimshon Streets.
High capacity Initiation Yefe Nof Ltd. Public Construction of a public transport route Haifa 448 Q2 / 2020 Q4 / 2020 3 No Public Budgetary Contractor
buses (Bus transport in the Neve Sha’anan neighborhood in tender
Rapid Transit - Neve Haifa and connecting it to the existing
- BRT) Sha’anan public transport network (Metronit
and the proposed artery on the Carmel
Ridge.) In some segments, a central bus
route is planned and in other segments
a public transport lane is planned (on
one-way streets) - in existing bus routes.
Note: Cash flow is based on 85%
matching with the Ministry of
Transportation’s share.
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 12Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
High capacity Tender Yefe Nof Ltd. Public Extending the Metronit line to Acre and Haifa 431 Q2 / 2020 Q4 / 2020 4 No Public Budgetary Contractor
buses (Bus transport - integrating it with the public transport tender
Rapid Transit Acre planning in Acre in the intercity
- BRT) segment (Route 4.) Right-lane for public
transport, with mixed traffic within Acre.
High capacity Detailed Yefe Nof Ltd. Public Paving of a public transport route up Haifa 477 Q1 / 2020 Q2 / 2020 4 No Public Budgetary Contractor
buses (Bus planning transport to Tirat HaCarmel as an extension for tender
Rapid Transit and/or - Tirat the Metronit, which currently ends at
- BRT) financial HaCarmel Hof HaCarmel Central Bus Station - a
closure segment on Route 4 and a municipal
segment within Tirat HaCarmel.
High capacity Construction Yefe Nof Ltd. Eastward Construction of a public transport route Haifa 407 Q4 / 2017 Q4 / 2017 4 No Public Budgetary Contractor
buses (Bus extension on the Bar Yehuda, Haifa-Nesher artery. tender
Rapid Transit of the
- BRT) Metronit
(Nesher)
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 13Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
New road Initiation Netivei The holiday Lateral (east-west) artery between Route Center 1,200 TBD TBD 3 No Public Budgetary Contractor
Ayalon Ltd. artery 4 and Route 2 south of Route 5 and tender
Ramat HaSharon.
New road Initiation Netivei Israel Route 44 - Beit Dagan Interchange and widening of Center 1,300 Q4 / 2021 Q3 / 2021 4 No Public Budgetary Contractor
Ltd. Beit Dagan Route 44 into a three-lane bidirectional tender
- Nir Zvi, road with a public transport lane parallel
including to the road.
interchange
New road Initiation Netivei Israel Route 40 Removing the existing Route 40 from Center 300 TBD TBD 3 No Public Budgetary Contractor
Ltd. - Petach the built-up area and upgrading Route tender
Tikva 40 as a national main highway, as well
Bypass as providing a solution for the expected
(Israel demands in light of the government
Lands resolution to evacuate Camp Sirkin and
Authority) to construct residential neighborhoods
and commercial areas on the evacuated
land. A highway, including three
interchanges at the junction with Routes
4713 and 483 and in the Segula area.
The highway includes segments of
tunneling in its central section to the
west of the future Sirkin neighborhood.
New road Initiation Netivei Israel Arrangement Access to the national road network South 55 Q1 / 2022 Q3 / 2022 2 N/A Public Budgetary Contractor
Ltd. of entrances from communities in southern Israel. tender
to
communities
pursuant to
Government
Resolution
2025, dated
September
23, 2014, on
the topic of
the Multiyear
Program
for the
Development
of the South
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 14Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
New road Detailed Netivei Israel Route 65 Widening the road to a two-lane North 1,060 TBD TBD 4 No Public Budgetary Contractor
planning Ltd. - Golani bidirectional road at the length of tender
and/or -Dovrat1 about 18 km; constructing five level
financial separations.
closure -
New road Detailed Netivei Israel Route 71 - Doubling of Route 71 to a two-lane North 567 TBD TBD 3 No Public Budgetary Contractor
planning Ltd. Afula - Beit bidirectional road and constructing an tender
and/or She’an (Beit interchange at the junctions between
financial She’an - Beit She’an and the Yissachar Junction.
closure Yissachar)2
New road Detailed Netivei Israel Route 65 - Increasing the capacity of the regional North 387 Q2 / 2020 Q4 / 2020 3 No Public Budgetary Contractor
planning Ltd. Afula East road network due to the development tender
and/or Bypass of the city of Afula. Eliminating the
financial vehicular traffic passing through Afula’s
closure city center by those travelling from
southern Israel en route to northern
Israel. Improving road safety - driving
north with no traffic lights. Adapting the
road for the traffic congestion forecasted
for 2030. Continuing the development of
the Route 65 northern artery, widening
the road to a two-lane bidirectional
road at the length of about 6.5 km from
Balfouria (Junction 60/65) up to the
connection to Route 65 in the Ahuzat
Barak area. Planning of a junction at the
connection to Routes 60 and 65 and an
interchange at the connection to Route
65 in Ahuzat Barak.
New road Detailed Netivei Israel Route 561 - Addition of a new two-lane bidirectional Center TBD TBD TBD TBD N/A Public Budgetary Contractor
planning Ltd. Kfar Netter lateral (east-west) regional road. tender
and/or -Route 4
financial
closure
1 The project is frozen until budgetary approval is received
2 The project is frozen until budgetary approval is received
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 15Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
New road Detailed Netivei Israel Route Addition of an entrance to Camp Center 112 Q4 / 2021 Q4 / 2021 3 N/A Public Budgetary Contractor
planning Ltd. 44 - Gezer Rachavam from the eastern side. tender
and/or Interchange
financial
closure
New road Construction Netivei Israel Route 444, Upgrading Route 444 to a two-lane Center 160 Q1 / 2019 Q3 / 2019 3 N/A Public Budgetary Contractor
Ltd. Netivei bidirectional road. tender
Israel,
Shoham
-Ben
Shemen
New road Detailed Netivei Israel Route 4 - Completion of the Holon East Center 237 Q4 / 2020 Q1 / 2021 3 N/A Public Budgetary Contractor
planning Ltd. Holon East Interchange on Route 4 in response tender
and/or Interchange to the growth in planned housing
financial units in Holon and Rishon LeZion. The
closure urban building plan in the program
was promoted by the municipalities of
Holon and Rishon LeZion. Completion
of the Holon East Interchange, including
ramps on the east side. The work also
includes the construction of supporting
and acoustic walls, environmental
development, landscaping and irrigation,
drainage, electrical and lighting works,
overhead sign structural supports, traffic
lights and paint, and handling of the
relocation of various infrastructures.
New road Detailed Netivei Israel Route 57, Upgrading of lateral (east-west) Route Center 2,245 Q1 / 2021 Q3 / 2021 4 No Public Budgetary Contractor
planning Ltd. Netivei 57 and upgrading the connection to tender
and/or Israel - longitudinal (north-south) Route 4
financial Kfar Yona through the Sharon Interchange and
closure Bypass and constructing the Pardesiya Interchange.
HaSharon
Interchange
4/57.
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 16Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
New road Detailed Netivei Israel Route 85 This project will enable improvement North 374 TBD TBD 3 No Public Budgetary Contractor
planning Ltd. - Karmiel - of the level of service on Route 85 tender
and/or Hanania3 east of the Karmiel East Junction and
financial improvement of the level of safety on
closure this road; widening of the road along its
existing route to a two-lane bidirectional
road between the Hanania Junction to
Karmiel (Big Junction), while ensuring
hardened lane dividers and lighting in
the areas needing this. The widening
will enable significant improvement in
the levels of safety and service for road
users in the immediate term (concurrent
with National Infrastructure Plan 49).
New road Detailed Netivei Israel Route A new road from a new neighborhood in South 228 Q4 / 2019 Q3 / 2020 2 No Public Budgetary Contractor
planning Ltd. 2411 - Sde Ofakim and arrangement of the junction tender
and/or Teyman on Route 25. Connecting Route 2411 to
financial Airfield - Route 25.
closure Ofakim
New road Detailed Netivei Israel Route 41 The project constitutes a part of South 515 Q2 / 2021 Q1 / 2022 3 No Public Budgetary Contractor
planning Ltd. - Ashdod several projects providing better access tender
and/or Stage 4 without traffic lights to Ashdod Port.
financial (Nir Galim), The project also provides a solution
closure expansion for traffic problems expected to arise
from from the traffic volumes deriving from
Bnei Brit the project. Arrangement of modes of
Junction access and accessibility to the Ashdod
up to the Industrial Zone and Ashdod Port,
Ashdod Moshav Bnei Darom and Moshav Nir
Junction Galim; an IEC switching station; Route
41 - a three-lane bidirectional road
between the Ashdod Interchange and
Bnei Brit Junction. The project includes
the construction of an interchange at the
Nir Galim Junction, arrangement of the
entrances to Nir Galim and Bnei Darom
and to the Ashdod Industrial Zone
and arrangement of the underground
passage to the IEC switching station.
3 The project is frozen until budgetary approval is received
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 17Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
New road Detailed Netivei Israel Route 2, Connection of the Apollonia Center 240 TBD TBD 2 No Public Budgetary Contractor
planning Ltd. Netivei neighborhood to Route 2. tender
and/or Israel -
financial Apollonia
closure Interchange
and
promotion
of
availability4
New road Detailed Netivei Israel Route 264 Widening to a two-lane bidirectional South 385 TBD TBD 3 No Public Budgetary Contractor
planning Ltd. between road from Beit Kama to Eshel HaNasi. tender
and/or the Kama
financial Junction
closure and the
Eshel
HaNasi
Junction5
New road Construction Netivei Israel Route 2 - Widening of Route 2 at the length of Center 1,259 Q4 / 2018 Q3 / 2019 4 No Public Budgetary Contractor
Ltd. Havatzelet 12 km to a fast three-lane bidirectional tender
- Olga (NIP road.
31)
New road Construction Netivei Israel Route 444 Safety improvements and widening to a Center 189 Q4 / 2018 Q3 / 2019 3 N/A Public Budgetary Contractor
Ltd. - through two-lane bidirectional road. tender
Tayibe
New road Construction Netivei Israel Route 781 Widening of Route 781 to a two-lane Haifa 70 Q3 / 2018 Q4 / 2018 3 N/A Public Budgetary Contractor
Ltd. - Widening bidirectional road. tender
of a
segment
along 6.3 -
8 km
4 The project is frozen until budgetary approval is received
5 The project is frozen until budgetary approval is received
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 18Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
New road Construction Netivei Israel Arrangement Arrangement of Junction 444/10, Center 500 Q4 / 2018 Q2 / 2019 3 No Public Budgetary Contractor
Ltd. of Junction including a connection to Yehuda HaLevi, tender
444/10, Rosh HaAyin - Interchange 444/10,
widening widening of Route 444 between Route
of public 10 and 471, Public Transport Lane 444
transport from Route 5 to 471, Public Transport
lane Lane on Route 5.
444, and
widening of
Route 444
New road Construction Netivei Israel Route 859 Construction of a new two-lane North 430 Q4 / 2018 Q2 / 2019 3 No Public Budgetary Contractor
Ltd. from 4 to bidirectional lateral (east-west) regional tender
70 road and adding agricultural roads.
New road Construction Netivei Israel Route Completion of statutory planning of South 50 Q1 / 2019 Q3 / 2019 2 N/A Public Budgetary Contractor
Ltd. 293 - from Route 293 from Beit Kama to HaGdi tender
Beit Kama Junction, and arrangement of the
to HaGdi junctions along the artery according to
Junction priorities and budget.
New road Construction Netivei Israel Route Diverting and widening of Route 89. North 135 Q4 / 2018 Q1 / 2019 3 No Public Budgetary Contractor
Ltd. 89 - Kabri tender
-Nahariya
New road Construction Netivei Israel Route 16 New entry road to Jerusalem from the Jerusalem 1,445 Q4 / 2016 Q4 / 2019 4 Yes Franchise Combined PPP
Ltd. west, connecting National Route 1 from
the Motza area to Giv’at Shaul and to
Bait Street in Jerusalem, adjacent to
the Giv’at Mordechai Interchange on
Menachem Begin Blvd. The road will
include two tunnels: one under the Har
Nof neighborhood and the second under
the Yefe Nof neighborhood. Additionally,
three interchanges, including bridging in
the vicinity of Motza, Nachal Revida, and
the Bait Junction.
New road Construction Yefe Nof Ltd. Haifa Port Construction of a transit link from the Haifa 1,859 Q1 / 2017 Q2 / 2017 6 No Public Budgetary Contractor
connections future HaMifratz Port and the national tender
road and rail network, including
arrangement of the underground
infrastructures to the future port inside
the infrastructure tunnel.
New road Construction Netivei Route 200 Western bypass road in Ramle between Center 470 Q4 / 2018 Q3 / 2019 4 No Public Budgetary Contractor
Ayalon Ltd. Route 431 and Route 44. tender
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 19Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
New road Construction Netivei Israel Route 38 Widening of Route 38 in the segment Center 595 Q4 / 2017 Q4 / 2018 3 No Public Budgetary Contractor
Ltd. South between Tsor’a and Ramat Beit Shemesh tender
to a two-lane bidirectional road,
including the construction of a lane
divider at Yish’i - Giv’at Sharett Junction,
a pedestrian bridge at the entrance
junction to the western industrial zone
and a lane divider at the entrance
junction to Ramat Beit Shemesh,
including a pedestrian bridge.
New road Construction Netivei Israel Route 4 Construction of the Ashdod North South 322 Q4 / 2016 Q2 / 2018 3 No Public Budgetary Contractor
Ltd. - Ashdod Interchange with Route 4, widening of tender
North Route 4 to three lanes, and the Yavne -
Interchange Ashdod road.
(Israel
Lands
Authority)
New road Construction Netivei Israel Route 423 - Completion of the new two-lane Center 262 Q4 / 2017 Q2 / 2018 2 No Public Budgetary Contractor
Ltd. Ness Ziona bidirectional regional road connecting tender
Eastern Begin Rd. in Rehovot to Ness Ziona and
Bypass, the interchange with Route 431. The
Segment B project includes level separations with
the train and the drainage pumping
station.
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 20Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
New road Construction Netivei Israel Route 232 - Widening of Route 232 from Ma’on to South 195 Q2 / 2018 Q1 / 2019 3 No Public Budgetary Contractor
Ltd. Ma’on - Nir the Nir Yitzhak Shalom Junction to two tender
Yitzhak lanes in a limited section and arranging
the junctions.
New road Construction Netivei Israel Route 90 Widening of Route 90 from the Yotvata South 162 Q3 / 2017 Q2 / 2018 3 N/A Public Budgetary Contractor
Ltd. (53-63 km) area up to the split with Route 40 at tender
Ketura Junction (53-63 km) to a two-lane
bidirectional road with a hardened lane
divider, adding safety improvements for
users of the HaArava Road, widening
of the road to a two-lane bidirectional
road, and arranging junctions.
Interchange Initiation Netivei Harav Construction of an interchange on Center 310 TBD TBD 3 No Public Budgetary Contractor
Ayalon Ltd. Mecher Route 2 between Glilot and the HaSira tender
Interchange Interchange, for the Herzliya and Ramat
HaSharon housing units being built in
the vicinity.
Interchange Initiation Netivei Israel Route Constructing an interchange at the Center TBD TBD TBD 3 N/A Public Budgetary Contractor
Ltd. 38 - Beit entrance to Beit Shemesh and Route tender
Shemesh 3855 by constructing two interchanges
Interchange instead of the junctions with traffic
(Ministry of lights.
Construction
and
Housing)
Interchange Tender Netivei Israel Route 40 Constructing an interchange at the Center 193 Q3 / 2019 Q2 / 2020 3 N/A Public Budgetary Contractor
Ltd. - Lehavim Lehavim Junction 31/40. tender
Interchange
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 21Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
Interchange Detailed Netivei Israel Route 41 Improving and upgrading the access South 956 Q2 / 2021 Q1 / 2022 3 No Public Budgetary Contractor
planning Ltd. - Bnei Brit to the ports in Ashdod; reinforcing the tender
and/or Interchange transit connection between Ashdod
financial - expansion and the highway/main road network;
closure from Bnei arranging the interchange at the Bnei
Brit up to Brit Junction and providing a solution for
the Port access roads to the vicinity; increasing
(Herzl B) road capacity and improving traffic
flow on Route 41 by widening Route
41 to a three-lane bidirectional road;
constructing an interchange and
providing a solution for access roads
in the area; relocating and repairing
infrastructures.
Interchange Detailed Netivei Israel Route Arrangement of the junction at the Center 55 Q1 / 2020 Q2 / 2020 3 No Public Budgetary Contractor
planning Ltd. 40 - Kiryat entrance to the new neighborhood west tender
and/or Gat South of Route 40.
financial Junction
closure
Interchange Detailed Netivei Israel Umm Batin Construction of an interchange at the South 300 Q3 / 2021 Q1 / 2022 3 No Public Budgetary Contractor
planning Ltd. Interchange entrance to the intelligence complex and tender
and/or - Route 60 Umm Batin.
financial
closure
Interchange Construction Trans-Israel Construction Construction of the Yahalom Interchange South 250 Q3 / 2018 Q1 / 2019 3 Under Public Budgetary Contractor
Ltd. of Shoket that directs the traffic in the active review tender
Interchange road network (Route 31 and Route 60)
- 60/31 adjacent to the complexes containing
commercial areas and gas stations and
adjacent to agricultural areas.
Interchange Construction Netivei Israel Route 79 Constructing an interchange at the North 219 Q2 / 2019 Q3 / 2019 3 N/A Public Budgetary Contractor
Ltd. - Yiftachel Yiftachel Junction between Routes 79 tender
Interchange and 784.
Interchange Construction Netivei Israel Route 65 Construction of an access interchange to North TBD Q2 / 2018 Q3 / 2018 3 No Public Budgetary Contractor
Ltd. - 444/65 the town of Harish to connect roads 65 tender
Interchange, and 444.
Mishmar
HaGvul
Interchange
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 22Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
Interchange Construction Moria Ltd. Ginot Constructing an interchange at the Jerusalem 330 Q3 / 2017 Q2 / 2018 3 No Public Budgetary Contractor
Sakharov Sakharov Junction before the entrance tender
Interchange to Jerusalem and adding a new public
transport lane in each direction between
the Sakharov Interchange and Yirmiyahu
Junction.
Interchange Construction Netivei Israel Route 4 - The project includes widening of Route South 253 Q4 / 2017 Q2 / 2018 3 No Public Budgetary Contractor
Ltd. Ashkelon 4, the construction of ramps and a tender
Interchange bridge over Route 4.
(Israel
Lands
Authority)
Interchange Construction Netivei Israel Route The project will provide residents with North 187 Q1 / 2018 Q2 / 2018 3 N/A Public Budgetary Contractor
Ltd. 22 - Chen access and should accelerate urban tender
Interchange development. The project will also
- Kiryat enable the arrangement of the transit
Bialik (Israel access to the Naot Ofek neighborhood
Lands in Kiryat Bialik, which is being promoted
Authority) by the Israel Lands Authority within
the framework of the “Path to an
Apartment” program - to Kiryat Bialik
and to Route 22 bypassing Krayot. The
segment under construction connects
Hen Blvd. in Kiryat Bialik to the Naot
Ofek neighborhood, including full ramps
on Route 22 and a connection to Etzel St.
Bicycle paths Construction Netivei Dan A freeway network of bicycle paths in Center 500 Q4 / 2018 Q2 / 2019 3 No Public Budgetary Contractor
Ayalon Ltd. Bicycles Metropolitan Tel Aviv. tender
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 23MINISTRY OF TRANSPORTATION AND ROAD SAFETY | ISRAEL PORT AUTHORITY
Type of Project status Managing Project name Description Location Construction Forecasted Forecasted Forecasted Has Ownership Funding Expected
infrastructure authority/ cost estimate tender construction construction suitability for method method implementation
company (ILS millions) publication start date duration a PPP been method
date (years) examined?
Seaport Detailed Israel Ports Upgrading Upgrading of Ashdod Port to raise Ashdod 500 Q1 / 2019 Q2 / 2020 3 No Public Public Contractor
planning Ltd. and of Platform its competitive capacity to be on par tender
and/or Ashdod Port 21 at with that of the new south port being
financial Company Ashdod constructed.
closure Port
Seaport Initiation Israel Ports Upgrading Upgrading of Haifa Port to raise its Haifa 500 TBD TBD 2 No Public Public Contractor
Ltd. and Haifa of the competitive capacity to be on par tender
Port Company eastern with the new HaMifratz Port being
Ltd. container constructed in Haifa.
platform at
Haifa Port
Seaport Construction Israel Ports Construction Construction of a new deep-water port Haifa 4,000 Q3 / 2013 Q1 / 2015 7 Yes Public + Public Contractor
Ltd. of HaMifratz in Haifa. Franchise tender
Port
Seaport Construction Israel Ports Construction Construction of a new deep-water port Ashdod 4,000 Q3 / 2013 Q1 / 2015 7 Yes Public + Public Contractor
Ltd. of the South in Ashdod. Franchise tender
Port
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 24MINISTRY OF TRANSPORTATION AND ROAD SAFETY | ISRAEL AIRPORTS AUTHORITY
The projects of the Israel Airports Authority specified in the table are based on data and assessments approved by the government prior to the coronavirus crisis.
Given the impact of the crisis on the aviation sector, significant changes in these projects are possible, whether in terms of the promotion of these projects as a whole or in terms of the scheduling.
The field of Project Managing The name of Description Location Construction Expected Expected Expected Has PPP Ownership Funding Expected
infrastructure status authority/ the project cost estimate date for date for construction suitability method method implementation
company (millions of publication start of duration been method
NIS) of the construction (years) examined?
tender
Air transport: Detailed Israel Airports Planning and Expanding the street-level building Ben-Gurion 2,180 Q2 / 2020 Q1 / 2021 4 N/A Public Other Contractor
Upgrading planning Authority construction at Terminal 3 at Ben-Gurion Airport Airport tender
airport and/or of additional constructing a fifth wing (A) in the
infrastructures financial terminal aviation area and adding operational
closure infrastructures parking areas for aircraft maintenance
to increase and servicing and ancillary
the capacity infrastructures and facilities.
at Ben-Gurion
Airport
Air transport: Construction Israel Airports Replacement Replacing the security check instruments Ben-Gurion 267 NA Q1 / 2020 5 N/A Public Other Contractor
Upgrading Authority of the with new-generation instruments, Airport tender
airport security configuring the conveyance and sorting
infrastructures check systems to be compatible with the new
systems with instruments, and making changes and
advanced- adjustments in the HBS network.
generation
systems,
increasing
the capacity
of the
screening
and security
check
systems and
more.
Air transport: Construction Israel Airports Replacement, Development and procurement of XDI Ben-Gurion 215 NA Q1 / 2020 7 N/A Public Other Contractor
Upgrading Authority upgrading, diffraction technology instruments that Airport tender
of airport and meet IAA’s unique operational needs.
infrastructures adjustment
of security
check
machines on
Level 3
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 25The field of Project Managing The name of Description Location Construction Expected Expected Expected Has PPP Ownership Funding Expected
infrastructure status authority/ the project cost estimate date for date for construction suitability method method implementation
company (millions of publication start of duration been method
NIS) of the construction (years) examined?
tender
Air transport: Construction Israel Airports Adjustments As a result of the increase in passenger Ben-Gurion 120 NA Q4 / 2019 5 N/A Public Other Contractor
Upgrading Authority to the traffic at Ben-Gurion Airport, the existing Airport tender
airport technological HMS system needs to be adjusted to the
infrastructures sorting and existing capacity.
security
check system
to meet the
growth in
traffic
Air transport: Tender Israel Airports Replacement Replacement of the automation and Ben-Gurion 260 Q4 / 2019 Q3 / 2020 4 N/A Public Other Contractor
Upgrading Authority of radar and communications systems and the radar Airport tender
airport automation systems at Ben-Gurion Airport, including
infrastructures systems the construction of a new building, due
to the aging of the existing systems.
Air transport: Construction Israel Airports Modification Renovation and upgrading of Aircraft Ben-Gurion 220 Q4 / 2017 Q2 / 2018 2.5 N/A Public Other Contractor
Upgrading Authority of Lot B for Parking Lot B, located adjacent to the Airport tender
airport aviation cargo terminals, and adjusting them to
infrastructures facilities meet ICAO standards. Two stages.
Air transport: Construction Israel Airports Construction Construction of a central office building Ben-Gurion 120 Q2 / 2019 Q3 / 2019 2.5 N/A Public Other Contractor
Upgrading Authority of an office to consolidate the management units of Airport tender
airport building the IAA that are dispersed throughout
infrastructures for the Ben-Gurion Airport.
authority’s
management
Air transport: Construction Israel Airports Preparation Advancing the planning and paving Ben-Gurion 167 Q3 / 2013 Q1 / 2014 3+3 N/A Public Other Contractor
Upgrading Authority of the of aircraft parking lots, including an Airport tender
infrastructures parking lots additional station at Ben-Gurion Airport
at the airport in the areas for test-running of large engines.
of former Multiple-stage construction.
Air Force
Base 27
Air transport: Construction Israel Airports Construction Construction of food plants in the Ben-Gurion 100 Q1 / 2016 Q1 / 2020 3 Yes Franchise Other PPP
Upgrading Authority of food Western Support Complex, adjacent to Airport
airport plants at Terminal 3.
infrastructures Ben-Gurion
Airport
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 26The field of Project Managing The name of Description Location Construction Expected Expected Expected Has PPP Ownership Funding Expected
infrastructure status authority/ the project cost estimate date for date for construction suitability method method implementation
company (millions of publication start of duration been method
NIS) of the construction (years) examined?
tender
Air transport: Construction Israel Airports ERP project The project is intended to provide an Ben-Gurion 150 Q1 / 2019 Q4 / 2019 5 N/A Public Other Contractor
Upgrading Authority for the Israel advanced solution for the IAA’s need Airport tender
airport Airports for administrative information systems,
infrastructures Authority while assimilating a modern, integrative
off-the-shelf ERP on new technological
infrastructure.
Air transport: Initiation Israel Airports Planning With the closure of Sde Dov Airport and Haifa 130 TBD TBD 2.5 N/A Public Other Contractor
Upgrading and in light of the expected closure of the tender
airport execution Herzliya Airport, the Haifa Airport must
infrastructures of the be prepared to absorb the light aviation
absorption traffic.
of the
domestic
operations
in Haifa
Air transport: Initiation Israel Airports Construction Planning and construction of a new Allenby TBD TBD TBD 4 N/A Public Tariff Contractor
Upgrading of a new Passenger Arrivals Terminal at the Terminal tender
airport Arrivals Allenby Terminal in response to the
infrastructures Terminal accelerated growth in passenger traffic
at Allenby in recent years.
Terminal6
6 A budget of 15 million (ILS) has been approved for planning only. Final approval for construction has not yet been issued.
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF TRANSPORTATION AND ROAD SAFETY | 27MINISTRY OF ENERGY
INFRASTRUCTURE FOR GROWTH 2020 | 28MINISTRY OF ENERGY
The field of Project Managing The name of Description Location Construction Expected Expected Expected Has PPP Ownership Funding Expected
infrastructure status authority/ the project cost estimate date for date for construction suitability method method implementation
company (millions of publication start of duration been method
NIS) of the construction (years) examined?
tender
Electricity: Initiation Electricity Private Conventional electricity generation, 360 Kiryat Gat 1,388 N/A Q1 / 2020 3 N/A Private Private Executed
Conventional Authority power megawatts. privately
electricity producer:
generation Tzomet
Energy Ltd.
Electricity: Initiation Electricity Private Conventional electricity generation, 186 Ashdod 594 N/A Q1 / 2020 3 N/A Private Private Executed
Conventional Authority power megawatts. privately
electricity producer:
generation Etgal
Ashdod Ltd.
Electricity: Initiation Accountant- Conventional Conventional power stations. TBD TBD Q1 / 2021 Q3 / 2022 3 Yes Franchise Private PPP
Conventional General power
electricity stations
generation
Electricity: Construction Israel Electric Combined Conventional electricity generation, Hadera 4,800 N/A Q3 / 2019 3 No Public Tariff Combined
Conventional Corporation cycle plants 1,260 megawatts. execution
electricity - Orot (private and
generation Rabin1 contractors)
Electricity: Construction Electricity Private Conventional electricity generation, 451 Be’er Tuvia 2,000 N/A Q2 / 2018 2 N/A Private Private Executed
Conventional Authority power megawatts. Construction completion privately
electricity producer: and commercial launch at the beginning
generation IPM Be’er of 2020.
Tuvia Ltd.
Electricity: Construction Electricity Private Cogeneration of electricity, 148 Hadera 880 N/A Q1 / 2017 3 N/A Private Private Executed
Cogeneration Authority power megawatts. Construction completion privately
of electricity producer: and commercial launch at the beginning
Advanced of 2020.
Integrated
Energy Ltd.
1 Pursuant to Government Resolution 3859, dated June 3, 2018, regarding: “Reform in the electricity economy and restructuring of the IEC and amending government resolutions,” the construction of the second combined cycle plant is contingent upon the sale of the Alon Tavor site and the publication of the
competitive proceeding for the sale of the Ramat Hovav site.
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF ENERGY | 29The field of Project Managing The name of Description Location Construction Expected Expected Expected Has PPP Ownership Funding Expected
infrastructure status authority/ the project cost estimate date for date for construction suitability method method implementation
company (millions of publication start of duration been method
NIS) of the construction (years) examined?
tender
Electricity: Construction Electricity Private Cogeneration of electricity, 73 Kiryat Gat 420 NA Q2 / 2017 3 N/A Private Private Executed
Cogeneration Authority power megawatts. Completion of construction privately
of electricity producer: and commercial launch at the beginning
Alon Gat of 2020.
Energy
Centers
Electricity: Construction Electricity Private Cogeneration of electricity, 73 Ramat 434 N/A Q1 / 2016 TBD N/A Private Private Executed
Cogeneration Authority power megawatts. Gavriel privately
of electricity producer: Industrial
IPP Ramat Zone
Gavriel
Electricity: Construction Electricity Private Cogeneration of electricity, 73 Alon Tavor 434 N/A Q1 / 2016 TBD N/A Private Private Executed
Cogeneration Authority power megawatts. Industrial privately
of electricity producer: Zone
IPP Alon
Tavor
Electricity: Initiation Electricity Private Electricity generation from wind, 190 Golan 797 N/A Q1 / 2020 3 N/A Private Private Executed
Generation Authority power megawatts. Heights privately
of electricity producer:
from Spirit of
renewable Genesis
sources Wind
Energies Ltd.
Electricity: Initiation Accountant- Dimona- Photovoltaic electricity generation - up Dimona TBD Q1 / 2020 Q1 / 2022 1.5 Yes Franchise Private PPP
Generation General South2 to about 500 megawatts.
of electricity
from
renewable
sources
Electricity: Initiation Accountant- PV3 Photovoltaic electricity generation - Near TBD Q3 / 2020 Q3 / 2022 1 Yes Franchise Private PPP
Generation General about 90 megawatts. Kibbutz
of electricity Ashalim
from
renewable
sources
2 The data only refer to the first tender of up to 300 megawatts.
INFRASTRUCTURE FOR GROWTH 2020 MINISTRY OF ENERGY | 30You can also read