Chapter – 5 : Land Management & Urban
              Growth

                  IL&FS ECOSMART
Chapter - 5 : Land Management & Urban Growth - Centre For ...
Chapter – 5 Land Management & Urban Growth

                                      CHAPTER - 5
                 LAND MANAGEMENT & URBAN GROWTH
5.1     INTRODUCTION

        Delhi is located strategically on two National Highways (NH-2 & NH-8) that
        connect Delhi to Kolkata and Mumbai. NH-2 & NH-8 are two prime vertices of
        the Golden Quadrilateral Corridor of the National Highways Development
        Project. The city attracts a migrant population of 645 per day from various part
        of the country, mainly from the northern region. In order to control the
        unprecedented growth of Delhi, the approach of ‘planned decentralization’ has
        been suggested as per the MPD-1961 & 81 and NCR Plan 2001 & 21.

        This chapter deals with the physical growth trends and planning efforts
        undertaken in Delhi. An attempt has been made to understand future growth
        trends and issues related to urban development. The approach at the NCR
        level is presented in the box below:

          The NCR Plan 2021 has proposed a six tier settlement system i.e. Metro
          Centre, Regional Centre, Sub-Regional Centre, Service Centre, Central
          Village and Basic Village. Seven metro centers (Faridabad-Ballabhgarh;
          Gurgaon-Manesar, Gaziabad-Loni, NOIDA, Sonepat-Kundli, Greater NOIDA,
          Meerut) are proposed as potential growth nodes to attract capital functions
          and activities and help in population dispersal from the national capital.
          Because of their special functional status and size, a very high level of
          physical, social and economic infrastructure (better than that in the capital)
          is required to be developed within these towns/complexes. The respective
          participating states and their agencies would not only be required to create
          the necessary infrastructure themselves in these Metro Centers but also
          facilitate the private sector investment therein.

5.2     CONSTITUENTS OF DELHI

        The National Capital Territory, Delhi (NCTD) area consists of the following three
        municipal areas-

        (i)      New Delhi Municipal Corporation (NDMC) area at the core. This is the
                 imperial Delhi spread over an area of 42.74 km2 which was established in
                 1911. It comprises of government Offices & residential areas and
                 commercial nodes with wide roads, parks and open spaces etc. The
                 NDMC area is administered by an 11 member council comprising 3 MLA’s;
                 five government officers and 2 civilians nominated by Central
                 Government; and a chairperson appointed by Central Government. The
                 Council reports directly to Central Government.

        (ii)     Municipal Corporation of Delhi (MCD) area, occupying 1397 sq. kms, or
                 most of the area of the city. The MCD further comprises the following
                 areas:
                 • Old Delhi comprising of the walled city (Shahajahanabad) and
                    densely built up areas between the Red Fort and the New Delhi
                    Railway Station on the periphery;

Client : Dept. of Urban Development, Govt. of Delhi                                        5-1
Consultant : IL&FS Ecosmart Limited
Chapter - 5 : Land Management & Urban Growth - Centre For ...
Chapter – 5 Land Management & Urban Growth

                  •    Civil lines along the Ridge and Delhi University area in the North with
                       large plots and open spaces;
                  •    New colonies, which have come up in last 50 years on the Southern
                       and Western sides;
                  •    New development across the Yamuna river comprising of Shahadara
                       in the North, Patparganj & Mayur Vihar in the South;
                  •    728 squatter settlements, spread over an area of 9.68 km2 all over
                       the NCT area.
                  •    Around 185 villages in outer Delhi area and 135 urban villages
                       characterized by haphazard development with marginal municipal
                       services etc. (outer Delhi is included in MCD limits and accounted for
                       in the MCD area).

                  The MCD is administered by an elected council comprising ward
                  councilors from each of the 137 wards in the area. (refer Section 13,
                  “Institutional Arrangement”). The MCD reports directly to the Central
                  Government.

        (iii)     Delhi Cantonment area between the Airport and the NDMC area, spread
                  over an area of 42.97 km2. The cantonment area is administered by the
                  Delhi Cantonment Board (DCB), which reorts directly to the Central
                  Government (Ministry of Defence).

        In 1999, the urban area of Delhi covered 701.62 Sq. Kms (Refer Table 5.1 and
        5.2; and Figure 5.1).

                  Table 5.1: Constituents of National Capital Territory of Delhi
                                                       Total Area       Total Population
                             Constituents                in km2             in ‘000
                                                        (2001)         1981      2001
                  MCD AREA                              1397.3         6899      11244
                  Walled City Area                        11.6          582       570
                  Walled City Extension                   23.0          568       624
                  Rest of MCD Area (including
                                                         1362.7        3768        8049
                  Urban Extn. and Rural areas)
                  NDMC AREA                               42.7         496          587
                  DELHI CANTONMENT BOARD                  43.0         NA           NA
                  NCTD AREA                               1483          -            -
                  Source: (i) Master Plan of Delhi-2001 & 2021; (ii) Status Report for Delhi-21, Delhi Urban
                  Environment and Infrastructure Improvement Project (DUEIIP), January 2001

                  Table 5.2: Delhi Area Statistics
            S.        Item                                                          Area (Sq.
            No.                                                                     kms)
            1.        Total Area                                                    1483
            2.        Urban Area*                                                   701.62
                                                                                    (47.3%)
            3.        Natural Features to be Conserved**                            195.09
            4.        Balance Area Available for Urbanisation                       586.29
            5.        Addl. Area Proposed for Urbanisation (2021)***                276.29
            6.        Proposed Urban Area (2021)                                    977.91
                                                                                    (66%)
        * As per IRS-IC LISS 3 Satellite Data
        ** Including. forests, ridge, rivers, wildlife sanctuaries, other water bodies and drains
        *** Preliminary estimate, MPD 2021

Client : Dept. of Urban Development, Govt. of Delhi                                                    5-2
Consultant : IL&FS Ecosmart Limited
Chapter - 5 : Land Management & Urban Growth - Centre For ...
Chapter – 5 Land Management & Urban Growth

  Total Area of these Zones is                                                 These Zones are holding
  20-22000 hectare.                                                            population    more     than
  Additional population of 2.5                                                 assigned during MPD 2001.
  million to be accomm-odated in
                                                                               The activities such as
  these zones at a density of 250
  pph.
                                                                               wholesale Market; ISBT;
                                                                               Vegetable Market et. can be
                                                 P1 & P2                       removed from these Zones
                                                                               to Urban Extns.

                                        N
                                                 M
                                                               C
                                                      H
                                                                       O
                                                                           E
                                                           B       A
                                            K1
                                             &                     D
  Re densification of the                   K2
                                                      G
  zones with low density and L
  high land value has been                                         F
  proposed

                                                               J

                             Figure 5.1: Planning Division in NCTD Area

5.3     EXISTING CITY ASSESSMENT

        Delhi city region comprises of three components (i) Existing Urban Area; and (ii)
        Urban Extensions. The existing urban area has been classified as (a) Planned
        area; (b) Special Area; (c) Ecologically sensitive areas and (d) Unplanned areas.
        The descriptions of these areas are presented in Table 5-3.

        Table 5.3: Description of Various Components of Delhi Urban Area

           Components
          of Delhi Urban                                       Description
               Area
                              The planned area of Delhi include (i) Influence area along MRTS and
                              Major Transport Corridor; (ii) Lutyens Bunglow Zone; (iii)
          PLANNED             Chanakyapuri area; (iv) DIZ area; (v) Mata Sundari Area; (vi) Civil
          AREAS               Lines Bunglow area; (vii) Other part of NDMC area;(viii) Planned
                              built-up housing; (ix) Planned (Hierarchical) Commercial Area; (xii)
                              Planned Industrial Area
                              Special areas as defined on the plan cover about 2600 ha and have
          SPECIAL             been divided into three separate parts (i) Walled City; (ii) Walled
          AREAS               City Extension and (iii) Karol Bagh. These are characterized by a mix
                              of different land uses and have similarities in built form.
          UNPLANNED           The unplanned areas are distributed homogenously across the urban

Client : Dept. of Urban Development, Govt. of Delhi                                                5-3
Consultant : IL&FS Ecosmart Limited
Chapter - 5 : Land Management & Urban Growth - Centre For ...
Chapter – 5 Land Management & Urban Growth

           Components
          of Delhi Urban                                     Description
               Area
          AREAS               form. These areas are (i) Slum & JJ Clusters; (ii) Resettlement
                              Colonies; (iii) Urban Villages; (iv) Unauthorized Colonies; (v) Informal
                              Shopping Areas; (vi) non conforming Industrial areas. These areas
                              provide substantial housing stock; commercial and industrial
                              development.
                              The urban extensions are peripheral areas which experience pressure
                              of development. These areas comprise of villages, unauthorized
          URBAN               colonies and JJ clusters. As per MPD-2021, 29 lakh population
          EXTENSIONS          already exists in these areas. The urban extensions where
                              development processes have been initiated are Dwarka, Rohini Phase
                              III, IV and V and Narela.
        Source: Compiled from Master Plan of Delhi, 2021

        The development status of the city has been revised with respect to Existing
        Linear Development; Development in Special areas; Unauthorised / Unorganised
        Colonies; Housing Supply & Demand; Planned & Unplanned Commercial &
        Industrial areas and ecologically sensitive areas.

5.3.1 Influence Zone along Major MRTS and Major Corridors

        The growth of Delhi over the years has been on a ring and radial pattern, with
        reliance on road based public transport. The development envisaged by
        previous plans was poly-nodal with a hierarchy of commercial centres located
        on either ring or radial roads. The proposed MRTS network has been acting as a
        development catalyst and has sizeable impact on the existing structure of the
        city.

5.3.2 Development Profile along Major Corridors

        The road network can be categorized into four types i.e. Arterial roads, sub
        arterial roads, minor arterial road and collector roads. About 1100 km of road
        length are provided with right of way of 30m and above.

        The road network comprising of ring and radial pattern has C.P. as a focal point
        with Mathura road, Lal Bhadur Shastri Marg, Aurobindo Marg, Rao Tula Ram
        Marg, Gurgaon Road (NH 8) Patel road, Shankar road, Rohtak Road, G.T Road
        (NH1), Loni road, Shahadra road, NH 24 bypass forming the radials while
        Mahatma Gandhi Road (Ring Road), Outer Ring road, Noida road- Bund road
        forming the prominent rings. These radial and ring roads serve as major
        arterials to carry bulk of traffic in the city.

        These major corridors are high intensity development zones with planned and
        unplanned development along them. The predominant developments along the
        major corridors are presented in 4 & Figure 5.2.

        Table 5.4: Development Intensity along Major Corridors of Delhi

          Name of           Characteristics & Type of              Problem
          Corridor          Development
          NH-2 (Delhi       The length of NH-2 in NCTD is          • Encroachments at Jaitpur &
          Kolkata):         around 20km from Badarpur                Badarpur intersection reduce
          Major arm of      Border to Rajghat. It is one entry       the carriageway width.
          Golden            point to Delhi and has industrial,     • Prone to water logging during
Client : Dept. of Urban Development, Govt. of Delhi                                              5-4
Consultant : IL&FS Ecosmart Limited
Chapter - 5 : Land Management & Urban Growth - Centre For ...
Chapter – 5 Land Management & Urban Growth

          Name of           Characteristics & Type of           Problem
          Corridor          Development
          Quadrilateral     institutional and residential           rainy seasons and lack of
                            development. At the entry point         suitable drainage
                            it is characterized by haphazard        infrastructure
                            and unplanned growth residential    •   Bottleneck at the entry point
                            & industrial areas in urban             with industrial, commercial
                            villages.                               development and Bus & Truck
                                                                    parking
                                                                •   Environmental degradation
                                                                    because of filling of water
                                                                    bodies and low lying areas for
                                                                    commercial uses such as petrol
                                                                    pump, Transport training
                                                                    institute, Sarai Kale Khan ISBT.
          NH-24             The length of NH-24 in NCTD is      •   The corridor passes through
          (Delhi-           around 15km from Ghazipur to            low lying area and the
          Lucknow):         NH-2 intersection at IP Park. It        development in the Yamuna
          Major             was at Ghazipur which is a major        Bed. It has unorganized
          Corridor          fish & chicken market; and fruit        development in villages such
          Connecting        & vegetable market of Delhi. It         as Khicripur, Pandav Nagar
          Important         also has major garbage dumping          etc.
          business          site. It mainly traverses through   •   The corridor has been
          centres of        haphazard development within            encroached by JJ clusters.
          Uttar Pradesh     urban villages and Patparganj &         These clusters are devoid of
          to National       Mayur Vihar society complexes.          basic infrastructure facilities
          Capital           The proposed site for common            leading high interaction with
                            wealth games is also in proximity       the corridor.
                            to this corridor.                   •   Low lying areas along the
                                                                    corridor are used for dumping
                                                                    of HH and construction wastes.

          NH-1 (Delhi       The length of NH-1 from Samli       • High density industrial;
          to Kanpur:        border to TP Nagar Border is          commercial and unauthorized
          Major             around 40 km. It traverses            development
          Corridor          through Industrial areas            • Truck parking near the TP
          traverses         (Wazirpur, Jahangirpuri, Badli in     Nagar border in east with
          through           North and Jhilmil & Shahadara in      transport operators located
          industrial        East), Institutional area (Delhi      along the corridor
          nodes of          University, IP University, Old      • Encroachment on the corridor
          Delhi and UP      Secretariat), Resettlement            due to unauthorized
                            Colonies (Babarpur, Saleempuri,       development have transformed
                            Seemapuri et.al)                      the urban built form in the
                                                                  area along the corridor
          NH-10 (Delhi      It is around 25km in length in      • Development of resettlement
          to Rohtak): It    NCTD extending from Savdar            colonies and industrial areas at
          is an             Ghevra to Sarai Rohilla. It           the urban periphery has led to
          important         traverses through the urban           unauthorized and unplanned
          corridor in       extensions of Delhi, which have       growth of village settlements
          West Delhi        potential for future development.     in and around these areas.
          connecting        It is connected to Dwarka and
          second order      Rohini through ring roads.
          settlements
          of Haryana
          NH-8 (Delhi       It is around 15 km in length in     • It mainly has planned
          to Mumbai):       NCTD extending from Rajokari          development and high traffic
          Connecting        Border to Daulakaun. It is one of     volumes due to its linkage to
          the National      most developed corridor of the        planned residential areas,
          Capital to the    city with industrial; residential     Dwarka and IT city Gurgaon.
Client : Dept. of Urban Development, Govt. of Delhi                                            5-5
Consultant : IL&FS Ecosmart Limited
Chapter - 5 : Land Management & Urban Growth - Centre For ...
Chapter – 5 Land Management & Urban Growth

          Name of           Characteristics & Type of             Problem
          Corridor          Development
          Economic          and commercial development.           • Its proximity to the Airport
          Capital of the    Most of the predominant                 leads to high interaction with
          Country and       historical monuments are also           Cargo and goods traffic.
          traversing        accessible through this corridor.     • It is also connected to
          through           It has intense commercial               institutional areas of Delhi and
          major             development near Rajokri border         traverses through intense
          industrial        with large open spaces due to the       residential development,
          nodes of the      Airport and cantonment areas. It        prone to landuse
          country           connects urban periphery to New         transformation.
                            Delhi and Old Delhi Areas.
          Outer and         The ring road is of 75 km in          • Ring road has now become
          Inner Ring        length connecting institutional         part of the city transportation
          Road              and industrial areas in the north       network with high intensity
                            to residential and industrial area      commercial and industrial
                            in the west; and historical sites &     development.
                            institutional area in south and
                            east.
          Institutional     The institutional corridor of the     • It has experienced
          Corridor          city is of around 45km in length        transformation of residential
                            and traverses through Pusa road,        areas to institutional and
                            Central Secretariat Complex,            commercial areas --- eg.
                            AIIMS, IIT, CWC and JNU areas           Green Park; Hauzkhas; Pusa
                                                                    road etc. These Landuse
                                                                    transformations have led to
                                                                    pressure on physical
                                                                    infrastructure of the city.
          MRTS              MRTS has been planned to cover        • These nodes are vulnerable to
          Corridors         the spread of Delhi and its             encroachment by unauthorized
                            peripheral area. The metro              commercial development if
                            station complexes at 2km                not planned along with
                            distance are nodes for                  schemes for corridor
                            commercial development.                 development.

Client : Dept. of Urban Development, Govt. of Delhi                                             5-6
Consultant : IL&FS Ecosmart Limited
Chapter - 5 : Land Management & Urban Growth - Centre For ...
Chapter – 5 Land Management & Urban Growth

                                                       NH-1

                       ROHINI RESIDENTIAL                               Ghaziabad
                              AREA                                               NH-1
                     NH-10
                                                        WALLED CITY
                                                         &ITS EXTN
                                                                                NH-24
                                                      INSTITUTIONAL
                                                          AREA

                                             Low Density Area

                    DWARKA RESIDENTIAL
                          AREA                                               NOIDA
                                                        HERITAGE
                                                        PRECINCT

                                                                         Faridabad
                                     Gurgaon
                              NH-8                                             NH-2

                             Figure 5.2 : Major Transport Coordination

5.4     LOW DENSITY AREAS IN CITY

        There is a large proportion of underused land with number of vacant sites or
        unutilized built areas within the central city. A majority of these are
        government lands having mostly low density (2 story structures) and old
        housing. As per the study, government is able to provide housing to only 30-35%
        of its employees within these areas. The gross densities in these areas are
        around 160 PPH against 350 PPH in the adjoining areas namely Safdarjang
        Enclave extn; Munirka; Bhikaji Cama commercial complex. Table 5.5 presents
        the development profile of low density areas.

        Table 5.5: Development Profile of Low Density Area

                                 GROSS DENSITY IN
          EXISITING AREA                                  GROUND COVERAGE              FAR
                                       PPH
          Lodhi Colony                 222                         18                   37
          RK Puram                     190                         17                   35
          Moti Bagh                    145                         15                   31
          Laxmibai Nagar               225                         19                   38
        Source: Ravi Kumar Kakkar, Unpublished Thesis on Urban Design Strategies for Renewal of State
        Owned Housing Estates, Urban Design Department, SPA, 1992-93.

Client : Dept. of Urban Development, Govt. of Delhi                                             5-7
Consultant : IL&FS Ecosmart Limited
Chapter - 5 : Land Management & Urban Growth - Centre For ...
Chapter – 5 Land Management & Urban Growth

        As per the provision of MPD-2001, the gross density of residential areas should
        be 350 PPH or 78 DU/ha with FAR of 33% against the existing FAR of 15%;
        whereas in commercial areas ground coverage of 25% and FAR of 100% is
        permitted. MPD-2001 & 2021 have recommended comprehensive planning for
        improvement and redevelopment of these areas in order to make the best use
        of land resources (Refer Figure 5.3).

                                Motibagh                    Lodhi Colony

                                                             Laxmibai Nagar
                                       RK Puram

                          Figure 5.3 : Low Density areas in Delhi

5.5     STATUS OF SPECIAL AREAS

        The special area has been divided into three parts namely (i) Walled City; (ii)
        Walled City Extension and (iii) Karol Bagh. These are characterized by a mix
        of different land uses and have similarities in compact built form, narrow
        circulation space and low rise high density developments mainly
        accommodating residential, commercial (both retail or wholesale) and
        industrial uses. Therefore it is important that these areas, which are already
        established with identified uses, continue to play an active economic role
        (Refer Figure 5.4).

        (a)      Walled City Area: The traditional walled city area is a core of the
                 business district. The area is prone to commercialization, particularly
                 with improved accessibility due to the MRTS. Around 20% of the
                 wholesale trade enterprises (37000 enterprises) of urban Delhi are
                 located in the walled city accounting for 12% of the employment.

        (b)      Walled City Extension: Pahar Ganj, Sadar Bazar, Rosanna Road and
                 their adjoining areas are called as walled city extension. These are old
                 congested built-up areas mainly with mixed land use. For upgradation of
                 the environment in these areas minimum level of infrastructure and
                 parking are to be provided.

        (c)      Karol Bagh Area: Karol Bagh area has been one of the important
                 commercial centres outside the walled city. The land use transformation

Client : Dept. of Urban Development, Govt. of Delhi                                        5-8
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

                   from residential to commercial has led to increase in parking demand,
                   reduction in available road width and pressure on other physical
                   infrastructure. Therefore, this area is due for comprehensive
                   redevelopment on the basis of mixed use concept with provision of
                   parking and up gradation of facilities and utilities. The grid iron pattern
                   is an asset to regulate and pedestrianise traffic movement.

                                                                              CORE OF BUSINESS
                                                                                   DISTRICT
                  COMMERCIAL CENTRE
              ‰    Provision of parking and up
                                                                        ‰    Potential for Commercialization

                   gradation of facilities and utilities                ‰    Proposal to       Shift        Wholesale
                                                                             Trade Activity
              ‰    Grid Iron Pattern is to be treated
                   as an asset to regulate and                          ‰    Special   Treatment       of    Heritage
                   pedestrians the traffic movement                          area
                                                                        ‰    Reconstruction & Redevelopment

                                                                   WALLED CITY
                                        KAROL BAGH                   EXTN.     WALLED CITY
                                           AREA                                   AREA

                      MIXED LANDUSE
    ‰   Provision of minimum Level Infrastructure & Parking
        Facilities
    ‰    Redevelopment    in       term      of    comprehensive
        redevelopment scheme

                                    Figure 5.4: Status of Special Area of Delhi

5.6      UNAUTHORIZED & UNORGANIZED COLONIES

         The unplanned areas of the city include Slum and JJ Clusters, Resettlement
         colonies, unauthorized colonies and urban villages. Slum and JJ clusters have
         been discussed in detail in chapter 6. The section below presents in detail the
         status of unauthorized colonies and urban villages.

         Unauthorized Colonies

         The large scale land acquisition by DDA, unregulated growth of urban fringes
         and housing shortage are the genesis of unauthorized colonies in Delhi. There
         are around 1432 unauthorized colonies1 providing shelter to around 30 lakh
         people. In the past unauthorized colonies have being regularized only twice in

•
1
 Though an official figure suggests that 1432 such colonies exist in Delhi, there are at least 200 more such colonies
which sprung up after March 2002 for which no policy exists.
Client : Dept. of Urban Development, Govt. of Delhi                                                               5-9
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

        Delhi. Once in 1961 when over 100 colonies were regularized and last time in
        1977 when around 600 colonies where regularized.

        Affluent unauthorized colonies included Sanik Farm; Anant Ram Dairy (near RK
        Puram), Mahendru Enclave (near Model town); other colonies include
        Zakirnagar, Jamianagar, Anand Parbat, Khanpur Extension, Viswas Nagar,
        Bawana, Madanpur Khader etc (Figure 5.4). Around 1000 unauthorized colonies
        are on private land developed by builders.

        The infrastructure status in these colonies is marginally better than slums. No
        metalled road exists in any of these colonies, nor is there a provision of sewer
        lines and other facilities.

        Urban Development Department, NCTD has been putting up various models for
        regularizing these against the resident’s demand of regularization without any
        charges (on the line of earlier regularization in 1977). The UDD proposals are
        presented in Table 5..

        Table 5.6: Unauthorized Colonies Regularization Model

              Facilities        Charges (Rs per m2)
          Power                    Rs 6600 Per KV     The cost for regularization of 100 sqm of
                                                      plot is Rs 1 lakh. Delhi Government had
          Water                     Rs 220 per m2     invited    application   from    residents
                                                      associations for all unauthorized colonies
          Sewerage                  Rs 355 per m2     in October 2004, through a public notice.
          Roads and                                   The applicants were asked to submit their
                                    Rs 400 per m2
          Drains                                      area plans. 1153 applications were
          Total Fixed                                 received out of 1432 unauthorized
                                   Rs 1060 per m2
          Charge                                      colonies.

5.7     URBAN VILLAGES

        165 urban villages and 52 census towns form part of the National Capital
        Territory of Delhi (NCTD). These urban villages have undergone significant
        physical and functional transformation related to their specific location.
        Villages are characterized by a mix of different land uses and have similarities
        in compact built-up form, narrow circulation space and high density
        developments. These mainly accommodate residential, commercial, industrial
        and mixed uses. These areas, established with identified uses, continue to play
        an active economic role.

5.8     STATUS OF SHELTER IN CITY

        Urban Delhi accommodated about 11.5 lakh households in different housing
        developments in 1981. The Housing shortage at the beginning of second plan
        (MPD-1981-2001) period had been estimated at about 3 lakh dwelling units
        which included (i) Squatter and shelterless, (ii) Families sharing houses in
        congested built-up areas; (iii) houses requiring immediate replacement.
        Therefore it had been estimated that 16.2 lakh DUs were required for the
        period of 1981-2001 as shown in Table 5..

Client : Dept. of Urban Development, Govt. of Delhi                                       5-10
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

        Table 5.7: Housing to be built (1981-91)

                    Year                New Housing required                    Average per year
                   1981-86                       323000                               65000
                   1986-91                       379000                               76000
                   1991-96                       434000                               87000
                   1996-01                       483000                               97000
                    Total                        1619000                              81000
        Source: A People’s Housing Policy; The case study of Delhi, Hazards Centre, January, 2003

        As against this, Table 5. indicates the actual housing development in Delhi until
        1995. This indicates that for the period of the second Master Plan (1981-2001),
        in fact DDA was able to provide land and housing for only 34 per cent of target.

        DDA and cooperatives (42.5%) met their share of 43% and the site & services
        plots resettlement sites (23.9%) correspond to the 25%, but the allotment of
        plots for individual families (31.7%) significantly exceeded the 17% provision.

        Table 5.8: Development of Housing

                  Type            upto 1971       1971-81         1981-91   1991-95      Total      %age
          DDA Flats                   5600            60000       129000      57000     251600       23.5
          DUs on individual
                                     59000            82400       135600      63000     340000       31.7
          plots
          DUs     by    Co-
                                        -             94661        72960      36000     203621       19.0
          operatives
          Resettlement
                                     35000            162700       40000      18300     256000       23.9
          Schemes
          Slum Rehousing              9500            6000          4500        -        20000       1.9
          Total                     109100        405761          382060     174300     107122      100.0
          DUs per Year               10910            40576        38206     43575      31506
        Source: A People’s Housing Policy; The case study of Delhi, Hazards Centre, January, 2003

5.9     STATUS OF INDUSTRIAL DEVELOPMENT

        As per economic survey of Delhi 2001-02, there were about 1,29,000 industrial
        units in Delhi in 1998, against 85050 units in 1991. An average unit employed 9
        workers while 30% of units employed less than 4 workers. Units related to
        textiles products constitute the largest number followed by repair services and
        electrical machinery. Table 5.9 shows the growth of industrial units and
        employment.

        Table 5.9: Growth of Industrial Units and Employment
                                                                    Number of           Employees per
                  Year          Number of Industries
                                                                    Employee              Industries
                  1981                  42000                         568910                  14
                  1991                  85050                         730951                   9
                  2001                  129000                       1440000                  11
        Source: Compiled from MPD-2021

Client : Dept. of Urban Development, Govt. of Delhi                                                 5-11
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

        i) Existing Planned Industrial Areas: Out of 1.3 lakhs industrial units in Delhi,
        only around 25000-30,000 are located in planned industrial areas (Refer Figure
        5.5 & 5.6). The existing industrial estates are Bawana; Narela; Badali;
        Mangolpuri; Okhla; Patparganj and Shahdara. These industrial areas were
        developed in the 70s and over the years have deteriorated considerably in
        terms of physical infrastructure. The industrial estates in the city are owned by
        three agencies- Delhi State Industrial Development Corporation (DSIDC), Delhi
        Government Industries Department and DDA. These industrial estates have
        various problems such as pot-holed roads, overflowing garbage bins, lack of
        water supply, improper electricity installations and absence of banks, common
        facility centres and post office. All the 28 industrial estates are plagued with
        the following problems.

        •    Poor Water Supply: Water is supplied in these industrial estates for less
             than half hour per day leading to diminishing quality of the produce.

        •    Bad Roads: The poor road connectivity to industrial estates has made
             industries withdraw from the area, leading to low occupancy and poor cost
             recovery. Bawana industrial estate is spread over 1900 acres of land but
             only around 10 per cent plots are occupied.

        •    Garbage Disposal: Garbage is littered on the roads and overflows out of the
             dustbins. The collection system is unreliable.

        •    Freehold Issue: There is a duality in the policy of the centre and the state.
             While DDA gives plot on freehold basis, the Delhi government still has a
             leasehold policy which does not give full ownership of land to the unit
             owner.

        •    Encroachment: Several plots are encroached by slum dwellers. The estate
             manager does not have the power to evict these encroachers.

        ii) Unplanned Industrial Area: A survey of residential areas with industrial
        concentration has revealed that only seven qualify clearly for regularization (as
        per the criteria of more than 70% industrial use). The remaining can get
        regularized only after considering godowns, commercial shops and commercial
        godowns as industrial activity (Refer Table 5.10)

        Table 5.10: Percentage breakup of Unregularised Industrial Areas in Delhi

                                Industrial                        Comme
                                                 Industrial                  Commercial
                Areas          Concentrati                         rcial                       Total
                                                 Godowns                      Godowns
                                   on                              Use
            Jawahar Nagar         75.18                                                        75.18
            Karawal Nagar         78.86                                                        78.86
            Haiderpur             76.06                                                        76.06
            Shalimar
                                   80.70                                                       80.70
            Village
            New Mandoli            72.36                                                       72.36
            Basai Darapur          75.07                                                       75.07
            Khyala                 70.22                                                       70.22
            Rithala                57.81              13.53                                    71.34
            Mundka, Swarn
                                   64.06              20.90                                    84.96
            Park
            Mundka                 48.35              25.87                                    74.22
Client : Dept. of Urban Development, Govt. of Delhi                                               5-12
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

                                Industrial                        Comme
                                                 Industrial                  Commercial
                Areas          Concentrati                         rcial                       Total
                                                 Godowns                      Godowns
                                   on                              Use
           Naresh     Park
                                    2.17              18.11                                    70.28
           Extn.
           Peeragarhi              60.44              11.52                                    71.96
           Nawada                  69.31                            5.29                       74.60
           Hastsal-Pkt A           63.38                           18.99                       82.67
           Hastsal-Pkt B           66.47                           11.76                       78.23
           Dabri                   52.24              7.05         15.38                       74.67
           Libaspur                57.85                           12.29                       70.14
           Sultanpur
                                   41.29              20.32        8.70         5.01           75.32
           Mazra

        As per the Table above the maximum industrial concentration is in Shalimar
        village which has 80.70 per cent of the area under industries. Areas that do not
        qualify even after the inclusion of godowns include Tikri Kalan, Prahladpur,
        Viswas Nagar, Tri Nagar and Nangli Sakrawati. Two areas have more than 85 per
        cent industrial concentration (GT Karnal Road-80.64% and Kirti Nagar-95.83%)
        but do not qualify because the land area is less than four hectare land (Refer
        Figure 5.5)

                    Figure 5.5 : Location of Planned and Unorganised Industrial Areas

Client : Dept. of Urban Development, Govt. of Delhi                                               5-13
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

5.10    ECOLOGICALLY SENSITIVE AREAS

        Besides Delhi’s magnificent built heritage (discussed in detail in Chapter 7),
        there are natural and historical landscape features (Yamuna River Corridor,
        Delhi Ridge) and the associated protected areas of natural wildlife (Jasola
        Wildlife Sanctuary) that characterize the urban form of Delhi. The detail status
        of Yamuna River Corridor and Jasola Wildlife Sanctuary & Delhi Ridge are
        discussed below.

          Areas                           Characteristics of Ecologically Sensitive areas
          YAMMUNA             The river front in Delhi has lost its potential heritage, religious,
          RIVER               pulic amenity and recreational value. It is surrounded by unplanned
          CORRIDOR            and haphazard development of villages and JJ clusters in North; by
                              Thermal Power Plants, Aksardham Temple complex, Commonwealth
                              Game village etc in central part; in the south by Julenagaon; Taimur
                              Nagar, Kalindikunj etc. The problem areas associated with river
                              corridor in NCTD are listed below:
                              • Though an interstate water sharing treaty exists, there is lack of
                                   an effective inter state river basin hydro-policy regime. This
                                   results in upstream pollution from agricultural pesticides and
                                   sub-optimal water extraction practices.
                              • The presence of extensive, high density areas of informal low
                                   income housing generating large volumes of untreated sewage
                                   and solid waste that is discharged into the river.
                              • A recent Supreme Court Order stipulates that industrial effluent
                                   must be treated to a prescribed standard before being
                                   discharged into the Yamuna. Making this order operational,
                                   through effective implementation, enforcement and monitoring
                                   will be critical to the environmental sustainability of the
                                   Yamuna.
                              • Within the context of the Yamuna Action Plan, DDA has proposed
                                   to change the use of 260 hectare of land in the central tranche
                                   to public use.
          JASOLA              The sustainability of the sensitive ecological habitat of the Jasola
          WILDLIFE            wildlife area will also require the formulation and implementation
          AREA AND THE        of a special case integrated area strategy that would be likely to
          RIDGE               include Delhi Ridge as the environmental context and buffer zone to
                              the sanctuary. The problems associated with this area are as
                              follows:
                              • Temporary incompatible use permissions granted for storage,
                                   assembly, temporary accommodation (e.g. exhibition related
                                   activities) have left behind residual materials. This despoils the
                                   area and renders it environmentally vulnerable.
                              • Incremental quarry extraction activities have scared the ridge;
                                   and (post working) designation as wasteland by the DDA in its
                                   land-use plans has consolidated this abuse.

        It is imperative to state that the development of Delhi Ridge and Yamuna City
        Regional Park System has to be comprehensively looked into to plan for better
        physical environment & ecological system of the city.

5.11    LAND DEVELOPMENT AND MANAGEMENT

        A brief summary of the roles and responsibilities of central and state
        government agencies in land management are presented below.

Client : Dept. of Urban Development, Govt. of Delhi                                            5-14
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

           Department/Agency           Roles and Responsibilities
           Land Record                 •    Deals with Nazul-I lands transferred to DDA from Delhi
           Management, DDA                  Improvement Trust and Nazul-II lands acquired under the
                                            policy of large scale acquisition for development and
                                            disposal of land by DDA after 1957.
                                       •    The functions of the land management department are
                                            to acquire land, allot sites for petrol pumps and gas
                                            godowns, maintain land records, protect land from
                                            encroachment and enforce Master plan section against
                                            misuse. DDA has setup six field zones for the purpose of
                                            protection of land.
           Land and Building           •    The revenue department acquires land on behalf of the
           Department/Revenue               DDA/MCD/Slum department. The demand for land
           Department                       acquisition is placed by DDA to the land building
                                            department, which acquires the land for the DDA after
                                            getting approval from the LG; and after acquisition,
                                            places the same at the disposal of DDA, under section 12
                                            of DDA act
           L&E Department of           •    The L&E department of MCD deals with records of land
           MCD                              and properties of the colonies/villages within the
                                            jurisdiction of MCD. The department also deals with
                                            collection of property tax and monitors its activities
                                            through the 12 MCD zones.
           L&DO GoI, UDPA              •    The department deals with the maintenance of land
                                            record of the properties of the GoI. The activities of
                                            construction and maintenance are with CPWD.

        In NCTD area most of the lands are owned by the DDA, L&DO and central
        governments. Land under state ownership is limited and sectorally owned.
        Agricultural land is mainly privately owned and owners pay agriculture tax to
        the revenue department. However the private sector primarily comprises of
        individuals; families; trusts; institutions; families; trusts; institutions and
        firms/companies, which own or seek land or space built on land (refer Table
        5.).

        Table 5.11: Land Ownership in Delhi

            Land Owning                        L&DO         Cantonment     Others (MCD,
                                   DDA                                                        Total
               Agency                         (NDMC)           Board       Railways etc)
          Area in hectare        25377.2        4270.0          114352.8          4300.0       148300
          % to Total                 17.1             2.9            2.9             77.1         100
        Source: DUEIIP, Status Report for Delhi-21

5.12    EFFORTS OF PLANNED DEVELOPMENT

        In order to encourage planned development in the city, the DDA prepared
        master plans for the NCTD Area. Various plans prepared for Delhi over the years
        include (i) Lutyen’s Plan for the New Delhi (the imperial capital) now NDMC
        area-1911; (ii) Interim General Plan for Delhi prepared by the Town Planning
        Organisation (TPO) in 1956; (iii) Master Plan for Delhi (MPD) with perspective of
        1981 (based on Land use inventory TPO, 1958) prepared by DDA in 1962; (iv)
        Master Plan for Delhi with perspective of 2001 prepared by DDA in 1990; (v)
        National Capital Regional Plan (NCRP) with perspective of 2001 prepared in
        1989; (vi) Draft Master Plan Delhi with perspective of 2021, prepared by DDA in
        2005 (notification awaited) and (vii) National Capital Regional Plan (NCRP) with

Client : Dept. of Urban Development, Govt. of Delhi                                             5-15
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

        perspective of 2021 prepared in 2005. The salient features of these plans are
        discussed in the subsequent section.

5.12.1 Master Plan for Delhi (1961-81)

        MPD-1981 has divided city into 8 planning divisions and planning districts with
        an objective to make these self contained in employment and community
        facilities. As per MPD-1981, these divisions were proposed to have populations
        ranging from 3 to 7 lakhs. Hence each division had 2-3 district centres, which
        are composite retail shopping centres with commercial and service uses. As per
        the plan, total land available for urbanization in 1981, was about 440 km2.
        Beyond this has the “Agricultural Green Belt” which was to be preserved for
        agricultural use. The proposed activities as per Master Plan (1961-81) are
        presented in Table 5.12 & Figure 5.7.

        Table 5.12: Proposed Activities as per Master Plan (1961-81)

           Land Uses                                          Activities
           Acquisition of      •   In order to contain the likely population of about 6.0 million by
           Land and                1981, the following additional land areas were proposed to be
           Development             developed under various uses: Residential: 30,000 acres;
                                   Commercial: 1900 acres; Industrial: 4800 acres; Government: 500
                                   acres; Recreational: 25000 acres
           Residential         •   Medium and High Density residential development proposed in
                                   the planning division A & B (Old Wall City area & its Extension).
                               •   Average Residential Density ranges from 81 PPA in West Yamuna
                                   Canal area to 235 PPA in old walled city area. The average gross
                                   density in the Master Plan is about 97 PPA.
                               •   Redensification of low density areas such as Lodhi colony; RK
                                   Puram, Motibagh and laxmibai nagar.
                               •   Developing Low income housing-1,50,000 units; government
                                   housing-1,10,000 units and private housing-4,85,000 units
           Commercial          •   The Commercial area as per MPD 1981 works out to be 0.48
                                   acres/1000 population.
                               •   The hierarchies of commercial area proposed were Central
                                   Business District (CBD); District Shopping Centre; Community
                                   Shopping; local shopping and convenient shopping.
                               •   Development of commercial area of 565 acres.
           Slum                •   20 projects were to be developed upto 1981 for slum
           Improvements            improvements. These slum areas are Kotla Mubarakpur; Sui
           &                       Walan; Kucha Pati Ram; Sarai Rohilla; Qadam Sharif; Shadipur
           Redevelopment           Khampur, Ajmeri Gate etc.
           Industrial Area     •   Areas proposed for industrial development. The details are given
                                   as part of Table 5..
           Recreational        •   It has been proposed to develop 25000 acres of land for
           Areas                   recreational use.
                               •   It was proposed to provide active recreational facilities such as
                                   open air theatres, libraries, museums, swimming pools, terraced
                                   gardens, landscaped vistas and botanical gardens.
           Plan for Rural      •   The rural towns proposed for the location of light and medium
           Delhi                   industries are Nangloi Jat, Bawana, Palam and Najafgarh
                               •   It was proposed to provide 17 local shopping centres for each
                                   cluster of villages (within radius of 3 miles from every village), 6
                                   district shopping centres for bigger village groups (within radius
                                   of 5 miles from every village) and 3 mandis in more central
                                   location (Palam; Khera kalan and Kanjhawala).
        Source: Compiled from Master Plan of Delhi-1961-81
Client : Dept. of Urban Development, Govt. of Delhi                                            5-16
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

        Table 5.13: Proposed Wholesale & Specialized Markets (1981)

                   Market                             Proposed Location                  Area in
                                                                                          Acre
         Fruit and Vegetable           One mandi near Daya Basti railway station in             35
         Markets                       Sarai Rohilla in North-west and another in
                                       South of Delhi at Okhla
         Wholesale Grain Market        Site near Teliwara, in north of Sadar bazaar             17
                                       was proposed
         Bicycle and accessories       Jhandewalan area                                         10
         Cloth Market                  Redevelopment & Modernization of Chandni                 10
                                       Chowk area and site west of church mission
                                       road
         Fodder Market                 Dayabasti near Najafgarh Road                             6

         General Merchandise           Improvement and reorganization of Sadar                  61
         and hosiery                   Bazar-Old Bahadurgarh road
         Iron, steel and scrap         Jhadewalan; reorganization of junk & scrap               15
         metal market                  yards in Motia Khan
         Building Materials            West Delhi adjacent to the railway line to               50
                                       Rewari
        Source: Compiled from Master Plan of Delhi-1961-81

        Table 5.14: Proposed Location of Industrial Estates and Zones (1981)

           Industrial Area   Total            Industrial Area    Total      Industrial     Total
                              Land                                Land        Area          Land
                               (in                                 (in                       (in
                             acres)                              acres)                    acres)
          A. Extensive manufacturing         B. Intensive Manufacturing     C. Service          355
                                                                            Industries
         Najafgarh                     716   Flatted industries      192   D.                  106
         Industrial Area                     inlying locations             Extractive
                                                                           Industries
         Okhla Industrial             1241   Flatted industries      169   E. Special          165
         Area                                outlying locations            Industries
         Azadpur                       743   Sub-Total               361   Sub-Total           626
         Industrial Area
         Shahdara                     3832
         Industrial Area
         Rohtak Industrial            1034
         Area
         Sub-Total             7566

        Source: Compiled from Master Plan of Delhi-1961-81

5.12.2 Review of Master Plan Proposals

          MPD-81 proposed to increase the residential use to 44% from 18% in 1961.
          However the residential use as per the MPD-61 was 30% which is far below the
          proposed use. Other uses such as recreational area, as proposed in MPD-81 were
          24%, which got limited to 12%. The area under commercial land use was
          proposed to be 2% but it exceeded to 3.8%. Similarly, the area under Industrial
          land use was proposed to be increased to 5% but only 3.5% of the area was
          under this land use in 1981 (Refer 6 & 6 (a)).
Client : Dept. of Urban Development, Govt. of Delhi                                 5-17
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

        Railways                A griculture
         Land                      0.3%                Proposed
               Transpo rtati
          2%                                             1981                        Agricult ure
               o n Facilities                                                                                                 Commercial
                                                                  Railways Land        16.2%                                     Use
                    8%
                                                                       2%                            Resident ial                2%
                                                                                                        Use
                                                                                                                                    Indust rial Use
                                                                                                        18%
            Recreatio n              Residential                                                                                         2%
               Use                      Use
               24%                      44%                                Transport at ion
                                                                                                            P ub l i c &
                                                                              Facilit ies
                                                                                                           Semi - Pub l i c
                                                                                25%
                                                                                                               U se
                 P ublic &                                                                                     2 5%
                   S e m i-
                P ublic Us e                                                             Recreat ion Use
                    15 %                                                                      10%

                                               Co mmercial                                                                         Existing
                                                   Use                                                                              1961
                                Industrial Use
                                                   2%
                                     5%

    Figure 5.6: Proposed Landuse 1981                              Figure 5.6(a): Existing Landuse 1961

        Other departures from the proposed master plan measures include:

        •      As proposed the enhancement of existing CBD in MPD-81 did not take place.
               Connaught place & its extension and commercial areas in the walled city
               and its extension continues to function as CBD with all the associated
               problems of parking and traffic congestion etcl.
        •      As per MPD-81, all non-conforming uses were to be shifted in stages to
               conforming areas; but no areas with non confirming uses were shifted out.
        •      MPD-81 proposed industrial areas consisting mainly of flatted factories; light
               industries and extensive industries but no flatted factory area was
               developed except for Jhandewalan area.
        •      MPD-81 estimated around 20000 informal sector units in 1981 which is
               limited to 15%. Moreover plan did not contain any specific proposal for
               integration of unorganized sector in development schemes.
        •      MPD-81 targeted to construct government housing, Low cost housing and
               private housing as per details mentioned in Table 5.11. During the two
               decades, only 5.43 lakhs houses had been constructed against target of 7.47
               lakh.
        •      MPD-81 had proposed 15 district centres out of which only 3 had been
               developed in 1981 (Nehru Place; Rajendra Place and Bhikaji Cama Place.
        •      Two wholesale markets namely Fruit & Vegetable Market (Okhla) and Iron &
               Steel Market (Jhandewalan) had been shifted out up to 1981; and two cycle
               & truck accessories markets were partially shifted. Most of the other
               markets continued to grow further in the walled city creating, further
               congestion.

5.12.3 Master Plan for Delhi (1981-01)

        MPD-2001, was based on the basic premise of Balanced Regional Development,
        which emphasizes restrictive policy of employment generation. The main
        guidelines for this policy were: (i) only such new Central Government Offices
        which directly serve the Ministries of the Government of India be located in
        Delhi; (ii) Industrial Growth in Delhi be restricted to small scale and less labour
        intensive and (iii) Legal & Fiscal measures to restrict employment and
        distributive trade.

Client : Dept. of Urban Development, Govt. of Delhi                                                                                     5-18
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

        The MPD-2001 projected a population of 12.8 million by 2001 for the entire
        NCT. However, the plan recommended to restrict the population to 11 million
        in NCT and divert the remaining 0.2 million to selected towns in the NCR. The
        population of NCT was however 13.4 million in 2001 Refer Figure 5.8.

        (i)       Spatial Strategies

        The Master plan has come up with strategies for each of the constituents of the
        NCTD and DMA area. The proposed strategies as per Master Plan (1981-01) are
        presented in Table 5.15.

        Table 5.15: Proposed Activities as per Master Plan (1981-01)

              Constituent
                                                       Proposed Strategy
                 Area
          Acquisition of      •   24000 hectare of land to be acquired up to 2001
          Land and            •   Land development for residential purpose 12000 ha and
          Development             industrial purpose 1600 ha

                              •   Revitalization of Walled City keeping in view the traditional
                                  character and style of the buildings
                              •   Redevelopment of Sadar Bazaar wholesale market by provision
                                  of necessary infrastructure and parking areas
                              •   Prohibiting all heavy commercial vehicles in walled city area
          Walled City-
                              •   Cars not allowed inside the walled city areas with provision of
          Special Area
                                  underground parking at Lal Quila, Delhi Gate, Ajmeri Gate,
                                  Turkman Gate, Mori Gate and Purdah bagh
                              •   One way traffic on all the streets of walled city
                              •   Planning tools such as conservative surgery to be adopted for
                                  city upgradation
                              •   New Concept of Partially built plotted housing has been
                                  introduced. This involves partially built housing on individual
                                  plots of 70-80m2.
                              •   Cooperative formation in 600 unauthorized colonies for
          Residential             improvement of low level of physical & social infrastructure
                              •   Planned Development of Urban extension areas (Rohini, Dwarka
                                  and Narela)
                              •   Augmentation of housing at focused locations-Patparganj, Sarita
                                  Vihar and Vasant Kunj (4000 ha)
                              •   Existing CBDs-Old Wall City, Connaught Place and Karol Bagh two
                                  Sub CBDs, Proposed 2 Sub-CBDs (One in Trans Yamuna Area &
                                  other in the urban extension area)
                              •   Existing Five district centers; 22 new district centers proposed
                                  (14 in existing urban limits & 8 in the urban extensions)
          Commercial
                              •   It was proposed to develop four regional wholesale markets in
                                  different directions integrated with freight complexes.
                              •   11 regional cum local wholesale markets as secondary wholesale
                                  markets are proposed to be developed in different planning
                                  divisions.
                              •   Provision of Hostel accommodation for single; minimum 25% as
                                  site and Services and 45% housing up to 2 rooms dwellings for
          Slum                    about 1 lakh LIG families
          Improvement &       •   Infrastructure up gradation in 44 resettlement colonies and
          Redevelopment           provisions of income earning opportunities within or proximity of
                                  resettlement colonies
                              •   Provision of slum housing for 49000 families
          Industrial use      •   Industrial area redevelopment scheme for Anand Parbhat (Light

Client : Dept. of Urban Development, Govt. of Delhi                                          5-19
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

            Constituent
                                                            Proposed Strategy
               Area
                                    Industrial Area); Shahdara (Light Industrial Area) and Shampur
                                    Badli (Extensive Industrial Area)
                              •     Provision of 16 new light industrial areas (Total area of 1533 ha)
                                    was to be developed in urban industrial extensions (UIE). Each
                                    UIE upto 5 units of about 20 ha.
                              •     Provision of 1.6 km wide green belt beyond urbanisable limits
          Recreational
                              •     Provision of Divisional sport centres-7nos; District level children
          Area
                                    parks-11nos; Development of lakes-2nos
                              •     Five villages were identified as higher order growth centre-
                                    Bakhtwarpur; Bawana; Jharoda Kalan; Dhansa and Chawala. Six
          Plan for Rural            villages were identified as lower order growth centre- Jagatpur;
          Delhi                     Ghogha; Qutab Garh; Jaunti; Mitron; Gommanhera
                              •     Environment improvement of 120 villages and development of 11
                                    central villages
          Channelisation      •     Development of river front considering all ecological and
          of River                  scientific aspects as project of special significance for city
          Yamuna

        Table 5.16: Proposed Wholesale & Specialized Markets (2001)

                                                                                              Area in
               Market                                  Proposed Location
                                                                                              Hectare
          A. MARKET WITH WAREHOUSING
          Textile        &        Patparganj in east; Madanpur Khadar & Urban
                                                                                                70
          Textile Products        Extension in South; Urban Extension in South West
          Auto,      Motor
                                  Patparganj in east; Urban Extension in South; Urban
          Part           &                                                                      43
                                  Extension in South West
          Machinery
          Fruit        and
                                  Loni Road in east; Madanpur Khader & Urban Extension
          Vegetable                                                                             53
                                  in South; Urban Extension in South West
          Market
          Hardware     and        Patparganj & Loni Road in east; Madanpur Khader &
          Building                Urban Extension in South; Urban Extension in South            53
          Material                West
                                  Patparganj in east; Madanpur Khader & Urban
          Iron and Steel                                                                        25
                                  Extension in South; Urban Extension in South West
                                  Patparganj in east; Madanpur Khader in South;
          Food Grain                                                                            32
                                  Nazafgarh in South West
                                  Patparganj & Loni Road in east; Madanpur Khader &
          Timber                  Urban Extension in South; Urban Extension in South            112
                                  West
          Plastic Leather
                                  Patparganj in east and Urban Extension in South West          19
          and PVC
          Relocation   of
                                  Patparganj in east                                             4
          Junk Market
                                  Patparganj in east; Madanpur Khader & Urban
          Truck Terminal          Extension in South; Najafgarh & Urban Extension in            219
                                  South West
                                  Sub-CBD (Shahdara); Okhla; Rohtak Road District
                                  Centre; Shivaji Place District Centre in North; Wazirpur
          Regional    cum
                                  District Centre; Rohini District Centre; Markets of 8-        157
          local Markets
                                  10hectare in each urban extension and fodder markets
                                  was to be developed in the rural areas

Client : Dept. of Urban Development, Govt. of Delhi                                              5-20
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

                                                                                                         Area in
                 Market                                Proposed Location
                                                                                                         Hectare
             Integrated          Madanpur Khadar (NH-2); Patparganj (NH-24); GT Road
                                                                                                             -
             Freight Complex     (NH-1) and Bharthal (NH-8)
         Source: Compiled from Master Plan of Delhi-1981-01

         •     Review of Master Plan Proposals (1981-01)

         Proposals which have not been completed as per the directions of the Master
         Plan are presented below:

         o     As proposed the enhancement of existing CBD in MPD-01 did not take place.
               Connaught place & its extension, and commercial areas in the walled city
               and its extension continue to function as CBD with all the associated
               problem of parking and traffic congestion etc.

         o     District centres at Jhanakpuri; Laxminagar and Shivaji palace are still in
               process of development

         o     As per MPD-01, all non-conforming uses were to be shifted in stages to the
               conforming areas but no areas with non-conforming uses were shifted out.

         o     No provision of Hostel accommodation for single workers; or minimum 25%
               as site and Services and 45% housing up to 2 rooms dwellings for about 1
               lakh LIG families were made up to 2001

         o     Only 1 integrated freight complex at Gazipur is in development stage
               against the 4 proposed in MPD-01.

5.12.4 Draft Master Plan for Delhi (2001-21)

         The land use plan 2021 has been prepared based on (i) the policies enunciated
         for different urban activities; (ii) requirement of additional social and physical
         infrastructure; (iii) Transportation and work centres; (iv) restructuring of land
         uses along the MRTS corridors. In order to control development; the areas have
         been designated as one of the 27 use zones. These zones have been classified
         into 10 categories2 as shown in Figure 5.9.

         MPD-2021 projected a population of 23.0 million by 2021 for the entire NCT.
         However, the plan recommended accommodating 11.4 million people in zone A
         to H; and 3.9 million in Dwarka, Rohini phase-III, IV & V and Narela; and
         diverting the remaining 8.0 million in the planned new urban extensions. MPD-
         2021 is in draft stage the detailed provisions and development strategy
         suggested in the plan will be presented once it is finalized.

5.13     PROVISIONS OF NCR PLAN 2001 & 21

         Five towns were proposed in the Master Plan (2001-21) as DMA towns in the
         Delhi Metropolitan Area (DMA). These include Ghaziabad, Faridabad, Gurgaon,
         Kundli and Loni. A total of 3.5-lakh population was assigned by the Master Plan
         to these towns for the year 2011. Besides, specialized economic activities were

•
2
  The Landuse categories are Residential; Commercial; Industrial; Recreational; Regional Park/Ridge; Transportation;
Utility; Government; Public & Semi-Public Use; Agriculture and Water Bodies
Client : Dept. of Urban Development, Govt. of Delhi                                                          5-21
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

        proposed for each of these towns. A brief summary of the land use allocation
        strategies and provisions in NCR plan is discussed below:

                 Sectors                                 Recommendations
            Development of       •    DMA Towns: Faridbad, NOIDA, Ghaziabad, Kundli,
            New Townships             Bahadurgarh and Gurgaon
                                 •    Priorty Towns (Regional Centres): Palwal, Khurja, Hapur,
                                      Meerut, Bulandshar, Panipat, Rohtak, Dharuhera, Bhiwadi,
                                      Rewari, Alwar
                                 •    Counter Magnet Towns; Patiala (Punjab); Bareilly (Uttar
                                      Pradesh); Gwalior (Madhya Pradesh), Kota (Rajasthan), Hissar
                                      (Haryana)
                                 •    Sub- Regional Centre: Shikarpur; Philhua; Tijara; Khairthal;
                                      Bahror; Bawal; Hathin; Hodal; Jhajjar and Sonipat
            Development of       •    Development Proposals: Regional Road Links
            Transport Sector     •    Elevated Expressway on Ring Road
                                 •    Development Proposal-Regional Rail
            Industrial           •    Industrial Development through NCRPB assistance in Loni;
            Development               Faridabad; Kundli; Gurgaon; Meerut; Barhi; Panipat; Manesar;
                                      Bhiwadi; Bawal; Neemrana; Alwar

5.14    ISSUES IN LAND & GROWTH MANAGEMENT

        Some of the major issues emerge from the above analysis are presented below:

        •     Increasing gap between demand and supply of housing and
              infrastructure: The growth of unauthorized colonies and JJ clusters clearly
              indicate the housing status of the city. Consistently, targets for housing
              provision have not been met. Moreover, the poor have borne the brount of
              the shortfall. Overall, Around 5 lakh houses are to be constructed to fulfill
              past back logs, over and above the future demand of 20 lakh houses by
              2021.

        •     Over crowding, haphazard development without basic services: There are
              728 JJ clusters; 1700 unauthorized colonies and 165 urban villages
              accommodating around 60 lakh population. Of these, barely 25% of the
              population has access to physical infrastructure.

        •     Encroachments on agricultural land and urban villages: The urbanization
              area is expanding in an adhoc manner, often into the green area. Due to lax
              development regulations and control, rural areas are falling prey to
              unauthorized development. Original land owners have parceled their
              holdings and sold these at high prices to builders/developers. Urban villages
              have been over-run with haphazard developments

        •     Exploitation of Land for unauthorized development: Large portion of
              urban land in NCT is owned by government generally for public, community
              and government uses. Without programmed use and efforts for protection,
              these lands get easily encroached by both marginal groups and unregistered
              land speculators. This is further aggravated by insufficient official provision
              of land for various uses – be it residential, commercial or industrial.

        •     Non-Conforming Land uses: Around 1 lakh industries are located in non-
              conforming areas as per MPD. Efforts for relocation have failed due to the
Client : Dept. of Urban Development, Govt. of Delhi                                         5-22
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

             inaccessibility to work-centre of the relocation site; lack of infrastructure;
             security of tenure & assets and affordability of the owner.

        •    Lack of Linkage of Physical Planning Strategy with Financial Planning:
             Successful physical planning should respond to economic realities; and
             support broader financial goals and strategies for the city. The link between
             these aspects, while strong in the first Master Plan, seems to have
             weakened substantially in subsequent plans. Failure of implementation has
             aggravated the situation further.

                         Figure 5.7 : L A N D U S E M A P 1961 – 81

Client : Dept. of Urban Development, Govt. of Delhi                                       5-23
Consultant : IL&FS Ecosmart Limited
Chapter – 5 Land Management & Urban Growth

                       Figure 5.8 : L A N D U S E M A P 1981 - 2001

                          Figure 5.9 : L A N D U S E    M A P 2001-21
Client : Dept. of Urban Development, Govt. of Delhi                                        5-24
Consultant : IL&FS Ecosmart Limited