WYNDHAM NORTH DEVELOPMENT CONTRIBUTIONS PLAN - PSP1088 OAKBANK PSP1089 TARNEIT NORTH
←
→
Page content transcription
If your browser does not render page correctly, please read the page content below
PSP1088
OAKBAN
K
PSP108
TARNEIT 9
NORTH
PSP1090
TRUGAN
INA
PSP1091
RIVERDA
LE
WYNDHAM NORTH
DEVELOPMENT CONTRIBUTIONS PLAN
June 2013WYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN ii SM | 20130531 04:43
WYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
CONTENTS
1.0 INTRODUCTION 3
PLANS
1.1 Report structure 3
Plan 1 Development Contributions Plan area 4
1.2 Strategic basis 3
Plan 2 Charge areas 6
1.3 Planning and Environment Act 1987 3
1.4 Strategic Planning for Wyndham North 5 Plan 3 Road & bridge projects 10
1.5 Wyndham North Precinct Structure Plans 5 Plan 4 Intersection projects 12
1.6 The area to which the Development Contributions Plan applies 7 Plan 5 Open space, active recreation projects & community facillities 16
1.7 Related infrastructure agreements 7
1.8 Project identification 7
2.0 INFRASTRUCTURE PROJECT JUSTIFICATION 8
2.1 Items not included in the Development Contributions Plan 8 TABLES
2.2 Infrastructure projects 9
Table 1 Summary of charges 2
2.3 Project timing 19
Table 2 Charge areas 7
2.4 Distinction between Development and Community Infrastructure 19
Table 3 Road & bridge projects 9
3.0 CALCULATION OF CONTRIBUTIONS 20 Table 4 Intersection projects 13
3.1 Calculation of Net Developable Area and demand units 20 Table 5 Recreation projects 17
3.2 Calculations of contributions charges 22 Table 6 Community facility projects 18
3.3 Cost apportionment 23 Table 7 Community infrastructure levy projects 19
4.0 DEVELOPMENT CONTRIBUTIONS PLAN ADMINISTRATION 30 Table 8 Summary land use budget 21
Table 9 Calculation of costs 24
4.1 Payment of contribution levies and payment timing 30
Table 10 Infrastrucutre delivery priorities 33
4.2 Funds administration 32
4.3 Construction and land value costs indexation 32
4.4 Development Contributions Plan review period 32
4.5 Collecting Agency (agency responsible for collecting infrastructure levy) 32
4.6 Development Agency (agency responsible for works) 32
5.0 IMPLEMENTATION STRATEGY 33
5.1 Rationale for the implementation strategy 33
5.2 Implementation mechanism 33
6.0 OTHER INFORMATION 34
6.1 Acronyms 34
6.2 Glossary 34
1WYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
The following table provides an overview of the project categories and charges included within this DCP.
A more detailed explanation of apportionment, methods of calculation, and the description and costs of
individual projects is included within the document.
Table 1 Summary of Charges
SUMMARY - NET DEVELOPABLE AREA (NDA) BY CHARGE AREA
CHARGE AREA HECTARES PROPORTION OF TOTAL
Residential (RNDA) 2,689 90%
Employment (ENDA) 302 10%
TOTAL 2,991 100%
SUMMARY - DEVELOPMENT INFRASTRUCUTRE LEVY
CHARGE AREAS
PROJECTS TOTAL COST OF PROJECTS
CONTRIBUTING
Transport $491,646,757 Residential & employment
Recreation $179,182,419 Residential
Community $67,607,658 Residential
TOTAL $738,436,835
SUMMARY - DEVELOPMENT INFRASTRUCTURE LEVY BY CHARGE AREA
CONTRIBUTION PER NET
TOTAL COST OF
CHARGE AREA DEVELOPABLE HECTARE
CONTRIBUTION
(P/NDHA)
Residential $688,744,043 $256,150
Employment $49,692,791 $164,366
SUMMARY - BREAKDOWN OF DEVELOPMENT INFRASTRUCTURE LEVY
RESIDENTIAL (P/NDHA) EMPLOYMENT (P/NDHA)
Land $57,517 $19,130
Construction $198,632 $145,236
TOTAL $256,150 $164,366
SUMMARY - NET DEVELOPABLE AREA (NDA) BY CHARGE AREA
ESTIAMATED TOTAL
ESTIMATED DWELLINGS
CONTRIBUTION
Capped at $900 per dwelling 41,135 $37,021,451
2 SM | 20130531 04:43WYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
1.0 INTRODUCTION 1.1 REPORT STRUCTURE 1.2 STRATEGIC BASIS
The Wyndham North Development Contributions Plan (the ‘DCP’) has been This document comprises five parts: The strategic basis for the DCP is established by the State and Local Planning
prepared by the Growth Areas Authority with the assistance of Wyndham Policy Framework of the Wyndham Planning Scheme. The key documents
City, service authorities and other major stakeholders. are the:
The DCP: •• Growth Corridor Plans
•• Outlines projects required to ensure that future residents, visitors and •• Municipal Strategic Statement
workers in the area can be provided with timely access to infrastructure STRATEGIC BASIS
•• Wyndham Infrastructure Financing Policy and Framework for
and services necessary to support a quality and affordable lifestyle. Section 1.0 clearly explains the strategic basis for the Development Contributions Infrastructure Financing
Plan, which includes informantion about the various Wyndham North Precinct
•• Establishes a framework for development proponents to make a financial
Structure Plans. Section 2.0 provides justification for the various infrastructure
•• Oakbank Precinct Structure Plan
contribution towards the cost of the identified infrastructure projects.
It ensures that the cost of providing new infrastructure and services is
projects included in the Development Contributions Plan. •• Tarneit North Precinct Structure Plan
shared equitably between various development proponents and the •• Truganina Precinct Structure Plan
wider community. •• Riverdale Precinct Structure Plan
•• Provides the details of the calculation of financial contributions that must •• Relevant Precinct Structure Plan supporting documents.
be made by future developments towards the nominated projects. In CALCULATION OF CONTRIBUTIONS These documents set out a broad, long term vision for the sustainable
this way, it provides developers, investors and local communities with Section 3.0 sets out how the development contributions are calculated and costs development of the DCP area and its surrounds.
certainty about development contributions requirements and how these apportioned.
will be administered. The Growth Corridor Plans illustrate the planned extent of residential,
employment and other development as well as the location of larger activity
centres for each growth area. They also include key elements of infrastructure
and services such as the regional open space network, metropolitan public
transport networks, freeways and arterial roads.
ADMINISTRATION AND IMPLEMENTATION
Section 4.0 focuses on administration of the Development Contributions Plan. 1.3 PLANNING AND ENVIRONMENT ACT 1987
The DCP has been prepared in accordance with Part 3B of the Planning and
Environment Act 1987 (the Act) as well as other relevant legislation and has
been developed in line with the State and Local Planning Policy Framework
of the Wyndham Planning Scheme. It is consistent with the Minister for
IMPLEMENTATION
Planning’s Direction on Development Contributions made under section
Section 5.0 focuses on implementation of the Development Contributions Plan
46M(1) of the Act and has had regards to the Victorian Government’s
and identifies infrastructure delivery priorities.
Development Contributions Guidelines (the ‘DCP Guidelines’).
The DCP provides for the charging of a Development Infrastructure
Levy pursuant to section 46J(a) of the Act towards works, services and
facilities. It also provides for the charging of a Community Infrastructure
OTHER INFORMATION Levy pursuant to section 46J(b) of the Act as some items are classified as
community infrastructure by reference to the Act, the Minister’s Direction on
Section 6.0 provides other supporting information.
Development Contributions and the DCP guidelines.
The DCP forms part of the Wyndham Planning Scheme pursuant to section
46I of the Act and is an incorporated document under Clause 81 of the
Wyndham Planning Scheme.
The DCP is implemented in the Wyndham Planning Scheme through
Schedule 13 to the Development Contributions Plan Overlay which applies
to the area shown in Plan 1.
3Precinct Structure Plan BOUNDARY ROAD
Wyndham North DCP area
ROAD
DERRIMUT
k
ee
Cr
R)
M
on
(O
et
l
AD PSP1090
Ske
RO
NG PSP1089 TRUGANINA
RI
AN
LIT TARNEIT NORTH
O PSP1088
ain
P DOHERTYS
RO ROAD
Dr
ET OAKBANK
M
ROAD
R
ad
TE
OU
Dry
o
h R
Cr
TARNEIT
syt
ee
k
F or
REGION
AL RAIL
LINK (R
RL)
LEAKES RO
AD
FORSYTH ROAD
LEAKES ROAD
D
av
AD
PSP1091
is
DAVIS RO
Cre
RIVERDALE
ek
D
NG ROA
W e rri
b
ARMSTRO
ee
Ri
ve
r
Plan 1 Future Urban Structure
plan 1
development contributions plan area
BA
LL
AN
wyndham north development contributions plan 0 200 400 600 800 1km
RO
AD
AD
ROWYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
1.4 STRATEGIC PLANNING FOR WYNDHAM NORTH 1.5 WYNDHAM NORTH PRECINCT STRUCTURE PLANS The wider sub-corridor planning process confirmed:
The Wyndham North sub-corridor includes around 4,000 hectares of land The four Wyndham North PSPs (the PSPs) set out the vision for how land
•• A detailed NDA for each PSP based on a survey of encumbrances and a
broad allocation of community facilities.
in the Urban Growth Zone, which was rezoned as part of the 2010 Urban should be developed, illustrate the future urban structure and describe the
Growth Boundary change. objectives to be achieved by the future development. They also outline •• All road, intersection, bridge, and culvert projects required to service the
projects required to ensure that future residents, visitors and workers new community.
The proximity of the four Wyndham North precincts to each other and
their location adjacent to existing development has allowed the strategic
within the area are provided with timely access to services and transport •• The provision ratio for sporting reserves, schools, and community centres.
infrastructure necessary to support a quality affordable lifestyle.
planning of the sub-corridor to proceed on an integrated basis, with each Accordingly, the PSPs may refine the location and layout of some items
PSP considering not only its individual needs, but also how it will integrate The PSPs enable urban development and the future urban structure of the included in this DCP but will not change the project list nor the overall rate.
with and relate to adjoining areas. The transport, community and recreation new communities are depicted through a number of networks, including
needs of the future community have all been considered in terms of the transport, open space and active recreation, social infrastructure, town
whole sub-corridor. centres, housing and places for local employment.
The need for the infrastructure included within the DCP has been determined 1.5.1 Oakbank (PSP 1088)
according to the anticipated development of the Wyndham North sub-
corridor. The DCP has been prepared in conjunction with the Precinct The Oakbank PSP will ultimately accommodate approximately 28,363 people
Structure Plans through a sub-corridor wide planning process. This process and 10,130 dwellings. At the time of writing, this PSP is currently being
provided the rationale and justification for infrastructure items that have prepared and is expected to be reviewed by Government Agencies in mid
been included. Accordingly, the DCP is an implementation based planning 2013.
tool which identifies the infrastructure items required by the new community
and apportions the cost of this infrastructure in an equitable manner across 1.5.2 Tarneit North (PSP 1089)
the plan area. The Tarneit North PSP will ultimately accommodate approximately 28,139
Where a Precinct Structure Plan was not available at the time of publication, people and 10,050 dwellings. At the time of writing, this PSP is currently
the DCP makes assumptions for required infrastructure consistent with being prepared and is expected to be reviewed by Government Agencies in
the population forecasts prepared through the sub-corridor background mid 2013.
planning and standard provision ratios. While the DCP has determined the 1.5.3 Truganina (PSP 1090)
number and size of facilities required within each precinct, the PSP will
determine the configuration and location. The Truganina PSP will ultimately accommodate approximately 23,470
people and 8,382 dwellings. At the time of writing, this PSP is currently in
The Wyndham North Background Report provides an overview of the sub- draft and will be placed on exhibition in mid-late 2013.
corridor planning process.
1.5.4 Riverdale (PSP 1091)
The Riverdale PSP will ultimately accommodate approximately 34,039 people
and 12,157 dwellings. At the time of writing, this PSP is currently in draft and
will be placed on exhibition with the DCP.
52 EMPLOYMENT BOUNDARY ROAD
ROAD
DERRIMUT
k
ee
Cr
R)
M
on
(O
et
l
AD
Ske
RO
NG
RI
AN
LIT
1 RESIDENTIAL
O
ain
P DOHERTYS
RO ROAD
Dr
ET
M
ROAD
R
d
TE
D
oa
U
Dry
MORRIS ROA
O
h R
Cr
TARNEIT
syt
ee
k
F or
REGION
AL RAIL
LINK (R
POS 01
RL)
LEAKES RO
AD
AD
FORSYTH ROAD
RO
N
ISO
LEAKES ROAD
SAYERS R
OAD
D
av
AD
is
DAVIS RO
Cre
ek
HO
GA
NS
RO
AD
D
NG ROA
W e rri
b
ARMSTRO
ee
Ri
ve
r
Plan 2 Charge Areas
plan 2
BA
charge areas
LL
AN
wyndham north development contributions plan
RO
0 200 400 600 800 1km
AD
AD
ROWYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
1.6 THE AREA TO WHICH THE DEVELOPMENT 1.7 RELATED INFRASTRUCTURE AGREEMENTS
CONTRIBUTIONS PLAN APPLIES There are a number of infrastructure agreements that relate to the Wyndham
In accordance with section 46K(1)(a) of the Planning and Environment Act North DCP area. These include the Truganina Employment DCP, the Truganina
1987 the DCP applies to land shown in Plan 1. The area is also shown on South DCP and the Wyndham North Concept Plan and associated Section
Development Contributions Plan Overlay Schedule 13 in the Wyndham 173 agreements of the Planning and Environment Act 1987 that have been
Planning Scheme. entered into. Infrastructure projects impacted by these agreements (along
Leakes and Forsyth Roads) have external apportionments to take these
The DCP applies to approximately 2,991 Net Developable Hectares of land previous agreements into consideration.
which is divided into two charge areas as shown in Plan 2..
1.8 PROJECT IDENTIFICATION
Table 2 Charge areas
The project identification system used in the DCP has been designed to
assist in understanding of and navigation through the document. Road,
CHARGE AREA NET DEVELOPABLE AREA bridge, intersection, and community facility projects use the identification
system of project category, PSP number, and a sequential project number.
As an example, a road project in Truganina (PSP 1090) will have the project
Charge Area 1 – Residential 2,689 hectares identifier similar to RD-90-01.
Charge Area 2 – Employment 302 hectares The project cateogires are summarised as:
•• RD - Roads
The DCP clearly demonstrates the infrastructure required to service the •• BR - Bridges & culverts
broader development sub-corridor. In selecting items, consideration has •• IN - Intersections
been given to ensure they are not already wholly funded through another
contribution mechanism, such as a mandatory infrastructure construction •• CO - Community facilities
requirement of the PSPs, an existing local development contributions plan, Sporting reserves are given different identifiers relating to the rates applied
an agreement under Section 173 of the Act or as a condition on an existing to broad projects. AR denotes land and construction costs, AP denotes
planning permit. Identified overlap in funding has been addressed, for pavilions, and AI denotes active indoor recreation.
example by adjusting other relevant development contributions plans or
other suitable means provided for in the Planning and Environment Act.
Parts of Oakbank (PSP 1088) and Tarneit North (PSP 1089) include highly
fragmented land ownership. This fragmentation will require additional
infrastructure projects to ensure a more equitable outcome for landowners.
These additional infrastructure projects would usually be considered
developer works and will be included in a separate DCP that will be prepared
by Council at a later date. Infrastructure included within additional local DCPs
might include connector roads and associated bridges and primary links in
the shared path network.
7WYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
2.0 INFRASTRUCTURE PROJECT JUSTIFICATION 2.1 ITEMS NOT INCLUDED IN THE DEVELOPMENT The delivery of the State Infrastructure items will be provided as warranted
and as funds become available, which may potentially include Growth Area
CONTRIBUTIONS PLAN Infrastructure Charge (GAIC) Work in Kind projects.
The need for infrastructure included in the DCP has been determined
according to the anticipated development of the Wyndham North sub- The following items are not included in the DCP, as they are considered to Land for and construction of the following items has not been included within
corridor. be normal to the construction of a development and are not considered to the DCP as they will be delivered as part of the Regional Rail Link project:
warrant cost sharing arrangements beyond those set out in this DCP and
Items can be included in a development contributions plan if they will be
must be provided by developers as a matter of course in implementing the •• Leakes Road bridge crossing of the Regional Rail Link.
used by the future community of an area. New development does not
have to trigger the need for new items in its own right. The development is
PSPs: •• Davis Road bridge crossing of the Regional Rail Link.
charged in line with its projected share of use. An item can be included in a •• Internal streets and connector streets, creek and drainage line crossings •• Tarneit Road bridge crossing of the Regional Rail Link.
development contributions plan regardless of whether it is within or outside and associated traffic management measures (except where nominated
in this DCP).
•• Derrimut Road bridge crossing of the Regional Rail Link.
the DCP area.
•• Dohertys Road bridge crossing of the Regional Rail Link.
Before inclusion in the DCP, all items have been assessed to ensure they •• Waterway management works and drainage systems.
•• Boundary Road bridge crossing of the Regional Rail Link.
have a relationship or nexus to proposed development in the DCP area. The •• Intersections connecting the development to the existing road network,
cost apportionment methodology adopted in the DCP relies on the nexus except where specified as development contributions plan projects. •• Tarneit train station.
principle. A new development is deemed to have a nexus with an item if its
•• Water, sewerage, underground power, gas and telecommunications •• Shared path bridge crossing of the Werribee River associated with the
future residents or employees are expected to make use of that item. Regional Rail Link.
services.
A summary of how each item is related to proposed development within the
DCP area is set out below and individual item apportionments are identified
•• Local pathways and connections to the regional and / or district pathway Duplication of any roads not considered a State responsibility at the time
network. would be undertaken by Council.
in Table 9.
•• Shared path networks, including required crossings of waterways.
The items that have been included in the DCP all have the following
characteristics: •• Basic levelling, provision of biodiversity offsets, water tapping and
landscaping of local active and passive open space.
•• They are essential to the health, safety and well being of the community.
•• Passive public open space reserve master plans and any agreed associated
•• They will be used by a broad cross-section of the community. works required by the PSPs.
•• They reflect the vision and objectives expressed in the Wyndham North •• Council’s plan checking and supervision.
PSPs.
•• Bus stops.
•• They are not recurrent items.
These items may be further addressed and defined by an agreement under
•• They are the basis for the future development of an integrated network. s173 of the Act and / or conditions in planning permits.
Construction of the following items has not been included within the DCP as
they are determined to be State Infrastructure items:
•• Second and third carriageway of Ison Road.
•• Ison Road bridge crossing of the Werribee River.
•• Second and third carriageway of Derrimut Road.
•• Derrimut Road bridge crossing duplication of the Regional Rail Link.
•• Forsyth Road bridge crossing of the Regional Rail Link.
•• Third carriageway of Leakes Road.
•• Third carriageway of Boundary Road.
•• Outer Metropolitan Ring Transport Corridor and associated interchanges.
•• Truganina train station.
•• Davis Road train station.
•• Riverdale train station.
•• Second pedestrian bridge crossing of the Werribee River.
•• Government primary or secondary schools.
8 SM | 20130531 04:43WYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
2.2 INFRASTRUCTURE PROJECTS 2.2.1 Transport projects The DCP also includes new road bridges across the RRL at Morris and Sayers
Roads and the duplication of the Dohertys Road bridge as they are considered
The following three types of projects are included in the DCP (refer to Plans The transport related projects in the DCP are based on the transport network to be essential to the connectivity of the overall road network.
3-6): depicted in Plan 3 which is supported by the West Growth Area Corridor Plan
and the Wyndham North PSPs. The transport projects include a combination The DCP has also funded a number of pedestrian crossings of the Regional
•• Transport of: Rail Link. These crossings have been included in locations where there is an
•• Recreation •• Road construction (including land and waterway crossing requirements)
absence of another crossing (such as a road, station or waterway underpass)
in order to link communities on either side of the rail line.
•• Community •• Construction of major controlled intersections and associated works
The following road and bridge projects shown in Plan 3 are funded by the DCP:
Table 3 Road & bridge projects
DCP INDICATIVE
CHARGE AREAS
PROJECT PROJECT TITLE - ROADS PROJECT DESCRIPTION - ROADS PROVISION
CONTRIBUTING
NUMBER TRIGGER
Davis Road (Dohertys Road to Purchase of land to widen road reserve from 20m wide to 41m wide (ultimate treatment) and upgrade of existing carriageway for 523m, excluding intersections Residential & At time of
RD-88-01
Boundary Road) (interim treatment) Employment subdivision
Purchase of land to widen road reserve from 20m wide to 34m wide (ultimate treatment) and upgrade of existing carriageway for 532m, excluding intersections Residential & At time of
RD-88-02 Davis Road (Dohertys Road to RRL)
(interim treatment) Employment subdivision
Residential & At time of
RD-88-03 Ison Road Purchase of land to create road reserve 41m wide (ultimate treatment) and construction of carriageway for 1,791m, excluding intersections (interim treatment)
Employment subdivision
Sayers Road extension (RRL to Ison Residential & At time of
RD-88-04 Purchase of land to create road reserve 34m wide (ultimate treatment) and construction of carriageway for 136m, excluding intersections (interim treatment)
Road) Employment subdivision
Purchase of land to widen road reserve from 20m wide to 41m wide (ultimate treatment) and upgrade of existing carriageway for 1,075m, excluding intersections Residential & At time of
RD-88-05 Leakes Road (RRL to Ison Road)
(interim treatment) Employment subdivision
Dohertys Road (Ison Road to Davis Purchase of land to widen road reserve from 20m wide to 41m wide (ultimate treatment) and upgrade of existing carriageway for 1,213m, excluding intersections Residential & At time of
RD-88-06
Road) (interim treatment) Employment subdivision
Purchase of land to widen road reserve from 20m wide to 34m wide (ultimate treatment) and upgrade of existing carriageway for 1,265m, excluding intersections Residential & At time of
RD-89-01 Tarneit Road
(interim treatment) Employment subdivision
Leakes Road (Derrimut Road to Davis Purchase of land to widen road reserve from 20m wide to 41m wide (ultimate treatment) and construction of additional carriageway for 2,086m, excluding Residential & At time of
RD-89-02
Road) intersections (interim treatment). Includes relocation of 66Kv electricity line from Derrimut to Tarneit Road. Employment subdivision
Dohertys Road (Derrimut Road to Davis Purchase of land to widen road reserve from 20m wide to 34m wide (ultimate treatment) and upgrade of existing carriageway for 1,464m, excluding intersections Residential & At time of
RD-89-03
Road) (interim treatment) Employment subdivision
Dohertys Road (deviation from existing Purchase of land to widen road reserve 34m wide (ultimate treatment) and realignment of existing carriageway for 462m, excluding intersections (interim Residential & At time of
RD-89-04
reserve) treatment) Employment subdivision
Purchase of land to widen road reserve from 20m wide to 41m wide (ultimate treatment) and upgrade of existing carriageway for 1,661m, excluding intersections Residential & At time of
RD-89-05 Boundary Road (Derrimut to Davis)
(interim treatment) Employment subdivision
Forsyth Road (from Truganina
Residential & At time of
RD-90-01 EmploymentPrecinct to Boundary Purchase of land to widen road reserve 41m wide (ultimate treatment) and construction of carriageway for 600m, excluding intersections (interim treatment)
Employment subdivision
Road)
Residential & At time of
RD-90-02 Morris Road Purchase of land to widen road reserve 34m wide (ultimate treatment) and construction of carriageway for 1,207m, excluding intersections (interim treatment)
Employment subdivision
Leakes Road (Forsyth Road to Derrmiut Purchase of land to widen road reserve from 20m wide to 41m wide (ultimate treatment) and construction of additional carriageway for 1,865m, excluding Residential & At time of
RD-90-03
Road) intersections (interim treatment). Includes relocation of 66Kv electricity line from Forsyth to Derrimut Road. Employment subdivision
Dohertys Road (Forsyth Road to Purchase of land to widen road reserve from 20m wide to 34m wide (ultimate treatment) and upgrade of existing carriageway for 1,318m, excluding intersections Residential & At time of
RD-90-04
Derrimut Road) (interim treatment) Employment subdivision
Purchase of land to widen road reserve from 20m wide to 41m wide (ultimate treatment) and upgrade of existing carriageway for 1,414m, excluding intersections Residential & At time of
RD-90-05 Boundary Road (RRL to Derrimut Road)
(interim treatment) Employment subdivision
Purchase of land to widen road reserve from 20m wide to 34m wide (ultimate treatment) and upgrade of existing carriageway for 1,227m, excluding intersections Residential & At time of
RD-91-01 Davis Road (Sayers Road to RRL)
(interim treatment) Employment subdivision
9road project
bridge/culvert project
BOUNDARY ROAD
ROAD
DERRIMUT
k
ee
Cr
R)
M
on
(O
et
l
AD
Ske
RO
NG
RI
AN
OLIT
ain
P DOHERTYS
RO ROAD
Dr
ET
M
ROAD
R
d
TE
D
oa
OU
Dry
MORRIS ROA
h R
Cr
TARNEIT
syt
ee
k
F or
REGION
AL RAIL
LINK (R
POS 01
RL)
LEAKES RO
AD
AD
FORSYTH ROAD
RO
N
ISO
LEAKES ROAD
SAYERS R
OAD
D
av
AD
is
DAVIS RO
Cre
ek
HO
GA
NS
RO
AD
D
NG ROA
W e rri
b
ARMSTRO
ee
Ri
ve
r
Plan 3 Road & Bridge Projects
plan 3
BA
road & bridge projects
LL
AN
wyndham north development contributions plan
RO
0 200 400 600 800 1km
AD
AD
RO
THSWYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
DCP INDICATIVE
CHARGE AREAS
PROJECT PROJECT TITLE - ROADS PROJECT DESCRIPTION - ROADS PROVISION
CONTRIBUTING
NUMBER TRIGGER
Davis Road (Hogans Road to Sayers Purchase of land to widen road reserve from 20m wide to 34m wide (ultimate treatment) and upgrade of existing carriageway for 966m, excluding intersections Residential & At time of
RD-91-02
Road) (interim treatment) Employment subdivision
Residential & At time of
RD-91-03 Armstrong Road extension Purchase of land to create road reserve 34m wide (ultimate treatment) and construction of carriageway for 229m, excluding intersections (interim treatment)
Employment subdivision
Sewells Road (Armstrong Road to Purchase of land to widen road reserve from 20m wide to 34m wide (ultimate treatment) and upgrade of existing carriageway for 256m, excluding intersections Residential & At time of
RD-91-04
Sayers Road) (interim treatment) Employment subdivision
Hogans Road (Existing reserve Davis Purchase of land to widen road reserve from 20m wide to 34m wide (ultimate treatment) and upgrade of existing carriageway for 509m, excluding intersections Residential & At time of
RD-91-05
Road to Davis Creek) (interim treatment) Employment subdivision
Residential & At time of
RD-91-06 Hogans Road - Extension Purchase of land to widen road reserve 34m wide (ultimate treatment) and construction of carriageway for 845m, excluding intersections (interim treatment)
Employment subdivision
Purchase of land to widen road reserve from 20m wide to 34m wide (ultimate treatment) and upgrade of existing carriageway for 935m, excluding intersections Residential & At time of
RD-91-07 Sayers Road - Existing reserve
(interim treatment) Employment subdivision
Residential & At time of
RD-91-08 Sayers Road - Road realignment to RRL Purchase of land to widen road reserve 34m wide (ultimate treatment) and construction of carriageway for 215m, excluding intersections (interim treatment)
Employment subdivision
Purchase of land to widen road reserve from 20m wide to 41m wide (ultimate treatment) and upgrade of existing carriageway for 119m, excluding intersections Residential & At time of
RD-91-09 Leakes Road (Davis Road to RRL)
(interim treatment) Employment subdivision
DCP
CHARGE AREAS INDICATIVE PROVISION
PROJECT PROJECT TITLE - BRIDGES PROJECT DESCRIPTION - BRIDGES
CONTRIBUTING TRIGGER
NUMBER
BR-88-C1 Ison Road crossing of waterway (Standard culvert type C1) Construction of 2 x standard C1 culvert waterway crossings in PSP 1088 Residential & Employment At time of subdivision
BR-89-C1 Leakes Road crossing of waterway (Standard culvert type C2) Construction of 1 x standard C2 culvert waterway crossing in PSP 1089 Residential & Employment At time of subdivision
BR-89-C2 Boundary Road crossing of waterway (Standard culvert type C2) Construction of 2 x standard C2 culvert waterway crossings in PSP 1089 Residential & Employment At time of subdivision
BR-89-01 Boundary Road bridge over Dry Creek Construction of 2 lane bridge crossing of Dry Creek Residential & Employment At time of subdivision
BR-89-02 Tarneit Road bridge over Dry Creek Construction of 2 lane bridge crossing of Dry Creek Residential & Employment At time of subdivision
BR-89-03 Dohertys Road bridge over Dry Creek Construction of 4 lane bridge crossing of Dry Creek Residential & Employment At time of subdivision
BR-89-04 Pedestrian bridge across Regional Rail Link Construction of pedestrian bridge over Regional Rail Link in PSP 1089 Residential & Employment At time of subdivision
BR-90-C1 Boundary Road crossing of waterway (Standard culvert type C2) Construction of 1 x standard C1 culvert waterway crossings in PSP 1090 Residential & Employment At time of subdivision
BR-90-C2 Dohertys Road crossing of waterway (Standard culvert type C2) Construction of 1 x standard C2 culvert waterways crossings in PSP 1090 Residential & Employment At time of subdivision
BR-90-C3 Leakes Road crossing of water (Standard culvert type C2) Construction of 2 x standard C2 culvert waterways crossings in PSP 1090 Residential & Employment At time of subdivision
BR-90-C4 Forsyth Road crossing of waterway (Standard culvert type C2) Construction of 1 x standard C2 culvert waterways crossings in PSP 1090 Residential & Employment At time of subdivision
BR-90-01 Boundary Road bridge over Skeleton Creek Construction of 2 lane bridge crossing of Skeleton Creek Residential & Employment At time of subdivision
BR-90-02 Dohertys Road bridge over Skeleton Creek Construction of 2 lane bridge crossing of Skeleton Creek Residential & Employment At time of subdivision
BR-90-03 Leakes Road bridge over Skeleton Creek Construction of 2 lane bridge crossing of Skeleton Creek Residential & Employment At time of subdivision
BR-90-04 Morris Road bridge over Regional Rail Link Construction of 2 lane bridge crossing of Regional Rail Link Residential & Employment At time of subdivision
BR-90-05 Pedestrian bridge across Regional Rail Link Construction of pedestrian bridge over Regional Rail Link in PSP 1090 Residential & Employment At time of subdivision
BR-90-06 Duplication of Dohertys Road bridge over Reigonal Rail Link Construction of 2 lane bridge crossing of Regional Rail Link Residential & Employment At time of subdivision
BR-91-C1 Davis Road crossing over waterway (Standard culvert type C2) Construction of 1 x standard C2 culvert waterway crossing in PSP 1091 Residential & Employment At time of subdivision
BR-91-C2 Hogans Road crossing over waterway (Standard culvert type C2) Construction of 1 x standard C2 culvert waterway crossings in PSP 1091 Residential & Employment At time of subdivision
BR-91-01 Pedestrian bridge across Regional Rail Link Construction of pedestrian bridge over Regional Rail Link in PSP 1091 Residential & Employment At time of subdivision
BR-91-02 Sayers Road bridge over Regional Rail Link Construction of 2 lane bridge crossing of Regional Rail Link Residential & Employment At time of subdivision
11BOUNDARY ROAD
ROAD
DERRIMUT
k
ee
Cr
R)
M
on
(O
et
l
AD
Ske
RO
NG
RI
AN
OLIT
ain
P DOHERTYS
RO ROAD
Dr
ET
M
ROAD
R
d
TE
D
oa
OU
Dry
MORRIS ROA
h R
Cr
TARNEIT
syt
ee
k
F or
REGION
AL RAIL
LINK (R
POS 01
RL)
LEAKES RO
AD
AD
FORSYTH ROAD
RO
N
ISO
LEAKES ROAD
SAYERS R
OAD
D
av
AD
is
DAVIS RO
Cre
ek
HO
GA
NS
RO
AD
D
NG ROA
W e rri
b
ARMSTRO
ee
Ri
ve
r
Plan 4 Intersection Projects
plan 4
BA
intersections
LL
AN
wyndham north development contributions plan
RO
0 200 400 600 800 1km
AD
AD
S ROWYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
DCP
CHARGE AREAS INDICATIVE PROVISION
PROJECT PROJECT TITLE - BRIDGES PROJECT DESCRIPTION - BRIDGES
CONTRIBUTING TRIGGER
NUMBER
BR-91-03 Armstrong Road bridge over Werribee River Construction of 2 lane bridge crossing of Werribee River (50%) Residential & Employment At time of subdivision
BR-91-04 Hogans Road bridge over Davis Creek Construction of 2 lane bridge crossing of Davis Creek Residential & Employment At time of subdivision
BR-91-05 Pedestrian bridge across Werribee River Construction of pedestrian bridge over Werribee River Residential & Employment At time of subdivision
The following intersections projects shown in Plan 4 are funded by the DCP:
Table 4 Intersection projects
DCP INDICATIVE
CHARGE AREAS
PROJECT PROJECT TITLE - INTERSECTIONS PROJECT DESCRIPTION - INTERSECTIONS PROVISION
CONTRIBUTING
NUMBER TRIGGER
Residential & At time of
IN-88-01 Boundary Road / Davis Road Purchase of land for intersection totalling 0.48ha (ultimate treatment) and construction of arterial to arterial signalised T intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-88-02 David Road / East-West Connector Purchase of land for intersection totalling 2.03ha (ultimate treatment) and construction of arterial to industrial connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-88-03 David Road / East-West Connector Purchase of land for intersection totalling 1.07ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-88-04 Dohertys Road / Ison Road Purchase of land for intersection totalling 2.95ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-88-05 Dohertys Road / Gard Road Purchase of land for intersection totalling 0.81ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-88-06 Dohertys Road / Davis Road Purchase of land for intersection totalling 1.39ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Ison Road / East-West Connector Residential & At time of
IN-88-07 Purchase of land for intersection totalling 2.06ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Boulevard Employment subdivision
Residential & At time of
IN-88-08 Ison Road / East-West Connector Purchase of land for intersection totalling 2.02ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-88-09 Davis Road / East-West Connector Purchase of land for intersection totalling 0.85ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-88-10 Leakes Road / Ison Road Purchase of land for intersection totalling 2.80ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-88-11 Leakes Road / North-South Connector Purchase of land for intersection totalling 0.88ha (ultimate treatment) and construction of arterial to connector signalised T intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-88-12 Ison Road / Sayers Road Purchase of land for intersection totalling 3.16ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-88-13 Ison Road / East-West Connector Purchase of land for intersection totalling 1.35ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Boundary Road / North-South Residential & At time of
IN-89-01 Purchase of land for intersection totalling 0.51ha (ultimate treatment) and construction of arterial to connector signalised T intersection (interim treatment)
Connector Employment subdivision
Residential & At time of
IN-89-02 Boundary Road / Tarneit Road Purchase of land for intersection totalling 0.40ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Boundary Road / North-South Residential & At time of
IN-89-03 Purchase of land for intersection totalling 1.93ha (ultimate treatment) and construction of arterial to connector signalised T intersection (interim treatment)
Connector Blvd Employment subdivision
Residential & At time of
IN-89-04 Boundary Road / Derrimut Road Purchase of land for intersection totalling 2.20ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-89-05 Tarneit Road / Kenning Road Purchase of land for intersection totalling 1.00ha (ultimate treatment) and construction of arterial to industrial connector signalised 4-way intersection (interim treatment)
Employment subdivision
13WYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
DCP INDICATIVE
CHARGE AREAS
PROJECT PROJECT TITLE - INTERSECTIONS PROJECT DESCRIPTION - INTERSECTIONS PROVISION
CONTRIBUTING
NUMBER TRIGGER
Residential & At time of
IN-89-06 Derrimut Road / East-West Connector Purchase of land for intersection totalling 1.54ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Dohertys Road / North-South Connector Residential & At time of
IN-89-07 Purchase of land for intersection totalling 0.87ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Boulevard Employment subdivision
Residential & At time of
IN-89-08 Dohertys Road / Tarneit Road Purchase of land for intersection totalling 1.05ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-89-09 Dohertys Road / North-South Connector Purchase of land for intersection totalling 0.87ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-89-10 Dohertys Road / Derrimut Road Purchase of land for intersection totalling 1.13ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-89-11 Tarneit Road / East-West Connector Purchase of land for intersection totalling 1.12ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-89-12 Derrimut Road / East-West Connector Purchase of land for intersection totalling 1.77ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-89-13 Leakes Road / Cottesloe Boulevard Purchase of land for intersection totalling 0.77ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-89-14 Leakes Road / Tarneit Road Purchase of land for intersection totalling 1.30ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-89-15 Leakes Road / Crossway Avenue Purchase of land for intersection totalling 0.78ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-89-16 Leakes Road / Derrimut Road Purchase of land for intersection totalling 1.25ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Boundary Road / North-South Residential & At time of
IN-90-01 Purchase of land for intersection totalling 1.57ha (ultimate treatment) and construction of arterial to connector signalised T intersection (interim treatment)
Connector Employment subdivision
Residential & At time of
IN-90-02 Boundary Road / Morris Road Purchase of land for intersection totalling 0.60ha (ultimate treatment) and construction of arterial to arterial signalised T intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-03 Boundary Road / Forsyth Road Purchase of land for intersection totalling 0.81ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-04 Morris Road / East-West Connector Purchase of land for intersection totalling 1.13ha (ultimate treatment) and construction of arterial to industrial connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-05 Forsyth Road / East-West Connector Purchase of land for intersection totalling 2.18ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-06 Morris Road / East-West Connector Purchase of land for intersection totalling 1.20ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-07 Forsyth Road / East-West Connector Purchase of land for intersection totalling 2.73ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Dohertys Road / North-South Local Residential & At time of
IN-90-08 Purchase of land for intersection totalling 0.44ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Access L2 Employment subdivision
Residential & At time of
IN-90-09 Dohertys Road / North-South Connector Purchase of land for intersection totalling 0.75ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-10 Dohertys Road / Morris Road Purchase of land for intersection totalling 1.68ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-11 Dohertys Road / Woods Road Purchase of land for intersection totalling 0.82ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-12 Dohertys Road / Forsyth Road Purchase of land for intersection totalling 2.28ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
14 SM | 20130531 04:43WYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
DCP INDICATIVE
CHARGE AREAS
PROJECT PROJECT TITLE - INTERSECTIONS PROJECT DESCRIPTION - INTERSECTIONS PROVISION
CONTRIBUTING
NUMBER TRIGGER
Residential & At time of
IN-90-13 Morris Road / East-West Local Access L2 Purchase of land for intersection totalling 0.73ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-14 Morris Road / East-West Connector Purchase of land for intersection totalling 1.17ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-15 Leakes Road / Sunset Views Boulevard Purchase of land for intersection totalling 0.99ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-16 Leakes Road / Morris Road Purchase of land for intersection totalling 2.00ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-17 Leakes Road / Woods Road Purchase of land for intersection totalling 0.75ha (ultimate treatment) and construction of arterial to connector signalised T intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-90-18 Leakes Road / Forsyth Road Intersection fully funded from Truganina Employment DCP and Truganina South DCP
Employment subdivision
Residential & At time of
IN-90-19 Forsyth Road / East-West Connector Blvd Purchase of land for intersection totalling 0.89ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-91-01 Leakes Road / North-South Connector Purchase of land for intersection totalling 1.65ha (ultimate treatment) and construction of arterial to connector signalised T intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-91-02 Leakes Road / Davis Road Purchase of land for intersection totalling 1.26ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-91-03 Davis Road / East-West Connector Purchase of land for intersection totalling 0.52ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-91-04 Sayers Road / North-South Connector Purchase of land for intersection totalling 1.36ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-91-05 Sayers Road / Sewells Road Purchase of land for intersection totalling 1.00ha (ultimate treatment) and construction of arterial to arterial signalised T intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-91-06 Sayers Road / North-South Connector Purchase of land for intersection totalling 0.96ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-91-07 Davis Road / Sayers Road Purchase of land for intersection totalling 0.84ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-91-08 Sewells Road / East-West Connector Purchase of land for intersection totalling 0.60ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-91-09 Sewells Road / East-West Connector Purchase of land for intersection totalling 0.84ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-91-10 Armstrong Road / East-West Connector Purchase of land for intersection totalling 1.47ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
Armstrong Road /Sewells Road / Hogans Residential & At time of
IN-91-11 Purchase of land for intersection totalling 1.14ha (ultimate treatment) and construction of arterial to arterial signalised T intersection (interim treatment)
Road Employment subdivision
Hogans Road / North-South Connector Residential & At time of
IN-91-12 Purchase of land for intersection totalling 1.58ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Boulevard Employment subdivision
Hogans Road / North-South Connector Residential & At time of
IN-91-13 Purchase of land for intersection totalling 1.58ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Boulevard Employment subdivision
Residential & At time of
IN-91-14 Davis Road / Hogans Road Purchase of land for intersection totalling 1.45ha (ultimate treatment) and construction of arterial to arterial signalised 4-way intersection (interim treatment)
Employment subdivision
Residential & At time of
IN-91-15 Davis Road / East-West Connector Purchase of land for intersection totalling 0.65ha (ultimate treatment) and construction of arterial to connector signalised 4-way intersection (interim treatment)
Employment subdivision
15BOUNDARY ROAD
ROAD
DERRIMUT
k
ee
Cr
R)
M
on
(O
et
l
AD
Ske
RO
NG
RI
AN
LIT
PO
ain
DOHERTYS
RO ROAD
Dr
ET
M
ROAD
R
d
TE
D
oa
OU
Dry
MORRIS ROA
h R
Cr
TARNEIT
syt
ee
k
F or
REGION
AL RAIL
LINK (R
POS 01
RL)
LEAKES RO
AD
AD
FORSYTH ROAD
RO
N
ISO
LEAKES ROAD
SAYERS R
OAD
D
av
AD
is
DAVIS RO
Cre
ek
HO
GA
NS
RO
A D
D
NG ROA
W e rri
b
ARMSTRO
ee
Ri
ve
r
Plan 5 Sports Reserves
plan 5
BA
open space, active recreation projects & community facilities
LL
AN
wyndham north development contributions plan
RO
0 200 400 600 800 1km
AD
AD
ROWYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
2.2.2 Recreation facility projects The total land contribution compromises 16 individual reserves (four per
precinct) that will be identified by the relevant PSP.
The recreation contributions include:
The DCP provides an additional contribution per hectare of land designated
•• Provision of land for sports reserves
for active recreation reserves for the basic construction, surfacing, and
•• Contribution towards construction of sports facilities in open space landscaping of facilities.
reserves.
This flexible approach will allow the Development Agency to have regard to
•• Contribution towards construction of pavilions for future sports fields. matters such as changing provision standards and models, the immediate
The DCP provides a contribution for the purchase of land equivilant to needs of the community, current regulations and best practice and construct
7-per-cent of Residential Net Developable Area (RNDA) which equates to facilities that will best suit the needs of the future community.
approximately 188 hectares across the sub-corridor. The following recreation projects shown in Plan 5 are funded by the DCP:
The following recreation projects shown in Plan 5 are funded by the DCP:
Table 5 Recreation projects
DCP PROJECT CHARGE AREAS INDICATIVE
PROJECT TITLE - RECREATION PROJECT DESCRIPTION - RECREATION
NUMBER CONTRIBUTING PROVISION TRIGGER
Purchase of land equivilant to 7% of total RNDA and standard per-hectare rate for construction of sporting surfaces, infrastructure and
AR Active recreation resreves Residential At time of subdivision
basic landscaping.
AP Pavillions within active reserves Construction of sporting pavilions Residential At time of subdivision
AI Indoor sports contribution Purchase of land for two indoor sports facilities. Residential At time of subdivision
17WYNDHAM NORTH DEVELOPMENT CONTRIBUTION S PLAN
2.2.3 Community facility projects The community projects are based on the projections determined through In reviewing the scope of the facility, the Development Agency will have
the sub-corridor planning process, consistent with the range of facilities and regard to matters such as changing provision standards and models, the
The community projects include: provision ratio set out in research undertaken by the Growth Areas Authority, immediate needs of the community, current regulations and best practice
•• Land and construction of Level 1 community centres incorporating a ASR Research and assessment by Wyndham City (Planning for Community and may adjust and refine the scope of the facility to respond to these
double kindergarten throughout the PSPs. Infrastructure in Growth Area (2008), Wyndham Social Infrastructure Plan: matters.
•• Land and construction of Level 2 community centres incorporating a 2040 (2012)). The community facilities defined in these projects are the
best estimates of the future requirements and specifications of the future
The Development Agency may also adjust and refine the scope of the facility
double kindergarten and maternal and child health centre throughout to reflect the capacity of any non-DCP funds that can be made available (for
the PSPs. Wyndham North community.
example from a grant or some other funding stream).
•• Land and construction of Level 3 community centres incorporating The detailed design and scope (as defined in Table 5) of each of the following
In adjusting and refining any final project scope the Development Agency
a double kindergarten, maternal and child health centre, library and community projects will be reviewed by the Development Agency closer to
will ensure that at least the same total cost of the project item (as indexed
performing arts centre. the time that they are constructed.
from time to time) is invested into the community facilities proposed.
The following community projects shown in Plan 6 are funded by the DCP:
Table 6 Community Facility Projects
DCP
CHARGE AREAS INDICATIVE PROVISION
PROJECT PROJECT TITLE - COMMUNITY FACILITIES PROJECT DESCRIPTION - COMMUNITY FACILITIES
CONTRIBUTING TRIGGER
NUMBER
Purchase of land for community centre and construction of two kindergarten rooms attached to a government
CO-88-01 Oakbank Level 1 Children's Centre Residential At time of subdivision
primary school
Purchase of land for community centre and construction of multipurpose community centre, including two
CO-88-02 Oakbank Level 2 Multi Purpose Community Centre Residential At time of subdivision
kindergarten rooms and two maternal child health care rooms
Purchase of land for community centre and construction of two kindergarten rooms attached to a government
CO-89-01 Tarneit North Level 1 Children's Centre Residential At time of subdivision
primary school
Purchase of land for community centre and construction of multipurpose community centre, including two
CO-89-02 Tarneit North Level 2 Multi Purpose Community Centre Residential At time of subdivision
kindergarten rooms and two maternal child health care rooms
Tarneit North Level 3 Multi Purpose Community Centre & Library & Regional Purchase of land for community centre and construction of multipurpose community centre, including two
CO-89-03 Residential At time of subdivision
Performing Arts Centre kindergarten rooms and two maternal child health care rooms
CO-89-04 Tarneit North Level 3 Library & Regional Performing Arts Centre Construction of library and regional performing arts centre Residential At time of subdivision
Purchase of land for community centre and construction of two kindergarten rooms attached to a government
CO-90-01 Truganina Level 1 Children's Centre Residential At time of subdivision
primary school
Purchase of land for community centre and construction of two kindergarten rooms attached to a government
CO-90-02 Truganina Level 1 Children's Centre Residential At time of subdivision
primary school
Purchase of land for community centre and construction of multipurpose community centre, including two
CO-90-03 Truganina Level 2 Multi Purpose Community Centre Residential At time of subdivision
kindergarten rooms and two maternal child health care rooms
Purchase of land for community centre and construction of multipurpose community centre, including two
CO-90-04 Truganina Level 2 Multi Purpose Community Centre Residential At time of subdivision
kindergarten rooms and two maternal child health care rooms
CO-90-05 Truganina Level 3 Library Construction of library Residential At time of subdivision
Purchase of land for community centre and construction of two kindergarten rooms attached to a government
CO-91-01 Riverdale Level 1 Children's Centre Residential At time of subdivision
primary school
Purchase of land for community centre and construction of multipurpose community centre, including two
CO-91-02 Riverdale Level 2 Multi Purpose Community Centre Residential At time of subdivision
kindergarten rooms and two maternal child health care rooms
Purchase of land for community centre and construction of multipurpose community centre, including two
CO-91-03 Riverdale Level 3 Multi Purpose Community Centre & Library Residential At time of subdivision
kindergarten rooms and two maternal child health care rooms
CO-91-04 Riverdale Level 3 Library Construction of library Residential At time of subdivision
18 SM | 20130531 04:43You can also read