LCS EXPANSION OPPORTUNITIES

Page created by Kent Parsons
 
CONTINUE READING
LCS EXPANSION OPPORTUNITIES
LCS EXPANSION
OPPORTUNITIES
LCS EXPANSION OPPORTUNITIES
IDENTIFIED NEEDS
LCS staff and volunteers have identified the necessity for a four-year short-term solution to our
space needs. To better understand our needs, staff members first worked to identify our
anticipated growth over this short-term period.

ANTICIPATED OCCUPANCY BY YEAR

     2015-2016                 2016-2017                 2017-2018                   2018-2019

   232                       260                       300                          330
      PEOPLE                    PEOPLE                    PEOPLE                       PEOPLE

          Staff: 25                 Staff: 25                 Staff: 30                    Staff: 30

     th                        th                        th                           th
    7 Grade: 55               7 Grade: 55               7 Grade: 60                 7 Grade: 60

     th                        th                        th                           th
    8 Grade: 55               8 Grade: 55               8 Grade: 55                 8 Grade: 60

     th                        th                        th                           th
    9 Grade: 40               9 Grade: 40               9 Grade: 50                 9 Grade: 50

      th                        th                        th                           th
    10 Grade: 25              10 Grade: 40              10 Grade: 40                10 Grade: 50

      th                        th                        th                           th
    11 Grade: 20              11 Grade: 25              11 Grade: 40                11 Grade: 40

      th                        th                        th                           th
    12 Grade: 12              12 Grade: 20              12 Grade: 25                12 Grade: 40

                                                                          LCS Expansion Opportunities   1
LCS EXPANSION OPPORTUNITIES
MINIMUM BUILDING NEEDS

CLASSROOM SPACE                                                                           5,184 SF

  •   12 classrooms at 18’ x 24’
  •   30 student limit per classroom
  •   11 classrooms x 30 students = estimated 330-student maximum in building + 1 room for
      special education
  •   2 of the 12 classrooms furnished with a sink and eye wash station to accommodate
      science and art rooms

OTHER SPACE                                                                               4,780 SF

  •   Multi-occupancy boys and girls bathrooms
  •   Separate staff bathroom(s)
  •   Front desk/reception area, health office, custodial closet, storage space, and
      two - three office spaces
  •   Common area
  •   Basic kitchen
  •   Hallways

TOTAL ESTIMATE OF ABSOLUTE MINIMUM SQUARE FOOTAGE                                         9,964 SF

                                                                       LCS Expansion Opportunities   2
LCS EXPANSION OPPORTUNITIES
BUDGET
The administration and business office have determined an available annual budget of $183,510,
which allows $8,000 monthly to be available for additional mortgage or lease payments. A
breakdown of how this equates to a possible second site is listed below, which includes mortgage,
custodial, grounds keep and more.

FIRST PROJECTION OF COST FOR SECOND SITE OPTION (DEC. 2014)

FACILITY COST FOR SECOND SITE:

SECOND SITE MORTGAGE PAYMENTS... $96,000 ($8,000/month for 12 months)

FACILITY WATER/SEWAGE... $6,000

FACILITY DISPOSAL SERVICES... $4,000

FACILITY REPAIR & MAINTANCE... $9,000

FACILITY STREET MAINTANCE FEE... $1,500

FACILITY PROPERTY INSURANCE... $2,500

TELEPHONE COMMUNICATION... $1,000

FACILITY SUPPLIES... $4,500

FACILITY NATURAL GAS... $2,000

FACILITY UTILITY SERVICES... $12,000

FACILITY NON-CAP EQUIPMENT... $1,000

FACILITY SNOW REMOVAL...$2,000

FACILITY LAWN CARE... $2,000

FACILITY GROUNDS SERVICES... $1,000

GROUNDS SERVICES GEN SUPPLIES... $200

FACILITY SECURITY REPAIR & MAINT.... $500

                                                                      LCS Expansion Opportunities   3
LCS EXPANSION OPPORTUNITIES
FACILITY SECURITY SUPPLIES... $435

FACILITY SAFETY REPAIR & MAINT... $500

FACILITY SAFTEY SERVICES... $500

FACILITY SAFETY SUPPLIES... $200

FACILITY SAFETY NON-CAP EQUIP... $300

CUSTODIAL STAFF FOR SECOND SITE: $36,375

TOTAL: $183,510 initial projection for cost due to expansion

The above projection does not include additional school supplies, materials, technology, and so
forth necessary for an expansion.

Two new positions (1.0 School Counselor/$45,000 and a possible 0.5 FTE Assistant/$15,000) are
utilized for expansion; however, they are not included in the projection above as they are needed
for the amount of growth/projected student enrollment and are not necessarily due to facility
changes.

                                                                       LCS Expansion Opportunities   4
LCS EXPANSION OPPORTUNITIES
EXECUTIVE SUMMARY
Based on research detailed in this report, the Expansion Committee makes the following class of
recommendations in order of priority:

1. Continue to pursue second campus options as they appear to offer the best financial landscape
for the next step, a long-term campus solution. The second facility will become an asset for the
acquisition of a single K-12 campus location. Consider creative options for providing adequate
access to the multi-purpose room/gymnasium.

   •   Get City traffic approval
   •   Research feasibility of transportation services
   •   Work with LCS faculty, staff and parents to optimize use of second and existing sites
   •   Creatively design the second campus in a way that improves overall facility and program
       offerings while upholding the school’s mission and vision
   •   Ensure the facility is an upgraded solution for students whose schooling is currently
       impacted

2. Actively pursue landlord about expansion options in current facility.

   •   Upon receiving new proposal, seek legal counsel regarding financial implications
   •   Determine actual financial outlook with current site build out

3. Weigh overall financial and cultural impact of these two recommendations. Student retention
during this interim period should be carefully navigated.

4. Continue to pursue backup options listed at the end of this report in the event that these
options become unavailable.

The remainder of this report details the Expansion Committee’s research and findings to support
the above recommendations.

                                                                           LCS Expansion Opportunities   5
LCS EXPANSION OPPORTUNITIES
SEVERAL OPTIONS
During the Expansion Committee’s initial research, we identified several potential ways to meet
our objectives.

OPTION 1: RENT OR BUY OFF-SITE BUILDING FOR SECOND CAMPUS

      Provides relief to the parking lot as well as the building

      Keeps the school within our City agreement regarding traffic at our existing site

      Some staff will have to move between campuses throughout the day, but this will be

       limited as much as possible.

      Requires city conceptual review, which can require additional costs such as street-side

       improvements or other identified impacts

      Requires some duplication of facilities and staff (commons area, front desk, SHOA, etc.)

      If purchase, gain ability to recoup tenant finish in resale of building.

      Purchase is a financial asset for the school.

      Second site limits electives for sixth grade as well as ability grouping up to 7th grade

      Complicates pickup and drop-off for families with children in upper and lower schools

      Concerns around ability to provide hot lunch program at a second site

      Concerns with providing physical education at a second site. Note that this is site-

       dependent.

OPTION 2: REMODEL EXISTING FACILITY AND BUILD ADDITIONAL SPACE

      Changes to the building and site beyond regular maintenance would have to be approved

       by the landlord.

      Any remodel cost cannot be recouped.

      Classrooms are utilized to their fullest potential, leaving only the original building (17,000

       SF) to better utilize, which alone is not enough space to meet our needs without another

       building added on the property.

      The City of Loveland would have to review our traffic agreement as the number of students

       on campus would exceed the agreed upon number of 620 students at one time.

                                                                            LCS Expansion Opportunities   6
LCS EXPANSION OPPORTUNITIES
OPTION 3: RENT OR BUY MODULARS

     Provides approximately 1,500 SF of classroom space per modular

     Needs six modulars to accommodate our needs

     Can be placed on our existing site or at a second location

     Expensive to setup and take down (approximately $90,000 for setup excluding site

      improvements and $20,000 for take down)

     Buildings are relatively easy to install.

     If purchased (not leased), buildings can be moved to a future site and reused.

     Can be wet (plumbing) or dry (no water hookup)

     Existing restroom facilities onsite would require extensive upgrades/additions or portable

      toilets to be utilized.

     Requires a lot of up front setup cost that can’t be financed

     Leasing buildings will cost approximately $510,000 to $630,000 total over five years.

      Financial institutions do not view modulars as an asset (whether purchased or leased), thus

      affecting our bottom line.

     If on one campus, opportunities to use commons areas, multi-purpose room, and so forth

      can save money.

     Alleviates the need for additional custodial staff that would be required for a second site.

     Will require land use agreement or build out of ditch to the east of the school to recoup

      parking spaces used by modular

     Maintenance increases from one building to seven.

     Purchasing buildings will cost approximately $840,000 and will be the school’s

      responsibility to relocate or sell in the future

     Because traffic will continue to increase for our one campus, we anticipate traffic concerns

      from the City and will need to address them.

                                                                        LCS Expansion Opportunities   7
LCS EXPANSION OPPORTUNITIES
SECOND CAMPUS OPTION
  Considering the space constraints of the current LCS building and footprint, the Expansion
  Committee felt it important to explore additional property and space as an interim solution.
  Based on the financial analysis, the purchase of a second campus over the rental of a second
  campus is recommended.

  RENT VS. PURCHASE ANALYSIS

  The following table displays the comparison of a building available for rent or purchase in the
  current market, excluding tenant finish. Note that the purchase of a property limits the amount of
  cash on hand but presents the potential to recoup a portion, if not all of the invested cost,
  including the tenant finish costs. This is opposed to a rental scenario that does not limit cash on
  hand, but all costs are irrecoverable and will not show as an asset.

                       Year 1        Year 2         Year 3         Year 4          Year 5            Total

Monthly Mortgage      $4,001.99      $4,001.99     $4,001.99      $4,001.99       $4,001.99       $20,009.95
Payment

Monthly Rent          $8,885.67      $9,152.24     $9,426.81      $9,709.61      $10,000.90       $38,175.23
Payment

  As displayed above, the monthly payment of a purchased building could be roughly $4,000 per
  month. (Note that numbers are approximate and interest rate is estimated a bit high.) Tenant
  finish (independent of rent versus purchase) is projected at $500,000 for the two offsite options
  that have been identified as viable. Therefore, the overall projected monthly cost for a purchase
  option falls within budgeted amount of $8,000 with the ability to add the tenant finish costs into a
  loan.

  The lease option exceeds the budgeted monthly allowance without including the tenant finish
  costs.

                                                                            LCS Expansion Opportunities   8
LCS EXPANSION OPPORTUNITIES
LOCATIONS

Several sites were analyzed; however, based on location, security needs, building size and cost, the
following sites were removed from consideration:

   •   221 East 29th Street (former Penton Media building)
   •   201 East 4th Street (former First National Bank building)
   •   201 East 5th Street (Reporter Herald building available as a sublease)
   •   1605 Foxtrail Drive (office building near Centerra)
   •   5205 Granite Street (former Porter Industry building)
   •   1355 E. Eisenhower Blvd (former Albertsons building)

VIABLE OPTIONS

The following sites have been analyzed by the Expansion Committee and are still candidates for
board consideration.

                                                    995 N. WILSON AVENUE
                                                    Stand-alone flex/light manufacturing building.
                                                    One 10' overhead door. All walls and ceiling
                                                    grid have been removed except for restrooms.
                                                    Building has a clean slate to work with. Three
                                                    new 7.5 T HVAC rooftop units. New roof.
                                                    Located just a few blocks south of Hwy. 34 and
                                                    has excellent visibility. Maintenance-free
                                                    mature landscaping. Immediate availability.

                                                    1020 S. LINCOLN AVENUE
                                                    Free standing building is currently wide open
                                                    and ideal for a single tenant user. However, it
                                                    is also legally condominiumized and can
                                                    accommodate six 1,800 SF separately metered
                                                    condo units.

                                                                         LCS Expansion Opportunities   9
995 N. WILSON

STATS                           Built in 1972, this building is a gutted concrete building with a
                                newly installed roof and HVAC units. It is a rectangle shell with
    Purchase
                 $839,000       no duct work or insulation. It has single pane windows and no
        Price:
                                fire sprinkler. Tenant finish accounts for the replacement of
      Square     9,100 (1000
                                windows, duct work and insulation throughout the building.
     Footage:    SF addition)
                                Additionally, the finish includes the installation of a fire
     Cost per
                 $150.16        sprinkler. It has a finished ceiling height of 8 feet that will pose
 Square Foot:
                                challenges for larger spaces, but initial feedback from the
   Year Built:   1972           architect indicated that it is workable.

                 53,143 SF      The building allows for expansion to the west that would give a
     Lot Size:
                 (1.22 acres)   required additional 1,000 square feet, allowing for two more
      Parking                   classrooms. With this addition, the building would meet
                 33
      Spaces:                   minimum space requirements for the next four years, as
Distance from                   defined by administration. Estimated cost for the addition is
                 2.6 miles
         LCS:                   included in the tenant finish bid.

Tenant Finish:   $677,593.00

                                                                           LCS Expansion Opportunities   10
The building is not designed to be broken into condo units, but this could be considered in the
build out to allow for more sale options in the future.

The footprint is small (1.22 acres) and leaves little room to grow. There is property to the
north owned by the City of Loveland. This space houses a utility station, but the rest of the
property is open. Initial conversations with City officials indicated that there may be a possibility
for us to utilize this space.

Traffic is the main concern expressed by the city during the concept review meeting. There is a
concrete median, the property is in close proximity to main street lights and there is no right turn
lane into the property. However, there are two entrances, and the property would allow for onsite
queuing of vehicles. Traffic volunteer, John Seyer, is currently working with the City to determine if
a plausible solution for traffic exists. Research of school transportation is also underway. Offering
partial site-to-site busing may alleviate traffic concerns; however, there is concern regarding the
turn radius being adequate for a bus at this site. The property is located approximately 2.6 miles
from the current LCS facility.

LOCATION

The building is located near Eisenhower Blvd. on the west side of Wilson.

                                                                           LCS Expansion Opportunities   11
The open field is located directly to the north of the Wilson site and is outlined in red below.

                                                                          LCS Expansion Opportunities   12
PROPOSED BUILD OUT

The following build out includes feedback from LCS administration and shows the school’s
minimum needs. While the drawing was completed specifically with the Wilson site in mind, the
same concepts could be applied to any facility.

                                                                     LCS Expansion Opportunities   13
1020 S. LINCOLN

Stats                            This site has little interior build out and is ready for

    Purchase
                                 construction. The building is legally condominiumized and can
                  $900,000       accommodate six 1,800 SF separately metered condo units,
         Price:
                                 which improves resale options.
        Square
                  10,805
     Footage:                    The building currently resides in a floodplain and was minimally
     Cost per                    flooded in September 2013. The City has indicated that the
                  $127.55
 Square Foot:                    original builder raised the building by 18”, taking it out of the

   Year Built:    2006
                                 floodplain. However, he did not file the FEMA paperwork, which
                                 could still be done in a two-three month process to formally
                  57,499 SF      remove the building from the floodplain. The cost of this has
     Lot Size:
                  (1.32 acres)   not been determined at this time. In the interim, inexpensive
        Parking                  flood insurance can be purchased. The likelihood of another
                  56
        Spaces:                  flood is very small as the City of Loveland plans to make some
Distance from                    road infrastructure changes in 2016, which was the cause of the
                  3.4 miles
                                 flooding at this location. The cost of this has not been
           LCS:
                                 determined at this time; however, should the building not be
Tenant Finish:    $478,197.00
                                 removed from the floodplain, flood insurance is estimated at
                                 $700 annually.

                                                                         LCS Expansion Opportunities   14
A planned mezzanine level is ready for build-out, adding another 3,000 SF to expand in addition to
the current 10,805 SF of the building. This build out was not included in the tenant finish estimate.
An elevator is not necessary per ADA requirements as long as the school does not place anything
on the upper level that doesn’t already exist on the main level. For example, bathrooms on the
mezzanine level only would not meet ADA requirements. However, should there be bathrooms
on both levels or only the main level, LCS would be fine. Good planning prior to construction will
keep this facility ADA compliant without requiring an elevator.

Furthermore, the building was designed for a 20’ expansion to the east that does not impact traffic
spaces or an onsite, double traffic queue line. The expansion would add another 2,600 SF. This
provides LCS room for future growth if necessary.

An underutilized building to the northeast can provide options in creating a possible parking lot
use agreement to accommodate overflow parking. This would require the addition of a sidewalk
to access one property from the other.

Two buildings to the north of this location is a public workout facility, which could provide options
for LCS to host weight-lifting and other physical education classes for students. Barnes Baseball
fields are 0.6 miles to the northwest of the facility (opposite side of the road) and can offer
additional options for a physical education program.

Separated by a drainage ditch, there is vacant land directly to the east of this facility that could
also offer options for physical education and/or recess. Note that some plumbing work has been
completed for future expansion of an apartment complex, and there are some pipes sticking up
out of the ground further on the south side of the property.

The building directly to the north of this location was recently purchased with the intention of a
gun part manufacturing company residing in this location. Additionally, part of the space will likely
be housed by a gun retailer. It is important to note that there will not be a gun range. After
speaking with legal representation, we were advised that this is not of concern to the school as the
gun store is a business allowed to be near schools. There would only be concern should the
location be a firing range, which is not planned for the building.

The building to the north of 1020 S. Lincoln has shared access. It is unclear if a commercial
version of an HOA would need to be setup and what, if any, expenses related to this.

The location is zoned for a Planned Unit Development (PUD). Though charters are exempt from
zoning, PUD regulations do not state that a school can be located in one. The expansion team has
confirmed with the City that PUD zoning is also an exemption for charters, making this site a
viable option for LCS.

                                                                            LCS Expansion Opportunities   15
The City of Loveland has expressed concern with LCS locating on a main arterial roadway. The
traffic count for this location (21,000 trips per day) is higher than the Wilson property (15,000 per
day). However, the road has a significantly longer turning lane than the Wilson property (no
concrete median). It is also believed that busing students from the LCS property to this location
will lower traffic enough to make this location agreeable to the City of Loveland traffic engineers.
(Refer to the details around busing later in this report.)

Finally, note that accessing the Lincoln property from LCS requires that the driver cross over a
railroad track. LCS administration is encouraged to learn the railroad schedule and communicate
the schedule so parents and staff aren’t delayed by the train.

PROPOSED BUILD OUT

A drawing of a proposed build out for this location has not been completed as the process on this
property started later.

LOCATION

The building is located near Hwy. 402 on the east side of Highway 287.

                                                                          LCS Expansion Opportunities   16
The gym is two buildings to the north of the Lincoln site and is outlined in blue below. The yellow
outline indicates the underutilized parking lot to the northeast of the property. The red outline
indicates the open field to the east of the building.

                                                                         LCS Expansion Opportunities   17
COMPARISON OF PURCHASE OPTIONS
There are many differences between sites that are best presented in a side-by-side comparison in
the following table:

                         OPTION 1             OPTION 1               OPTION 2                   OPTION 3

                            995 N.               1020 S.             Onsite
   Address                  Wilson               Lincoln            Remodel                    Modulars
                       10,260 with                                 6,000 SF
 Square Footage                             10,805                                            8,640 up to 10,752
                       addition                                    (addition of gym)

                                                                   Existing Building:
                                                                   2008
 Year Built            1972                 2006                                              1996 or newer
                                                                   Gym: New
                                                                   Construction

                       53,143 SF            57,499 SF              256,046 SF                 256,046 SF
 Lot Size
                       (1.22 acres)         (1.32 acres)           (5.9 acres)                (5.9 acres)

                                                                                              Need to Replace
 Parking Spaces        33                   56                     No change
                                                                                              30 Stalls

 Distance from LCS     2.6 miles            3.4 miles              Onsite                     Onsite

                                                                   Property
                                            Traffic, Floodplain,                              Site
                                                                   Ownership or
                                            Proximity to other                                improvements,
 Challenges to                                                     purchase
                       Traffic              Businesses,                                       restroom facilities,
 Overcome                                                          agreement; Sewer
                                            Shared Access,                                    and additional
                                                                   upgrades; City
                                            Train                                             traffic count
                                                                   approval of traffic
                                            Accommodates
                                            3,000 SF
                                            mezzanine build
 Additional            Can add 20-30’ to
                                            out; Can add 20’ to
 Expansion             the west of the                             NA                         NA
                                            the east of
 Opportunities         building
                                            building without
                                            impacting traffic
                                            or parking stalls
                       City-owned green
                       space to north of    Gym two buildings
                                                                   New gymnasium
 Physical Education    property; Cost has   to the north; Ball
                                                                   with cafeteria             NA
 Opportunities         not been             fields 0.6 miles
                                                                   used as overflow
                       determined to        away
                       develop it.

                                                                            LCS Expansion Opportunities     18
OPTION 1             OPTION 1             OPTION 2                  OPTION 3

                     995 N.              1020 S.              Onsite
  Address            Wilson              Lincoln             Remodel                  Modulars
                                      Underutilized
                                      building nearby       Save money on
                                      with possibility of   additional               Save money on
Additional
                                      parking lot usage     custodial costs;         additional
Opportunities
                                      agreement; Open       Remain on one            custodial costs
                                      field to east of      campus
                                      building

Traffic Counts    15,000 per day      21,000 per day        Will increase            Will increase

                                                                                     $840,000
                                                                                     $345,000 or
                                                                                     $6,000 per month
Purchase Price    $839,000            $900,000              TBD
                                                                                     to lease
                                                                                     $85,480 setup and
                                                                                     $16,800 takedown
                                                                                     $80.00 purchase
Cost per Square   $91.55 purchase     $83.29 purchase
                                                            NA                       $17.50 install and
Foot              $147.82 finished    $127.55 finished
                                                                                     site improvements
                                      $1,374 annually
                                      Additional cost for
                                                                                     $200 per unit
Insurance         $1,015 annually     floodplain            TBD
                                                                                     annually
                                      insurance not
                                      listed.
                  $512,593.00 of
                                      $478.197.00
                  current building
                                      Additional cost to                             $15,000 upgrade
Tenant Finish
                                      build in mezzanine    TBD                      sewer; $39,000 for
Costs             $165,000 to
                                      and expand to the                              additional parking
                  extend build to
                                      east (optional)
                  west

                  $1,517,608          $1,379,571                                     $991,200
Overall Project   Recoverable         Recoverable                                    Irrecoverable
                                                            TBD
Cost              Expense             Expense                                        Expense
                  Shows as an asset   Shows as an asset                              No asset

                                                                   LCS Expansion Opportunities    19
Note that the following has been included for the 2015-2016 school year budget to accommodate
a second site but are not included in the comparison above as they are planned expenses
independent of expansion method.

   •       Insurance: 2,500
   •       Custodial Staff for Second Site: $36,375
   •       Utilities for Second Site: $48,635

The above projections do not include cost to develop the land to the north of the Wilson site,
school zone flashers for a second site, any required street-side improvements or architecture
costs.

VIABLE SOLUTIONS TO SECOND SITE CHALLENGES

 TRAFFIC CONCERNS FROM THE CITY OF LOVELAND                                     SOLUTION: BUSING

 The City of Loveland has expressed traffic concerns with LCS locating a second campus near or
 directly on a main arterial road. Though LCS volunteer and traffic engineer John Seyer has been
 working with the city on traffic counts and traffic plans. The concerns still remain and will
 require a costly traffic study and can still stop LCS from selecting specific sites should the City
 continue to express concerns.

 In response to this concern from the City, the Expansion Committee is proposing busing all
 upper school students from the original school site to the second site. Not only will this lessen
 our traffic impact on a new site, but it can minimize inconvenience for families accustomed to
 the single drop location.

 A typical activity bus with three kids per seat has a capacity of 47 students and costs $100,000 to
 purchase new. These buses are typically used for longer trips and thus have seats spaced
 farther apart from one another to provide more comfort for longer drives.

 A school bus is intended for shorter trips and thus the seats are closer together, which would
 meet LCS’ need. These buses accommodate seating for 72 students. Denver has many buses
 for sale including a 2005 bus with 50,000 miles and an asking price of $25,000.

 Should LCS plan to purchase a bus, the following costs are expected:

       •    Insurance of less than $1,000 per bus per year
       •    Annual inspection cost of $500 per bus through the Colorado Department of Education
       •    Fuel costs (Buses are expected to get approximately five miles per gallon.)

                                                                            LCS Expansion Opportunities   20
•   Bus drivers are required six hours of annual in-service training and a physical every other
       year. They also have to be on a list for randomized drug testing and are typically paid
       hourly.
   •   Maintenance including tires; however, because LCS would be running buses on paved
       roads and short distances, larger repairs should be somewhat minimal.
   •   Licensing costs are $0.17 per vehicle per year

Note that LCS has an agreement with the City regarding our allowed current student population
on the existing site. Moving students to a second site keeps us within the agreed upon
limitations with the coming years of growth.

LCS administration has approached the school district with site-to-site transportation, assuming
four miles one way for 180-200 students, which equates to three buses. The cost is roughly
$130 per day, which totals approximately $24,050 for the school year. This includes gas and
driver pay for thirty minutes. LCS administration will get more accurate cost projections near
the middle of January. Note that the district is already stretched for buses during LCS drop off
and pick up times. So while busing may not necessarily be an option through the district, they
are looking at the possibilities.

STAFF THAT TEACHES AT BOTH CAMPUSES
The administration is working to minimize the impact of staff members that teach in both upper
and lower schools. The administration could consider adding a “floating” staff member (or
possibly front desk staff) to cover for delayed traveling staff due to accident, breakdown and so
forth. Administration may need to research mileage compensation for employees traveling
between two campuses.

ABILITY GROUPING FOR 6TH AND 7TH GRADE STUDENTS
With the addition of a second campus, LCS administration may consider special
accommodations for ability grouping students. Math and foreign languages are subjects that
LCS would utilize additional space to place students in the level they test into. Further,
additional space is planned for supplementary, small-group support in math and literacy at all
grade levels to meet all LCS students’ educational needs, whether to “catch up” to grade level or
to be even more challenged academically. It is unclear at this time how administration will
accommodate ability grouping between sixth and seventh grade students. Cost to do so has not
been estimated or included in this report.

PHYSICAL EDUCATION AT SECOND SITE WITHOUT A GYM
Administration is looking at utilizing the plot of land directly north of the Wilson building and
Barnes Ball park and a gym near the Lincoln site. LCS may also purchase a van/bus that will be
able to transport students to a local park or even the Chilson center for physical education. The
van/bus may also be used for sports team competitions and other events.

                                                                       LCS Expansion Opportunities   21
SECOND SITE GRADE LEVELS
Options are site-specific but planning has revolved around grades 7-12 moving to a second site.
The Wilson facility does not have enough space to include sixth grade students while the Lincoln
building may support sixth grade through twelfth grade at one location with the build out of the
mezzanine level. If K-6 remains at the main building, sixth grade tracks would return to the
model from the first year of LCS and receive instruction in the Core Knowledge curriculum
similar to fifth grade. Instead of signing up for one elective course a semester, like a Foreign
Language or Physical Education, sixth graders will have “specials” courses on a rotational
schedule receiving Latin, physical education, art, and music in addition to the core subject
classes. Creating a K-6/7-12 split helps minimize the amount of staff traveling between sites and
provides a transitional year for sixth graders before moving into the upper school.

FLOODPLAIN AT LINCOLN
The building currently resides in a floodplain and was minimally flooded in September 2013.
The City has indicated that the original builder raised the building by 18”, taking it out of the
floodplain. However, he did not file the FEMA paperwork, which could still be done in a two-
three month process to formally remove the building from the floodplain. The cost of this has
not been determined at this time. In the interim, inexpensive flood insurance can be purchased.
The likelihood of another flood is very small as the City of Loveland plans to make some road
infrastructure changes in 2016, which was the cause of the flooding at this location. The cost of
this has not been determined at this time nor has cost for flood insurance should the building
not be removed from the floodplain but an estimate of $700 annually was provided.

                                                                          LCS Expansion Opportunities   22
SECOND CAMPUS PROJECT TIMELINE

                                                    TARGETED
PHASE I: DUE DILIGENCE / 1–2 WEEKS                 COMPLETION
                                                      DATE

                                                      02 / 28 / 2015

                                                    TARGETED
PHASE II: ARCHITECTURE / 5 WEEKS                   COMPLETION
                                                      DATE

                                                      02 / 28 / 2015

                                                    TARGETED
PHASE III: PERMITTING / 2 MONTHS                   COMPLETION
                                                      DATE

                                                      04 / 30 / 2015

                                                    TARGETED
PHASE IV: CONSTRUCTION / 3 MONTHS                  COMPLETION
                                                      DATE

                                                      08 / 01 / 2015

                                     LCS Expansion Opportunities   23
EXISTING SITE OPTIONS
We considered what modifications could be done to the existing site to provide the additional
needed space. Based on research done last year, a rough financial estimate is applied to each idea
below. Please note that final numbers may be impacted by lease negotiations and current market
conditions.

EXTEND THE SECOND FLOOR LOFT

We could extend the loft above the front desk area to better use our space and wouldn’t impact
utilities significantly since we already heat and cool that area. We’d also have to add lighting
below the build in as we’d be covering up a lot of our natural light that we currently have. That
cost would be around $150,000.

We would add approximately three to four classrooms once a hallway is added and space left to
accommodate the existing staircase. If we were to build this new space into classrooms, it would
mean adding heating and cooling to each room, adding a drop ceiling, lights, sprinkler system, and
so forth. Cost to mirror the finish that we have on the north end loft area is estimated at $75,000.
While this option provides three to four classrooms, it would have to be done in conjunction with
one of the other options listed below to meet our needs.

Bottom line: $225,000 to get three to four additional classrooms (approximately 1863 SF)

SECOND BUILDING COUPLED WITH A LAND USE AGREEMENT

We considered adding a second building to the north of the multi-purpose room (where upper
school students have recess). This would require replacing the open play area. The land to the
north of the school was recently purchased by the City of Loveland and is no longer available for a
mutual land use agreement. A study can be performed on the water retention area to the east of
the school to determine how much of the land can be built up and used as a play area. The study
cost is estimated at $500-$1,000.

Because the cost of steel is expensive, it’s cheaper to remodel the multi-purpose room into
classrooms and build a separate gymnasium with concrete walls. Therefore, a second onsite steel
building is not recommended.

Bottom line: cost prohibitive

                                                                          LCS Expansion Opportunities   24
REMODEL THE MULTI-PURPOSE ROOM, BUILD A GYM AND UTILIZE LAND USE
AGREEMENT

Based on information gathered more than a year ago and rough measurements, we were able to
offer a recommendation for onsite facility improvements. Please note that all financial estimates
are not based on architectural drawings or landlord negotiations. However, this is an important
expansion option to explore. Following is a description of these ideas.

Reutilize the multi-purpose room and space to the west and build in two levels similar to the east
side of the school where all the classrooms are. Because the kitchen is close to there, we could
possibly link into the plumbing there and put in a bank of bathrooms on both the main and
second level. Then add a row of classrooms all the way back on the north side. Then as you head
south from those classrooms, there would be a hallway, a row of administrative offices, a hallway
and another bank of classrooms. This would get us about 12 classrooms and more administrative
offices and rooms for special education, testing, meeting with parents, etc. This cost is about
$660,000.

A less expensive alternative would be to utilize the multi-purpose room as a combination space.
Half of the room would be divided into two floors of classrooms and offices. The other half would
serve as a cafeteria and additional space for drama club practices, science fairs, music concerts,
book fairs, and so forth.

We could use the open play space directly north of the multi-purpose room to build a gymnasium.
The cost of metal is very high right now, so building a shell of a gym out of cinder blocks is
recommended. Cost for a concrete floor only without a gym floor, bleachers, and so forth is
estimated at $480,000.

Our understanding is that the existing detention basin is oversized for our site and a portion of it
could be reclaimed for our use. To determine how much we can reclaim, a new drainage study
will have to be completed (approx. $1,000 and included in the below estimate). Any recoverable
area in the detention basin would be converted to additional parking.

Bottom line: A rough estimate of $1,140,000 gets us a cafeteria/auditorium, 12 classrooms, and a
shell of a gymnasium (6,000 SF). Additional funds would need to be spent to make the new
gymnasium usable for physical education, to expand onsite parking into the east side detention
basin, and to replace the former open space for upper school recess. The newly created
cafeteria/auditorium adds relief to the former multi-purpose room, allowing additional physical
education classes, a hot lunch program that doesn’t interfere with physical education classes and
room for after-school activities to meet in a new area (drama club, choir practice, and so forth).
This option keeps our school a K-12 site without impact to ability grouping or new challenges
introduced by a second site (split staff and student body, separation of some student body from

                                                                          LCS Expansion Opportunities   25
the multi-purpose room) and allows us the opportunity to boost our athletic and performing arts
departments by customizing some of the new classrooms to best meet our needs. Furthermore,
this option presents the least impact to our stakeholders.

                                                                      LCS Expansion Opportunities   26
MODULARS
Highmark has approved the additions of modular on our property.

The budget estimate for modular trailer installation is based on leasing six double wide units from
a local (front range) portable building company and completing associated site work (dirt work,
electrical, additional parking, etc.). Pricing assumes LCS will contract directly with a local portable
building supplier for delivery/setup, monthly leasing and with other local contractors for site prep,
parking expansion and electrical hook-up. Purchase options on the trailers are available and will
be discussed later in this report.

In general, there is no standard dimension for these types of units. They can range in sizes from
24’ x 60’ (1,440 square feet) to 28’ x 64’ (1,792 square feet). The market is ever changing, and we
will be limited to what is on the market at the time of lease (or purchase). Therefore, the six
modular units could give LCS from 8,640 SF up to 10,752 SF of expansion square footage.
Included in this report are examples of the types of units typically available. However, the smaller
size (24’ x 60’ or 1,440 SF) is the most common size and should be used for informational purposes
at this point.

The lease estimate is based on wet or dry units as the price difference is negligible (buildings with
and without bathrooms); however, the most feasible site locations for the modulars on LCS
property are not near the existing sanitary sewer to be hooked up directly. Therefore, if wet units
were leased, hooking up the bathrooms would cost $70,000, which includes parking lot
restoration (asphalt trenches, concrete curb where it has to be cut, landscape restoration, and so
forth). If the bathrooms were not hooked up at this time, students would have to use the existing
restrooms in the building or rent portable toilets (approx. $150.00/unit/month).

Budget pricing is included in the site setup costs to increase the existing sanitary sewer line from a
4” to 6” line. This is for a quantity of sewer on school property only; if it has to be expanded beyond
school property, costs will increase proportionately. The Expansion Committee does not have
detailed plans on where the 4” sanitary sewer ends or ties into the sewer main; therefore, we are
limited to the quantity shown on current plans, which show school property only.

A substantial portion of the set-up costs are related to electrical hook-up. In the budget quote we
have $40,000 slated for this, which is based on a conservative budget quote from a site electrical
company. If some factors work in our favor, we believe there can be some savings on this cost.
These factors include what actual modular units we receive and their power requirement (this
varies) along with the possibility of consolidating the different site locations.

                                                                            LCS Expansion Opportunities   27
If a land use agreement is established, the buildings theoretically could be placed on this land;
however, the buildings would rest on land between the two property lines. As a drawback though,
if they were placed on leased land, the buildings would be too far from the school to be able use
the schools restrooms (per code); therefore, portable restrooms would have to be utilized.

The Possible Modular Site Plan option (shown below) assumes installation of six double wide
units, two in the south east portion of the parking lot, two in the south center portion and two in
the west grass lawn. This will take approximately 30 parking stalls out of service; therefore, we
have included a plan to “relocate” these stalls to a new 30 stall extension to the parking lot in the
detention basin (east side of LCS property).

Our understanding is that the existing detention basin is oversized for our site and a portion of it
could be reclaimed for our use. To determine how much we can reclaim, a new drainage study
will have to be completed (approx. $1,000 and included in the below estimate). Therefore, this
estimate and option assumes we are able to reclaim enough of the detention basin for additional
parking. If the modular option is the path forward, this is the first thing that will need to be
completed by the school (not the architect or constructor). Budget prices for this option are
summarized below.

The cost ranges below are due to the range in estimates from local portable building suppliers. It
is unknown if the lower cost supplier will still have units available when leases are signed, hence
the cost range below.

 MODULARS                                                                         COST ESTIMATE

Modular Monthly Lease of six double-wide units                            $6,000-$8,000/month

Modular Setup Costs                                                                $87,730-90,000

30 Stall Asphalt Parking Lot Addition                                            $38,342-$45,000

Upgrade of Sanitary Sewer Service (on school property only)                                  $15,000

Total five-year cost for leasing modular units is approximately $510,000 to $630,000 (includes
installation and site work). Purchase price for the same units is approximately $80.00 per square
foot or $115,200 per unit. This comes to about $840,000 total (includes installation and site work).

The above estimate does not include furnishing the buildings with desks, chairs, cabinets, etc., and
the monthly costs do not include utilities.

                                                                           LCS Expansion Opportunities   28
If the school was able to reclaim enough of the detention pond, all six modulars could be placed
here; however, higher costs for site work (dirt import, paving around buildings for ADA all weather
access, and so forth) were offset by not needing the additional parking spaces. Therefore, it is a
comparable cost.

                                                                      WET MODULAR
                                                                      Services
                                                                      60’ x 24’

                                                                      If bathrooms are not utilized, the
                                                                      area can be converted into storage or
                                                                      closet space.

                                                                      DRY MODULAR
                                                                      Services
                                                                      60’ x 24’

                                                                         LCS Expansion Opportunities       29
MODULARS PROJECT TIMELINE
The timeline below is a realistic assumption of what will be required to get modulars setup onsite.
The critical part is to choose the modular unit supplier and actual units to lease, as these units
begin to get leased near the end of January.
                                                                                                            TARGETED
 PHASE I: DUE DILIGENCE / 2 WEEKS                                                                          COMPLETION
                                                                                                              DATE
   Modular suppliers will have to contacted for firm estimates and if adequate units are
                                                                                                              02 / 28 / 2015
   available. In addition, it is suggested that interested parties (Board, committee,
   principal, etc.) visit the potential final supplier to look at the actual units to be leased
   or purchased.

                                                                                                            TARGETED
 PHASE II: ARCHITECTURE / 5 WEEKS                                                                          COMPLETION
                                                                                                              DATE
   Concurrently with talking to building suppliers, an architect will need to be on board to
   help design best locations for the modulars and required site improvements. Related                        02 / 28 / 2015

   to the architect, contractors will also need to be solicited and contracted for services to
   include site prep, electrical, paving, etc. The architect should take care of this portion
   with his scope of work.

                                                                                                            TARGETED
 PHASE III: PERMITTING / 2 MONTHS                                                                          COMPLETION
                                                                                                              DATE

   Once a modular supplier is chosen and actual units leased, permitting will need to                         04 / 30 / 2015
   begin. This will include buy-in by the City and any State required building permits.
   The architect should also help with this process and be included with his scope of
   work.

                                                                                                            TARGETED
 PHASE IV: CONSTRUCTION / 3 MONTHS                                                                         COMPLETION
                                                                                                              DATE

   Three months for construction is very feasible. Some of the construction that does not                     08 / 01 / 2015
   impact daily school operations can begin before summer break and should begin by
   May 1, 2015. This will give adequate time (two months) once school breaks for summer
   to install and set-up the modulars.

                                                                                             LCS Expansion Opportunities   30
In conclusion, this budget estimate is intended to be compared to the Second Campus option
previously described. Therefore, it is general in nature and provides a realistic single site option to
our expansion needs. If this option is the route the school board chooses to go, we can then tailor
it to our more specific needs, make modifications and begin to line up a supplier.

POSSIBLE MODULAR SITE PLAN
The following is a possible site plan that accommodates six modulars and a replacement of 32
parking stalls to the east. This plan shows three groups of two modulars placed in various
locations around the school site that could accommodate their sizes. As previously mentioned,
doing this will take away approximately 30 +/- parking stalls and there would be a need to replace
these. With some minor dirt work (assuming a new drainage study allows this), it is very easy to
add them along the west edge of the detention pond.

                                                                          LCS Expansion Opportunities   31
This proposed modular layout will constrict the current drop-off/pick-up traffic flow and will need
to be addressed, especially with the increased traffic in subsequent years due to increased
student population.

ADDITIONAL OPTIONS
The Expansion Committee will continue exploring additional options, including but not limited to
developing a rental agreement with existing underutilized properties, such as churches, and other
second site options available for sale or rent. Furthermore, the committee will explore any other
vacant or underutilized buildings not currently on the market.

                                                                        LCS Expansion Opportunities   32