INVESTMENTS ATTRACTION OF IN THE METROPOLITAN AREA - 30METRO - Città Metropolitana di Torino...
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
ATTRACTION OF
INVESTMENTS
PROJECT IN THE METROPOLITAN
30METRO
In cooperation with:
AREA
LINKS Foundation, Confindustria Piemonte,
Consorzio Insediamenti produttivi del Canavese30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 1
ATTRACTION OF
INVESTMENTS
IN THE METROPOLITAN AREA
DOSSIER REALIZED BY
NOVEMBER 2019
Città metropolitana di Torino
Economic Development Department
Corso Inghilterra 7 - 10138 Torino
Phone (0039) 011 861 73 18
E-mail sviluppo@cittametropolitana.torino.it
IN COLLABORATION WITH
LINKS Foundation
www.linksfoundation.com
Confindustria Piemonte
www.confindustria.piemonte.it
CIP Canavese
www.insiediamentiproduttivicanavese.it30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 3
PROJECT
30 METRO
INTERACTIVE PLATFORM
MAP-Based web platform including information about all the abandoned industrial areas and about the territorial context.
www.urbantoolbox.it/project/trentametro
FOR METROPOLITAN DEVELOPMENT
(developed by LINKS Foundation by in.vi.to tool)
The TRENTAMETRO project, owners was initiated to check the
DR. DIMITRI DE VITA
promoted by the Città metropolitana actual interest in selling their areas
di Torino in partnership with LINKS and to obtain the authorization to
Foundation, Confindustria Piemonte include them in the dossier.
and Consorzio per gli Insediamenti
Produttivi del Canavese, aims to This document hopes to be a
achieve the maximum potential catalogue capable of promoting
on the territorial and urban level, the selected areas at a national
in order to boost new productive and international level, in order
activities and to promote the reuse to transform abandoned places
of many abandoned areas of our into opportunities for economic
territory. development.
Through the attraction of productive For these reasons, the
foreign investments and the TRENTAMETRO dossier is available
development of synergies between in Italian, English, Chinese and
public and private investors, the Russian.
initiative aims to revitalize marginal
or peripheral areas, to contain Within the project, a geo-referenced
soil consumption and to kick-start web platform* has been created and
environmental regeneration and made available to the business world,
urban redevelopment processes. which contains information about
COUNCILLOR
the localization of all the mapped
Mountain development, European
As a first step, the project has mapped abandoned areas, including those not
and International relations and
all the abandoned industrial areas of included in the dossier. Moreover,
projects, strategic planning,
the metropolitan territory measuring the platform allows interaction with
economic development, productive
more than 5,000 square meters. information about the territorial
activities, transportation,
Then, a selection among the over 130 context in which the different areas
professional training.
mapped areas allowed identification are located.
of the 30 most attractive sites,
through a process that took into
consideration the services and
the surroundings of every site: its
accessibility, the presence of an
industrial area and the broadband
connection.
*The platform is available at the following
Once the most competitive areas link:
were defined, a dialogue with the www.urbantoolbox.it/project/trentametro4 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 5
CITTÀ Extraordinary nature, history, tradition, culture, technological innovation,
top quality food and wine, sport and relaxation.
Lonely Planet
METROPOLITANA The Metropolitan City of Turin Novalesa and Moncenisio; the
ATTRACTION AND TOURISTIC HOSPITALITY
offers a dynamic and varied tourist Olympic mountains of Valle di Susa,
experience. There are countless Val Soana and Ceresole Reale; the
cultural and landscape assets of Argentera Valley; the Vineyards of
DI TORINO
artistic, historical and archaeological Carema; the Alte Valli di Lanzo; the
interest, such as the Fenestrelle Val Germanasca; the intermorainic
Fortress which, due to its size and Hill of Avigliana; Pian Cervetto and
its development along the entire left the Morena of Mazzè.
side of the Chisone Valley, has been
called “the Great Piedmontese Wall”. Turin is also home to many attractive
museums, testaments to the history,
Sites and areas recognized as World culture, industrial presence and
Heritage by UNESCO are widespread internationality of the city. In
The Metropolitan City of Turin, the waters of the extensive network within the Metropolitan City of Turin: particular, those that stand out are
LOCATION AND ENVIRONMENTAL QUALITY
312
MUNICIPALITIES
with its 186 km border with France
(Savoie and Hautes-Alpes) and a
dense and efficient network of road
of secondary tributaries. Hundreds
of lake basins enrich the territory,
from the Germanasca Valley, to the
the system of Savoy Residences
includes over a dozen sites in the
the Egyptian Museum, the National
Cinema Museum, followed by the
Capital City (Palazzo Reale, Turin Textile Museum in Chieri, the Museum
and rail infrastructure, is one of Gran Paradiso massif, to the Locana State Archives, the Madama and of Forte Bramafam in Bardonecchia,
the main national connections with and Lanzo Valleys; in the lowland Carignano Palaces, Villa della Regina, the Historical Museum of the Cavalry
6.827
SQUARE KILOMETRES
Western Europe (Frejus, Mont Blanc
and Moncenisio tunnels, Ventimiglia,
areas, the Viverone Lake, the Lakes
of Avigliana, the Lake of Candia, and
Valentino Castle...) and numerous
castles spread out across the
of Pinerolo and the Historical
Museum of Sacred Art in Susa. The
Sempione and Colle di Tenda passes). the Lake Sirio stand out for their metropolitan area. These include the Metropolitan City of Turin is now
environmental and touristic value. hunting lodge of Stupinigi, the Reggia actively one of the main European
Its capital was defined by Le di Venaria Reale and the castles of La centers for contemporary art thanks
2.300.000
INHABITANTS
Corbusier as “the city with the most
beautiful natural location in the
Mandria, Rivoli and Agliè. to the Museum of Contemporary
Art of the CasPhonelo di Rivoli, the
world” for its proximity to the Alpine It is also worth mentioning the Gallery of Modern Art, the Sandretto
the hills, the major lakes and the sea. recent recognition by UNESCO Rebaudengo Foundation, Palazzo
of the Collina del Po Torinese as a Bricherasio, the Pinacoteca Agnelli,
The Metropolitan City of Turin is also Biosphere Reserve (MAB), and Ivrea, and the Merz Foundation.
one of the richest metropolitan areas an industrial city of the twentieth
in Europe from an environmental, century, as the 54th Italian site Of further interest are the extra-
landscape and historic-cultural point registered as a World Heritage Site. urban museums (Museums of railway
of view. transport through the Bussoleno
There are many historical and Alps, the Museum of Rural Life at
The mountain areas, characterized cultural routes in the Metropolitan the Pool, the museum of viticulture
by the presence of natural parks and City area (the Via Francigena, an in Prarostino, the Valdese Museum
extensive wooded areas, are known important route of communication of Rorà, …). Furthermore to be
above all for winter tourism and and pilgrimage between Central considered are the “eco museums”,
internationally famous for having Europe and Rome; the historic- places of cultural diffusion and
hosted the XX Winter Olympic Games cultural itinerary of the “Glorious knowledge of local realities: Freidano
in 2006, and are a true paradise Repatriation of the Waldenses”; (Settimo Torinese); Morainic
for nature lovers in every season, the Great Crossing of the Alps , ...), Amphitheater (Ivrea); Feltrificio
offering numerous alternatives in as well as the hundreds of “minor” Crumière (Villar Pellice); Ecomuseo
terms of outdoor activities. assets that testify to the culture and dell’Argilla (Cambiano) and Prali
traditions of the places. Mines (Prali).
The Po River, the largest in Italy,
rises on the Monviso at the Piano More tourist areas of great interest The great cultural liveliness that
del Re and crosses the entire are the: Poirino Plateau; the Turin animates the Metropolitan City
Metropolitan City of Turin, collecting Hill; the Serra moraine of Ivrea, of Turin is demonstrated by the6 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 7
numerous first-rate literary, musical and hiking experiences through From an economic standpoint The new identity of the Metropolitan
PRODUCTION SECTOR AND INNOVATION
and theatrical events hosted routes that involve local farms and the Metropolitan City of Turin is City of Turin is emerging, with strong
throughout the territory. winegrowers, cellars, educational characterized by the presence of potential and future prospects,
farms, museums and castles (Colours a productive fabric with strong characterized by a lively system
Amongst all these elements of and flavours route, Royal Route of specialization in the manufacturing dedicated to innovation, which
attraction, the enogastronomic Turin wines, ...). sector. includes:
heritage stands out, representing
an extremely valuable resource Confirming the capacity of attraction The territory can also count on > 2 universities
for the metropolitan area, and exercised by the artistic and cultural companies’ high investment capacity > 3 business incubators
there are many options offered to heritage of the territory, and by its and propensity for innovation, and > 4 innovation poles
those interested in low-impact and tourist accommodation, Piedmont on a specialized tertiary sector. The > 2 science and technology parks
environmentally friendly forms of has obtained the Lonely Planet “Best internationalization of companies > 2 technological districts
tourism. There are also numerous in Travel” award that brands it as the is confirmed by a trade balance that > 1 Bio park (Colleretto Giacosa)
opportunities for taste itineraries Best Region to Visit in the World for has increased significantly in the
that combine the discovery of local 2019. last 10 years (equal to € 15bn in The above-mentioned structures
products of excellence, with cultural 2017), and above all characterized host students, researchers, startups
by the dynamism of the enterprises and companies and promote cultural
belonging to the districts: 7 districts amalgamation and offer high
out of 11 have registered an increase standards and versatility from the
in their exports in 2017. point of view of the labor market.
The industrial production system The metropolitan dimension of
is of a high calibre with a strong Turin is also reinforced by its ability
productive specialization in the to network with other Italian and
following sectors: European cities and metropolitan
areas (Metrex, Metropolis, Tecla,
> automotive and transportation ArcoLatino ...).
> metallurgy
> electronic
> advanced mechanics and
mechatronics
> food industries
> production of rubber and plastic
articles.
Local industrial realities belonging
to national and international
networks have strong connections
with regional districts: aerospace;
goldsmith; textiles; wine; appliances
and household goods; taps; and
fittings and valves.
Piedmont ranks first in Italy
for spending on research and
development (2.2% of regional GDP),
of which 80% comes from businesses.
The Metropolitan City of Turin is
among the first in Italy due to the
presence of start-ups (3.42%) and,
in 2016, it ranked second after
Amsterdam in the prestigious
“European Capital of Innovation
Awards” competition organized by
the European Commission.8 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO
The development model of the Savona and Bardonecchia;
INFRASTRUCTURAL EQUIPMENT
advanced economies is based on > and the connection with France,
the increase in competitiveness through the Fréjus Tunnel, the
of territories able to create SS25 of Moncenisio and the SS24
employment, thanks to the ability to of Montgenèvre;
guarantee efficient, sustainable and
free movement for people and goods. To support the mobility of goods
Europe has identified and supported there are two important intermodal
the creation of the Trans European logistics hubs:
Network-Transport (TEN-T). One
of the corridors involving Italy, the > the S.I.TO freight village – which
“Mediterranean” Corridor (the main is strongly interconnected with
East-West connection axis of an area the Orbassano railway yard
that includes 18% of the population – endowed with innovative
of Europe and produces 17% of its and technologically advanced
GDP), crosses the territory of the infrastructures and facilities at
Metropolitan City of Turin. the service of companies;
> and the Ambrogio gateway
Of extreme importance is the located in Candiolo, specialized in
proximity to the ports of Genoa intermodal transport.
and Savona and to the passes and
tunnels towards Europe (Ventimiglia, S.I.TO represents a fundamental
Montgenèvre, Fréjus, Mont Blanc, junction of the Piedmontese logistics
Simplon, Gotthard). system. Located near the capital of
Turin and thanks to the connection
Important infrastructural with the railway line to France, it
endowment guarantees the offers excellent services for logistics
Metropolitan City of Turin high companies and shippers and is
performance in terms of mobility and suitable for city logistic activities.
logistics.
Easily accessible from the rest of
The railway network is the most the territory is also the urban axis
extensive of those in Northern Italy, called the Innovation Mile, along
with 77 stations that are located which the headquarters of the
along approximaPhoney 2,000 km organizations that make up the
of lines that innervate the entire Turin innovation ecosystem are
metropolitan area. distributed. The corridor is served
by 2 railway stations, a metro line,
The motorway network (compared and a boulevard that lies above the
to the number of registered cars) is in railway tunnel and connects the axis
third place, while the road network, directly to the motorway network.
with a radial conformation on Turin,
extends for over 3,000 km connecting It is on this axis that the Metropolitan
the totality of the 312 Municipalities Railway Service is established,
and a large part of their fractional which, thanks to its 8 lines that
centers. extend for around 500km, serves
over 300 daily connections and 93
Of these particular infrastructures, it stations, allowing for a capillary and
is worth mentioning: rhythmic connection with the main
poles of the metropolitan territory,
> the Sandro Pertini International including the territories outside the
Airport, connected through the Turin conurbation.
motorway network to strategic
logistics hubs and important
industrial and knowledge poles,
such as Aosta, Milan, Piacenza,10 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 11
LIST OF THE
The Homogeneous Zones, identified 80,000 inhabitants characterize
LOCATION OF THE 30 SELECTED SITES,
DIVIDED BY HOMOGENEOUS ZONES
by the Metropolitan City of Turin them. These can become the optimal
are the operational structure of setting for the organization of
the Conferenza Metropolitana associated municipal services and
(Metropolitan Conference). Territorial for the functions of metropolitan
30 SITES
contiguity and a population of at least competence (Statute, art. 27).
ZONE 2 01 FORMER TEKSID - AREA IR1 | BUTTIGLIERA ALTA
02 PN2 AREA | BEINASCO
03 S.I.TO AREA | ORBASSANO
HOMOGENEOUS ZONES
ZONE 1 TORINO
04 FORMER ILTE | MONCALIERI ZONE 2 AM TORINO OVEST
ZONE 3
05 PIP4 AREA | NICHELINO ZONE 3 AM TORINO SUD
ZONE 4 AM TORINO NORD
06 FORMER LIRI | NICHELINO (SOLD) ZONE 5 PINEROLESE
07 MONTEPO AREA | TROFARELLO ZONE 6 VALLI DI SUSA E SANGONE
ZONE 7 CIRIACESE-VALLI DI LANZO
08 FORMER BURGO | SAN MAURO T.SE
ZONE 8 CANAVESE OCCIDENTALE
09 PI12BORSETTO | SETTIMO T.SE ZONE 9 EPOREDIESE
10 PI13B CPT | SETTIMO T.SE ZONE10 CHIVASSESE
ZONE 11 CHIERESE - CARMAGNOLESE
11 MF24 ECOALPI DUE | SETTIMO T.SE
12 FORMER BRONDI | SETTIMO T.SE
ZONE 4
13 FORMER TRECI SPA | SETTIMO T.SE (SOLD)
14 FORMER SIDAUTO/SPARCO | SETTIMO T.SE Ivrea
20
15 AERFERRISI BUILDING | SETTIMO T.SE 21
16 FORMER PIRELLI | SETTIMO T.SE
17 FORMER EATON | RIVAROLO C.SE Rivarolo C.
19
17 18
22
ZONE 8 18 PR14 AREA | RIVAROLO C.SE Lanzo Torinese
19 FORMER PINIFARINA | SAN GIORGIO C.SE Cirié 25
23 26
20 BUSINESS PARK | IVREA Volpiano 24
ZONE 9 Chivasso
21 FORMER TECSINTER | IVREA 12 1514
16
Susa Venaria R. 11 13 10
09
22 FORMER BULL | CALUSO (SOLD) 08
01 Torino
23 CHIND NORTH | CHIVASSO Rivoli
03
ZONE 10 24 CHIND SOUTH | CHIVASSO 02 Chieri
30
Moncalieri 29
25 FORMER WIERER | RONDISSONE 05 06 04 07
26 FURNACE GHIGGIA | TORRAZZA PIEMONTE
27 FORMER ALPESTRE | CARMAGNOLA Pinerolo
27
28
28 FORMER TEKSID | CARMAGNOLA
ZONE 11
29 FONTANETO2 | CHIERI
30 FORMER EMBRACO | RIVA C/O CHIERI12 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 13
MUNICIPALITY OF BUTTIGLIERA ALTA
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
35,0 KM
FORMER TEKSID-AREA IR1
> Land Surface
FROM TURIN AIRPORT 28,000 sqm
> Built-up area allowed
17,800 sqm
CORSO SUSA 4 - FERRIERA 30,0KM
FROM THE AMBROGIO
> Existing gross floor area
17,800 sqm
GATEWAY OF
CANDIOLO > Gross floor area allowed
In 1891, the French group Ferriere- The factory is located along the route
DESCRIPTION
17,800 sqm
sous-Jougne transferred the facilities that joins the Metropolitan City of
for the construction of shoe nails Turin, through the Frejus Tunnel with > Production area
and wire to Avigliana; in 1896, after
having installed ovens and rolling
mills, the company began processing
France, and is connected to the E70
motorway by the Avigliana junction.
For 2021 the construction of the
17,0 KM
FROM S.I.TO
17,000 sqm
> Offices
steel and wire rod laminates. Three new Ferriera di Buttigliera Alta FREIGHT VILLAGE 800 sqm
years later, to coincide with the railway station is expected in the
expansion of the plant, the company area immediately facing the plant;
Ferriere di Buttigliera Alta and of the station will be directly connected UTILITIES
NORTH
Avigliana was born, then integrated
in 1978 into TEKSID. Following the
global steel crisis, the plant was
to the new stop of Line 3 of the
Metropolitan Railway Service, which
will directly connect the site with the
2,5 KM
FROM AVIGLIANA
Electric
Sewerage
Water
abandoned by FIAT and leased to City of Turin and, subsequently, with RAILWAY STATION Phone
other smaller industries. the Sandro Pertini Airport.
Broadband
01 1,5 KM
FROM THE
TYPOLOGY AND STATE OF PRESERVATION
Greenfield
IDENTIFICATION CODE Building New
HOMOGENEOUS ZONES 2 TORINO-BARDONECCHIA
Ivrea Good
MOTORWAY JUNCTION
Mediocre
Poor
Bad
Rivarolo C.
Lanzo Torinese
RECLAMATIONS REQUIRED
Cirié
There are no reports in the Acts
Volpiano
Chivasso about the need for activation of the
environmental matrix remediation
Susa Venaria R.
procedure.
Torino
Rivoli
BUTTIGLIERA ALTA
FORMER TEKSID-AREA IR1 Chieri
NOTES
Moncalieri
The current intended use is industrial
but an on-going variant to the PRG
(current Urban Masterplan) foresees
Pinerolo
the commercial destination.
CONTACTS
Gilberto ALICE
PHONE: (+39) 011.9329306
Mail: urbanistica@comune.buttiglieraalta.to.it14 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 15
MUNICIPALITY OF BEINASCO
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
33,0 KM
PN2 AREA
> Land Surface
FROM TURIN AIRPORT 17,386 sqm
> Built-up area allowed
max 8,693 sqm
VIA BOLOGNA/VIA VENEZIA 10,0KM
FROM THE AMBROGIO
> Existing gross floor area
0 sqm
GATEWAY OF
> Gross floor area allowed
The area owned by the Company as it is immediately adjacent to
CANDIOLO
DESCRIPTION
8,693 sqm
ATIVA SpA is a greenfield for the junction of the Turin ring road
which the intended use is artisanal junction; the new line of the Turin
UTILITIES
and industrial, and is located in metro, which is currently being
the industrial area, near the FCA
Mirafiori Sud facilities.
studied, would implement its
connection with the capital. 5,0 KM
FROM S.I.TO FREIGHT
Electric
Sewerage
The position is extremely favourable Water
VILLAGE Phone
Broadband NORTH
5,5KM
TYPOLOGY AND STATE OF PRESERVATION
Greenfield
FROM TORINO LINGOTTO Building New
RAILWAY STATION Good
Mediocre
Poor
02
IDENTIFICATION CODE 0,5 KM
Bad
RECLAMATIONS REQUIRED
HOMOGENEOUS ZONES 3 Ivrea
FROM THE RING ROAD
JUNCTION There are no reports in the Acts
about the need for activation of the
environmental matrix remediation
Rivarolo C. procedure.
Lanzo Torinese
Cirié
Volpiano
Chivasso
Susa Venaria R.
Torino
Rivoli
Chieri
Moncalieri
BEINASCO
PN2 AREA
Pinerolo
CONTACTS
Davide FINELLO
Phone: (+39) 011.3814100
Mail: finello@ativa.it16 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 17
MUNICIPALITY OF ORBASSANO
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
28,0 KM
S.I.TO AREA
> Land Surface
FROM TURIN AIRPORT 138,000 sqm
> Built-up area allowed
max 0,5 sqm/sqm
TURIN FREIGHT VILLAGE 13,0KM
FROM THE AMBROGIO
> Existing gross floor area
0 sqm
GATEWAY OF
> Gross floor area allowed
The area is composed of 2 free and interconnected to the Turin
CANDIOLO
DESCRIPTION
2 sqm/sqm
surfaces, for a total of approximately Orbassano rail freight yard.
138,000 square meters, bordering on It is directly accessible from the
the CAAT agri-food site of Turin. It is south Turin ring road through a UTILITIES
located inside the Turin logistic hub
called S.I.TO (Interporto di Torino
road junction in the vicinity, which
guarantees an excellent connection 0 KM
FROM S.I.TO FREIGHT
Electric
Company), one of the best locations with the entire motorway network Sewerage
in the North West Logistic Area, along towards France, Lombardy, Liguria VILLAGE Water
the new southern European railway and the rest of Italy. Phone
known as Corridor V (representing S.I.TO covers approximately 280,000 Broadband NORTH
the privileged “door” of the Alps square meters in the Municipalities of
for goods directed to North-West
Europe).
S.I.TO has its own 7-track terminal,
Turin, Grugliasco, Orbassano, Rivalta
and Rivoli, and hosts 350,000 square
meters of warehouses and 750,000
2,0KM
FROM ORBASSANO
TYPOLOGY AND STATE OF PRESERVATION
Greenfield
connected with the railway line square meters of yards. FREIGHT STATION Building New
through the Orbassano goods yard
Good
Mediocre
03
IDENTIFICATION CODE 0,5 KM
Poor
Bad
HOMOGENEOUS ZONES 3 Ivrea
FROM THE MOTORWAY
JUNCTION RECLAMATIONS REQUIRED
There are no reports in the Acts
Rivarolo C.
about the need for activation of the
environmental matrix remediation
Lanzo Torinese procedure.
Cirié
Volpiano
Chivasso NOTES
Susa Venaria R. Area intended for the storage of
Torino
goods with or without shipping
Rivoli
activities, with a rail link; warehouses
Chieri
ORBASSANO for storage and storage of goods,
Moncalieri S.I.TO AREA premises for processing goods,
packaging, and final assembly;
connected or induced administrative,
Pinerolo
managerial and commercial activity;
manager and custodian housing,
CONTACTS canteen and social services.
Davide GIAQUINTA
Phone: (+39) 011.3975975 There are service roads to
Mail: ufficiotecnico.giaquinta@sitospa.it
settlements and parking lots.18 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 19
MUNICIPALITY OF MONCALIERI
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
48,7 KM
FORMER ILTE
> Land Surface
FROM TURIN AIRPORT 277,000 sqm
> Built-up area allowed
85,045 sqm
VIA FORTUNATO POSTIGLIONE 14 14,0KM
FROM THE AMBROGIO
> Existing gross floor area
92,445 sqm
GATEWAY OF
> Gross floor area further buildable
The former ILTE, decommissioned the needs dictated by growing
CANDIOLO
DESCRIPTION
81,995 sqm
since 2016, was the headquarters production.
of ILTE (Industry Book Publishing The area is located in the Sanda Vadò > Production area
Company), founded in 1947 when industrial pole, one of the strategic 80,575 sqm
the Institute of the Italian book S.r.l.
(ILTE since October 1951) decided
areas of the Metropolitan City of
Turin, consisting of modern industrial 20,0 KM
FROM S.I.TO FREIGHT
> Offices
to dedicate special spaces for a buildings, mostly designed by the 11,870 sqm
telephone directory printing press. In designer Giorgetto Giugiaro. A hotel, VILLAGE
view of the ever-expanding activity, a bank, a shopping and entertainment
ILTE in the following decades has centre and other services make the UTILITIES
NORTH
moved from its original location in area very functional. Logistically, the
Electric
Turin to the more modern Moncalieri
plant (characterized by a building
with a singular propeller staircase
area is close to the Vadò junction of
the Turin Bypass, at the Turin-Genoa
motorway exit and the Turin ring
2,3KM
FROM TROFARELLO
Sewerage
Water
Phone
designed by the engineer Nino road. RAILWAY STATION Broadband
Rosani), which is able to satisfy
TYPOLOGY AND STATE OF PRESERVATION
04
IDENTIFICATION CODE 4,5 KM Greenfield
Building New
HOMOGENEOUS ZONES 3 Ivrea
FROM THE MOTORWAY Good
JUNCTION Mediocre
Poor
Bad
Rivarolo C.
Lanzo Torinese RECLAMATIONS REQUIRED
Cirié
Reclamations necessary for asbestos
Volpiano roofing. There are no reports in the
Chivasso
Acts about the need for activation
Susa Venaria R. of the environmental matrix
remediation procedure.
Torino
Rivoli
Chieri
Moncalieri
MONCALIERI
FORMER ILTE
Pinerolo
CONTACTS
Silvano BATTOCCHIO
(+39) 335 8036867
battocchio@battocchioimmobiliare.it20 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 21
MUNICIPALITY OF NICHELINO
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
39,0 KM
PIP4 AREA
> Land Surface
FROM TURIN AIRPORT 60,000 sqm
> Built-up area allowed
max 50%
CORSO VITTIME DEL LAVORO 3,4KM
FROM THE AMBROGIO
> As regards the details relating
to the work that can be carried
GATEWAY OF out, please refer to the technical
standards for implementing the
The PIP4 area is located behind with the presence of widespread
CANDIOLO
DESCRIPTION
Plan for Productive Settlements
another industrial area (PIP3), building interventions, both (P.I.P.)
developed in the 2000s along the residential and industrial.
Vernea road. The area has good accessibility, as it > Land dedicated to production
In the area are foreseen: industrial
lots; a commercial lot; a service area
is connected to the ring road through
the Dobouchè junction. 11,0 KM
FROM S.I.TO FREIGHT
45,000 sqm
composed of a bar / restaurant; > Land dedicated to services
a service centre and a hotel. The VILLAGE 15,000 sqm
context is still partially agricultural
NORTH
UTILITIES
1,5KM
FROM NICHELINO
Electric
Sewerage
RAILWAY STATION Water
Phone
Broadband
05
IDENTIFICATION CODE 2,5 KM TYPOLOGY AND STATE OF PRESERVATION
HOMOGENEOUS ZONES 3 Ivrea
FROM THE MOTORWAY
JUNCTION Greenfield
Building New
Good
Mediocre
Rivarolo C.
Poor
Lanzo Torinese Bad
Cirié
Volpiano
Chivasso RECLAMATIONS REQUIRED
Susa Venaria R.
There are no reports in the Acts
Torino about the need for activation of the
Rivoli
environmental matrix remediation
Chieri procedure.
Moncalieri
NICHELINO NOTES
PIP4 AREA
Pinerolo
Primary urbanization: public green
areas, equipped green areas, public
CONTACTS car parks.
Salvatore CARBONE Part of the area is subject to a building
Phone: (+39) 011.7172304; (+39) 335.7920600 constraint due to a power line that
Mail: salvatore.carbone@finpiemontepartecipazioni.it
crosses it in an east-west direction.22 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 23
MUNICIPALITY OF NICHELINO
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
38,0 KM
FORMER LIRI
> Land Surface
FROM TURIN AIRPORT 63,961 sqm
> Built-up area allowed
22,631.37 sqm
VIA VERNEA 2 3,0KM
FROM THE AMBROGIO
> Existing gross floor area
24,164 sqm
GATEWAY OF
> Gross floor area allowed
The area is located in an industrial, The Municipal General Master Plan
CANDIOLO
DESCRIPTION
20,000 sqm
craft and commercial district hosting (PRGC) classified the area as “BP2
both national and international area – subject to reorganization, > Production area
companies, mainly operating urban transformation and 18,944 sqm
in the engineering, chemical-
pharmaceutical and design sectors.
completion”.
The former LIRI, well connected with 11,0 KM
FROM S.I.TO FREIGHT
> Offices
The complex includes a series of the transport network, has excellent 1,831 sqm
sheds previously dedicated to the visibility and accessibility. According VILLAGE
production cycle, an office building, to the current Urban Master Plan
UTILITIES
a porter’s lodge, ancillary rooms and (PRG) a direct connection to the
LD
LD
NORTH
other accessory areas. The plant was nearby ring road will be implemented. Electric
decommissioned in 2013.
1,4KM
FROM NICHELINO
Sewerage
Water
Phone
RAILWAY STATION Broadband
TYPOLOGY AND STATE OF PRESERVATION
06
SO
SO
IDENTIFICATION CODE 3,0 KM
FROM THE RING ROAD
Greenfield
Building New
Good
HOMOGENEOUS ZONES 3 Ivrea
Mediocre
JUNCTION
Poor
Bad
Rivarolo C.
RECLAMATIONS REQUIRED
Lanzo Torinese
Cirié
According to the available
documentation:
Volpiano
Chivasso
> on the site there are still
underground (disused) tanks
Susa Venaria R. and underground networks of
Torino utilities;
Rivoli
> operations were carried out to
Chieri remove materials containing
Moncalieri asbestos from buildings;
NICHELINO > the hazardous and non-hazardous
FORMER LIRI waste detected by ARPA during
Pinerolo the inspection has been removed;
> no information is available on
CONTACTS the state of the soil, subsoil or
groundwater as no investigations
have been carried out on the
records.24 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 25
MUNICIPALITY OF TROFARELLO
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
45,0 KM
MONTEPO AREA
> Land surface
FROM TURIN AIRPORT 41,940 sqm
> Building land area
26,550 sqm
SANDA VADÒ - AREA I1-SA3 DEL P.R.G.C. DI TROFARELLO 14,0KM
FROM THE AMBROGIO
> Built-up area allowed
15,907 sqm (maximum buildable
GATEWAY OF area for non commercial
activities)
The Montepo area is located in the services. The initiative benefited
CANDIOLO
DESCRIPTION
Sanda Vadò industrial area, one from contributions for the promotion > Existing gross floor area
of the most strategic areas of the of Integrated Development Poles n.d.
Metropolitan City of Turin which - PIS - aimed at production areas,
also hosts commercial activities.
The functionality of the
assigned by the European Union,
the Italian State and the Piedmont 19,0 KM
FROM S.I.TO FREIGHT
> Gross floor area allowed
max 15,907 sqm
infrastructures and the quality of Region to the Cities of Moncalieri
the architectural and urban planning and Trofarello. VILLAGE
project, signed by Giugiaro Design, A hotel, a bank, a shopping and UTILITIES
NORTH
make the Montepo technological entertainment centre and other
Electric
district a unique example of services make the area very
Sewerage
typological homogeneity of the
architectural product in the Italian
and European panorama, and a
functional. Logistically, the area is
close to the Vadò junction of the
Turin Bypass, at the Turin-Genoa
2,5KM
FROM TROFARELLO
Water
Phone
Broadband
European centre of excellence in motorway exit and the Turin ring RAILWAY STATION
the field of production facilities and road.
TYPOLOGY AND STATE OF PRESERVATION
07
IDENTIFICATION CODE 0,5 KM
Greenfield
Building New
Good
HOMOGENEOUS ZONES 3 Ivrea
FROM THE RING ROAD Mediocre
JUNCTION Poor
Bad
Rivarolo C.
RECLAMATIONS REQUIRED
Lanzo Torinese
There are no reports in the Acts
Cirié
about the need for activation of the
Volpiano environmental matrix remediation
Chivasso
procedure.
Susa Venaria R.
Torino
Rivoli
Chieri
Moncalieri
TROFARELLO
MONTEPO AREA
Pinerolo
CONTACTS
Salvatore CARBONE
Phone: (+39) 011.7172304; (+39) 335.7920600
Mail: salvatore.carbone@finpiemontepartecipazioni.it26 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 27
MUNICIPALITY OF SAN MAURO TORINESE
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
18,0 KM
FORMER BURGO
> Land Surface
FROM TURIN AIRPORT 58,382 sqm
> Built-up area allowed
6,216 sqm
VIA LUIGI BURGO (FORMER OF FREIDANO) 38,0KM
FROM THE AMBROGIO
> Existing gross floor area
13,578 sqm
GATEWAY OF
> Gross floor area allowed
In the mid-1970s, Cartiere BURGO the space-filter used as a garden,
CANDIOLO
DESCRIPTION
0 sqm
from Turin decided to build a new and connect to the outer crown with
location in the industrial area of the offices, pierced by vertical windows. > Production area
municipality of San Mauro Torinese. The lobby is surrounded by oval 0 sqm
The building, designed in 1977
by the Brazilian architect Oscar
decorated glass windows overlooking
the garden. The truncated conical 27,0 KM
FROM S.I.TO FREIGHT
> Offices
Niemeyer (one of the most famous volume of the management offices is 13,578 sqm
internationally renowned architects suspended on the upper floor. VILLAGE
of the 20th century), has a suspended The building was dismissed in 2013
annular structure, spread over 6,000 due to the transfer of the Burgo NORTH
square meters, and is structured by group to Altavilla Vicentina.
UTILITIES
concentric crowns.
The circular plan develops on
three levels: a basement where the
The area is located near the industrial
area of San Mauro Torinese, close to
the A4 and A5 motorways junctions.
5,0KM
FROM TORINO STURA
Electric
Sewerage
technological centre, assembly hall In the surroundings, there are RAILWAY STATION Water
and canteen are located, and two services such as a sports hall, hotel Phone
floors for offices and management. facilities and logistics centres for Broadband
From the hall four corridors cross shipments.
08
IDENTIFICATION CODE 3,0 KM
HOMOGENEOUS ZONES 4 Ivrea
FROM THE MOTORWAY TYPOLOGY AND STATE OF PRESERVATION
JUNCTION
Greenfield
Building New
Good
Rivarolo C.
Mediocre
Lanzo Torinese Poor
Bad
Cirié
Volpiano
Chivasso
Susa Venaria R.
RECLAMATIONS REQUIRED
SAN MAURO TORINESE Torino
FORMER BURGO Rivoli
There are no reports in the Acts
Chieri about the need for activation of the
Moncalieri environmental matrix remediation
procedure.
Pinerolo
CONTACTS
NOTES
Gianluca COZZA
Phone: (+39) 044.4227217
The building is subject to architectural
Mail: cozza.gianluca@burgo.com
constraints.28 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 29
MUNICIPALITY OF SETTIMO TORINESE
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
10,0 KM
PI12 BORSETTO
> Land Surface
FROM TURIN AIRPORT 60,000 sqm
> Built-up area allowed
n.d.
VIA KENNEDY 35,0KM
FROM THE AMBROGIO
> Existing gross floor area
0 sqm
GATEWAY OF
> Gross floor area allowed
The area Pi12 BORSETTO is Mappano. The Urban Masterplan
CANDIOLO
DESCRIPTION
30,000 sqm
a greenfield located within an anticipates, for this area, the creation
industrial area, north of the “Bealera of a new road system, enabling a > Production area
Nuova” Canal, and is part of the direct connection with the motorway n.d.
industrial fringe portions on the
edge of the Municipalities of Settimo
exit of Settimo Torinese.
24,0 KM
FROM S.I.TO FREIGHT
> Offices
Torinese, Leinì, Borgaro Torinese and n.d.
VILLAGE
UTILITIES NORTH
4,5KM
Electric
Sewerage
Water
FROM TORINO STURA
Phone
RAILWAY STATION Broadband
09
IDENTIFICATION CODE 1,5 KM
TYPOLOGY AND STATE OF PRESERVATION
Greenfield
HOMOGENEOUS ZONES 4 Ivrea
FROM THE RING ROAD Building New
JUNCTION Good
Mediocre
Poor
Bad
Rivarolo C.
Lanzo Torinese
RECLAMATIONS REQUIRED
Cirié
Volpiano There are no reports in the Acts
Chivasso about the need for activation of the
Susa Venaria R.
environmental matrix remediation
SETTIMO TORINESE procedure
PI12 BORSETTO Rivoli
Torino
Chieri
Moncalieri
Pinerolo
CONTACTS
Corrado GROSSO
Phone: (+39) 335.5732548
Mail: info@studiotecnicogrosso.it30 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 31
MUNICIPALITY OF SETTIMO TORINESE
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
11,6 KM
PI13B CPT
> Land Surface
FROM TURIN AIRPORT 15,000 sqm
> Covered area allowed
10,000 sqm
VIA KENNEDY 35,5KM
FROM THE AMBROGIO
> Existing gross floor area
0 sqm
GATEWAY OF
CANDIOLO > Gross floor area allowed
The area identified as Pi13b CPT is industrial intervention unit in the
DESCRIPTION
10.000 sqm
a greenfield located in an industrial “Bor.Set.To” area and the Pi13a
area, north of the “Bealera Nuova” area for the completion of the Leinì > Production area
canal, which in Settimo T.se
constitutes the morphological-
environmental limit of the Green
industrial Contracted executive plan
PEC.
The PRGC (General Urban Master
23,9 KM
FROM S.I.TO FREIGHT
n.d.
> Offices
Corridor named “Tangenziale Plan) foresees an adaptation of the VILLAGE n.d.
verde”, and is part of the industrial road network for this area, with the
fringe portions on the edges of the creation of a new road infrastructure
Municipalities of Settimo T.se, Leinì, that would create a direct connection UTILITIES NORTH
7,0
Borgaro T.se and Mappano. with the Settimo Torinese motorway
The area is located between the junction. KM Electric
FROM SETTIMO Sewerage
Water
TORINESE RAILWAY
Phone
STATION Broadband
10
IDENTIFICATION CODE 1,5 KM
TYPOLOGY AND STATE OF PRESERVATION
Greenfield
HOMOGENEOUS ZONES 4 Ivrea
FROM THE RING ROAD Building New
JUNCTION Good
Mediocre
Poor
Rivarolo C. Bad
Lanzo Torinese
Cirié RECLAMATIONS REQUIRED
Volpiano
Chivasso There are no reports in the Acts
Susa
about the need for activation of the
Venaria R.
SETTIMO TORINESE environmental matrix remediation
PI13B CPT Rivoli
Torino procedure.
Chieri
Moncalieri
NOTES
This is a transit area located between
Pinerolo the industrial intervention unit in the
Bor.Set.To area and the Pi13a area
CONTACTS for the completion of the Leinì PEC
Corrado GROSSO (Industrial Construction Agreement).
Phone: (+39) 335.5732548
Its transformation is subject to an
Mail: info@studiotecnicogrosso.it
Executive Urban Planning Tool.32 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 33
MUNICIPALITY OF SETTIMO TORINESE
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
10,4 KM
MF 24 ECOALPI DUE
> Land Surface
FROM TURIN AIRPORT 15,000 sqm
> Maximum built-up area
6.000 sqm
MF24 - VIA CASCINA BORMIOLA 34,7KM
FROM THE AMBROGIO
> Existing gross floor area
n.d.
GATEWAY OF
> Gross floor area allowed
ECOALPI DUE is a greenfield that a new road and a roundabout for
CANDIOLO
DESCRIPTION
10,200 sqm
can be transformed through a connecting the planned industrial
private Urban Plan (SUE) focused area with the Settimo Torinese > Production area
on three areas (Pi13a, Pi13b motorway junction. n.d.
and Mf24), coordinated by an
Intervention Program approved by
A short distance away is the industrial
and commercial centre of Settimo 23,0 KM
FROM S.I.TO FREIGHT
> Offices
the Municipality. Torinese, which includes the largest n.d.
The area is close to the Turin-Aosta Italian Retail Park, a logistics hub for VILLAGE
motorway, and the Urban Masterplan shipments, IT companies, textiles and
provides an adaptation of the road engineering plants. UTILITIES
NORTH
network with the construction of
Electric
6,0KM
FROM TORINO STURA
Sewerage
Water
Phone
RAILWAY STATION Broadband
11
TYPOLOGY AND STATE OF PRESERVATION
IDENTIFICATION CODE 0,6 KM
FROM THE TORINO RING
Greenfield
Building New
HOMOGENEOUS ZONES 4 Ivrea Good
ROAD JUNCTION Mediocre
Poor
Bad
Rivarolo C.
Lanzo Torinese
RECLAMATIONS REQUIRED
Cirié
There are no reports in the Acts
Volpiano
Chivasso about the need for activation of the
environmental matrix remediation
Susa Venaria R.
SETTIMO TORINESE procedure.
MF 24 ECOALPI DUE Torino
Rivoli
Chieri
Moncalieri
Pinerolo
CONTACTS
corrado GROSSO
Phone: (+39) 335.5732548
Mail: info@studiotecnicogrosso.it34 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 35
MUNICIPALITY OF SETTIMO TORINESE
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
13,0 KM
FORMER BRONDI
> Land Surface
FROM TURIN AIRPORT 25.000 sqm
> Built-up area allowed
max 50%
VIA MAPPANO 34,0KM
FROM THE AMBROGIO
> Existing gross floor area
9.784 sqm
GATEWAY OF
CANDIOLO > Gross floor area allowed
The former BRONDI building near the entrance to the Turin-Aosta
DESCRIPTION
25.000 sqm
was, from the 70s until 2002, the motorway (towards France), and to
headquarters of the Brondi company the Turin North Ring Road. > Production area
(founded in Turin in 1935) which
specialized in the production and
distribution of fixed telephone
A short distance away is the industrial
and commercial centre of Settimo
Torinese, which includes the largest
24,0 KM
FROM S.I.TO FREIGHT
100%
> Offices
equipment. Italian Retail Park, a logistics hub for VILLAGE 0 sqm
The complex, which includes the plant shipments, IT companies, textiles and
and the surrounding land, is located engineering plants.
UTILITIES
NORTH
6,0 KM
FROM SETTIMO
Electric
Sewerage
Water
TORINESE RAILWAY Phone
STATION Broadband
12
TYPOLOGY AND STATE OF PRESERVATION
IDENTIFICATION CODE 0,2 KM
FROM THE RING ROAD
Greenfield
Building New
HOMOGENEOUS ZONES 4 Ivrea Good
JUNCTION Mediocre
Poor
Bad
Rivarolo C.
Lanzo Torinese RECLAMATIONS REQUIRED
Cirié
There are no reports in the Acts
Volpiano
Chivasso
about the need for activation of the
environmental matrix remediation
Susa
SETTIMO TORINESE Venaria R. procedure.
FORMER BRONDI Torino
Rivoli
Chieri
Moncalieri
Pinerolo
CONTACTS
Corrado GROSSO
Phone: (+39) 335.5732548
Mail: info@studiotecnicogrosso.it36 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 37
MUNICIPALITY OF SETTIMO TORINESE
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
10,7 KM
FORMER TRECI SPA
> Land Surface
FROM TURIN AIRPORT 54,700 sqm
> Built-up area allowed
12,120 sqm (existing)
STRADA CAFFADIO 24 34,0KM
FROM THE AMBROGIO
27,350 sqm (maximum build-up
area allowed)
GATEWAY OF > Existing gross floor area
CANDIOLO 13,820 sqm
The former TRECI is a compendium Well connected to the motorway
DESCRIPTION
dating back to the early 1960s, network, the former TRECI is next to > Gross floor area allowed
consisting of industrial buildings, the motorway junction of the Turin 46,560 sqm
now used as a sales area and offices.
Recently, a photovoltaic system was
built on roofs for energy production.
North Ring Road, of the Turin-Aosta
and the Turin-Milan motorways.
A short distance away is the industrial
24,0 KM
FROM S.I.TO FREIGHT
> Production area
12,520 sqm
The structure of the compendium is and commercial centre of Settimo VILLAGE
rectangular and includes an office Torinese, which includes the largest > Offices
building, located at the entrance, and Italian Retail Park, a logistics hub for 1,300 sqm
a building intended for storage and shipments, IT companies, textiles and
LD
LD
NORTH
6,3
operational offices located on the engineering plants.
opposite side. KM UTILITIES
FROM SETTIMO
Electric
TORINESE RAILWAY
Sewerage
STATION Water
Phone
Broadband
13
SO
SO
IDENTIFICATION CODE 0,4 KM
FROM THE RING ROAD TYPOLOGY AND STATE OF PRESERVATION
HOMOGENEOUS ZONES 4 Ivrea
JUNCTION Greenfield
Building New
Good
Rivarolo C. Mediocre
Poor
Lanzo Torinese
Bad
Cirié
Volpiano
Chivasso RECLAMATIONS REQUIRED
SETTIMO TORINESE Susa Venaria R.
FORMER TRECI There are no reports in the Acts
Rivoli
Torino about the need for activation of the
environmental matrix remediation
Chieri procedure.
Moncalieri
NOTES
Pinerolo
The area falls under sub-class
CONTACTS IIIb2A of the summary map of
hydrogeological hazard with
preclusion of construction of
underground floors.38 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 39
MUNICIPALITY OF SETTIMO TORINESE
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
12,0 KM
FORMER SIDAUTO/SPARCO
> Land Surface
FROM TURIN AIRPORT 48,684 sqm
> Built-up area allowed
10,403 sqm
TORINO-MILANO MOTORWAY - KM 0,500 37,0KM
FROM THE AMBROGIO
> Existing gross floor area
11,154 sqm
GATEWAY OF
CANDIOLO > Gross floor area allowed
The former SIDAUTO complex, industrial, recreational, and tertiary
DESCRIPTION
15,000 sqm
located on the border of the City sections, with a part set aside for > Industry, offices and craft:
of Turin, was established as the accommodation and commercial use 70%
headquarters of SIDAUTO, the
exclusive importer for Italy of the
Saab and Mazda car brands. From
and a minor part for non-permanent
residence.
The area around it is characterized
27,0 KM
FROM S.I.TO FREIGHT
> Accommodation and
commercial activities: 20%
> Temporary housing: 10%
2003 to 2010 it hosted SPARCO, by profound urban planning and VILLAGE
an Italian company specialized in road changes taking place, including:
components and technical clothing the new road link with the Turin-
for automotive competitions. Milan motorway; the construction UTILITIES NORTH
1,8
Currently the site is occupied by of the Falchera Park of lakes
4 industrial sheds and an office and the executive arrangement KM Electric
Sewerage
building. agreement for the construction FROM TORINO STURA
The PRGC allows the inclusion of new of new residences and trade in a Water
RAILWAY STATION Phone
intended uses for a total of 15,000 neighbouring area.
square meters divided into artisanal, Broadband
14 2,0 KM
FROM THE A4
TYPOLOGY AND STATE OF PRESERVATION
IDENTIFICATION CODE
HOMOGENEOUS ZONES 4 Ivrea
TORINO-MILAN Greenfield
MOTORWAY JUNCTION Building New
Good
Mediocre
Poor
Rivarolo C.
Bad
Lanzo Torinese
Cirié
Volpiano RECLAMATIONS REQUIRED
Chivasso
SETTIMO TORINESE Susa Venaria R.
There are no reports in the Acts
FORMER SIDAUTO/SPARCO about the need for activation of the
Torino
Rivoli environmental matrix remediation
procedure.
Chieri
Moncalieri
NOTES
CONTACTS Pinerolo
for the property: sig.ra Giulia Pagani The transformation of the area
Mail: gpagani@sidit.com is subject to an Executive Urban
technical references: Negozio Blu Architetti Planning Tool, which has the task of
Phone: (+39) 011.19211833
defining the distribution of permitted
Mail: n.blu@tiscali.it
uses.40 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 41
MUNICIPALITY OF SETTIMO TORINESE
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
13,0 KM
AERFERRISI BUILDING
> Land Surface
FROM TURIN AIRPORT 17,000 sqm
> Built-up area allowed
5,570 sqm
VIA CEBROSA 5 38,0KM
FROM THE AMBROGIO
> Existing gross floor area
11,390 sqm
GATEWAY OF
CANDIOLO > Gross floor area allowed
The building, with two floors and Turin-Milan railway line and the A4-
DESCRIPTION
n.d.
a basement, is composed of a part A5 motorway exit. It is also close to
dedicated to offices and a part the Turin Stura railway station. > Production area
dedicated to warehouses.
The area, with excellent accessibility
and visibility, is located close to the
26,0 KM
FROM S.I.TO FREIGHT
10,000 sqm
> Offices
VILLAGE 2,500 sqm
UTILITIES
NORTH
1,8 KM
FROM TORINO STURA
Electric
Sewerage
Water
RAILWAY STATION Phone
Broadband
15 1,7 KM
FROM THE A4
TYPOLOGY AND STATE OF PRESERVATION
Greenfield
IDENTIFICATION CODE Building New
HOMOGENEOUS ZONES 4 Ivrea
TORINO-MILANO Good
MOTORWAY JUNCTION Mediocre
Poor
Bad
Rivarolo C.
Lanzo Torinese RECLAMATIONS REQUIRED
Cirié
Presence of asbestos cement roofing.
Volpiano
Chivasso
There are no reports in the Acts
about the need for activation of the
SETTIMO TORINESE Susa Venaria R. environmental matrix remediation
AERFERRISI BUILDING
Torino
procedure.
Rivoli
Chieri
Moncalieri
Pinerolo
CONTACTS
Paolo FERRISI
Phone: (+39) 011 2740283
Mail: info@aerferrisi.com42 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 43
MUNICIPALITY OF SETTIMO TORINESE
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
15,0 KM
FORMER PIRELLI
> Land Surface
FROM TURIN AIRPORT 276,517 sqm
> Index of territorial buildability
0.8 sqm/sqm
LAGUNA VERDE - VIA TORINO 91 38,0KM
FROM THE AMBROGIO
> Land uses according to the
current Urban Masterplan (PRG):
GATEWAY OF mixed residential, advanced
tertiary, commercial, research,
The former PIRELLI is part of the This portion is located along the axis
CANDIOLO
DESCRIPTION
crafts and services
area called “Laguna Verde”, one of of via Torino and is characterized by
the largest urban redevelopment excellent accessibility thanks to the > Forecasts for land use and
projects designed today in Italy, recent construction of a road link building capacities are under
both for the size involved and for the
conceptual level of the project.
that directly connects the area to the
Turin ring road system. 27,0 KM
FROM S.I.TO FREIGHT
discussion with the Municipality
of Settimo Torinese
VILLAGE UTILITIES
Electric NORTH
Sewerage
Water
2,5KM
FROM TORINO STURA
Phone
Broadband
RAILWAY STATION TYPOLOGY AND STATE OF PRESERVATION
Greenfield
Building New
16
IDENTIFICATION CODE 2,5 KM
Good
Mediocre
Poor
HOMOGENEOUS ZONES 4 Ivrea
FROM THE MOTORWAY Bad
JUNCTION
RECLAMATIONS REQUIRED
Reclamation procedure in progress.
Rivarolo C.
Part of the area, about 88,000 square
Lanzo Torinese meters, is currently empty and partially
excavated following land reclamation
Cirié
activities. The reclamation consisted
Volpiano
Chivasso
essentially in the excavation, screening
and disposal of the thin fraction
SETTIMO TORINESE Susa Venaria R. of contaminated land with a land
FORMER PIRELLI
Torino
reclamation target for residential
Rivoli
use. The remediation activities were
Chieri positively tested by the competent
Moncalieri bodies and the remaining part of the
area was subjected to environmental
quality assessment. The Risk Analysis
Pinerolo
and the Land Remediation Operational
NOTES Project must be presented. On site
CONTACTS there are buildings already completely
Marco LANATA A part of the area is subject to the reclaimed from materials containing
Phone: (+39) 335.8484845
detailed plan for the area Mf13 of the asbestos. Monitoring of groundwater is
Mail: marco.lanata@pirelli.com
Urban Masterplan. underway.44 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 45
MUNICIPALITY OF RIVAROLO CANAVESE
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
22,0 KM
FORMER EATON
> Land Surface
FROM TURIN AIRPORT 57,800 sqm
> Built-up area allowed
25,000 sqm
VIA BICOCCA, 28 59,0KM
FROM THE AMBROGIO
> Existing gross floor area
n.d.
GATEWAY OF
CANDIOLO > Gross floor area allowed
The former EATON housed one of the the Canavese area; accessibility
DESCRIPTION
n.d.
two plants of the US multinational and connection with the rest of the
EATON in Rivarolo. territory are guaranteed by the > Production area
The company used to produce valves
for the automotive sector and closed
at the start of 2006.
SP460 and by the Rivarolo Canavese
railway station. Around the area,
there are commercial activities and
45,0 KM
FROM S.I.TO FREIGHT
19,800 sqm
> Offices
The plant is centrally located in houses. VILLAGE 5,400 sqm
UTILITIES NORTH
1,5 KM
FROM RIVAROLO
Electric
Sewerage
Idrica
RAILWAY STATION Phone
Broadband
10,0
TYPOLOGY AND STATE OF PRESERVATION
17
IDENTIFICATION CODE
KM
FROM THE A5 Greenfield
Building New
HOMOGENEOUS ZONES 8 Ivrea
TORINO-AOSTA Good
MOTORWAY JUNCTION Mediocre
Poor
Bad
Rivarolo C.
RIVAROLO CANAVESE Lanzo Torinese RECLAMATIONS REQUIRED
FORMER EATON
Cirié
Remediation activities are in progress.
Volpiano
Chivasso
Susa Venaria R.
Torino
Rivoli
Chieri
Moncalieri
CONTACTS
Paolo BARETTA
Phone (+39) 011 2208243 Pinerolo
Mail: paolobaretta@eaton.com
Luigi LONGO
Phone: (+39) 334.6254606
Mail: luigilongo@eaton.com46 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 47
MUNICIPALITY OF RIVAROLO CANAVESE
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
22,0 KM
PR14 AREA
> Land Surface
FROM TURIN AIRPORT 20,947 sqm
> Built-up area allowed
about 5,000 sqm
VIA OLIVETTI 3 56,0 KM
FROM THE AMBROGIO
> Existing gross floor area
4,434 sqm
GATEWAY OF > Production area
CANDIOLO 4,205 sqm
The PR14 area consists of a disused facing road SP460 guarantees the
DESCRIPTION
> Offices
company within the industrial area of accessibility and connection with the 291 sqm
Rivarolo Canavese. rest of the territory. > Housing
In the surrounding area there are
industrial and commercial activities,
44,0 KM
FROM S.I.TO FREIGHT
118 sqm
as well as residential fabric. The > Gross floor area allowed
VILLAGE 12,568 sqm
2,0 KM
FROM RIVAROLO
UTILITIES
Electric
NORTH
Sewerage
CANAVESE RAILWAY
Water
STATION Phone
Broadband
18 10,0 KM
FROM THE A5
TYPOLOGY AND STATE OF PRESERVATION
IDENTIFICATION CODE
HOMOGENEOUS ZONES 8 Ivrea
TORINO-AOSTA Greenfield
MOTORWAY JUNCTION Building New
Good
Mediocre
Poor
Rivarolo C.
Bad
RIVAROLO CANAVESE Lanzo Torinese
PR14 AREA
Cirié
Volpiano
RECLAMATIONS REQUIRED
Chivasso
The covers of the sheds, in fiber cement,
Susa Venaria R. need to be reclaimed.
Torino There are no reports in the Acts
Rivoli
about the need for activation of the
Chieri environmental matrix remediation
Moncalieri procedure.
Pinerolo
CONTACTS
Massimiliano LEONE
Phone: (+39) 342.1472151
Mail: leone.massim@gmail.com48 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 30METRO PROJECT | CITTÀ METROPOLITANA DI TORINO 49
MUNICIPALITY OF SAN GIORGIO CANAVESE
SPECIFIC INFORMATION
SURFACE DIMENSIONS AND DETAILS
30,0 KM
FORMER PININFARINA
> Land Surface
FROM TURIN AIRPORT 196,000 sqm industrial area
> 138,000 sqm agricultural area
> Built-up area allowed
STRADA PROVINCIALE 53 55,0 KM
FROM THE AMBROGIO
37,876 sqm
> Existing gross floor area
GATEWAY OF 38,000 sqm
CANDIOLO
The PININFARINA plant was The plant ceased its activity in 2011,
DESCRIPTION
> Gross floor area allowed
established in 1987 to produce the the last of the three Pininfarina 27,000 sqm
Cadillac Allanté. In the following plants (the other two were located in
44,0KM
years, it became the production site Grugliasco and Bairo Canavese). > Production area
for other successful models, such The complex is located near the A5 35,148 sqm
as the Fiat Coupé, the Peugeot 406 Valle d’Aosta motorway junction.
Coupé and the Lancia K SW.
FROM S.I.TO FREIGHT
> Offices
VILLAGE
670 sqm
> Services NORTH
9,0
1,132 sqm
KM
FROM FELETTO
RAILWAY STATION UTILITIES
Electric
Sewerage
19
Water
IDENTIFICATION CODE
8,0 KM
FROM CALUSO
Phone
Broadband
HOMOGENEOUS ZONES 8 Ivrea RAILWAY STATION
TYPOLOGY AND STATE OF PRESERVATION
Greenfield
SAN GIORGIO CANAVESE
FORMER PININFARINA
Lanzo Torinese
Rivarolo C.
0,2 KM
FROM THE A5
Building New
Good
Mediocre
Cirié
TORINO-AOSTA Poor
Volpiano
Chivasso
MOTORWAY JUNCTION Bad
Susa Venaria R.
Rivoli
Torino RECLAMATIONS REQUIRED
Chieri Remediation procedure (risk analysis)
Moncalieri completed, with the adoption of some
constraints and control obligations.
Pinerolo
CONTACTS
Gianfranco ALBERTINI
Phone: (+39) 335.5774917
Mail: g.albertini@pininfarina.itYou can also read